  "schema_version": 1,
  "generated_on": "2026-09-26",
  "title": "Project-level public large-load and data-center evidence",
  "record_count": 271,
  "purpose": "Move beyond aggregate source units into individually identifiable projects, permits and named utility-customer records whenever the public evidence exposes a discrete entity, location or regulatory record.",
  "accounting": "These records are project/evidence records, not additions to the core 1,540-row table. Multiple dated capacity claims within one project are preserved separately. No MW is inferred from a different unit or missing utility disclosure.",
  "sources": [
    {
      "id": "VA-DEQ",
      "name": "Virginia DEQ Issued Air Permits for Data Centers",
      "url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "record_count": 33,
      "notes": "Individual permit identities; no uniform customer MW field."
    },
    {
      "id": "BPA-LARGE-LOAD",
      "name": "BPA Large Load Registry / secondary reproduction",
      "url": "https://substationscout.com/large-load-registry/",
      "record_count": 60,
      "notes": "Request IDs, filed MW, POI and status where publicly reproduced; non-additive."
    },
    {
      "id": "AESO-DATA-LOAD",
      "name": "AESO Connection Project List",
      "url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "record_count": 28,
      "notes": "Data-load project identities, planning-area/town and DTS/contract-capacity fields; customer remains undisclosed where not published."
    },
    {
      "id": "NYISO-LOAD-PROJECTS",
      "name": "NYISO public interconnection queue / Load Projects",
      "url": "https://www.nyiso.com/interconnections",
      "record_count": 12,
      "notes": "Named load-project crosswalks; site/POI fields retained where publicly exposed."
    },
    {
      "id": "IESO-LOAD",
      "name": "IESO Application Status",
      "url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "record_count": 6,
      "notes": "Current load/increase-load application records from the public application-status universe."
    },
    {
      "id": "AEP-Q126",
      "name": "AEP Q1 2026 Earnings Presentation",
      "url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "record_count": 8,
      "notes": "Named utility/customer project locations; most loads explicitly not public."
    },
    {
      "id": "EEI-APR26",
      "name": "EEI Large Load Projects and Tariffs",
      "url": "https://www.eei.org/-/media/Project/EEI/Documents/Issues%20and%20Policy/List%20of%20Large%20Customer%20Projects%20and%20Tariffs",
      "record_count": 2,
      "notes": "Industry compilation; not used as utility-primary MW evidence."
    },
    {
      "id": "ISO-NE-CELT",
      "name": "ISO-NE CELT 2026 Large Loads",
      "url": "https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf",
      "record_count": 2,
      "notes": "Forecast project entries; study maturity not inferred."
    },
    {
      "id": "GA-PSC",
      "name": "Georgia PSC Docket 44280 Filing 228337",
      "url": "https://psc.ga.gov/search/facts-document/?documentId=228337",
      "record_count": 1
    },
    {
      "id": "ENTERGY-RIVER-BEND",
      "name": "Entergy River Bend AI data-center announcement",
      "url": "https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
      "record_count": 1
    },
    {
      "id": "ALECTRA-MTS6",
      "name": "Alectra Vaughan MTS #6",
      "url": "https://alectrautilities.com/VaughanMTS6",
      "record_count": 1
    },
    {
      "id": "COMED-NEW-PROJECTS",
      "name": "ComEd Data Center Forecast Development — New Projects List",
      "url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "record_count": 28,
      "notes": "Historical project rows extracted from the public regulatory filing; source exposes location, connection, engineering status and in-service year but not a uniform project MW."
    },
    {
      "id": "DOMINION-SERVICE-PROJECTS",
      "name": "Dominion Energy Virginia data-center service filings",
      "url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
      "record_count": 3,
      "notes": "Named/lettered data-center campus service projects and load ramps in Dominion transmission filings."
    },
    {
      "id": "NYISO-GOLD-BOOK-2024",
      "name": "NYISO 2024 Load & Capacity Data Report — Table IV-7",
      "url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "record_count": 9,
      "notes": "Additional named large-load queue records directly published by NYISO in the 2024 Gold Book."
    },
    {
      "id": "IDAHO-POWER-2025-IRP",
      "name": "Idaho Power 2025 IRP Appendix A",
      "url": "https://docs.idahopower.com/pdfs/AboutUs/PlanningForFuture/2025IRP/2025%20IRP%20Appendix%20A.pdf",
      "record_count": 1,
      "notes": "Named Meta/Brisbie data-center project and additional firm-load forecast source."
    },
    {
      "id": "CAISO-LARGE-LOADS",
      "name": "PG&E/CAISO Large Load LC24 and Serial Data Center Studies",
      "url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "record_count": 14,
      "notes": "11 LC24 load records totaling 840 MW plus 3 serial San Jose load records totaling 700 MW."
    }
  ],
  "records": [
    {
      "id": "VIRGINIA-DEQ-74150-3",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services, Inc. IAD-114 IAD-115",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74150-3",
      "permit_issuance_date": "07/29/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74154-5",
      "evidence_type": "environmental_permit_record",
      "project_name": "Aerospace Data Facility - East",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Fairfax Co.",
      "permit_number": "74154-5",
      "permit_issuance_date": "03/02/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74161-5",
      "evidence_type": "environmental_permit_record",
      "project_name": "QTS Investment Properties Manassas LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Prince William Co.",
      "permit_number": "74161-5",
      "permit_issuance_date": "03/26/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74171-4",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services (IAD-130, IAD-131, IAD-313 and DCA-072)",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Prince William Co.",
      "permit_number": "74171-4",
      "permit_issuance_date": "03/30/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74127-3",
      "evidence_type": "environmental_permit_record",
      "project_name": "Data Center Vint Hill LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Fauquier Co.",
      "permit_number": "74127-3",
      "permit_issuance_date": "01/20/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74118-3",
      "evidence_type": "environmental_permit_record",
      "project_name": "Cashvad Ventures LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Manassas City",
      "permit_number": "74118-3",
      "permit_issuance_date": "04/27/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74239-2",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services Inc - IAD-134/135/136",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Fairfax Co.",
      "permit_number": "74239-2",
      "permit_issuance_date": "07/29/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74241-4",
      "evidence_type": "environmental_permit_record",
      "project_name": "Gainesville Crossing Data Campus - GCDC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Prince William Co.",
      "permit_number": "74241-4",
      "permit_issuance_date": "07/29/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74252-2",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services IAD-215",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74252-2",
      "permit_issuance_date": "04/06/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74260-2",
      "evidence_type": "environmental_permit_record",
      "project_name": "NTT Global Data Centers VA10 LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Prince William Co.",
      "permit_number": "74260-2",
      "permit_issuance_date": "04/03/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74262-4",
      "evidence_type": "environmental_permit_record",
      "project_name": "Digital Third Second Manassas, LLC & Digital Carver Brickyard, LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Prince William Co.",
      "permit_number": "74262-4",
      "permit_issuance_date": "06/24/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74265-3",
      "evidence_type": "environmental_permit_record",
      "project_name": "Yondr Data Center",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74265-3",
      "permit_issuance_date": "08/13/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74269-2",
      "evidence_type": "environmental_permit_record",
      "project_name": "STACK Infrastructure Data Center - SI NVA06A LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74269-2",
      "permit_issuance_date": "02/11/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74284-2",
      "evidence_type": "environmental_permit_record",
      "project_name": "Vantage Data Center VA3 LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74284-2",
      "permit_issuance_date": "01/05/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74288-2",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services Inc. IAD450 Cosner Tech Campus",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Spotsylvania Co.",
      "permit_number": "74288-2",
      "permit_issuance_date": "06/01/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74296-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Kincora Data Center",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74296-1",
      "permit_issuance_date": "01/20/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74299-2",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services Inc - IAD - 550 Louisa REB",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Louisa Co.",
      "permit_number": "74299-2",
      "permit_issuance_date": "02/20/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74302-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services Inc - IAD-243/244/290/291/292",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74302-1",
      "permit_issuance_date": "07/15/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74308-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Digital Filigree LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74308-1",
      "permit_issuance_date": "03/23/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74321-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Belmont Innovation Campus",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74321-1",
      "permit_issuance_date": "01/28/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74323-2",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services Inc IAD-180, IAD-181, IAD-182, & IAD-183",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74323-2",
      "permit_issuance_date": "03/16/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74329-2",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services IAD-870",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Spotsylvania Co.",
      "permit_number": "74329-2",
      "permit_issuance_date": "03/26/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74331-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Westfax Property Owner A LP/Westfax 4-5A",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Fairfax Co.",
      "permit_number": "74331-1",
      "permit_issuance_date": "03/04/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74332-2",
      "evidence_type": "environmental_permit_record",
      "project_name": "Herndon Technology Partners LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Fairfax Co.",
      "permit_number": "74332-2",
      "permit_issuance_date": "07/31/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74333-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services Inc IAD-45",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Prince William Co.",
      "permit_number": "74333-1",
      "permit_issuance_date": "03/26/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74335-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "SDC Ashburn I - SE Parcel Campus",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74335-1",
      "permit_issuance_date": "03/20/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74336-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Word of Grace Data Center",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Fairfax Co.",
      "permit_number": "74336-1",
      "permit_issuance_date": "05/22/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74337-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services Inc IAD-170",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Loudoun Co.",
      "permit_number": "74337-1",
      "permit_issuance_date": "03/20/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74338-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Vantage Data Centers VA41 LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Stafford Co.",
      "permit_number": "74338-1",
      "permit_issuance_date": "05/12/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74341-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Clean Arc Data Centers - VA-1 Campus",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Caroline Co.",
      "permit_number": "74341-1",
      "permit_issuance_date": "07/02/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74342-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services Inc IAD-110/111/112/113",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Prince William Co.",
      "permit_number": "74342-1",
      "permit_issuance_date": "06/12/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74348-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "DataBank Data Center Culpeper LLC",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Culpeper Co.",
      "permit_number": "74348-1",
      "permit_issuance_date": "08/05/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "VIRGINIA-DEQ-74349-1",
      "evidence_type": "environmental_permit_record",
      "project_name": "Amazon Data Services Inc IAD-264",
      "utility_or_provider": "Virginia Department of Environmental Quality",
      "jurisdiction": "Virginia, US",
      "county_or_zone": "Prince William Co.",
      "permit_number": "74349-1",
      "permit_issuance_date": "07/29/2026",
      "program_type": "Article 6 - mNSR",
      "regional_office": "Northern",
      "status": "permit issued",
      "capacity_claims": [],
      "source_authority": "state environmental regulator",
      "source_url": "https://www.deq.virginia.gov/news-info/shortcuts/permits/air/issued-air-permits-for-data-centers",
      "capture_date": "2026-09-26",
      "source_scope": "Issued Air Permits for Data Centers",
      "notes": "Identity/regulatory record only; no uniform customer MW field is published in the listing. The page title states an Aug. 17, 2026 inventory while the table contains later 2026 permit dates; displayed permit dates are retained verbatim."
