      "id": "VIRGINIA-DEQ-74150-3",
      "project_name": "Amazon Data Services, Inc. IAD-114 IAD-115",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74150-3",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74154-5",
      "project_name": "Aerospace Data Facility - East",
      "rto": "VA",
      "st": "VA",
      "co": "Fairfax Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/city centroid",
      "lat": 38.8462,
      "lon": -77.3064,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Fairfax Co.",
      "county_or_zone": "Fairfax Co.",
      "queue_id": null,
      "permit_number": "74154-5",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74161-5",
      "project_name": "QTS Investment Properties Manassas LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Prince William Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.7032,
      "lon": -77.4861,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Prince William Co.",
      "county_or_zone": "Prince William Co.",
      "queue_id": null,
      "permit_number": "74161-5",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74171-4",
      "project_name": "Amazon Data Services (IAD-130, IAD-131, IAD-313 and DCA-072)",
      "rto": "VA",
      "st": "VA",
      "co": "Prince William Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.7032,
      "lon": -77.4861,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Prince William Co.",
      "county_or_zone": "Prince William Co.",
      "queue_id": null,
      "permit_number": "74171-4",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74127-3",
      "project_name": "Data Center Vint Hill LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Fauquier Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.736,
      "lon": -77.812,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Fauquier Co.",
      "county_or_zone": "Fauquier Co.",
      "queue_id": null,
      "permit_number": "74127-3",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74118-3",
      "project_name": "Cashvad Ventures LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Manassas City",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "city centroid",
      "lat": 38.7509,
      "lon": -77.4753,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Manassas City",
      "county_or_zone": "Manassas City",
      "queue_id": null,
      "permit_number": "74118-3",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74239-2",
      "project_name": "Amazon Data Services Inc - IAD-134/135/136",
      "rto": "VA",
      "st": "VA",
      "co": "Fairfax Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/city centroid",
      "lat": 38.8462,
      "lon": -77.3064,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Fairfax Co.",
      "county_or_zone": "Fairfax Co.",
      "queue_id": null,
      "permit_number": "74239-2",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74241-4",
      "project_name": "Gainesville Crossing Data Campus - GCDC",
      "rto": "VA",
      "st": "VA",
      "co": "Prince William Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.7032,
      "lon": -77.4861,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Prince William Co.",
      "county_or_zone": "Prince William Co.",
      "queue_id": null,
      "permit_number": "74241-4",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74252-2",
      "project_name": "Amazon Data Services IAD-215",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74252-2",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74260-2",
      "project_name": "NTT Global Data Centers VA10 LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Prince William Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.7032,
      "lon": -77.4861,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Prince William Co.",
      "county_or_zone": "Prince William Co.",
      "queue_id": null,
      "permit_number": "74260-2",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74262-4",
      "project_name": "Digital Third Second Manassas, LLC & Digital Carver Brickyard, LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Prince William Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.7032,
      "lon": -77.4861,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Prince William Co.",
      "county_or_zone": "Prince William Co.",
      "queue_id": null,
      "permit_number": "74262-4",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74265-3",
      "project_name": "Yondr Data Center",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74265-3",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74269-2",
      "project_name": "STACK Infrastructure Data Center - SI NVA06A LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74269-2",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74284-2",
      "project_name": "Vantage Data Center VA3 LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74284-2",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74288-2",
      "project_name": "Amazon Data Services Inc. IAD450 Cosner Tech Campus",
      "rto": "VA",
      "st": "VA",
      "co": "Spotsylvania Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.1851,
      "lon": -77.6579,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Spotsylvania Co.",
      "county_or_zone": "Spotsylvania Co.",
      "queue_id": null,
      "permit_number": "74288-2",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74296-1",
      "project_name": "Kincora Data Center",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74296-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74299-2",
      "project_name": "Amazon Data Services Inc - IAD - 550 Louisa REB",
      "rto": "VA",
      "st": "VA",
      "co": "Louisa Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 37.9773,
      "lon": -77.9621,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Louisa Co.",
      "county_or_zone": "Louisa Co.",
      "queue_id": null,
      "permit_number": "74299-2",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74302-1",
      "project_name": "Amazon Data Services Inc - IAD-243/244/290/291/292",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74302-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74308-1",
      "project_name": "Digital Filigree LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74308-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74321-1",
      "project_name": "Belmont Innovation Campus",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74321-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74323-2",
      "project_name": "Amazon Data Services Inc IAD-180, IAD-181, IAD-182, & IAD-183",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74323-2",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74329-2",
      "project_name": "Amazon Data Services IAD-870",
      "rto": "VA",
      "st": "VA",
      "co": "Spotsylvania Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.1851,
      "lon": -77.6579,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Spotsylvania Co.",
      "county_or_zone": "Spotsylvania Co.",
      "queue_id": null,
      "permit_number": "74329-2",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74331-1",
      "project_name": "Westfax Property Owner A LP/Westfax 4-5A",
      "rto": "VA",
      "st": "VA",
      "co": "Fairfax Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/city centroid",
      "lat": 38.8462,
      "lon": -77.3064,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Fairfax Co.",
      "county_or_zone": "Fairfax Co.",
      "queue_id": null,
      "permit_number": "74331-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74332-2",
      "project_name": "Herndon Technology Partners LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Fairfax Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/city centroid",
      "lat": 38.8462,
      "lon": -77.3064,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Fairfax Co.",
      "county_or_zone": "Fairfax Co.",
      "queue_id": null,
      "permit_number": "74332-2",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74333-1",
      "project_name": "Amazon Data Services Inc IAD-45",
      "rto": "VA",
      "st": "VA",
      "co": "Prince William Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.7032,
      "lon": -77.4861,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Prince William Co.",
      "county_or_zone": "Prince William Co.",
      "queue_id": null,
      "permit_number": "74333-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74335-1",
      "project_name": "SDC Ashburn I - SE Parcel Campus",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74335-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74336-1",
      "project_name": "Word of Grace Data Center",
      "rto": "VA",
      "st": "VA",
      "co": "Fairfax Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/city centroid",
      "lat": 38.8462,
      "lon": -77.3064,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Fairfax Co.",
      "county_or_zone": "Fairfax Co.",
      "queue_id": null,
      "permit_number": "74336-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74337-1",
      "project_name": "Amazon Data Services Inc IAD-170",
      "rto": "VA",
      "st": "VA",
      "co": "Loudoun Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 39.0881,
      "lon": -77.6377,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Loudoun Co.",
      "county_or_zone": "Loudoun Co.",
      "queue_id": null,
      "permit_number": "74337-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74338-1",
      "project_name": "Vantage Data Centers VA41 LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Stafford Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.4168,
      "lon": -77.452,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Stafford Co.",
      "county_or_zone": "Stafford Co.",
      "queue_id": null,
      "permit_number": "74338-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74341-1",
      "project_name": "Clean Arc Data Centers - VA-1 Campus",
      "rto": "VA",
      "st": "VA",
      "co": "Caroline Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.0312,
      "lon": -77.3443,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Caroline Co.",
      "county_or_zone": "Caroline Co.",
      "queue_id": null,
      "permit_number": "74341-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74342-1",
      "project_name": "Amazon Data Services Inc IAD-110/111/112/113",
      "rto": "VA",
      "st": "VA",
      "co": "Prince William Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.7032,
      "lon": -77.4861,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Prince William Co.",
      "county_or_zone": "Prince William Co.",
      "queue_id": null,
      "permit_number": "74342-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74348-1",
      "project_name": "DataBank Data Center Culpeper LLC",
      "rto": "VA",
      "st": "VA",
      "co": "Culpeper Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.4812,
      "lon": -77.9557,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Culpeper Co.",
      "county_or_zone": "Culpeper Co.",
      "queue_id": null,
      "permit_number": "74348-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74349-1",
      "project_name": "Amazon Data Services Inc IAD-264",
      "rto": "VA",
      "st": "VA",
      "co": "Prince William Co.",
      "mw": null,
      "status": "permit issued",
      "provider": "Virginia Department of Environmental Quality",
      "customer_or_developer": null,
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "precision": "county/zone centroid",
      "lat": 38.7032,
      "lon": -77.4861,
      "evidence_type": "environmental_permit_record",
      "jurisdiction": "Virginia, US",
      "location": "Prince William Co.",
      "county_or_zone": "Prince William Co.",
      "queue_id": null,
      "permit_number": "74349-1",
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_scope": "Issued Air Permits for Data Centers",
      "capture_date": "2026-09-26",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "AEP-GOOGLE-FORT-WAYNE-2026",
      "project_name": "Google — Data Centers",
      "rto": "IN",
      "st": "IN",
      "co": "Fort Wayne, IN",
      "mw": null,
      "status": "publicly identified in utility investor material",
      "provider": "American Electric Power",
      "customer_or_developer": "Google",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "precision": "city/site area",
      "lat": 41.0793,
      "lon": -85.1394,
      "evidence_type": "named_utility_load_project",
      "jurisdiction": "Indiana, US",
      "location": "Fort Wayne, IN",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "capture_date": "2026-05-01",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-MICROSOFT-GRANGER-2026",
      "project_name": "Microsoft — Data Centers",
      "rto": "IN",
      "st": "IN",
      "co": "Granger, IN",
      "mw": null,
      "status": "publicly identified in utility investor material",
      "provider": "American Electric Power",
      "customer_or_developer": "Microsoft",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "precision": "city/site area",
      "lat": 41.7534,
      "lon": -86.1108,
      "evidence_type": "named_utility_load_project",
      "jurisdiction": "Indiana, US",
      "location": "Granger, IN",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "capture_date": "2026-05-01",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-AWS-COLUMBUS-2026",
      "project_name": "AWS — Data Centers",
      "rto": "OH",
      "st": "OH",
      "co": "Columbus, OH",
      "mw": null,
      "status": "publicly identified in utility investor material",
      "provider": "American Electric Power",
      "customer_or_developer": "AWS",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "precision": "city/site area",
      "lat": 39.9612,
      "lon": -82.9988,
      "evidence_type": "named_utility_load_project",
      "jurisdiction": "Ohio, US",
      "location": "Columbus, OH",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "capture_date": "2026-05-01",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-SBENERGY-PIKETON-2026",
      "project_name": "SB Energy — Data Center",
      "rto": "OH",
      "st": "OH",
      "co": "Piketon, OH",
      "mw": 10000,
      "status": "publicly identified in utility investor material",
      "provider": "American Electric Power",
      "customer_or_developer": "SB Energy",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "precision": "city/site area",
      "lat": 39.0698,
      "lon": -82.9827,
      "evidence_type": "named_utility_load_project",
      "jurisdiction": "Ohio, US",
      "location": "Piketon, OH",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 10000,
          "unit": "MW",
          "raw_value": "10 GW Campus at Buildout",
          "qualifier": "campus at buildout"
        }
      ],
      "source_authority": "utility investor presentation",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "capture_date": "2026-05-01",
      "notes": "AEP reports 10 GW campus at buildout; this is a planned campus-scale figure, not an energized-load measurement."
    },
    {
      "id": "AEP-GOOGLE-PUTNAM-2026",
      "project_name": "Google — Data Centers",
      "rto": "VA",
      "st": "VA",
      "co": "Putnam County, WV",
      "mw": null,
      "status": "publicly identified in utility investor material",
      "provider": "American Electric Power",
      "customer_or_developer": "Google",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "precision": "city/site area",
      "lat": 38.44,
      "lon": -81.89,
      "evidence_type": "named_utility_load_project",
      "jurisdiction": "West Virginia, US",
      "location": "Putnam County, WV",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "capture_date": "2026-05-01",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-AWS-SHREVEPORT-2026",
      "project_name": "AWS — Data Centers",
      "rto": "LA",
      "st": "LA",
      "co": "Shreveport, LA",
      "mw": null,
      "status": "publicly identified in utility investor material",
      "provider": "American Electric Power",
      "customer_or_developer": "AWS",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "precision": "city/site area",
      "lat": 32.5252,
      "lon": -93.7502,
      "evidence_type": "named_utility_load_project",
      "jurisdiction": "Louisiana, US",
      "location": "Shreveport, LA",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "capture_date": "2026-05-01",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-META-TULSA-2026",
      "project_name": "Meta — Data Centers",
      "rto": "OK",
      "st": "OK",
      "co": "Tulsa, OK",
      "mw": null,
      "status": "publicly identified in utility investor material",
      "provider": "American Electric Power",
      "customer_or_developer": "Meta",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "precision": "city/site area",
      "lat": 36.154,
      "lon": -95.9928,
      "evidence_type": "named_utility_load_project",
      "jurisdiction": "Oklahoma, US",
      "location": "Tulsa, OK",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "capture_date": "2026-05-01",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-LANCIUM-ABILENE-2026",
      "project_name": "LANCIUM — Stargate Data Center",
      "rto": "TX",
      "st": "TX",
      "co": "Abilene, TX",
      "mw": null,
      "status": "publicly identified in utility investor material",
      "provider": "American Electric Power",
      "customer_or_developer": "LANCIUM",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "precision": "city/site area",
      "lat": 32.4487,
      "lon": -99.7331,
      "evidence_type": "named_utility_load_project",
      "jurisdiction": "Texas, US",
      "location": "Abilene, TX",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "capture_date": "2026-05-01",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "EEI-AWS-NEW-ALBANY-2026",
      "project_name": "Amazon Web Services (AWS) — New Albany, OH",
      "rto": "OH",
      "st": "OH",
      "co": "New Albany, OH",
      "mw": null,
      "status": "publicly announced project",
      "provider": "AEP Ohio",
      "customer_or_developer": "Amazon Web Services (AWS)",
      "source_url": "https://www.eei.org/-/media/Project/EEI/Documents/Issues%20and%20Policy/List%20of%20Large%20Customer%20Projects%20and%20Tariffs",
      "precision": "city/site area",
      "lat": 40.0812,
      "lon": -82.8088,
      "evidence_type": "named_large_load_project_from_industry_list",
      "jurisdiction": "Ohio, US",
      "location": "New Albany, OH",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "EEI public large-load project list",
      "source_scope": "EEI Large Load Projects and Tariffs (April 2026)",
      "capture_date": "2026-04",
      "notes": "Industry compilation identifies the AWS data-center project and AEP Ohio service context; no project MW is stated in the cited row."
    },
    {
      "id": "EEI-GOOGLE-MORGAN-TOWNSHIP-2026",
      "project_name": "Google — Morgan Township, IN",
      "rto": "IN",
      "st": "IN",
      "co": "Morgan Township, IN",
      "mw": null,
      "status": "publicly announced project",
      "provider": "AES Indiana",
      "customer_or_developer": "Google",
      "source_url": "https://www.eei.org/-/media/Project/EEI/Documents/Issues%20and%20Policy/List%20of%20Large%20Customer%20Projects%20and%20Tariffs",
      "precision": "city/site area",
      "lat": 39.99,
      "lon": -86.02,
      "evidence_type": "named_large_load_project_from_industry_list",
      "jurisdiction": "Indiana, US",
      "location": "Morgan Township, IN",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "EEI public large-load project list",
      "source_scope": "EEI Large Load Projects and Tariffs (April 2026)",
      "capture_date": "2026-04",
      "notes": "Industry compilation identifies the Google data-center project. A 700 MW natural-gas option in an IRP is not treated as the data-center load."
    },
    {
      "id": "GA-OPENAI-CAMELLIA-2026",
      "project_name": "Project Camellia",
      "rto": "GA",
      "st": "GA",
      "co": "Effingham County",
      "mw": 3200,
      "status": "contract approved / project announced",
      "provider": "Georgia Power",
      "customer_or_developer": "OpenAI",
      "source_url": "https://psc.ga.gov/search/facts-document/?documentId=228337",
      "precision": "city/site area",
      "lat": 32.37,
      "lon": -81.34,
      "evidence_type": "named_utility_contract_project",
      "jurisdiction": "Georgia, US",
      "location": "Savannah Gateway Industrial Hub / Effingham County",
      "county_or_zone": "Effingham County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 3200,
          "unit": "MW",
          "raw_value": "3,200 megawatts",
          "qualifier": "Georgia Power announcement: new demand under 25-year agreement",
          "source_url": "https://www.georgiapower.com/news-hub/press-releases/contract-openai-approved-part-portfolio-delivering-950-million-annual-savings.html",
          "capture_date": "2026-08-26"
        },
        {
          "value_mw": 3210,
          "unit": "MW",
          "raw_value": "3,210 MW",
          "qualifier": "Georgia PSC public contract summary cover letter",
          "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/228337/109582",
          "capture_date": "2026-09-08"
        }
      ],
      "source_authority": "utility + state public service commission",
      "source_scope": "Georgia PSC Docket 44280, Filing 228337 plus Georgia Power public announcement",
      "capture_date": "2026-09-26",
      "notes": "Both dated primary-source figures are preserved as separate raw claims; neither is silently substituted for the other. The filing cover letter states the public summary is for a 3,210 MW electric-service contract."
    },
    {
      "id": "ENTERGY-HUT8-RIVER-BEND-2025",
      "project_name": "River Bend AI data center campus",
      "rto": "LA",
      "st": "LA",
      "co": "West Feliciana Parish",
      "mw": 330,
      "status": "under construction; operations expected Q2 2027",
      "provider": "Entergy Louisiana",
      "customer_or_developer": "Hut 8 / Fluidstack",
      "source_url": "https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
      "precision": "city/site area",
      "lat": 30.95,
      "lon": -91.43,
      "evidence_type": "named_utility_service_project",
      "jurisdiction": "Louisiana, US",
      "location": "Southeast Louisiana / River Bend",
      "county_or_zone": "West Feliciana Parish",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 330,
          "unit": "MW",
          "raw_value": "330 megawatts",
          "qualifier": "initial utility capacity",
          "source_url": "https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
          "capture_date": "2025-12-17"
        },
        {
          "value_mw": 245,
          "unit": "MW",
          "raw_value": "245 MW",
          "qualifier": "critical IT load",
          "source_url": "https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
          "capture_date": "2025-12-17"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "up to 1,000 MW",
          "qualifier": "potential utility-capacity scale",
          "source_url": "https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
          "capture_date": "2025-12-17"
        }
      ],
      "source_authority": "utility primary source",
      "source_scope": "Entergy project announcement",
      "capture_date": "2026-09-26",
      "notes": "Utility capacity, critical IT load and potential future utility scale are preserved as distinct measures."
