  "schema_version": 2,
  "generated_on": "2026-09-27",
  "title": "Track 3 public-web claim layer",
  "purpose": "Normalized claim-level representation of the public-web enrichment layer. Site-scoped records require an Epoch site ID; state/multi-site and explicit negative-capture records may remain unbound while retaining source provenance.",
  "accounting": {
    "claim_count": 454,
    "site_scoped_claim_count": 451,
    "unbound_public_claim_count": 3,
    "site_count": 93,
    "domain_counts": {
      "site_identity": 125,
      "capacity": 15,
      "grid_connection": 86,
      "ownership": 21,
      "construction": 53,
      "financing": 30,
      "regulatory": 18,
      "cooling": 20,
      "service_or_contract": 41,
      "compute_tenancy": 12,
      "operations": 5,
      "chip_inventory": 10,
      "power_telemetry": 1,
      "other": 17
    }
  },
  "claims": [
    {
      "claim_id": "EVID-PWEB-526ed33e720c3b8cf6e1",
      "epoch_id": "EPOCH-02484a65a5dac16d",
      "site_name": "QTS Richmond 3",
      "domain": "site_identity",
      "field": "address",
      "value": "3525, 3529, 3535, 3539, 3543 Portugee Road, Sandston, VA 23150",
      "relationship": "facility addresses",
      "source": "QTS",
      "source_urls": [
        "https://q.com/data-centers/richmond-3/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-526ed33e720c3b8cf6e1"
    },
    {
      "claim_id": "EVID-PWEB-8578a29bcda4eaf2c6a1",
      "epoch_id": "EPOCH-02484a65a5dac16d",
      "site_name": "QTS Richmond 3",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "240 MW planned on completion; 221 acres; five Freedom Design buildings",
      "relationship": "official facility capacity/site-plan disclosure",
      "source": "QTS",
      "source_urls": [
        "https://q.com/data-centers/richmond-3/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-8578a29bcda4eaf2c6a1"
    },
    {
      "claim_id": "EVID-PWEB-82e933ee9acb72d8cd5d",
      "epoch_id": "EPOCH-02484a65a5dac16d",
      "site_name": "QTS Richmond 3",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Dominion Energy Virginia",
      "relationship": "serving utility / grid",
      "source": "Dominion Energy; public utility registry",
      "source_urls": [
        "https://www.dominionenergy.com/-/media/content/about/power-line-projects/white-oak/pdfs/application-volume-3of3-part1of2-2023-white-oak.pdf"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-82e933ee9acb72d8cd5d"
    },
    {
      "claim_id": "EVID-PWEB-1c7f0ba2f2922a46731d",
      "epoch_id": "EPOCH-02484a65a5dac16d",
      "site_name": "QTS Richmond 3",
      "domain": "ownership",
      "field": "owner",
      "value": "QTS Data Centers",
      "relationship": "site operator",
      "source": "QTS; DEPLOY",
      "source_urls": [
        "https://q.com/data-centers/richmond-3/",
        "https://registry.deploy.report/datacenters/facilities/qts-richmond-3-sandston-va"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-1c7f0ba2f2922a46731d"
    },
    {
      "claim_id": "EVID-PWEB-5a9535ce",
      "epoch_id": "EPOCH-02484a65a5dac16d",
      "site_name": "QTS Richmond 3",
      "domain": "site_identity",
      "field": "project",
      "value": "Richmond 3 Data Center Campus",
      "relationship": "official campus/project identity",
      "source": "QTS",
      "source_urls": [
        "https://q.com/data-centers/richmond-3/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "QTS labels the site Richmond 3 and describes a 221-acre, five-building master-planned campus.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-5a9535ce"
    },
    {
      "claim_id": "EVID-PWEB-4cedc22c8b3a0bc3d4e5",
      "epoch_id": "EPOCH-02c050b6b554fadd",
      "site_name": "Meta Los Lunas",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Public Service Company of New Mexico (PNM)",
      "relationship": "serving / interconnecting utility",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/meta-los-lunas-new-mexico"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-4cedc22c8b3a0bc3d4e5"
    },
    {
      "claim_id": "EVID-PWEB-79c1a92a85eb2a85acab",
      "epoch_id": "EPOCH-0355f445ca6cbed4",
      "site_name": "Microsoft SAT14",
      "domain": "site_identity",
      "field": "address",
      "value": "3545 Wiseman Boulevard, San Antonio, TX 78251",
      "relationship": "facility address",
      "source": "Texas Department of Licensing and Regulation (TDLR)",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019142",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019588",
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2021019686"
      ],
      "publication_date": "2021-07-06",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-79c1a92a85eb2a85acab"
    },
    {
      "claim_id": "EVID-PWEB-c8ebb1e6ca081f71739a",
      "epoch_id": "EPOCH-0355f445ca6cbed4",
      "site_name": "Microsoft SAT14",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Page Southerland Page (Page)",
      "relationship": "design firm of record",
      "source": "TDLR",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019142",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019588",
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2021019686"
      ],
      "publication_date": "2021-07-06",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This is a design firm, not a general-contractor designation.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-c8ebb1e6ca081f71739a"
    },
    {
      "claim_id": "EVID-PWEB-cffc8a636100bcf12a31",
      "epoch_id": "EPOCH-0355f445ca6cbed4",
      "site_name": "Microsoft SAT14",
      "domain": "financing",
      "field": "investment",
      "value": "$154.9M Phase 1 + $26.8M Phase 2 + $31.3M Phase 3 + $27.2M Phase 4 estimated costs",
      "relationship": "TDLR registered construction values",
      "source": "TDLR",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019142",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019588",
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2021019686"
      ],
      "publication_date": "2021-07-06",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Permit/registered project values; not necessarily total facility capex and not external investment.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-cffc8a636100bcf12a31"
    },
    {
      "claim_id": "EVID-PWEB-543b4926dd8d2762e3a7",
      "epoch_id": "EPOCH-0355f445ca6cbed4",
      "site_name": "Microsoft SAT14",
      "domain": "site_identity",
      "field": "project",
      "value": [
        "SAT14 - Phase 1",
        "SAT14 - Phase 2",
        "SAT14 - Phase 3",
        "SAT14 - Phase 4"
      ],
      "relationship": "state-registered construction projects for SAT14 Data Center",
      "source": "TDLR",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019142",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019588",
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2021019686"
      ],
      "publication_date": "2021-07-06",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-543b4926dd8d2762e3a7"
    },
    {
      "claim_id": "EVID-PWEB-ed77439b6afaca2d1530",
      "epoch_id": "EPOCH-0355f445ca6cbed4",
      "site_name": "Microsoft SAT14",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "TDLR projects TABS2021019142, TABS2021019471, TABS2021019588, TABS2021019686; Phase 1 closed, Phases 2-4 inspection complete",
      "relationship": "Texas architectural-barriers construction record",
      "source": "TDLR",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019142",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019471",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2021019588",
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2021019686"
      ],
      "publication_date": "2021-07-06",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ed77439b6afaca2d1530"
    },
    {
      "claim_id": "EVID-PWEB-580a09a75a50aee3d6ac",
      "epoch_id": "EPOCH-03aad260b30bfbe1",
      "site_name": "AWS Berwick",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "PPL Electric Utilities / Talen Energy",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.sec.gov/Archives/edgar/data/1622536/000162828025038626/tln-20250630.htm"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-580a09a75a50aee3d6ac"
    },
    {
      "claim_id": "EVID-PWEB-KEMPAS-ADDR-20260927",
      "epoch_id": "EPOCH-04f65e1aee6c98ab",
      "site_name": "DayOne Kempas",
      "domain": "site_identity",
      "field": "address",
      "value": "81330, Jalan Kempas Lama, 81300 Johor, Malaysia",
      "relationship": "facility address",
      "source": "Data Center Map",
      "source_urls": [
        "https://www.datacentermap.com/malaysia/johor-bahru/dayone-kempas-tech-park/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Secondary facility directory publishes the DayOne Kempas Tech Park address; retained as site-location evidence, not a parcel survey.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-KEMPAS-ADDR-20260927"
    },
    {
      "claim_id": "EVID-PWEB-42ad0a0e6c5c92fb2afc",
      "epoch_id": "EPOCH-04f65e1aee6c98ab",
      "site_name": "DayOne Kempas",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Tenaga Nasional Berhad (TNB)",
      "relationship": "green-energy supply partnership",
      "source": "DayOne; CGS",
      "source_urls": [
        "https://dayonedc.com/about-us",
        "https://cdn1.i3investor.com/my/files/dfgs88n/2025/06/13/1570666695--882063151.pdf"
      ],
      "publication_date": "2025-06-12",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DayOne says it partnered with TNB on green-energy solutions; CGS describes a CRESS deal covering DayOne Johor campuses including Kempas.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-42ad0a0e6c5c92fb2afc"
    },
    {
      "claim_id": "EVID-PWEB-8f52c4fa2c701a1497ab",
      "epoch_id": "EPOCH-04f65e1aee6c98ab",
      "site_name": "DayOne Kempas",
      "domain": "financing",
      "field": "investors",
      "value": [
        "SoftBank Vision Fund",
        "Coatue Management",
        "Ken Griffin",
        "Baupost Group",
        "GIC"
      ],
      "relationship": "corporate financing/investment context",
      "source": "DayOne",
      "source_urls": [
        "https://dayonedc.com/about-us"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Investors are disclosed by DayOne at company/funding level; the source does not allocate a specific investor cheque to Kempas alone.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-8f52c4fa2c701a1497ab"
    },
    {
      "claim_id": "EVID-PWEB-c4a41af126be201db2ea",
      "epoch_id": "EPOCH-04f65e1aee6c98ab",
      "site_name": "DayOne Kempas",
      "domain": "ownership",
      "field": "owner",
      "value": "DayOne Data Centers",
      "relationship": "developer/operator",
      "source": "DayOne",
      "source_urls": [
        "https://dayonedc.com/about-us",
        "https://dayonedc.com/market/johor"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DayOne describes Kempas Tech Park as its second Malaysia data-center site.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-c4a41af126be201db2ea"
    },
    {
      "claim_id": "EVID-PWEB-KEMPAS-PROJECT-20260927",
      "epoch_id": "EPOCH-04f65e1aee6c98ab",
      "site_name": "DayOne Kempas",
      "domain": "site_identity",
      "field": "project",
      "value": "DayOne Kempas Tech Park",
      "relationship": "facility/project identity",
      "source": "Data Center Map",
      "source_urls": [
        "https://www.datacentermap.com/malaysia/johor-bahru/dayone-kempas-tech-park/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Secondary facility directory identifies the site as DayOne Kempas Tech Park and records its address.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-KEMPAS-PROJECT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-6ce5532357a6da647531",
      "epoch_id": "EPOCH-052be5b551cd099b",
      "site_name": "QTS Richmond 2",
      "domain": "site_identity",
      "field": "address",
      "value": "6030–6070 Technology Blvd, Sandston, VA 23150",
      "relationship": "facility addresses",
      "source": "QTS",
      "source_urls": [
        "https://q.com/data-centers/richmond-2/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-6ce5532357a6da647531"
    },
    {
      "claim_id": "EVID-PWEB-b78d6df8303a9f51d4e5",
      "epoch_id": "EPOCH-052be5b551cd099b",
      "site_name": "QTS Richmond 2",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "180 MW planned on completion; 85 acres; five planned buildings",
      "relationship": "official facility capacity/site-plan disclosure",
      "source": "QTS",
      "source_urls": [
        "https://q.com/data-centers/richmond-2/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b78d6df8303a9f51d4e5"
    },
    {
      "claim_id": "EVID-PWEB-2aa7c76b75b794572a7e",
      "epoch_id": "EPOCH-052be5b551cd099b",
      "site_name": "QTS Richmond 2",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Dominion Energy",
      "relationship": "energy partner / serving utility",
      "source": "Intel Accelerator",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": "2026-09-26",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-2aa7c76b75b794572a7e"
    },
    {
      "claim_id": "EVID-PWEB-49b077f337887d09731d",
      "epoch_id": "EPOCH-052be5b551cd099b",
      "site_name": "QTS Richmond 2",
      "domain": "ownership",
      "field": "owner",
      "value": "QTS Data Centers",
      "relationship": "site operator",
      "source": "QTS; DEPLOY",
      "source_urls": [
        "https://q.com/data-centers/richmond-2/",
        "https://registry.deploy.report/datacenters/facilities/qts-richmond-2-sandston-va"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-49b077f337887d09731d"
    },
    {
      "claim_id": "EVID-PWEB-d33c46da",
      "epoch_id": "EPOCH-052be5b551cd099b",
      "site_name": "QTS Richmond 2",
      "domain": "site_identity",
      "field": "project",
      "value": "Richmond 2 Data Center Campus",
      "relationship": "official campus/project identity",
      "source": "QTS",
      "source_urls": [
        "https://q.com/data-centers/richmond-2/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "QTS labels the site Richmond 2 and describes an 85-acre, five-building master-planned campus.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-d33c46da"
    },
    {
      "claim_id": "EVID-PWEB-77afb80162a975f14ae3",
      "epoch_id": "EPOCH-0788d9aeb3114553",
      "site_name": "Meta Montgomery",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Hensel Phelps"
      ],
      "relationship": "publicly identified construction/EPC partners",
      "source": "Intel Accelerator enrichment",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://datacenters.atmeta.com/asset/montgomery-data-center-info-sheet/"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Retained construction/EPC field from the enrichment registry; contractor role may be EPC, GC, or construction partner depending on source.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-77afb80162a975f14ae3"
    },
    {
      "claim_id": "EVID-PWEB-batch5-meta-montgomery-cons-1",
      "epoch_id": "EPOCH-0788d9aeb3114553",
      "site_name": "Meta Montgomery",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Hensel Phelps",
      "relationship": "construction partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/05/hello-montgomery/"
      ],
      "publication_date": "2024-05-16",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's Montgomery launch announcement directs construction information to Hensel Phelps and identifies it among project partners.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch5-meta-montgomery-cons-1"
    },
    {
      "claim_id": "EVID-PWEB-47184f25514ea7620179",
      "epoch_id": "EPOCH-0788d9aeb3114553",
      "site_name": "Meta Montgomery",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Alabama Power Company",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://datacenters.atmeta.com/asset/montgomery-data-center-info-sheet/"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-47184f25514ea7620179"
    },
    {
      "claim_id": "EVID-PWEB-batch6-meta-montgomery-ener-0",
      "epoch_id": "EPOCH-0788d9aeb3114553",
      "site_name": "Meta Montgomery",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Alabama Power Company",
      "relationship": "publicly identified energy partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/wp-content/uploads/2025/09/Meta-Montgomery-Data-Center.pdf"
      ],
      "publication_date": "2025-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's Montgomery fact sheet says it is working with local partners including Alabama Power Company to meet its 100% clean and renewable energy goal.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch6-meta-montgomery-ener-0"
    },
    {
      "claim_id": "EVID-PWEB-e056362af8cf21516c12",
      "epoch_id": "EPOCH-0788d9aeb3114553",
      "site_name": "Meta Montgomery",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Alabama Power",
      "relationship": "serving utility",
      "source": "DEPLOY / Alabama PSC public record",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/meta-alabama-montgomery",
        "https://www.pscpublicaccess.alabama.gov/pscpublicaccess/PSC/CommissionMeetingDetailsPage.aspx?meetingId=e818fcfc-459d-49d9-9dc1-0a674ff9164c"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Alabama PSC record also identifies Dotier LLC, a Meta subsidiary, in connection with Alabama Power renewable subscription projects for a Montgomery data center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-e056362af8cf21516c12"
    },
    {
      "claim_id": "EVID-PWEB-batch5-meta-montgomery-inve-0",
      "epoch_id": "EPOCH-0788d9aeb3114553",
      "site_name": "Meta Montgomery",
      "domain": "financing",
      "field": "investment",
      "value": "More than $1.5 billion",
      "relationship": "campus investment",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/"
      ],
      "publication_date": "2025-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta says the Montgomery campus expansion increased its investment to more than $1.5 billion.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch5-meta-montgomery-inve-0"
    },
    {
      "claim_id": "EVID-PWEB-94e579a3bb6cf816d187",
      "epoch_id": "EPOCH-0788d9aeb3114553",
      "site_name": "Meta Montgomery",
      "domain": "site_identity",
      "field": "project",
      "value": "Montgomery Data Center",
      "relationship": "official project name",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/"
      ],
      "publication_date": "2025-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-94e579a3bb6cf816d187"
    },
    {
      "claim_id": "EVID-PWEB-10bf34d334ad7615d205",
      "epoch_id": "EPOCH-0bb0b996b7c96beb",
      "site_name": "Meta Eagle Mountain",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Mortenson"
      ],
      "relationship": "publicly identified construction/EPC partners",
      "source": "Intel Accelerator enrichment",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://registry.deploy.report/datacenters/meta-eagle-mountain-utah"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Retained construction/EPC field from the enrichment registry; contractor role may be EPC, GC, or construction partner depending on source.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-10bf34d334ad7615d205"
    },
    {
      "claim_id": "EVID-PWEB-f45cb4e1bbe67b62d6fa",
      "epoch_id": "EPOCH-0bb0b996b7c96beb",
      "site_name": "Meta Eagle Mountain",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Mortenson",
      "relationship": "construction partner",
      "source": "Intel Accelerator",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": "2026-09-26",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-f45cb4e1bbe67b62d6fa"
    },
    {
      "claim_id": "EVID-PWEB-13a1ecf699566184c48c",
      "epoch_id": "EPOCH-0bb0b996b7c96beb",
      "site_name": "Meta Eagle Mountain",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Williams",
      "relationship": "energy partner / generation context",
      "source": "Intel Accelerator",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": "2026-09-26",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Energy-partner relationship from the enrichment registry; not necessarily the serving utility.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-13a1ecf699566184c48c"
    },
    {
      "claim_id": "EVID-PWEB-512f573b6e7da4251a25",
      "epoch_id": "EPOCH-0d287943c30fe239",
      "site_name": "Amazon Madison Mega Site",
      "domain": "site_identity",
      "field": "address",
      "value": "1978 Highway 22, Canton, MS 39046",
      "relationship": "facility address",
      "source": "Mississippi Department of Environmental Quality",
      "source_urls": [
        "https://opcgis.deq.state.ms.us/ensearchonline/ai_info.aspx?ai=86219"
      ],
      "publication_date": "2026-09-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-512f573b6e7da4251a25"
    },
    {
      "claim_id": "EVID-PWEB-38e148f5006fbe5d8328",
      "epoch_id": "EPOCH-0d287943c30fe239",
      "site_name": "Amazon Madison Mega Site",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Canton Municipal Utilities",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.datacenter.fyi/public-record/amazon-madison-mega-site-4fb34373"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-38e148f5006fbe5d8328"
    },
    {
      "claim_id": "EVID-PWEB-d7a5ccf2b9c6a2e74dc3",
      "epoch_id": "EPOCH-0d287943c30fe239",
      "site_name": "Amazon Madison Mega Site",
      "domain": "ownership",
      "field": "owner",
      "value": "Amazon Data Services Inc.",
      "relationship": "facility entity",
      "source": "Mississippi Department of Environmental Quality",
      "source_urls": [
        "https://opcgis.deq.state.ms.us/ensearchonline/ai_info.aspx?ai=86219"
      ],
      "publication_date": "2026-09-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-d7a5ccf2b9c6a2e74dc3"
    },
    {
      "claim_id": "EVID-PWEB-bc8d17d9ed47f64857de",
      "epoch_id": "EPOCH-0d287943c30fe239",
      "site_name": "Amazon Madison Mega Site",
      "domain": "site_identity",
      "field": "project",
      "value": "Project Rainier (site association)",
      "relationship": "project collaboration identity",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/amazon-madison-mega-site"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Epoch describes the site as likely part of the Anthropic–Amazon Project Rainier collaboration.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-bc8d17d9ed47f64857de"
    },
    {
      "claim_id": "EVID-PWEB-28603ca9e8de988b37f7",
      "epoch_id": "EPOCH-0d287943c30fe239",
      "site_name": "Amazon Madison Mega Site",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "Air-construction permit 1720-00098; public-comment modification dated 2026-08-24",
      "relationship": "Mississippi environmental permit record",
      "source": "Mississippi Department of Environmental Quality",
      "source_urls": [
        "https://opcgis.deq.state.ms.us/ensearchonline/ai_info.aspx?ai=86219"
      ],
      "publication_date": "2026-08-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-28603ca9e8de988b37f7"
    },
    {
      "claim_id": "EVID-PWEB-074efe7a39da5f8700fb",
      "epoch_id": "EPOCH-145ed5861bdf2982",
      "site_name": "OpenAI Stargate Michigan",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Related Digital",
      "relationship": "campus developer",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/expanding-stargate-to-michigan/"
      ],
      "publication_date": "2025-10-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "OpenAI calls Related Digital the developer; it is not necessarily the general contractor.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-074efe7a39da5f8700fb"
    },
    {
      "claim_id": "EVID-PWEB-7f6acbc5feed6cf9334f",
      "epoch_id": "EPOCH-145ed5861bdf2982",
      "site_name": "OpenAI Stargate Michigan",
      "domain": "cooling",
      "field": "cooling",
      "value": "Closed-loop cooling system",
      "relationship": "site cooling architecture",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/expanding-stargate-to-michigan/"
      ],
      "publication_date": "2025-10-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-7f6acbc5feed6cf9334f"
    },
    {
      "claim_id": "EVID-PWEB-a19f8ae363d3b152a147",
      "epoch_id": "EPOCH-145ed5861bdf2982",
      "site_name": "OpenAI Stargate Michigan",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "DTE Energy",
      "relationship": "serving utility / power partner",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/stargate-community/",
        "https://openai.com/index/expanding-stargate-to-michigan/"
      ],
      "publication_date": "2025-12-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a19f8ae363d3b152a147"
    },
    {
      "claim_id": "EVID-PWEB-MI-SVC-20260927",
      "epoch_id": "EPOCH-145ed5861bdf2982",
      "site_name": "OpenAI Stargate Michigan",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "OpenAI states DTE Energy will serve the Stargate Michigan campus using existing excess transmission capacity; any upgrades required for operations are to be funded by the project rather than local ratepayers.",
      "relationship": "utility service / project-funded grid support",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/expanding-stargate-to-michigan/"
      ],
      "publication_date": "2025-10-30",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Company statement about planned utility service; it is not a measured-load or executed service-contract record.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MI-SVC-20260927"
    },
    {
      "claim_id": "EVID-PWEB-69865e5bd63f154ce192",
      "epoch_id": "EPOCH-14cecdb5956daea1",
      "site_name": "Meta Cheyenne",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Goat Systems LLC",
      "relationship": "commissioning / contractor",
      "source": "Wyoming Public Media; public reporting",
      "source_urls": [
        "https://www.wyomingpublicmedia.org/natural-resources-energy/2026-07-21/meta-appeals-board-of-public-utilities-notice-of-violation-regarding-bacterial-contamination"
      ],
      "publication_date": "2026-07-21",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Source identifies Goat Systems as the contractor responsible for fill-and-flush operations at the site; this is not a claim that it is the site's general contractor.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-69865e5bd63f154ce192"
    },
    {
      "claim_id": "EVID-PWEB-a23ed8c8",
      "epoch_id": "EPOCH-14cecdb5956daea1",
      "site_name": "Meta Cheyenne",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Ralph L. Wadsworth Construction",
      "relationship": "earthwork and underground utilities subcontractor",
      "source": "Ralph L. Wadsworth Construction",
      "source_urls": [
        "https://www.wadsco.com/mission-critical-data-center/"
      ],
      "publication_date": "2025-03-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Wadsworth says it performed earthwork and underground utilities for the Meta Cheyenne Data Center Campus and participated in preconstruction.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a23ed8c8"
    },
    {
      "claim_id": "EVID-PWEB-meta-14cecdb5-cons-4",
      "epoch_id": "EPOCH-14cecdb5956daea1",
      "site_name": "Meta Cheyenne",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Fortis Construction",
      "relationship": "publicly identified construction partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/07/hello-cheyenne/"
      ],
      "publication_date": "2024-07-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official Cheyenne announcement directs construction information to Fortis Construction and names Fortis Construction among the project partners.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-meta-14cecdb5-cons-4"
    },
    {
      "claim_id": "EVID-PWEB-2d98b9b85d460c609518",
      "epoch_id": "EPOCH-14cecdb5956daea1",
      "site_name": "Meta Cheyenne",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Black Hills Energy",
      "relationship": "serving utility",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/meta-wyoming-cheyenne"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-2d98b9b85d460c609518"
    },
    {
      "claim_id": "EVID-PWEB-meta-14cecdb5-ener-5",
      "epoch_id": "EPOCH-14cecdb5956daea1",
      "site_name": "Meta Cheyenne",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Black Hills Energy",
      "relationship": "publicly identified energy/grid infrastructure partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/07/hello-cheyenne/"
      ],
      "publication_date": "2024-07-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official Cheyenne announcement says Meta will work with Black Hills Energy to add new resources to the grid, including renewables.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-meta-14cecdb5-ener-5"
    },
    {
      "claim_id": "EVID-PWEB-batch4-meta-cheyenne-inve-5",
      "epoch_id": "EPOCH-14cecdb5956daea1",
      "site_name": "Meta Cheyenne",
      "domain": "financing",
      "field": "investment",
      "value": "More than $800 million",
      "relationship": "owner investment commitment",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/07/hello-cheyenne/"
      ],
      "publication_date": "2024-07-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta says it has invested more than $800 million in its Cheyenne data center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch4-meta-cheyenne-inve-5"
    },
    {
      "claim_id": "EVID-PWEB-batch4-meta-cheyenne-proj-6",
      "epoch_id": "EPOCH-14cecdb5956daea1",
      "site_name": "Meta Cheyenne",
      "domain": "site_identity",
      "field": "project",
      "value": "Cheyenne Data Center",
      "relationship": "official project name",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/07/hello-cheyenne/"
      ],
      "publication_date": "2024-07-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official announcement identifies the facility as its Cheyenne Data Center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch4-meta-cheyenne-proj-6"
    },
    {
      "claim_id": "EVID-PWEB-d4d62ec3",
      "epoch_id": "EPOCH-14cecdb5956daea1",
      "site_name": "Meta Cheyenne",
      "domain": "site_identity",
      "field": "project",
      "value": "Meta Cheyenne Data Center Campus",
      "relationship": "official site/project identity",
      "source": "Meta Data Centers / Fortis Construction",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/07/hello-cheyenne/",
        "https://fortisconstruction.com/project/meta-cheyenne-campus/"
      ],
      "publication_date": "2024-07-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta identifies its Cheyenne Data Center as a 715,000-square-foot campus; the current Meta locations page reports a $1.2B investment and 2024 groundbreaking.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-d4d62ec3"
    },
    {
      "claim_id": "EVID-PWEB-batch2-meta-bowling-green-cons-2",
      "epoch_id": "EPOCH-177c53f92d72ec4a",
      "site_name": "Meta Bowling Green",
      "domain": "construction",
      "field": "construction_companies",
      "value": "JE Dunn Construction",
      "relationship": "publicly identified construction partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2025/04/hello-bowling-green/"
      ],
      "publication_date": "2025-04-09",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official Bowling Green announcement points to JE Dunn Construction for construction information and names JE Dunn among local/project partners.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch2-meta-bowling-green-cons-2"
    },
    {
      "claim_id": "EVID-PWEB-f75f9427793becb49de9",
      "epoch_id": "EPOCH-177c53f92d72ec4a",
      "site_name": "Meta Bowling Green",
      "domain": "construction",
      "field": "construction_companies",
      "value": "JE Dunn Construction",
      "relationship": "construction partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2025/04/hello-bowling-green/"
      ],
      "publication_date": "2025-04-09",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-f75f9427793becb49de9"
    },
    {
      "claim_id": "EVID-PWEB-a5e695d82f942fa98fa5",
      "epoch_id": "EPOCH-177c53f92d72ec4a",
      "site_name": "Meta Bowling Green",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Toledo Edison Company",
      "relationship": "energy planning / utility partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2025/04/hello-bowling-green/"
      ],
      "publication_date": "2025-04-09",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a5e695d82f942fa98fa5"
    },
    {
      "claim_id": "EVID-PWEB-batch2-meta-bowling-green-ener-3",
      "epoch_id": "EPOCH-177c53f92d72ec4a",
      "site_name": "Meta Bowling Green",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Toledo Edison Company",
      "relationship": "publicly identified energy partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2025/04/hello-bowling-green/"
      ],
      "publication_date": "2025-04-09",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official announcement says it worked closely with Toledo Edison from the beginning to plan for the site's energy needs.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch2-meta-bowling-green-ener-3"
    },
    {
      "claim_id": "EVID-PWEB-d94ed83a0336cbe81369",
      "epoch_id": "EPOCH-177c53f92d72ec4a",
      "site_name": "Meta Bowling Green",
      "domain": "financing",
      "field": "investment",
      "value": ">$800M",
      "relationship": "owner investment",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2025/04/hello-bowling-green/"
      ],
      "publication_date": "2025-04-09",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-d94ed83a0336cbe81369"
    },
    {
      "claim_id": "EVID-PWEB-2b19b137",
      "epoch_id": "EPOCH-1ac0959562dee191",
      "site_name": "Meta Jeffersonville",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Turner Construction",
      "relationship": "general contractor / construction management",
      "source": "HOCHTIEF / Turner Construction",
      "source_urls": [
        "https://www.hochtief.com/news-media/press-releases/press-release/hochtief-subsidiary-to-build-hyperscale-data-center-for-meta-in-the-us"
      ],
      "publication_date": "2024-01-26",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "HOCHTIEF states Turner was awarded the contract to manage construction of Meta's Jeffersonville data center campus and reports more than 1,250 construction workers at peak.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-2b19b137"
    },
    {
      "claim_id": "EVID-PWEB-bf7f3217",
      "epoch_id": "EPOCH-1ac0959562dee191",
      "site_name": "Meta Jeffersonville",
      "domain": "cooling",
      "field": "cooling",
      "value": "68 air-cooled chillers; modeled 229.8 MW cooling capacity",
      "relationship": "cooling equipment / Epoch AI model",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/meta-jeffersonville"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Epoch AI reports 68 air-cooled chillers with modeled 229.8 MW total cooling capacity. This is model-derived equipment information, not direct electrical telemetry.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-bf7f3217"
    },
    {
      "claim_id": "EVID-PWEB-acdce6db3e9cd70b9de9",
      "epoch_id": "EPOCH-1ac0959562dee191",
      "site_name": "Meta Jeffersonville",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Duke Energy Indiana",
      "relationship": "serving utility",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/meta-indiana-jeffersonville"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-acdce6db3e9cd70b9de9"
    },
    {
      "claim_id": "EVID-PWEB-batch2-meta-jeffersonville-ener-4",
      "epoch_id": "EPOCH-1ac0959562dee191",
      "site_name": "Meta Jeffersonville",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Duke Energy",
      "relationship": "publicly identified energy partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/wp-content/uploads/2024/10/Indiana-Jeffersonville.pdf"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's Jeffersonville fact sheet says Meta is working with local partners including Duke Energy to meet renewable-energy goals for the data center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch2-meta-jeffersonville-ener-4"
    },
    {
      "claim_id": "EVID-PWEB-2f0c7b3cadc3c5ed5d51",
      "epoch_id": "EPOCH-1ac0959562dee191",
      "site_name": "Meta Jeffersonville",
      "domain": "financing",
      "field": "investment",
      "value": "$800M+",
      "relationship": "owner investment",
      "source": "Meta Data Centers / DEPLOY",
      "source_urls": [
        "https://datacenters.atmeta.com/us-locations/",
        "https://registry.deploy.report/datacenters/facilities/meta-indiana-jeffersonville"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Owner investment, not an external investor.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-2f0c7b3cadc3c5ed5d51"