    },
    {
      "id": "AEP-GOOGLE-FORT-WAYNE-2026",
      "evidence_type": "named_utility_load_project",
      "project_name": "Google — Data Centers",
      "customer_or_developer": "Google",
      "utility_or_provider": "American Electric Power",
      "jurisdiction": "Indiana, US",
      "location": "Fort Wayne, IN",
      "status": "publicly identified in utility investor material",
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "capture_date": "2026-05-01",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-MICROSOFT-GRANGER-2026",
      "evidence_type": "named_utility_load_project",
      "project_name": "Microsoft — Data Centers",
      "customer_or_developer": "Microsoft",
      "utility_or_provider": "American Electric Power",
      "jurisdiction": "Indiana, US",
      "location": "Granger, IN",
      "status": "publicly identified in utility investor material",
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "capture_date": "2026-05-01",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-AWS-COLUMBUS-2026",
      "evidence_type": "named_utility_load_project",
      "project_name": "AWS — Data Centers",
      "customer_or_developer": "AWS",
      "utility_or_provider": "American Electric Power",
      "jurisdiction": "Ohio, US",
      "location": "Columbus, OH",
      "status": "publicly identified in utility investor material",
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "capture_date": "2026-05-01",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-SBENERGY-PIKETON-2026",
      "evidence_type": "named_utility_load_project",
      "project_name": "SB Energy — Data Center",
      "customer_or_developer": "SB Energy",
      "utility_or_provider": "American Electric Power",
      "jurisdiction": "Ohio, US",
      "location": "Piketon, OH",
      "status": "publicly identified in utility investor material",
      "capacity_claims": [
        {
          "value_mw": 10000,
          "unit": "MW",
          "raw_value": "10 GW Campus at Buildout",
          "qualifier": "campus at buildout"
        }
      ],
      "source_authority": "utility investor presentation",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "capture_date": "2026-05-01",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "notes": "AEP reports 10 GW campus at buildout; this is a planned campus-scale figure, not an energized-load measurement."
    },
    {
      "id": "AEP-GOOGLE-PUTNAM-2026",
      "evidence_type": "named_utility_load_project",
      "project_name": "Google — Data Centers",
      "customer_or_developer": "Google",
      "utility_or_provider": "American Electric Power",
      "jurisdiction": "West Virginia, US",
      "location": "Putnam County, WV",
      "status": "publicly identified in utility investor material",
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "capture_date": "2026-05-01",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-AWS-SHREVEPORT-2026",
      "evidence_type": "named_utility_load_project",
      "project_name": "AWS — Data Centers",
      "customer_or_developer": "AWS",
      "utility_or_provider": "American Electric Power",
      "jurisdiction": "Louisiana, US",
      "location": "Shreveport, LA",
      "status": "publicly identified in utility investor material",
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "capture_date": "2026-05-01",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-META-TULSA-2026",
      "evidence_type": "named_utility_load_project",
      "project_name": "Meta — Data Centers",
      "customer_or_developer": "Meta",
      "utility_or_provider": "American Electric Power",
      "jurisdiction": "Oklahoma, US",
      "location": "Tulsa, OK",
      "status": "publicly identified in utility investor material",
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "capture_date": "2026-05-01",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "AEP-LANCIUM-ABILENE-2026",
      "evidence_type": "named_utility_load_project",
      "project_name": "LANCIUM — Stargate Data Center",
      "customer_or_developer": "LANCIUM",
      "utility_or_provider": "American Electric Power",
      "jurisdiction": "Texas, US",
      "location": "Abilene, TX",
      "status": "publicly identified in utility investor material",
      "capacity_claims": [],
      "source_authority": "utility investor presentation",
      "source_url": "https://docs.aep.com/docs/newsroom/resources/earnings/2026-05/1Q26EarningsReleasePresentation.pdf",
      "capture_date": "2026-05-01",
      "source_scope": "AEP Q1 2026 Earnings Presentation",
      "notes": "AEP names the customer/project and location but marks the AEP load as not public. No MW is inferred."
    },
    {
      "id": "EEI-AWS-NEW-ALBANY-2026",
      "evidence_type": "named_large_load_project_from_industry_list",
      "project_name": "Amazon Web Services (AWS) — New Albany, OH",
      "customer_or_developer": "Amazon Web Services (AWS)",
      "utility_or_provider": "AEP Ohio",
      "jurisdiction": "Ohio, US",
      "location": "New Albany, OH",
      "status": "publicly announced project",
      "capacity_claims": [],
      "source_authority": "EEI public large-load project list",
      "source_url": "https://www.eei.org/-/media/Project/EEI/Documents/Issues%20and%20Policy/List%20of%20Large%20Customer%20Projects%20and%20Tariffs",
      "capture_date": "2026-04",
      "source_scope": "EEI Large Load Projects and Tariffs (April 2026)",
      "notes": "Industry compilation identifies the AWS data-center project and AEP Ohio service context; no project MW is stated in the cited row."
    },
    {
      "id": "EEI-GOOGLE-MORGAN-TOWNSHIP-2026",
      "evidence_type": "named_large_load_project_from_industry_list",
      "project_name": "Google — Morgan Township, IN",
      "customer_or_developer": "Google",
      "utility_or_provider": "AES Indiana",
      "jurisdiction": "Indiana, US",
      "location": "Morgan Township, IN",
      "status": "publicly announced project",
      "capacity_claims": [],
      "source_authority": "EEI public large-load project list",
      "source_url": "https://www.eei.org/-/media/Project/EEI/Documents/Issues%20and%20Policy/List%20of%20Large%20Customer%20Projects%20and%20Tariffs",
      "capture_date": "2026-04",
      "source_scope": "EEI Large Load Projects and Tariffs (April 2026)",
      "notes": "Industry compilation identifies the Google data-center project. A 700 MW natural-gas option in an IRP is not treated as the data-center load."
    },
    {
      "id": "GA-OPENAI-CAMELLIA-2026",
      "evidence_type": "named_utility_contract_project",
      "project_name": "Project Camellia",
      "customer_or_developer": "OpenAI",
      "utility_or_provider": "Georgia Power",
      "jurisdiction": "Georgia, US",
      "county_or_zone": "Effingham County",
      "location": "Savannah Gateway Industrial Hub / Effingham County",
      "status": "contract approved / project announced",
      "capacity_claims": [
        {
          "value_mw": 3200,
          "unit": "MW",
          "raw_value": "3,200 megawatts",
          "qualifier": "Georgia Power announcement: new demand under 25-year agreement",
          "source_url": "https://www.georgiapower.com/news-hub/press-releases/contract-openai-approved-part-portfolio-delivering-950-million-annual-savings.html",
          "capture_date": "2026-08-26"
        },
        {
          "value_mw": 3210,
          "unit": "MW",
          "raw_value": "3,210 MW",
          "qualifier": "Georgia PSC public contract summary cover letter",
          "source_url": "https://services.psc.ga.gov/api/v1/External/Public/Get/Document/DownloadFile/228337/109582",
          "capture_date": "2026-09-08"
        }
      ],
      "source_authority": "utility + state public service commission",
      "source_url": "https://psc.ga.gov/search/facts-document/?documentId=228337",
      "capture_date": "2026-09-26",
      "source_scope": "Georgia PSC Docket 44280, Filing 228337 plus Georgia Power public announcement",
      "notes": "Both dated primary-source figures are preserved as separate raw claims; neither is silently substituted for the other. The filing cover letter states the public summary is for a 3,210 MW electric-service contract."
    },
    {
      "id": "ENTERGY-HUT8-RIVER-BEND-2025",
      "evidence_type": "named_utility_service_project",
      "project_name": "River Bend AI data center campus",
      "customer_or_developer": "Hut 8 / Fluidstack",
      "utility_or_provider": "Entergy Louisiana",
      "jurisdiction": "Louisiana, US",
      "county_or_zone": "West Feliciana Parish",
      "location": "Southeast Louisiana / River Bend",
      "status": "under construction; operations expected Q2 2027",
      "capacity_claims": [
        {
          "value_mw": 330,
          "unit": "MW",
          "raw_value": "330 megawatts",
          "qualifier": "initial utility capacity",
          "source_url": "https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
          "capture_date": "2025-12-17"
        },
        {
          "value_mw": 245,
          "unit": "MW",
          "raw_value": "245 MW",
          "qualifier": "critical IT load",
          "source_url": "https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
          "capture_date": "2025-12-17"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "up to 1,000 MW",
          "qualifier": "potential utility-capacity scale",
          "source_url": "https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
          "capture_date": "2025-12-17"
        }
      ],
      "source_authority": "utility primary source",
      "source_url": "https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center",
      "capture_date": "2026-09-26",
      "source_scope": "Entergy project announcement",
      "notes": "Utility capacity, critical IT load and potential future utility scale are preserved as distinct measures."
    },
    {
      "id": "ALECTRA-VAUGHAN-MTS6-2026",
      "evidence_type": "named_distribution_connection_project",
      "project_name": "Vaughan MTS #6 / undisclosed data-center customer",
      "customer_or_developer": "Undisclosed Alectra customer",
      "utility_or_provider": "Alectra Utilities",
      "jurisdiction": "Ontario, Canada",
      "location": "Langstaff Road / Highway 27 area, Vaughan",
      "status": "planned",
      "planned_in_service": "2027",
      "capacity_claims": [
        {
          "value_mva": 108,
          "unit": "MVA",
          "raw_value": "108 MVA",
          "qualifier": "current Alectra project page: customer maximum demand",
          "source_url": "https://alectrautilities.com/VaughanMTS6",
          "capture_date": "2026-09-26"
        },
        {
          "value_mva": 125,
          "unit": "MVA",
          "raw_value": "125MVA",
          "qualifier": "2025 Alectra distribution-system-plan report",
          "source_url": "https://alectrautilities.com/sites/default/files/assets/pdf/OEB_file_regulatory_affairs/alectra_exhibit-2a_distribution-system-plan_part-5-of-5_redacted_20251027.pdf",
          "capture_date": "2025-10-27"
        }
      ],
      "source_authority": "distribution utility primary sources",
      "source_url": "https://alectrautilities.com/VaughanMTS6",
      "capture_date": "2026-09-26",
      "source_scope": "Alectra Vaughan MTS #6 project page and OEB-filed distribution-system plan",
      "notes": "Two dated primary sources report 108 MVA and 125 MVA. Both are retained; MVA is not converted to MW."