    },
    {
      "id": "ALECTRA-VAUGHAN-MTS6-2026",
      "project_name": "Vaughan MTS #6 / undisclosed data-center customer",
      "rto": "ON",
      "st": "ON",
      "co": "Langstaff Road / Highway 27 area, Vaughan",
      "mw": null,
      "status": "planned",
      "provider": "Alectra Utilities",
      "customer_or_developer": "Undisclosed Alectra customer",
      "source_url": "https://alectrautilities.com/VaughanMTS6",
      "precision": "city/site area",
      "lat": 43.8561,
      "lon": -79.5085,
      "evidence_type": "named_distribution_connection_project",
      "jurisdiction": "Ontario, Canada",
      "location": "Langstaff Road / Highway 27 area, Vaughan",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mva": 108,
          "unit": "MVA",
          "raw_value": "108 MVA",
          "qualifier": "current Alectra project page: customer maximum demand",
          "source_url": "https://alectrautilities.com/VaughanMTS6",
          "capture_date": "2026-09-26"
        },
        {
          "value_mva": 125,
          "unit": "MVA",
          "raw_value": "125MVA",
          "qualifier": "2025 Alectra distribution-system-plan report",
          "source_url": "https://alectrautilities.com/sites/default/files/assets/pdf/OEB_file_regulatory_affairs/alectra_exhibit-2a_distribution-system-plan_part-5-of-5_redacted_20251027.pdf",
          "capture_date": "2025-10-27"
        }
      ],
      "source_authority": "distribution utility primary sources",
      "source_scope": "Alectra Vaughan MTS #6 project page and OEB-filed distribution-system plan",
      "capture_date": "2026-09-26",
      "notes": "Two dated primary sources report 108 MVA and 125 MVA. Both are retained; MVA is not converted to MW."
    },
    {
      "id": "AESO-P3066-PROJECT",
      "project_name": "Leedale Data Load",
      "rto": "AB",
      "st": "AB",
      "co": "Caroline",
      "mw": 1864,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 52.0833,
      "lon": -114.75,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Caroline",
      "county_or_zone": "Caroline",
      "queue_id": "P3066",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1864,
          "unit": "MW",
          "raw_value": "1864",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3198-PROJECT",
      "project_name": "Lynx Data Load",
      "rto": "AB",
      "st": "AB",
      "co": "Fort Saskatchewan",
      "mw": 1800,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.7128,
      "lon": -113.2183,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Fort Saskatchewan",
      "county_or_zone": "Fort Saskatchewan",
      "queue_id": "P3198",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1800,
          "unit": "MW",
          "raw_value": "1800",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2970-PROJECT",
      "project_name": "Beacon Langdon A.I. Hub 2 Load",
      "rto": "AB",
      "st": "AB",
      "co": "Calgary",
      "mw": 1400,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 51.0447,
      "lon": -114.0719,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P2970",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3108-PROJECT",
      "project_name": "Wild Rose Power Hub Load",
      "rto": "AB",
      "st": "AB",
      "co": "Calgary",
      "mw": 1300,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 51.0447,
      "lon": -114.0719,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P3108",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1300,
          "unit": "MW",
          "raw_value": "1300",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3109-PROJECT",
      "project_name": "Newell Data Center MPC Load",
      "rto": "AB",
      "st": "AB",
      "co": "Brooks",
      "mw": 1200,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 50.5657,
      "lon": -111.8987,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Brooks",
      "county_or_zone": "Brooks",
      "queue_id": "P3109",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2942-PROJECT",
      "project_name": "Genesee Data Center 1 MPC Load",
      "rto": "AB",
      "st": "AB",
      "co": "Wabamun",
      "mw": 1000,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.55,
      "lon": -114.4333,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P2942",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2936-PROJECT",
      "project_name": "GLDC Load Phase 1.1",
      "rto": "AB",
      "st": "AB",
      "co": "Fort Saskatchewan",
      "mw": 970,
      "status": "Active",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.7128,
      "lon": -113.2183,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Fort Saskatchewan",
      "county_or_zone": "Fort Saskatchewan",
      "queue_id": "P2936",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 970,
          "unit": "MW",
          "raw_value": "970",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3101-PROJECT",
      "project_name": "Carstairs Technology Park MPC Load",
      "rto": "AB",
      "st": "AB",
      "co": "Didsbury",
      "mw": 950,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 51.6667,
      "lon": -114.1333,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Didsbury",
      "county_or_zone": "Didsbury",
      "queue_id": "P3101",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 950,
          "unit": "MW",
          "raw_value": "950",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3102-PROJECT",
      "project_name": "Goldfinch Technology Park MPC Load",
      "rto": "AB",
      "st": "AB",
      "co": "Strathmore/Blackie",
      "mw": 950,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 50.9333,
      "lon": -113.5333,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Strathmore/Blackie",
      "county_or_zone": "Strathmore/Blackie",
      "queue_id": "P3102",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 950,
          "unit": "MW",
          "raw_value": "950",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3151-PROJECT",
      "project_name": "GLDC Load Phase 1.2",
      "rto": "AB",
      "st": "AB",
      "co": "Fort Saskatchewan",
      "mw": 830,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.7128,
      "lon": -113.2183,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Fort Saskatchewan",
      "county_or_zone": "Fort Saskatchewan",
      "queue_id": "P3151",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 830,
          "unit": "MW",
          "raw_value": "830",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3116-PROJECT",
      "project_name": "Rocky View Data Center MPC Load",
      "rto": "AB",
      "st": "AB",
      "co": "Calgary",
      "mw": 800,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 51.0447,
      "lon": -114.0719,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P3116",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 800,
          "unit": "MW",
          "raw_value": "800",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3137-PROJECT",
      "project_name": "Sheerness Data MPC Load",
      "rto": "AB",
      "st": "AB",
      "co": "Sheerness",
      "mw": 800,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 51.5333,
      "lon": -111.7833,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Sheerness",
      "county_or_zone": "Sheerness",
      "queue_id": "P3137",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 800,
          "unit": "MW",
          "raw_value": "800",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2946-PROJECT",
      "project_name": "Genesee Data Center 2 MPC Load",
      "rto": "AB",
      "st": "AB",
      "co": "Wabamun",
      "mw": 500,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.55,
      "lon": -114.4333,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P2946",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 500,
          "unit": "MW",
          "raw_value": "500",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3095-PROJECT",
      "project_name": "Keephills Data Centre Phase 2",
      "rto": "AB",
      "st": "AB",
      "co": "Wabamun",
      "mw": 466,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.55,
      "lon": -114.4333,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P3095",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 466,
          "unit": "MW",
          "raw_value": "466",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3112-PROJECT",
      "project_name": "North Calgary Three Data Centre MPC Load",
      "rto": "AB",
      "st": "AB",
      "co": "Calgary",
      "mw": 450,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 51.0447,
      "lon": -114.0719,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P3112",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 450,
          "unit": "MW",
          "raw_value": "450",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3136-PROJECT",
      "project_name": "Sundance Data MPC Load",
      "rto": "AB",
      "st": "AB",
      "co": "Wabamun",
      "mw": 401,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.55,
      "lon": -114.4333,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P3136",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 401,
          "unit": "MW",
          "raw_value": "401",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2926-PROJECT",
      "project_name": "Beacon Foothills A.I. Hub Load",
      "rto": "AB",
      "st": "AB",
      "co": "High River",
      "mw": 400,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 50.5833,
      "lon": -113.8667,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "High River",
      "county_or_zone": "High River",
      "queue_id": "P2926",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2927-PROJECT",
      "project_name": "Beacon Harry Smith A.I. Hub Load",
      "rto": "AB",
      "st": "AB",
      "co": "Wabamun",
      "mw": 400,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.55,
      "lon": -114.4333,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P2927",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2928-PROJECT",
      "project_name": "Beacon Langdon A.I. Hub Load",
      "rto": "AB",
      "st": "AB",
      "co": "Calgary",
      "mw": 400,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 51.0447,
      "lon": -114.0719,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P2928",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2934-PROJECT",
      "project_name": "Beacon Heartland A.I. Hub Load",
      "rto": "AB",
      "st": "AB",
      "co": "Fort Saskatchewan",
      "mw": 400,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.7128,
      "lon": -113.2183,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Fort Saskatchewan",
      "county_or_zone": "Fort Saskatchewan",
      "queue_id": "P2934",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2935-PROJECT",
      "project_name": "Beacon Saunders Lake A.I. Hub Load",
      "rto": "AB",
      "st": "AB",
      "co": "Edmonton",
      "mw": 400,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.5461,
      "lon": -113.4938,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Edmonton",
      "county_or_zone": "Edmonton",
      "queue_id": "P2935",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3106-PROJECT",
      "project_name": "Alberta South A.I. Load",
      "rto": "AB",
      "st": "AB",
      "co": "Lethbridge",
      "mw": 400,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 49.6956,
      "lon": -112.8451,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Lethbridge",
      "county_or_zone": "Lethbridge",
      "queue_id": "P3106",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3107-PROJECT",
      "project_name": "Chestermere Enterprise A.I. Load",
      "rto": "AB",
      "st": "AB",
      "co": "Calgary",
      "mw": 400,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 51.0447,
      "lon": -114.0719,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P3107",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3175-PROJECT",
      "project_name": "Beacon Heartland Data Load",
      "rto": "AB",
      "st": "AB",
      "co": "Fort Saskatchewan",
      "mw": 400,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.7128,
      "lon": -113.2183,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Fort Saskatchewan",
      "county_or_zone": "Fort Saskatchewan",
      "queue_id": "P3175",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3156-PROJECT",
      "project_name": "High Plains East Industrial Park",
      "rto": "AB",
      "st": "AB",
      "co": "Calgary",
      "mw": 300,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 51.0447,
      "lon": -114.0719,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P3156",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3110-PROJECT",
      "project_name": "Mihta Askiy Data Load",
      "rto": "AB",
      "st": "AB",
      "co": "Peace River",
      "mw": 300,
      "status": "ISD Under Review",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 56.234,
      "lon": -117.29,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Peace River",
      "county_or_zone": "Peace River",
      "queue_id": "P3110",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3083-PROJECT",
      "project_name": "Keephills Data Centre Phase 1.1",
      "rto": "AB",
      "st": "AB",
      "co": "Wabamun",
      "mw": 230,
      "status": "Project appears in current registry",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.55,
      "lon": -114.4333,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P3083",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 230,
          "unit": "MW",
          "raw_value": "230",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3152-PROJECT",
      "project_name": "Keephills Data Centre Phase 1.2",
      "rto": "AB",
      "st": "AB",
      "co": "Wabamun",
      "mw": 165,
      "status": "Project appears in current registry",
      "provider": "Alberta Electric System Operator",
      "customer_or_developer": null,
      "source_url": "https://gridlens.ca/queue",
      "precision": "county/zone centroid",
      "lat": 53.55,
      "lon": -114.4333,
      "evidence_type": "aeso_data_load_project_record",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P3152",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 165,
          "unit": "MW",
          "raw_value": "165",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_scope": "Current AESO Connection Project List",
      "capture_date": "2026-09-26",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "IESO-2026-917-PROJECT",
      "project_name": "Port Hope TS - Load Increase",
      "rto": "ON",
      "st": "ON",
      "co": "East",
      "mw": 45,
      "status": "Active",
      "provider": "Independent Electricity System Operator",
      "customer_or_developer": "HYDRO ONE NETWORKS INC.",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "precision": "county/zone centroid",
      "lat": 44.9,
      "lon": -76.3,
      "evidence_type": "ieso_load_application_record",
      "jurisdiction": "Ontario, Canada",
      "location": "East",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 45,
          "unit": "MW",
          "raw_value": "45 MW",
          "qualifier": "New load facility"
        }
      ],
      "source_authority": "IESO primary source",
      "source_scope": "Application Status, last updated 2026-09-10",
      "capture_date": "2026-09-26",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "IESO-2026-913-PROJECT",
      "project_name": "St. Clair Technology Centre",
      "rto": "ON",
      "st": "ON",
      "co": "West",
      "mw": 200,
      "status": "Active",
      "provider": "Independent Electricity System Operator",
      "customer_or_developer": "TRUENORTH SUSTAINABLE INFRASTRUCTURE INC.",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "precision": "county/zone centroid",
      "lat": 43.15,
      "lon": -80.6,
      "evidence_type": "ieso_load_application_record",
      "jurisdiction": "Ontario, Canada",
      "location": "West",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200 MW",
          "qualifier": "New load facility"
        }
      ],
      "source_authority": "IESO primary source",
      "source_scope": "Application Status, last updated 2026-09-10",
      "capture_date": "2026-09-26",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "IESO-2026-911-PROJECT",
      "project_name": "Mana Industrial Facility Expansion",
      "rto": "ON",
      "st": "ON",
      "co": "Southwest",
      "mw": 95,
      "status": "Active",
      "provider": "Independent Electricity System Operator",
      "customer_or_developer": "Max Aicher North America Ltd.",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "precision": "county/zone centroid",
      "lat": 42.98,
      "lon": -81.25,
      "evidence_type": "ieso_load_application_record",
      "jurisdiction": "Ontario, Canada",
      "location": "Southwest",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 95,
          "unit": "MW",
          "raw_value": "95 MW",
          "qualifier": "New load facility"
        }
      ],
      "source_authority": "IESO primary source",
      "source_scope": "Application Status, last updated 2026-09-10",
      "capture_date": "2026-09-26",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "IESO-2026-907-PROJECT",
      "project_name": "Marionville DS: New Transformer T2",
      "rto": "ON",
      "st": "ON",
      "co": "Ottawa",
      "mw": 23.2,
      "status": "Active",
      "provider": "Independent Electricity System Operator",
      "customer_or_developer": "HYDRO ONE NETWORKS INC.",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "precision": "county/zone centroid",
      "lat": 45.4215,
      "lon": -75.6972,
      "evidence_type": "ieso_load_application_record",
      "jurisdiction": "Ontario, Canada",
      "location": "Ottawa",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 23.2,
          "unit": "MW",
          "raw_value": "23.2 MW",
          "qualifier": "Increase load"
        }
      ],
      "source_authority": "IESO primary source",
      "source_scope": "Application Status, last updated 2026-09-10",
      "capture_date": "2026-09-26",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "IESO-2026-903-PROJECT",
      "project_name": "Project IQ197",
      "rto": "ON",
      "st": "ON",
      "co": "Essa",
      "mw": 1380,
      "status": "Active",
      "provider": "Independent Electricity System Operator",
      "customer_or_developer": "197 McKay Barrie Corp",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "precision": "county/zone centroid",
      "lat": 44.3167,
      "lon": -79.7833,
      "evidence_type": "ieso_load_application_record",
      "jurisdiction": "Ontario, Canada",
      "location": "Essa",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1380,
          "unit": "MW",
          "raw_value": "1380 MW",
          "qualifier": "New load facility"
        }
      ],
      "source_authority": "IESO primary source",
      "source_scope": "Application Status, last updated 2026-09-10",
      "capture_date": "2026-09-26",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "IESO-2026-902-PROJECT",
      "project_name": "Tahoe Blvd Load Center",
      "rto": "ON",
      "st": "ON",
      "co": "Toronto",
      "mw": 25,
      "status": "Active",
      "provider": "Independent Electricity System Operator",
      "customer_or_developer": "ALECTRA UTILITIES CORPORATION",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "precision": "county/zone centroid",
      "lat": 43.6532,
      "lon": -79.3832,
      "evidence_type": "ieso_load_application_record",
      "jurisdiction": "Ontario, Canada",
      "location": "Toronto",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 25,
          "unit": "MW",
          "raw_value": "25 MW",
          "qualifier": "Increase load"
        }
      ],
      "source_authority": "IESO primary source",
      "source_scope": "Application Status, last updated 2026-09-10",
      "capture_date": "2026-09-26",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "NYISO-1670-LOAD-PROJECT",
      "project_name": "Lake Mariner Data II",
      "rto": "NY",
      "st": "NY",
      "co": "Niagara",
      "mw": 250,
      "status": "public queue load project",
      "provider": "NYSEG",
      "customer_or_developer": "Lake Mariner Data LLC",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county/zone centroid",
      "lat": 43.2011,
      "lon": -78.7446,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1670",
      "permit_number": null,
      "poi_substation": "Kintigh 345kV Substation",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1732-LOAD-PROJECT",
      "project_name": "Wulf Compute Data Center II",
      "rto": "NY",
      "st": "NY",
      "co": "Niagara",
      "mw": 250,
      "status": "public queue load project",
      "provider": "NYSEG",
      "customer_or_developer": "TeraWulf Brookings LLC",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county/zone centroid",
      "lat": 43.2011,
      "lon": -78.7446,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1732",
      "permit_number": null,
      "poi_substation": "Kintigh 345kV Substation",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1733-LOAD-PROJECT",
      "project_name": "Cayuga Data",
      "rto": "NY",
      "st": "NY",
      "co": "Cayuga",
      "mw": 162,
      "status": "public queue load project",
      "provider": "NYISO / transmission owner not retained in current extraction",
      "customer_or_developer": "Cayuga Operating Company LLC",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county centroid",
      "lat": 42.9281,
      "lon": -76.5614,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "Cayuga",
      "county_or_zone": "Cayuga",
      "queue_id": "1733",
      "permit_number": null,
      "poi_substation": "Milliken 115kV Substation",
      "capacity_claims": [
        {
          "value_mw": 162,
          "unit": "MW",
          "raw_value": "162 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1683-LOAD-PROJECT",
      "project_name": "Cayuga Compute",
      "rto": "NY",
      "st": "NY",
      "co": "Cayuga",
      "mw": 88,
      "status": "public queue load project",
      "provider": "NYISO / transmission owner not retained in current extraction",
      "customer_or_developer": "Cayuga Operating Company LLC",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county centroid",
      "lat": 42.9281,
      "lon": -76.5614,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "Cayuga",
      "county_or_zone": "Cayuga",
      "queue_id": "1683",
      "permit_number": null,
      "poi_substation": "Milliken 115kV Substation",
      "capacity_claims": [
        {
          "value_mw": 88,
          "unit": "MW",
          "raw_value": "88 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1731-LOAD-PROJECT",
      "project_name": "New York State Artificial Intelligence Data Center ZeroC",
      "rto": "NY",
      "st": "NY",
      "co": "St. Lawrence",
      "mw": 300,
      "status": "public queue load project",
      "provider": "NYISO / transmission owner not retained in current extraction",
      "customer_or_developer": "ZeroC Data Centers, LLC",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county/zone centroid",
      "lat": 44.4969,
      "lon": -75.0675,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1731",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1744-LOAD-PROJECT",
      "project_name": "Brookhaven Data Center",
      "rto": "NY",
      "st": "NY",
      "co": "Suffolk",
      "mw": 300,
      "status": "public queue load project",
      "provider": "NYISO / transmission owner not retained in current extraction",
      "customer_or_developer": "Brookhaven Logistics Center, LLC",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county/zone centroid",
      "lat": 40.8693,
      "lon": -72.8471,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "Suffolk",
      "county_or_zone": "Suffolk",
      "queue_id": "1744",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1736-LOAD-PROJECT",
      "project_name": "Ranalli SuperDC",
      "rto": "NY",
      "st": "NY",
      "co": "Onondaga",
      "mw": 270,
      "status": "public queue load project",
      "provider": "NYISO / transmission owner not retained in current extraction",
      "customer_or_developer": "Ranalli SuperDC LLC",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county/zone centroid",