    },
    {
      "claim_id": "EVID-PWEB-ccbaede46e664f40334f",
      "epoch_id": "EPOCH-1ac0959562dee191",
      "site_name": "Meta Jeffersonville",
      "domain": "site_identity",
      "field": "project",
      "value": "Meta Jeffersonville Data Center",
      "relationship": "official facility identity",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/us-locations/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ccbaede46e664f40334f"
    },
    {
      "claim_id": "EVID-PWEB-facbce45d2f872beaa96",
      "epoch_id": "EPOCH-1b7cb9c2b0eb479f",
      "site_name": "Microsoft Narvik Norway",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "230 MW secured grid capacity at the Narvik/Kvandal site; more than 30,000 NVIDIA Rubin GPUs in Microsoft's expanded 2027 deployment",
      "relationship": "campus-level infrastructure commitment",
      "source": "Nscale; Aker Nscale",
      "source_urls": [
        "https://www.nscale.com/press-releases/nscale-microsoft-norway",
        "https://mb.cision.com/Public/18835/4261024/994c2d210bb66616.pdf"
      ],
      "publication_date": "2026-04-14",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Campus-level commitment; not a site-level current load measurement.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-facbce45d2f872beaa96"
    },
    {
      "claim_id": "EVID-PWEB-077232319f471c1ff75e",
      "epoch_id": "EPOCH-1b7cb9c2b0eb479f",
      "site_name": "Microsoft Narvik Norway",
      "domain": "site_identity",
      "field": "project",
      "value": "Nscale Narvik campus / Aker Nscale Northern Norway AI infrastructure",
      "relationship": "project/campus identity",
      "source": "Nscale; Microsoft; Aker Nscale",
      "source_urls": [
        "https://www.nscale.com/press-releases/nscale-microsoft-norway",
        "https://news.microsoft.com/source/emea/features/the-port-town-in-norway-emerging-as-an-ai-hub/",
        "https://mb.cision.com/Public/18835/4261024/994c2d210bb66616.pdf"
      ],
      "publication_date": "2026-04-14",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-077232319f471c1ff75e"
    },
    {
      "claim_id": "EVID-PWEB-NARVIK-SVC-20260927",
      "epoch_id": "EPOCH-1b7cb9c2b0eb479f",
      "site_name": "Microsoft Narvik Norway",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Microsoft identifies the Narvik/Kvandal site as selected for its access to hydropower and transmission infrastructure; public project material reports 230 MW of secured grid capacity for the site.",
      "relationship": "site grid-capacity context",
      "source": "Microsoft",
      "source_urls": [
        "https://www.microsoft.com/en-us/european-data-centre-region/norway/narvik"
      ],
      "publication_date": "2025-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Public project/grid context; exact contract and interval consumption remain unretained.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-NARVIK-SVC-20260927"
    },
    {
      "claim_id": "EVID-PWEB-566b0d5ea2c5c0b362c4",
      "epoch_id": "EPOCH-1b7cb9c2b0eb479f",
      "site_name": "Microsoft Narvik Norway",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "Microsoft",
      "relationship": "customer agreement / AI compute deployment",
      "source": "Nscale",
      "source_urls": [
        "https://www.nscale.com/press-releases/nscale-microsoft-norway",
        "https://news.microsoft.com/source/emea/features/the-port-town-in-norway-emerging-as-an-ai-hub/"
      ],
      "publication_date": "2026-04-14",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-566b0d5ea2c5c0b362c4"
    },
    {
      "claim_id": "EVID-PWEB-a1a98ca244c6c74e4784",
      "epoch_id": "EPOCH-1c8ee8b0305c6313",
      "site_name": "Google Council Bluffs (East)",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Cubico Sustainable Investments (renewable PPA counterparty)",
      "relationship": "renewable power procurement",
      "source": "Google Cloud",
      "source_urls": [
        "https://cloud.google.com/blog/topics/sustainability/new-power-purchasing-agreement-method-lands-1-gw-clean-energy"
      ],
      "publication_date": "2026-09-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This is a renewable PPA relationship and not necessarily the serving utility.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a1a98ca244c6c74e4784"
    },
    {
      "claim_id": "EVID-PWEB-6a1510be1b750a343499",
      "epoch_id": "EPOCH-27e284efc1b1abc2",
      "site_name": "Meta Huntsville",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Tennessee Valley Authority (TVA)",
      "relationship": "serving utility / power region",
      "source": "SUE Data Centers; Meta US locations",
      "source_urls": [
        "https://suedatacenters.org/data-centers/meta-huntsville-al",
        "https://datacenters.atmeta.com/us-locations/"
      ],
      "publication_date": "2026-09-21",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-6a1510be1b750a343499"
    },
    {
      "claim_id": "EVID-PWEB-batch5-meta-huntsville-inve-2",
      "epoch_id": "EPOCH-27e284efc1b1abc2",
      "site_name": "Meta Huntsville",
      "domain": "financing",
      "field": "investment",
      "value": "$1.5 billion+",
      "relationship": "data-center investment",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/wp-content/uploads/2025/02/Meta_s-Huntsville-Data-Center.pdf"
      ],
      "publication_date": "2025-02-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's Huntsville fact sheet states a $1.5B+ data center investment in Alabama.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch5-meta-huntsville-inve-2"
    },
    {
      "claim_id": "EVID-PWEB-ff34c3430e4839f9f382",
      "epoch_id": "EPOCH-27e284efc1b1abc2",
      "site_name": "Meta Huntsville",
      "domain": "financing",
      "field": "investment",
      "value": "$1.5B+",
      "relationship": "owner investment",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/us-locations/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ff34c3430e4839f9f382"
    },
    {
      "claim_id": "EVID-PWEB-anthropic-lakemariner-project-20260927",
      "epoch_id": "EPOCH-29fb769630142638",
      "site_name": "Anthropic Lake Mariner",
      "domain": "site_identity",
      "field": "project",
      "value": "Lake Mariner",
      "relationship": "public site/project identity",
      "source": "Core42",
      "source_urls": [
        "https://www.core42.ai/resources/news/core42-advances-u.s.-ai-infrastructure-strategy-with-expanded-new-york-deployment"
      ],
      "publication_date": "2026-06-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Core42 identifies Lake Mariner as its New York AI infrastructure site and describes expansion to 60 MW.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-anthropic-lakemariner-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-anthropic-lakemariner-service-20260927",
      "epoch_id": "EPOCH-29fb769630142638",
      "site_name": "Anthropic Lake Mariner",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Core42 announced a 42 MW expansion of AI production infrastructure at Lake Mariner, increasing Core42 capacity from 18 MW to 60 MW.",
      "relationship": "site-specific AI infrastructure deployment",
      "source": "Core42",
      "source_urls": [
        "https://www.core42.ai/resources/news/core42-advances-u.s.-ai-infrastructure-strategy-with-expanded-new-york-deployment"
      ],
      "publication_date": "2026-06-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Site-specific capacity/deployment evidence; does not establish a utility queue ID.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-anthropic-lakemariner-service-20260927"
    },
    {
      "claim_id": "EVID-PWEB-batch3-google-storey-county-cool-0",
      "epoch_id": "EPOCH-2b89e13933a04725",
      "site_name": "Google Storey County",
      "domain": "cooling",
      "field": "cooling",
      "value": "Primarily air-cooled",
      "relationship": "publicly identified cooling architecture",
      "source": "Google",
      "source_urls": [
        "https://economicimpact.google/state/nv/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Google's Nevada page says the Storey County campus is primarily air-cooled.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch3-google-storey-county-cool-0"
    },
    {
      "claim_id": "EVID-PWEB-070497b47a7822d8bc39",
      "epoch_id": "EPOCH-2b89e13933a04725",
      "site_name": "Google Storey County",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "NV Energy",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://edocs.puc.state.or.us/efdocs/HTB/um2377htb339000027.pdf"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-070497b47a7822d8bc39"
    },
    {
      "claim_id": "EVID-PWEB-b146f87d7394baa3ac2d",
      "epoch_id": "EPOCH-2b89e13933a04725",
      "site_name": "Google Storey County",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "NV Energy",
      "relationship": "serving utility",
      "source": "SUE Data Centers registry",
      "source_urls": [
        "https://suedatacenters.org/data-centers/google-storey-county-nv"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b146f87d7394baa3ac2d"
    },
    {
      "claim_id": "EVID-PWEB-pue-2025q4-google-storey-county",
      "epoch_id": "EPOCH-2b89e13933a04725",
      "site_name": "Google Storey County",
      "domain": "operations",
      "field": "operational_efficiency",
      "value": {
        "metric": "PUE",
        "value": 1.14,
        "period": "TTM PUE, Q4 2025"
      },
      "relationship": "published facility efficiency metric",
      "source": "Google Data Centers",
      "source_urls": [
        "https://www.datacenters.google/efficiency/"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "PUE is a facility-efficiency metric and is not an interval grid-load measurement or a direct estimate of AI compute power.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-pue-2025q4-google-storey-county"
    },
    {
      "claim_id": "EVID-PWEB-4819cf2363085445cc92",
      "epoch_id": "EPOCH-2c2e40ddb178da3e",
      "site_name": "OpenAI Stargate Abilene",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Mortenson"
      ],
      "relationship": "publicly identified construction/EPC partners",
      "source": "Intel Accelerator enrichment",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.interconnection.fyi/data-center/project/openai-stargate-abilene-82570d68"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Retained construction/EPC field from the enrichment registry; contractor role may be EPC, GC, or construction partner depending on source.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-4819cf2363085445cc92"
    },
    {
      "claim_id": "EVID-PWEB-3c20fb6f51c7a0c18608",
      "epoch_id": "EPOCH-2d362a1adb09fddd",
      "site_name": "CoreWeave Chester VA",
      "domain": "financing",
      "field": "investment",
      "value": "$200M facility fit-out financing",
      "relationship": "facility financing",
      "source": "Epoch AI citing Chirisa",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/coreweave-chester-va"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This is facility financing associated with Chirisa fit-out; not necessarily an equity investor in CoreWeave.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-3c20fb6f51c7a0c18608"
    },
    {
      "claim_id": "EVID-PWEB-batch6-google-cedar-rapids-oper-2",
      "epoch_id": "EPOCH-2d6a8403fde79650",
      "site_name": "Google Cedar Rapids",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "In development",
      "relationship": "official current development status",
      "source": "Google Data Centers",
      "source_urls": [
        "https://www.datacenters.google/locations/iowa/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Google's Iowa location page describes the Cedar Rapids facility as a new data center campus announced in 2025 and still under development.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch6-google-cedar-rapids-oper-2"
    },
    {
      "claim_id": "EVID-PWEB-ece9be5300710ff90525",
      "epoch_id": "EPOCH-2d6a8403fde79650",
      "site_name": "Google Cedar Rapids",
      "domain": "site_identity",
      "field": "project",
      "value": "Google Cedar Rapids data center",
      "relationship": "official project identity",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/iowa/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ece9be5300710ff90525"
    },
    {
      "claim_id": "EVID-PWEB-colossus1-project-20260927",
      "epoch_id": "EPOCH-2dadeb4b013bef05",
      "site_name": "Colossus 1",
      "domain": "site_identity",
      "field": "project",
      "value": "Colossus 1",
      "relationship": "public project identity",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/colossus-1"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Epoch AI identifies the Memphis facility as Colossus 1.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-colossus1-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-colossus1-reg-20260927",
      "epoch_id": "EPOCH-2dadeb4b013bef05",
      "site_name": "Colossus 1",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "Shelby County Air Permit 01156-01PC; permit issued July 2, 2025 and appeal history retained in public record.",
      "relationship": "air-permit / regulatory record",
      "source": "Compute Atlas",
      "source_urls": [
        "https://www.compute-atlas.com/facilities/xai-colossus-1-turbines-memphis-tn"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Site-specific regulatory permit and appeal history; not a measurement of current emissions or load.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-colossus1-reg-20260927"
    },
    {
      "claim_id": "EVID-PWEB-jupiter-bloom-20260927",
      "epoch_id": "EPOCH-3816121e8d72fe04",
      "site_name": "OpenAI Stargate New Mexico",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Bloom Energy",
      "relationship": "onsite fuel-cell power provider",
      "source": "Oracle",
      "source_urls": [
        "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/"
      ],
      "publication_date": "2026-04-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Oracle states Project Jupiter will use Bloom Energy fuel cells with up to 2.45 GW of installed fuel-cell capacity; this is an onsite power relationship, not a transmission queue ID.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-jupiter-bloom-20260927"
    },
    {
      "claim_id": "EVID-PWEB-jupiter-project-20260927",
      "epoch_id": "EPOCH-3816121e8d72fe04",
      "site_name": "OpenAI Stargate New Mexico",
      "domain": "site_identity",
      "field": "project",
      "value": "Project Jupiter",
      "relationship": "public project identity",
      "source": "Oracle",
      "source_urls": [
        "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/"
      ],
      "publication_date": "2026-04-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Oracle identifies Project Jupiter as its AI data center campus in Doña Ana County, New Mexico.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-jupiter-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-jupiter-reg-20260927",
      "epoch_id": "EPOCH-3816121e8d72fe04",
      "site_name": "OpenAI Stargate New Mexico",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "Updated Project Jupiter air-quality permit application entered public review in 2026.",
      "relationship": "air-quality permitting",
      "source": "Oracle / New Mexico environmental review",
      "source_urls": [
        "https://www.oracle.com/news/announcement/public-review-opens-for-updated-project-jupiter-power-plan-2026-06-03/"
      ],
      "publication_date": "2026-06-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Oracle reports the New Mexico Environment Department deemed the updated permit application complete and moved it into public review; retained as process evidence, not an outcome judgment.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-jupiter-reg-20260927"
    },
    {
      "claim_id": "EVID-PWEB-3d510e20286cc58846b9",
      "epoch_id": "EPOCH-40ccef8ef4236635",
      "site_name": "Google The Dalles",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Northern Wasco County PUD / BPA",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://registry.deploy.report/datacenters/facilities/google-the-dalles-or"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-3d510e20286cc58846b9"
    },
    {
      "claim_id": "EVID-PWEB-pue-2025q4-google-the-dalles",
      "epoch_id": "EPOCH-40ccef8ef4236635",
      "site_name": "Google The Dalles",
      "domain": "operations",
      "field": "operational_efficiency",
      "value": {
        "metric": "PUE",
        "value": 1.1,
        "period": "TTM PUE, Q4 2025"
      },
      "relationship": "published facility efficiency metric",
      "source": "Google Data Centers",
      "source_urls": [
        "https://www.datacenters.google/efficiency/"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "PUE is a facility-efficiency metric and is not an interval grid-load measurement or a direct estimate of AI compute power.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-pue-2025q4-google-the-dalles"
    },
    {
      "claim_id": "EVID-PWEB-mantsala-project-20260927",
      "epoch_id": "EPOCH-41dea3fb46d2e6a8",
      "site_name": "Nebius Mantsala",
      "domain": "site_identity",
      "field": "project",
      "value": "Mäntsälä AI data center",
      "relationship": "public project identity",
      "source": "Nebius",
      "source_urls": [
        "https://nebius.com/newsroom/nebius-to-construct-310-mw-ai-factory-in-finland"
      ],
      "publication_date": "2026-03-31",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Nebius says its first Finnish data center in Mäntsälä was expanded to 75 MW, completed earlier in 2026.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-mantsala-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-581a24b694d7303a82aa",
      "epoch_id": "EPOCH-4525348d114e3e8e",
      "site_name": "Google Papillion",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Omaha Public Power District",
      "relationship": "serving utility",
      "source": "OPPD",
      "source_urls": [
        "https://www.oppd.com/media/316613/neomaha01a-pos-2019.pdf"
      ],
      "publication_date": "2019-10-04",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "OPPD public filing states Google announced a data center in Papillion within the district's service territory.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-581a24b694d7303a82aa"
    },
    {
      "claim_id": "EVID-PWEB-pue-2025q4-google-papillion",
      "epoch_id": "EPOCH-4525348d114e3e8e",
      "site_name": "Google Papillion",
      "domain": "operations",
      "field": "operational_efficiency",
      "value": {
        "metric": "PUE",
        "value": 1.09,
        "period": "TTM PUE, Q4 2025"
      },
      "relationship": "published facility efficiency metric",
      "source": "Google Data Centers",
      "source_urls": [
        "https://www.datacenters.google/efficiency/"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "PUE is a facility-efficiency metric and is not an interval grid-load measurement or a direct estimate of AI compute power.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-pue-2025q4-google-papillion"
    },
    {
      "claim_id": "EVID-PWEB-81f984a7d8ac33658a32",
      "epoch_id": "EPOCH-4525348d114e3e8e",
      "site_name": "Google Papillion",
      "domain": "site_identity",
      "field": "project",
      "value": "Google Papillion data center",
      "relationship": "project name",
      "source": "Google; OPPD",
      "source_urls": [
        "https://www.datacenters.google/locations/nebraska/",
        "https://www.oppd.com/media/316613/neomaha01a-pos-2019.pdf"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-81f984a7d8ac33658a32"
    },
    {
      "claim_id": "EVID-PWEB-431c25955a31c73d3d6a",
      "epoch_id": "EPOCH-4569f5444951b2fd",
      "site_name": "Crusoe Abilene Expansion",
      "domain": "cooling",
      "field": "cooling",
      "value": "Closed-loop non-evaporative liquid cooling",
      "relationship": "site cooling architecture",
      "source": "Crusoe",
      "source_urls": [
        "https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure"
      ],
      "publication_date": "2026-03-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-431c25955a31c73d3d6a"
    },
    {
      "claim_id": "EVID-PWEB-9466d72bd4facffacd5d",
      "epoch_id": "EPOCH-4569f5444951b2fd",
      "site_name": "Crusoe Abilene Expansion",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Crusoe onsite power generation",
      "relationship": "behind-the-meter power infrastructure",
      "source": "Crusoe",
      "source_urls": [
        "https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure"
      ],
      "publication_date": "2026-03-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-9466d72bd4facffacd5d"
    },
    {
      "claim_id": "EVID-PWEB-0955311b1521831b62c4",
      "epoch_id": "EPOCH-4569f5444951b2fd",
      "site_name": "Crusoe Abilene Expansion",
      "domain": "site_identity",
      "field": "project",
      "value": "New 900 MW AI Factory Campus / Abilene expansion",
      "relationship": "project identity",
      "source": "Crusoe",
      "source_urls": [
        "https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure"
      ],
      "publication_date": "2026-03-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-0955311b1521831b62c4"
    },
    {
      "claim_id": "EVID-PWEB-1a1354a5109b99301d83",
      "epoch_id": "EPOCH-4569f5444951b2fd",
      "site_name": "Crusoe Abilene Expansion",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "Microsoft",
      "relationship": "AI infrastructure customer / intended user",
      "source": "Crusoe",
      "source_urls": [
        "https://www.crusoe.ai/resources/newsroom/crusoe-announces-new-900-mw-ai-factory-campus-in-abilene-texas-to-support-microsoft-ai-infrastructure"
      ],
      "publication_date": "2026-03-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-1a1354a5109b99301d83"
    },
    {
      "claim_id": "EVID-PWEB-NC-ADDR-20260927",
      "epoch_id": "EPOCH-45b3c74314eb1f26",
      "site_name": "Anthropic-Amazon New Carlisle",
      "domain": "site_identity",
      "field": "address",
      "value": "55001 Larrison Blvd., New Carlisle, Indiana 46552",
      "relationship": "site address",
      "source": "Indiana Department of Environmental Management",
      "source_urls": [
        "https://ecm.idem.in.gov/cs/idcplg?IdcService=GET_FILE&dDocName=83736344&dID=83732301"
      ],
      "publication_date": "2025-11-21",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Exact address retained in the public environmental permit record.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-NC-ADDR-20260927"
    },
    {
      "claim_id": "EVID-PWEB-d9e3b672caa7ef536e27",
      "epoch_id": "EPOCH-45b3c74314eb1f26",
      "site_name": "Anthropic-Amazon New Carlisle",
      "domain": "chip_inventory",
      "field": "chip_quantities",
      "value": "Nearly 500,000 Trainium2 chips in Project Rainier; Amazon states more than 1 million Trainium2 chips for Anthropic by end-2025",
      "relationship": "AI accelerator deployment",
      "source": "Amazon",
      "source_urls": [
        "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster"
      ],
      "publication_date": "2025-10-29",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Project Rainier spans multiple U.S. data centers; the nearly-500k figure is project-level, not necessarily all at New Carlisle.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-d9e3b672caa7ef536e27"
    },
    {
      "claim_id": "EVID-PWEB-795cad129f466f0ee91a",
      "epoch_id": "EPOCH-45b3c74314eb1f26",
      "site_name": "Anthropic-Amazon New Carlisle",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Walbridge",
        "Clayco",
        "Ryan Companies",
        "Angelo Iafrate"
      ],
      "relationship": "general contractors for Project Rainier campus build-out",
      "source": "Measured AI",
      "source_urls": [
        "https://measuredai.substack.com/p/aws-new-carlisle-data-center-campus"
      ],
      "publication_date": "2026-07-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Four general contractors identified by the cited reconstruction; this is construction-partner evidence, not investor evidence.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-795cad129f466f0ee91a"
    },
    {
      "claim_id": "EVID-PWEB-879609a8313f5f511a25",
      "epoch_id": "EPOCH-45b3c74314eb1f26",
      "site_name": "Anthropic-Amazon New Carlisle",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Indiana Michigan Power (AEP)",
      "relationship": "site-level utility relationship for Project Rainier",
      "source": "Intel Accelerator / Compute Atlas",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-879609a8313f5f511a25"
    },
    {
      "claim_id": "EVID-PWEB-4d19f94f0e7900a83b55",
      "epoch_id": "EPOCH-45b3c74314eb1f26",
      "site_name": "Anthropic-Amazon New Carlisle",
      "domain": "financing",
      "field": "investment",
      "value": "Approximately $11B",
      "relationship": "campus investment",
      "source": "Amazon / CNBC / KDC",
      "source_urls": [
        "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster",
        "https://kdc.bussetech.com/sites/aws-new-carlisle/"
      ],
      "publication_date": "2025-10-29",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Project investment; not external investor capital.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-4d19f94f0e7900a83b55"
    },
    {
      "claim_id": "EVID-PWEB-30dbba1435ed6df94fd8",
      "epoch_id": "EPOCH-45b3c74314eb1f26",
      "site_name": "Anthropic-Amazon New Carlisle",
      "domain": "site_identity",
      "field": "project",
      "value": "Project Rainier",
      "relationship": "public program identity",
      "source": "Intel Accelerator",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-30dbba1435ed6df94fd8"
    },
    {
      "claim_id": "EVID-PWEB-NC-REG-20260927",
      "epoch_id": "EPOCH-45b3c74314eb1f26",
      "site_name": "Anthropic-Amazon New Carlisle",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "Indiana Part 70 operating permit T141-47750-00642 for Amazon Data Services, Inc., 55001 Larrison Blvd., New Carlisle, Indiana 46552.",
      "relationship": "site-specific environmental permit",
      "source": "Indiana Department of Environmental Management",
      "source_urls": [
        "https://ecm.idem.in.gov/cs/idcplg?IdcService=GET_FILE&dDocName=83736344&dID=83732301"
      ],
      "publication_date": "2025-11-21",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Government permit record; establishes a site-specific regulated facility record, not current AI compute operation.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-NC-REG-20260927"
    },
    {
      "claim_id": "EVID-PWEB-xai-qts-address-20260927",
      "epoch_id": "EPOCH-495a9afde5e4b96c",
      "site_name": "xAI QTS Atlanta",
      "domain": "site_identity",
      "field": "address",
      "value": "1025 Jefferson St NW, Atlanta, GA 30318",
      "relationship": "building address",
      "source": "QTS Data Centers",
      "source_urls": [
        "https://q.com/data-centers/atlanta-1/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "QTS lists DC2 at 1025 Jefferson St NW; facility tracking ties the same address to xAI's Atlanta cluster.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-xai-qts-address-20260927"
    },
    {
      "claim_id": "EVID-PWEB-xai-qts-georgiapower-20260927",
      "epoch_id": "EPOCH-495a9afde5e4b96c",
      "site_name": "xAI QTS Atlanta",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Georgia Power",
      "relationship": "campus substation infrastructure provider",
      "source": "QTS Data Centers",
      "source_urls": [
        "https://q.com/data-centers/atlanta-1/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "QTS says Atlanta 1 has dedicated onsite, expandable Georgia Power substations; this is campus-level infrastructure evidence, not a metered xAI supply allocation.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-xai-qts-georgiapower-20260927"
    },
    {
      "claim_id": "EVID-PWEB-xai-qts-project-20260927",
      "epoch_id": "EPOCH-495a9afde5e4b96c",
      "site_name": "xAI QTS Atlanta",
      "domain": "site_identity",
      "field": "project",
      "value": "Atlanta 1 DC2",
      "relationship": "building/project identity",
      "source": "QTS Data Centers",
      "source_urls": [
        "https://q.com/data-centers/atlanta-1/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "QTS identifies DC2 at 1025 Jefferson St NW as part of the Atlanta 1 campus.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-xai-qts-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-xai-qts-user-20260927",
      "epoch_id": "EPOCH-495a9afde5e4b96c",
      "site_name": "xAI QTS Atlanta",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "SpaceXAI",
      "relationship": "AI compute user",
      "source": "Epoch AI / facility tracking",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/xai-qts-atlanta",
        "https://gpuquant.com/facilities/qts-atlanta-1-dc2"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Epoch AI identifies SpaceXAI as the owner and user; GPUQuant identifies xAI compute at the same 1025 Jefferson building.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-xai-qts-user-20260927"
    },
    {
      "claim_id": "EVID-PWEB-3ca9f8d6",
      "epoch_id": "EPOCH-4a87099a6d1e001f",
      "site_name": "Amazon Ridgeland",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Hemphill Construction Co. Inc.",
      "relationship": "prime contractor for Project Atlas infrastructure and utility improvements",
      "source": "Mississippi Department of Environmental Quality (LCNOI)",
      "source_urls": [
        "https://opc.deq.state.ms.us/get_doc.aspx?dt=pdf&id=1781710"
      ],
      "publication_date": "2025-04-30",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The Mississippi filing names Hemphill Construction Co. Inc. as prime contractor and Amazon Data Services as owner for the stated site project at W County Line Road.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-3ca9f8d6"
    },
    {
      "claim_id": "EVID-PWEB-5f8337fa",
      "epoch_id": "EPOCH-4a87099a6d1e001f",
      "site_name": "Amazon Ridgeland",
      "domain": "site_identity",
      "field": "project",
      "value": "Project Atlas - Infrastructure and Utility Improvements",
      "relationship": "named site/infrastructure project in Mississippi permit filing",
      "source": "Mississippi Department of Environmental Quality (LCNOI)",
      "source_urls": [
        "https://opc.deq.state.ms.us/get_doc.aspx?dt=pdf&id=1781710"
      ],
      "publication_date": "2025-04-30",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The filing identifies Amazon Data Services as owner and names the facility site as Project Atlas - Infrastructure and Utility Improvements at W County Line Road, Ridgeland, MS. This is an associated infrastructure/utility project record, not a claim about the entire data-center campus.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-5f8337fa"
    },
    {
      "claim_id": "EVID-PWEB-e33f00a5e97863991d83",
      "epoch_id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "domain": "cooling",
      "field": "cooling",
      "value": "Closed-loop cooling; approximately 600,000-gallon one-time fill per building plus modest domestic use",
      "relationship": "site cooling architecture",
      "source": "SUE Data Centers",
      "source_urls": [
        "https://suedatacenters.org/data-centers/qts-eagle-mountain-ut"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-e33f00a5e97863991d83"
    },
    {
      "claim_id": "EVID-PWEB-08039b9661e0211982aa",
      "epoch_id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Rocky Mountain Power (PacifiCorp)",
      "relationship": "serving utility",
      "source": "DEPLOY / SUE Data Centers",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/qts-eagle-mountain-eagle-mountain-ut",
        "https://suedatacenters.org/data-centers/qts-eagle-mountain-ut"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-08039b9661e0211982aa"
    },
    {
      "claim_id": "EVID-PWEB-789cf694de56ab9dfc06",
      "epoch_id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Rocky Mountain Power",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://registry.deploy.report/datacenters/facilities/qts-eagle-mountain-eagle-mountain-ut"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-789cf694de56ab9dfc06"
    },
    {
      "claim_id": "EVID-PWEB-646cdad7d66b0c235056",
      "epoch_id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "domain": "financing",
      "field": "investment",
      "value": "Sweetwater #3 community-reinvestment tax-increment financing; first-phase increment projected at about $98.86M",
      "relationship": "public-development financing context",
      "source": "SUE Data Centers / Eagle Mountain City RDA",
      "source_urls": [
        "https://suedatacenters.org/data-centers/qts-eagle-mountain-ut"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Public development financing context; not project equity investment.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-646cdad7d66b0c235056"
    },
    {
      "claim_id": "EVID-PWEB-62d9cbbdd3656b3fc343",
      "epoch_id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "domain": "ownership",
      "field": "owner",
      "value": "QTS Data Centers",
      "relationship": "operator/developer",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/qts-eagle-mountain-eagle-mountain-ut"
      ],
      "publication_date": "2026-09-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-62d9cbbdd3656b3fc343"
    },
    {
      "claim_id": "EVID-PWEB-54c8d865f70dcf9e6b95",
      "epoch_id": "EPOCH-4b5df4f52274f2ba",
      "site_name": "Meta Sarpy",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Omaha Public Power District",
      "relationship": "serving utility",
      "source": "DEPLOY; Meta Data Centers",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/meta-nebraska-sarpy",
        "https://datacenters.atmeta.com/2021/03/sarpy-expanding-by-nearly-1-million-square-feet/"
      ],
      "publication_date": "2021-03-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-54c8d865f70dcf9e6b95"
    },
    {
      "claim_id": "EVID-PWEB-c8c1f13474b2f3b6547f",
      "epoch_id": "EPOCH-4b5df4f52274f2ba",
      "site_name": "Meta Sarpy",
      "domain": "financing",
      "field": "investment",
      "value": "$2.5B+",
      "relationship": "owner investment",
      "source": "Meta Data Centers / current US locations",
      "source_urls": [
        "https://datacenters.atmeta.com/us-locations/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Current Meta location page states $2.5B+ investment; owner investment is not treated as an external investor.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-c8c1f13474b2f3b6547f"
    },
    {
      "claim_id": "EVID-PWEB-pue-2025q4-google-omaha",
      "epoch_id": "EPOCH-4eeccbee73808216",
      "site_name": "Google Omaha",
      "domain": "operations",
      "field": "operational_efficiency",
      "value": {
        "metric": "PUE",
        "value": 1.05,
        "period": "TTM PUE, Q4 2025"
      },
      "relationship": "published facility efficiency metric",
      "source": "Google Data Centers",
      "source_urls": [
        "https://www.datacenters.google/efficiency/"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "PUE is a facility-efficiency metric and is not an interval grid-load measurement or a direct estimate of AI compute power.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-pue-2025q4-google-omaha"
    },
    {
      "claim_id": "EVID-PWEB-1aa0b50300ab9bc5ce29",
      "epoch_id": "EPOCH-4eeccbee73808216",
      "site_name": "Google Omaha",
      "domain": "site_identity",
      "field": "project",
      "value": "Google Omaha data center",
      "relationship": "project name",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/nebraska/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-1aa0b50300ab9bc5ce29"
    },
    {
      "claim_id": "EVID-PWEB-497cf015b7ceea5d8328",
      "epoch_id": "EPOCH-534376160415dc84",
      "site_name": "Microsoft Project Osmium",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "MISO",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://cdn.misoenergy.org/NEW%20LOAD%20ANNOUNCEMENTS%20IN%20MISO%20REGIONS%2012062024684954.pdf"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-497cf015b7ceea5d8328"
    },
    {
      "claim_id": "EVID-PWEB-f750a95c94d0f4d8767b",
      "epoch_id": "EPOCH-55d4b5e818b5bb2a",
      "site_name": "DayOne Nusajaya",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Tenaga Nasional Berhad (TNB)",
      "relationship": "green-energy supply partnership",
      "source": "DayOne; CGS",
      "source_urls": [
        "https://dayonedc.com/about-us",
        "https://cdn1.i3investor.com/my/files/dfgs88n/2025/06/13/1570666695--882063151.pdf"
      ],