    },
    {
      "id": "AESO-P3066-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Leedale Data Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Caroline",
      "county_or_zone": "Caroline",
      "queue_id": "P3066",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 1864,
          "unit": "MW",
          "raw_value": "1864",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3198-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Lynx Data Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Fort Saskatchewan",
      "county_or_zone": "Fort Saskatchewan",
      "queue_id": "P3198",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 1800,
          "unit": "MW",
          "raw_value": "1800",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2970-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Beacon Langdon A.I. Hub 2 Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P2970",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3108-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Wild Rose Power Hub Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P3108",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 1300,
          "unit": "MW",
          "raw_value": "1300",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3109-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Newell Data Center MPC Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Brooks",
      "county_or_zone": "Brooks",
      "queue_id": "P3109",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2942-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Genesee Data Center 1 MPC Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P2942",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2936-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "GLDC Load Phase 1.1",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Fort Saskatchewan",
      "county_or_zone": "Fort Saskatchewan",
      "queue_id": "P2936",
      "status": "Active",
      "capacity_claims": [
        {
          "value_mw": 970,
          "unit": "MW",
          "raw_value": "970",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3101-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Carstairs Technology Park MPC Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Didsbury",
      "county_or_zone": "Didsbury",
      "queue_id": "P3101",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 950,
          "unit": "MW",
          "raw_value": "950",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3102-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Goldfinch Technology Park MPC Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Strathmore/Blackie",
      "county_or_zone": "Strathmore/Blackie",
      "queue_id": "P3102",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 950,
          "unit": "MW",
          "raw_value": "950",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3151-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "GLDC Load Phase 1.2",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Fort Saskatchewan",
      "county_or_zone": "Fort Saskatchewan",
      "queue_id": "P3151",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 830,
          "unit": "MW",
          "raw_value": "830",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3116-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Rocky View Data Center MPC Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P3116",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 800,
          "unit": "MW",
          "raw_value": "800",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3137-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Sheerness Data MPC Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Sheerness",
      "county_or_zone": "Sheerness",
      "queue_id": "P3137",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 800,
          "unit": "MW",
          "raw_value": "800",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2946-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Genesee Data Center 2 MPC Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P2946",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 500,
          "unit": "MW",
          "raw_value": "500",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3095-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Keephills Data Centre Phase 2",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P3095",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 466,
          "unit": "MW",
          "raw_value": "466",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3112-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "North Calgary Three Data Centre MPC Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P3112",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 450,
          "unit": "MW",
          "raw_value": "450",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3136-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Sundance Data MPC Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P3136",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 401,
          "unit": "MW",
          "raw_value": "401",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2926-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Beacon Foothills A.I. Hub Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "High River",
      "county_or_zone": "High River",
      "queue_id": "P2926",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2927-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Beacon Harry Smith A.I. Hub Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P2927",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2928-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Beacon Langdon A.I. Hub Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P2928",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2934-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Beacon Heartland A.I. Hub Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Fort Saskatchewan",
      "county_or_zone": "Fort Saskatchewan",
      "queue_id": "P2934",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P2935-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Beacon Saunders Lake A.I. Hub Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Edmonton",
      "county_or_zone": "Edmonton",
      "queue_id": "P2935",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3106-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Alberta South A.I. Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Lethbridge",
      "county_or_zone": "Lethbridge",
      "queue_id": "P3106",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3107-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Chestermere Enterprise A.I. Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P3107",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3175-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Beacon Heartland Data Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Fort Saskatchewan",
      "county_or_zone": "Fort Saskatchewan",
      "queue_id": "P3175",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 400,
          "unit": "MW",
          "raw_value": "400",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3156-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "High Plains East Industrial Park",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Calgary",
      "county_or_zone": "Calgary",
      "queue_id": "P3156",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3110-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Mihta Askiy Data Load",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Peace River",
      "county_or_zone": "Peace River",
      "queue_id": "P3110",
      "status": "ISD Under Review",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3083-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Keephills Data Centre Phase 1.1",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P3083",
      "status": "Project appears in current registry",
      "capacity_claims": [
        {
          "value_mw": 230,
          "unit": "MW",
          "raw_value": "230",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "AESO-P3152-PROJECT",
      "evidence_type": "aeso_data_load_project_record",
      "project_name": "Keephills Data Centre Phase 1.2",
      "utility_or_provider": "Alberta Electric System Operator",
      "jurisdiction": "Alberta, Canada",
      "location": "Wabamun",
      "county_or_zone": "Wabamun",
      "queue_id": "P3152",
      "status": "Project appears in current registry",
      "capacity_claims": [
        {
          "value_mw": 165,
          "unit": "MW",
          "raw_value": "165",
          "qualifier": "DTS / contract-capacity figure shown by current Connection Project List mirror"
        }
      ],
      "source_authority": "secondary extraction of AESO Connection Project List",
      "source_url": "https://gridlens.ca/queue",
      "official_source_url": "https://www.aeso.ca/grid/transmission-projects/connection-project-reporting/",
      "capture_date": "2026-09-26",
      "source_scope": "Current AESO Connection Project List",
      "notes": "Project identity, town/planning area and DTS value are exposed in the current public Connection Project List mirror. Customer/proponent is not disclosed in the retained public row; no customer name is inferred. DTS is a contract-capacity change, not a guaranteed current site demand."
    },
    {
      "id": "IESO-2026-917-PROJECT",
      "evidence_type": "ieso_load_application_record",
      "project_name": "Port Hope TS - Load Increase",
      "customer_or_developer": "HYDRO ONE NETWORKS INC.",
      "utility_or_provider": "Independent Electricity System Operator",
      "jurisdiction": "Ontario, Canada",
      "location": "East",
      "status": "Active",
      "planned_in_service": "2028-Q1",
      "capacity_claims": [
        {
          "value_mw": 45,
          "unit": "MW",
          "raw_value": "45 MW",
          "qualifier": "New load facility"
        }
      ],
      "source_authority": "IESO primary source",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "capture_date": "2026-09-26",
      "source_scope": "Application Status, last updated 2026-09-10",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "IESO-2026-913-PROJECT",
      "evidence_type": "ieso_load_application_record",
      "project_name": "St. Clair Technology Centre",
      "customer_or_developer": "TRUENORTH SUSTAINABLE INFRASTRUCTURE INC.",
      "utility_or_provider": "Independent Electricity System Operator",
      "jurisdiction": "Ontario, Canada",
      "location": "West",
      "status": "Active",
      "planned_in_service": "2028-Q3",
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200 MW",
          "qualifier": "New load facility"
        }
      ],
      "source_authority": "IESO primary source",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "capture_date": "2026-09-26",
      "source_scope": "Application Status, last updated 2026-09-10",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "IESO-2026-911-PROJECT",
      "evidence_type": "ieso_load_application_record",
      "project_name": "Mana Industrial Facility Expansion",
      "customer_or_developer": "Max Aicher North America Ltd.",
      "utility_or_provider": "Independent Electricity System Operator",
      "jurisdiction": "Ontario, Canada",
      "location": "Southwest",
      "status": "Active",
      "planned_in_service": "2028-Q3",
      "capacity_claims": [
        {
          "value_mw": 95,
          "unit": "MW",
          "raw_value": "95 MW",
          "qualifier": "New load facility"
        }
      ],
      "source_authority": "IESO primary source",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "capture_date": "2026-09-26",
      "source_scope": "Application Status, last updated 2026-09-10",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "IESO-2026-907-PROJECT",
      "evidence_type": "ieso_load_application_record",
      "project_name": "Marionville DS: New Transformer T2",
      "customer_or_developer": "HYDRO ONE NETWORKS INC.",
      "utility_or_provider": "Independent Electricity System Operator",
      "jurisdiction": "Ontario, Canada",
      "location": "Ottawa",
      "status": "Active",
      "planned_in_service": "2027-Q4",
      "capacity_claims": [
        {
          "value_mw": 23.2,
          "unit": "MW",
          "raw_value": "23.2 MW",
          "qualifier": "Increase load"
        }
      ],
      "source_authority": "IESO primary source",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "capture_date": "2026-09-26",
      "source_scope": "Application Status, last updated 2026-09-10",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "IESO-2026-903-PROJECT",
      "evidence_type": "ieso_load_application_record",
      "project_name": "Project IQ197",
      "customer_or_developer": "197 McKay Barrie Corp",
      "utility_or_provider": "Independent Electricity System Operator",
      "jurisdiction": "Ontario, Canada",
      "location": "Essa",
      "status": "Active",
      "planned_in_service": "2027-Q4",
      "capacity_claims": [
        {
          "value_mw": 1380,
          "unit": "MW",
          "raw_value": "1380 MW",
          "qualifier": "New load facility"
        }
      ],
      "source_authority": "IESO primary source",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "capture_date": "2026-09-26",
      "source_scope": "Application Status, last updated 2026-09-10",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "IESO-2026-902-PROJECT",
      "evidence_type": "ieso_load_application_record",
      "project_name": "Tahoe Blvd Load Center",
      "customer_or_developer": "ALECTRA UTILITIES CORPORATION",
      "utility_or_provider": "Independent Electricity System Operator",
      "jurisdiction": "Ontario, Canada",
      "location": "Toronto",
      "status": "Active",
      "planned_in_service": "2028-Q2",
      "capacity_claims": [
        {
          "value_mw": 25,
          "unit": "MW",
          "raw_value": "25 MW",
          "qualifier": "Increase load"
        }
      ],
      "source_authority": "IESO primary source",
      "source_url": "https://ieso.ca/Sector-Participants/Connection-Process/Application-Status",
      "capture_date": "2026-09-26",
      "source_scope": "Application Status, last updated 2026-09-10",
      "notes": "Official IESO application-status record. The page states it covers connection proposals that submitted an application package and executed the required agreement; technical feasibility reports may be confidential. This record is not asserted to be a data center unless the public project name/source says so."
    },
    {
      "id": "NYISO-1670-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "Lake Mariner Data II",
      "customer_or_developer": "Lake Mariner Data LLC",
      "utility_or_provider": "NYSEG",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1670",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": "Kintigh 345kV Substation",
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1732-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "Wulf Compute Data Center II",
      "customer_or_developer": "TeraWulf Brookings LLC",
      "utility_or_provider": "NYSEG",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1732",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": "Kintigh 345kV Substation",
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1733-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "Cayuga Data",
      "customer_or_developer": "Cayuga Operating Company LLC",
      "utility_or_provider": "NYISO / transmission owner not retained in current extraction",
      "jurisdiction": "New York, US",
      "location": "Cayuga",
      "county_or_zone": "Cayuga",
      "queue_id": "1733",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 162,
          "unit": "MW",
          "raw_value": "162 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": "Milliken 115kV Substation",
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1683-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "Cayuga Compute",
      "customer_or_developer": "Cayuga Operating Company LLC",
      "utility_or_provider": "NYISO / transmission owner not retained in current extraction",
      "jurisdiction": "New York, US",
      "location": "Cayuga",
      "county_or_zone": "Cayuga",
      "queue_id": "1683",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 88,
          "unit": "MW",
          "raw_value": "88 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": "Milliken 115kV Substation",
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1731-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "New York State Artificial Intelligence Data Center ZeroC",
      "customer_or_developer": "ZeroC Data Centers, LLC",
      "utility_or_provider": "NYISO / transmission owner not retained in current extraction",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1731",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": null,
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1744-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "Brookhaven Data Center",
      "customer_or_developer": "Brookhaven Logistics Center, LLC",
      "utility_or_provider": "NYISO / transmission owner not retained in current extraction",
      "jurisdiction": "New York, US",
      "location": "Suffolk",
      "county_or_zone": "Suffolk",
      "queue_id": "1744",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": null,
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1736-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "Ranalli SuperDC",
      "customer_or_developer": "Ranalli SuperDC LLC",
      "utility_or_provider": "NYISO / transmission owner not retained in current extraction",
      "jurisdiction": "New York, US",
      "location": "Onondaga",
      "county_or_zone": "Onondaga",
      "queue_id": "1736",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 270,
          "unit": "MW",
          "raw_value": "270 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": null,
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1745-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "Pontoon Bridge Road Data Center",
      "customer_or_developer": "American Data Center Partners LLC",
      "utility_or_provider": "NYISO / transmission owner not retained in current extraction",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1745",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": null,
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1752-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "Broome County Tech Park",
      "customer_or_developer": "The Agency",
      "utility_or_provider": "NYISO / transmission owner not retained in current extraction",
      "jurisdiction": "New York, US",
      "location": "Broome",
      "county_or_zone": "Broome",
      "queue_id": "1752",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": null,
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1465-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "Digihost load",
      "customer_or_developer": "Digihost Technologies, Inc.",
      "utility_or_provider": "National Grid",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1465",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 50.2,
          "unit": "MW",
          "raw_value": "50.2 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": "Walck Road 115 kV substation",
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-0776-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "Greenidge Load",
      "customer_or_developer": "Greenidge Generation LLC",
      "utility_or_provider": "NYSEG",
      "jurisdiction": "New York, US",
      "location": "Yates",
      "county_or_zone": "Yates",
      "queue_id": "0776",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": "Greenidge 115kV",
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "NYISO-1646-LOAD-PROJECT",
      "evidence_type": "nyiso_load_project_site_record",
      "project_name": "POWI Project",
      "customer_or_developer": "P&M Brick LLC",
      "utility_or_provider": "National Grid",
      "jurisdiction": "New York, US",
      "location": "Albany",
      "county_or_zone": "Albany",
      "queue_id": "1646",
      "status": "public queue load project",
      "capacity_claims": [
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50 MW",
          "qualifier": "NYISO load-project queue value"
        }
      ],
      "poi_substation": "New Scotland to Knickerbocker 345kV line",
      "source_authority": "NYISO primary + independent public queue reading",
      "source_url": "https://www.nyiso.com/interconnections",
      "source_urls": [
        "https://www.nyiso.com/interconnections",
        "https://www.interconnection.fyi/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "NYISO Load Projects population / public queue mirrors",
      "notes": "Named load project connected to a New York county/site or point of interconnection. Current accessible third-party project pages reproduce queue identifiers, capacity and site/POI fields; official NYISO publishes the underlying interconnection queue workbook but automated retrieval of that workbook is blocked in the current environment. No IA status is inferred from a queue presence."