      "lat": 43.0104,
      "lon": -76.1952,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "Onondaga",
      "county_or_zone": "Onondaga",
      "queue_id": "1736",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 270,
          "unit": "MW",
          "raw_value": "270 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1745-LOAD-PROJECT",
      "project_name": "Pontoon Bridge Road Data Center",
      "rto": "NY",
      "st": "NY",
      "co": "St. Lawrence",
      "mw": 250,
      "status": "public queue load project",
      "provider": "NYISO / transmission owner not retained in current extraction",
      "customer_or_developer": "American Data Center Partners LLC",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county/zone centroid",
      "lat": 44.4969,
      "lon": -75.0675,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1745",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1752-LOAD-PROJECT",
      "project_name": "Broome County Tech Park",
      "rto": "NY",
      "st": "NY",
      "co": "Broome",
      "mw": 250,
      "status": "public queue load project",
      "provider": "NYISO / transmission owner not retained in current extraction",
      "customer_or_developer": "The Agency",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county/zone centroid",
      "lat": 42.1608,
      "lon": -75.8184,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "Broome",
      "county_or_zone": "Broome",
      "queue_id": "1752",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1465-LOAD-PROJECT",
      "project_name": "Digihost load",
      "rto": "NY",
      "st": "NY",
      "co": "Niagara",
      "mw": 50.2,
      "status": "public queue load project",
      "provider": "National Grid",
      "customer_or_developer": "Digihost Technologies, Inc.",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county/zone centroid",
      "lat": 43.2011,
      "lon": -78.7446,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1465",
      "permit_number": null,
      "poi_substation": "Walck Road 115 kV substation",
      "capacity_claims": [
        {
          "value_mw": 50.2,
          "unit": "MW",
          "raw_value": "50.2 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-0776-LOAD-PROJECT",
      "project_name": "Greenidge Load",
      "rto": "NY",
      "st": "NY",
      "co": "Yates",
      "mw": 60,
      "status": "public queue load project",
      "provider": "NYSEG",
      "customer_or_developer": "Greenidge Generation LLC",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county/zone centroid",
      "lat": 42.6335,
      "lon": -77.1052,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "Yates",
      "county_or_zone": "Yates",
      "queue_id": "0776",
      "permit_number": null,
      "poi_substation": "Greenidge 115kV",
      "capacity_claims": [
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1646-LOAD-PROJECT",
      "project_name": "POWI Project",
      "rto": "NY",
      "st": "NY",
      "co": "Albany",
      "mw": 50,
      "status": "public queue load project",
      "provider": "National Grid",
      "customer_or_developer": "P&M Brick LLC",
      "source_url": "https://www.nyiso.com/interconnections",
      "precision": "county/zone centroid",
      "lat": 42.6003,
      "lon": -73.9776,
      "evidence_type": "nyiso_load_project_site_record",
      "jurisdiction": "New York, US",
      "location": "Albany",
      "county_or_zone": "Albany",
      "queue_id": "1646",
      "permit_number": null,
      "poi_substation": "New Scotland to Knickerbocker 345kV line",
      "capacity_claims": [
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "source_authority": "NYISO primary + independent public queue reading",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "capture_date": "2026-09-26",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "BPA-OPEN-RANGE",
      "project_name": "Open Range",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Adams County",
      "mw": 3300,
      "status": "RECEIVED",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 46.99,
      "lon": -117.16,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Adams County, WA",
      "county_or_zone": "Adams County",
      "queue_id": "L0705",
      "permit_number": null,
      "poi_substation": "Lower Monumental-Hanford No 1 Lower Monumental-Ashe No 1 Grand Coulee-Hanford No 1",
      "capacity_claims": [
        {
          "value_mw": 3300,
          "unit": "MW",
          "raw_value": "3.3 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 3300,
          "unit": "MW",
          "raw_value": "3300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-DOE-DATA-CENTER",
      "project_name": "DOE Data Center",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Benton County",
      "mw": 2800,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 46.24,
      "lon": -119.51,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0673",
      "permit_number": null,
      "poi_substation": "Ashe Substation",
      "capacity_claims": [
        {
          "value_mw": 2800,
          "unit": "MW",
          "raw_value": "2.8 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 2750,
          "unit": "MW",
          "raw_value": "2750 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-LONGHORN-MCNARY-LOOP",
      "project_name": "Longhorn-McNary 230 kV Loop",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Umatilla and Morrow",
      "mw": 2200,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.57,
      "lon": -118.92,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla and Morrow, OR",
      "county_or_zone": "Umatilla and Morrow",
      "queue_id": "L0653",
      "permit_number": null,
      "poi_substation": "Longhorn Substation, McNary Substation",
      "capacity_claims": [
        {
          "value_mw": 2200,
          "unit": "MW",
          "raw_value": "2.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 2225,
          "unit": "MW",
          "raw_value": "2225 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-NW-HILLSBORO-NORTH-PLAINS-PH2",
      "project_name": "NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2)",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Washington County",
      "mw": 1800,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.55,
      "lon": -123.1,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Washington County, OR",
      "county_or_zone": "Washington County",
      "queue_id": "L0561",
      "permit_number": null,
      "poi_substation": "Allston-Keeler No. 1",
      "capacity_claims": [
        {
          "value_mw": 1800,
          "unit": "MW",
          "raw_value": "1.8 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1800,
          "unit": "MW",
          "raw_value": "1800 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-CAC-GREEN-H2",
      "project_name": "CAC Green H2 Facility",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Columbia County",
      "mw": 1600,
      "status": "withdrawn",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "precision": "county display point",
      "lat": 46.3,
      "lon": -117.91,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Columbia County, WA",
      "county_or_zone": "Columbia County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1600,
          "unit": "MW",
          "raw_value": "1.6 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-PACIFIC-WEST-COAST-CABLE",
      "project_name": "Pacific West Coast Cable",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Columbia County",
      "mw": 1600,
      "status": "withdrawn",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "precision": "county display point",
      "lat": 45.98,
      "lon": -123.1,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Columbia County, OR",
      "county_or_zone": "Columbia County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1600,
          "unit": "MW",
          "raw_value": "1.6 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-MCNARY-230KV-SUBSTATION",
      "project_name": "McNary 230 kV Substation",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Linn County",
      "mw": 1400,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 44.5,
      "lon": -122.5,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Linn County, OR",
      "county_or_zone": "Linn County",
      "queue_id": "L0585",
      "permit_number": null,
      "poi_substation": "McNary Substation",
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1.4 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1450,
          "unit": "MW",
          "raw_value": "1450 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-WEST-HILLSBORO-DATA-CENTER-PH1",
      "project_name": "West Hillsboro Data Center Project (Phase 1)",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Washington County",
      "mw": 1400,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.55,
      "lon": -123.1,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Washington County, OR",
      "county_or_zone": "Washington County",
      "queue_id": "L0560",
      "permit_number": null,
      "poi_substation": "Keeler-Forest Grove No. 1 & No. 2 Lines",
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1.4 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1400 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-LAKESIDE-INDUSTRIES",
      "project_name": "Lakeside Industries",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Klickitat County",
      "mw": 1300,
      "status": "RECEIVED",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.87,
      "lon": -120.8,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Klickitat County, WA",
      "county_or_zone": "Klickitat County",
      "queue_id": "L0690",
      "permit_number": null,
      "poi_substation": "Big Eddy Substation",
      "capacity_claims": [
        {
          "value_mw": 1300,
          "unit": "MW",
          "raw_value": "1.3 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1260,
          "unit": "MW",
          "raw_value": "1260 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-MCNARY-230KV-LOOPED",
      "project_name": "McNary 230 kV Looped",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Umatilla",
      "mw": 1300,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.59,
      "lon": -118.33,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0636",
      "permit_number": null,
      "poi_substation": "McNary Substation",
      "capacity_claims": [
        {
          "value_mw": 1300,
          "unit": "MW",
          "raw_value": "1.3 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1256,
          "unit": "MW",
          "raw_value": "1256 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-SSP-SUNSET",
      "project_name": "SSP-Sunset",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Yakima County",
      "mw": 1200,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 46.46,
      "lon": -120.74,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Yakima County, WA",
      "county_or_zone": "Yakima County",
      "queue_id": "L0684",
      "permit_number": null,
      "poi_substation": "Wautoma-Rock Creek No. 1 line or Spring Creek-Wine Country No. 1 line",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-SECOND-1200MW-DATA-CENTER-LOAD",
      "project_name": "Second 1200 MW Data Center Load",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Walla Walla County",
      "mw": 1200,
      "status": "RECEIVED",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 46.23,
      "lon": -118.48,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Walla Walla County, WA",
      "county_or_zone": "Walla Walla County",
      "queue_id": "L0682",
      "permit_number": null,
      "poi_substation": "Lower Monumental-McNary No. 1 line",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-1200MW-DATA-CENTER-LOADS",
      "project_name": "1200 MW Data Center Loads",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Walla Walla County",
      "mw": 1200,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 46.23,
      "lon": -118.48,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Walla Walla County, WA",
      "county_or_zone": "Walla Walla County",
      "queue_id": "L0649",
      "permit_number": null,
      "poi_substation": "Between #37/1 & 32/1 on the Lower Monumental-McNary line",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-PSE-CHERRY-POINT",
      "project_name": "PSE Cherry Point",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Whatcom County",
      "mw": 1200,
      "status": "withdrawn",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "precision": "county display point",
      "lat": 48.82,
      "lon": -122.47,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Whatcom County, WA",
      "county_or_zone": "Whatcom County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-INDUSTRIAL-LOAD-PHASE-2",
      "project_name": "Industrial Load Phase 2",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Morrow County",
      "mw": 1200,
      "status": "withdrawn",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "precision": "county display point",
      "lat": 45.45,
      "lon": -119.53,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Morrow County, OR",
      "county_or_zone": "Morrow County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-CASCADE-RENEWABLE-HVDC",
      "project_name": "Cascade Renewable Transmission Project - HVDC",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Wasco County",
      "mw": 1100,
      "status": "active",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "precision": "county display point",
      "lat": 45.18,
      "lon": -121.17,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Wasco County, OR",
      "county_or_zone": "Wasco County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1100,
          "unit": "MW",
          "raw_value": "1.1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-SIXMILE-CANYON-500KV",
      "project_name": "Sixmile Canyon 500kV Substation",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Umatilla County",
      "mw": 1100,
      "status": "withdrawn",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "precision": "county display point",
      "lat": 45.65,
      "lon": -118.68,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla County, OR",
      "county_or_zone": "Umatilla County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1100,
          "unit": "MW",
          "raw_value": "1.1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-VINES-REST",
      "project_name": "Vines Rest 1000 MW",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Klickitat County",
      "mw": 1000,
      "status": "RECEIVED",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.87,
      "lon": -120.8,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Klickitat County, WA",
      "county_or_zone": "Klickitat County",
      "queue_id": "L0704",
      "permit_number": null,
      "poi_substation": "McNary-John Day No. 1 line McNary-John Day No. 2 line",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-ENERGIZER-II",
      "project_name": "Energizer II",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Klickitat County",
      "mw": 1000,
      "status": "RECEIVED",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.87,
      "lon": -120.8,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Klickitat County, WA",
      "county_or_zone": "Klickitat County",
      "queue_id": "L0702",
      "permit_number": null,
      "poi_substation": "Rock Creek Substation at",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-DALLESPORT-SERVER-FARM",
      "project_name": "Dallesport Server Farm",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Klickitat County",
      "mw": 1000,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.87,
      "lon": -120.8,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Klickitat County, WA",
      "county_or_zone": "Klickitat County",
      "queue_id": "L0664",
      "permit_number": null,
      "poi_substation": "Big Eddy Substation or Big Eddy-Chenowith No. 2 line",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-TWO-RIVERS-230KV",
      "project_name": "Two Rivers 230 kV",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Umatilla",
      "mw": 1000,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.59,
      "lon": -118.33,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0660",
      "permit_number": null,
      "poi_substation": "McNary Substation",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-MARION-CHEMAWA",
      "project_name": "Marion-Chemawa",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Marion",
      "mw": 1000,
      "status": "active",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "precision": "county display point",
      "lat": 44.92,
      "lon": -122.8,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Marion, OR",
      "county_or_zone": "Marion",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-SIX-MILE-CANYON-SUBSTATION",
      "project_name": "Six Mile Canyon Substation",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Umatilla County",
      "mw": 1000,
      "status": "CONST AGRMT EXE",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.65,
      "lon": -118.68,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla County, OR",
      "county_or_zone": "Umatilla County",
      "queue_id": "L0510",
      "permit_number": null,
      "poi_substation": "BPA's Ashe - Slatt No.1 line",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-KEELER-SUBSTATION",
      "project_name": "Keeler Substation",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Washington County",
      "mw": 1000,
      "status": "CONST AGRMT EXE",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.55,
      "lon": -123.1,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Washington County, OR",
      "county_or_zone": "Washington County",
      "queue_id": "L0452",
      "permit_number": null,
      "poi_substation": "BPA's Keeler Substation",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-YELLOW-ROSEBUSH",
      "project_name": "Yellow Rosebush",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Wasco",
      "mw": 970,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.18,
      "lon": -121.17,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Wasco, OR",
      "county_or_zone": "Wasco",
      "queue_id": "L0699",
      "permit_number": null,
      "poi_substation": "Buckley Substation or Buckley-Marion No. 1 line or Ashe-Marion No. 2 line.",
      "capacity_claims": [
        {
          "value_mw": 970,
          "unit": "MW",
          "raw_value": "970 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 970,
          "unit": "MW",
          "raw_value": "970 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-STACK-IPI-DATA-CENTER",
      "project_name": "Stack IPI Data Center",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Klickitat County",
      "mw": 958,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.87,
      "lon": -120.8,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Klickitat County, WA",
      "county_or_zone": "Klickitat County",
      "queue_id": "L0545",
      "permit_number": null,
      "poi_substation": "RKCR-JDAY-1 or MCNY-ROSS-2 near Harvalum Substation",
      "capacity_claims": [
        {
          "value_mw": 958,
          "unit": "MW",
          "raw_value": "958 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 958,
          "unit": "MW",
          "raw_value": "958 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-PLYMOUTH-950MW",
      "project_name": "Plymouth 950 MW",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Benton County",
      "mw": 950,
      "status": "RECEIVED",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 46.24,
      "lon": -119.51,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0703",
      "permit_number": null,
      "poi_substation": "McNary-John Day No. 2 line or McNary-Ross No. 1 line or McNary-Horse Heaven No. 1",
      "capacity_claims": [
        {
          "value_mw": 950,
          "unit": "MW",
          "raw_value": "950 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 950,
          "unit": "MW",
          "raw_value": "950 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-WEST-RICHLAND-DATA-CENTER",
      "project_name": "West Richland Data Center Campus",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Benton County",
      "mw": 912,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 46.24,
      "lon": -119.51,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0621",
      "permit_number": null,
      "poi_substation": "Ashe-Slatt No 1 line; Ashe-Marion No 2 line",
      "capacity_claims": [
        {
          "value_mw": 912,
          "unit": "MW",
          "raw_value": "912 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 912,
          "unit": "MW",
          "raw_value": "912 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-PLYMOUTH-DATA-CENTER-CAMPUS",
      "project_name": "Plymouth Data Center Campus",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Benton County",
      "mw": 864,
      "status": "withdrawn",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "precision": "county display point",
      "lat": 46.24,
      "lon": -119.51,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 864,
          "unit": "MW",
          "raw_value": "864 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-WIND-RIVER-PLYMOUTH",
      "project_name": "Wind River - Plymouth 230 kV",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Benton County",
      "mw": 800,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 46.24,
      "lon": -119.51,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0685",
      "permit_number": null,
      "poi_substation": "McNary-John Day No. 2 line",
      "capacity_claims": [
        {
          "value_mw": 800,
          "unit": "MW",
          "raw_value": "800 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 800,
          "unit": "MW",
          "raw_value": "800 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-LONGHORN-230KV-SUBSTATION",
      "project_name": "Longhorn 230 kV Substation",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Linn County",
      "mw": 750,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 44.5,
      "lon": -122.5,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Linn County, OR",
      "county_or_zone": "Linn County",
      "queue_id": "L0586",
      "permit_number": null,
      "poi_substation": "Longhorn Substation",
      "capacity_claims": [
        {
          "value_mw": 750,
          "unit": "MW",
          "raw_value": "750 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 750,
          "unit": "MW",
          "raw_value": "750 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-WOODBURN-700MW",
      "project_name": "Woodburn 700 MW",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Marion",
      "mw": 700,
      "status": "STUDY",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 44.92,
      "lon": -122.8,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Marion, OR",
      "county_or_zone": "Marion",
      "queue_id": "L0659",
      "permit_number": null,
      "poi_substation": "Big Eddy-Chemawa No 1 line",
      "capacity_claims": [
        {
          "value_mw": 700,
          "unit": "MW",
          "raw_value": "700 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 700,
          "unit": "MW",
          "raw_value": "700 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-PARS-CLATSKANIE",
      "project_name": "PARS - Clatskanie",
      "rto": "Oregon, US",
      "st": "Oregon",
      "co": "Columbia County",
      "mw": 680,
      "status": "RECEIVED",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 45.98,
      "lon": -123.1,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Columbia County, OR",
      "county_or_zone": "Columbia County",
      "queue_id": "L0701",
      "permit_number": null,
      "poi_substation": "TBD",
      "capacity_claims": [
        {
          "value_mw": 680,
          "unit": "MW",
          "raw_value": "680 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 680,
          "unit": "MW",
          "raw_value": "680 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements."