      "publication_date": "2025-06-12",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-f750a95c94d0f4d8767b"
    },
    {
      "claim_id": "EVID-PWEB-dc1661b47803e8a54fd8",
      "epoch_id": "EPOCH-55d4b5e818b5bb2a",
      "site_name": "DayOne Nusajaya",
      "domain": "ownership",
      "field": "owner",
      "value": "DayOne Data Centers",
      "relationship": "developer/operator",
      "source": "DayOne",
      "source_urls": [
        "https://dayonedc.com/about-us",
        "https://dayonedc.com/market/johor"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-dc1661b47803e8a54fd8"
    },
    {
      "claim_id": "EVID-PWEB-barberlake-project-20260927",
      "epoch_id": "EPOCH-5b05fa7b682be282",
      "site_name": "Anthropic Barber Lake",
      "domain": "site_identity",
      "field": "project",
      "value": "Barber Lake Facility",
      "relationship": "public facility/project identity",
      "source": "Cipher Digital / U.S. SEC",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/cifr-20260924.htm"
      ],
      "publication_date": "2026-09-25",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Cipher's September 2026 SEC filing identifies the Barber Lake Facility in Colorado City, Texas and describes an amended lease and updated delivery schedule.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-barberlake-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-barberlake-contract-20260927",
      "epoch_id": "EPOCH-5b05fa7b682be282",
      "site_name": "Anthropic Barber Lake",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Barber Lake is under a 20-year contracted lease structure: the existing Fluidstack lease followed by a 10-year commitment from a leading AI lab; first data halls expected Q4 2026 through Q1 2027.",
      "relationship": "site-specific long-term lease / AI capacity commitment",
      "source": "Cipher Digital / U.S. SEC",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/cifr-20260924.htm",
        "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/barberlakeleaseamendmentpr.htm"
      ],
      "publication_date": "2026-09-25",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The filing identifies Fluidstack and a subsequent leading-AI-lab commitment but does not name the latter in the public filing; no tenant identity is inferred here.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-barberlake-contract-20260927"
    },
    {
      "claim_id": "EVID-PWEB-3e934e57c3657e06c062",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "Third-party observed series reached 333 MW IT power and ~324k H100-eq by Jan-May 2026",
      "relationship": "site-scale modeled physical estimate",
      "source": "Samaritan Research",
      "source_urls": [
        "https://samaritan-research.org/data/ai-data-centers/directory/google-new-albany"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Modeled from imagery/cooling/chip and land-use evidence; not a measured interval load.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-3e934e57c3657e06c062"
    },
    {
      "claim_id": "EVID-PWEB-68efb31e5ccccfd2dceb",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "600 MW campus utility-feed figure reported by Data Center Search",
      "relationship": "third-party facility capacity context",
      "source": "Data Center Search",
      "source_urls": [
        "https://datacentersearch.org/sites/google-new-albany"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Third-party modeled/compiled campus figure; not treated as official utility-deliverable capacity or measured IT load.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-68efb31e5ccccfd2dceb"
    },
    {
      "claim_id": "EVID-PWEB-0769f2060169f95d4211",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "chip_inventory",
      "field": "chip_quantities",
      "value": "Google TPU v5e, TPU v5p, TPU v6e (type presence; quantity not published by source)",
      "relationship": "site accelerator inventory type",
      "source": "Samaritan Research",
      "source_urls": [
        "https://samaritan-research.org/data/ai-data-centers/directory/google-new-albany"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Source estimates chip types but does not establish a defensible unit count; the quantity field remains unknown.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-0769f2060169f95d4211"
    },
    {
      "claim_id": "EVID-PWEB-5b573db9cdec720c6980",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "chip_inventory",
      "field": "chip_quantities",
      "value": "Google TPU v5e, TPU v5p and TPU v6e; unit quantity not published by this source",
      "relationship": "site accelerator type evidence",
      "source": "Samaritan Research",
      "source_urls": [
        "https://samaritan-research.org/data/ai-data-centers/directory/google-new-albany"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Type presence only; this does not establish a unit count.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-5b573db9cdec720c6980"
    },
    {
      "claim_id": "EVID-PWEB-27478d5354ef3db3767b",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "AEP Ohio",
      "relationship": "serving utility",
      "source": "DataCentersExposed / public facility sources",
      "source_urls": [
        "https://datacentersexposed.com/facilities/google-new-albany",
        "https://datacentersearch.org/sites/google-new-albany"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-27478d5354ef3db3767b"
    },
    {
      "claim_id": "EVID-PWEB-f07c0bcea8d9b97a5f65",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "AEP Ohio",
      "relationship": "serving utility",
      "source": "DataCentersExposed / Data Center Search",
      "source_urls": [
        "https://datacentersexposed.com/facilities/google-new-albany",
        "https://datacentersearch.org/sites/google-new-albany"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-f07c0bcea8d9b97a5f65"
    },
    {
      "claim_id": "EVID-PWEB-95d496721dbb9ca537f7",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "financing",
      "field": "investment",
      "value": "Reported $600M investment",
      "relationship": "facility investment",
      "source": "SUE Data Centers",
      "source_urls": [
        "https://suedatacenters.org/data-centers/google-new-albany-oh"
      ],
      "publication_date": "2026-07-26",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Third-party reported facility investment; not a Google-disclosed project capex figure in the cited page.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-95d496721dbb9ca537f7"
    },
    {
      "claim_id": "EVID-PWEB-54d78b4b736808dfb57c",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Building 2 operational; Buildings 3-4 classified operational; Building 5 construction nearing completion as of 2026-05-18",
      "relationship": "building-level physical observation",
      "source": "Samaritan Research",
      "source_urls": [
        "https://samaritan-research.org/data/ai-data-centers/directory/google-new-albany"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Third-party satellite/cooling observation; this is not independent physical certification.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-54d78b4b736808dfb57c"
    },
    {
      "claim_id": "EVID-PWEB-7265ee7c",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "site_identity",
      "field": "project",
      "value": "New Albany Data Center",
      "relationship": "named facility/project identity",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/google-new-albany-oh"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DEPLOY's September 2026 facility record identifies Google's New Albany Data Center as an operating facility. The registry retains this as a facility-level project identity.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-7265ee7c"
    },
    {
      "claim_id": "EVID-PWEB-0b70414e",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "financing",
      "field": "capex_record",
      "value": "More than $1.2 billion",
      "relationship": "announced investment",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's September 3, 2026 announcement says the project represents an investment of more than $1.2 billion in Kuna.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-0b70414e"
    },
    {
      "claim_id": "EVID-PWEB-b39753efcc637ce40df6",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Hensel Phelps",
      "relationship": "project construction partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b39753efcc637ce40df6"
    },
    {
      "claim_id": "EVID-PWEB-c0bc87fd",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Ralph L. Wadsworth Construction",
      "relationship": "site-development / mission-critical contractor",
      "source": "Ralph L. Wadsworth Construction",
      "source_urls": [
        "https://www.wadsco.com/mission-critical/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Wadsworth's official mission-critical project list names Meta – Kuna Data Center Campus in Kuna, Idaho. This is a site-specific contractor relationship.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-c0bc87fd"
    },
    {
      "claim_id": "EVID-PWEB-e545a082",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Hensel Phelps Construction",
        "Engineered Structures Inc."
      ],
      "relationship": "site construction contractors",
      "source": "Idaho Statesman",
      "source_urls": [
        "https://www.idahostatesman.com/news/business/article304464416.html"
      ],
      "publication_date": "2025-04-30",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta said it contracted with Hensel Phelps Construction and Engineered Structures Inc. for the Kuna data center. This is a site-specific contractor relationship.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-e545a082"
    },
    {
      "claim_id": "EVID-PWEB-meta-5de9a1c7-cons-2",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Hensel Phelps",
      "relationship": "publicly identified construction partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official Kuna announcement names Hensel Phelps among the local and project partners; no broader contractor roster is inferred.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-meta-5de9a1c7-cons-2"
    },
    {
      "claim_id": "EVID-PWEB-fae02a76",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "construction",
      "field": "construction_workforce_record",
      "value": "1,600 skilled trade workers at peak construction",
      "relationship": "construction workforce disclosure",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta reports 1,600 skilled trade workers at peak construction for the Kuna project.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-fae02a76"
    },
    {
      "claim_id": "EVID-PWEB-3e1f152d00937d569de9",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Idaho Power",
      "relationship": "electricity provider / project energy partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-3e1f152d00937d569de9"
    },
    {
      "claim_id": "EVID-PWEB-meta-5de9a1c7-ener-3",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Idaho Power",
      "relationship": "publicly identified energy/grid infrastructure partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official Kuna announcement says it worked closely with Idaho Power to plan for its energy needs and identifies Idaho Power as a project partner.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-meta-5de9a1c7-ener-3"
    },
    {
      "claim_id": "EVID-PWEB-batch4-meta-kuna-inve-3",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "financing",
      "field": "investment",
      "value": "More than $1.2 billion",
      "relationship": "owner investment commitment",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta says it has invested more than $1.2 billion in the Kuna data center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch4-meta-kuna-inve-3"
    },
    {
      "claim_id": "EVID-PWEB-batch4-meta-kuna-proj-4",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "site_identity",
      "field": "project",
      "value": "Kuna Data Center",
      "relationship": "official project name",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official launch announcement identifies the facility as the Kuna Data Center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch4-meta-kuna-proj-4"
    },
    {
      "claim_id": "EVID-PWEB-f69619f4",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "site_identity",
      "field": "project",
      "value": "Meta Kuna Data Center Campus",
      "relationship": "official site/project identity",
      "source": "Meta Data Centers / Ralph L. Wadsworth Construction",
      "source_urls": [
        "https://datacenters.atmeta.com/us-locations/",
        "https://www.wadsco.com/mission-critical/"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's current U.S. locations material identifies Kuna as a Meta data center location; Wadsworth's mission-critical project list names the Meta Kuna Data Center Campus.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-f69619f4"
    },
    {
      "claim_id": "EVID-PWEB-3ec73e83",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "site_identity",
      "field": "project_status",
      "value": "Operational / online",
      "relationship": "current operating status",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta announced on September 3, 2026 that the Kuna Data Center was online and operational.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-3ec73e83"
    },
    {
      "claim_id": "EVID-PWEB-9f5d78d8c57117349661",
      "epoch_id": "EPOCH-65e758d676dc06d6",
      "site_name": "CoreWeave Muskogee OK",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "~70 MW leased power",
      "relationship": "CoreWeave lease from Core Scientific",
      "source": "Core Scientific",
      "source_urls": [
        "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-013214/q4fy25earningsdeckvfinal.htm"
      ],
      "publication_date": "2026-03-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-9f5d78d8c57117349661"
    },
    {
      "claim_id": "EVID-PWEB-UAE-CAP-20260927",
      "epoch_id": "EPOCH-661288625d17662a",
      "site_name": "OpenAI Stargate UAE",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "OpenAI announced a 1 GW Stargate UAE cluster in Abu Dhabi, with 200 MW expected to go live in 2026.",
      "relationship": "project capacity announcement",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/introducing-stargate-uae/"
      ],
      "publication_date": "2025-05-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Announced cluster capacity; not a measured operating-load record.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-UAE-CAP-20260927"
    },
    {
      "claim_id": "PWEB-SOURCE-368cba3e47d3b3f5",
      "epoch_id": "EPOCH-661288625d17662a",
      "site_name": "OpenAI Stargate UAE",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "UAE energy/infrastructure counterparties not specified in the cited OpenAI announcement",
      "relationship": "negative capture / unresolved utility field",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/introducing-stargate-uae/"
      ],
      "publication_date": "2025-05-22",
      "capture_date": "2026-09-27",
      "disposition": "NO_PUBLIC_VALUE_CAPTURED",
      "scope_note": "Retained only as an explicit searched field state; no energy company is inferred.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained_no_source_id",
      "source_record_id": null
    },
    {
      "claim_id": "EVID-PWEB-086bcbe80287e2a48095",
      "epoch_id": "EPOCH-661288625d17662a",
      "site_name": "OpenAI Stargate UAE",
      "domain": "financing",
      "field": "investors",
      "value": [
        "G42",
        "Oracle",
        "NVIDIA",
        "Cisco",
        "SoftBank"
      ],
      "relationship": "named project partners in OpenAI's Stargate UAE partnership",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/introducing-stargate-uae/"
      ],
      "publication_date": "2025-05-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "OpenAI identifies these as partners to the agreement; partner status is not equivalent to disclosed project equity.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-086bcbe80287e2a48095"
    },
    {
      "claim_id": "EVID-PWEB-UAE-PARTNERS-20260927",
      "epoch_id": "EPOCH-661288625d17662a",
      "site_name": "OpenAI Stargate UAE",
      "domain": "financing",
      "field": "investors",
      "value": [
        "G42",
        "Oracle",
        "NVIDIA",
        "Cisco",
        "SoftBank"
      ],
      "relationship": "named Stargate UAE partners/investment counterparties",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/introducing-stargate-uae/"
      ],
      "publication_date": "2025-05-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Named partners in the OpenAI announcement; relationship type is retained as published and is not relabeled as equity ownership.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-UAE-PARTNERS-20260927"
    },
    {
      "claim_id": "EVID-PWEB-46917d45fffa32b8ebfa",
      "epoch_id": "EPOCH-661288625d17662a",
      "site_name": "OpenAI Stargate UAE",
      "domain": "site_identity",
      "field": "project",
      "value": "Stargate UAE — Abu Dhabi 1 GW cluster; 200 MW expected to go live in 2026",
      "relationship": "international project/program",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/introducing-stargate-uae/"
      ],
      "publication_date": "2025-05-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-46917d45fffa32b8ebfa"
    },
    {
      "claim_id": "EVID-PWEB-7882ba53",
      "epoch_id": "EPOCH-6799460068cbed36",
      "site_name": "Google Kansas City East",
      "domain": "construction",
      "field": "construction_status",
      "value": "Building 1 operational as of 2026-08-01; Buildings 2-4 under construction at earlier dated milestones",
      "relationship": "dated buildout trajectory",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/google-kansas-city-east"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Epoch AI's dated satellite observations record land clearing in 2024, foundations for Buildings 1-4, generator/cooling installation, and Building 1 operational in August 2026.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-7882ba53"
    },
    {
      "claim_id": "EVID-PWEB-7da3a6c7",
      "epoch_id": "EPOCH-6799460068cbed36",
      "site_name": "Google Kansas City East",
      "domain": "cooling",
      "field": "cooling",
      "value": "SPX Cooling Technologies NC8422V-1 evaporative cooling towers; 18 units; modeled 135.3 MW",
      "relationship": "cooling equipment / Epoch AI model",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/google-kansas-city-east"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Epoch AI reports 18 NC8422V-1 evaporative cooling towers with modeled 135.3 MW total cooling capacity. The figure is part of Epoch AI's cooling-equipment power model, not interval electrical telemetry.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-7da3a6c7"
    },
    {
      "claim_id": "EVID-PWEB-4017ce9949a584e3d8c1",
      "epoch_id": "EPOCH-6799460068cbed36",
      "site_name": "Google Kansas City East",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Evergy",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://efis.psc.mo.gov/Document/Display/795136"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-4017ce9949a584e3d8c1"
    },
    {
      "claim_id": "EVID-PWEB-cf86ce4367f95f0ce329",
      "epoch_id": "EPOCH-6db3bc2c79843ffd",
      "site_name": "Google Bristow",
      "domain": "site_identity",
      "field": "address",
      "value": "13001 Rollins Ford Road, Bristow, VA 20136",
      "relationship": "public facility address",
      "source": "datacenter.fyi public records",
      "source_urls": [
        "https://www.datacenter.fyi/public-record/google-be69857b"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-cf86ce4367f95f0ce329"
    },
    {
      "claim_id": "EVID-PWEB-201840817c148595250b",
      "epoch_id": "EPOCH-6db3bc2c79843ffd",
      "site_name": "Google Bristow",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Dominion Energy Virginia",
      "relationship": "grid operator",
      "source": "datacenter.fyi public records",
      "source_urls": [
        "https://www.datacenter.fyi/public-record/google-be69857b"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-201840817c148595250b"
    },
    {
      "claim_id": "EVID-PWEB-2945939337d498413d6a",
      "epoch_id": "EPOCH-6db3bc2c79843ffd",
      "site_name": "Google Bristow",
      "domain": "ownership",
      "field": "owner",
      "value": "Nova Mango Farms LLC",
      "relationship": "site owner/developer",
      "source": "datacenter.fyi public records",
      "source_urls": [
        "https://www.datacenter.fyi/public-record/google-be69857b"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This source identifies Nova Mango Farms LLC as owner/developer and Google as operator.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-2945939337d498413d6a"
    },
    {
      "claim_id": "EVID-PWEB-8d9f8f3b",
      "epoch_id": "EPOCH-6db3bc2c79843ffd",
      "site_name": "Google Bristow",
      "domain": "site_identity",
      "field": "project",
      "value": "Google Bristow",
      "relationship": "named facility/project identity",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/google-bristow"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Epoch AI's September 2026 record identifies Google Bristow in Bristow, Virginia as an operational AI data center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-8d9f8f3b"
    },
    {
      "claim_id": "EVID-PWEB-10b0607f3dad66febaef",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "JE Dunn"
      ],
      "relationship": "publicly identified construction/EPC partners",
      "source": "Intel Accelerator enrichment",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.interconnection.fyi/data-center/project/meta-temple-f7dc40d2"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Retained construction/EPC field from the enrichment registry; contractor role may be EPC, GC, or construction partner depending on source.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-10b0607f3dad66febaef"
    },
    {
      "claim_id": "EVID-PWEB-bcad5667f65a4ec900fb",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "construction",
      "field": "construction_companies",
      "value": "JE Dunn",
      "relationship": "construction partner / contractor",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta explicitly lists JE Dunn among local partners for the Temple Data Center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-bcad5667f65a4ec900fb"
    },
    {
      "claim_id": "EVID-PWEB-meta-6ff5e1ae-cons-0",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "construction",
      "field": "construction_companies",
      "value": "JE Dunn",
      "relationship": "publicly identified construction partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official Temple announcement names JE Dunn among the project partners; the announcement does not characterize JE Dunn's full contractual role, so this is retained as a named construction/project partner.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-meta-6ff5e1ae-cons-0"
    },
    {
      "claim_id": "EVID-PWEB-93e2f1d43de29e453d6a",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "cooling",
      "field": "cooling",
      "value": "Closed-loop liquid-cooled system",
      "relationship": "site cooling architecture",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta says the system is designed to use zero water for a majority of the year.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-93e2f1d43de29e453d6a"
    },
    {
      "claim_id": "EVID-PWEB-batch4-meta-temple-cool-0",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "cooling",
      "field": "cooling",
      "value": "Closed-loop liquid-cooled system",
      "relationship": "site cooling architecture",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta says Temple's cooling system is designed to use zero water for a majority of the year.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch4-meta-temple-cool-0"
    },
    {
      "claim_id": "EVID-PWEB-0760a442f435f527e9e6",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Oncor Electric",
      "relationship": "energy / utility planning partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta says it worked with Oncor to plan for and meet Temple energy needs.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-0760a442f435f527e9e6"
    },
    {
      "claim_id": "EVID-PWEB-38f0055531893ec9cddb",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Heart of Texas Electric Cooperative",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.interconnection.fyi/data-center/project/meta-temple-f7dc40d2"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-38f0055531893ec9cddb"
    },
    {
      "claim_id": "EVID-PWEB-meta-6ff5e1ae-ener-1",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Oncor Electric",
      "relationship": "publicly identified energy/grid infrastructure partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official Temple announcement says it worked closely with Oncor Electric to plan for and meet the data center's energy needs.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-meta-6ff5e1ae-ener-1"
    },
    {
      "claim_id": "EVID-PWEB-batch4-meta-temple-inve-1",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "financing",
      "field": "investment",
      "value": "More than $1.2 billion",
      "relationship": "owner investment commitment",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta says it has invested more than $1.2 billion in the Temple data center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch4-meta-temple-inve-1"
    },
    {
      "claim_id": "EVID-PWEB-batch4-meta-temple-proj-2",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "site_identity",
      "field": "project",
      "value": "Temple Data Center",
      "relationship": "official project name",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's official launch announcement identifies the facility as the Temple Data Center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch4-meta-temple-proj-2"
    },
    {
      "claim_id": "EVID-PWEB-SAT40-ADDR-20260927",
      "epoch_id": "EPOCH-71d0091a05448224",
      "site_name": "Microsoft SAT40",
      "domain": "site_identity",
      "field": "address",
      "value": "15000 Lambda Drive, San Antonio, TX 78245",
      "relationship": "site address",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013247"
      ],
      "publication_date": "2023-03-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Exact site address in the primary TDLR project record.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-SAT40-ADDR-20260927"
    },
    {
      "claim_id": "EVID-PWEB-sat40-address-20260927",
      "epoch_id": "EPOCH-71d0091a05448224",
      "site_name": "Microsoft SAT40",
      "domain": "site_identity",
      "field": "address",
      "value": "15000 Lambda Drive, San Antonio, TX 78245",
      "relationship": "registered project address",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013247"
      ],
      "publication_date": "2023-03-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "TDLR gives the SAT40 project address.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-sat40-address-20260927"
    },
    {
      "claim_id": "EVID-PWEB-SAT40-OWNER-20260927",
      "epoch_id": "EPOCH-71d0091a05448224",
      "site_name": "Microsoft SAT40",
      "domain": "ownership",
      "field": "owner",
      "value": "Microsoft",
      "relationship": "facility owner named in TDLR filing",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013247"
      ],
      "publication_date": "2023-03-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Owner field in the primary TDLR project record.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-SAT40-OWNER-20260927"
    },
    {
      "claim_id": "EVID-PWEB-sat40-project-20260927",
      "epoch_id": "EPOCH-71d0091a05448224",
      "site_name": "Microsoft SAT40",
      "domain": "site_identity",
      "field": "project",
      "value": "SAT40",
      "relationship": "registered construction project",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013247"
      ],
      "publication_date": "2023-03-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "TDLR project TABS2023013247 is named SAT40 / SAT40 Data Center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-sat40-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-sat40-reg-20260927",
      "epoch_id": "EPOCH-71d0091a05448224",
      "site_name": "Microsoft SAT40",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "TDLR TABS2023013247; new construction; review complete; estimated cost $175.9M; 153,227 ft².",
      "relationship": "construction / regulatory record",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013247"
      ],
      "publication_date": "2023-03-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Texas state construction filing retained as site-specific regulatory evidence.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-sat40-reg-20260927"
    },
    {
      "claim_id": "EVID-PWEB-SAT40-REG-20260927",
      "epoch_id": "EPOCH-71d0091a05448224",
      "site_name": "Microsoft SAT40",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "Texas Architectural Barriers Project TABS2023013247: new construction of SAT40 Data Center at 15000 Lambda Drive, San Antonio, Bexar County; 153,227 square feet; estimated cost $175.9 million; review complete.",
      "relationship": "site-specific building/regulatory record",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013247"
      ],
      "publication_date": "2023-03-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "TDLR primary record; this closes a regulatory evidence field but is not an interval electricity measurement.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-SAT40-REG-20260927"
    },
    {
      "claim_id": "EVID-PWEB-lancaster-address-20260927",
      "epoch_id": "EPOCH-7648e1438308fdae",
      "site_name": "CoreWeave Lancaster Greenfield site",
      "domain": "site_identity",
      "field": "address",
      "value": "216 Greenfield Road, Lancaster, PA",
      "relationship": "facility address",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/coreweave-lancaster-pa"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DEPLOY identifies 216 Greenfield Road, Lancaster, Pennsylvania as the CoreWeave facility address.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-lancaster-address-20260927"
    },
    {
      "claim_id": "EVID-PWEB-lancaster-project-20260927",
      "epoch_id": "EPOCH-7648e1438308fdae",
      "site_name": "CoreWeave Lancaster Greenfield site",
      "domain": "site_identity",
      "field": "project",
      "value": "CoreWeave Lancaster AI data center",
      "relationship": "public project identity",
      "source": "CoreWeave",
      "source_urls": [
        "https://www.coreweave.com/blog/building-pennsylvania-into-the-mid-atlantic-ai-hub"
      ],
      "publication_date": "2025-07-15",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "CoreWeave announced a new Lancaster, Pennsylvania data center, initially 100 MW with potential expansion to 300 MW.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-lancaster-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-lancaster-commitment-20260927",
      "epoch_id": "EPOCH-7648e1438308fdae",
      "site_name": "CoreWeave Lancaster Greenfield site",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "CoreWeave committed up to $6 billion to equip the Lancaster facility; initial 100 MW with potential expansion to 300 MW.",
      "relationship": "site-specific capacity/infrastructure commitment",
      "source": "CoreWeave",
      "source_urls": [
        "https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx"
      ],
      "publication_date": "2025-07-15",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The commitment is a site-specific infrastructure statement; it does not establish a utility queue ID or measured load.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-lancaster-commitment-20260927"
    },
    {
      "claim_id": "EVID-PWEB-ellendale-utility-20260927",
      "epoch_id": "EPOCH-768183e4de6062d2",
      "site_name": "CoreWeave Ellendale ND",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Otter Tail Power",
      "relationship": "serving utility",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/applied-digital-ellendale-eln01-hosting-nd"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DEPLOY identifies Otter Tail Power as the utility for the Ellendale facility; this is a public utility relationship, not a formal queue-ID match.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ellendale-utility-20260927"
    },
    {
      "claim_id": "EVID-PWEB-ellendale-project-20260927",
      "epoch_id": "EPOCH-768183e4de6062d2",
      "site_name": "CoreWeave Ellendale ND",
      "domain": "site_identity",
      "field": "project",
      "value": "Polaris Forge 1",
      "relationship": "campus/project identity",
      "source": "Applied Digital",
      "source_urls": [
        "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm"
      ],
      "publication_date": "2026-05-31",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Applied Digital identifies Polaris Forge 1 as its flagship Ellendale HPC campus.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ellendale-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-ellendale-lease-20260927",
      "epoch_id": "EPOCH-768183e4de6062d2",
      "site_name": "CoreWeave Ellendale ND",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "CoreWeave leases for up to 250 MW across Buildings 2 and 3 at the 400 MW Ellendale campus.",
      "relationship": "site-specific data-center lease",
      "source": "U.S. SEC / Applied Digital",
      "source_urls": [
        "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001641172-25-013199/form8-k.htm"
      ],
      "publication_date": "2025-05-28",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The SEC filing documents the site-specific leases; lease capacity is distinct from total campus capacity statements.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ellendale-lease-20260927"
    },
    {
      "claim_id": "EVID-PWEB-nebius-vineland-construction-20260927",
      "epoch_id": "EPOCH-781cbfae186209ad",
      "site_name": "Microsoft-Nebius New Jersey",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Northeast Precast",
      "relationship": "construction partner",
      "source": "Northwise Research",
      "source_urls": [
        "https://northwiseproject.com/research/nbis-stock-vineland-nj-data-center"
      ],
      "publication_date": "2026-09-17",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Northwise identifies Northeast Precast as a construction partner; source class remains secondary.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-nebius-vineland-construction-20260927"
    },
    {
      "claim_id": "EVID-PWEB-nebius-vineland-project-20260927",
      "epoch_id": "EPOCH-781cbfae186209ad",
      "site_name": "Microsoft-Nebius New Jersey",
      "domain": "site_identity",
      "field": "project",
      "value": "Nebius AI Data Center (Vineland)",
      "relationship": "public project identity",
      "source": "Nebius / public project record",
      "source_urls": [
        "https://nebius.com/newsroom/nebius-announces-multi-billion-dollar-agreement-with-microsoft-for-ai-infrastructure",
        "https://datacenterrecord.org/projects/nebius-ai-data-center-vineland-nj"
      ],
      "publication_date": "2026-09-12",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Nebius identifies a new data center in Vineland, New Jersey; a September 2026 public record identifies the project as the Nebius AI Data Center (Vineland).",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-nebius-vineland-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-nebius-vineland-contract-20260927",
      "epoch_id": "EPOCH-781cbfae186209ad",
      "site_name": "Microsoft-Nebius New Jersey",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Microsoft Agreement for dedicated GPU cloud computing capacity at Nebius's new Vineland data center, deployed in tranches during 2025-2026 under a five-year term.",
      "relationship": "site-specific compute contract",
      "source": "Nebius / U.S. SEC",
      "source_urls": [
        "https://nebius.com/newsroom/nebius-announces-multi-billion-dollar-agreement-with-microsoft-for-ai-infrastructure",
        "https://www.sec.gov/Archives/edgar/data/1513845/000110465926052948/nbis-20251231x20f.htm"
      ],
      "publication_date": "2025-09-08",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The SEC filing states that the Microsoft Agreement provides dedicated GPU cloud capacity in clusters at the new Vineland data center over a five-year term.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-nebius-vineland-contract-20260927"
    },
    {