    },
    {
      "id": "BPA-OPEN-RANGE",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Open Range",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Adams County, WA",
      "county_or_zone": "Adams County",
      "queue_id": "L0705",
      "status": "RECEIVED",
      "filed_month": "2026-08",
      "capacity_claims": [
        {
          "value_mw": 3300,
          "unit": "MW",
          "raw_value": "3.3 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 3300,
          "unit": "MW",
          "raw_value": "3300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        46.99,
        -117.16
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Lower Monumental-Hanford No 1 Lower Monumental-Ashe No 1 Grand Coulee-Hanford No 1"
    },
    {
      "id": "BPA-DOE-DATA-CENTER",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "DOE Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0673",
      "status": "STUDY",
      "filed_month": "2025-11",
      "capacity_claims": [
        {
          "value_mw": 2800,
          "unit": "MW",
          "raw_value": "2.8 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 2750,
          "unit": "MW",
          "raw_value": "2750 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        46.24,
        -119.51
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Ashe Substation"
    },
    {
      "id": "BPA-LONGHORN-MCNARY-LOOP",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Longhorn-McNary 230 kV Loop",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla and Morrow, OR",
      "county_or_zone": "Umatilla and Morrow",
      "queue_id": "L0653",
      "status": "STUDY",
      "filed_month": "2025-06",
      "capacity_claims": [
        {
          "value_mw": 2200,
          "unit": "MW",
          "raw_value": "2.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 2225,
          "unit": "MW",
          "raw_value": "2225 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.57,
        -118.92
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Longhorn Substation, McNary Substation"
    },
    {
      "id": "BPA-NW-HILLSBORO-NORTH-PLAINS-PH2",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2)",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Washington County, OR",
      "county_or_zone": "Washington County",
      "queue_id": "L0561",
      "status": "STUDY",
      "filed_month": "2023-05",
      "capacity_claims": [
        {
          "value_mw": 1800,
          "unit": "MW",
          "raw_value": "1.8 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1800,
          "unit": "MW",
          "raw_value": "1800 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.55,
        -123.1
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Allston-Keeler No. 1"
    },
    {
      "id": "BPA-CAC-GREEN-H2",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "CAC Green H2 Facility",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Columbia County, WA",
      "county_or_zone": "Columbia County",
      "queue_id": null,
      "status": "withdrawn",
      "filed_month": "2023-03",
      "capacity_claims": [
        {
          "value_mw": 1600,
          "unit": "MW",
          "raw_value": "1.6 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "map_point": [
        46.3,
        -117.91
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-PACIFIC-WEST-COAST-CABLE",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Pacific West Coast Cable",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Columbia County, OR",
      "county_or_zone": "Columbia County",
      "queue_id": null,
      "status": "withdrawn",
      "filed_month": "2005-11",
      "capacity_claims": [
        {
          "value_mw": 1600,
          "unit": "MW",
          "raw_value": "1.6 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "map_point": [
        45.98,
        -123.1
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-MCNARY-230KV-SUBSTATION",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "McNary 230 kV Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Linn County, OR",
      "county_or_zone": "Linn County",
      "queue_id": "L0585",
      "status": "STUDY",
      "filed_month": "2023-11",
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1.4 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1450,
          "unit": "MW",
          "raw_value": "1450 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        44.5,
        -122.5
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "McNary Substation"
    },
    {
      "id": "BPA-WEST-HILLSBORO-DATA-CENTER-PH1",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "West Hillsboro Data Center Project (Phase 1)",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Washington County, OR",
      "county_or_zone": "Washington County",
      "queue_id": "L0560",
      "status": "STUDY",
      "filed_month": "2023-05",
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1.4 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1400 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.55,
        -123.1
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Keeler-Forest Grove No. 1 & No. 2 Lines"
    },
    {
      "id": "BPA-LAKESIDE-INDUSTRIES",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Lakeside Industries",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Klickitat County, WA",
      "county_or_zone": "Klickitat County",
      "queue_id": "L0690",
      "status": "RECEIVED",
      "filed_month": "2026-03",
      "capacity_claims": [
        {
          "value_mw": 1300,
          "unit": "MW",
          "raw_value": "1.3 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1260,
          "unit": "MW",
          "raw_value": "1260 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.87,
        -120.8
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Big Eddy Substation"
    },
    {
      "id": "BPA-MCNARY-230KV-LOOPED",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "McNary 230 kV Looped",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0636",
      "status": "STUDY",
      "filed_month": "2024-11",
      "capacity_claims": [
        {
          "value_mw": 1300,
          "unit": "MW",
          "raw_value": "1.3 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1256,
          "unit": "MW",
          "raw_value": "1256 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.59,
        -118.33
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "McNary Substation"
    },
    {
      "id": "BPA-SSP-SUNSET",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "SSP-Sunset",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Yakima County, WA",
      "county_or_zone": "Yakima County",
      "queue_id": "L0684",
      "status": "STUDY",
      "filed_month": "2026-02",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        46.46,
        -120.74
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Wautoma-Rock Creek No. 1 line or Spring Creek-Wine Country No. 1 line"
    },
    {
      "id": "BPA-SECOND-1200MW-DATA-CENTER-LOAD",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Second 1200 MW Data Center Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Walla Walla County, WA",
      "county_or_zone": "Walla Walla County",
      "queue_id": "L0682",
      "status": "RECEIVED",
      "filed_month": "2026-01",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        46.23,
        -118.48
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Lower Monumental-McNary No. 1 line"
    },
    {
      "id": "BPA-1200MW-DATA-CENTER-LOADS",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "1200 MW Data Center Loads",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Walla Walla County, WA",
      "county_or_zone": "Walla Walla County",
      "queue_id": "L0649",
      "status": "STUDY",
      "filed_month": "2025-04",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1200 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        46.23,
        -118.48
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Between #37/1 & 32/1 on the Lower Monumental-McNary line"
    },
    {
      "id": "BPA-PSE-CHERRY-POINT",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "PSE Cherry Point",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Whatcom County, WA",
      "county_or_zone": "Whatcom County",
      "queue_id": null,
      "status": "withdrawn",
      "filed_month": "2013-06",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "map_point": [
        48.82,
        -122.47
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-INDUSTRIAL-LOAD-PHASE-2",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Industrial Load Phase 2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Morrow County, OR",
      "county_or_zone": "Morrow County",
      "queue_id": null,
      "status": "withdrawn",
      "filed_month": "2016-02",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1.2 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "map_point": [
        45.45,
        -119.53
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-CASCADE-RENEWABLE-HVDC",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Cascade Renewable Transmission Project - HVDC",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Wasco County, OR",
      "county_or_zone": "Wasco County",
      "queue_id": null,
      "status": "active",
      "filed_month": "2021-06",
      "capacity_claims": [
        {
          "value_mw": 1100,
          "unit": "MW",
          "raw_value": "1.1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "map_point": [
        45.18,
        -121.17
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-SIXMILE-CANYON-500KV",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Sixmile Canyon 500kV Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla County, OR",
      "county_or_zone": "Umatilla County",
      "queue_id": null,
      "status": "withdrawn",
      "filed_month": "2022-03",
      "capacity_claims": [
        {
          "value_mw": 1100,
          "unit": "MW",
          "raw_value": "1.1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "map_point": [
        45.65,
        -118.68
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-VINES-REST",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Vines Rest 1000 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Klickitat County, WA",
      "county_or_zone": "Klickitat County",
      "queue_id": "L0704",
      "status": "RECEIVED",
      "filed_month": "2026-07",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.87,
        -120.8
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "McNary-John Day No. 1 line McNary-John Day No. 2 line"
    },
    {
      "id": "BPA-ENERGIZER-II",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Energizer II",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Klickitat County, WA",
      "county_or_zone": "Klickitat County",
      "queue_id": "L0702",
      "status": "RECEIVED",
      "filed_month": "2026-06",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.87,
        -120.8
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Rock Creek Substation at"
    },
    {
      "id": "BPA-DALLESPORT-SERVER-FARM",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Dallesport Server Farm",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Klickitat County, WA",
      "county_or_zone": "Klickitat County",
      "queue_id": "L0664",
      "status": "STUDY",
      "filed_month": "2025-08",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.87,
        -120.8
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Big Eddy Substation or Big Eddy-Chenowith No. 2 line"
    },
    {
      "id": "BPA-TWO-RIVERS-230KV",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Two Rivers 230 kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla, OR",
      "county_or_zone": "Umatilla",
      "queue_id": "L0660",
      "status": "STUDY",
      "filed_month": "2025-07",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.59,
        -118.33
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "McNary Substation"
    },
    {
      "id": "BPA-MARION-CHEMAWA",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Marion-Chemawa",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Marion, OR",
      "county_or_zone": "Marion",
      "queue_id": null,
      "status": "active",
      "filed_month": "2025-01",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "map_point": [
        44.92,
        -122.8
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-SIX-MILE-CANYON-SUBSTATION",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Six Mile Canyon Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla County, OR",
      "county_or_zone": "Umatilla County",
      "queue_id": "L0510",
      "status": "CONST AGRMT EXE",
      "filed_month": "2021-12",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.65,
        -118.68
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "BPA's Ashe - Slatt No.1 line"
    },
    {
      "id": "BPA-KEELER-SUBSTATION",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Keeler Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Washington County, OR",
      "county_or_zone": "Washington County",
      "queue_id": "L0452",
      "status": "CONST AGRMT EXE",
      "filed_month": "2018-09",
      "capacity_claims": [
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1 GW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 1000,
          "unit": "MW",
          "raw_value": "1000 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.55,
        -123.1
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "BPA's Keeler Substation"
    },
    {
      "id": "BPA-YELLOW-ROSEBUSH",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Yellow Rosebush",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Wasco, OR",
      "county_or_zone": "Wasco",
      "queue_id": "L0699",
      "status": "STUDY",
      "filed_month": "2026-06",
      "capacity_claims": [
        {
          "value_mw": 970,
          "unit": "MW",
          "raw_value": "970 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 970,
          "unit": "MW",
          "raw_value": "970 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.18,
        -121.17
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Buckley Substation or Buckley-Marion No. 1 line or Ashe-Marion No. 2 line."