    },
    {
      "id": "BPA-ROZA",
      "project_name": "Roza",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Kittitas County",
      "mw": 630,
      "status": "energized",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "precision": "county display point",
      "lat": 47.1,
      "lon": -120.68,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Kittitas County, WA",
      "county_or_zone": "Kittitas County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 630,
          "unit": "MW",
          "raw_value": "630 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-DPUD-DATA-CENTER",
      "project_name": "DPUD Data Center",
      "rto": "Washington, US",
      "st": "Washington",
      "co": "Chelan County",
      "mw": 600,
      "status": "withdrawn",
      "provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "customer_or_developer": null,
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "precision": "county display point",
      "lat": 47.87,
      "lon": -120.61,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Chelan County, WA",
      "county_or_zone": "Chelan County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 600,
          "unit": "MW",
          "raw_value": "600 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "capture_date": "2026-09-22",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-LARGE-L0661",
      "project_name": "Steelhead 230 kV",
      "rto": "Oregon, US",
      "st": "Oregon, US",
      "co": "Morrow County, OR",
      "mw": 600,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "public project-name/site-area display point",
      "lat": 45.45,
      "lon": -119.53,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Morrow County, OR",
      "county_or_zone": "Morrow County",
      "queue_id": "L0661",
      "permit_number": null,
      "poi_substation": "Sixmile Canyon Substation at",
      "capacity_claims": [
        {
          "value_mw": 600,
          "unit": "MW",
          "raw_value": "600 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0201",
      "project_name": "Juan de Fuca HVDC (Port Angeles)",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Clallam County, WA",
      "mw": 550,
      "status": "STUDY COMPLETED",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 48.11,
      "lon": -123.6,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Clallam County, WA",
      "county_or_zone": "Clallam County",
      "queue_id": "L0201",
      "permit_number": null,
      "poi_substation": "Port Angeles",
      "capacity_claims": [
        {
          "value_mw": 550,
          "unit": "MW",
          "raw_value": "550 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0202",
      "project_name": "Juan de Fuca HVDC (Fairmount)",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Jefferson County, WA",
      "mw": 550,
      "status": "STUDY COMPLETED",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 48.1,
      "lon": -123.5,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Jefferson County, WA",
      "county_or_zone": "Jefferson County",
      "queue_id": "L0202",
      "permit_number": null,
      "poi_substation": "Fairmount",
      "capacity_claims": [
        {
          "value_mw": 550,
          "unit": "MW",
          "raw_value": "550 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0482",
      "project_name": "Morrow Flat_Longhorn",
      "rto": "Oregon, US",
      "st": "Oregon, US",
      "co": "Umatilla County, OR",
      "mw": 500,
      "status": "ENERGIZED",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 45.59,
      "lon": -118.33,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla County, OR",
      "county_or_zone": "Umatilla County",
      "queue_id": "L0482",
      "permit_number": null,
      "poi_substation": "Morrow Flat Substation",
      "capacity_claims": [
        {
          "value_mw": 500,
          "unit": "MW",
          "raw_value": "500 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0674",
      "project_name": "Starbuck 500 MW",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Columbia County, WA",
      "mw": 500,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "public project-name/site-area display point",
      "lat": 46.53,
      "lon": -117.14,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Columbia County, WA",
      "county_or_zone": "Columbia County",
      "queue_id": "L0674",
      "permit_number": null,
      "poi_substation": "Central Ferry-Lower Monumental No. 1 line",
      "capacity_claims": [
        {
          "value_mw": 500,
          "unit": "MW",
          "raw_value": "500 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0499",
      "project_name": "Project Pivot and Specialized",
      "rto": "Oregon, US",
      "st": "Oregon, US",
      "co": "Umatilla County, OR",
      "mw": 484,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 45.59,
      "lon": -118.33,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla County, OR",
      "county_or_zone": "Umatilla County",
      "queue_id": "L0499",
      "permit_number": null,
      "poi_substation": "McNary Substation",
      "capacity_claims": [
        {
          "value_mw": 484,
          "unit": "MW",
          "raw_value": "484 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0389",
      "project_name": "Industrial Load",
      "rto": "Oregon, US",
      "st": "Oregon, US",
      "co": "Morrow County, OR",
      "mw": 450,
      "status": "ENERGIZED",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "public project-name/site-area display point",
      "lat": 45.45,
      "lon": -119.53,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Morrow County, OR",
      "county_or_zone": "Morrow County",
      "queue_id": "L0389",
      "permit_number": null,
      "poi_substation": "Mcnary Substation or Morrow Flat Substation",
      "capacity_claims": [
        {
          "value_mw": 450,
          "unit": "MW",
          "raw_value": "450 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0481",
      "project_name": "McNary 230kV",
      "rto": "Oregon, US",
      "st": "Oregon, US",
      "co": "Umatilla County, OR",
      "mw": 450,
      "status": "CONST AGRMT EXE",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 45.59,
      "lon": -118.33,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla County, OR",
      "county_or_zone": "Umatilla County",
      "queue_id": "L0481",
      "permit_number": null,
      "poi_substation": "McNary , Bay 28",
      "capacity_claims": [
        {
          "value_mw": 450,
          "unit": "MW",
          "raw_value": "450 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0417",
      "project_name": "Boundary Substation",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Pend Oreille County, WA",
      "mw": 370,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 48.5,
      "lon": -117.27,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Pend Oreille County, WA",
      "county_or_zone": "Pend Oreille County",
      "queue_id": "L0417",
      "permit_number": null,
      "poi_substation": "Boundary Substation",
      "capacity_claims": [
        {
          "value_mw": 370,
          "unit": "MW",
          "raw_value": "370 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0534",
      "project_name": "Atlas Agro",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Benton County, WA",
      "mw": 350,
      "status": "STUDY COMPLETED",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 46.24,
      "lon": -119.51,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0534",
      "permit_number": null,
      "poi_substation": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line",
      "capacity_claims": [
        {
          "value_mw": 350,
          "unit": "MW",
          "raw_value": "350 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0380",
      "project_name": "Network Load Expansion 3",
      "rto": "Oregon, US",
      "st": "Oregon, US",
      "co": "Wasco County, OR",
      "mw": 300,
      "status": "ENERGIZED",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 45.18,
      "lon": -121.17,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Wasco County, OR",
      "county_or_zone": "Wasco County",
      "queue_id": "L0380",
      "permit_number": null,
      "poi_substation": "Chenoweth Substation",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0433",
      "project_name": "Network Load Expansion 4 Quenett Creek Substation",
      "rto": "Oregon, US",
      "st": "Oregon, US",
      "co": "Wasco County, OR",
      "mw": 300,
      "status": "ENERGIZED",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 45.18,
      "lon": -121.17,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Wasco County, OR",
      "county_or_zone": "Wasco County",
      "queue_id": "L0433",
      "permit_number": null,
      "poi_substation": "Quenett Creek Substation",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0543",
      "project_name": "Bonanza",
      "rto": "Oregon, US",
      "st": "Oregon, US",
      "co": "Crook County, OR",
      "mw": 300,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point",
      "lat": 44.3,
      "lon": -120.85,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Crook County, OR",
      "county_or_zone": "Crook County",
      "queue_id": "L0543",
      "permit_number": null,
      "poi_substation": "Ponderosa Substation",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0558",
      "project_name": "Stearns Lane",
      "rto": "Oregon, US",
      "st": "Oregon, US",
      "co": "Washington County, OR",
      "mw": 300,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 45.55,
      "lon": -123.1,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Washington County, OR",
      "county_or_zone": "Washington County",
      "queue_id": "L0558",
      "permit_number": null,
      "poi_substation": "BPA's Green Valley Substation",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0494",
      "project_name": "Ponderary Renewable Fiber and Blockchain Project",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Pend Oreille County, WA",
      "mw": 300,
      "status": "ENERGIZED",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 48.5,
      "lon": -117.27,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Pend Oreille County, WA",
      "county_or_zone": "Pend Oreille County",
      "queue_id": "L0494",
      "permit_number": null,
      "poi_substation": "Usk Substation",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0603",
      "project_name": "Getchell Substation",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Snohomish County, WA",
      "mw": 300,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 47.87,
      "lon": -121.83,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Snohomish County, WA",
      "county_or_zone": "Snohomish County",
      "queue_id": "L0603",
      "permit_number": null,
      "poi_substation": "Snohomish-Murray line",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0630",
      "project_name": "Data Storage Facility",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Walla Walla County, WA",
      "mw": 300,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 46.23,
      "lon": -118.48,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Walla Walla County, WA",
      "county_or_zone": "Walla Walla County",
      "queue_id": "L0630",
      "permit_number": null,
      "poi_substation": "Lower Monumental-McNary No. 1 line",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0647",
      "project_name": "Atlas Agro Data Server Facility",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Benton County, WA",
      "mw": 300,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 46.24,
      "lon": -119.51,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0647",
      "permit_number": null,
      "poi_substation": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0657",
      "project_name": "Atlas Agro Data Server Facility, Phase 2",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Benton County, WA",
      "mw": 300,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 46.24,
      "lon": -119.51,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0657",
      "permit_number": null,
      "poi_substation": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0650",
      "project_name": "300 MW Data Center Load Served from Grizzly",
      "rto": "US / BPA",
      "st": "US / BPA",
      "co": "Jefferson County",
      "mw": 300,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "public project-name/site-area display point",
      "lat": 48.1,
      "lon": -123.5,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "US / BPA",
      "location": "Jefferson County",
      "county_or_zone": "Jefferson County",
      "queue_id": "L0650",
      "permit_number": null,
      "poi_substation": "Grizzly Substation",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0700",
      "project_name": "PARS - MW&L",
      "rto": "Oregon, US",
      "st": "Oregon, US",
      "co": "Yamhill County, OR",
      "mw": 300,
      "status": "RECEIVED",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "public project-name/site-area display point",
      "lat": 45.3,
      "lon": -123.2,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Oregon, US",
      "location": "Yamhill County, OR",
      "county_or_zone": "Yamhill County",
      "queue_id": "L0700",
      "permit_number": null,
      "poi_substation": "TBD",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0610",
      "project_name": "PW1 & PW2",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Columbia County, WA",
      "mw": 250,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "public project-name/site-area display point",
      "lat": 46.29,
      "lon": -117.91,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Columbia County, WA",
      "county_or_zone": "Columbia County",
      "queue_id": "L0610",
      "permit_number": null,
      "poi_substation": "Allston Substation",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0668",
      "project_name": "ATP TES Data Server",
      "rto": "US / BPA",
      "st": "US / BPA",
      "co": "Benton County",
      "mw": 250,
      "status": "RECEIVED",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; source state omitted",
      "lat": 46.24,
      "lon": -119.51,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "US / BPA",
      "location": "Benton County",
      "county_or_zone": "Benton County",
      "queue_id": "L0668",
      "permit_number": null,
      "poi_substation": "Benton Substation",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0677",
      "project_name": "TC KERR Data Center",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Cowlitz County, WA",
      "mw": 240,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 46.2,
      "lon": -122.68,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Cowlitz County, WA",
      "county_or_zone": "Cowlitz County",
      "queue_id": "L0677",
      "permit_number": null,
      "poi_substation": "Longview Substation",
      "capacity_claims": [
        {
          "value_mw": 240,
          "unit": "MW",
          "raw_value": "240 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "BPA-LARGE-L0693",
      "project_name": "230 kV Feed from Longview Substation to Alcoa",
      "rto": "Washington, US",
      "st": "Washington, US",
      "co": "Cowlitz County, WA",
      "mw": 240,
      "status": "STUDY",
      "provider": "Bonneville Power Administration",
      "customer_or_developer": null,
      "source_url": "https://substationscout.com/large-load-registry/",
      "precision": "county display point; state disclosure retained separately",
      "lat": 46.2,
      "lon": -122.68,
      "evidence_type": "secondary_large_load_request_record",
      "jurisdiction": "Washington, US",
      "location": "Cowlitz County, WA",
      "county_or_zone": "Cowlitz County",
      "queue_id": "L0693",
      "permit_number": null,
      "poi_substation": "Cowlitz Substation",
      "capacity_claims": [
        {
          "value_mw": 240,
          "unit": "MW",
          "raw_value": "240 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "capture_date": "2026-09-23",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load."
    },
    {
      "id": "ISO-NE-NEMA-DATACENTER-200MW-2026",
      "project_name": "NEMA Data Center — CELT 2026 Forecast",
      "rto": "Massachusetts, US",
      "st": "Massachusetts, US",
      "co": "NEMA",
      "mw": 200,
      "status": "forecast included; not under construction",
      "provider": "ISO New England",
      "customer_or_developer": null,
      "source_url": "https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf",
      "precision": "load-zone display point",
      "lat": 42.36,
      "lon": -71.06,
      "evidence_type": "iso_ne_forecast_large_load_project",
      "jurisdiction": "Massachusetts, US",
      "location": "NEMA load zone",
      "county_or_zone": "NEMA",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200 MW",
          "qualifier": "reported nameplate before forecast derating",
          "source_url": "https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf",
          "capture_date": "2026"
        }
      ],
      "source_authority": "ISO New England primary forecast",
      "source_scope": "Large Loads in the CELT 2026 Forecast",
      "capture_date": "2026-09-26",
      "notes": "ISO-NE says projects included in this forecast must exceed 20 MW and have a formal study agreement. The listed 200 MW is a nameplate value before derating; the forecast does not identify a unique customer/site address. Map uses NEMA load-zone display geometry, not an inferred facility address."
    },
    {
      "id": "ISO-NE-CT-ELECTRIFICATION-85MW-2026",
      "project_name": "CT General Electrification — CELT 2026 Forecast",
      "rto": "Connecticut, US",
      "st": "Connecticut, US",
      "co": "CT",
      "mw": 85,
      "status": "forecast included; not under construction",
      "provider": "ISO New England",
      "customer_or_developer": null,
      "source_url": "https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf",
      "precision": "load-zone display point",
      "lat": 41.6,
      "lon": -72.7,
      "evidence_type": "iso_ne_forecast_large_load_project",
      "jurisdiction": "Connecticut, US",
      "location": "CT load zone",
      "county_or_zone": "CT",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 85,
          "unit": "MW",
          "raw_value": "85 MW",
          "qualifier": "reported nameplate before forecast derating",
          "source_url": "https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf",
          "capture_date": "2026"
        }
      ],
      "source_authority": "ISO New England primary forecast",
      "source_scope": "Large Loads in the CELT 2026 Forecast",
      "capture_date": "2026-09-26",
      "notes": "This is general electrification rather than a data center. It is retained because the project-universe layer covers large-load evidence, not only data centers. Forecast nameplate is before derating; no facility address is supplied."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R01",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 01)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Elk Grove",
      "mw": null,
      "status": "Phase 3 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0039,
      "lon": -87.9703,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R02",
      "project_name": "ComEd Data Center Forecast — Hoffman Estates (row 02)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Hoffman Estates",
      "mw": null,
      "status": "Phase 3 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0629,
      "lon": -88.1227,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Hoffman Estates",
      "county_or_zone": "Hoffman Estates",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R03",
      "project_name": "ComEd Data Center Forecast — Mt. Prospect (row 03)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Mt. Prospect",
      "mw": null,
      "status": "Phase 2 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0664,
      "lon": -87.9373,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Mt. Prospect",
      "county_or_zone": "Mt. Prospect",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R04",
      "project_name": "ComEd Data Center Forecast — Chicago (row 04)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Chicago",
      "mw": null,
      "status": "Phase 2 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.8781,
      "lon": -87.6298,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Chicago",
      "county_or_zone": "Chicago",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R05",
      "project_name": "ComEd Data Center Forecast — Des Plaines (row 05)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Des Plaines",
      "mw": null,
      "status": "Phase 2 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0334,
      "lon": -87.8834,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Des Plaines",
      "county_or_zone": "Des Plaines",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R06",
      "project_name": "ComEd Data Center Forecast — Itasca (row 06)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Itasca",
      "mw": null,
      "status": "Phase 2 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.975,
      "lon": -88.0075,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Itasca",
      "county_or_zone": "Itasca",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R07",
      "project_name": "ComEd Data Center Forecast — Aurora (row 07)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Aurora",
      "mw": null,
      "status": "Phase 2 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.7606,
      "lon": -88.3201,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Aurora",
      "county_or_zone": "Aurora",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R08",
      "project_name": "ComEd Data Center Forecast — Chicago (row 08)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Chicago",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.8781,
      "lon": -87.6298,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Chicago",
      "county_or_zone": "Chicago",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R09",
      "project_name": "ComEd Data Center Forecast — Chicago (row 09)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Chicago",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.8781,
      "lon": -87.6298,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Chicago",
      "county_or_zone": "Chicago",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R10",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 10)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Elk Grove",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0039,
      "lon": -87.9703,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R11",
      "project_name": "ComEd Data Center Forecast — Northlake (row 11)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Northlake",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.9173,
      "lon": -87.8956,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Northlake",
      "county_or_zone": "Northlake",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R12",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 12)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Elk Grove",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0039,
      "lon": -87.9703,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R13",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 13)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Elk Grove",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0039,
      "lon": -87.9703,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R14",
      "project_name": "ComEd Data Center Forecast — Hoffman Estates (row 14)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Hoffman Estates",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0629,
      "lon": -88.1227,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Hoffman Estates",
      "county_or_zone": "Hoffman Estates",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R15",
      "project_name": "ComEd Data Center Forecast — Wood Dale (row 15)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Wood Dale",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.9634,
      "lon": -87.9789,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Wood Dale",
      "county_or_zone": "Wood Dale",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R16",
      "project_name": "ComEd Data Center Forecast — DeKalb (row 16)",
      "rto": "ComEd",
      "st": "IL",
      "co": "DeKalb",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.9295,
      "lon": -88.7504,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "DeKalb",
      "county_or_zone": "DeKalb",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R17",
      "project_name": "ComEd Data Center Forecast — Montgomery (row 17)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Montgomery",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.7298,
      "lon": -88.3459,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Montgomery",
      "county_or_zone": "Montgomery",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R18",
      "project_name": "ComEd Data Center Forecast — Hoffman Estates (row 18)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Hoffman Estates",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0629,
      "lon": -88.1227,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Hoffman Estates",
      "county_or_zone": "Hoffman Estates",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R19",
      "project_name": "ComEd Data Center Forecast — Yorkville (row 19)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Yorkville",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.6411,
      "lon": -88.4473,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Yorkville",
      "county_or_zone": "Yorkville",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R20",
      "project_name": "ComEd Data Center Forecast — Lisle (row 20)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Lisle",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.8011,
      "lon": -88.074,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Lisle",
      "county_or_zone": "Lisle",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R21",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 21)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Elk Grove",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0039,
      "lon": -87.9703,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R22",
      "project_name": "ComEd Data Center Forecast — Aurora (row 22)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Aurora",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.7606,
      "lon": -88.3201,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Aurora",
      "county_or_zone": "Aurora",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R23",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 23)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Elk Grove",
      "mw": null,
      "status": "Phase 0 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0039,
      "lon": -87.9703,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R24",
      "project_name": "ComEd Data Center Forecast — Aurora (row 24)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Aurora",
      "mw": null,
      "status": "Phase 0 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.7606,
      "lon": -88.3201,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Aurora",
      "county_or_zone": "Aurora",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R25",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 25)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Elk Grove",
      "mw": null,
      "status": "Phase 0 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 42.0039,
      "lon": -87.9703,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R26",
      "project_name": "ComEd Data Center Forecast — Carol Stream (row 26)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Carol Stream",
      "mw": null,
      "status": "Phase 0 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.9125,
      "lon": -88.134,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Carol Stream",
      "county_or_zone": "Carol Stream",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R27",
      "project_name": "ComEd Data Center Forecast — Northlake (row 27)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Northlake",
      "mw": null,
      "status": "Phase 0 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.9173,
      "lon": -87.8956,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Northlake",
      "county_or_zone": "Northlake",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R28",
      "project_name": "ComEd Data Center Forecast — Plano (row 28)",
      "rto": "ComEd",
      "st": "IL",
      "co": "Plano",
      "mw": null,
      "status": "Phase 1 engineering",
      "provider": "ComEd / Illinois Commerce Commission",
      "customer_or_developer": "Not published in source",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "precision": "city display point",
      "lat": 41.662,
      "lon": -88.537,
      "evidence_type": "utility_data_center_forecast_project_record",
      "jurisdiction": "Illinois, US",
      "location": "Plano",
      "county_or_zone": "Plano",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "capture_date": "2026-09-26",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "DOMINION-CAMPUS-A-TWIN-CREEKS-2024",
      "project_name": "Cochran Mill TC 2, LLC data-center campus / Campus A",
      "rto": "Dominion",
      "st": "VA",
      "co": "Loudoun County",
      "mw": 84,
      "status": "service planning / substation project",
      "provider": "Dominion Energy Virginia",
      "customer_or_developer": "Cochran Mill TC 2, LLC / Twin Creeks Development, LLC",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
      "precision": "county display point",
      "lat": 39.07,
      "lon": -77.54,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Virginia, US",
      "location": "Eastern Loudoun County, Virginia",
      "county_or_zone": "Loudoun County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 84,
          "unit": "MW",
          "raw_value": "84 MW",
          "qualifier": "summer peak projected for 2025",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "approximately 300 MW",
          "qualifier": "summer peak projected for 2035",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_scope": "Dominion NOVA Application Volume 1 of 3 (2024)",
      "capture_date": "2026-09-26",
      "notes": "Dominion filing publicly identifies this campus and its service linkage."