      "claim_id": "EVID-PWEB-nebius-vineland-user-20260927",
      "epoch_id": "EPOCH-781cbfae186209ad",
      "site_name": "Microsoft-Nebius New Jersey",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "Microsoft",
      "relationship": "dedicated capacity customer",
      "source": "Nebius / U.S. SEC",
      "source_urls": [
        "https://nebius.com/newsroom/nebius-announces-multi-billion-dollar-agreement-with-microsoft-for-ai-infrastructure",
        "https://www.sec.gov/Archives/edgar/data/1513845/000110465926052948/nbis-20251231x20f.htm"
      ],
      "publication_date": "2025-09-08",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Nebius states dedicated GPU capacity from the new Vineland data center is being delivered to Microsoft.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-nebius-vineland-user-20260927"
    },
    {
      "claim_id": "EVID-PWEB-b378464290342284bc39",
      "epoch_id": "EPOCH-785d6e4c34607dd4",
      "site_name": "Google Arcola",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Dominion Energy",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://suedatacenters.org/data-centers/google-arcola-loudoun-va"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b378464290342284bc39"
    },
    {
      "claim_id": "EVID-PWEB-4d755f77871171f668b4",
      "epoch_id": "EPOCH-78e7d8474fbdf968",
      "site_name": "OpenAI Stargate Wisconsin",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "WEC Energy Group",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://openai.com/index/stargate-community/"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-4d755f77871171f668b4"
    },
    {
      "claim_id": "EVID-PWEB-9101a1c8795dce588fa5",
      "epoch_id": "EPOCH-78e7d8474fbdf968",
      "site_name": "OpenAI Stargate Wisconsin",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "WEC Energy Group",
      "relationship": "power infrastructure / dedicated electricity rate context",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/stargate-community/"
      ],
      "publication_date": "2025-12-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-9101a1c8795dce588fa5"
    },
    {
      "claim_id": "EVID-PWEB-b2212b1b8c162cfc5c07",
      "epoch_id": "EPOCH-78e7d8474fbdf968",
      "site_name": "OpenAI Stargate Wisconsin",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "WEC Energy Group",
      "relationship": "power infrastructure / dedicated electricity rate",
      "source": "OpenAI Stargate Community",
      "source_urls": [
        "https://openai.com/index/stargate-community/"
      ],
      "publication_date": "2025-12-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b2212b1b8c162cfc5c07"
    },
    {
      "claim_id": "EVID-PWEB-WI-SVC-20260927",
      "epoch_id": "EPOCH-78e7d8474fbdf968",
      "site_name": "OpenAI Stargate Wisconsin",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "OpenAI states that in Wisconsin its partners Oracle and Vantage are working with WEC Energy Group to develop new energy generation and capacity, including solar and battery storage, for the Stargate infrastructure.",
      "relationship": "energy-capacity development context",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/stargate-community/"
      ],
      "publication_date": "2025-12-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Company statement about the Wisconsin Stargate program; it is infrastructure-planning evidence, not an interval meter record or executed utility contract.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-WI-SVC-20260927"
    },
    {
      "claim_id": "EVID-PWEB-1c50b76fd1d2dabf83f3",
      "epoch_id": "EPOCH-78f8285078416a9e",
      "site_name": "Meta-QTS Hillsboro 2",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Portland General Electric (PGE) / Tower Solar counterparties",
      "relationship": "utility and renewable-energy supply context",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/meta-qts-hillsboro-2"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Epoch's source list records a QTS Hillsboro 2 announcement and an agreement with PGE for a 120 MWac solar installation.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-1c50b76fd1d2dabf83f3"
    },
    {
      "claim_id": "EVID-PWEB-batch2-meta-aiken-cons-7",
      "epoch_id": "EPOCH-7d9b5af0cce16f1c",
      "site_name": "Meta Aiken",
      "domain": "construction",
      "field": "construction_companies",
      "value": "DPR Construction",
      "relationship": "publicly identified construction partner",
      "source": "DPR Construction",
      "source_urls": [
        "https://www.dpr.com/projects/meta-aiken-data-center-aiken-sc"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DPR's project page identifies the Meta Aiken Data Center as its project/client relationship; the role is retained as a construction partner rather than expanded beyond the source.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch2-meta-aiken-cons-7"
    },
    {
      "claim_id": "EVID-PWEB-southgate-gpu-20260927",
      "epoch_id": "EPOCH-827d7832237170bd",
      "site_name": "Southgate Melbourne",
      "domain": "chip_inventory",
      "field": "chip_quantities",
      "value": "Approximately 18,400 NVIDIA GB300 GPUs contracted for the Melbourne facility; Firmus also reported 18,500 GB300 ordered for the first-stage program.",
      "relationship": "site/program GPU deployment",
      "source": "Firmus",
      "source_urls": [
        "https://firmus.co/newsroom/firmus-signs-multi-year-agreement-with-global-hyperscale-customer-at-project-southgate",
        "https://firmus.co/newsroom/southgate-expansion"
      ],
      "publication_date": "2026-03-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Firmus's site-specific contract calls for approximately 18,400 GB300 GPUs at the Melbourne facility; the broader 18,500 figure is a first-stage program statement.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-southgate-gpu-20260927"
    },
    {
      "claim_id": "EVID-PWEB-southgate-project-20260927",
      "epoch_id": "EPOCH-827d7832237170bd",
      "site_name": "Southgate Melbourne",
      "domain": "site_identity",
      "field": "project",
      "value": "Project Southgate — Melbourne",
      "relationship": "public AI infrastructure project",
      "source": "Firmus",
      "source_urls": [
        "https://firmus.co/newsroom/southgate-expansion",
        "https://firmus.co/newsroom/firmus-signs-multi-year-agreement-with-global-hyperscale-customer-at-project-southgate"
      ],
      "publication_date": "2026-03-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Firmus identifies Southgate Melbourne as the first Australian deployment of its multi-site Project Southgate program.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-southgate-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-SOUTHGATE-SVC-20260927",
      "epoch_id": "EPOCH-827d7832237170bd",
      "site_name": "Southgate Melbourne",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Firmus announced a long-term contract with a leading global technology company for dedicated AI infrastructure capacity at Project Southgate's first Australian deployment, covering approximately 18,400 NVIDIA GB300 GPUs for the Melbourne facility.",
      "relationship": "dedicated AI infrastructure capacity contract",
      "source": "Firmus Technologies",
      "source_urls": [
        "https://firmus.co/newsroom/firmus-signs-multi-year-agreement-with-global-hyperscale-customer-at-project-southgate"
      ],
      "publication_date": "2026-03-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The customer is not named in the cited announcement. This is a contract/capacity record, not proof of current physical deployment or measured demand.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-SOUTHGATE-SVC-20260927"
    },
    {
      "claim_id": "EVID-PWEB-batch2-meta-rosemount-cons-0",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Mortenson",
      "relationship": "publicly identified construction partner",
      "source": "Meta Engineering",
      "source_urls": [
        "https://engineering.fb.com/2026/03/30/data-center-engineering/ai-for-american-produced-cement-and-concrete/"
      ],
      "publication_date": "2026-03-30",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's engineering article identifies Mortenson as a partner on the Rosemount data center project.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch2-meta-rosemount-cons-0"
    },
    {
      "claim_id": "EVID-PWEB-b2354bf9",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "cooling",
      "field": "cooling",
      "value": "Water-efficient cooling technology; Meta states the design is significantly more water efficient than industry standard",
      "relationship": "official facility cooling disclosure",
      "source": "Meta",
      "source_urls": [
        "https://datacenters.atmeta.com/wp-content/uploads/2024/10/Minnesota-Rosemount.pdf"
      ],
      "publication_date": "2024-10-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta's Rosemount fact sheet describes the campus cooling design qualitatively and does not supply a numeric cooling capacity in the cited passage.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b2354bf9"
    },
    {
      "claim_id": "EVID-PWEB-9ed4d5e0dc9e28a16ef3",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Xcel Energy",
      "relationship": "utility / infrastructure partner",
      "source": "City of Rosemount; Xcel-related public project description",
      "source_urls": [
        "https://rosemountmn.gov/progress"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Rosemount states Meta collaborated with the City and Xcel Energy on energy upgrades and new transmission lines.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-9ed4d5e0dc9e28a16ef3"
    },
    {
      "claim_id": "EVID-PWEB-ba9548c5fd291ccfe687",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Xcel Energy",
      "relationship": "serving utility / electricity provider",
      "source": "Xcel Energy",
      "source_urls": [
        "https://stories.xcelenergy.com/stories/Building-the-21st-century-economy--Xcel-Energy-to-power-new-Meta-data-center"
      ],
      "publication_date": "2025-04-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ba9548c5fd291ccfe687"
    },
    {
      "claim_id": "EVID-PWEB-batch2-meta-rosemount-ener-1",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Xcel Energy",
      "relationship": "publicly identified energy partner",
      "source": "Xcel Energy Stories",
      "source_urls": [
        "https://stories.xcelenergy.com/stories/Building-the-21st-century-economy--Xcel-Energy-to-power-new-Meta-data-center"
      ],
      "publication_date": "2024-03-15",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Xcel's official announcement says it will power Meta's new Rosemount data center and describes its work with Meta on the facility's energy needs.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch2-meta-rosemount-ener-1"
    },
    {
      "claim_id": "EVID-PWEB-b2e5ab5465559187c934",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "site_identity",
      "field": "project",
      "value": "Bigfoot / Jimnist; Meta Rosemount Data Center",
      "relationship": "project alias / official facility",
      "source": "City of Rosemount; Meta Data Centers",
      "source_urls": [
        "https://rosemountmn.gov/progress",
        "https://datacenters.atmeta.com/asset/rosemount-data-center-info-sheet/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "City source says the project was previously code-named Bigfoot or Jimnist and identifies Meta as the company.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b2e5ab5465559187c934"
    },
    {
      "claim_id": "EVID-PWEB-96dedd45",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "site_identity",
      "field": "project_status",
      "value": "Under construction",
      "relationship": "current facility status",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/meta-minnesota-rosemount"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DEPLOY's September 2026 facility record describes Meta Rosemount Data Center as under construction.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-96dedd45"
    },
    {
      "claim_id": "EVID-PWEB-9773e9baed56ba10e192",
      "epoch_id": "EPOCH-83ca909f7eb211c7",
      "site_name": "Google Mesa",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Arizona Public Service",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.datacenter.fyi/public-record/google-aa4275ee"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-9773e9baed56ba10e192"
    },
    {
      "claim_id": "EVID-PWEB-pue-2025q4-google-midlothian",
      "epoch_id": "EPOCH-85492d2b8df586a1",
      "site_name": "Google Midlothian",
      "domain": "operations",
      "field": "operational_efficiency",
      "value": {
        "metric": "PUE",
        "value": 1.1,
        "period": "TTM PUE, Q4 2025"
      },
      "relationship": "published facility efficiency metric",
      "source": "Google Data Centers",
      "source_urls": [
        "https://www.datacenters.google/efficiency/"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "PUE is a facility-efficiency metric and is not an interval grid-load measurement or a direct estimate of AI compute power.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-pue-2025q4-google-midlothian"
    },
    {
      "claim_id": "EVID-PWEB-0ab443eb87dacfc84fd8",
      "epoch_id": "EPOCH-85492d2b8df586a1",
      "site_name": "Google Midlothian",
      "domain": "site_identity",
      "field": "project",
      "value": "Google Midlothian data center",
      "relationship": "official site identity",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/texas/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-0ab443eb87dacfc84fd8"
    },
    {
      "claim_id": "EVID-PWEB-d43973a952d317a6d2d0",
      "epoch_id": "EPOCH-8696ef81d91560a9",
      "site_name": "CoreWeave Dalton 1 & 2",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "~175 MW leased power",
      "relationship": "CoreWeave lease from Core Scientific",
      "source": "Core Scientific",
      "source_urls": [
        "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-013214/q4fy25earningsdeckvfinal.htm"
      ],
      "publication_date": "2026-03-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-d43973a952d317a6d2d0"
    },
    {
      "claim_id": "EVID-PWEB-4b892bea2ebf1398dad6",
      "epoch_id": "EPOCH-8838deed95ffb554",
      "site_name": "Meta Prometheus",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "Meta says the Perry, Davis-Besse and Beaver Valley nuclear projects will support the grids serving its operations, including Prometheus",
      "relationship": "firm-power / grid-support program",
      "source": "Meta",
      "source_urls": [
        "https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/"
      ],
      "publication_date": "2026-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid-support program context; not a Prometheus-specific contracted MW allocation.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-4b892bea2ebf1398dad6"
    },
    {
      "claim_id": "EVID-PWEB-85c73a84861cdc88a1c5",
      "epoch_id": "EPOCH-8838deed95ffb554",
      "site_name": "Meta Prometheus",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "Samaritan estimate: 496 MW IT power and ~600k H100-equivalent compute; projected Q3 2028 1,022 MW / 1.235M H100-eq",
      "relationship": "third-party modeled current and projected scale",
      "source": "Samaritan Research",
      "source_urls": [
        "https://samaritan-research.org/data/ai-data-centers/directory/meta-prometheus"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Modeled estimate based on imagery/cooling/regulatory/chip/land data; not an official utility capacity or measured demand.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-85c73a84861cdc88a1c5"
    },
    {
      "claim_id": "EVID-PWEB-97cf72e62fa2ba4ab21e",
      "epoch_id": "EPOCH-8838deed95ffb554",
      "site_name": "Meta Prometheus",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Williams Companies",
      "relationship": "behind-the-meter generation construction / project partner",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/meta-ohio-new-albany"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Williams is associated with the Socrates South gas-generation project behind the Meta New Albany campus; not necessarily the site's general contractor.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-97cf72e62fa2ba4ab21e"
    },
    {
      "claim_id": "EVID-PWEB-171e8566d6c0d5506f71",
      "epoch_id": "EPOCH-8838deed95ffb554",
      "site_name": "Meta Prometheus",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": [
        "AEP Ohio",
        "Vistra/Constellation",
        "Oklo",
        "TerraPower"
      ],
      "relationship": "grid interconnection and disclosed power counterparties",
      "source": "DEPLOY; Meta/public project records",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/meta-ohio-new-albany",
        "https://registry.deploy.report/datacenters/meta-prometheus-ohio"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "AEP Ohio is the grid-interconnection utility; the other entities are disclosed nuclear/advanced-generation counterparties. These relationships must not be collapsed into a single utility label.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-171e8566d6c0d5506f71"
    },
    {
      "claim_id": "EVID-PWEB-1f45adbb9eab49f4676b",
      "epoch_id": "EPOCH-8838deed95ffb554",
      "site_name": "Meta Prometheus",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Operational; latest satellite-observation entry dated 2026-08-31",
      "relationship": "physical/operational observation",
      "source": "Samaritan Research",
      "source_urls": [
        "https://samaritan-research.org/data/ai-data-centers/directory/meta-prometheus"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Operational classification is the source's assessment; retained as third-party evidence rather than independent certification.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-1f45adbb9eab49f4676b"
    },
    {
      "claim_id": "EVID-PWEB-0cfcd11b850bbc1f99bf",
      "epoch_id": "EPOCH-8838deed95ffb554",
      "site_name": "Meta Prometheus",
      "domain": "site_identity",
      "field": "project",
      "value": "Prometheus Supercluster",
      "relationship": "official project identity",
      "source": "Meta / Meta Data Centers",
      "source_urls": [
        "https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/",
        "https://samaritan-research.org/data/ai-data-centers/directory/meta-prometheus"
      ],
      "publication_date": "2026-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-0cfcd11b850bbc1f99bf"
    },
    {
      "claim_id": "EVID-PWEB-8167be4ec0701e2677c4",
      "epoch_id": "EPOCH-8baa344f9717520c",
      "site_name": "Start Campus Sines Data Campus",
      "domain": "cooling",
      "field": "cooling",
      "value": "Ocean/seawater cooling",
      "relationship": "site cooling architecture",
      "source": "Open Compute Project / EDP",
      "source_urls": [
        "https://www.opencompute.org/facilities/73/start-campus-sines-12gw-data-campus-sin01",
        "https://edp.com/en/media/news/start-campus-and-edp-enter-agreement-accelerate-renewable-powered-data-centre"
      ],
      "publication_date": "2026-02-25",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-8167be4ec0701e2677c4"
    },
    {
      "claim_id": "EVID-PWEB-SINES-COOL-20260927",
      "epoch_id": "EPOCH-8baa344f9717520c",
      "site_name": "Start Campus Sines Data Campus",
      "domain": "cooling",
      "field": "cooling",
      "value": "SINES Data Campus uses seawater cooling that repurposes infrastructure from a decommissioned power plant; the operator describes the campus as water-free on the freshwater-use dimension.",
      "relationship": "site cooling system",
      "source": "Start Campus",
      "source_urls": [
        "https://www.startcampus.pt/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Operator statement about campus cooling architecture; this is infrastructure evidence, not direct thermal telemetry.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-SINES-COOL-20260927"
    },
    {
      "claim_id": "EVID-PWEB-b9a91fdcb57607835f65",
      "epoch_id": "EPOCH-8baa344f9717520c",
      "site_name": "Start Campus Sines Data Campus",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "EDP",
      "relationship": "preferred long-term green-energy partner under MoU",
      "source": "EDP",
      "source_urls": [
        "https://edp.com/en/media/news/start-campus-and-edp-enter-agreement-accelerate-renewable-powered-data-centre"
      ],
      "publication_date": "2026-02-25",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b9a91fdcb57607835f65"
    },
    {
      "claim_id": "EVID-PWEB-a45fd357f785e6da739a",
      "epoch_id": "EPOCH-8baa344f9717520c",
      "site_name": "Start Campus Sines Data Campus",
      "domain": "financing",
      "field": "investors",
      "value": "Davidson Kempner",
      "relationship": "capital partner referenced in campus development",
      "source": "EDP",
      "source_urls": [
        "https://edp.com/en/media/news/start-campus-and-edp-enter-agreement-accelerate-renewable-powered-data-centre"
      ],
      "publication_date": "2026-02-25",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "EDP describes Start Campus's platform as complemented by Davidson Kempner's capital; it is capital context for the developer/platform, not necessarily a project-only equity allocation.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a45fd357f785e6da739a"
    },
    {
      "claim_id": "EVID-PWEB-691117595c4f04e02d11",
      "epoch_id": "EPOCH-8baa344f9717520c",
      "site_name": "Start Campus Sines Data Campus",
      "domain": "site_identity",
      "field": "project",
      "value": "SINES Data Campus / SIN01–SIN06",
      "relationship": "official campus program",
      "source": "Open Compute Project; EDP",
      "source_urls": [
        "https://www.opencompute.org/facilities/73/start-campus-sines-12gw-data-campus-sin01",
        "https://edp.com/en/media/news/start-campus-and-edp-enter-agreement-accelerate-renewable-powered-data-centre"
      ],
      "publication_date": "2026-02-25",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-691117595c4f04e02d11"
    },
    {
      "claim_id": "EVID-PWEB-SINES-SVC-20260927",
      "epoch_id": "EPOCH-8baa344f9717520c",
      "site_name": "Start Campus Sines Data Campus",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Start Campus states the SINES Data Campus has 1.2 GW total campus capacity and describes the campus as powered by 100% renewable energy; the operator previously announced that the additional power allocation was secured through REN.",
      "relationship": "grid capacity / energy-service context",
      "source": "Start Campus",
      "source_urls": [
        "https://www.startcampus.pt/",
        "https://www.startcampus.pt/press_release_august_2024_1gw"
      ],
      "publication_date": "2024-08-08",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Public operator/grid-allocation evidence is retained separately from interval meter data.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-SINES-SVC-20260927"
    },
    {
      "claim_id": "EVID-PWEB-f55fb5bd448672ae889b",
      "epoch_id": "EPOCH-93a4aa4fa40d40ca",
      "site_name": "Microsoft Goodyear",
      "domain": "cooling",
      "field": "cooling",
      "value": "Water-use and wastewater infrastructure are part of Microsoft's Goodyear community commitments; per-facility cooling architecture not established by the cited record",
      "relationship": "site infrastructure context",
      "source": "Microsoft / DEPLOY",
      "source_urls": [
        "https://local.microsoft.com/communities/americas/greater-phoenix/",
        "https://registry.deploy.report/datacenters/microsoft-goodyear-phx70"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Retained as infrastructure context; not a claim that the exact cooling system is known.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-f55fb5bd448672ae889b"
    },
    {
      "claim_id": "EVID-PWEB-8e233a79b38e0c9a2ddc",
      "epoch_id": "EPOCH-93a4aa4fa40d40ca",
      "site_name": "Microsoft Goodyear",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Arizona Public Service (APS)",
      "relationship": "serving utility / utility feed",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/microsoft-goodyear-phx70"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-8e233a79b38e0c9a2ddc"
    },
    {
      "claim_id": "EVID-PWEB-batch2-microsoft-goodyear-ener-8",
      "epoch_id": "EPOCH-93a4aa4fa40d40ca",
      "site_name": "Microsoft Goodyear",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Arizona Public Service (APS)",
      "relationship": "publicly identified serving utility",
      "source": "Southern Utah Economic Data Center Registry",
      "source_urls": [
        "https://suedatacenters.org/data-centers/microsoft-goodyear-az"
      ],
      "publication_date": "2026-08-08",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "A secondary facility record identifies APS as the utility for Microsoft's Goodyear campus; retained as secondary source evidence, not a first-party Microsoft statement.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch2-microsoft-goodyear-ener-8"
    },
    {
      "claim_id": "EVID-PWEB-ec50662fb406a5e386d4",
      "epoch_id": "EPOCH-93a4aa4fa40d40ca",
      "site_name": "Microsoft Goodyear",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Partially energized",
      "relationship": "current facility status",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/microsoft-goodyear-phx70"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ec50662fb406a5e386d4"
    },
    {
      "claim_id": "EVID-PWEB-vantagetx1-project-20260927",
      "epoch_id": "EPOCH-96d37578ca36f86c",
      "site_name": "Vantage TX1",
      "domain": "site_identity",
      "field": "project",
      "value": "TX1 / Vantage Data Centers TX1",
      "relationship": "campus identity in Texas construction filings",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2026001234",
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2026012091"
      ],
      "publication_date": "2026-02-09",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "TDLR filings identify Vantage Data Centers TX1 LLC and facilities TX11/TX12 at the San Antonio TX1 campus.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-vantagetx1-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-vantagetx1-reg-20260927",
      "epoch_id": "EPOCH-96d37578ca36f86c",
      "site_name": "Vantage TX1",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "TDLR filings TABS2026001234 (TX12) and TABS2026012091 (TX12 tenant fit-up) identify Vantage Data Centers TX1 LLC as owner; the latter registers a 96 MW data-module fit-up.",
      "relationship": "construction / regulatory record",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2026001234",
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2026012091"
      ],
      "publication_date": "2026-02-09",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Site/campus-specific regulatory records for Vantage TX1 in San Antonio.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-vantagetx1-reg-20260927"
    },
    {
      "claim_id": "EVID-PWEB-e6748ff20b370d5066ed",
      "epoch_id": "EPOCH-a286a89bd1c1b6e7",
      "site_name": "VNET Bayin Ulanqab",
      "domain": "site_identity",
      "field": "project",
      "value": "10 GW Hyperscale 2.0",
      "relationship": "campus program",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/vnet-bayin-ulanqab"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-e6748ff20b370d5066ed"
    },
    {
      "claim_id": "EVID-PWEB-8aa79955a5245b527b22",
      "epoch_id": "EPOCH-a2c9f0846296fe65",
      "site_name": "Google Waltham Cross",
      "domain": "construction",
      "field": "construction_companies",
      "value": "250+ companies, majority local; no specific general contractor published",
      "relationship": "construction ecosystem",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/waltham-cross/"
      ],
      "publication_date": "2025-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Google says more than 250 companies worked on the facility; it does not identify a single principal contractor on this page.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-8aa79955a5245b527b22"
    },
    {
      "claim_id": "EVID-PWEB-6590e0f8cda289ba6ef3",
      "epoch_id": "EPOCH-a2c9f0846296fe65",
      "site_name": "Google Waltham Cross",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Shell Energy Europe Limited",
      "relationship": "24/7 carbon-free energy manager",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/waltham-cross/"
      ],
      "publication_date": "2025-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Shell is identified as energy manager for Google's UK clean-energy portfolio, not necessarily the distribution utility.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-6590e0f8cda289ba6ef3"
    },
    {
      "claim_id": "EVID-PWEB-helios-hitt-20260927",
      "epoch_id": "EPOCH-a69e48fd129d0cdb",
      "site_name": "Coreweave Helios",
      "domain": "construction",
      "field": "construction_companies",
      "value": "HITT Contracting",
      "relationship": "general contractor for Phase II",
      "source": "Galaxy Digital",
      "source_urls": [
        "https://investor.galaxy.com/news-releases/news-release-details/galaxy-announces-second-quarter-2026-financial-results"
      ],
      "publication_date": "2026-08-05",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Galaxy states HITT Contracting is the general contractor for the 260 MW critical-IT Phase II build.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-helios-hitt-20260927"
    },
    {
      "claim_id": "EVID-PWEB-HELIOS-OWNER-20260927",
      "epoch_id": "EPOCH-a69e48fd129d0cdb",
      "site_name": "Coreweave Helios",
      "domain": "ownership",
      "field": "owner",
      "value": "Galaxy Helios I LLC",
      "relationship": "facility owner named in TDLR filing",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025012175"
      ],
      "publication_date": "2025-02-18",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Legal owner named in primary building filing; tenant field is not assigned in the filing.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-HELIOS-OWNER-20260927"
    },
    {
      "claim_id": "EVID-PWEB-helios-project-20260927",
      "epoch_id": "EPOCH-a69e48fd129d0cdb",
      "site_name": "Coreweave Helios",
      "domain": "site_identity",
      "field": "project",
      "value": "Helios",
      "relationship": "public project identity",
      "source": "Galaxy Digital",
      "source_urls": [
        "https://www.galaxy.com/newsroom/galaxy-completes-phase-i-of-its-helios-data-center-campus"
      ],
      "publication_date": "2026-07-06",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Galaxy identifies the Texas campus as Helios.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-helios-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-HELIOS-REG-20260927",
      "epoch_id": "EPOCH-a69e48fd129d0cdb",
      "site_name": "Coreweave Helios",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "Texas Architectural Barriers Project TABS2025012175 for Helios: new construction of a 136,057-square-foot data center plus 11,400-square-foot water treatment building at 984 County Road 112, Afton, Texas; estimated cost $800 million; review complete.",
      "relationship": "site-specific building/regulatory record",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025012175"
      ],
      "publication_date": "2025-02-18",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "TDLR primary record; building/regulatory evidence does not establish current energization or AI workload.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-HELIOS-REG-20260927"
    },
    {
      "claim_id": "EVID-PWEB-helios-lease-20260927",
      "epoch_id": "EPOCH-a69e48fd129d0cdb",
      "site_name": "Coreweave Helios",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "CoreWeave 15-year lease; Phase I delivered 133 MW critical IT load; additional Phase II capacity under lease.",
      "relationship": "site-specific data-center lease",
      "source": "Galaxy Digital",
      "source_urls": [
        "https://www.galaxy.com/newsroom/galaxy-completes-phase-i-of-its-helios-data-center-campus",
        "https://www.galaxy.com/newsroom/galaxy-announces-commitment-with-coreweave"
      ],
      "publication_date": "2026-07-06",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Site-specific commercial relationship, kept separate from utility queue verification.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-helios-lease-20260927"
    },
    {
      "claim_id": "EVID-PWEB-a44176cbee2c5003f2b7",
      "epoch_id": "EPOCH-ac1ca1cf8df13b3c",
      "site_name": "CoreWeave Denton TX",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Denton Municipal Electric (DME)",
      "relationship": "municipal electric supplier under power purchase agreement",
      "source": "Core Scientific SEC filing",
      "source_urls": [
        "https://content-archive.fast-edgar.com/20260421/AS22R22DZZ2R72ZK22TI2CYLG66BEZ22Z282/d149019dex992.htm"
      ],
      "publication_date": "2026-04-21",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a44176cbee2c5003f2b7"
    },
    {
      "claim_id": "EVID-PWEB-fa81133e8072cc22215f",
      "epoch_id": "EPOCH-ac1ca1cf8df13b3c",
      "site_name": "CoreWeave Denton TX",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Denton Municipal Electric",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://registry.deploy.report/datacenters/core-scientific-coreweave-denton-texas"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-fa81133e8072cc22215f"
    },
    {
      "claim_id": "EVID-PWEB-59943ead47a75823b85d",
      "epoch_id": "EPOCH-ac1ca1cf8df13b3c",
      "site_name": "CoreWeave Denton TX",
      "domain": "site_identity",
      "field": "project",
      "value": "Denton Campus",
      "relationship": "official campus/project name",
      "source": "Core Scientific SEC filing",
      "source_urls": [
        "https://content-archive.fast-edgar.com/20260421/AS22R22DZZ2R72ZK22TI2CYLG66BEZ22Z282/d149019dex992.htm"
      ],
      "publication_date": "2026-04-21",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-59943ead47a75823b85d"
    },
    {
      "claim_id": "EVID-PWEB-119c1c5a20a5cf2dab62",
      "epoch_id": "EPOCH-ac1ca1cf8df13b3c",
      "site_name": "CoreWeave Denton TX",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "~260 MW leased power / HPC infrastructure contract",
      "relationship": "CoreWeave lease from Core Scientific",
      "source": "Core Scientific",
      "source_urls": [
        "https://investors.corescientific.com/news-events/press-releases/detail/110/core-scientific-and-coreweave-announce-1-2-billion-expansion-at-denton-tx-site"
      ],
      "publication_date": "2025-03-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-119c1c5a20a5cf2dab62"
    },
    {
      "claim_id": "EVID-PWEB-batch2-coreweave-denton-tx-serv-9",
      "epoch_id": "EPOCH-ac1ca1cf8df13b3c",
      "site_name": "CoreWeave Denton TX",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Denton Municipal Electric (DME) power purchase agreement",
      "relationship": "site-specific power service contract",
      "source": "U.S. Securities and Exchange Commission filing",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "An SEC filing states that power for the Denton Campus is supplied by the City of Denton through DME under a power purchase agreement for total potential campus load of approximately 394 MW; retained as contract/service evidence, separate from Epoch's IT-power figure.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch2-coreweave-denton-tx-serv-9"
    },
    {
      "claim_id": "EVID-PWEB-bce9733be5c9602b526a",
      "epoch_id": "EPOCH-ac1ca1cf8df13b3c",
      "site_name": "CoreWeave Denton TX",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "DME Contract: approximately 394 MW total potential campus load; 14-year term with two optional seven-year extensions",
      "relationship": "power purchase agreement",
      "source": "Core Scientific SEC filing",
      "source_urls": [
        "https://content-archive.fast-edgar.com/20260421/AS22R22DZZ2R72ZK22TI2CYLG66BEZ22Z282/d149019dex992.htm"
      ],
      "publication_date": "2026-04-21",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-bce9733be5c9602b526a"
    },
    {
      "claim_id": "EVID-PWEB-shackelford-project-20260927",
      "epoch_id": "EPOCH-b427a75f62d61aae",
      "site_name": "OpenAI Stargate Shackelford",
      "domain": "site_identity",
      "field": "project",
      "value": "Stargate / Frontier",
      "relationship": "public project identity",
      "source": "Samaritan Research / Vantage",
      "source_urls": [