    },
    {
      "id": "BPA-STACK-IPI-DATA-CENTER",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Stack IPI Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Klickitat County, WA",
      "county_or_zone": "Klickitat County",
      "queue_id": "L0545",
      "status": "STUDY",
      "filed_month": "2022-12",
      "capacity_claims": [
        {
          "value_mw": 958,
          "unit": "MW",
          "raw_value": "958 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 958,
          "unit": "MW",
          "raw_value": "958 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.87,
        -120.8
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "RKCR-JDAY-1 or MCNY-ROSS-2 near Harvalum Substation"
    },
    {
      "id": "BPA-PLYMOUTH-950MW",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Plymouth 950 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0703",
      "status": "RECEIVED",
      "filed_month": "2026-07",
      "capacity_claims": [
        {
          "value_mw": 950,
          "unit": "MW",
          "raw_value": "950 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 950,
          "unit": "MW",
          "raw_value": "950 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        46.24,
        -119.51
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "McNary-John Day No. 2 line or McNary-Ross No. 1 line or McNary-Horse Heaven No. 1"
    },
    {
      "id": "BPA-WEST-RICHLAND-DATA-CENTER",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "West Richland Data Center Campus",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0621",
      "status": "STUDY",
      "filed_month": "2024-09",
      "capacity_claims": [
        {
          "value_mw": 912,
          "unit": "MW",
          "raw_value": "912 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 912,
          "unit": "MW",
          "raw_value": "912 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        46.24,
        -119.51
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Ashe-Slatt No 1 line; Ashe-Marion No 2 line"
    },
    {
      "id": "BPA-PLYMOUTH-DATA-CENTER-CAMPUS",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Plymouth Data Center Campus",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": null,
      "status": "withdrawn",
      "filed_month": "2024-09",
      "capacity_claims": [
        {
          "value_mw": 864,
          "unit": "MW",
          "raw_value": "864 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "map_point": [
        46.24,
        -119.51
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-WIND-RIVER-PLYMOUTH",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Wind River - Plymouth 230 kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0685",
      "status": "STUDY",
      "filed_month": "2026-02",
      "capacity_claims": [
        {
          "value_mw": 800,
          "unit": "MW",
          "raw_value": "800 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 800,
          "unit": "MW",
          "raw_value": "800 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        46.24,
        -119.51
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "McNary-John Day No. 2 line"
    },
    {
      "id": "BPA-LONGHORN-230KV-SUBSTATION",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Longhorn 230 kV Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Linn County, OR",
      "county_or_zone": "Linn County",
      "queue_id": "L0586",
      "status": "STUDY",
      "filed_month": "2023-11",
      "capacity_claims": [
        {
          "value_mw": 750,
          "unit": "MW",
          "raw_value": "750 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 750,
          "unit": "MW",
          "raw_value": "750 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        44.5,
        -122.5
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Longhorn Substation"
    },
    {
      "id": "BPA-WOODBURN-700MW",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Woodburn 700 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Marion, OR",
      "county_or_zone": "Marion",
      "queue_id": "L0659",
      "status": "STUDY",
      "filed_month": "2025-07",
      "capacity_claims": [
        {
          "value_mw": 700,
          "unit": "MW",
          "raw_value": "700 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 700,
          "unit": "MW",
          "raw_value": "700 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        44.92,
        -122.8
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "Big Eddy-Chemawa No 1 line"
    },
    {
      "id": "BPA-PARS-CLATSKANIE",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "PARS - Clatskanie",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Oregon, US",
      "location": "Columbia County, OR",
      "county_or_zone": "Columbia County",
      "queue_id": "L0701",
      "status": "RECEIVED",
      "filed_month": "2026-06",
      "capacity_claims": [
        {
          "value_mw": 680,
          "unit": "MW",
          "raw_value": "680 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        },
        {
          "value_mw": 680,
          "unit": "MW",
          "raw_value": "680 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "map_point": [
        45.98,
        -123.1
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests. Current cross-check adds BPA request ID and POI/status from Substation Scout's reproduction of the BPA published spreadsheet; the source explicitly says requested MW are as filed and not study results or entitlements.",
      "poi_substation": "TBD"
    },
    {
      "id": "BPA-ROZA",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Roza",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Kittitas County, WA",
      "county_or_zone": "Kittitas County",
      "queue_id": null,
      "status": "energized",
      "filed_month": "2022-12",
      "capacity_claims": [
        {
          "value_mw": 630,
          "unit": "MW",
          "raw_value": "630 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "map_point": [
        47.1,
        -120.68
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-DPUD-DATA-CENTER",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "DPUD Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration / Watt Street secondary normalization",
      "jurisdiction": "Washington, US",
      "location": "Chelan County, WA",
      "county_or_zone": "Chelan County",
      "queue_id": null,
      "status": "withdrawn",
      "filed_month": "2025-12",
      "capacity_claims": [
        {
          "value_mw": 600,
          "unit": "MW",
          "raw_value": "600 MW",
          "qualifier": "Watt Street large-load ledger request capacity"
        }
      ],
      "source_authority": "secondary normalization of public BPA load-queue data",
      "source_url": "https://www.wattstreet.net/load-ledger/",
      "capture_date": "2026-09-22",
      "source_scope": "BPA largest requests publicly displayed by Watt Street",
      "map_point": [
        47.87,
        -120.61
      ],
      "map_precision": "county display point",
      "notes": "Public secondary cross-reference of a BPA large-load request. The displayed BPA ledger does not identify this as a data center unless the project name itself does so. Capacity is requested load, not contracted or energized demand. Transmission/substation names are retained because the source classifies them as large-load requests."
    },
    {
      "id": "BPA-LARGE-L0661",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Steelhead 230 kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Oregon, US",
      "location": "Morrow County, OR",
      "county_or_zone": "Morrow County",
      "queue_id": "L0661",
      "poi_substation": "Sixmile Canyon Substation at",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 600,
          "unit": "MW",
          "raw_value": "600 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0201",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Juan de Fuca HVDC (Port Angeles)",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Clallam County, WA",
      "county_or_zone": "Clallam County",
      "queue_id": "L0201",
      "poi_substation": "Port Angeles",
      "status": "STUDY COMPLETED",
      "capacity_claims": [
        {
          "value_mw": 550,
          "unit": "MW",
          "raw_value": "550 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0202",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Juan de Fuca HVDC (Fairmount)",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Jefferson County, WA",
      "county_or_zone": "Jefferson County",
      "queue_id": "L0202",
      "poi_substation": "Fairmount",
      "status": "STUDY COMPLETED",
      "capacity_claims": [
        {
          "value_mw": 550,
          "unit": "MW",
          "raw_value": "550 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0482",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Morrow Flat_Longhorn",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla County, OR",
      "county_or_zone": "Umatilla County",
      "queue_id": "L0482",
      "poi_substation": "Morrow Flat Substation",
      "status": "ENERGIZED",
      "capacity_claims": [
        {
          "value_mw": 500,
          "unit": "MW",
          "raw_value": "500 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0674",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Starbuck 500 MW",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Columbia County, WA",
      "county_or_zone": "Columbia County",
      "queue_id": "L0674",
      "poi_substation": "Central Ferry-Lower Monumental No. 1 line",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 500,
          "unit": "MW",
          "raw_value": "500 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0499",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Project Pivot and Specialized",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla County, OR",
      "county_or_zone": "Umatilla County",
      "queue_id": "L0499",
      "poi_substation": "McNary Substation",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 484,
          "unit": "MW",
          "raw_value": "484 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0389",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Industrial Load",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Oregon, US",
      "location": "Morrow County, OR",
      "county_or_zone": "Morrow County",
      "queue_id": "L0389",
      "poi_substation": "Mcnary Substation or Morrow Flat Substation",
      "status": "ENERGIZED",
      "capacity_claims": [
        {
          "value_mw": 450,
          "unit": "MW",
          "raw_value": "450 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0481",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "McNary 230kV",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Oregon, US",
      "location": "Umatilla County, OR",
      "county_or_zone": "Umatilla County",
      "queue_id": "L0481",
      "poi_substation": "McNary , Bay 28",
      "status": "CONST AGRMT EXE",
      "capacity_claims": [
        {
          "value_mw": 450,
          "unit": "MW",
          "raw_value": "450 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0417",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Boundary Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Pend Oreille County, WA",
      "county_or_zone": "Pend Oreille County",
      "queue_id": "L0417",
      "poi_substation": "Boundary Substation",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 370,
          "unit": "MW",
          "raw_value": "370 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0534",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Atlas Agro",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0534",
      "poi_substation": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line",
      "status": "STUDY COMPLETED",
      "capacity_claims": [
        {
          "value_mw": 350,
          "unit": "MW",
          "raw_value": "350 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0380",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Network Load Expansion 3",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Oregon, US",
      "location": "Wasco County, OR",
      "county_or_zone": "Wasco County",
      "queue_id": "L0380",
      "poi_substation": "Chenoweth Substation",
      "status": "ENERGIZED",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0433",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Network Load Expansion 4 Quenett Creek Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Oregon, US",
      "location": "Wasco County, OR",
      "county_or_zone": "Wasco County",
      "queue_id": "L0433",
      "poi_substation": "Quenett Creek Substation",
      "status": "ENERGIZED",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0543",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Bonanza",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Oregon, US",
      "location": "Crook County, OR",
      "county_or_zone": "Crook County",
      "queue_id": "L0543",
      "poi_substation": "Ponderosa Substation",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0558",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Stearns Lane",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Oregon, US",
      "location": "Washington County, OR",
      "county_or_zone": "Washington County",
      "queue_id": "L0558",
      "poi_substation": "BPA's Green Valley Substation",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0494",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Ponderary Renewable Fiber and Blockchain Project",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Pend Oreille County, WA",
      "county_or_zone": "Pend Oreille County",
      "queue_id": "L0494",
      "poi_substation": "Usk Substation",
      "status": "ENERGIZED",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0603",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Getchell Substation",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Snohomish County, WA",
      "county_or_zone": "Snohomish County",
      "queue_id": "L0603",
      "poi_substation": "Snohomish-Murray line",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0630",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Data Storage Facility",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Walla Walla County, WA",
      "county_or_zone": "Walla Walla County",
      "queue_id": "L0630",
      "poi_substation": "Lower Monumental-McNary No. 1 line",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0647",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Atlas Agro Data Server Facility",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0647",
      "poi_substation": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0657",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "Atlas Agro Data Server Facility, Phase 2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Benton County, WA",
      "county_or_zone": "Benton County",
      "queue_id": "L0657",
      "poi_substation": "Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0650",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "300 MW Data Center Load Served from Grizzly",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US / BPA",
      "location": "Jefferson County",
      "county_or_zone": "Jefferson County",
      "queue_id": "L0650",
      "poi_substation": "Grizzly Substation",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0700",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "PARS - MW&L",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Oregon, US",
      "location": "Yamhill County, OR",
      "county_or_zone": "Yamhill County",
      "queue_id": "L0700",
      "poi_substation": "TBD",
      "status": "RECEIVED",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0610",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "PW1 & PW2",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Columbia County, WA",
      "county_or_zone": "Columbia County",
      "queue_id": "L0610",
      "poi_substation": "Allston Substation",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0668",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "ATP TES Data Server",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "US / BPA",