    },
    {
      "id": "DOMINION-CAMPUS-B-SYCOLIN-STARLIGHT-2024",
      "project_name": "Belmont Innovation Campus / Campus B",
      "rto": "Dominion",
      "st": "VA",
      "co": "Loudoun County",
      "mw": 6,
      "status": "service planning / substation project",
      "provider": "Dominion Energy Virginia",
      "customer_or_developer": "Loudoun GC, LLC / Sentinel Data Centers (SDC)",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
      "precision": "county display point",
      "lat": 39.04,
      "lon": -77.58,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Virginia, US",
      "location": "West of Belmont Ridge Road, eastern Loudoun County, Virginia",
      "county_or_zone": "Loudoun County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 6,
          "unit": "MW",
          "raw_value": "6 MW",
          "qualifier": "summer peak projected for 2026",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "approximately 300 MW",
          "qualifier": "summer peak projected for 2036",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 18,
          "unit": "MW",
          "raw_value": "18 MW",
          "qualifier": "summer peak projected for 2028",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 255,
          "unit": "MW",
          "raw_value": "approximately 255 MW",
          "qualifier": "summer peak projected for 2038",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_scope": "Dominion NOVA Application Volume 1 of 3 (2024)",
      "capture_date": "2026-09-26",
      "notes": "Dominion filing publicly identifies this campus and its service linkage."
    },
    {
      "id": "DOMINION-SPOTSYTECH-TRIBUTARY-2024",
      "project_name": "SpotsyTech Campus / Tributary Station",
      "rto": "Dominion",
      "st": "VA",
      "co": "Spotsylvania County",
      "mw": 7,
      "status": "transmission service project / campus planned",
      "provider": "Dominion Energy Virginia / Rappahannock Electric Cooperative",
      "customer_or_developer": "SpotsyTechnoCampus LLC",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/tributary/pdfs/tributary-application-vol-1-part-1-of-4.pdf",
      "precision": "county display point",
      "lat": 38.2,
      "lon": -77.59,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Virginia, US",
      "location": "Spotsylvania County, Virginia",
      "county_or_zone": "Spotsylvania County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 7,
          "unit": "MW",
          "raw_value": "initial load being 7 MW",
          "qualifier": "DP request initial load",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/tributary/pdfs/tributary-application-vol-1-part-1-of-4.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 295,
          "unit": "MW",
          "raw_value": "295 MW",
          "qualifier": "projected load by 2032",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/tributary/pdfs/tributary-application-vol-1-part-1-of-4.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 30,
          "unit": "MW",
          "raw_value": "30 MW",
          "qualifier": "startup data-center building power capacity",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/tributary/pdfs/tributary-application-vol-1-part-1-of-4.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 283,
          "unit": "MW",
          "raw_value": "approximately 283 MW",
          "qualifier": "data-center share of total full-occupancy site capacity",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/tributary/pdfs/tributary-application-vol-1-part-1-of-4.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_scope": "Dominion Tributary Station application",
      "capture_date": "2026-09-26",
      "notes": "Dominion filing identifies a 230 kV DP request from REC to serve SpotsyTech Campus and gives both project-wide and data-center-specific load figures. The figures are preserved as different measures rather than summed."
    },
    {
      "id": "DOMINION-CAMPUS-C-LUNAR-APOLLO-2024",
      "project_name": "Customer C — Campus C / Lunar and Apollo Substations",
      "rto": "Dominion",
      "st": "VA",
      "co": "Loudoun County",
      "mw": 12,
      "status": "service planning / substation project",
      "provider": "Dominion Energy Virginia",
      "customer_or_developer": "Customer C (name not public in filing)",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
      "precision": "county display point",
      "lat": 39.05,
      "lon": -77.58,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Virginia, US",
      "location": "Eastern Loudoun County, Virginia",
      "county_or_zone": "Loudoun County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 12,
          "unit": "MW",
          "raw_value": "12 MW",
          "qualifier": "summer peak projected for 2026",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 278,
          "unit": "MW",
          "raw_value": "approximately 278 MW",
          "qualifier": "summer peak projected for 2036",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 27,
          "unit": "MW",
          "raw_value": "27 MW",
          "qualifier": "summer peak projected for 2027",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 239,
          "unit": "MW",
          "raw_value": "approximately 239 MW",
          "qualifier": "summer peak projected for 2037",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_scope": "Dominion NOVA Application Volume 1 of 3 (2024)",
      "capture_date": "2026-09-26",
      "notes": "Dominion identifies Campus C as a new data-center campus in eastern Loudoun County served by proposed Lunar and Apollo substations. The filing publishes two DP-request load ramps for Campus C; customer identity is retained as confidential."
    },
    {
      "id": "DOMINION-CULPEPER-DATABANK-CAMPUS-2024",
      "project_name": "Culpeper DataBank data-center campus / Campus A",
      "rto": "Dominion",
      "st": "VA",
      "co": "Culpeper County",
      "mw": null,
      "status": "service planning / transmission project",
      "provider": "Dominion Energy Virginia",
      "customer_or_developer": "Culpeper DataBank (DataBank)",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/culpeper-tech-zone/pdfs/2024-culpeper-tech-zone-scc-application-volume-1-of-5-part-1-of-3.pdf",
      "precision": "county/city display point",
      "lat": 38.47,
      "lon": -78,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Virginia, US",
      "location": "Culpeper County / Town of Culpeper, Virginia",
      "county_or_zone": "Culpeper County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Dominion Energy regulatory filing",
      "source_scope": "Dominion Culpeper Tech Zone SCC Application",
      "capture_date": "2026-09-26",
      "notes": "Dominion filing explicitly names DataBank as Customer A/Culpeper DataBank and says the customer requested service for a new data-center campus. The source excerpt does not expose a uniform customer MW claim, so capacity remains empty."
    },
    {
      "id": "DOMINION-STACK-CULPEPER-CAMPUS-2024",
      "project_name": "STACK Infrastructure data-center campus / Campus B",
      "rto": "Dominion",
      "st": "VA",
      "co": "Culpeper County",
      "mw": null,
      "status": "service planning / transmission project",
      "provider": "Dominion Energy Virginia",
      "customer_or_developer": "STACK Infrastructure Inc. (STACK)",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/culpeper-tech-zone/pdfs/2024-culpeper-tech-zone-scc-application-volume-1-of-5-part-1-of-3.pdf",
      "precision": "county/city display point",
      "lat": 38.47,
      "lon": -78,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Virginia, US",
      "location": "Culpeper County / Town of Culpeper, Virginia",
      "county_or_zone": "Culpeper County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Dominion Energy regulatory filing",
      "source_scope": "Dominion Culpeper Tech Zone SCC Application",
      "capture_date": "2026-09-26",
      "notes": "Dominion filing explicitly identifies STACK Infrastructure as Customer B and ties the customer to a new data-center campus in the project area. No project MW is inferred."
    },
    {
      "id": "DOMINION-COPPER-RIDGE-CULPEPER-CAMPUS-2024",
      "project_name": "Copper Ridge Data Center Campus / Campus C",
      "rto": "Dominion",
      "st": "VA",
      "co": "Culpeper County",
      "mw": null,
      "status": "service planning / transmission project",
      "provider": "Dominion Energy Virginia",
      "customer_or_developer": "Copper Ridge Data Center Campus",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/culpeper-tech-zone/pdfs/2024-culpeper-tech-zone-scc-application-volume-1-of-5-part-1-of-3.pdf",
      "precision": "county/city display point",
      "lat": 38.47,
      "lon": -78,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Virginia, US",
      "location": "Culpeper County / Town of Culpeper, Virginia",
      "county_or_zone": "Culpeper County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Dominion Energy regulatory filing",
      "source_scope": "Dominion Culpeper Tech Zone SCC Application",
      "capture_date": "2026-09-26",
      "notes": "Dominion filing explicitly identifies Copper Ridge Data Center Campus as Customer C and ties it to a new data-center campus in the project area. No project MW is inferred."
    },
    {
      "id": "NYISO-580-WNY-STAMP-GB24",
      "project_name": "WNY STAMP",
      "rto": "NYISO",
      "st": "NY",
      "co": "Genesee",
      "mw": 300,
      "status": "2024 Gold Book queue record",
      "provider": "NYISO",
      "customer_or_developer": "Genesee County Economic Development Center",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "precision": "county display point",
      "lat": 42.9992,
      "lon": -78.1959,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Genesee",
      "county_or_zone": "Genesee",
      "queue_id": "580",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-850-CAYUGA-LOAD-GB24",
      "project_name": "Cayuga Load",
      "rto": "NYISO",
      "st": "NY",
      "co": "Tompkins",
      "mw": 50,
      "status": "2024 Gold Book queue record",
      "provider": "NYISO",
      "customer_or_developer": "Cayuga Operating Company, LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "precision": "county display point",
      "lat": 42.4509,
      "lon": -76.4724,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Tompkins",
      "county_or_zone": "Tompkins",
      "queue_id": "850",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-979-NORTH-COUNTRY-DATA-CENTER-GB24",
      "project_name": "North Country Data Center",
      "rto": "NYISO",
      "st": "NY",
      "co": "St. Lawrence",
      "mw": 176,
      "status": "2024 Gold Book queue record",
      "provider": "NYISO",
      "customer_or_developer": "North Country Data Center",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "precision": "county display point",
      "lat": 44.4969,
      "lon": -75.0675,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "979",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1213-ST-LAWRENCE-DATA-AND-AGRICULTURAL-CENTER-GB24",
      "project_name": "St Lawrence Data and Agricultural Center",
      "rto": "NYISO",
      "st": "NY",
      "co": "St. Lawrence",
      "mw": 200,
      "status": "2024 Gold Book queue record",
      "provider": "NYISO",
      "customer_or_developer": "Petawatt Holdings, Inc.",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "precision": "county display point",
      "lat": 44.4969,
      "lon": -75.0675,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1213",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1315-SDC-ST-LAWRENCE-GB24",
      "project_name": "SDC St. Lawrence",
      "rto": "NYISO",
      "st": "NY",
      "co": "St. Lawrence",
      "mw": 120,
      "status": "2024 Gold Book queue record",
      "provider": "NYISO",
      "customer_or_developer": "Sabey Data Center Properties, LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "precision": "county display point",
      "lat": 44.4969,
      "lon": -75.0675,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1315",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 120,
          "unit": "MW",
          "raw_value": "120.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1446-MASSENA-GREEN-HYDROGEN-GB24",
      "project_name": "Massena Green Hydrogen",
      "rto": "NYISO",
      "st": "NY",
      "co": "St. Lawrence",
      "mw": 110,
      "status": "2024 Gold Book queue record",
      "provider": "NYISO",
      "customer_or_developer": "Air Products and Chemicals, Inc.",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "precision": "county display point",
      "lat": 44.4969,
      "lon": -75.0675,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1446",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 110,
          "unit": "MW",
          "raw_value": "110.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1484-580-STAMP-LOAD-INCREASE-GB24",
      "project_name": "580 STAMP load increase",
      "rto": "NYISO",
      "st": "NY",
      "co": "Genesee",
      "mw": 300,
      "status": "2024 Gold Book queue record",
      "provider": "NYISO",
      "customer_or_developer": "Genesee County Economic Development Corporation",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "precision": "county display point",
      "lat": 42.9992,
      "lon": -78.1959,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Genesee",
      "county_or_zone": "Genesee",
      "queue_id": "1484",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1536-WHITE-PINE-PHASE-1-GB24",
      "project_name": "White Pine Phase 1",
      "rto": "NYISO",
      "st": "NY",
      "co": "Onondaga",
      "mw": 480,
      "status": "2024 Gold Book queue record",
      "provider": "NYISO",
      "customer_or_developer": "Micron New York Semiconductor Manufacturing LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "precision": "county display point",
      "lat": 43.0104,
      "lon": -76.1952,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Onondaga",
      "county_or_zone": "Onondaga",
      "queue_id": "1536",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 480,
          "unit": "MW",
          "raw_value": "480.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1627-MICRON-FAB-2-GB24",
      "project_name": "Micron Fab 2",
      "rto": "NYISO",
      "st": "NY",
      "co": "Onondaga",
      "mw": 576,
      "status": "2024 Gold Book queue record",
      "provider": "NYISO",
      "customer_or_developer": "Micron New York Semiconductor Manufacturing LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "precision": "county display point",
      "lat": 43.0104,
      "lon": -76.1952,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Onondaga",
      "county_or_zone": "Onondaga",
      "queue_id": "1627",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 576,
          "unit": "MW",
          "raw_value": "576.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "IDAHO-META-BRISBIE-2025",
      "project_name": "Brisbie, LLC (Meta Platforms, Inc.)",
      "rto": "Idaho Power",
      "st": "ID",
      "co": "Ada County",
      "mw": null,
      "status": "2025 Idaho Power IRP source reports under construction; on track for completion in 2025",
      "provider": "Idaho Power",
      "customer_or_developer": "Brisbie, LLC (Meta Platforms, Inc.)",
      "source_url": "https://docs.idahopower.com/pdfs/AboutUs/PlanningForFuture/2025IRP/2025%20IRP%20Appendix%20A.pdf",
      "precision": "city display point",
      "lat": 43.4917,
      "lon": -116.4203,
      "evidence_type": "utility_named_data_center_project",
      "jurisdiction": "Idaho, US",
      "location": "Kuna, Idaho",
      "county_or_zone": "Ada County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Idaho Power primary source",
      "source_scope": "2025 Integrated Resource Plan — Appendix A: Sales and Load Forecast",
      "capture_date": "2026-09-26",
      "notes": "Named Meta/Brisbie data-center project; no project MW is published in the cited passage."