        "https://samaritan-research.org/data/data-centers/satellite-explorer/OpenAIStargateShackelford"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The public site dossier identifies the Shackelford development as OpenAI Stargate and says Vantage developed it under the name Frontier.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-shackelford-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-08f39c6ac0492d0ed98d",
      "epoch_id": "EPOCH-bbcf0efa8bcebd41",
      "site_name": "Meta Hyperion",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Mortenson"
      ],
      "relationship": "publicly identified construction/EPC partners",
      "source": "Intel Accelerator enrichment",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Retained construction/EPC field from the enrichment registry; contractor role may be EPC, GC, or construction partner depending on source.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-08f39c6ac0492d0ed98d"
    },
    {
      "claim_id": "EVID-PWEB-48844851a898303ec3c1",
      "epoch_id": "EPOCH-bbcf0efa8bcebd41",
      "site_name": "Meta Hyperion",
      "domain": "site_identity",
      "field": "project",
      "value": "Hyperion / Richland Parish Data Center",
      "relationship": "official project identity",
      "source": "Meta / public project reporting",
      "source_urls": [
        "https://datacenters.atmeta.com/us-locations/",
        "https://registry.deploy.report/datacenters/facilities/meta-louisiana-richland-parish"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Verify exact canonical site ID against current Epoch record before merging; this record is a public project identity capture.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-48844851a898303ec3c1"
    },
    {
      "claim_id": "EVID-PWEB-9d4f16bc8a564ffae5bc",
      "epoch_id": "EPOCH-bbf05f2d8903eccc",
      "site_name": "Goodnight",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Crusoe",
        "Hoffman"
      ],
      "relationship": "publicly identified construction/EPC partners",
      "source": "Intel Accelerator enrichment",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.gridtracker.io/example-report"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Retained construction/EPC field from the enrichment registry; contractor role may be EPC, GC, or construction partner depending on source.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-9d4f16bc8a564ffae5bc"
    },
    {
      "claim_id": "EVID-PWEB-32abdb25",
      "epoch_id": "EPOCH-bdc85fadae79b6b2",
      "site_name": "AWS New Albany",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Suffolk Construction",
      "relationship": "general contractor",
      "source": "Compute Institute / City of New Albany permit record",
      "source_urls": [
        "https://compute.institute/entities/suffolk-construction",
        "https://newalbanyohio.org/community-development/project-updates/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Compute Institute's source-backed project role identifies Suffolk Construction as general contractor for the AWS New Albany Data Center Campus and points to City of New Albany permit records.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-32abdb25"
    },
    {
      "claim_id": "EVID-PWEB-1e60cbc16128019de192",
      "epoch_id": "EPOCH-bdc85fadae79b6b2",
      "site_name": "AWS New Albany",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "AEP Ohio / PJM",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://datacentersexposed.com/facilities/amazon-new-albany-2"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-1e60cbc16128019de192"
    },
    {
      "claim_id": "EVID-PWEB-6b95f1192066ddaac8b6",
      "epoch_id": "EPOCH-bdc85fadae79b6b2",
      "site_name": "AWS New Albany",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "AEP Ohio",
      "relationship": "serving utility",
      "source": "DataCentersExposed",
      "source_urls": [
        "https://datacentersexposed.com/facilities/amazon-new-albany-2"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-6b95f1192066ddaac8b6"
    },
    {
      "claim_id": "EVID-PWEB-14825ea4",
      "epoch_id": "EPOCH-bdc85fadae79b6b2",
      "site_name": "AWS New Albany",
      "domain": "site_identity",
      "field": "project",
      "value": "AWS New Albany Data Center Campus",
      "relationship": "named campus/project identity",
      "source": "Compute Institute / City of New Albany permit record",
      "source_urls": [
        "https://compute.institute/entities/suffolk-construction",
        "https://newalbanyohio.org/community-development/project-updates/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Public permit-based research identifies the AWS New Albany Data Center Campus; the project is treated as a named campus identity, not an inference about all New Albany facilities.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-14825ea4"
    },
    {
      "claim_id": "EVID-PWEB-69578253",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Darana Hybrid",
      "relationship": "primary permit-submitting contractor for electrical, mechanical, plumbing and related work",
      "source": "Measured AI",
      "source_urls": [
        "https://measuredai.substack.com/p/xai-colossus-data-center-cluster"
      ],
      "publication_date": "2026-06-16",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Measured AI reports Darana Hybrid as a primary permit-submitting contractor for xAI's Memphis Colossus buildings. This is a contractor relationship reported by a secondary research source, not an ownership claim.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-69578253"
    },
    {
      "claim_id": "EVID-PWEB-cc2ferguson20260923",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Ferguson Enterprises LLC"
      ],
      "relationship": "publicly documented construction supplier / lien claimant",
      "source": "WSMV Action News 5",
      "source_urls": [
        "https://www.wsmv.com/2026/09/23/new-lien-filed-against-musk-linked-data-center-memphis/"
      ],
      "publication_date": "2026-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "WSMV reported that Ferguson Enterprises LLC filed a lien against MZX Tech LLC for $4.2 million it said was owed for work at Colossus 2; the report describes Ferguson as having provided pipes, pipe valves and fittings. This is a site-specific construction/supply relationship, not a claim that Ferguson is the general contractor.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-cc2ferguson20260923"
    },
    {
      "claim_id": "EVID-PWEB-2f4d691df92304f27a57",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Tennessee Valley Authority",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.interconnection.fyi/data-center/project/xai-colossus-2-ff09d693"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-2f4d691df92304f27a57"
    },
    {
      "claim_id": "EVID-PWEB-77e2e54cbb6719be2a31",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": [
        "Memphis Light, Gas and Water (MLGW)",
        "Tennessee Valley Authority (TVA)"
      ],
      "relationship": "site utility / direct-supply request",
      "source": "xAI Memphis Info Center; Daily Memphian",
      "source_urls": [
        "https://x.ai/memphis/info",
        "https://dailymemphian.com/article/65680/spacexai-power-memphis-tennessee-valley-authority-tva"
      ],
      "publication_date": "2026-08-20",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "xAI states standard operations draw power from MLGW; Daily Memphian reports a site-specific request to TVA for additional direct supply. These are distinct relationships, not a single utility label.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-77e2e54cbb6719be2a31"
    },
    {
      "claim_id": "EVID-PWEB-cbdf15c10faee7acd98d",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Tennessee Valley Authority (TVA)",
      "relationship": "power supplier / 100 MW increase reported in 2026",
      "source": "Memphis Business Journal",
      "source_urls": [
        "https://www.bizjournals.com/memphis/news/2026/08/20/spacexai-power-increase-tva-data-center-colossus-2.html"
      ],
      "publication_date": "2026-08-20",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Site-level utility relationship; not a queue ID.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-cbdf15c10faee7acd98d"
    },
    {
      "claim_id": "EVID-PWEB-dcab430bdfd39c7c3d6a",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "MLGW; TVA; on-site battery and generation support",
      "relationship": "power system relationships",
      "source": "SpaceXAI; Daily Memphian",
      "source_urls": [
        "https://x.ai/memphis/info",
        "https://dailymemphian.com/article/65680/spacexai-power-memphis-tennessee-valley-authority-tva"
      ],
      "publication_date": "2026-08-20",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-dcab430bdfd39c7c3d6a"
    },
    {
      "claim_id": "EVID-PWEB-609e5df08c460cd4e7d1",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "financing",
      "field": "investment",
      "value": "$659M permit value for a Colossus 2 campus expansion",
      "relationship": "construction permit value",
      "source": "Memphis Business Journal",
      "source_urls": [
        "https://www.bizjournals.com/memphis/news/2026/03/03/xai-colossus-2-campus-5414-tulane-building.html"
      ],
      "publication_date": "2026-03-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Permit value, not total project capex or investor funding.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-609e5df08c460cd4e7d1"
    },
    {
      "claim_id": "EVID-PWEB-5d41ec59",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "financing",
      "field": "investors",
      "value": "NVIDIA",
      "relationship": "reported project-linked equity participant in financing tied to Colossus 2",
      "source": "Reuters (reporting Bloomberg); Bloomberg",
      "source_urls": [
        "https://www.reuters.com/business/musks-xai-nears-20-billion-capital-raise-tied-nvidia-chips-2025-10-07/",
        "https://news.bloomberglaw.com/antitrust/musks-xai-nears-20-billion-capital-raise-tied-to-nvidia-chips"
      ],
      "publication_date": "2025-10-07",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Reported financing structure included an SPV intended to buy NVIDIA processors and rent them to xAI for use in Colossus 2; Reuters reported NVIDIA would invest in the financing. This is a project-linked financing relationship, not a claim that NVIDIA owns Colossus 2.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-5d41ec59"
    },
    {
      "claim_id": "EVID-PWEB-b2cde1389f9da056463b",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "site_identity",
      "field": "project",
      "value": "Colossus 2",
      "relationship": "public project identity",
      "source": "Memphis Business Journal",
      "source_urls": [
        "https://www.bizjournals.com/memphis/news/2026/03/03/xai-colossus-2-campus-5414-tulane-building.html"
      ],
      "publication_date": "2026-03-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Project identity; does not establish ownership or external investment.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b2cde1389f9da056463b"
    },
    {
      "claim_id": "EVID-PWEB-cebecd5b9d8b717df82a",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "xAI states permits were obtained for Colossus and all Memphis infrastructure, including the first MLGW substation and planned water-recycling plant",
      "relationship": "construction permitting",
      "source": "SpaceXAI Memphis",
      "source_urls": [
        "https://x.ai/memphis/info"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-cebecd5b9d8b717df82a"
    },
    {
      "claim_id": "EVID-PWEB-9c5213bb",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Tennessee Valley Authority (TVA) direct electric service agreement / load request greater than 100 MW for MZX Tech LLC",
      "relationship": "site-specific electric service / large-load request",
      "source": "Daily Memphian; Yahoo Finance / Memphis Commercial Appeal",
      "source_urls": [
        "https://dailymemphian.com/article/65680/spacexai-power-memphis-tennessee-valley-authority-tva",
        "https://finance.yahoo.com/energy/articles/tva-board-approves-agreement-spacexai-234602682.html"
      ],
      "publication_date": "2026-08-20",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "TVA Board approval on August 20, 2026 covered a load request greater than 100 MW for MZX Tech LLC. The cited reporting ties the request to SpaceXAI's Colossus II campus spanning the Memphis/Southaven area. This is a service/load-request record, not interval telemetry.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-9c5213bb"
    },
    {
      "claim_id": "EVID-PWEB-nva02-novec-20260927",
      "epoch_id": "EPOCH-c89a3269719f868a",
      "site_name": "STACK Infrastructure NVA02",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Northern Virginia Electric Cooperative (NOVEC)",
      "relationship": "onsite substation infrastructure provider",
      "source": "STACK Infrastructure",
      "source_urls": [
        "https://www.stackinfra.com/locations/americas/northern-virginia/nva02/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "STACK states NVA02 has two dedicated 300 MW onsite substations from NOVEC; this is infrastructure evidence, not a formal queue-ID match.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-nva02-novec-20260927"
    },
    {
      "claim_id": "EVID-PWEB-nva02-project-20260927",
      "epoch_id": "EPOCH-c89a3269719f868a",
      "site_name": "STACK Infrastructure NVA02",
      "domain": "site_identity",
      "field": "project",
      "value": "NVA02",
      "relationship": "campus/project identity",
      "source": "STACK Infrastructure",
      "source_urls": [
        "https://www.stackinfra.com/locations/americas/northern-virginia/nva02/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "STACK identifies the Manassas campus as NVA02.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-nva02-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-cc9d96507cee7b059876",
      "epoch_id": "EPOCH-cc12c3e42b3eaf08",
      "site_name": "QTS Richmond 1",
      "domain": "site_identity",
      "field": "address",
      "value": "6000 Technology Blvd, Sandston, VA 23150; additional RIC1 buildings at 3560/3540/3520 Portugee Rd",
      "relationship": "facility addresses",
      "source": "QTS",
      "source_urls": [
        "https://q.com/data-centers/richmond-1/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-cc9d96507cee7b059876"
    },
    {
      "claim_id": "EVID-PWEB-460b3900",
      "epoch_id": "EPOCH-cc12c3e42b3eaf08",
      "site_name": "QTS Richmond 1",
      "domain": "power_telemetry",
      "field": "backup_generation",
      "value": "On-site diesel fuel with multiple refueling contracts; 48 hours of generator runtime",
      "relationship": "facility backup-generation disclosure for RIC1 DC1-DC3",
      "source": "QTS facility factsheet",
      "source_urls": [
        "https://qtsdatacenters.com/wp-content/uploads/2024/07/QTS_Facility_Sheet_RIC1-DC1-DC2-DC3.pdf"
      ],
      "publication_date": "2024-07-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Factsheet-level disclosure for RIC1 DC1-DC3; this is infrastructure capability, not observed generator operation or measured fuel use.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-460b3900"
    },
    {
      "claim_id": "EVID-PWEB-c7308ef496571866a147",
      "epoch_id": "EPOCH-cc12c3e42b3eaf08",
      "site_name": "QTS Richmond 1",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "238 MW; 207-acre campus; six planned facilities; 2.3M sq ft current space",
      "relationship": "official facility capacity/site-plan disclosure",
      "source": "QTS",
      "source_urls": [
        "https://q.com/data-centers/richmond-1/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-c7308ef496571866a147"
    },
    {
      "claim_id": "EVID-PWEB-1c2efeb8",
      "epoch_id": "EPOCH-cc12c3e42b3eaf08",
      "site_name": "QTS Richmond 1",
      "domain": "construction",
      "field": "construction_companies",
      "value": "DPR Construction",
      "relationship": "contractor for QTS Richmond 1 Data Center 3 retrofit",
      "source": "DPR Construction",
      "source_urls": [
        "https://www.dpr.com/projects/qts-richmond-data-center"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DPR's project page identifies its QTS Richmond 1 Data Center 3 project in Sandston and describes the retrofit/buildout scope.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-1c2efeb8"
    },
    {
      "claim_id": "EVID-PWEB-9491d56c",
      "epoch_id": "EPOCH-cc12c3e42b3eaf08",
      "site_name": "QTS Richmond 1",
      "domain": "cooling",
      "field": "cooling",
      "value": "Evaporative-cooled and air-cooled chiller units; CRAC/CRAH cooling; temperature and humidity sensors",
      "relationship": "facility cooling disclosure for RIC1 DC1-DC3 factsheet",
      "source": "QTS facility factsheet",
      "source_urls": [
        "https://qtsdatacenters.com/wp-content/uploads/2024/07/QTS_Facility_Sheet_RIC1-DC1-DC2-DC3.pdf"
      ],
      "publication_date": "2024-07-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Scope is the RIC1 DC1-DC3 factsheet subset, which states cooling equipment types and environmental monitoring. It should not be extrapolated to every RIC1 building.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-9491d56c"
    },
    {
      "claim_id": "EVID-PWEB-1583557a376aed2b306f",
      "epoch_id": "EPOCH-cc12c3e42b3eaf08",
      "site_name": "QTS Richmond 1",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Dominion Energy Virginia",
      "relationship": "serving utility / grid",
      "source": "SUE Data Centers; Dominion Energy",
      "source_urls": [
        "https://suedatacenters.org/data-centers/qts-richmond-1-dc1-ric1-white-oak-technology-park-va",
        "https://www.dominionenergy.com/-/media/content/about/power-line-projects/white-oak/pdfs/application-volume-3of3-part1of2-2023-white-oak.pdf"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-1583557a376aed2b306f"
    },
    {
      "claim_id": "EVID-PWEB-13ae0cd2620e176ffb88",
      "epoch_id": "EPOCH-cc12c3e42b3eaf08",
      "site_name": "QTS Richmond 1",
      "domain": "ownership",
      "field": "owner",
      "value": "Quality Investment Properties Richmond, LLC / QTS Data Centers",
      "relationship": "site operator / project entity",
      "source": "QTS; SUE Data Centers",
      "source_urls": [
        "https://q.com/data-centers/richmond-1/",
        "https://suedatacenters.org/data-centers/qts-richmond-1-dc1-ric1-white-oak-technology-park-va"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-13ae0cd2620e176ffb88"
    },
    {
      "claim_id": "EVID-PWEB-2fd5cd0a",
      "epoch_id": "EPOCH-cc12c3e42b3eaf08",
      "site_name": "QTS Richmond 1",
      "domain": "site_identity",
      "field": "project",
      "value": "Richmond 1 Data Center Campus",
      "relationship": "official campus/project identity",
      "source": "QTS",
      "source_urls": [
        "https://q.com/data-centers/richmond-1/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "QTS labels the site Richmond 1 and describes it as a multi-building data center campus. This is a project/campus identity, not an investor record.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-2fd5cd0a"
    },
    {
      "claim_id": "EVID-PWEB-batch2-meta-gallatin-cons-5",
      "epoch_id": "EPOCH-d29894d37388a96a",
      "site_name": "Meta Gallatin",
      "domain": "construction",
      "field": "construction_companies",
      "value": "DPR Construction",
      "relationship": "publicly identified general contractor",
      "source": "DPR Construction",
      "source_urls": [
        "https://www.dpr.com/projects/facebook-gallatin-data-center"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DPR's current project page identifies DPR Construction as general contractor for the Meta/Facebook Gallatin data center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch2-meta-gallatin-cons-5"
    },
    {
      "claim_id": "EVID-PWEB-batch3-meta-gallatin-cool-1",
      "epoch_id": "EPOCH-d29894d37388a96a",
      "site_name": "Meta Gallatin",
      "domain": "cooling",
      "field": "cooling",
      "value": "Direct-air cooling using outside air and fans",
      "relationship": "site cooling architecture",
      "source": "DPR Construction",
      "source_urls": [
        "https://www.dpr.com/projects/facebook-gallatin-data-center"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DPR's project page describes the Gallatin site as using direct air cooling with outside air and fan technology.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch3-meta-gallatin-cool-1"
    },
    {
      "claim_id": "EVID-PWEB-2b92f5bcf8c2ea0dd8c1",
      "epoch_id": "EPOCH-d29894d37388a96a",
      "site_name": "Meta Gallatin",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": [
        "Tennessee Valley Authority (TVA)",
        "Tennessee solar counterparties"
      ],
      "relationship": "renewable-energy support / power system",
      "source": "Meta Data Centers; Gallatin Economic Development Agency",
      "source_urls": [
        "https://datacenters.atmeta.com/2020/08/hello-gallatin/",
        "https://www.gallatingetsit.com/corporate-tech"
      ],
      "publication_date": "2020-08-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta states it contracted for 220 MW of new solar energy in Tennessee to support operations in the area and thanks TVA and local partners.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-2b92f5bcf8c2ea0dd8c1"
    },
    {
      "claim_id": "EVID-PWEB-batch2-meta-gallatin-ener-6",
      "epoch_id": "EPOCH-d29894d37388a96a",
      "site_name": "Meta Gallatin",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Tennessee Valley Authority",
      "relationship": "publicly identified energy partner",
      "source": "DPR Construction",
      "source_urls": [
        "https://www.dpr.com/projects/facebook-gallatin-data-center"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DPR's project page says the Gallatin campus is supported by renewable energy through partnerships with the Tennessee Valley Authority.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch2-meta-gallatin-ener-6"
    },
    {
      "claim_id": "EVID-PWEB-5cf7c8788ac9691d1154",
      "epoch_id": "EPOCH-d29894d37388a96a",
      "site_name": "Meta Gallatin",
      "domain": "financing",
      "field": "investment",
      "value": ">$1.5B",
      "relationship": "owner investment",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/"
      ],
      "publication_date": "2024-11-14",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Owner investment, not external financing.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-5cf7c8788ac9691d1154"
    },
    {
      "claim_id": "EVID-PWEB-e6b4671fd01ef088f4cc",
      "epoch_id": "EPOCH-d29894d37388a96a",
      "site_name": "Meta Gallatin",
      "domain": "site_identity",
      "field": "project",
      "value": "Gallatin Data Center",
      "relationship": "official project name",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/",
        "https://datacenters.atmeta.com/2020/08/hello-gallatin/"
      ],
      "publication_date": "2024-11-14",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-e6b4671fd01ef088f4cc"
    },
    {
      "claim_id": "EVID-PWEB-488fbd38ee0c166422f6",
      "epoch_id": "EPOCH-d2da66ea035880ce",
      "site_name": "QTS Cedar Rapids",
      "domain": "cooling",
      "field": "cooling",
      "value": "Closed-loop cooling system with minimal ongoing water consumption",
      "relationship": "site cooling architecture",
      "source": "Alliant Energy / QTS",
      "source_urls": [
        "https://www.alliantenergy.com/news/illuminate/%2C-w-%2C/2026/05/050726-qts"
      ],
      "publication_date": "2026-05-07",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-488fbd38ee0c166422f6"
    },
    {
      "claim_id": "EVID-PWEB-7aa6fce6ea7756332655",
      "epoch_id": "EPOCH-d2da66ea035880ce",
      "site_name": "QTS Cedar Rapids",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Alliant Energy",
      "relationship": "energy partner / grid infrastructure provider",
      "source": "Alliant Energy; QTS",
      "source_urls": [
        "https://www.alliantenergy.com/news/news-center/2025/02/021225-qtsannouncementcr",
        "https://q.com/the-qts-difference/energy-approach/"
      ],
      "publication_date": "2025-02-13",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-7aa6fce6ea7756332655"
    },
    {
      "claim_id": "EVID-PWEB-e2b4c604a623fb69acab",
      "epoch_id": "EPOCH-d2da66ea035880ce",
      "site_name": "QTS Cedar Rapids",
      "domain": "financing",
      "field": "investment",
      "value": "Minimum $750M campus investment; up to $18M community betterment contribution over 20 years after first construction phase",
      "relationship": "project investment/development agreement",
      "source": "Alliant Energy; City of Cedar Rapids",
      "source_urls": [
        "https://www.alliantenergy.com/news/news-center/2025/02/021225-qtsannouncementcr"
      ],
      "publication_date": "2025-02-13",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Project-level investment commitment; not an external investor.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-e2b4c604a623fb69acab"
    },
    {
      "claim_id": "EVID-PWEB-b86105021a4ab0941810",
      "epoch_id": "EPOCH-d2da66ea035880ce",
      "site_name": "QTS Cedar Rapids",
      "domain": "ownership",
      "field": "owner",
      "value": "QTS Cedar Rapids LLC / QTS Data Centers",
      "relationship": "project entity / developer",
      "source": "City of Cedar Rapids; Alliant Energy; QTS",
      "source_urls": [
        "https://www.alliantenergy.com/news/news-center/2025/02/021225-qtsannouncementcr",
        "https://q.com/data-centers/cedar-rapids/"
      ],
      "publication_date": "2025-02-13",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b86105021a4ab0941810"
    },
    {
      "claim_id": "EVID-PWEB-e080e7b4",
      "epoch_id": "EPOCH-d2da66ea035880ce",
      "site_name": "QTS Cedar Rapids",
      "domain": "site_identity",
      "field": "project",
      "value": "QTS Cedar Rapids Data Center Campus",
      "relationship": "official campus/project identity",
      "source": "QTS Data Centers",
      "source_urls": [
        "https://q.com/data-centers/cedar-rapids/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "QTS's official page labels Cedar Rapids, Iowa as a Data Center Campus and states QTS is building it. No contractor is inferred from this source.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-e080e7b4"
    },
    {
      "claim_id": "EVID-PWEB-5fc6912ddcea57bd29b3",
      "epoch_id": "EPOCH-d8b28fdbc55817f9",
      "site_name": "Google Columbus",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "303 MW IT power; 332k H100-equivalent compute; $11.5B modeled capex",
      "relationship": "third-party site-scale estimate",
      "source": "Intel Accelerator",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": "2026-09-26",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Third-party modeled values, not direct utility measurements or Google-disclosed capex.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-5fc6912ddcea57bd29b3"
    },
    {
      "claim_id": "EVID-PWEB-c1b77486ab7d2862e687",
      "epoch_id": "EPOCH-d8b28fdbc55817f9",
      "site_name": "Google Columbus",
      "domain": "chip_inventory",
      "field": "chip_quantities",
      "value": "TPU v5e, v5p, v6e, v7",
      "relationship": "site accelerator types",
      "source": "Intel Accelerator",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": "2026-09-26",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Types are listed; exact unit counts are not established by this source.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-c1b77486ab7d2862e687"
    },
    {
      "claim_id": "EVID-PWEB-c157e8e6e2b057338ed9",
      "epoch_id": "EPOCH-d8b28fdbc55817f9",
      "site_name": "Google Columbus",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Source projects Building 5 operational on 2027-07-01; five-building campus shown in deployment estimate",
      "relationship": "projected deployment milestone",
      "source": "Intel Accelerator",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": "2026-09-26",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This is a third-party projected milestone, not a verified future completion date.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-c157e8e6e2b057338ed9"
    },
    {
      "claim_id": "EVID-PWEB-2ce6a4636dcef7eeebfa",
      "epoch_id": "EPOCH-d8b28fdbc55817f9",
      "site_name": "Google Columbus",
      "domain": "site_identity",
      "field": "project",
      "value": "Google Columbus data center",
      "relationship": "official/public project identity",
      "source": "Intel Accelerator / Google",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.datacenters.google/locations/ohio/"
      ],
      "publication_date": "2026-09-26",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-2ce6a4636dcef7eeebfa"
    },
    {
      "claim_id": "EVID-PWEB-c7732fdd1e713782cc92",
      "epoch_id": "EPOCH-d9050b43689ed24c",
      "site_name": "Microsoft Fairwater Atlanta",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "HITT Contracting",
        "Clayco",
        "Brasfield & Gorrie"
      ],
      "relationship": "construction partners on Fayetteville Fairwater/main campus",
      "source": "Measured AI",
      "source_urls": [
        "https://measuredai.substack.com/p/microsoft-fairwater-atlanta-data-center"
      ],
      "publication_date": "2026-06-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The source identifies HITT on Fairwater DC-1/DC-2/DC-10, Clayco on DC-9, and Brasfield & Gorrie on DC-3/DC-4 plus East Campus site preparation.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-c7732fdd1e713782cc92"
    },
    {
      "claim_id": "EVID-PWEB-fairwaterbuilders20260927",
      "epoch_id": "EPOCH-d9050b43689ed24c",
      "site_name": "Microsoft Fairwater Atlanta",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "HITT Contracting",
        "Clayco",
        "Brasfield & Gorrie"
      ],
      "relationship": "publicly identified construction partners on the Fayetteville data-center campus",
      "source": "MeasuredAI",
      "source_urls": [
        "https://measuredai.substack.com/p/microsoft-fairwater-atlanta-data-center"
      ],
      "publication_date": "2026-06-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "MeasuredAI reports HITT Contracting on Fairwater and other Fayetteville buildings, Clayco on Fairwater DC-9, and Brasfield & Gorrie on Fairwater/DC-3/DC-4 and site preparation. Source role is retained as secondary public evidence; it is not treated as an independently verified general-contractor roster.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-fairwaterbuilders20260927"
    },
    {
      "claim_id": "EVID-PWEB-a064e1f6b86fcbdcfee6",
      "epoch_id": "EPOCH-d9050b43689ed24c",
      "site_name": "Microsoft Fairwater Atlanta",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Georgia Power",
      "relationship": "site-level energy partner",
      "source": "Intel Accelerator / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Retained public enrichment identifies Georgia Power as site-level energy partner and Southern Company as public grid operator.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a064e1f6b86fcbdcfee6"
    },
    {
      "claim_id": "EVID-PWEB-a468cb36b106e4ed306f",
      "epoch_id": "EPOCH-d9050b43689ed24c",
      "site_name": "Microsoft Fairwater Atlanta",
      "domain": "financing",
      "field": "investment",
      "value": "$3B estimated build-out value for East Campus/ATL2 East DRI filing",
      "relationship": "campus expansion value",
      "source": "Measured AI / City of Fayetteville records",
      "source_urls": [
        "https://measuredai.substack.com/p/microsoft-fairwater-atlanta-data-center"
      ],
      "publication_date": "2026-05-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "East Campus estimate, not total Microsoft investment and not external investor funding.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a468cb36b106e4ed306f"
    },
    {
      "claim_id": "EVID-PWEB-29c1cd6454e42d1d2016",
      "epoch_id": "EPOCH-d9050b43689ed24c",
      "site_name": "Microsoft Fairwater Atlanta",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Buildings 1-4 operational as of 2026-06-14; additional campus construction ongoing",
      "relationship": "satellite-derived project status",
      "source": "Samaritan Research / Epoch AI",
      "source_urls": [
        "https://samaritan-research.org/data/data-centers/satellite-explorer/MicrosoftFairwaterFayettevilleGeorgia"
      ],
      "publication_date": "2026-06-14",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Status is building-level and based on satellite imagery; not a utility commissioning certificate.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-29c1cd6454e42d1d2016"
    },
    {
      "claim_id": "EVID-PWEB-80a26af30358ed6da35c",
      "epoch_id": "EPOCH-d9050b43689ed24c",
      "site_name": "Microsoft Fairwater Atlanta",
      "domain": "site_identity",
      "field": "project",
      "value": "Microsoft AI WAN",
      "relationship": "public program/project identity",
      "source": "Intel Accelerator",
      "source_urls": [
        "https://intelaccelerator.com/projects"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-80a26af30358ed6da35c"
    },
    {
      "claim_id": "EVID-PWEB-a5aa4838248028948fa5",
      "epoch_id": "EPOCH-dadec9d6ef7fca88",
      "site_name": "EcoDataCenter 2",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "Up to 600 MW available; 200,000 m² land",
      "relationship": "developer capacity disclosure",
      "source": "EcoDataCenter",
      "source_urls": [
        "https://ecodatacenter.tech/data-center/ecodatacenter2"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a5aa4838248028948fa5"
    },
    {
      "claim_id": "EVID-PWEB-b7ecf20766f12f28af8c",
      "epoch_id": "EPOCH-dadec9d6ef7fca88",
      "site_name": "EcoDataCenter 2",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": [
        "local hydropower",
        "wind power",
        "Borlänge Energi"
      ],
      "relationship": "renewable energy / heating ecosystem",
      "source": "EcoDataCenter",
      "source_urls": [
        "https://ecodatacenter.tech/data-center/ecodatacenter2"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b7ecf20766f12f28af8c"
    },
    {
      "claim_id": "EVID-PWEB-c6c348872f4f6ae8ac2d",
      "epoch_id": "EPOCH-dadec9d6ef7fca88",
      "site_name": "EcoDataCenter 2",
      "domain": "site_identity",
      "field": "project",
      "value": "EcoDataCenter 2 / Borlänge development",
      "relationship": "official site identity",
      "source": "EcoDataCenter",
      "source_urls": [
        "https://ecodatacenter.tech/data-center/ecodatacenter2"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-c6c348872f4f6ae8ac2d"
    },
    {
      "claim_id": "EVID-PWEB-7802f1df8185439159f2",
      "epoch_id": "EPOCH-dadec9d6ef7fca88",
      "site_name": "EcoDataCenter 2",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "All environmental permits approved; construction began September 2025; first phase targeted mid-2027",
      "relationship": "environmental permitting / construction",
      "source": "EcoDataCenter",
      "source_urls": [
        "https://ecodatacenter.tech/data-center/ecodatacenter2"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-7802f1df8185439159f2"
    },
    {
      "claim_id": "EVID-PWEB-bdba98a68e7e13ec7a57",
      "epoch_id": "EPOCH-dc6199921ba82b85",
      "site_name": "OpenAI Stargate Lordstown",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "FirstEnergy / Ohio Edison",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://suedatacenters.org/data-centers/stargate-lordstown-oh"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-bdba98a68e7e13ec7a57"
    },
    {
      "claim_id": "EVID-PWEB-8e6beb926a943e143517",
      "epoch_id": "EPOCH-e06bc7faa8b1b187",
      "site_name": "Google Lincoln",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Lincoln Electric System",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.les.com/sites/default/files/bd-min-dec-2023.pdf"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-8e6beb926a943e143517"
    },
    {
      "claim_id": "EVID-PWEB-8419b300719f654b8161",
      "epoch_id": "EPOCH-e06bc7faa8b1b187",
      "site_name": "Google Lincoln",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Google says the Lincoln, Nebraska data center comes online in 2026",
      "relationship": "official milestone",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/nebraska/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-8419b300719f654b8161"
    },
    {
      "claim_id": "EVID-PWEB-d0f12f2cf39645aa5e1c",
      "epoch_id": "EPOCH-e06bc7faa8b1b187",
      "site_name": "Google Lincoln",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Online in 2026",