      "location": "Benton County",
      "county_or_zone": "Benton County",
      "queue_id": "L0668",
      "poi_substation": "Benton Substation",
      "status": "RECEIVED",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0677",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "TC KERR Data Center",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Cowlitz County, WA",
      "county_or_zone": "Cowlitz County",
      "queue_id": "L0677",
      "poi_substation": "Longview Substation",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 240,
          "unit": "MW",
          "raw_value": "240 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "BPA-LARGE-L0693",
      "evidence_type": "secondary_large_load_request_record",
      "project_name": "230 kV Feed from Longview Substation to Alcoa",
      "customer_or_developer": null,
      "utility_or_provider": "Bonneville Power Administration",
      "jurisdiction": "Washington, US",
      "location": "Cowlitz County, WA",
      "county_or_zone": "Cowlitz County",
      "queue_id": "L0693",
      "poi_substation": "Cowlitz Substation",
      "status": "STUDY",
      "capacity_claims": [
        {
          "value_mw": 240,
          "unit": "MW",
          "raw_value": "240 MW",
          "qualifier": "BPA large-load request MW as filed",
          "source_url": "https://substationscout.com/large-load-registry/",
          "capture_date": "2026-09-23"
        }
      ],
      "source_authority": "secondary reproduction of BPA public load queue",
      "source_url": "https://substationscout.com/large-load-registry/",
      "capture_date": "2026-09-23",
      "source_scope": "BPA Large Load Registry — 50 largest live requests",
      "notes": "BPA request reproduced from a public secondary registry that identifies request ID, filed MW, location, POI and status. BPA does not publish end-use; the project name is retained without classifying the load.",
      "map_point": null
    },
    {
      "id": "ISO-NE-NEMA-DATACENTER-200MW-2026",
      "evidence_type": "iso_ne_forecast_large_load_project",
      "project_name": "NEMA Data Center — CELT 2026 Forecast",
      "customer_or_developer": null,
      "utility_or_provider": "ISO New England",
      "jurisdiction": "Massachusetts, US",
      "location": "NEMA load zone",
      "county_or_zone": "NEMA",
      "queue_id": null,
      "status": "forecast included; not under construction",
      "planned_in_service": "through 2027",
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200 MW",
          "qualifier": "reported nameplate before forecast derating",
          "source_url": "https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf",
          "capture_date": "2026"
        }
      ],
      "source_authority": "ISO New England primary forecast",
      "source_url": "https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Large Loads in the CELT 2026 Forecast",
      "notes": "ISO-NE says projects included in this forecast must exceed 20 MW and have a formal study agreement. The listed 200 MW is a nameplate value before derating; the forecast does not identify a unique customer/site address. Map uses NEMA load-zone display geometry, not an inferred facility address.",
      "map_point": [
        42.36,
        -71.06
      ],
      "map_precision": "NEMA load-zone display point"
    },
    {
      "id": "ISO-NE-CT-ELECTRIFICATION-85MW-2026",
      "evidence_type": "iso_ne_forecast_large_load_project",
      "project_name": "CT General Electrification — CELT 2026 Forecast",
      "customer_or_developer": null,
      "utility_or_provider": "ISO New England",
      "jurisdiction": "Connecticut, US",
      "location": "CT load zone",
      "county_or_zone": "CT",
      "queue_id": null,
      "status": "forecast included; not under construction",
      "planned_in_service": "through 2040",
      "capacity_claims": [
        {
          "value_mw": 85,
          "unit": "MW",
          "raw_value": "85 MW",
          "qualifier": "reported nameplate before forecast derating",
          "source_url": "https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf",
          "capture_date": "2026"
        }
      ],
      "source_authority": "ISO New England primary forecast",
      "source_url": "https://www.iso-ne.com/static-assets/documents/100033/fx2026_large_loads.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Large Loads in the CELT 2026 Forecast",
      "notes": "This is general electrification rather than a data center. It is retained because the project-universe layer covers large-load evidence, not only data centers. Forecast nameplate is before derating; no facility address is supplied.",
      "map_point": [
        41.6,
        -72.7
      ],
      "map_precision": "CT load-zone display point"
    },
    {
      "id": "COMED-NEWPROJECT-P11-R01",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 01)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "status": "Phase 3 engineering",
      "planned_in_service": "2024",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 1,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R02",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Hoffman Estates (row 02)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Hoffman Estates",
      "county_or_zone": "Hoffman Estates",
      "status": "Phase 3 engineering",
      "planned_in_service": "2025",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 2,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R03",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Mt. Prospect (row 03)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Mt. Prospect",
      "county_or_zone": "Mt. Prospect",
      "status": "Phase 2 engineering",
      "planned_in_service": "2026",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 3,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R04",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Chicago (row 04)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Chicago",
      "county_or_zone": "Chicago",
      "status": "Phase 2 engineering",
      "planned_in_service": "2024",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Distribution",
      "project_capacity_band": "20 MW+",
      "source_row_index": 4,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R05",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Des Plaines (row 05)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Des Plaines",
      "county_or_zone": "Des Plaines",
      "status": "Phase 2 engineering",
      "planned_in_service": "2025",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Distribution",
      "project_capacity_band": "20 MW+",
      "source_row_index": 5,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R06",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Itasca (row 06)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Itasca",
      "county_or_zone": "Itasca",
      "status": "Phase 2 engineering",
      "planned_in_service": "2026",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 6,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R07",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Aurora (row 07)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Aurora",
      "county_or_zone": "Aurora",
      "status": "Phase 2 engineering",
      "planned_in_service": "2026",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 7,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R08",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Chicago (row 08)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Chicago",
      "county_or_zone": "Chicago",
      "status": "Phase 1 engineering",
      "planned_in_service": "2025",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Distribution",
      "project_capacity_band": "20 MW+",
      "source_row_index": 8,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R09",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Chicago (row 09)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Chicago",
      "county_or_zone": "Chicago",
      "status": "Phase 1 engineering",
      "planned_in_service": "2025",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Distribution",
      "project_capacity_band": "20 MW+",
      "source_row_index": 9,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R10",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 10)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "status": "Phase 1 engineering",
      "planned_in_service": "2025",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Distribution",
      "project_capacity_band": "20 MW+",
      "source_row_index": 10,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R11",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Northlake (row 11)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Northlake",
      "county_or_zone": "Northlake",
      "status": "Phase 1 engineering",
      "planned_in_service": "2026",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 11,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R12",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 12)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "status": "Phase 1 engineering",
      "planned_in_service": "2026",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 12,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R13",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 13)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "status": "Phase 1 engineering",
      "planned_in_service": "2026",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 13,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R14",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Hoffman Estates (row 14)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Hoffman Estates",
      "county_or_zone": "Hoffman Estates",
      "status": "Phase 1 engineering",
      "planned_in_service": "2026",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 14,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R15",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Wood Dale (row 15)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Wood Dale",
      "county_or_zone": "Wood Dale",
      "status": "Phase 1 engineering",
      "planned_in_service": "2027",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 15,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R16",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — DeKalb (row 16)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "DeKalb",
      "county_or_zone": "DeKalb",
      "status": "Phase 1 engineering",
      "planned_in_service": "2024",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 16,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R17",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Montgomery (row 17)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Montgomery",
      "county_or_zone": "Montgomery",
      "status": "Phase 1 engineering",
      "planned_in_service": "2024",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 17,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R18",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Hoffman Estates (row 18)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Hoffman Estates",
      "county_or_zone": "Hoffman Estates",
      "status": "Phase 1 engineering",
      "planned_in_service": "2028",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 18,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R19",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Yorkville (row 19)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Yorkville",
      "county_or_zone": "Yorkville",
      "status": "Phase 1 engineering",
      "planned_in_service": "2027",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 19,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R20",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Lisle (row 20)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Lisle",
      "county_or_zone": "Lisle",
      "status": "Phase 1 engineering",
      "planned_in_service": "2026",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Distribution",
      "project_capacity_band": "20 MW+",
      "source_row_index": 20,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R21",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 21)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "status": "Phase 1 engineering",
      "planned_in_service": "2026",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 21,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R22",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Aurora (row 22)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Aurora",
      "county_or_zone": "Aurora",
      "status": "Phase 1 engineering",
      "planned_in_service": "2027",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 22,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R23",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 23)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "status": "Phase 0 engineering",
      "planned_in_service": "2026",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 23,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R24",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Aurora (row 24)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Aurora",
      "county_or_zone": "Aurora",
      "status": "Phase 0 engineering",
      "planned_in_service": "2027",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 24,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R25",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Elk Grove (row 25)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Elk Grove",
      "county_or_zone": "Elk Grove",
      "status": "Phase 0 engineering",
      "planned_in_service": "UNKNOWN",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Distribution",
      "project_capacity_band": "20 MW+",
      "source_row_index": 25,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R26",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Carol Stream (row 26)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Carol Stream",
      "county_or_zone": "Carol Stream",
      "status": "Phase 0 engineering",
      "planned_in_service": "UNKNOWN",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Distribution",
      "project_capacity_band": "10-20 MW",
      "source_row_index": 26,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R27",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Northlake (row 27)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Northlake",
      "county_or_zone": "Northlake",
      "status": "Phase 0 engineering",
      "planned_in_service": "2025",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Distribution",
      "project_capacity_band": "20 MW+",
      "source_row_index": 27,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "COMED-NEWPROJECT-P11-R28",
      "evidence_type": "utility_data_center_forecast_project_record",
      "project_name": "ComEd Data Center Forecast — Plano (row 28)",
      "customer_or_developer": "Not published in source",
      "utility_or_provider": "ComEd / Illinois Commerce Commission",
      "jurisdiction": "Illinois, US",
      "location": "Plano",
      "county_or_zone": "Plano",
      "status": "Phase 1 engineering",
      "planned_in_service": "2029",
      "capacity_claims": [],
      "source_authority": "utility regulatory filing",
      "source_url": "https://icc.illinois.gov/docket/P2022-0486/documents/353641/files/619153.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "ComEd Ex. 119.02 RGP, Data Center Forecast Development — New Projects List (Page 11)",
      "connection_type": "Transmission",
      "project_capacity_band": "20 MW+",
      "source_row_index": 28,
      "precision": "city display point",
      "notes": "Historical ComEd planning/forecast project row. The cited filing publishes location, sector, connection, engineering status, in-service year and utilization assumptions, but not a project-specific MW in the exposed row. Row number is preserved to distinguish otherwise identical city/status entries; it is a source-row key, not an invented project identifier."