    },
    {
      "id": "CAISO-LC24-1",
      "project_name": "LC24-1",
      "rto": "CAISO",
      "st": "CA",
      "co": "Gilroy",
      "poi": "Garlic 115 kV switching station on Llagas-Morgan Hill 115 kV line",
      "mw": 49.5,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.0058,
      "lon": -121.5683,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "Gilroy",
      "county_or_zone": "Gilroy",
      "queue_id": "LC24-1",
      "permit_number": null,
      "poi_substation": "Garlic 115 kV switching station on Llagas-Morgan Hill 115 kV line",
      "capacity_claims": [
        {
          "value_mw": 49.5,
          "unit": "MW",
          "raw_value": "49.5 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-2",
      "project_name": "LC24-2",
      "rto": "CAISO",
      "st": "CA",
      "co": "De Anza",
      "poi": "Lockheed #1 115 kV",
      "mw": 49,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.323,
      "lon": -122.032,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "De Anza",
      "county_or_zone": "De Anza",
      "queue_id": "LC24-2",
      "permit_number": null,
      "poi_substation": "Lockheed #1 115 kV",
      "capacity_claims": [
        {
          "value_mw": 49,
          "unit": "MW",
          "raw_value": "49 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-3",
      "project_name": "LC24-3",
      "rto": "CAISO",
      "st": "CA",
      "co": "San Jose",
      "poi": "New Charcot 115 kV switching station near Trimble 115 kV",
      "mw": 99,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.3382,
      "lon": -121.8863,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-3",
      "permit_number": null,
      "poi_substation": "New Charcot 115 kV switching station near Trimble 115 kV",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-6",
      "project_name": "LC24-6",
      "rto": "CAISO",
      "st": "CA",
      "co": "Mission",
      "poi": "Eastshore 115 kV",
      "mw": 99,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.52,
      "lon": -121.96,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "Mission",
      "county_or_zone": "Mission",
      "queue_id": "LC24-6",
      "permit_number": null,
      "poi_substation": "Eastshore 115 kV",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-13",
      "project_name": "LC24-13",
      "rto": "CAISO",
      "st": "CA",
      "co": "San Jose",
      "poi": "New Hellyer 115 kV switching station on Metcalf-Evergreen #1/#2",
      "mw": 99,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.3382,
      "lon": -121.8863,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-13",
      "permit_number": null,
      "poi_substation": "New Hellyer 115 kV switching station on Metcalf-Evergreen #1/#2",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-14",
      "project_name": "LC24-14",
      "rto": "CAISO",
      "st": "CA",
      "co": "San Jose",
      "poi": "New Hellyer 115 kV switching station on Metcalf-Evergreen #1/#2",
      "mw": 99,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.3382,
      "lon": -121.8863,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-14",
      "permit_number": null,
      "poi_substation": "New Hellyer 115 kV switching station on Metcalf-Evergreen #1/#2",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-18",
      "project_name": "LC24-18",
      "rto": "CAISO",
      "st": "CA",
      "co": "Mission",
      "poi": "Eastshore 115 kV bus expansion in GIS",
      "mw": 99,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.52,
      "lon": -121.96,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "Mission",
      "county_or_zone": "Mission",
      "queue_id": "LC24-18",
      "permit_number": null,
      "poi_substation": "Eastshore 115 kV bus expansion in GIS",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-24",
      "project_name": "LC24-24",
      "rto": "CAISO",
      "st": "CA",
      "co": "Gilroy",
      "poi": "Garlic 115 kV switching station on Llagas-Morgan Hill 115 kV line",
      "mw": 49.5,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.0058,
      "lon": -121.5683,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "Gilroy",
      "county_or_zone": "Gilroy",
      "queue_id": "LC24-24",
      "permit_number": null,
      "poi_substation": "Garlic 115 kV switching station on Llagas-Morgan Hill 115 kV line",
      "capacity_claims": [
        {
          "value_mw": 49.5,
          "unit": "MW",
          "raw_value": "49.5 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-26",
      "project_name": "LC24-26",
      "rto": "CAISO",
      "st": "CA",
      "co": "San Jose",
      "poi": "San Jose A 115 kV",
      "mw": 99,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.3382,
      "lon": -121.8863,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-26",
      "permit_number": null,
      "poi_substation": "San Jose A 115 kV",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-27",
      "project_name": "LC24-27",
      "rto": "CAISO",
      "st": "CA",
      "co": "San Jose",
      "poi": "San Jose A 115 kV",
      "mw": 49,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.3382,
      "lon": -121.8863,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-27",
      "permit_number": null,
      "poi_substation": "San Jose A 115 kV",
      "capacity_claims": [
        {
          "value_mw": 49,
          "unit": "MW",
          "raw_value": "49 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-28",
      "project_name": "LC24-28",
      "rto": "CAISO",
      "st": "CA",
      "co": "San Jose",
      "poi": "San Jose A 115 kV",
      "mw": 49,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.3382,
      "lon": -121.8863,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-28",
      "permit_number": null,
      "poi_substation": "San Jose A 115 kV",
      "capacity_claims": [
        {
          "value_mw": 49,
          "unit": "MW",
          "raw_value": "49 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-SERIAL-DC1",
      "project_name": "Serial – Data Center 1",
      "rto": "CAISO",
      "st": "CA",
      "co": "San Jose",
      "poi": "New 230 kV/34.5 kV substation Midpoint on Newark-NRS 230 kV line; 34.5 kV service",
      "mw": 250,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.3382,
      "lon": -121.8863,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": "New 230 kV/34.5 kV substation Midpoint on Newark-NRS 230 kV line; 34.5 kV service",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-SERIAL-DC2",
      "project_name": "Serial – Data Center 2",
      "rto": "CAISO",
      "st": "CA",
      "co": "San Jose",
      "poi": "New 115 kV substation San Jose C on San Jose A-B 115 kV line; 34.5 kV service",
      "mw": 200,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.3382,
      "lon": -121.8863,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": "New 115 kV substation San Jose C on San Jose A-B 115 kV line; 34.5 kV service",
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-SERIAL-DC3",
      "project_name": "Serial – Data Center 3",
      "rto": "CAISO",
      "st": "CA",
      "co": "San Jose",
      "poi": "Dual 230 kV service from Los Esteros",
      "mw": 250,
      "status": "actively reviewed by ISO / study process",
      "provider": "Pacific Gas & Electric / California ISO",
      "customer_or_developer": null,
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "precision": "planning-area display point",
      "lat": 37.3382,
      "lon": -121.8863,
      "evidence_type": "caiso_large_load_interconnection_project",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": "Dual 230 kV service from Los Esteros",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "capture_date": "2026-09-26",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "NYISO-GB25-580",
      "project_name": "WNY STAMP",
      "rto": "NYISO",
      "st": "NY",
      "co": "Genesee",
      "mw": 300,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Genesee County Economic Development Corporation",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county display point",
      "lat": 42.9992,
      "lon": -78.1959,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Genesee",
      "county_or_zone": "Genesee",
      "queue_id": "580",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "B"
    },
    {
      "id": "NYISO-GB25-776",
      "project_name": "Greenidge Load",
      "rto": "NYISO",
      "st": "NY",
      "co": "Yates",
      "mw": 60,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Greenidge Generation LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 42.6335,
      "lon": -77.1052,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Yates",
      "county_or_zone": "Yates",
      "queue_id": "776",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-850",
      "project_name": "Cayuga Load",
      "rto": "NYISO",
      "st": "NY",
      "co": "Cayuga",
      "mw": 50,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Cayuga Operating Company, LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county centroid",
      "lat": 42.9281,
      "lon": -76.5614,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Cayuga",
      "county_or_zone": "Cayuga",
      "queue_id": "850",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-979",
      "project_name": "North Country Data Center",
      "rto": "NYISO",
      "st": "NY",
      "co": "St. Lawrence",
      "mw": 176,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "North Country Data Center",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 44.4969,
      "lon": -75.0675,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "979",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "D"
    },
    {
      "id": "NYISO-GB25-1213",
      "project_name": "St Lawrence Data and Agricultural Center",
      "rto": "NYISO",
      "st": "NY",
      "co": "St. Lawrence",
      "mw": 200,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Petawatt Holdings, Inc.",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 44.4969,
      "lon": -75.0675,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1213",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "D"
    },
    {
      "id": "NYISO-GB25-1315",
      "project_name": "SDC St. Lawrence",
      "rto": "NYISO",
      "st": "NY",
      "co": "St. Lawrence",
      "mw": 120,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Sabey Data Center Properties, LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 44.4969,
      "lon": -75.0675,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1315",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 120,
          "unit": "MW",
          "raw_value": "120",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 120,
          "unit": "MW",
          "raw_value": "120",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "D"
    },
    {
      "id": "NYISO-GB25-1465",
      "project_name": "Digihost Load",
      "rto": "NYISO",
      "st": "NY",
      "co": "Niagara",
      "mw": 50.2,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Digihost Technologies, Inc.",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 43.2011,
      "lon": -78.7446,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1465",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 50.2,
          "unit": "MW",
          "raw_value": "50.2",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 50.2,
          "unit": "MW",
          "raw_value": "50.2",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "A"
    },
    {
      "id": "NYISO-GB25-1484",
      "project_name": "580 STAMP load increase",
      "rto": "NYISO",
      "st": "NY",
      "co": "Genesee",
      "mw": 300,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "GCEDC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county display point",
      "lat": 42.9992,
      "lon": -78.1959,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Genesee",
      "county_or_zone": "Genesee",
      "queue_id": "1484",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "B"
    },
    {
      "id": "NYISO-GB25-1536",
      "project_name": "White Pine Phase 1",
      "rto": "NYISO",
      "st": "NY",
      "co": "Onondaga",
      "mw": 480,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Micron New York Semiconductor Manufacturing LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 43.0104,
      "lon": -76.1952,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Onondaga",
      "county_or_zone": "Onondaga",
      "queue_id": "1536",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 480,
          "unit": "MW",
          "raw_value": "480",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 480,
          "unit": "MW",
          "raw_value": "480",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-1627",
      "project_name": "Micron Fab 2",
      "rto": "NYISO",
      "st": "NY",
      "co": "Onondaga",
      "mw": 576,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Micron New York Semiconductor Manufacturing LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 43.0104,
      "lon": -76.1952,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Onondaga",
      "county_or_zone": "Onondaga",
      "queue_id": "1627",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 576,
          "unit": "MW",
          "raw_value": "576",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 507,
          "unit": "MW",
          "raw_value": "507",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-1646",
      "project_name": "POWI Project",
      "rto": "NYISO",
      "st": "NY",
      "co": "Albany",
      "mw": 50,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "P&M Brick LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 42.6003,
      "lon": -73.9776,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Albany",
      "county_or_zone": "Albany",
      "queue_id": "1646",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "F"
    },
    {
      "id": "NYISO-GB25-1670",
      "project_name": "Lake Mariner Data II",
      "rto": "NYISO",
      "st": "NY",
      "co": "Niagara",
      "mw": 250,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Lake Mariner data LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 43.2011,
      "lon": -78.7446,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1670",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "A"
    },
    {
      "id": "NYISO-GB25-1681",
      "project_name": "Niagara Digital Campus",
      "rto": "NYISO",
      "st": "NY",
      "co": "Niagara",
      "mw": 140,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Niagara Falls Redevelopment LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 43.2011,
      "lon": -78.7446,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1681",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 140,
          "unit": "MW",
          "raw_value": "140",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 140,
          "unit": "MW",
          "raw_value": "140",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "A"
    },
    {
      "id": "NYISO-GB25-1683",
      "project_name": "Cayuga Compute",
      "rto": "NYISO",
      "st": "NY",
      "co": "Cayuga",
      "mw": 150,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Cayuga Operating Company, LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county centroid",
      "lat": 42.9281,
      "lon": -76.5614,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Cayuga",
      "county_or_zone": "Cayuga",
      "queue_id": "1683",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 150,
          "unit": "MW",
          "raw_value": "150",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 150,
          "unit": "MW",
          "raw_value": "150",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-1713",
      "project_name": "Project Sycamore Orangeburg",
      "rto": "NYISO",
      "st": "NY",
      "co": "Orangeburg",
      "mw": 25.3,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Project Sycamore - Orangeburg",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "town display point (public locality, no street-level inference)",
      "lat": 41.02,
      "lon": -73.95,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Orangeburg",
      "county_or_zone": "Orangeburg",
      "queue_id": "1713",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 25.3,
          "unit": "MW",
          "raw_value": "25.3",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 25.3,
          "unit": "MW",
          "raw_value": "25.3",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "G"
    },
    {
      "id": "NYISO-GB25-1714",
      "project_name": "Hudson Valley Data Center",
      "rto": "NYISO",
      "st": "NY",
      "co": "Orangeburg",
      "mw": 25,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Robert Delcalzo",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "town display point (public locality, no street-level inference)",
      "lat": 41.02,
      "lon": -73.95,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Orangeburg",
      "county_or_zone": "Orangeburg",
      "queue_id": "1714",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 25,
          "unit": "MW",
          "raw_value": "25",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 25,
          "unit": "MW",
          "raw_value": "25",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "G"
    },
    {
      "id": "NYISO-GB25-1715",
      "project_name": "1547 CSR - Orangeburg LLC",
      "rto": "NYISO",
      "st": "NY",
      "co": "Orangeburg",
      "mw": 60,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Jerry Martin",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "town display point (public locality, no street-level inference)",
      "lat": 41.02,
      "lon": -73.95,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Orangeburg",
      "county_or_zone": "Orangeburg",
      "queue_id": "1715",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "G"
    },
    {
      "id": "NYISO-GB25-1716",
      "project_name": "Orangeburg Expansion Phase 2",
      "rto": "NYISO",
      "st": "NY",
      "co": "Orangeburg",
      "mw": 60,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "DataBank Holdings, LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "town display point (public locality, no street-level inference)",
      "lat": 41.02,
      "lon": -73.95,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Orangeburg",
      "county_or_zone": "Orangeburg",
      "queue_id": "1716",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "G"
    },
    {
      "id": "NYISO-GB25-1717",
      "project_name": "Proposed Datacenters at 450 Broadway, Buchanan, NY 10511",
      "rto": "NYISO",
      "st": "NY",
      "co": "Westchester",
      "mw": 200,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Holtec Decommissioning International (HDI)",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county centroid",
      "lat": 41.1616,
      "lon": -73.7564,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Westchester",
      "county_or_zone": "Westchester",
      "queue_id": "1717",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "H"
    },
    {
      "id": "NYISO-GB25-1721",
      "project_name": "Brookhaven Logistics Center",
      "rto": "NYISO",
      "st": "NY",
      "co": "Suffolk",
      "mw": 176,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "WF Industrial XII LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 40.8693,
      "lon": -72.8471,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Suffolk",
      "county_or_zone": "Suffolk",
      "queue_id": "1721",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "K"
    },
    {
      "id": "NYISO-GB25-1725",
      "project_name": "Greenidge 200 MW Data Center Project",
      "rto": "NYISO",
      "st": "NY",
      "co": "Yates",
      "mw": 200,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Greenidge Generation, LLC",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 42.6335,
      "lon": -77.1052,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Yates",
      "county_or_zone": "Yates",
      "queue_id": "1725",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-1726",
      "project_name": "Data & Technology Campus",
      "rto": "NYISO",
      "st": "NY",
      "co": "Niagara",
      "mw": 300,
      "status": "2025 Gold Book large-load interconnection request",
      "provider": "NYISO",
      "customer_or_developer": "Riverview Innovation & Technology Campus, Inc.",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "precision": "county/zone centroid",
      "lat": 43.2011,
      "lon": -78.7446,
      "evidence_type": "nyiso_gold_book_large_load_record",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1726",
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "capture_date": "2026-09-26",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code. Map point is display geometry, not a claimed street address.",
      "nyiso_zone_code": "A"
    },
    {
      "id": "XCEL-GOOGLE-PINE-ISLAND-2026",
      "project_name": "Google Pine Island Data Center / Project Skyway",
      "rto": "Xcel Energy",
      "st": "MN",
      "co": "Olmsted County",
      "mw": null,
      "status": "electric service agreement signed; route permit process underway",
      "provider": "Xcel Energy",
      "customer_or_developer": "Google",
      "source_url": "https://newsroom.xcelenergy.com/news/xcel-energy-to-power-new-google-data-center-in-minnesota",
      "precision": "city display point",
      "lat": 44.1986,
      "lon": -92.6468,
      "evidence_type": "utility_named_data_center_service_project",
      "jurisdiction": "Minnesota, US",
      "location": "Pine Island, MN",
      "county_or_zone": "Olmsted County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility + municipal primary sources",
      "source_scope": "Xcel/municipal Project Skyway and Google/Xcel agreement",
      "capture_date": "2026-09-26",
      "notes": "Xcel and Google publicly identify the Pine Island data center and associated electric-service agreement. The public materials disclose 1,400 MW wind + 200 MW solar + 300 MW storage associated with the clean-energy buildout, but those are generation/storage resources, not the data-center load; no load MW is inferred."
    },
    {
      "id": "ENTERGY-GOOGLE-WEST-MEMPHIS-2025",
      "project_name": "Google West Memphis Data Center",
      "rto": "Entergy Arkansas",
      "st": "AR",
      "co": "Crittenden County",
      "mw": null,
      "status": "announced / utility service ecosystem under development",
      "provider": "Entergy Arkansas",
      "customer_or_developer": "Google",
      "source_url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
      "precision": "city display point",
      "lat": 35.1465,
      "lon": -90.1848,
      "evidence_type": "utility_named_data_center_service_project",
      "jurisdiction": "Arkansas, US",
      "location": "West Memphis, AR",
      "county_or_zone": "Crittenden County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Google + Entergy primary sources",
      "source_scope": "Google Arkansas data-center announcement and Entergy Arkansas data-center service page",
      "capture_date": "2026-09-26",
      "notes": "Google publicly identifies West Memphis as its first Arkansas data center. Google announced a new 600 MW solar project with Entergy as an associated energy investment; that 600 MW figure is not treated as data-center load."
    },
    {
      "id": "ENTERGY-AWS-CLINTON-MS-2026",
      "project_name": "AWS Clinton Data Center",
      "rto": "Entergy Mississippi",
      "st": "MS",
      "co": "Hinds County",
      "mw": null,
      "status": "under construction / development",
      "provider": "Entergy Mississippi",
      "customer_or_developer": "Amazon Web Services",
      "source_url": "https://www.entergy.com/blog/amazons-1-billion-investment-in-clinton-celebrated-with-ribbon-cutting",
      "precision": "city display point",
      "lat": 32.3415,
      "lon": -90.3218,
      "evidence_type": "utility_named_data_center_service_project",
      "jurisdiction": "Mississippi, US",
      "location": "Clinton, MS",
      "county_or_zone": "Hinds County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility primary source",
      "source_scope": "Entergy Mississippi June 12, 2026 project report",
      "capture_date": "2026-09-26",
      "notes": "Entergy identifies Amazon Web Services and the former Delphi facility in Clinton as a data-center project. No project load MW is published in the cited utility source; capital investment is not converted into electrical capacity."