      "relationship": "official milestone",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/nebraska/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-d0f12f2cf39645aa5e1c"
    },
    {
      "claim_id": "EVID-PWEB-5e0cf10caad6dc1f4707",
      "epoch_id": "EPOCH-e06bc7faa8b1b187",
      "site_name": "Google Lincoln",
      "domain": "site_identity",
      "field": "project",
      "value": "Google Lincoln data center",
      "relationship": "project name",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/nebraska/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-5e0cf10caad6dc1f4707"
    },
    {
      "claim_id": "EVID-PWEB-218810567fa466b47108",
      "epoch_id": "EPOCH-e3aa5f34aa5c4a7b",
      "site_name": "OpenAI Stargate Milam",
      "domain": "construction",
      "field": "construction_companies",
      "value": "SB Energy",
      "relationship": "development/execution partner",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/stargate-sb-energy-partnership/"
      ],
      "publication_date": "2025-12-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "OpenAI selected SB Energy to build and operate the 1.2 GW Milam County site.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-218810567fa466b47108"
    },
    {
      "claim_id": "EVID-PWEB-654c2737b82c17bf3de8",
      "epoch_id": "EPOCH-e3aa5f34aa5c4a7b",
      "site_name": "OpenAI Stargate Milam",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "SB Energy powered infrastructure",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://openai.com/index/stargate-sb-energy-partnership/"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-654c2737b82c17bf3de8"
    },
    {
      "claim_id": "EVID-PWEB-cfabf01b2b8c5c4a4bae",
      "epoch_id": "EPOCH-e3aa5f34aa5c4a7b",
      "site_name": "OpenAI Stargate Milam",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "SB Energy onsite generation and storage; Texas grid modernization",
      "relationship": "dedicated power development",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/stargate-sb-energy-partnership/",
        "https://openai.com/index/stargate-community/"
      ],
      "publication_date": "2025-12-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-cfabf01b2b8c5c4a4bae"
    },
    {
      "claim_id": "EVID-PWEB-23ae26a666976d9ca07c",
      "epoch_id": "EPOCH-e3aa5f34aa5c4a7b",
      "site_name": "OpenAI Stargate Milam",
      "domain": "financing",
      "field": "investors",
      "value": [
        "OpenAI",
        "SoftBank Group"
      ],
      "relationship": "investment into SB Energy supporting Stargate development",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/stargate-sb-energy-partnership/"
      ],
      "publication_date": "2025-12-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "OpenAI and SoftBank each invested $500M in SB Energy. This is platform investment supporting development, not necessarily direct project equity.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-23ae26a666976d9ca07c"
    },
    {
      "claim_id": "EVID-PWEB-ORACLE-BATAM-LOC-20260927",
      "epoch_id": "EPOCH-ea5d1ae5837aba5c",
      "site_name": "Oracle Batam",
      "domain": "site_identity",
      "field": "location",
      "value": "Nongsa Digital Park, Batam, Indonesia",
      "relationship": "campus location",
      "source": "Data Center Dynamics",
      "source_urls": [
        "https://www.datacenterdynamics.com/en/news/oracle-establishes-cloud-presence-in-indonesia/"
      ],
      "publication_date": "2025-07-11",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The report places Oracle's Indonesia cloud facilities in DayOne-operated data centers at Nongsa Digital Park; no exact building coordinate is asserted.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ORACLE-BATAM-LOC-20260927"
    },
    {
      "claim_id": "EVID-PWEB-ORACLE-BATAM-SVC-20260927",
      "epoch_id": "EPOCH-ea5d1ae5837aba5c",
      "site_name": "Oracle Batam",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Oracle is reported to lease DayOne Data Centers facilities at Nongsa Digital Park for its Indonesia North cloud region; the reported DayOne plots could support facilities with at least 120 MW of power.",
      "relationship": "tenant lease / site service linkage",
      "source": "Data Center Dynamics",
      "source_urls": [
        "https://www.datacenterdynamics.com/en/news/oracle-establishes-cloud-presence-in-indonesia/"
      ],
      "publication_date": "2025-07-11",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Secondary reporting attributes the lease to people familiar with the matter. It establishes a public tenant-to-campus linkage but not a specific parcel or measured load.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ORACLE-BATAM-SVC-20260927"
    },
    {
      "claim_id": "EVID-PWEB-e8fec2acd441e5519de9",
      "epoch_id": "EPOCH-ea699c935d46e066",
      "site_name": "Google Pryor (North)",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Grand River Dam Authority (GRDA)",
      "relationship": "serving utility",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/google-mayes-county-ok"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-e8fec2acd441e5519de9"
    },
    {
      "claim_id": "EVID-PWEB-d7a17f00528d94680d2a",
      "epoch_id": "EPOCH-ea699c935d46e066",
      "site_name": "Google Pryor (North)",
      "domain": "financing",
      "field": "investment",
      "value": "$9B announced capex; 400 permanent reported jobs",
      "relationship": "campus investment / employment disclosure",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/google-mayes-county-ok"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Campus-level disclosed/compiled figures; not allocated across individual buildings.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-d7a17f00528d94680d2a"
    },
    {
      "claim_id": "EVID-PWEB-f38c0d9e84d57e4b3c21",
      "epoch_id": "EPOCH-ea699c935d46e066",
      "site_name": "Google Pryor (North)",
      "domain": "ownership",
      "field": "owner",
      "value": "MidAmerica Industrial Park",
      "relationship": "host land owner / industrial park",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/google-mayes-county-ok"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-f38c0d9e84d57e4b3c21"
    },
    {
      "claim_id": "EVID-PWEB-6be6931b",
      "epoch_id": "EPOCH-ea699c935d46e066",
      "site_name": "Google Pryor (North)",
      "domain": "site_identity",
      "field": "project",
      "value": "Google Pryor Data Center Campus (Mayes County Expansion)",
      "relationship": "named campus/project identity",
      "source": "SUE Data Centers / Google",
      "source_urls": [
        "https://suedatacenters.org/data-centers/google-pryor-ok",
        "https://www.datacenters.google/locations/oklahoma/"
      ],
      "publication_date": "2026-09-14",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Public records identify Google's Pryor site as the Mayes County expansion/data center campus. This is retained as a campus identity and should not be used to collapse distinct Epoch sub-sites.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-6be6931b"
    },
    {
      "claim_id": "EVID-PWEB-ea02e76171e1547b3284",
      "epoch_id": "EPOCH-ea699c935d46e066",
      "site_name": "Google Pryor (North)",
      "domain": "site_identity",
      "field": "project",
      "value": "Mayes County Data Center / Google Pryor (MidAmerica) Data Center Campus",
      "relationship": "campus/project identity",
      "source": "DEPLOY; Compute Atlas",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/google-mayes-county-ok",
        "https://www.compute-atlas.com/facilities/leeward-mayes-solar-mayes-county-ok"
      ],
      "publication_date": "2026-09-14",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ea02e76171e1547b3284"
    },
    {
      "claim_id": "EVID-PWEB-635ccf065252b11abc39",
      "epoch_id": "EPOCH-eb87487504bda8ed",
      "site_name": "CoreWeave Marble NC",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Duke Energy",
      "relationship": "publicly identified grid operator / energy infrastructure relationship",
      "source": "Intel Accelerator enrichment / Interconnection.fyi",
      "source_urls": [
        "https://intelaccelerator.com/projects",
        "https://www.jain.com/analysis/projects/core-scientific-marble/"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Grid operator relationship is retained separately from a formal queue ID; where the string contains multiple entities, the relationship is reproduced as published rather than decomposed.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-635ccf065252b11abc39"
    },
    {
      "claim_id": "EVID-PWEB-89a71c3e419bf7e359f2",
      "epoch_id": "EPOCH-eb87487504bda8ed",
      "site_name": "CoreWeave Marble NC",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "~65 MW leased power",
      "relationship": "CoreWeave lease from Core Scientific",
      "source": "Core Scientific",
      "source_urls": [
        "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-013214/q4fy25earningsdeckvfinal.htm"
      ],
      "publication_date": "2026-03-02",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-89a71c3e419bf7e359f2"
    },
    {
      "claim_id": "EVID-PWEB-stream-phoenix-project-20260927",
      "epoch_id": "EPOCH-ee5c7acdbc729ef8",
      "site_name": "Stream Phoenix",
      "domain": "site_identity",
      "field": "project",
      "value": "PHXA — Stream Phoenix",
      "relationship": "campus/project identity",
      "source": "Stream Data Centers",
      "source_urls": [
        "https://www.streamdatacenters.com/locations/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Stream identifies PHXA as its Phoenix campus and reports 280 MW at full build.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-stream-phoenix-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-b8a4c85ac2dd820c9a8b",
      "epoch_id": "EPOCH-f1a2bcdd78478bc2",
      "site_name": "Google Red Oak",
      "domain": "site_identity",
      "field": "project",
      "value": "Google Red Oak data center",
      "relationship": "official site identity",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/texas/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-b8a4c85ac2dd820c9a8b"
    },
    {
      "claim_id": "EVID-PWEB-4ef3b62cb28ff53158a9",
      "epoch_id": "EPOCH-f1a70be0079d215a",
      "site_name": "Nscale Keflavik",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Icelandic geothermal and hydropower system",
      "relationship": "renewable power source",
      "source": "Nscale",
      "source_urls": [
        "https://www.nscale.com/ai-infrastructure"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-4ef3b62cb28ff53158a9"
    },
    {
      "claim_id": "EVID-PWEB-918a8da4fcfca0e02440",
      "epoch_id": "EPOCH-f1a70be0079d215a",
      "site_name": "Nscale Keflavik",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "Nscale GPU deployments / Verne Iceland campus",
      "relationship": "partner-run facility context",
      "source": "Nscale",
      "source_urls": [
        "https://www.nscale.com/ai-infrastructure"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The page states the Keflavik installation is set to host more than 4,600 NVIDIA Blackwell Ultra GPUs across Verne's Icelandic campus in 2026.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-918a8da4fcfca0e02440"
    },
    {
      "claim_id": "EVID-PWEB-96237d95d60a4cd8a6ba",
      "epoch_id": "EPOCH-f340a33a5ef18d4f",
      "site_name": "Google Fort Wayne",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Indiana Michigan Power",
      "relationship": "utility information provided to City of Fort Wayne",
      "source": "City of Fort Wayne",
      "source_urls": [
        "https://engage.cityoffortwayne.org/data-center"
      ],
      "publication_date": "2025-12-11",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-96237d95d60a4cd8a6ba"
    },
    {
      "claim_id": "EVID-PWEB-batch6-google-fort-wayne-oper-1",
      "epoch_id": "EPOCH-f340a33a5ef18d4f",
      "site_name": "Google Fort Wayne",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Operational",
      "relationship": "official current operating status",
      "source": "Google Data Centers",
      "source_urls": [
        "https://www.datacenters.google/locations/indiana/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Google's Indiana location page describes Fort Wayne as an operational data center.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch6-google-fort-wayne-oper-1"
    },
    {
      "claim_id": "EVID-PWEB-a155be9d9e7f7fc0dfcb",
      "epoch_id": "EPOCH-f340a33a5ef18d4f",
      "site_name": "Google Fort Wayne",
      "domain": "site_identity",
      "field": "project",
      "value": "Google Data Center",
      "relationship": "official local project identity",
      "source": "City of Fort Wayne",
      "source_urls": [
        "https://engage.cityoffortwayne.org/data-center"
      ],
      "publication_date": "2025-12-11",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a155be9d9e7f7fc0dfcb"
    },
    {
      "claim_id": "EVID-PWEB-1f31418960132a10dba1",
      "epoch_id": "EPOCH-f48a533b01898dfd",
      "site_name": "CoreWeave Norway",
      "domain": "chip_inventory",
      "field": "chip_quantities",
      "value": "NVIDIA B200 — estimated 20.1k units",
      "relationship": "site accelerator inventory estimate",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/coreweave-norway"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Epoch estimate, not a company-disclosed procurement count.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-1f31418960132a10dba1"
    },
    {
      "claim_id": "EVID-PWEB-a9a5fa0c211bfa515b3c",
      "epoch_id": "EPOCH-f48a533b01898dfd",
      "site_name": "CoreWeave Norway",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Bulk Infrastructure",
      "relationship": "developer/campus partner",
      "source": "Epoch AI / Bulk Infrastructure",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/coreweave-norway"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Bulk is the infrastructure developer/campus partner in the source set; this is not necessarily a general-contractor designation.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-a9a5fa0c211bfa515b3c"
    },
    {
      "claim_id": "EVID-PWEB-743c00542f1ca6d4fb88",
      "epoch_id": "EPOCH-f48a533b01898dfd",
      "site_name": "CoreWeave Norway",
      "domain": "cooling",
      "field": "cooling",
      "value": "32 unknown air-cooled chillers, estimated 56.3 MW capacity",
      "relationship": "site cooling model",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/coreweave-norway"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Modeled equipment observation, not a manufacturer-confirmed bill of materials.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-743c00542f1ca6d4fb88"
    },
    {
      "claim_id": "EVID-PWEB-6465d4948e59660a731d",
      "epoch_id": "EPOCH-f48a533b01898dfd",
      "site_name": "CoreWeave Norway",
      "domain": "site_identity",
      "field": "project",
      "value": "CoreWeave Norway / Bulk N01 42 MW facility",
      "relationship": "project/site identity",
      "source": "Epoch AI / Bulk Infrastructure",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/coreweave-norway"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-6465d4948e59660a731d"
    },
    {
      "claim_id": "EVID-PWEB-batch5-microsoft-fairwater-wiscon-cons-5",
      "epoch_id": "EPOCH-f5dc9d7a3f02c2e9",
      "site_name": "Microsoft Fairwater Wisconsin",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Walsh Construction",
      "relationship": "general contractor / construction partner",
      "source": "Microsoft Local",
      "source_urls": [
        "https://local.microsoft.com/blog/mount-pleasant-datacenter-project-update/"
      ],
      "publication_date": "2026-07-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Microsoft's July 2026 Mount Pleasant update names Walsh Construction as the contact for ongoing site work; the same page notes prior construction phases involving Kiewit, so contractor identity is time-scoped.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch5-microsoft-fairwater-wiscon-cons-5"
    },
    {
      "claim_id": "EVID-PWEB-batch5-microsoft-fairwater-wiscon-cons-6",
      "epoch_id": "EPOCH-f5dc9d7a3f02c2e9",
      "site_name": "Microsoft Fairwater Wisconsin",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Kiewit",
      "relationship": "historical construction partner",
      "source": "Microsoft Local",
      "source_urls": [
        "https://local.microsoft.com/blog/mount-pleasant-datacenter-project-update/"
      ],
      "publication_date": "2024-09-12",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Microsoft's Mount Pleasant update records Kiewit as the general contractor for an earlier phase/site-preparation period; retained as a historical relationship rather than a current exclusivity claim.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-batch5-microsoft-fairwater-wiscon-cons-6"
    },
    {
      "claim_id": "EVID-PWEB-17068207638e20f54784",
      "epoch_id": "EPOCH-f5dc9d7a3f02c2e9",
      "site_name": "Microsoft Fairwater Wisconsin",
      "domain": "financing",
      "field": "investment",
      "value": "Initial $3.3B pledge; additional $4B commitment; >$7B total Wisconsin commitment",
      "relationship": "owner investment commitment",
      "source": "Microsoft",
      "source_urls": [
        "https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/"
      ],
      "publication_date": "2025-09-18",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This is owner investment, not an external investor/financing party.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-17068207638e20f54784"
    },
    {
      "claim_id": "EVID-PWEB-d10cd62130a3d313b0d5",
      "epoch_id": "EPOCH-f5dc9d7a3f02c2e9",
      "site_name": "Microsoft Fairwater Wisconsin",
      "domain": "financing",
      "field": "investment",
      "value": "Initial $3.3B investment plus additional $4B commitment; more than $7B total Wisconsin investment",
      "relationship": "owner investment",
      "source": "Microsoft",
      "source_urls": [
        "https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/"
      ],
      "publication_date": "2025-09-18",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-d10cd62130a3d313b0d5"
    },
    {
      "claim_id": "EVID-PWEB-0aedbf17",
      "epoch_id": "EPOCH-f5dc9d7a3f02c2e9",
      "site_name": "Microsoft Fairwater Wisconsin",
      "domain": "site_identity",
      "field": "project",
      "value": "Fairwater data center, Mount Pleasant, Wisconsin",
      "relationship": "official facility/project identity",
      "source": "Microsoft",
      "source_urls": [
        "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
        "https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/"
      ],
      "publication_date": "2026-06-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Microsoft identifies Fairwater in Mount Pleasant and reported its first datacenter facility complete and fully operational on June 23, 2026.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-0aedbf17"
    },
    {
      "claim_id": "EVID-PWEB-2d7e117a67ffff214f0c",
      "epoch_id": "EPOCH-f5dc9d7a3f02c2e9",
      "site_name": "Microsoft Fairwater Wisconsin",
      "domain": "site_identity",
      "field": "project",
      "value": "Fairwater",
      "relationship": "data-center project name",
      "source": "Microsoft",
      "source_urls": [
        "https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/"
      ],
      "publication_date": "2025-09-18",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Microsoft identifies the Mount Pleasant AI data center as Fairwater.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-2d7e117a67ffff214f0c"
    },
    {
      "claim_id": "EVID-PWEB-google-lancaster-project-20260927",
      "epoch_id": "EPOCH-f92e98f4b76a9bcd",
      "site_name": "Google Lancaster",
      "domain": "site_identity",
      "field": "project",
      "value": "Lancaster",
      "relationship": "public project identity",
      "source": "Google",
      "source_urls": [
        "https://economicimpact.google/state/oh/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Google identifies Lancaster as one of its Ohio data-center projects.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-google-lancaster-project-20260927"
    },
    {
      "claim_id": "EVID-PWEB-google-lancaster-user-20260927",
      "epoch_id": "EPOCH-f92e98f4b76a9bcd",
      "site_name": "Google Lancaster",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "Google",
      "relationship": "owner/operator public identity",
      "source": "Google",
      "source_urls": [
        "https://economicimpact.google/state/oh/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Google identifies Lancaster as a Google data center; this is not a claim about third-party tenants.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-google-lancaster-user-20260927"
    },
    {
      "claim_id": "PWEB-SOURCE-47d1a200955e4c6b",
      "epoch_id": null,
      "site_name": "Google Iowa",
      "domain": "financing",
      "field": "investment",
      "value": "$7B investment to expand Council Bluffs and establish Cedar Rapids campus",
      "relationship": "state-level Google investment program",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/iowa/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "State-level total; do not allocate the full amount to a single facility.",
      "claim_scope": "state_or_multi_site_public_web",
      "provenance_status": "source_link_retained_no_source_id",
      "source_record_id": null
    },
    {
      "claim_id": "PWEB-SOURCE-7b5ad8485ad99a2f",
      "epoch_id": null,
      "site_name": "Google Nebraska",
      "domain": "financing",
      "field": "investment",
      "value": "$1.2B new investment announced in 2023 across Lincoln, Omaha and Papillion",
      "relationship": "state-level Google data-center investment program",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/nebraska/"
      ],
      "publication_date": "2023-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "State-level figure; do not allocate the entire amount to a single facility.",
      "claim_scope": "state_or_multi_site_public_web",
      "provenance_status": "source_link_retained_no_source_id",
      "source_record_id": null
    },
    {
      "claim_id": "PWEB-SOURCE-e70819e13be8fb04",
      "epoch_id": null,
      "site_name": "Google Texas sites",
      "domain": "site_identity",
      "field": "project",
      "value": [
        "Google Midlothian",
        "Google Red Oak"
      ],
      "relationship": "official Texas campus identities",
      "source": "Google",
      "source_urls": [
        "https://www.datacenters.google/locations/texas/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "State-level source confirms Midlothian and Red Oak as Google's two current Texas locations.",
      "claim_scope": "state_or_multi_site_public_web",
      "provenance_status": "source_link_retained_no_source_id",
      "source_record_id": null
    },
    {
      "claim_id": "EVID-PWEB-MISSING-20fd70-LOCATION",
      "epoch_id": "EPOCH-77e196fc5320fd70",
      "site_name": "Huawei Horinger",
      "domain": "site_identity",
      "field": "location",
      "value": "Hohhot, Inner Mongolia, China",
      "relationship": "current public site location",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-horinger"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-20fd70-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-20fd70-OWNER",
      "epoch_id": "EPOCH-77e196fc5320fd70",
      "site_name": "Huawei Horinger",
      "domain": "ownership",
      "field": "owner",
      "value": "Huawei",
      "relationship": "current owner",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-horinger"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-20fd70-OWNER"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-20fd70-OPERATIONAL_STATUS",
      "epoch_id": "EPOCH-77e196fc5320fd70",
      "site_name": "Huawei Horinger",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Operational",
      "relationship": "current status",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-horinger"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-20fd70-OPERATIONAL_STATUS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-20fd70-CAPACITY_RECORD",
      "epoch_id": "EPOCH-77e196fc5320fd70",
      "site_name": "Huawei Horinger",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "184 MW current IT power; 89k H100-eq estimated compute; $7.0B estimated capital cost",
      "relationship": "current facility scale snapshot",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-horinger"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-20fd70-CAPACITY_RECORD"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-20fd70-CHIP_QUANTITIES",
      "epoch_id": "EPOCH-77e196fc5320fd70",
      "site_name": "Huawei Horinger",
      "domain": "chip_inventory",
      "field": "chip_quantities",
      "value": "118k Huawei Ascend 910C",
      "relationship": "current accelerator estimate",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-horinger"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-20fd70-CHIP_QUANTITIES"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-20fd70-COOLING",
      "epoch_id": "EPOCH-77e196fc5320fd70",
      "site_name": "Huawei Horinger",
      "domain": "cooling",
      "field": "cooling",
      "value": "29 evaporative cooling towers and 124 air-cooled chillers; 170.7 MW modeled cooling",
      "relationship": "current cooling-equipment snapshot",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-horinger"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-20fd70-COOLING"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-20fd70-PROJECT_STATUS",
      "epoch_id": "EPOCH-77e196fc5320fd70",
      "site_name": "Huawei Horinger",
      "domain": "site_identity",
      "field": "project_status",
      "value": "Operational phase 1; a later building is under construction as of Aug. 18, 2026; further expansion is projected",
      "relationship": "dated buildout status",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-horinger"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-20fd70-PROJECT_STATUS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-fe885a-LOCATION",
      "epoch_id": "EPOCH-af62ae3440fe885a",
      "site_name": "Huawei Wuhu",
      "domain": "site_identity",
      "field": "location",
      "value": "Wuhu, Anhui, China",
      "relationship": "current public site location",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-wuhu"
      ],
      "publication_date": "2026-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-fe885a-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-fe885a-OWNER",
      "epoch_id": "EPOCH-af62ae3440fe885a",
      "site_name": "Huawei Wuhu",
      "domain": "ownership",
      "field": "owner",
      "value": "Huawei",
      "relationship": "current owner",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-wuhu"
      ],
      "publication_date": "2026-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-fe885a-OWNER"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-fe885a-OPERATIONAL_STATUS",
      "epoch_id": "EPOCH-af62ae3440fe885a",
      "site_name": "Huawei Wuhu",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Operational",
      "relationship": "current status",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-wuhu"
      ],
      "publication_date": "2026-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-fe885a-OPERATIONAL_STATUS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-fe885a-CAPACITY_RECORD",
      "epoch_id": "EPOCH-af62ae3440fe885a",
      "site_name": "Huawei Wuhu",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "157 MW current IT power; 76k H100-eq estimated compute; $5.9B estimated capital cost",
      "relationship": "current facility scale snapshot",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-wuhu"
      ],
      "publication_date": "2026-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-fe885a-CAPACITY_RECORD"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-fe885a-CHIP_QUANTITIES",
      "epoch_id": "EPOCH-af62ae3440fe885a",
      "site_name": "Huawei Wuhu",
      "domain": "chip_inventory",
      "field": "chip_quantities",
      "value": "100.7k Huawei Ascend 910C",
      "relationship": "current accelerator estimate",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-wuhu"
      ],
      "publication_date": "2026-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-fe885a-CHIP_QUANTITIES"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-fe885a-COOLING",
      "epoch_id": "EPOCH-af62ae3440fe885a",
      "site_name": "Huawei Wuhu",
      "domain": "cooling",
      "field": "cooling",
      "value": "59 evaporative cooling towers and 111 air-cooled chillers; 279.7 MW modeled cooling",
      "relationship": "current cooling-equipment snapshot",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-wuhu"
      ],
      "publication_date": "2026-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-fe885a-COOLING"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-fe885a-PROJECT_STATUS",
      "epoch_id": "EPOCH-af62ae3440fe885a",
      "site_name": "Huawei Wuhu",
      "domain": "site_identity",
      "field": "project_status",
      "value": "Four buildings operational as of Aug. 6, 2026; additional buildings remain under construction or projected",
      "relationship": "dated buildout status",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-wuhu"
      ],
      "publication_date": "2026-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-fe885a-PROJECT_STATUS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-be3fe8-LOCATION",
      "epoch_id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "domain": "site_identity",
      "field": "location",
      "value": "Barker, New York, United States",
      "relationship": "current public site location",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/core42-lake-mariner"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-be3fe8-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-be3fe8-OWNER",
      "epoch_id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "domain": "ownership",
      "field": "owner",
      "value": "Core42",
      "relationship": "current owner",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/core42-lake-mariner"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-be3fe8-OWNER"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-be3fe8-USERS",
      "epoch_id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "G42 (likely)",
      "relationship": "current user attribution",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/core42-lake-mariner"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-be3fe8-USERS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-be3fe8-OPERATIONAL_STATUS",
      "epoch_id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Operational",
      "relationship": "current status",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/core42-lake-mariner"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-be3fe8-OPERATIONAL_STATUS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-be3fe8-ADDRESS",
      "epoch_id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "domain": "site_identity",
      "field": "address",
      "value": "7725 Lake Rd, 14012 Barker, New York, USA",
      "relationship": "public facility address",
      "source": "DataCenterMap",
      "source_urls": [
        "https://www.datacentermap.com/usa/new-york/buffalo/core42-lake-mariner-data-center/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-be3fe8-ADDRESS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-be3fe8-SERVICE_OR_CONTRACT",
      "epoch_id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "TeraWulf announced long-term data-center lease agreements with Core42 for more than 70 MW of turn-key infrastructure at Lake Mariner; the infrastructure was to be released in phases between Q1 and Q3 2025.",
      "relationship": "site-specific lease / capacity agreement",
      "source": "G42",
      "source_urls": [
        "https://www.g42.ai/resources/news/g42-expands-us-operations-70mw-data-center-infrastructure-agreement-terawulf"
      ],
      "publication_date": "2025-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-be3fe8-SERVICE_OR_CONTRACT"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-be3fe8-CAPACITY_RECORD",
      "epoch_id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "58 MW current IT power; 72k H100-eq estimated compute; 28.5k Nvidia B200 estimate",
      "relationship": "current facility scale snapshot",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/core42-lake-mariner"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-be3fe8-CAPACITY_RECORD"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-be3fe8-CHIP_QUANTITIES",
      "epoch_id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "domain": "chip_inventory",
      "field": "chip_quantities",
      "value": "28.5k Nvidia B200",
      "relationship": "current accelerator estimate",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/core42-lake-mariner"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-be3fe8-CHIP_QUANTITIES"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-be3fe8-COOLING",
      "epoch_id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "domain": "cooling",
      "field": "cooling",
      "value": "45 Evapco EAW-DD dry coolers; 32.8 MW modeled cooling",
      "relationship": "current cooling-equipment snapshot",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/core42-lake-mariner"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-be3fe8-COOLING"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-5b37fd-LOCATION",
      "epoch_id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "domain": "site_identity",
      "field": "location",
      "value": "Zhangbei, Hebei, China",
      "relationship": "current public site location",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/alibaba-zhangbei"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-5b37fd-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-5b37fd-OWNER",
      "epoch_id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "domain": "ownership",
      "field": "owner",
      "value": "Alibaba",
      "relationship": "current owner",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/alibaba-zhangbei"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-5b37fd-OWNER"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-5b37fd-USERS",
      "epoch_id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "Alibaba (likely)",
      "relationship": "current user attribution",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/alibaba-zhangbei"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-5b37fd-USERS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-5b37fd-OPERATIONAL_STATUS",
      "epoch_id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "domain": "site_identity",
      "field": "operational_status",
      "value": "Operational",
      "relationship": "current status",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/alibaba-zhangbei"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-5b37fd-OPERATIONAL_STATUS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-5b37fd-ADDRESS",
      "epoch_id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "domain": "site_identity",
      "field": "address",
      "value": "Alibaba Zhangbei Miaotan Data Center, South of Weifang Second Road, Zhangbei County, Zhangjiakou, Hebei, China",
      "relationship": "certified facility address",
      "source": "BSI",
      "source_urls": [
        "https://www.bsigroup.com/en-ID/products-and-services/assessment-and-certification/validation-and-verification/client-directory-profile/ALIBAB-0047453910-107/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-5b37fd-ADDRESS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-5b37fd-CAPACITY_RECORD",
      "epoch_id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "domain": "capacity",
      "field": "capacity_record",
      "value": "169 MW current IT power; 32k H100-eq estimated compute; $6.4B estimated capital cost",
      "relationship": "current facility scale snapshot",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/alibaba-zhangbei"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-5b37fd-CAPACITY_RECORD"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-5b37fd-CHIP_QUANTITIES",
      "epoch_id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "domain": "chip_inventory",
      "field": "chip_quantities",
      "value": "213.2k Nvidia H20",
      "relationship": "current accelerator estimate",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/alibaba-zhangbei"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-5b37fd-CHIP_QUANTITIES"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-5b37fd-PROJECT_STATUS",
      "epoch_id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "domain": "site_identity",
      "field": "project_status",