    },
    {
      "id": "DOMINION-CAMPUS-A-TWIN-CREEKS-2024",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "Cochran Mill TC 2, LLC data-center campus / Campus A",
      "customer_or_developer": "Cochran Mill TC 2, LLC / Twin Creeks Development, LLC",
      "utility_or_provider": "Dominion Energy Virginia",
      "jurisdiction": "Virginia, US",
      "location": "Eastern Loudoun County, Virginia",
      "county_or_zone": "Loudoun County",
      "status": "service planning / substation project",
      "planned_in_service": "2024 (requested)",
      "capacity_claims": [
        {
          "value_mw": 84,
          "unit": "MW",
          "raw_value": "84 MW",
          "qualifier": "summer peak projected for 2025",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "approximately 300 MW",
          "qualifier": "summer peak projected for 2035",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Dominion NOVA Application Volume 1 of 3 (2024)",
      "precision": "county display point",
      "notes": "Dominion filing publicly identifies Campus A as the Cochran Mill TC 2, LLC Data Center, developed by Twin Creeks Development, LLC (Customer A). The same filing ties it to the proposed Twin Creeks Substation and publishes the 84 MW (2025) and approximately 300 MW (2035) load projections."
    },
    {
      "id": "DOMINION-CAMPUS-B-SYCOLIN-STARLIGHT-2024",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "Belmont Innovation Campus / Campus B",
      "customer_or_developer": "Loudoun GC, LLC / Sentinel Data Centers (SDC)",
      "utility_or_provider": "Dominion Energy Virginia",
      "jurisdiction": "Virginia, US",
      "location": "West of Belmont Ridge Road, eastern Loudoun County, Virginia",
      "county_or_zone": "Loudoun County",
      "status": "service planning / substation project",
      "capacity_claims": [
        {
          "value_mw": 6,
          "unit": "MW",
          "raw_value": "6 MW",
          "qualifier": "summer peak projected for 2026",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "approximately 300 MW",
          "qualifier": "summer peak projected for 2036",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 18,
          "unit": "MW",
          "raw_value": "18 MW",
          "qualifier": "summer peak projected for 2028",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 255,
          "unit": "MW",
          "raw_value": "approximately 255 MW",
          "qualifier": "summer peak projected for 2038",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Dominion NOVA Application Volume 1 of 3 (2024)",
      "precision": "county display point",
      "notes": "Dominion filing publicly identifies Campus B as the Belmont Innovation Campus, developed by Loudoun GC, LLC, the local affiliate of Sentinel Data Centers (SDC). The filing ties it to proposed Sycolin Creek and Starlight substations and publishes two separate load ramps."
    },
    {
      "id": "DOMINION-SPOTSYTECH-TRIBUTARY-2024",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "SpotsyTech Campus / Tributary Station",
      "customer_or_developer": "SpotsyTechnoCampus LLC",
      "utility_or_provider": "Dominion Energy Virginia / Rappahannock Electric Cooperative",
      "jurisdiction": "Virginia, US",
      "location": "Spotsylvania County, Virginia",
      "county_or_zone": "Spotsylvania County",
      "status": "transmission service project / campus planned",
      "capacity_claims": [
        {
          "value_mw": 7,
          "unit": "MW",
          "raw_value": "initial load being 7 MW",
          "qualifier": "DP request initial load",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/tributary/pdfs/tributary-application-vol-1-part-1-of-4.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 295,
          "unit": "MW",
          "raw_value": "295 MW",
          "qualifier": "projected load by 2032",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/tributary/pdfs/tributary-application-vol-1-part-1-of-4.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 30,
          "unit": "MW",
          "raw_value": "30 MW",
          "qualifier": "startup data-center building power capacity",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/tributary/pdfs/tributary-application-vol-1-part-1-of-4.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 283,
          "unit": "MW",
          "raw_value": "approximately 283 MW",
          "qualifier": "data-center share of total full-occupancy site capacity",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/tributary/pdfs/tributary-application-vol-1-part-1-of-4.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/tributary/pdfs/tributary-application-vol-1-part-1-of-4.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Dominion Tributary Station application",
      "precision": "county display point",
      "notes": "Dominion filing identifies a 230 kV DP request from REC to serve SpotsyTech Campus and gives both project-wide and data-center-specific load figures. The figures are preserved as different measures rather than summed."
    },
    {
      "id": "DOMINION-CAMPUS-C-LUNAR-APOLLO-2024",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "Customer C — Campus C / Lunar and Apollo Substations",
      "customer_or_developer": "Customer C (name not public in filing)",
      "utility_or_provider": "Dominion Energy Virginia",
      "jurisdiction": "Virginia, US",
      "location": "Eastern Loudoun County, Virginia",
      "county_or_zone": "Loudoun County",
      "status": "service planning / substation project",
      "capacity_claims": [
        {
          "value_mw": 12,
          "unit": "MW",
          "raw_value": "12 MW",
          "qualifier": "summer peak projected for 2026",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 278,
          "unit": "MW",
          "raw_value": "approximately 278 MW",
          "qualifier": "summer peak projected for 2036",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 27,
          "unit": "MW",
          "raw_value": "27 MW",
          "qualifier": "summer peak projected for 2027",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        },
        {
          "value_mw": 239,
          "unit": "MW",
          "raw_value": "approximately 239 MW",
          "qualifier": "summer peak projected for 2037",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-1-of-3-2024.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Dominion NOVA Application Volume 1 of 3 (2024)",
      "precision": "county display point",
      "notes": "Dominion identifies Campus C as a new data-center campus in eastern Loudoun County served by proposed Lunar and Apollo substations. The filing publishes two DP-request load ramps for Campus C; customer identity is retained as confidential."
    },
    {
      "id": "DOMINION-CULPEPER-DATABANK-CAMPUS-2024",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "Culpeper DataBank data-center campus / Campus A",
      "customer_or_developer": "Culpeper DataBank (DataBank)",
      "utility_or_provider": "Dominion Energy Virginia",
      "jurisdiction": "Virginia, US",
      "location": "Culpeper County / Town of Culpeper, Virginia",
      "county_or_zone": "Culpeper County",
      "status": "service planning / transmission project",
      "capacity_claims": [],
      "source_authority": "Dominion Energy regulatory filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/culpeper-tech-zone/pdfs/2024-culpeper-tech-zone-scc-application-volume-1-of-5-part-1-of-3.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Dominion Culpeper Tech Zone SCC Application",
      "precision": "county/city display point",
      "notes": "Dominion filing explicitly names DataBank as Customer A/Culpeper DataBank and says the customer requested service for a new data-center campus. The source excerpt does not expose a uniform customer MW claim, so capacity remains empty."
    },
    {
      "id": "DOMINION-STACK-CULPEPER-CAMPUS-2024",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "STACK Infrastructure data-center campus / Campus B",
      "customer_or_developer": "STACK Infrastructure Inc. (STACK)",
      "utility_or_provider": "Dominion Energy Virginia",
      "jurisdiction": "Virginia, US",
      "location": "Culpeper County / Town of Culpeper, Virginia",
      "county_or_zone": "Culpeper County",
      "status": "service planning / transmission project",
      "capacity_claims": [],
      "source_authority": "Dominion Energy regulatory filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/culpeper-tech-zone/pdfs/2024-culpeper-tech-zone-scc-application-volume-1-of-5-part-1-of-3.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Dominion Culpeper Tech Zone SCC Application",
      "precision": "county/city display point",
      "notes": "Dominion filing explicitly identifies STACK Infrastructure as Customer B and ties the customer to a new data-center campus in the project area. No project MW is inferred."
    },
    {
      "id": "DOMINION-COPPER-RIDGE-CULPEPER-CAMPUS-2024",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "Copper Ridge Data Center Campus / Campus C",
      "customer_or_developer": "Copper Ridge Data Center Campus",
      "utility_or_provider": "Dominion Energy Virginia",
      "jurisdiction": "Virginia, US",
      "location": "Culpeper County / Town of Culpeper, Virginia",
      "county_or_zone": "Culpeper County",
      "status": "service planning / transmission project",
      "capacity_claims": [],
      "source_authority": "Dominion Energy regulatory filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/culpeper-tech-zone/pdfs/2024-culpeper-tech-zone-scc-application-volume-1-of-5-part-1-of-3.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Dominion Culpeper Tech Zone SCC Application",
      "precision": "county/city display point",
      "notes": "Dominion filing explicitly identifies Copper Ridge Data Center Campus as Customer C and ties it to a new data-center campus in the project area. No project MW is inferred."
    },
    {
      "id": "NYISO-580-WNY-STAMP-GB24",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "WNY STAMP",
      "customer_or_developer": "Genesee County Economic Development Center",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Genesee",
      "county_or_zone": "Genesee",
      "queue_id": "580",
      "status": "2024 Gold Book queue record",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "capture_date": "2026-09-26",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "precision": "county display point",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-850-CAYUGA-LOAD-GB24",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Cayuga Load",
      "customer_or_developer": "Cayuga Operating Company, LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Tompkins",
      "county_or_zone": "Tompkins",
      "queue_id": "850",
      "status": "2024 Gold Book queue record",
      "capacity_claims": [
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "capture_date": "2026-09-26",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "precision": "county display point",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-979-NORTH-COUNTRY-DATA-CENTER-GB24",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "North Country Data Center",
      "customer_or_developer": "North Country Data Center",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "979",
      "status": "2024 Gold Book queue record",
      "capacity_claims": [
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "capture_date": "2026-09-26",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "precision": "county display point",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1213-ST-LAWRENCE-DATA-AND-AGRICULTURAL-CENTER-GB24",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "St Lawrence Data and Agricultural Center",
      "customer_or_developer": "Petawatt Holdings, Inc.",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1213",
      "status": "2024 Gold Book queue record",
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "capture_date": "2026-09-26",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "precision": "county display point",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1315-SDC-ST-LAWRENCE-GB24",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "SDC St. Lawrence",
      "customer_or_developer": "Sabey Data Center Properties, LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1315",
      "status": "2024 Gold Book queue record",
      "capacity_claims": [
        {
          "value_mw": 120,
          "unit": "MW",
          "raw_value": "120.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "capture_date": "2026-09-26",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "precision": "county display point",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1446-MASSENA-GREEN-HYDROGEN-GB24",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Massena Green Hydrogen",
      "customer_or_developer": "Air Products and Chemicals, Inc.",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1446",
      "status": "2024 Gold Book queue record",
      "capacity_claims": [
        {
          "value_mw": 110,
          "unit": "MW",
          "raw_value": "110.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "capture_date": "2026-09-26",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "precision": "county display point",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1484-580-STAMP-LOAD-INCREASE-GB24",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "580 STAMP load increase",
      "customer_or_developer": "Genesee County Economic Development Corporation",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Genesee",
      "county_or_zone": "Genesee",
      "queue_id": "1484",
      "status": "2024 Gold Book queue record",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "capture_date": "2026-09-26",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "precision": "county display point",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1536-WHITE-PINE-PHASE-1-GB24",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "White Pine Phase 1",
      "customer_or_developer": "Micron New York Semiconductor Manufacturing LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Onondaga",
      "county_or_zone": "Onondaga",
      "queue_id": "1536",
      "status": "2024 Gold Book queue record",
      "capacity_claims": [
        {
          "value_mw": 480,
          "unit": "MW",
          "raw_value": "480.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "capture_date": "2026-09-26",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "precision": "county display point",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "NYISO-1627-MICRON-FAB-2-GB24",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Micron Fab 2",
      "customer_or_developer": "Micron New York Semiconductor Manufacturing LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Onondaga",
      "county_or_zone": "Onondaga",
      "queue_id": "1627",
      "status": "2024 Gold Book queue record",
      "capacity_claims": [
        {
          "value_mw": 576,
          "unit": "MW",
          "raw_value": "576.0",
          "qualifier": "2024 NYISO Gold Book summer value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2024-Gold-Book-Public.pdf/170c7717-1e3e-e2fc-0afb-44b75d337ec6",
      "capture_date": "2026-09-26",
      "source_scope": "2024 Load & Capacity Data Report, Table IV-7 Large Load Interconnection Requests",
      "precision": "county display point",
      "notes": "NYISO Gold Book states these values reflect the NYISO Interconnection Queue. Queue presence is not treated as evidence that the project is operating."