    },
    {
      "id": "ALABAMA-QTS-BESSEMER-PROJECT-MARVEL-2026",
      "project_name": "QTS Bessemer / Project Marvel",
      "rto": "Alabama Power",
      "st": "AL",
      "co": "Jefferson County",
      "mw": 1200,
      "status": "planned / approved local land use",
      "provider": "Alabama Power",
      "customer_or_developer": "QTS Data Centers / Logistics Land Investment LLC",
      "source_url": "https://www.compute-atlas.com/facilities/qts-marvel-bessemer-al",
      "precision": "city/site area",
      "lat": 33.44,
      "lon": -86.97,
      "evidence_type": "utility_service_project_secondary_capacity",
      "jurisdiction": "Alabama, US",
      "location": "Bessemer, AL",
      "county_or_zone": "Jefferson County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1,200 MW",
          "qualifier": "reported planned utility power availability / campus capacity",
          "source_url": "https://www.compute-atlas.com/facilities/qts-marvel-bessemer-al",
          "capture_date": "2026-09-25"
        }
      ],
      "source_authority": "secondary facility registry with public-source citations",
      "source_scope": "Publicly researched facility record; Alabama Power service linkage",
      "capture_date": "2026-09-26",
      "notes": "The public research record reports 1,200 MW planned and identifies Alabama Power as utility. This is secondary evidence rather than a directly published Alabama Power MW disclosure, so it is not promoted into the core queue total."
    },
    {
      "id": "ALABAMA-CLOVERLEAF-RED-CLAY-2026",
      "project_name": "Cloverleaf Infrastructure / Project Red Clay",
      "rto": "Alabama Power",
      "st": "AL",
      "co": "Lowndes County",
      "mw": 1500,
      "status": "large-load project reported; service arrangements developing",
      "provider": "Alabama Power",
      "customer_or_developer": "Cloverleaf Infrastructure",
      "source_url": "https://www.compute-atlas.com/facilities/cloverleaf-red-clay-lowndes-al",
      "precision": "county display point",
      "lat": 32.151,
      "lon": -86.655,
      "evidence_type": "utility_service_project_secondary_capacity",
      "jurisdiction": "Alabama, US",
      "location": "Lowndes County, AL",
      "county_or_zone": "Lowndes County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1500,
          "unit": "MW",
          "raw_value": "1,500 MW",
          "qualifier": "reported requested energy capacity from Alabama Power",
          "source_url": "https://www.compute-atlas.com/facilities/cloverleaf-red-clay-lowndes-al",
          "capture_date": "2026-09-26"
        }
      ],
      "source_authority": "secondary facility registry citing local reporting",
      "source_scope": "Compute Atlas public facility record",
      "capture_date": "2026-09-26",
      "notes": "The cited public facility record reports a 1,500 MW energy-capacity request from Alabama Power. This remains secondary evidence; exact utility-contract status is not asserted."
    },
    {
      "id": "ALABAMA-VOLTCORE-SOMERVILLE-2026",
      "project_name": "Sovereign Gazelle Bitcoin Mining Data Center / Somerville",
      "rto": "Alabama Power",
      "st": "AL",
      "co": "Morgan County",
      "mw": 50,
      "status": "proposed / stalled by local right-of-way issues",
      "provider": "Alabama Power",
      "customer_or_developer": "Sovereign Gazelle",
      "source_url": "https://suedatacenters.org/data-centers/sovereign-gazelle-somerville-al",
      "precision": "city display point",
      "lat": 34.4709,
      "lon": -86.4908,
      "evidence_type": "utility_service_project_secondary_capacity",
      "jurisdiction": "Alabama, US",
      "location": "Somerville, AL",
      "county_or_zone": "Morgan County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50 MW",
          "qualifier": "reported planned bitcoin-mining/data-center load",
          "source_url": "https://suedatacenters.org/data-centers/sovereign-gazelle-somerville-al",
          "capture_date": "2026-09-26"
        }
      ],
      "source_authority": "secondary facility research record",
      "source_scope": "SUE Data Centers public facility record",
      "capture_date": "2026-09-26",
      "notes": "The source reports a 50 MW plan and says utility connections were approved; it also states VoltCore is the EPC/engineering contractor rather than site owner/operator. This is secondary evidence and remains outside the core queue total."
    },
    {
      "id": "DOMINION-EDSALL-DATA-CENTER-176MW-2024",
      "project_name": "Edsall Lines and Substation Project / Fairfax data center customer",
      "rto": "Dominion Energy Virginia",
      "st": "VA",
      "co": "Fairfax County",
      "mw": 176,
      "status": "service planning / transmission project",
      "provider": "Dominion Energy Virginia",
      "customer_or_developer": "Customer not publicly named in filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/edsall/pdfs/application-volume-2-of-3-2024-edsall.pdf",
      "precision": "county display point",
      "lat": 38.83,
      "lon": -77.28,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Virginia, US",
      "location": "Fairfax County, VA",
      "county_or_zone": "Fairfax County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176 megawatts",
          "qualifier": "projected load requested by data-center customer",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/edsall/pdfs/application-volume-2-of-3-2024-edsall.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_scope": "230 kV Edsall Lines and Substation Project, Application Volume 2",
      "capture_date": "2026-09-26",
      "notes": "Dominion's filing states the customer requested 176 MW of projected load for a planned data-center development in Fairfax County. Customer name is not public in the cited filing."
    },
    {
      "id": "DOMINION-LAKESIDE-MEC-240MW-2023",
      "project_name": "Lakeside Campus / MEC DP",
      "rto": "Dominion Energy Virginia",
      "st": "VA",
      "co": "Mecklenburg County",
      "mw": 240,
      "status": "service planning / transmission project",
      "provider": "Dominion Energy Virginia",
      "customer_or_developer": "MEC (customer name not otherwise identified in filing)",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/jeffress/pdfs/jeffress-scc-application-vol-1-of-3.pdf",
      "precision": "county display point",
      "lat": 36.68,
      "lon": -78.37,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Virginia, US",
      "location": "Mecklenburg County, VA",
      "county_or_zone": "Mecklenburg County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 240,
          "unit": "MW",
          "raw_value": "240 MW at full build-out",
          "qualifier": "MEC data-center DP request",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/jeffress/pdfs/jeffress-scc-application-vol-1-of-3.pdf",
          "capture_date": "2023"
        },
        {
          "value_mw": 24,
          "unit": "MW",
          "raw_value": "24 MW in 2025",
          "qualifier": "summer peak forecast",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/jeffress/pdfs/jeffress-scc-application-vol-1-of-3.pdf",
          "capture_date": "2023"
        },
        {
          "value_mw": 30,
          "unit": "MW",
          "raw_value": "30 MW in 2026",
          "qualifier": "summer peak forecast",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/jeffress/pdfs/jeffress-scc-application-vol-1-of-3.pdf",
          "capture_date": "2023"
        },
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60 MW in 2027",
          "qualifier": "summer peak forecast",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/jeffress/pdfs/jeffress-scc-application-vol-1-of-3.pdf",
          "capture_date": "2023"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_scope": "Jeffress SCC Application Volume 1",
      "capture_date": "2026-09-26",
      "notes": "Dominion's filing states MEC's DP request served a data-center customer and projects 240 MW at full build-out with 24/30/60 MW near-term summer-peak values. This is a planned service profile, not measured consumption."
    },
    {
      "id": "DOMINION-LEESBURG-AREA-1372MW-2024",
      "project_name": "Leesburg Load Area — three data-center customer campuses",
      "rto": "Dominion Energy Virginia",
      "st": "VA",
      "co": "Loudoun County",
      "mw": 1372,
      "status": "service planning / area transmission project",
      "provider": "Dominion Energy Virginia",
      "customer_or_developer": "Three customers; names confidential in filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-2-of-3-2024.pdf",
      "precision": "county display point",
      "lat": 39.07,
      "lon": -77.54,
      "evidence_type": "utility_data_center_service_area_record",
      "jurisdiction": "Virginia, US",
      "location": "Eastern Loudoun County, VA",
      "county_or_zone": "Loudoun County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1372,
          "unit": "MW",
          "raw_value": "approximately 1,372 MW",
          "qualifier": "combined projected customer load plus emerging area load",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-2-of-3-2024.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_scope": "Leesburg Load Area data-center service planning",
      "capture_date": "2026-09-26",
      "notes": "The 1,372 MW figure covers combined projected customer load and emerging load in the area; it is an area-level figure and must not be added to the three campus records separately."
    },
    {
      "id": "GA-GEORGIA-POWER-HILLS-BRIDGE-LARGE-LOAD-2026",
      "project_name": "Hills Bridge–Speedway 500 kV Transmission Project",
      "rto": "Georgia Power",
      "st": "GA",
      "co": "Henry / Clayton Counties",
      "mw": null,
      "status": "transmission project under development",
      "provider": "Georgia Power",
      "customer_or_developer": "Customer not publicly named",
      "source_url": "https://www.georgiapower.com/about/grid-reliability/grid-projects/transmission-projects/hills-bridge-speedway.html",
      "precision": "county-area display point",
      "lat": 33.49,
      "lon": -84.37,
      "evidence_type": "utility_named_large_load_transmission_project",
      "jurisdiction": "Georgia, US",
      "location": "Henry and Clayton Counties, GA",
      "county_or_zone": "Henry / Clayton Counties",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "utility primary source",
      "source_scope": "Georgia Power project page",
      "capture_date": "2026-09-26",
      "notes": "Georgia Power states the transmission project is being developed to serve a specific large-load customer. No project MW is published on the cited page, so no load capacity is inferred."
    },
    {
      "id": "ALABAMA-POWER-DOTIER-CONTRACT-2026",
      "project_name": "Dotier LLC — Alabama Power electric-service contract",
      "rto": "Alabama Power",
      "st": "AL",
      "co": "Montgomery County",
      "mw": null,
      "status": "contract filed with Alabama PSC",
      "provider": "Alabama Power",
      "customer_or_developer": "Dotier LLC (Meta subsidiary)",
      "source_url": "https://energyandpolicy.org/alabama-power-data-center-contracts-redacted/",
      "precision": "city display point",
      "lat": 32.37,
      "lon": -86.3,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Alabama, US",
      "location": "Montgomery, AL",
      "county_or_zone": "Montgomery County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Alabama PSC filing reporting / utility contract evidence",
      "source_scope": "Alabama Power large-load contract filed June 18, 2026",
      "capture_date": "2026-09-26",
      "notes": "Alabama Power filed a contract with Dotier LLC on June 18, 2026. Public contract capacity is redacted. Alabama environmental permitting identifies Dotier Data Center at 1055 Hyundai Boulevard, Montgomery. No load MW is inferred from unrelated generator ratings or investment figures."
    },
    {
      "id": "ALABAMA-POWER-NEBIUS-CONTRACT-2026",
      "project_name": "Alabama ADC Holdings LLC — Alabama Power electric-service contract",
      "rto": "Alabama Power",
      "st": "AL",
      "co": "Jefferson County",
      "mw": null,
      "status": "contract filed with Alabama PSC",
      "provider": "Alabama Power",
      "customer_or_developer": "Alabama ADC Holdings LLC (Nebius affiliate)",
      "source_url": "https://www.scribd.com/document/1068237120/Alabama-Power-electronic-filing-contract-for-electric-service-with-Alabama-ADC-Holdings-LLC",
      "precision": "city/site area",
      "lat": 33.44,
      "lon": -86.97,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Alabama, US",
      "location": "Birmingham, AL",
      "county_or_zone": "Jefferson County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Alabama PSC contract transmittal / public contract evidence",
      "source_scope": "Alabama Power electric-service contract filed July 24, 2026",
      "capture_date": "2026-09-26",
      "notes": "The public contract version is redacted. Independent public records identify Alabama ADC Holdings LLC as a Nebius affiliate and identify the Birmingham AI data-center site. Contract capacity remains unknown in the public contract; no MW is inferred."
    },
    {
      "id": "ENTERGY-META-RICHLAND-PARISH-2025",
      "project_name": "Meta Northeast Louisiana Data Center",
      "rto": "Entergy Louisiana",
      "st": "LA",
      "co": "Richland Parish",
      "mw": 1500,
      "status": "under construction / development",
      "provider": "Entergy Louisiana",
      "customer_or_developer": "Meta Platforms, Inc.",
      "source_url": "https://www.entergy.com/news/meta-selects-northeast-louisiana-as-site-10-billion-data-center",
      "precision": "county display point",
      "lat": 32.45,
      "lon": -91.75,
      "evidence_type": "utility_named_data_center_service_project",
      "jurisdiction": "Louisiana, US",
      "location": "Richland Parish, LA",
      "county_or_zone": "Richland Parish",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1500,
          "unit": "MW",
          "raw_value": "1,500-megawatt data center",
          "qualifier": "Entergy description of data-center scale",
          "source_url": "https://www.entergy.com/news/meta-selects-northeast-louisiana-as-site-10-billion-data-center",
          "capture_date": "2026-09-26"
        }
      ],
      "source_authority": "utility primary source",
      "source_scope": "Entergy Louisiana project announcement",
      "capture_date": "2026-09-26",
      "notes": "Entergy publicly describes Meta's Northeast Louisiana project as a 1,500 MW data center and says Entergy will add generation to meet growing demand including the data center. No separate queue ID is inferred."
    },
    {
      "id": "ENTERGY-AWS-MADISON-COUNTY-MS-2025",
      "project_name": "Amazon Web Services Madison County Data Center",
      "rto": "Entergy Mississippi",
      "st": "MS",
      "co": "Madison County",
      "mw": 650,
      "status": "expansion / development",
      "provider": "Entergy Mississippi",
      "customer_or_developer": "Amazon Web Services",
      "source_url": "https://www.entergy.com/blog/entergy-welcomed-energy-industry-leaders-new-orleans",
      "precision": "county display point",
      "lat": 32.63,
      "lon": -90,
      "evidence_type": "utility_named_data_center_service_project",
      "jurisdiction": "Mississippi, US",
      "location": "Madison County, MS",
      "county_or_zone": "Madison County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 650,
          "unit": "MW",
          "raw_value": "650-MW data center project",
          "qualifier": "Entergy description of project scale",
          "source_url": "https://www.entergy.com/blog/entergy-welcomed-energy-industry-leaders-new-orleans",
          "capture_date": "2026-09-26"
        }
      ],
      "source_authority": "utility primary source",
      "source_scope": "Entergy corporate/EEI growth article",
      "capture_date": "2026-09-26",
      "notes": "Entergy describes the AWS Madison County project as a 650 MW data center project. This is a utility primary-source statement but the article does not provide a public queue/POI identifier; no such identifier is inferred."
    },
    {
      "id": "ERCOT-30INR0031-CALDWELL-2026",
      "project_name": "Caldwell County Energy Center",
      "rto": "ERCOT",
      "st": "TX",
      "co": "Caldwell County",
      "mw": 1500,
      "status": "SS Completed, FIS Started, No IA",
      "provider": "ERCOT",
      "customer_or_developer": "Caldwell County Energy Center, LLC",
      "source_url": "https://savrn.com/data-center-permits-tracker",
      "precision": "county seat display point",
      "lat": 29.8849,
      "lon": -97.6697,
      "evidence_type": "secondary_data_center_interconnection_project",
      "jurisdiction": "Texas, US",
      "location": "Caldwell County, TX",
      "county_or_zone": "Caldwell County",
      "queue_id": "30INR0031",
      "poi_substation": null,
      "status_detail": "SS Completed, FIS Started, No IA",
      "capacity_claims": [
        {
          "value_mw": 1500,
          "unit": "MW",
          "raw_value": "1,500 MW",
          "qualifier": "public facility tracker interconnection capacity"
        }
      ],
      "source_authority": "secondary public facility/permit tracker",
      "source_scope": "Current Data Center Permits Tracker",
      "capture_date": "2026-09-26",
      "notes": "Named ERCOT data-center interconnection project. Treat as secondary facility evidence and potentially overlapping with the core ERCOT queue row; not added to core totals."
    },
    {
      "id": "ERCOT-33INR0005-BULLOCK-2026",
      "project_name": "Bullock Data Center",
      "rto": "ERCOT",
      "st": "TX",
      "co": "Hill County",
      "mw": 1400,
      "status": "SS Completed, FIS Started, No IA",
      "provider": "ERCOT",
      "customer_or_developer": "Bullock Data Center, LLC",
      "source_url": "https://savrn.com/data-center-permits-tracker",
      "precision": "county seat display point",
      "lat": 32.0109,
      "lon": -97.13,
      "evidence_type": "secondary_data_center_interconnection_project",
      "jurisdiction": "Texas, US",
      "location": "Hill County, TX",
      "county_or_zone": "Hill County",
      "queue_id": "33INR0005",
      "poi_substation": null,
      "status_detail": "SS Completed, FIS Started, No IA",
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1,400 MW",
          "qualifier": "public facility tracker interconnection capacity"
        }
      ],
      "source_authority": "secondary public facility/permit tracker",
      "source_scope": "Current Data Center Permits Tracker",
      "capture_date": "2026-09-26",
      "notes": "Named ERCOT data-center interconnection project. Secondary source; likely overlaps ERCOT queue data and is therefore non-additive."
    },
    {
      "id": "ERCOT-33INR0006-LIBERTY-2026",
      "project_name": "Liberty Thermal Energy Center / Liberty Data Center I",
      "rto": "ERCOT",
      "st": "TX",
      "co": "Hill County",
      "mw": 1400,
      "status": "SS Completed, FIS Started, No IA",
      "provider": "ERCOT",
      "customer_or_developer": "Liberty Data Center I, LLC",
      "source_url": "https://savrn.com/data-center-permits-tracker",
      "precision": "county seat display point",
      "lat": 32.0109,
      "lon": -97.13,
      "evidence_type": "secondary_data_center_interconnection_project",
      "jurisdiction": "Texas, US",
      "location": "Hill County, TX",
      "county_or_zone": "Hill County",
      "queue_id": "33INR0006",
      "poi_substation": null,
      "status_detail": "SS Completed, FIS Started, No IA",
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1,400 MW",
          "qualifier": "public facility tracker interconnection capacity"
        }
      ],
      "source_authority": "secondary public facility/permit tracker",
      "source_scope": "Current Data Center Permits Tracker",
      "capture_date": "2026-09-26",
      "notes": "Named ERCOT data-center interconnection project. Secondary source; likely overlaps ERCOT queue data and is therefore non-additive."