      "value": "Six buildings operational after chiller upgrades as of Jan. 3, 2026; further project status is not reported as active expansion in the current Epoch page",
      "relationship": "dated buildout status",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/alibaba-zhangbei"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-5b37fd-PROJECT_STATUS"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-20fd70-PROJECT",
      "epoch_id": "EPOCH-77e196fc5320fd70",
      "site_name": "Huawei Horinger",
      "domain": "site_identity",
      "field": "project",
      "value": "Huawei Horinger AI data center",
      "relationship": "public facility/project identity",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-horinger"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-20fd70-PROJECT"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-fe885a-PROJECT",
      "epoch_id": "EPOCH-af62ae3440fe885a",
      "site_name": "Huawei Wuhu",
      "domain": "site_identity",
      "field": "project",
      "value": "Huawei Wuhu AI data center",
      "relationship": "public facility/project identity",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/huawei-wuhu"
      ],
      "publication_date": "2026-09-23",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-fe885a-PROJECT"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-be3fe8-PROJECT",
      "epoch_id": "EPOCH-d1b62579c6be3fe8",
      "site_name": "Core42 Lake Mariner",
      "domain": "site_identity",
      "field": "project",
      "value": "Lake Mariner AI/HPC deployment",
      "relationship": "site-specific AI infrastructure deployment",
      "source": "G42",
      "source_urls": [
        "https://www.g42.ai/resources/news/g42-expands-us-operations-70mw-data-center-infrastructure-agreement-terawulf"
      ],
      "publication_date": "2025-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-be3fe8-PROJECT"
    },
    {
      "claim_id": "EVID-PWEB-MISSING-5b37fd-PROJECT",
      "epoch_id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "domain": "site_identity",
      "field": "project",
      "value": "Alibaba Zhangbei Miaotan Data Center",
      "relationship": "certified facility/project identity",
      "source": "BSI",
      "source_urls": [
        "https://www.bsigroup.com/en-ID/products-and-services/assessment-and-certification/validation-and-verification/client-directory-profile/ALIBAB-0047453910-107/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-MISSING-5b37fd-PROJECT"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-b5bb2a-ADDRESS",
      "epoch_id": "EPOCH-55d4b5e818b5bb2a",
      "site_name": "DayOne Nusajaya",
      "domain": "site_identity",
      "field": "address",
      "value": "3, Lingkaran, Jalan Teknologi Perintis 1, Nusajaya Tech Park, Johor, Malaysia",
      "relationship": "facility/campus address",
      "source": "DataCenterMap",
      "source_urls": [
        "https://www.datacentermap.com/malaysia/johor-bahru/dayone-gerbang-nusajaya/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-b5bb2a-ADDRESS"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-b5bb2a-PROJECT",
      "epoch_id": "EPOCH-55d4b5e818b5bb2a",
      "site_name": "DayOne Nusajaya",
      "domain": "site_identity",
      "field": "project",
      "value": "Nusajaya Tech Park (NTP) campus",
      "relationship": "campus/project identity",
      "source": "DayOne",
      "source_urls": [
        "https://dayonedc.com/market/green-data-center-malaysia"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-b5bb2a-PROJECT"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-cbed36-LOCATION",
      "epoch_id": "EPOCH-6799460068cbed36",
      "site_name": "Google Kansas City East",
      "domain": "site_identity",
      "field": "location",
      "value": "Kansas City, Missouri, United States",
      "relationship": "current public site location",
      "source": "Google",
      "source_urls": [
        "https://datacenters.google/locations/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-cbed36-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-cbed36-USERS",
      "epoch_id": "EPOCH-6799460068cbed36",
      "site_name": "Google Kansas City East",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "Google DeepMind (likely)",
      "relationship": "likely primary AI user",
      "source": "InfraSale",
      "source_urls": [
        "https://infrasale.com/marketplace/intelligence/frontier-dcs/43"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-cbed36-USERS"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-a04725-LOCATION",
      "epoch_id": "EPOCH-2b89e13933a04725",
      "site_name": "Google Storey County",
      "domain": "site_identity",
      "field": "location",
      "value": "Storey County, Nevada, United States",
      "relationship": "current public site location",
      "source": "Google",
      "source_urls": [
        "https://datacenters.google/locations/storey-county-nevada/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-a04725-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-a04725-OWNER",
      "epoch_id": "EPOCH-2b89e13933a04725",
      "site_name": "Google Storey County",
      "domain": "ownership",
      "field": "owner",
      "value": "Google",
      "relationship": "operator/owner",
      "source": "Google",
      "source_urls": [
        "https://datacenters.google/locations/storey-county-nevada/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-a04725-OWNER"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-7aba5c-LOCATION",
      "epoch_id": "EPOCH-ea5d1ae5837aba5c",
      "site_name": "Oracle Batam",
      "domain": "site_identity",
      "field": "location",
      "value": "Nongsa Digital Park, Batam, Indonesia",
      "relationship": "publicly identified data-center location",
      "source": "Bloomberg",
      "source_urls": [
        "https://www.bloomberg.com/news/articles/2025-07-10/oracle-said-to-move-ahead-with-cloud-services-plan-in-indonesia"
      ],
      "publication_date": "2025-07-10",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-7aba5c-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-7aba5c-SERVICE_OR_CONTRACT",
      "epoch_id": "EPOCH-ea5d1ae5837aba5c",
      "site_name": "Oracle Batam",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Oracle planned to lease DayOne data centers at Nongsa Digital Park for its Indonesian cloud-services operation; public reporting described plots capable of supporting facilities with at least 120 MW.",
      "relationship": "reported lease / tenancy arrangement",
      "source": "Bloomberg",
      "source_urls": [
        "https://www.bloomberg.com/news/articles/2025-07-10/oracle-said-to-move-ahead-with-cloud-services-plan-in-indonesia"
      ],
      "publication_date": "2025-07-10",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-7aba5c-SERVICE_OR_CONTRACT"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-7170bd-LOCATION",
      "epoch_id": "EPOCH-827d7832237170bd",
      "site_name": "Southgate Melbourne",
      "domain": "site_identity",
      "field": "location",
      "value": "Melbourne, Victoria, Australia",
      "relationship": "current public site location",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/southgate-melbourne"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-7170bd-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-7170bd-USERS",
      "epoch_id": "EPOCH-827d7832237170bd",
      "site_name": "Southgate Melbourne",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "NVIDIA DGX Cloud (announced first customer/region access)",
      "relationship": "announced user/customer relationship",
      "source": "Firmus",
      "source_urls": [
        "https://firmus.co/newsroom/southgate-expansion"
      ],
      "publication_date": "2025-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-7170bd-USERS"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-2be282-LOCATION",
      "epoch_id": "EPOCH-5b05fa7b682be282",
      "site_name": "Anthropic Barber Lake",
      "domain": "site_identity",
      "field": "location",
      "value": "Colorado City, Texas, United States",
      "relationship": "current public site location",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/anthropic-barber-lake"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-2be282-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-2be282-OWNER",
      "epoch_id": "EPOCH-5b05fa7b682be282",
      "site_name": "Anthropic Barber Lake",
      "domain": "ownership",
      "field": "owner",
      "value": "Cipher Mining",
      "relationship": "facility owner in current Epoch record",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/anthropic-barber-lake"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-2be282-OWNER"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-2be282-USERS",
      "epoch_id": "EPOCH-5b05fa7b682be282",
      "site_name": "Anthropic Barber Lake",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "Anthropic",
      "relationship": "announced/identified AI user",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/anthropic-barber-lake"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-2be282-USERS"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-2be282-ENERGY_COMPANIES",
      "epoch_id": "EPOCH-5b05fa7b682be282",
      "site_name": "Anthropic Barber Lake",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Google / Fluidstack power-and-silicon partnership context",
      "relationship": "energy/silicon financing partnership context",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/anthropic-barber-lake"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-2be282-ENERGY_COMPANIES"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-eb479f-ADDRESS",
      "epoch_id": "EPOCH-1b7cb9c2b0eb479f",
      "site_name": "Microsoft Narvik Norway",
      "domain": "site_identity",
      "field": "address",
      "value": "Nordmoveien 301, 8530 Bjerkvik, Narvik, Norway",
      "relationship": "contract-defined data center location",
      "source": "SEC filing",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/2110365/000119312526395475/ck0002110365-ex10_19.htm"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-eb479f-ADDRESS"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-eb479f-SERVICE_OR_CONTRACT",
      "epoch_id": "EPOCH-1b7cb9c2b0eb479f",
      "site_name": "Microsoft Narvik Norway",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "A filed contract defines Microsoft GPU services at the data-center facilities on land at Kvandal North, Bjerkvik, Narvik, including tranche-based delivery and service terms.",
      "relationship": "contract / site-specific GPU hosting arrangement",
      "source": "SEC filing",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/2110365/000119312526395475/ck0002110365-ex10_19.htm"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-eb479f-SERVICE_OR_CONTRACT"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-eb479f-LOCATION",
      "epoch_id": "EPOCH-1b7cb9c2b0eb479f",
      "site_name": "Microsoft Narvik Norway",
      "domain": "site_identity",
      "field": "location",
      "value": "Kvandal North, Bjerkvik, Narvik, Norway",
      "relationship": "contract-defined location",
      "source": "SEC filing",
      "source_urls": [
        "https://www.sec.gov/Archives/edgar/data/2110365/000119312526395475/ck0002110365-ex10_19.htm"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-eb479f-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-df2982-LOCATION",
      "epoch_id": "EPOCH-145ed5861bdf2982",
      "site_name": "OpenAI Stargate Michigan",
      "domain": "site_identity",
      "field": "location",
      "value": "Saline, Michigan, United States",
      "relationship": "public project location",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/stargate-michigan-data-center/"
      ],
      "publication_date": "2026-06-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-df2982-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-df2982-PROJECT",
      "epoch_id": "EPOCH-145ed5861bdf2982",
      "site_name": "OpenAI Stargate Michigan",
      "domain": "site_identity",
      "field": "project",
      "value": "The Barn / Stargate Michigan",
      "relationship": "project identity",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/stargate-michigan-data-center/"
      ],
      "publication_date": "2026-06-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-df2982-PROJECT"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-df2982-CONSTRUCTION_COMPANIES",
      "epoch_id": "EPOCH-145ed5861bdf2982",
      "site_name": "OpenAI Stargate Michigan",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Walbridge",
      "relationship": "named construction partner",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/stargate-michigan-data-center/"
      ],
      "publication_date": "2026-06-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-df2982-CONSTRUCTION_COMPANIES"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-5c4a7b-ADDRESS",
      "epoch_id": "EPOCH-e3aa5f34aa5c4a7b",
      "site_name": "OpenAI Stargate Milam",
      "domain": "site_identity",
      "field": "address",
      "value": "4299-2301 County Rd 134, Burlington, Texas 76519, United States",
      "relationship": "public facility address",
      "source": "DataCenterMap",
      "source_urls": [
        "https://www.datacentermap.com/usa/texas/cameron/stargate-milam-county/"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-5c4a7b-ADDRESS"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-5c4a7b-LOCATION",
      "epoch_id": "EPOCH-e3aa5f34aa5c4a7b",
      "site_name": "OpenAI Stargate Milam",
      "domain": "site_identity",
      "field": "location",
      "value": "Milam County, Texas, United States",
      "relationship": "public project location",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/five-new-stargate-sites/"
      ],
      "publication_date": "2025-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-5c4a7b-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-5c4a7b-PROJECT",
      "epoch_id": "EPOCH-e3aa5f34aa5c4a7b",
      "site_name": "OpenAI Stargate Milam",
      "domain": "site_identity",
      "field": "project",
      "value": "Milam County Data Center / Stargate",
      "relationship": "project identity",
      "source": "OpenAI",
      "source_urls": [
        "https://openai.com/index/stargate-sb-energy-partnership/"
      ],
      "publication_date": "2026-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-5c4a7b-PROJECT"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-72fe04-LOCATION",
      "epoch_id": "EPOCH-3816121e8d72fe04",
      "site_name": "OpenAI Stargate New Mexico",
      "domain": "site_identity",
      "field": "location",
      "value": "Santa Teresa, Doña Ana County, New Mexico, United States",
      "relationship": "public project location",
      "source": "Data Center Census",
      "source_urls": [
        "https://datacentercensus.com/dc/project-jupiter-dona-ana-county-nm"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-72fe04-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-72fe04-PROJECT",
      "epoch_id": "EPOCH-3816121e8d72fe04",
      "site_name": "OpenAI Stargate New Mexico",
      "domain": "site_identity",
      "field": "project",
      "value": "Project Jupiter / Stargate New Mexico",
      "relationship": "project identity",
      "source": "Data Center Census",
      "source_urls": [
        "https://datacentercensus.com/dc/project-jupiter-dona-ana-county-nm"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-72fe04-PROJECT"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-72fe04-CONSTRUCTION_COMPANIES",
      "epoch_id": "EPOCH-3816121e8d72fe04",
      "site_name": "OpenAI Stargate New Mexico",
      "domain": "construction",
      "field": "construction_companies",
      "value": "STACK Infrastructure",
      "relationship": "developer",
      "source": "Data Center Census",
      "source_urls": [
        "https://datacentercensus.com/dc/project-jupiter-dona-ana-county-nm"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-72fe04-CONSTRUCTION_COMPANIES"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-bdf968-LOCATION",
      "epoch_id": "EPOCH-78e7d8474fbdf968",
      "site_name": "OpenAI Stargate Wisconsin",
      "domain": "site_identity",
      "field": "location",
      "value": "Port Washington, Wisconsin, United States",
      "relationship": "public project location",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-wisconsin"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-bdf968-LOCATION"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-bdf968-OWNER",
      "epoch_id": "EPOCH-78e7d8474fbdf968",
      "site_name": "OpenAI Stargate Wisconsin",
      "domain": "ownership",
      "field": "owner",
      "value": "Oracle",
      "relationship": "current owner/developer attribution",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-wisconsin"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-bdf968-OWNER"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-bdf968-USERS",
      "epoch_id": "EPOCH-78e7d8474fbdf968",
      "site_name": "OpenAI Stargate Wisconsin",
      "domain": "compute_tenancy",
      "field": "users",
      "value": "OpenAI",
      "relationship": "current user attribution",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-wisconsin"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-bdf968-USERS"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-bdf968-PROJECT",
      "epoch_id": "EPOCH-78e7d8474fbdf968",
      "site_name": "OpenAI Stargate Wisconsin",
      "domain": "site_identity",
      "field": "project",
      "value": "Stargate",
      "relationship": "project identity",
      "source": "Epoch AI",
      "source_urls": [
        "https://epoch.ai/data/ai-data-centers/directory/openai-stargate-wisconsin"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": null,
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-bdf968-PROJECT"
    },
    {
      "claim_id": "EVID-PWEB-VANTAGE-OWNER-20260927",
      "epoch_id": "EPOCH-96d37578ca36f86c",
      "site_name": "Vantage TX1",
      "domain": "ownership",
      "field": "owner",
      "value": "VANTAGE DATA CENTERS TX1 LLC",
      "relationship": "owner of record for TX12 / TX1 campus construction projects",
      "source": "Texas Department of Licensing and Regulation",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Projects/TABS2026012091",
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026001234"
      ],
      "publication_date": "2026-02-09",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Official TDLR project records identify VANTAGE DATA CENTERS TX1 LLC as the owner for the 96 MW TX12 fit-up and TX1 campus project.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-VANTAGE-OWNER-20260927"
    },
    {
      "claim_id": "EVID-PWEB-ABILENE-OWNER-20260927",
      "epoch_id": "EPOCH-2c2e40ddb178da3e",
      "site_name": "OpenAI Stargate Abilene",
      "domain": "ownership",
      "field": "owner",
      "value": "Oracle",
      "relationship": "site owner / hardware owner identified by third-party facility research",
      "source": "Samaritan Research / Scrutica",
      "source_urls": [
        "https://samaritan-research.org/data/data-centers/satellite-explorer/OpenAIStargateAbilene",
        "https://scrutica.com/facilities/fac-stargate-abilene"
      ],
      "publication_date": "2026-09-24",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Third-party sources identify Oracle as the owner/hardware owner; retained as public enrichment rather than an independent ownership certification.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ABILENE-OWNER-20260927"
    },
    {
      "claim_id": "EVID-PWEB-ABILENE-POWER-20260927",
      "epoch_id": "EPOCH-2c2e40ddb178da3e",
      "site_name": "OpenAI Stargate Abilene",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": [
        "ERCOT",
        "on-site natural gas generation",
        "local West Texas wind"
      ],
      "relationship": "grid and on-site power supply context",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/oracle-abilene-texas"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DEPLOY describes ERCOT grid connection plus on-site generation; this is not a queue ID or interval telemetry measurement.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ABILENE-POWER-20260927"
    },
    {
      "claim_id": "EVID-PWEB-ABILENE-CONSTRUCTION-20260927",
      "epoch_id": "EPOCH-2c2e40ddb178da3e",
      "site_name": "OpenAI Stargate Abilene",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Crusoe"
      ],
      "relationship": "site construction/development partner",
      "source": "DEPLOY",
      "source_urls": [
        "https://registry.deploy.report/datacenters/facilities/oracle-abilene-texas"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "DEPLOY identifies Crusoe as having built the site; retained as construction/development evidence, not as a complete contractor roster.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ABILENE-CONSTRUCTION-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-d9050b-SERVICE-20260927",
      "epoch_id": "EPOCH-d9050b43689ed24c",
      "site_name": "Microsoft Fairwater Atlanta",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Official Georgia PSC/Georgia Power planning records identify QTS Fayetteville transmission needs for the campus, including Ashley Park 500/230 kV substation and two 230 kV lines to customer substations.",
      "relationship": "site-specific utility service / transmission planning evidence",
      "source": "Georgia Public Service Commission / Georgia Power",
      "source_urls": [
        "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220948/102128"
      ],
      "publication_date": "2025-01-10",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This establishes site-specific utility-service planning evidence but does not expose a customer contract number or queue ID.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-d9050b-SERVICE-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-d9050b-REGULATORY-20260927",
      "epoch_id": "EPOCH-d9050b43689ed24c",
      "site_name": "Microsoft Fairwater Atlanta",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "Official Georgia PSC records contain site-specific QTS Fayetteville transmission planning and related utility proceedings for serving the campus.",
      "relationship": "regulatory / utility planning record",
      "source": "Georgia Public Service Commission",
      "source_urls": [
        "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220948/102128"
      ],
      "publication_date": "2025-01-10",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Regulatory evidence is site-specific to QTS Fayetteville/Fairwater service infrastructure; it does not establish every local permit.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-d9050b-REGULATORY-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-45b3c7-SERVICE-20260927",
      "epoch_id": "EPOCH-45b3c74314eb1f26",
      "site_name": "Anthropic-Amazon New Carlisle",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Indiana Michigan Power/IURC public large-load proceedings identify AWS's New Carlisle hyperscaler facility as a planned 1,000 MW large-load customer in I&M territory.",
      "relationship": "site/customer utility service evidence",
      "source": "Indiana Utility Regulatory Commission / Indiana Michigan Power",
      "source_urls": [
        "https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/12dd9b3a-fcbe-ef11-b8e9-001dd803a96f/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46097%20Public%20Exhibit%20No.%201.pdf",
        "https://www.indianamichiganpower.com/company/news/view?releaseID=10036"
      ],
      "publication_date": "2025-02-19",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This establishes site/customer service evidence but does not expose a customer contract number or interconnection queue identifier.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-45b3c7-SERVICE-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-ea699c-SERVICE-20260927",
      "epoch_id": "EPOCH-ea699c935d46e066",
      "site_name": "Google Pryor (North)",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "GRDA's public financial report states that GRDA provides electric service to Google's data center in the MidAmerica Industrial Park.",
      "relationship": "site-specific electric service evidence",
      "source": "Grand River Dam Authority",
      "source_urls": [
        "https://grda.com/wp-content/uploads/2024/01/GRDA-CAFR-2017.pdf"
      ],
      "publication_date": "2018-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Official GRDA evidence establishes the utility service relationship; it does not expose a current contract number or interconnection queue identifier.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-ea699c-SERVICE-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-d2da66-SERVICE-20260927",
      "epoch_id": "EPOCH-d2da66ea035880ce",
      "site_name": "QTS Cedar Rapids",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Alliant Energy identifies QTS Cedar Rapids as a new customer and describes its partnership to provide power; public Iowa utility materials identify an energy-services agreement with QTS.",
      "relationship": "site-specific utility service / energy-services relationship",
      "source": "Alliant Energy / Iowa utility public materials",
      "source_urls": [
        "https://www.alliantenergy.com/news/news-center/2025/02/021225-qtsannouncementcr",
        "https://www.cleanenergydistricts.org/data-centers-in-iowa-resource-hub"
      ],
      "publication_date": "2025-02-13",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Utility-service relationship is established, but confidential contract details are not reproduced.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-d2da66-SERVICE-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-d2da66-REGULATORY-20260927",
      "epoch_id": "EPOCH-d2da66ea035880ce",
      "site_name": "QTS Cedar Rapids",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "Cedar Rapids City Council approved the QTS development agreement; Linn County separately approved a temporary construction laydown use at 6004 76th Ave.",
      "relationship": "site-specific municipal/county approval evidence",
      "source": "City of Cedar Rapids / Linn County",
      "source_urls": [
        "https://www.economicdevelopmentcr.com/data-centers",
        "https://www.linncountyiowa.gov/DocumentCenter/View/26593/2025-9-137-Approving-Temporary-Use---6004-76th-Ave-Fairfax-Iowa"
      ],
      "publication_date": "2025-01-28",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "These records establish public approvals relevant to the campus; they are not a complete permit inventory.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-d2da66-REGULATORY-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-d2da66-CONSTRUCTION-20260927",
      "epoch_id": "EPOCH-d2da66ea035880ce",
      "site_name": "QTS Cedar Rapids",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Layton Construction Company"
      ],
      "relationship": "named construction contractor / permit applicant for site construction laydown campus",
      "source": "Linn County",
      "source_urls": [
        "https://www.linncountyiowa.gov/DocumentCenter/View/26593/2025-9-137-Approving-Temporary-Use---6004-76th-Ave-Fairfax-Iowa"
      ],
      "publication_date": "2025-09-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Layton is explicitly the petitioner for a QTS construction laydown campus at 6004 76th Ave.; this does not establish a complete contractor roster for every phase.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-d2da66-CONSTRUCTION-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-5880ce-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-d2da66ea035880ce",
      "site_name": "QTS Cedar Rapids",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Distinct public records from Alliant Energy, the City of Cedar Rapids and Linn County independently corroborate the campus, its utility relationship and construction activity.",
      "relationship": "independent multi-source corroboration",
      "source": "Government / utility / regulatory records",
      "source_urls": [
        "https://www.alliantenergy.com/news/news-center/2025/02/021225-qtsannouncementcr",
        "https://www.economicdevelopmentcr.com/data-centers",
        "https://www.linncountyiowa.gov/DocumentCenter/View/26593/2025-9-137-Approving-Temporary-Use---6004-76th-Ave-Fairfax-Iowa"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Corroboration is based on distinct public publishers outside the canonical Epoch dataset; it does not mean every Track 3 domain is independently verified.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-5880ce-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-9ed24c-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-d9050b43689ed24c",
      "site_name": "Microsoft Fairwater Atlanta",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Distinct public records from Georgia PSC/Georgia Power and Georgia EPD independently corroborate the QTS Fayetteville/Fairwater campus and its utility/regulatory footprint.",
      "relationship": "independent multi-source corroboration",
      "source": "Government / utility / regulatory records",
      "source_urls": [
        "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/220948/102128",
        "https://epd.georgia.gov/document/document/28924-narrative/download"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Corroboration is based on distinct public publishers outside the canonical Epoch dataset; it does not mean every Track 3 domain is independently verified.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-9ed24c-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-eb1f26-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-45b3c74314eb1f26",
      "site_name": "Anthropic-Amazon New Carlisle",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Distinct Indiana state and utility/regulatory records independently corroborate the New Carlisle hyperscaler campus and its large-load service context.",
      "relationship": "independent multi-source corroboration",
      "source": "Government / utility / regulatory records",
      "source_urls": [
        "https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/12dd9b3a-fcbe-ef11-b8e9-001dd803a96f/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46097%20Public%20Exhibit%20No.%201.pdf",
        "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Corroboration is based on distinct public publishers outside the canonical Epoch dataset; it does not mean every Track 3 domain is independently verified.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-eb1f26-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-46e066-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-ea699c935d46e066",
      "site_name": "Google Pryor (North)",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "GRDA utility records and public project sources independently corroborate the Google Pryor campus and its electric-service relationship.",
      "relationship": "independent multi-source corroboration",
      "source": "Government / utility / regulatory records",
      "source_urls": [
        "https://grda.com/wp-content/uploads/2024/01/GRDA-CAFR-2017.pdf",
        "https://registry.deploy.report/datacenters/facilities/google-mayes-county-ok"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Corroboration is based on distinct public publishers outside the canonical Epoch dataset; it does not mean every Track 3 domain is independently verified.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-46e066-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-4b4d68-SERVICE-20260927",
      "epoch_id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "QTS states it is working directly with local utilities, that the local grid confirmed it can reliably support the site, and that QTS will pay for project energy infrastructure; Eagle Mountain City identifies Rocky Mountain Power as the city's electric utility.",
      "relationship": "site-specific utility service / infrastructure evidence",
      "source": "QTS Data Centers / Eagle Mountain City",
      "source_urls": [
        "https://q.com/data-centers/eagle-mountain/",
        "https://eaglemountain.gov/eagle-mountain-economic-development/industrial-development/"
      ],
      "publication_date": "2026-01-01",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The public sources establish the utility-service relationship and infrastructure responsibility but do not provide a confidential customer contract number.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-4b4d68-SERVICE-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-4b4d68-REGULATORY-20260927",
      "epoch_id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "Eagle Mountain City's February 4, 2025 first amendment to the QTS development agreement governs the data center project and expressly contemplates electrical transformation, transmission, distribution and substation equipment.",
      "relationship": "municipal development agreement / project regulation",
      "source": "Eagle Mountain City",
      "source_urls": [
        "https://eaglemountain.gov/wp-content/uploads/2025/07/RES-11-2025-Approving-1st-Amendment-QTS-Development-Agreement.pdf"
      ],
      "publication_date": "2025-02-04",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This is site-specific municipal regulatory/development evidence, not a complete permit inventory.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-4b4d68-REGULATORY-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-4b4d68-CONSTRUCTION-20260927",
      "epoch_id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Layton Construction"
      ],
      "relationship": "named construction partner",
      "source": "QTS Data Centers / Layton Construction",
      "source_urls": [
        "https://q.com/news/layton-construction-and-qts-data-centers-celebrate-topping-out-of-data-center-campus-in-eagle-mountain/"
      ],
      "publication_date": "2026-04-17",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "QTS and Layton jointly identify Layton in connection with the third-building topping-out; this is not a complete contractor roster.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-4b4d68-CONSTRUCTION-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-4b4d68-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Distinct city, county, QTS and construction-partner records independently corroborate the project identity, land and utility/construction footprint.",
      "relationship": "independent multi-source corroboration",
      "source": "Eagle Mountain City / Utah County / QTS Data Centers / Layton Construction",
      "source_urls": [
        "https://eaglemountain.gov/wp-content/uploads/2025/07/RES-11-2025-Approving-1st-Amendment-QTS-Development-Agreement.pdf",
        "https://www.utahcounty.gov/landrecords/Property.asp?av_serial=387070002002",
        "https://q.com/data-centers/eagle-mountain/",
        "https://q.com/news/layton-construction-and-qts-data-centers-celebrate-topping-out-of-data-center-campus-in-eagle-mountain/"
      ],
      "publication_date": "2026-04-17",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Corroboration uses distinct public publishers outside the canonical Epoch dataset; it does not imply every Track 3 domain is independently verified.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-4b4d68-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-c20399-SERVICE-20260927",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "MLGW states that 5420 Tulane Road had an existing general-services agreement; the TVA Board approved a new direct service agreement/load request for MZX Tech LLC on Aug. 20, 2026.",
      "relationship": "site-specific utility service evidence",
      "source": "Memphis Light Gas & Water / Tennessee Valley Authority",
      "source_urls": [
        "https://www.mlgw.com/images/content/files/pdf/XAIJuly2025Statement.pdf",
        "https://currently.att.yahoo.com/att/tva-board-approves-agreement-spacexai-234602682.html"
      ],
      "publication_date": "2026-08-20",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The sources establish utility-service arrangements but do not expose confidential contract terms or a queue identifier.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-c20399-SERVICE-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-c20399-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Independent MLGW, TVA and local reporting records corroborate the site's utility-service relationship and the 2026 transition to direct TVA service.",
      "relationship": "independent multi-source corroboration",
      "source": "MLGW / TVA / Memphis local reporting",
      "source_urls": [
        "https://www.mlgw.com/images/content/files/pdf/XAIJuly2025Statement.pdf",
        "https://www.dailymemphian.com/article/65680/spacexai-power-memphis-tennessee-valley-authority-tva",
        "https://currently.att.yahoo.com/att/tva-board-approves-agreement-spacexai-234602682.html"
      ],