    },
    {
      "id": "ALABAMA-POWER-WOOSTOR-CONTRACT-2026",
      "project_name": "Woostor LLC — Alabama Power electric-service contract",
      "rto": "ALABAMA POWER",
      "st": "AL",
      "co": null,
      "mw": null,
      "status": "public utility contract record",
      "provider": "Alabama Power",
      "customer_or_developer": "Woostor LLC",
      "source_url": "https://energyandpolicy.org/alabama-power-data-center-contracts-redacted/",
      "precision": "state jurisdiction centroid — no project location published",
      "lat": 32.8067,
      "lon": -86.7911,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Alabama, US",
      "location": "Alabama, US",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "secondary review of Alabama PSC contract filing",
      "source_scope": "Alabama Power electric-service contract filed August 14, 2026",
      "capture_date": "2026-09-26",
      "notes": "The public contract is redacted and the project site has not been identified in the public sources reviewed. The map uses an Alabama jurisdiction display point only; it is not a facility location."
    },
    {
      "id": "EVERGY-DIGITAL-REALTY-KS-CENTRAL-2026",
      "project_name": "Digital Realty — Evergy large-load ESA",
      "rto": "UTILITY",
      "st": "KS",
      "co": "Kansas Central",
      "mw": null,
      "status": "Signed; ESA announced May 2026",
      "provider": "Evergy",
      "customer_or_developer": "Digital Realty",
      "source_url": "https://investors.evergy.com/static-files/73352465-a5e0-4dbf-ac4b-98692902443f",
      "precision": "state / utility-service-area display point",
      "lat": 38.5,
      "lon": -98,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Evergy service territory / Kansas Central",
      "location": "Kansas Central",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Evergy primary investor presentation",
      "source_scope": "Evergy Q2 2026 Earnings Presentation, Data Center Announcements",
      "capture_date": "2026-08-11",
      "notes": "Evergy identifies the customer/project relationship and states the ESA is signed. Its presentation reports approximately 2.5 GW aggregate steady-state peak load for ESAs under LLPS but does not publish customer-by-customer MW; no individual MW is inferred."
    },
    {
      "id": "EVERGY-BEALE-KS-CENTRAL-2026",
      "project_name": "Beale Infrastructure — Evergy large-load ESA",
      "rto": "UTILITY",
      "st": "KS",
      "co": "Kansas Central",
      "mw": null,
      "status": "Signed; ESA announced February 2026",
      "provider": "Evergy",
      "customer_or_developer": "Beale Infrastructure",
      "source_url": "https://investors.evergy.com/static-files/73352465-a5e0-4dbf-ac4b-98692902443f",
      "precision": "state / utility-service-area display point",
      "lat": 38.5,
      "lon": -98,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Evergy service territory / Kansas Central",
      "location": "Kansas Central",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Evergy primary investor presentation",
      "source_scope": "Evergy Q2 2026 Earnings Presentation, Data Center Announcements",
      "capture_date": "2026-08-11",
      "notes": "Evergy identifies the customer/project relationship and states the ESA is signed. Its presentation reports approximately 2.5 GW aggregate steady-state peak load for ESAs under LLPS but does not publish customer-by-customer MW; no individual MW is inferred."
    },
    {
      "id": "EVERGY-GOOGLE-MO-WEST-2026",
      "project_name": "Google — Evergy large-load ESA",
      "rto": "UTILITY",
      "st": "MO",
      "co": "MO West",
      "mw": null,
      "status": "Signed; ESA announced February 2026",
      "provider": "Evergy",
      "customer_or_developer": "Google",
      "source_url": "https://investors.evergy.com/static-files/73352465-a5e0-4dbf-ac4b-98692902443f",
      "precision": "state / utility-service-area display point",
      "lat": 38.4,
      "lon": -92.5,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Evergy service territory / MO West",
      "location": "MO West",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Evergy primary investor presentation",
      "source_scope": "Evergy Q2 2026 Earnings Presentation, Data Center Announcements",
      "capture_date": "2026-08-11",
      "notes": "Evergy identifies the customer/project relationship and states the ESA is signed. Its presentation reports approximately 2.5 GW aggregate steady-state peak load for ESAs under LLPS but does not publish customer-by-customer MW; no individual MW is inferred."
    },
    {
      "id": "EVERGY-GOOGLE-MO-METRO-2026",
      "project_name": "Google — Evergy large-load ESA",
      "rto": "UTILITY",
      "st": "MO",
      "co": "MO Metro",
      "mw": null,
      "status": "Signed; ESA announced February 2026",
      "provider": "Evergy",
      "customer_or_developer": "Google",
      "source_url": "https://investors.evergy.com/static-files/73352465-a5e0-4dbf-ac4b-98692902443f",
      "precision": "state / utility-service-area display point",
      "lat": 38.4,
      "lon": -92.5,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Evergy service territory / MO Metro",
      "location": "MO Metro",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Evergy primary investor presentation",
      "source_scope": "Evergy Q2 2026 Earnings Presentation, Data Center Announcements",
      "capture_date": "2026-08-11",
      "notes": "Evergy identifies the customer/project relationship and states the ESA is signed. Its presentation reports approximately 2.5 GW aggregate steady-state peak load for ESAs under LLPS but does not publish customer-by-customer MW; no individual MW is inferred."
    },
    {
      "id": "EVERGY-META-MO-WEST-2026",
      "project_name": "Meta — Evergy large-load ESA",
      "rto": "UTILITY",
      "st": "MO",
      "co": "MO West",
      "mw": null,
      "status": "Signed; ESA announced February 2026",
      "provider": "Evergy",
      "customer_or_developer": "Meta",
      "source_url": "https://investors.evergy.com/static-files/73352465-a5e0-4dbf-ac4b-98692902443f",
      "precision": "state / utility-service-area display point",
      "lat": 38.4,
      "lon": -92.5,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Evergy service territory / MO West",
      "location": "MO West",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Evergy primary investor presentation",
      "source_scope": "Evergy Q2 2026 Earnings Presentation, Data Center Announcements",
      "capture_date": "2026-08-11",
      "notes": "Evergy identifies the customer/project relationship and states the ESA is signed. Its presentation reports approximately 2.5 GW aggregate steady-state peak load for ESAs under LLPS but does not publish customer-by-customer MW; no individual MW is inferred."
    },
    {
      "id": "MN-PUC-HARMONY-GROUP-ESA-26-159-2026",
      "project_name": "Minnesota Power / Harmony Group data-center ESA",
      "rto": "UTILITY",
      "st": "MN",
      "co": "Hermantown, MN",
      "mw": null,
      "status": "ESA filed; Commission review",
      "provider": "Minnesota Power / Minnesota Public Utilities Commission",
      "customer_or_developer": "Harmony Group, LLC (Alphabet/Google subsidiary)",
      "source_url": "https://mn.gov/puc/activities/v-l-e-c/data-centers/",
      "precision": "city display point",
      "lat": 46.8061,
      "lon": -92.2382,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Minnesota, US",
      "location": "Hermantown, MN",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Minnesota PUC primary source",
      "source_scope": "Data Centers — Electric Service Agreements",
      "capture_date": "2026-09-26",
      "notes": "Minnesota PUC identifies the ESA, customer, location and docket 26-159. Some customer demand estimates may be nonpublic; no MW inferred."
    },
    {
      "id": "MN-PUC-ECHO-ZONE-ESA-26-170-2026",
      "project_name": "Xcel Energy / Echo Zone data-center ESA",
      "rto": "UTILITY",
      "st": "MN",
      "co": "Pine Island, MN",
      "mw": null,
      "status": "ESA filed; Commission review",
      "provider": "Xcel Energy / Minnesota Public Utilities Commission",
      "customer_or_developer": "Echo Zone, LLC (Google subsidiary)",
      "source_url": "https://mn.gov/puc/activities/v-l-e-c/data-centers/",
      "precision": "city display point",
      "lat": 44.2027,
      "lon": -92.6455,
      "evidence_type": "utility_data_center_service_project",
      "jurisdiction": "Minnesota, US",
      "location": "Pine Island, MN",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Minnesota PUC primary source",
      "source_scope": "Data Centers — Electric Service Agreements",
      "capture_date": "2026-09-26",
      "notes": "Minnesota PUC identifies the ESA, customer, location and docket 26-170. Some customer load estimates may be nonpublic; no MW inferred."
    },
    {
      "id": "AES-INDIANA-GOOGLE-MONROVIA-2026",
      "project_name": "Google Monrovia data center project",
      "rto": "UTILITY",
      "st": "IN",
      "co": "Monrovia, IN",
      "mw": 1200,
      "status": "proposed; electric-service agreement filed for regulatory approval",
      "provider": "AES Indiana",
      "customer_or_developer": "Google",
      "source_url": "https://www.aesindiana.com/press-release/aes-indiana-google-partner",
      "precision": "city display point",
      "lat": 39.5789,
      "lon": -86.4825,
      "evidence_type": "utility_named_data_center_project",
      "jurisdiction": "Indiana, US",
      "location": "Monrovia, IN",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1,200 MW spot load growth",
          "qualifier": "IURC filing says this transmission project likely corresponds to Google (Monrovia); qualified attribution, not a direct contract value",
          "source_url": "https://www.in.gov/iurc/files/PUBLIC-AES-2025-IRP-Comments-3-6-26FINAL_Redacted.pdf",
          "capture_date": "2026-03-06"
        }
      ],
      "source_authority": "AES Indiana primary + IURC filing",
      "source_scope": "AES Indiana April 23 2026 announcement + IURC filings",
      "capture_date": "2026-09-26",
      "notes": "AES Indiana identifies the proposed Google data center in Monrovia and the customer-specific service agreement. The 1,200 MW value is retained as qualified IURC transmission-project attribution, not asserted as a direct customer contract value."
    },
    {
      "id": "DUKE-WHITEFIBER-MADISON-NC-ESA-2025",
      "project_name": "WhiteFiber / Enovum NC-1 — Duke Energy ESA facility",
      "rto": "DUKE",
      "st": "NC",
      "co": "Rockingham County",
      "mw": null,
      "status": "existing ESA assigned Aug. 4, 2025",
      "provider": "Duke Energy Carolinas",
      "customer_or_developer": "WhiteFiber / Enovum NC-1 Bidco LLC",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1710350/000121390026056212/R24.htm",
      "precision": "facility address",
      "lat": 36.3881,
      "lon": -79.2626,
      "evidence_type": "utility_compute_service_agreement",
      "jurisdiction": "North Carolina, US",
      "location": "805 Island Drive, Madison, NC",
      "county_or_zone": "Madison / Rockingham County",
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "SEC-filed customer report",
      "source_scope": "WhiteFiber 2026 quarterly filing",
      "capture_date": "2026-09-26",
      "notes": "Customer filing identifies an existing Duke Energy ESA for the facility at 805 Island Drive, Madison, NC and describes utility extra facilities. No MW is inferred from minimum-bill or facilities charges."
    },
    {
      "id": "NV-26-05030-VIP-LANDCO-2026",
      "project_name": "NV Energy large-load ESA — VIP LANDCO, LLC",
      "rto": "UTILITY",
      "st": "NV",
      "co": "Las Vegas area",
      "mw": null,
      "status": "PSC filing; portions may be confidential",
      "provider": "NV Energy",
      "customer_or_developer": "VIP LANDCO, LLC",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "precision": "city/service-area display point — site not published",
      "lat": 36.1699,
      "lon": -115.1398,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Nevada, US",
      "location": "Las Vegas area",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_scope": "Docket 26-05030 — Large Load Electric Service Agreement",
      "capture_date": "2026-09-26",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving VIP LANDCO, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05030-PROLOGIS-2026",
      "project_name": "NV Energy large-load ESA — Prologis L.P.",
      "rto": "UTILITY",
      "st": "NV",
      "co": "Las Vegas area",
      "mw": null,
      "status": "PSC filing; portions may be confidential",
      "provider": "NV Energy",
      "customer_or_developer": "Prologis L.P.",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "precision": "city/service-area display point — site not published",
      "lat": 36.1699,
      "lon": -115.1398,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Nevada, US",
      "location": "Las Vegas area",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_scope": "Docket 26-05030 — Large Load Electric Service Agreement",
      "capture_date": "2026-09-26",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving Prologis L.P.. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05029-NOVVA-LAS-VEGAS-2026",
      "project_name": "NV Energy large-load ESA — Novva Las Vegas, LLC",
      "rto": "UTILITY",
      "st": "NV",
      "co": "Las Vegas, NV",
      "mw": null,
      "status": "PSC filing; portions may be confidential",
      "provider": "NV Energy",
      "customer_or_developer": "Novva Las Vegas, LLC",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "precision": "city display point",
      "lat": 36.1699,
      "lon": -115.1398,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Nevada, US",
      "location": "Las Vegas, NV",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_scope": "Docket 26-05029 — Large Load Electric Service Agreement",
      "capture_date": "2026-09-26",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving Novva Las Vegas, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05029-PROTON-NLV-2026",
      "project_name": "NV Energy large-load ESA — Proton NLV, LLC",
      "rto": "UTILITY",
      "st": "NV",
      "co": "Las Vegas, NV",
      "mw": null,
      "status": "PSC filing; portions may be confidential",
      "provider": "NV Energy",
      "customer_or_developer": "Proton NLV, LLC",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "precision": "city display point",
      "lat": 36.1699,
      "lon": -115.1398,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Nevada, US",
      "location": "Las Vegas, NV",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_scope": "Docket 26-05029 — Large Load Electric Service Agreement",
      "capture_date": "2026-09-26",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving Proton NLV, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05028-VANTAGE-NV11-2026",
      "project_name": "NV Energy large-load ESA — Vantage Data Centers NV11, LLC",
      "rto": "UTILITY",
      "st": "NV",
      "co": "Northern Nevada",
      "mw": null,
      "status": "PSC filing; portions may be confidential",
      "provider": "NV Energy",
      "customer_or_developer": "Vantage Data Centers NV11, LLC",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "precision": "service-area display point — exact facility not published in docket index",
      "lat": 39.5296,
      "lon": -119.8138,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Nevada, US",
      "location": "Northern Nevada",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_scope": "Docket 26-05028 — Large Load Electric Service Agreement",
      "capture_date": "2026-09-26",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving Vantage Data Centers NV11, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05027-PR-RNO-2026",
      "project_name": "NV Energy large-load ESA — PR RNO Property Owner 1, LLC",
      "rto": "UTILITY",
      "st": "NV",
      "co": "Reno area",
      "mw": null,
      "status": "PSC filing; portions may be confidential",
      "provider": "NV Energy",
      "customer_or_developer": "PR RNO Property Owner 1, LLC",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "precision": "city/service-area display point — site not published",
      "lat": 39.5296,
      "lon": -119.8138,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Nevada, US",
      "location": "Reno area",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_scope": "Docket 26-05027 — Large Load Electric Service Agreement",
      "capture_date": "2026-09-26",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving PR RNO Property Owner 1, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05027-SV-RNO-2026",
      "project_name": "NV Energy large-load ESA — SV RNO Property Owner 1, LLC",
      "rto": "UTILITY",
      "st": "NV",
      "co": "Reno area",
      "mw": null,
      "status": "PSC filing; portions may be confidential",
      "provider": "NV Energy",
      "customer_or_developer": "SV RNO Property Owner 1, LLC",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "precision": "city/service-area display point — site not published",
      "lat": 39.5296,
      "lon": -119.8138,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Nevada, US",
      "location": "Reno area",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_scope": "Docket 26-05027 — Large Load Electric Service Agreement",
      "capture_date": "2026-09-26",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving SV RNO Property Owner 1, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05026-AMAZON-NV-2026",
      "project_name": "NV Energy large-load ESA — Amazon Data Services, Inc.",
      "rto": "UTILITY",
      "st": "NV",
      "co": "Nevada service territory",
      "mw": null,
      "status": "PSC filing; portions may be confidential",
      "provider": "NV Energy",
      "customer_or_developer": "Amazon Data Services, Inc.",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "precision": "state display point — facility site not published",
      "lat": 38.8026,
      "lon": -116.4194,
      "evidence_type": "utility_large_load_contract_record",
      "jurisdiction": "Nevada, US",
      "location": "Nevada service territory",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_scope": "Docket 26-05026 — Large Load Electric Service Agreement",
      "capture_date": "2026-09-26",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving Amazon Data Services, Inc.. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "BLACK-HILLS-CHEYENNE-1.8GW-2026",
      "project_name": "Prospective 1.8 GW data center project",
      "rto": "UTILITY",
      "st": "WY",
      "co": "Cheyenne, WY",
      "mw": 1800,
      "status": "generation reservation agreement; definitive ESA under negotiation",
      "provider": "Wyoming Electric / Black Hills Energy",
      "customer_or_developer": "Prospective customer (not publicly named)",
      "source_url": "https://ir.blackhillscorp.com/news-releases/news-release-details/black-hills-corp-reaffirms-2026-earnings-guidance-reports-2026",
      "precision": "city display point",
      "lat": 41.14,
      "lon": -104.8202,
      "evidence_type": "utility_large_load_service_project",
      "jurisdiction": "Wyoming, US",
      "location": "Cheyenne, WY",
      "county_or_zone": null,
      "queue_id": null,
      "permit_number": null,
      "poi_substation": null,
      "capacity_claims": [
        {
          "value_mw": 1800,
          "unit": "MW",
          "raw_value": "1.8 GW data center",
          "qualifier": "prospective project seeking service under Wyoming Electric LPCS tariff",
          "source_url": "https://ir.blackhillscorp.com/news-releases/news-release-details/black-hills-corp-reaffirms-2026-earnings-guidance-reports-2026",
          "capture_date": "2026-08-05"
        }
      ],
      "source_authority": "utility primary source",
      "source_scope": "Black Hills Q2 2026 results",
      "capture_date": "2026-09-26",
      "notes": "Black Hills reported a prospective 1.8 GW data-center project in Cheyenne with a generation reservation agreement. The customer is not publicly named in the cited source; the project is not treated as energized load."
    }
  ]
}