      "publication_date": "2026-08-20",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Distinct public publishers corroborate the utility relationship; this does not verify every power or capacity figure.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-c20399-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-4b4d68-PROJECT-20260927",
      "epoch_id": "EPOCH-4b4d686b6c457a68",
      "site_name": "QTS Eagle Mountain",
      "domain": "site_identity",
      "field": "project",
      "value": "QTS Data Center Campus",
      "relationship": "project identity used in municipal development agreement",
      "source": "Eagle Mountain City",
      "source_urls": [
        "https://eaglemountain.gov/wp-content/uploads/2025/07/RES-11-2025-Approving-1st-Amendment-QTS-Development-Agreement.pdf"
      ],
      "publication_date": "2025-02-04",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Official municipal agreement identifies the QTS Data Center Campus / Project and its associated electrical infrastructure.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-4b4d68-PROJECT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-5de9a1-SERVICE-20260927",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "IPUC Case IPC-E-21-42 covers Idaho Power's special contract and Tariff Schedule 33 for Brisbie LLC's data center facility in the Kuna area; the Commission approved the energy-services agreement.",
      "relationship": "site-specific electric service special contract",
      "source": "Idaho Public Utilities Commission",
      "source_urls": [
        "https://puc.idaho.gov/case/Details/6792",
        "https://puc.idaho.gov/Fileroom/PublicFiles/Press/20230512Idaho%20Power%20Brisbie%20Press%20Release.pdf"
      ],
      "publication_date": "2023-05-11",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The contract exists and was approved; confidential commercial terms are not reproduced.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-5de9a1-SERVICE-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-5de9a1-REGULATORY-20260927",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "IPUC Case IPC-E-21-42 and Orders 35777/35820/35958 provide customer- and facility-specific regulatory records for Brisbie's Kuna data center.",
      "relationship": "state utility regulatory proceeding",
      "source": "Idaho Public Utilities Commission",
      "source_urls": [
        "https://puc.idaho.gov/case/Details/6792",
        "https://puc.idaho.gov/Fileroom/PublicFiles/ELEC/IPC/IPCE2142/OrdNotc/20230620Final_Order_No_35820.pdf"
      ],
      "publication_date": "2023-06-20",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This is site/customer-specific utility regulation, not a complete building/environmental permit inventory.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-5de9a1-REGULATORY-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-5de9a1-CONSTRUCTION-20260927",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "Hensel Phelps",
        "Engineered Structures, Inc. (ESI)"
      ],
      "relationship": "named construction partners",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2023/10/ramping-up-construction-on-the-kuna-data-center/",
        "https://datacenters.atmeta.com/2022/02/hello-kuna/"
      ],
      "publication_date": "2023-10-12",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta explicitly names Hensel Phelps and ESI as partners; this is not a complete contractor roster.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-5de9a1-CONSTRUCTION-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-5de9a1-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Independent Meta, Idaho Power and IPUC records corroborate the Kuna facility, utility service relationship, ownership/customer relationship and construction timeline.",
      "relationship": "independent multi-source corroboration",
      "source": "Meta Data Centers / Idaho Power / Idaho Public Utilities Commission",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/",
        "https://docs.idahopower.com/pdfs/AboutUs/PlanningForFuture/irp/2023/2023-appendix-a-final.pdf",
        "https://puc.idaho.gov/case/Details/6792"
      ],
      "publication_date": "2026-09-03",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Independent sources are distinct publishers; this does not establish interval telemetry or complete site permitting.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-5de9a1-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-5de9a1-ENERGY-20260927",
      "epoch_id": "EPOCH-5de9a1c70a3e2275",
      "site_name": "Meta Kuna",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Idaho Power",
      "relationship": "electric utility / customer service provider",
      "source": "Idaho Public Utilities Commission / Idaho Power",
      "source_urls": [
        "https://puc.idaho.gov/Fileroom/PublicFiles/Press/20230512Idaho%20Power%20Brisbie%20Press%20Release.pdf",
        "https://docs.idahopower.com/pdfs/AboutUs/PlanningForFuture/irp/2023/2023-appendix-a-final.pdf"
      ],
      "publication_date": "2023-05-11",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Added as a retained public utility relationship; the utility is already present as a non-effective-unresolved field in the sweep.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-5de9a1-ENERGY-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-bbcf0e-SERVICE-20260927",
      "epoch_id": "EPOCH-bbcf0efa8bcebd41",
      "site_name": "Meta Hyperion",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Entergy Louisiana states it will power Meta's Richland Parish data center and has made dedicated grid investments, including the Smalling Substation; subsequent Entergy/Meta agreements continue documenting the site-specific power relationship.",
      "relationship": "site-specific utility service / grid infrastructure relationship",
      "source": "Entergy Louisiana / Meta",
      "source_urls": [
        "https://www.entergy.com/news/meta-selects-northeast-louisiana-as-site-10-billion-data-center",
        "https://www.entergy.com/news/entergy-louisiana-breaks-ground-on-key-substation-to-power-data-center-in-richland-parish",
        "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/"
      ],
      "publication_date": "2026-07-13",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Site-specific utility relationship is public; confidential commercial contract terms are not reproduced.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-bbcf0e-SERVICE-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-bbcf0e-CONSTRUCTION-20260927",
      "epoch_id": "EPOCH-bbcf0efa8bcebd41",
      "site_name": "Meta Hyperion",
      "domain": "construction",
      "field": "construction_companies",
      "value": [
        "DPR Construction",
        "Turner Construction Company",
        "Mortenson Construction"
      ],
      "relationship": "named general contractors",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/"
      ],
      "publication_date": "2026-07-13",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta identifies these three general contractors; this is not a complete subcontractor roster.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-bbcf0e-CONSTRUCTION-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-bbcf0e-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-bbcf0efa8bcebd41",
      "site_name": "Meta Hyperion",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Distinct Meta and Entergy records independently corroborate the Richland Parish data center, its power relationship and its construction program.",
      "relationship": "independent multi-source corroboration",
      "source": "Meta Data Centers / Entergy Louisiana",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/",
        "https://www.entergy.com/news/entergy-louisiana-breaks-ground-on-key-substation-to-power-data-center-in-richland-parish",
        "https://www.entergy.com/news/entergy-louisiana-supports-metas-new-data-center-with-infrastructure-upgrades-in-richland-parish"
      ],
      "publication_date": "2026-07-13",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Corroboration uses distinct corporate sources; it does not establish interval telemetry or complete permitting.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-bbcf0e-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-71d009-CONSTRUCTION-20260927",
      "epoch_id": "EPOCH-71d0091a05448224",
      "site_name": "Microsoft SAT40",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Turner Construction Co.",
      "relationship": "named construction company",
      "source": "San Antonio Report",
      "source_urls": [
        "https://sanantonioreport.org/microsoft-data-centers-san-antonio-region/"
      ],
      "publication_date": "2023-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Independent local reporting identifies Turner Construction Co. as builder of SAT40; this is not a complete contractor roster.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-71d009-CONSTRUCTION-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-71d009-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-71d0091a05448224",
      "site_name": "Microsoft SAT40",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "TDLR's site-specific SAT40 registration and independent San Antonio reporting both identify Microsoft SAT40 at 15000 Lambda Drive; the latter additionally identifies Turner Construction Co. as builder.",
      "relationship": "independent multi-source corroboration",
      "source": "Texas Department of Licensing and Regulation / San Antonio Report",
      "source_urls": [
        "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2023013247",
        "https://sanantonioreport.org/microsoft-data-centers-san-antonio-region/"
      ],
      "publication_date": "2023-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Distinct publishers corroborate project identity and location; this does not verify electrical telemetry or complete site permitting.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-71d009-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-8358e4-SERVICE-20260927",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Xcel Energy states it will power Meta's new Rosemount data center and describes energy upgrades and new transmission lines to provide the reliable energy supply needed for the facility.",
      "relationship": "site-specific electric service relationship",
      "source": "Xcel Energy",
      "source_urls": [
        "https://stories.xcelenergy.com/stories/Building-the-21st-century-economy--Xcel-Energy-to-power-new-Meta-data-center"
      ],
      "publication_date": "2024-03-15",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "This establishes the utility relationship and infrastructure work; it does not reproduce confidential service-contract terms.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-8358e4-SERVICE-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-8358e4-REGULATORY-20260927",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "The City of Rosemount states that the City Council approved the Project Bigfoot/Jimnist technology-campus application on 280 acres in UMore Park; the city later identifies the project as Meta's data center.",
      "relationship": "municipal development approval",
      "source": "City of Rosemount",
      "source_urls": [
        "https://www.rosemountmn.gov/progress"
      ],
      "publication_date": null,
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Site-specific municipal approval evidence; not a complete permit inventory.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-8358e4-REGULATORY-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-8358e4-CONSTRUCTION-20260927",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "construction",
      "field": "construction_companies",
      "value": "Mortenson",
      "relationship": "named construction partner",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/03/hello-rosemount/"
      ],
      "publication_date": "2024-03-14",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Meta states construction information is available from Mortenson and thanks Mortenson among the partners; this does not establish a complete contractor roster.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-8358e4-CONSTRUCTION-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-8358e4-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-8358e445402d91c2",
      "site_name": "Meta Rosemount",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Distinct Meta, Xcel Energy and City of Rosemount records independently corroborate the Rosemount data center, its site-development approval and utility relationship.",
      "relationship": "independent multi-source corroboration",
      "source": "Meta Data Centers / Xcel Energy / City of Rosemount",
      "source_urls": [
        "https://datacenters.atmeta.com/2024/03/hello-rosemount/",
        "https://stories.xcelenergy.com/stories/Building-the-21st-century-economy--Xcel-Energy-to-power-new-Meta-data-center",
        "https://www.rosemountmn.gov/progress"
      ],
      "publication_date": "2024-03-15",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Distinct public publishers corroborate the facility and utility/development context; this does not establish interval telemetry or complete permitting.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-8358e4-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-df2982-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-145ed5861bdf2982",
      "site_name": "OpenAI Stargate Michigan",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "OpenAI's site announcement identifies the Saline Township campus, Related Digital, and DTE; independent DEPLOY records the Stargate Saline facility, Related Digital and DTE service relationship.",
      "relationship": "independent multi-source corroboration",
      "source": "OpenAI / DEPLOY",
      "source_urls": [
        "https://openai.com/index/expanding-stargate-to-michigan/",
        "https://registry.deploy.report/datacenters/openai-oracle-stargate-saline-michigan"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Distinct public publishers corroborate the facility identity and utility/program relationship; this does not establish interval telemetry or complete permitting.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-df2982-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-bdf968-INDEPENDENT-20260927",
      "epoch_id": "EPOCH-78e7d8474fbdf968",
      "site_name": "OpenAI Stargate Wisconsin",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "OpenAI's Stargate Community record identifies Oracle/Vantage working with WEC Energy Group on the Wisconsin campus; independent DEPLOY facility records identify the Port Washington Lighthouse campus, OpenAI as Stargate offtaker, and WEC Energy/We Energies as utility.",
      "relationship": "independent multi-source corroboration",
      "source": "OpenAI / DEPLOY",
      "source_urls": [
        "https://openai.com/index/stargate-community/",
        "https://registry.deploy.report/datacenters/vantage-lighthouse-port-washington-wisconsin"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-27",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Distinct public publishers corroborate the facility identity and utility/program relationship; this does not establish interval telemetry or complete permitting.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-bdf968-INDEPENDENT-20260927"
    },
    {
      "claim_id": "EVID-PWEB-ADD-HYPERION-SERVICE-20260928",
      "epoch_id": "EPOCH-bbcf0efa8bcebd41",
      "site_name": "Meta Hyperion",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Meta states the Richland Parish expansion includes an energy agreement with Entergy Louisiana and that the arrangement saves Entergy customers $2.65 billion over 20 years.",
      "relationship": "site-specific utility / energy agreement",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/"
      ],
      "publication_date": "2026-07-13",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Fresh public-source capture retained on 2026-09-28.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ADD-HYPERION-SERVICE-20260928"
    },
    {
      "claim_id": "EVID-PWEB-ADD-HYPERION-REG-20260928",
      "epoch_id": "EPOCH-bbcf0efa8bcebd41",
      "site_name": "Meta Hyperion",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "LPSC dockets U-37425 and U-37882 concern Entergy generation/transmission resources and certification for the Meta Hyperion / Project Evest expansion in Richland Parish.",
      "relationship": "state utility regulatory proceeding",
      "source": "Louisiana Public Service Commission docket tracker",
      "source_urls": [
        "https://louisianai.com/permits/lpsc-u-37425-meta-phase-1-certification",
        "https://louisianai.com/permits/lpsc-u-37882-meta-expansion-certification"
      ],
      "publication_date": "2026-05-14",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Fresh public-source capture retained on 2026-09-28.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ADD-HYPERION-REG-20260928"
    },
    {
      "claim_id": "EVID-PWEB-ADD-HYPERION-INDEPENDENT-20260928",
      "epoch_id": "EPOCH-bbcf0efa8bcebd41",
      "site_name": "Meta Hyperion",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Meta's project disclosure and Louisiana utility-regulatory docket records independently corroborate the Hyperion campus, Entergy energy relationship, and project-specific regulatory footprint.",
      "relationship": "independent multi-source corroboration",
      "source": "Meta Data Centers / Louisiana utility-regulatory records",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/",
        "https://louisianai.com/lpsc-dockets"
      ],
      "publication_date": "2026-07-13",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Fresh public-source capture retained on 2026-09-28.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ADD-HYPERION-INDEPENDENT-20260928"
    },
    {
      "claim_id": "EVID-PWEB-ADD-TEMPLE-SERVICE-20260928",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Meta states it worked closely with Oncor Electric to plan for and meet the Temple data center's energy needs years before the facility came online.",
      "relationship": "site-specific utility service planning",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Fresh public-source capture retained on 2026-09-28.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ADD-TEMPLE-SERVICE-20260928"
    },
    {
      "claim_id": "EVID-PWEB-ADD-TEMPLE-COOLING-20260928",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "cooling",
      "field": "cooling",
      "value": "Meta states the Temple Data Center uses a water-efficient closed-loop liquid-cooled system and uses zero water for a majority of the year.",
      "relationship": "site-specific cooling infrastructure",
      "source": "Meta Data Centers",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Fresh public-source capture retained on 2026-09-28.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ADD-TEMPLE-COOLING-20260928"
    },
    {
      "claim_id": "EVID-PWEB-ADD-TEMPLE-INDEPENDENT-20260928",
      "epoch_id": "EPOCH-6ff5e1aeb6f0c7e3",
      "site_name": "Meta Temple",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Meta's official Temple disclosure and independent facility records corroborate operation, Oncor energy planning and the closed-loop liquid-cooling configuration.",
      "relationship": "independent multi-source corroboration",
      "source": "Meta Data Centers / independent facility records",
      "source_urls": [
        "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
        "https://registry.deploy.report/datacenters/facilities/meta-texas-temple"
      ],
      "publication_date": "2026-07-22",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Fresh public-source capture retained on 2026-09-28.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ADD-TEMPLE-INDEPENDENT-20260928"
    },
    {
      "claim_id": "EVID-PWEB-ADD-PAPILLION-SERVICE-20260928",
      "epoch_id": "EPOCH-4525348d114e3e8e",
      "site_name": "Google Papillion",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Omaha Public Power District identifies Google as a new large customer for its Papillion, Nebraska data center and describes evaluating transmission/distribution improvements and capacity resources to meet the expected demand.",
      "relationship": "site-specific utility service / large-customer planning",
      "source": "Omaha Public Power District",
      "source_urls": [
        "https://www.oppd.com/media/316613/neomaha01a-pos-2019.pdf"
      ],
      "publication_date": "2019-10-04",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Fresh public-source capture retained on 2026-09-28.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ADD-PAPILLION-SERVICE-20260928"
    },
    {
      "claim_id": "EVID-PWEB-ADD-PAPILLION-INDEPENDENT-20260928",
      "epoch_id": "EPOCH-4525348d114e3e8e",
      "site_name": "Google Papillion",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Google's current Nebraska directory and OPPD's utility filing independently corroborate the Papillion data center and its OPPD service context.",
      "relationship": "independent multi-source corroboration",
      "source": "Google / Omaha Public Power District",
      "source_urls": [
        "https://datacenters.google/locations/nebraska/",
        "https://www.oppd.com/media/316613/neomaha01a-pos-2019.pdf"
      ],
      "publication_date": "2026-09-01",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Fresh public-source capture retained on 2026-09-28.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ADD-PAPILLION-INDEPENDENT-20260928"
    },
    {
      "claim_id": "EVID-PWEB-ADD-NEWALBANY-SERVICE-20260928",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Public facility records identify Google New Albany as connected to the American Electric Power power grid; an independent facility source attributes the serving utility to AEP Ohio.",
      "relationship": "site-specific utility service context",
      "source": "DataCentersExposed / public facility records",
      "source_urls": [
        "https://datacentersexposed.com/facilities/google-new-albany",
        "https://www.datacenter.fyi/public-record/google-66898d08"
      ],
      "publication_date": "2026-06-21",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Fresh public-source capture retained on 2026-09-28.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ADD-NEWALBANY-SERVICE-20260928"
    },
    {
      "claim_id": "EVID-PWEB-ADD-NEWALBANY-INDEPENDENT-20260928",
      "epoch_id": "EPOCH-5b353d56a567a70b",
      "site_name": "Google New Albany",
      "domain": "other",
      "field": "independent_corroboration",
      "value": "Google's official Ohio/New Albany facility context and independent public facility records corroborate the New Albany campus and its AEP-grid relationship.",
      "relationship": "independent multi-source corroboration",
      "source": "Google / independent facility records",
      "source_urls": [
        "https://datacenters.google/locations/ohio/",
        "https://datacentersexposed.com/facilities/google-new-albany"
      ],
      "publication_date": "2026-06-21",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Fresh public-source capture retained on 2026-09-28.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-ADD-NEWALBANY-INDEPENDENT-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GOOGLE-MESA-ADDR-20260928",
      "epoch_id": "EPOCH-83ca909f7eb211c7",
      "site_name": "Google Mesa",
      "domain": "site_identity",
      "field": "address",
      "value": "7232 E Elliot Rd, Mesa, AZ 85212",
      "relationship": "site address / project location",
      "source": "City of Mesa / public facility records",
      "source_urls": [
        "https://mesa.legistar.com/View.ashx?G=6D482A9C-B912-4765-B79B-550C367FA729&GUID=A1C2EC01-F735-4471-A03A-DF8C09D4D8FA&ID=12826393&M=F",
        "https://www.datacenter.fyi/public-record/google-aa4275ee"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "City planning records identify 7232 E Elliot Rd as the Redhawk/Google campus address; the secondary facility record is retained as corroborating public evidence.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GOOGLE-MESA-ADDR-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GOOGLE-MESA-PROJECT-20260928",
      "epoch_id": "EPOCH-83ca909f7eb211c7",
      "site_name": "Google Mesa",
      "domain": "site_identity",
      "field": "project",
      "value": "Project Red Hawk / Google Redhawk Mesa Data Center Campus",
      "relationship": "public project identity",
      "source": "City of Mesa / Sue Data Centers",
      "source_urls": [
        "https://mesa.legistar.com/View.ashx?G=6D482A9C-B912-4765-B79B-550C367FA729&GUID=A1C2EC01-F735-4471-A03A-DF8C09D4D8FA&ID=12826393&M=F",
        "https://suedatacenters.org/data-centers/google-redhawk-mesa-az"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Public planning/facility records identify the Redhawk project/campus associated with Google Mesa; this does not assert a utility queue ID or measured load.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GOOGLE-MESA-PROJECT-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GOOGLE-MESA-SERVICE-20260928",
      "epoch_id": "EPOCH-83ca909f7eb211c7",
      "site_name": "Google Mesa",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Arizona Public Service is identified in a public Google Mesa facility record as the associated utility/grid relationship.",
      "relationship": "publicly identified electric utility / grid relationship",
      "source": "Data Center FYI / public facility record",
      "source_urls": [
        "https://www.datacenter.fyi/public-record/google-aa4275ee"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Public facility evidence of utility association; this is not a confidential service contract, interval electricity telemetry, or measured demand.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GOOGLE-MESA-SERVICE-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GOOGLE-MESA-REG-20260928",
      "epoch_id": "EPOCH-83ca909f7eb211c7",
      "site_name": "Google Mesa",
      "domain": "regulatory",
      "field": "regulatory",
      "value": "City of Mesa planning records identify the 7232 E Elliot Rd Redhawk/Google campus project in municipal development review.",
      "relationship": "municipal planning / development record",
      "source": "City of Mesa",
      "source_urls": [
        "https://mesa.legistar.com/View.ashx?G=6D482A9C-B912-4765-B79B-550C367FA729&GUID=A1C2EC01-F735-4471-A03A-DF8C09D4D8FA&ID=12826393&M=F"
      ],
      "publication_date": "2026-09-27",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Municipal planning evidence is retained as regulatory/development context; it does not establish an electrical queue ID or measured consumption.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GOOGLE-MESA-REG-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GRID-CHESTER-20260928",
      "epoch_id": "EPOCH-2d362a1adb09fddd",
      "site_name": "CoreWeave Chester VA",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Dominion Energy Virginia",
      "relationship": "reported grid operator for 1401 Meadowville Technology Parkway",
      "source": "datacenter.fyi",
      "source_urls": [
        "https://www.datacenter.fyi/public-record/chirisa-richmond-llc-110bbf11"
      ],
      "publication_date": null,
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The facility tracker identifies Dominion Energy Virginia as the grid operator for the exact 1401 Meadowville Technology Parkway address. This is site-level grid-operator evidence, not a utility contract or Epoch queue-ID assertion.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GRID-CHESTER-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GRID-VNET-20260928",
      "epoch_id": "EPOCH-a286a89bd1c1b6e7",
      "site_name": "VNET Bayin Ulanqab",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Tsinghua University field-study documentation records a 220kV substation at the VNET data center in Ulanqab; VNET directly draws electricity from high-voltage transmission lines and maintains its own on-site distribution network.",
      "relationship": "site-specific electrical supply / on-site distribution evidence",
      "source": "Tsinghua University Department of Electrical Engineering",
      "source_urls": [
        "https://www.eea.tsinghua.edu.cn/en/info/1038/3485.htm"
      ],
      "publication_date": "2025-08-26",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Site-visit evidence for the VNET data center power system; it does not assert a public queue ID or measured interval demand.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GRID-VNET-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GRID-HORINGER-20260928",
      "epoch_id": "EPOCH-77e196fc5320fd70",
      "site_name": "Huawei Horinger",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Huawei Cloud Horinger data center 220kV substation reached full energization, including the second Sahehan line; the project has three substations and provides dual-circuit high-grade power infrastructure for the data center.",
      "relationship": "site-specific substation and transmission-line energization",
      "source": "PowerChina Huilong Company",
      "source_urls": [
        "https://hngc.powerchina.cn/col/col1944/art/2026/art_7d1114b6a3164e8dabf7ae451cf8ec1c.html"
      ],
      "publication_date": "2026-09-07",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Primary project-contractor disclosure tied to the Horinger Huawei Cloud data center; it establishes site electrical infrastructure but not current interval load.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GRID-HORINGER-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GRID-WUHU-20260928",
      "epoch_id": "EPOCH-af62ae3440fe885a",
      "site_name": "Huawei Wuhu",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Official environmental filing for the Huawei Cloud East China Wuhu data center documents an external power project from the Qingzhu 220kV substation to the Huawei 220kV substation at the facility boundary, with an approximately 8.43 km route.",
      "relationship": "site-specific 220kV grid connection infrastructure",
      "source": "Wuhu Municipal Ecology and Environment Bureau",
      "source_urls": [
        "https://sthjj.wuhu.gov.cn/hbyw/hjsp/jsxmhpsp/8569531.html"
      ],
      "publication_date": "2024-01-01",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Official environmental approval record for the external 220kV line to the Huawei substation; it is infrastructure evidence, not a queue ID or interval-load measurement.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GRID-WUHU-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GRID-COREWEAVE-NORWAY-20260928",
      "epoch_id": "EPOCH-f48a533b01898dfd",
      "site_name": "CoreWeave Norway",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "Bulk Infrastructure states that CoreWeave uses the N01 Datacenter Campus in Vennesla, which is next to a major transformer station and has direct and redundant connections to multiple hydropower stations; Bulk reports 400 MW secured at the site.",
      "relationship": "site-specific electrical supply infrastructure for CoreWeave deployment",
      "source": "Bulk Infrastructure",
      "source_urls": [
        "https://bulkinfrastructure.com/newsroom/coreweave-partners-with-bulk-infrastructure"
      ],
      "publication_date": "2025-03-14",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Primary CoreWeave/Bulk announcement; 400 MW is campus secured capacity, not measured CoreWeave IT load.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GRID-COREWEAVE-NORWAY-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GRID-ALIBABA-ZHANGBEI-20260928",
      "epoch_id": "EPOCH-e20c2909085b37fd",
      "site_name": "Alibaba Zhangbei",
      "domain": "service_or_contract",
      "field": "service_or_contract",
      "value": "A retained public corporate case record identifies the Alibaba Zhangbei Yun Calculation Center Chahar project 110kV substation engineering work; Epoch imagery also records a large substation visibly connected to transmission lines at the site.",
      "relationship": "site-specific 110kV substation / transmission infrastructure",
      "source": "TGOOD / CNINFO filing plus Epoch AI",
      "source_urls": [
        "https://static.cninfo.com.cn/finalpage/2025-08-08/1224440344.PDF",
        "https://epoch.ai/data/ai-data-centers/directory/alibaba-zhangbei"
      ],
      "publication_date": "2025-08-08",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The corporate case record ties the 110kV substation engineering to Alibaba Zhangbei; Epoch provides the independent site imagery context. No public queue ID or interval demand is asserted.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GRID-ALIBABA-ZHANGBEI-20260928"
    },
    {
      "claim_id": "EVID-PWEB-GRID-NARVIK-20260928",
      "epoch_id": "EPOCH-1b7cb9c2b0eb479f",
      "site_name": "Microsoft Narvik Norway",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": "Nordkraft Industrinett / Statnett",
      "relationship": "site grid infrastructure and reserved transmission capacity",
      "source": "Norwegian Water Resources and Energy Directorate (NVE)",
      "source_urls": [
        "https://www.nve.no/konsesjon/konsesjonssaker/konsesjonssak?id=22622&type=A",
        "https://webfileservice.nve.no/API/PublishedFiles/Download/ef898a5b-14a7-4d5e-8dfa-51fc72100e4a/202503343/3450303"
      ],
      "publication_date": "2026-03-11",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "NVE records Nordkraft Industrinett's Skoglund substation and 230 MW reserved withdrawal from Statnett's Kvandal substation for Aker Nscale's nearby data-center expansion; this is grid-infrastructure/capacity evidence, not measured demand.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-GRID-NARVIK-20260928"
    },
    {
      "claim_id": "EVID-PWEB-CLOSE-c2039947-ENERGY-20260928",
      "epoch_id": "EPOCH-c20399471d1c5e4a",
      "site_name": "Colossus 2",
      "domain": "grid_connection",
      "field": "energy_companies",
      "value": [
        "Tennessee Valley Authority",
        "Memphis Light, Gas and Water"
      ],
      "relationship": "direct utility / power-service relationship",
      "source": "Tennessee Valley Authority Board action, reported by Daily Memphian",
      "source_urls": [
        "https://dailymemphian.com/article/65680/spacexai-power-memphis-tennessee-valley-authority-tva"
      ],
      "publication_date": "2026-08-20",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "The report states TVA approved a greater-than-100-MW load request for MZX Tech LLC, an affiliate of SpaceXAI, and that MZX Tech would become a direct TVA customer; MLGW is the local utility serving Memphis. The exact confidential service-agreement terms and final allocation of load are not asserted.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-CLOSE-c2039947-ENERGY-20260928"
    },
    {
      "claim_id": "EVID-PWEB-UAE-LOCATION-20260928",
      "epoch_id": "EPOCH-661288625d17662a",
      "site_name": "OpenAI Stargate UAE",
      "domain": "other",
      "field": "physical_target",
      "value": "Reuters reported on September 11, 2026 that two people familiar with planning confirmed the Stargate UAE complex is near Al Dhafra Air Base.",
      "relationship": "area-level physical-location lead",
      "source": "Reuters",
      "source_urls": [
        "https://www.reuters.com/world/middle-east/uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say-2026-09-11/"
      ],
      "publication_date": "2026-09-11",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Secondary reporting establishes an area-level lead only. It does not establish a parcel, polygon, or canonical facility coordinate and is not promoted into the physical target.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-UAE-LOCATION-20260928"
    },
    {
      "claim_id": "EVID-PWEB-UAE-STATUS-20260928",
      "epoch_id": "EPOCH-661288625d17662a",
      "site_name": "OpenAI Stargate UAE",
      "domain": "construction",
      "field": "construction_status",
      "value": "Reuters reported that first-phase construction is expected to continue with modifications while the wider 5 GW campus plan is being reconsidered as a distributed network of UAE sites.",
      "relationship": "current project-status reporting",
      "source": "Reuters",
      "source_urls": [
        "https://www.reuters.com/world/middle-east/uae-revises-ai-data-center-plan-after-iranian-attacks-sources-say-2026-09-11/"
      ],
      "publication_date": "2026-09-11",
      "capture_date": "2026-09-28",
      "disposition": "PUBLIC_SOURCE_CAPTURED",
      "scope_note": "Anonymous-source reporting is retained as attributed current context. It is not treated as an official commissioning, energization, or capacity measurement.",
      "claim_scope": "site_level_public_web",
      "provenance_status": "source_link_retained",
      "source_record_id": "EVID-PWEB-UAE-STATUS-20260928"
    }
  ]
}