    },
    {
      "id": "IDAHO-META-BRISBIE-2025",
      "evidence_type": "utility_named_data_center_project",
      "project_name": "Brisbie, LLC (Meta Platforms, Inc.)",
      "customer_or_developer": "Brisbie, LLC (Meta Platforms, Inc.)",
      "utility_or_provider": "Idaho Power",
      "jurisdiction": "Idaho, US",
      "location": "Kuna, Idaho",
      "county_or_zone": "Ada County",
      "status": "2025 Idaho Power IRP source reports under construction; on track for completion in 2025",
      "capacity_claims": [],
      "source_authority": "Idaho Power primary source",
      "source_url": "https://docs.idahopower.com/pdfs/AboutUs/PlanningForFuture/2025IRP/2025%20IRP%20Appendix%20A.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Integrated Resource Plan — Appendix A: Sales and Load Forecast",
      "precision": "city display point",
      "notes": "Idaho Power names the Meta data-center project and states that its $800 million data center was under construction in the 2025 IRP and was on track for completion in 2025. No project MW is published in the cited passage, so load remains unavailable rather than inferred."
    },
    {
      "id": "CAISO-LC24-1",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-1",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "Gilroy",
      "county_or_zone": "Gilroy",
      "queue_id": "LC24-1",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2027-07-01",
      "capacity_claims": [
        {
          "value_mw": 49.5,
          "unit": "MW",
          "raw_value": "49.5 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "Garlic 115 kV switching station on Llagas-Morgan Hill 115 kV line",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-2",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-2",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "De Anza",
      "county_or_zone": "De Anza",
      "queue_id": "LC24-2",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2027-06-01",
      "capacity_claims": [
        {
          "value_mw": 49,
          "unit": "MW",
          "raw_value": "49 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "Lockheed #1 115 kV",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-3",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-3",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-3",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2028-04-01",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "New Charcot 115 kV switching station near Trimble 115 kV",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-6",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-6",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "Mission",
      "county_or_zone": "Mission",
      "queue_id": "LC24-6",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2028-04-01",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "Eastshore 115 kV",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-13",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-13",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-13",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2026-06-01",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "New Hellyer 115 kV switching station on Metcalf-Evergreen #1/#2",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-14",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-14",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-14",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2028-04-01",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "New Hellyer 115 kV switching station on Metcalf-Evergreen #1/#2",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-18",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-18",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "Mission",
      "county_or_zone": "Mission",
      "queue_id": "LC24-18",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2028-04-01",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "Eastshore 115 kV bus expansion in GIS",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-24",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-24",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "Gilroy",
      "county_or_zone": "Gilroy",
      "queue_id": "LC24-24",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2026-08-01",
      "capacity_claims": [
        {
          "value_mw": 49.5,
          "unit": "MW",
          "raw_value": "49.5 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "Garlic 115 kV switching station on Llagas-Morgan Hill 115 kV line",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-26",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-26",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-26",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2029-06-01",
      "capacity_claims": [
        {
          "value_mw": 99,
          "unit": "MW",
          "raw_value": "99 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "San Jose A 115 kV",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-27",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-27",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-27",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2028-06-01",
      "capacity_claims": [
        {
          "value_mw": 49,
          "unit": "MW",
          "raw_value": "49 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "San Jose A 115 kV",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-LC24-28",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "LC24-28",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": "LC24-28",
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2027-12-01",
      "capacity_claims": [
        {
          "value_mw": 49,
          "unit": "MW",
          "raw_value": "49 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "San Jose A 115 kV",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-SERIAL-DC1",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "Serial – Data Center 1",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": null,
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2028",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "New 230 kV/34.5 kV substation Midpoint on Newark-NRS 230 kV line; 34.5 kV service",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-SERIAL-DC2",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "Serial – Data Center 2",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": null,
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2028",
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "New 115 kV substation San Jose C on San Jose A-B 115 kV line; 34.5 kV service",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "CAISO-SERIAL-DC3",
      "evidence_type": "caiso_large_load_interconnection_project",
      "project_name": "Serial – Data Center 3",
      "utility_or_provider": "Pacific Gas & Electric / California ISO",
      "jurisdiction": "California, US",
      "location": "San Jose",
      "county_or_zone": "San Jose",
      "queue_id": null,
      "status": "actively reviewed by ISO / study process",
      "planned_in_service": "2028",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250 MW",
          "qualifier": "Ultimate load level from PG&E September 2025 transmission-planning presentation",
          "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
          "capture_date": "2025-09-25"
        }
      ],
      "poi_substation": "Dual 230 kV service from Los Esteros",
      "source_authority": "CAISO/PGE public transmission-planning material",
      "source_url": "https://stakeholdercenter.caiso.com/InitiativeDocuments/Presentation-PGE-2025-2026Transmissionplanningprocess-Sep2525.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "PG&E 2025-2026 Transmission Planning Process presentation, LC24 and Serial Data Center tables",
      "notes": "Public large-load interconnection study record. The source provides load-pocket/planning-area geography and proposed POI, not a customer/site street address. Map uses a planning-area display point; this is not an exact facility coordinate. The three serial loads total 700 MW; the eleven LC24 loads total 840 MW, and these populations are not added to the nine-market core."
    },
    {
      "id": "NYISO-GB25-580",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "WNY STAMP",
      "customer_or_developer": "Genesee County Economic Development Corporation",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Genesee",
      "county_or_zone": "Genesee",
      "queue_id": "580",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2026-05",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "B"
    },
    {
      "id": "NYISO-GB25-776",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Greenidge Load",
      "customer_or_developer": "Greenidge Generation LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Yates",
      "county_or_zone": "Yates",
      "queue_id": "776",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2025-06",
      "capacity_claims": [
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-850",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Cayuga Load",
      "customer_or_developer": "Cayuga Operating Company, LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Cayuga",
      "county_or_zone": "Cayuga",
      "queue_id": "850",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2026-12",
      "capacity_claims": [
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-979",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "North Country Data Center",
      "customer_or_developer": "North Country Data Center",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "979",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2024-12",
      "capacity_claims": [
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "D"
    },
    {
      "id": "NYISO-GB25-1213",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "St Lawrence Data and Agricultural Center",
      "customer_or_developer": "Petawatt Holdings, Inc.",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1213",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2026-01",
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "D"
    },
    {
      "id": "NYISO-GB25-1315",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "SDC St. Lawrence",
      "customer_or_developer": "Sabey Data Center Properties, LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "St. Lawrence",
      "county_or_zone": "St. Lawrence",
      "queue_id": "1315",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2025-08",
      "capacity_claims": [
        {
          "value_mw": 120,
          "unit": "MW",
          "raw_value": "120",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 120,
          "unit": "MW",
          "raw_value": "120",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "D"
    },
    {
      "id": "NYISO-GB25-1465",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Digihost Load",
      "customer_or_developer": "Digihost Technologies, Inc.",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1465",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2024-04",
      "capacity_claims": [
        {
          "value_mw": 50.2,
          "unit": "MW",
          "raw_value": "50.2",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 50.2,
          "unit": "MW",
          "raw_value": "50.2",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "A"
    },
    {
      "id": "NYISO-GB25-1484",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "580 STAMP load increase",
      "customer_or_developer": "GCEDC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Genesee",
      "county_or_zone": "Genesee",
      "queue_id": "1484",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2025-12",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "B"
    },
    {
      "id": "NYISO-GB25-1536",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "White Pine Phase 1",
      "customer_or_developer": "Micron New York Semiconductor Manufacturing LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Onondaga",
      "county_or_zone": "Onondaga",
      "queue_id": "1536",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2026-06",
      "capacity_claims": [
        {
          "value_mw": 480,
          "unit": "MW",
          "raw_value": "480",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 480,
          "unit": "MW",
          "raw_value": "480",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-1627",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Micron Fab 2",
      "customer_or_developer": "Micron New York Semiconductor Manufacturing LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Onondaga",
      "county_or_zone": "Onondaga",
      "queue_id": "1627",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2030-09",
      "capacity_claims": [
        {
          "value_mw": 576,
          "unit": "MW",
          "raw_value": "576",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 507,
          "unit": "MW",
          "raw_value": "507",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-1646",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "POWI Project",
      "customer_or_developer": "P&M Brick LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Albany",
      "county_or_zone": "Albany",
      "queue_id": "1646",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2027-01",
      "capacity_claims": [
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "F"
    },
    {
      "id": "NYISO-GB25-1670",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Lake Mariner Data II",
      "customer_or_developer": "Lake Mariner data LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1670",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2025-04",
      "capacity_claims": [
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 250,
          "unit": "MW",
          "raw_value": "250",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "A"
    },
    {
      "id": "NYISO-GB25-1681",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Niagara Digital Campus",
      "customer_or_developer": "Niagara Falls Redevelopment LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1681",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2026-06",
      "capacity_claims": [
        {
          "value_mw": 140,
          "unit": "MW",
          "raw_value": "140",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 140,
          "unit": "MW",
          "raw_value": "140",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "A"
    },
    {
      "id": "NYISO-GB25-1683",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Cayuga Compute",
      "customer_or_developer": "Cayuga Operating Company, LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Cayuga",
      "county_or_zone": "Cayuga",
      "queue_id": "1683",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2025-10",
      "capacity_claims": [
        {
          "value_mw": 150,
          "unit": "MW",
          "raw_value": "150",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 150,
          "unit": "MW",
          "raw_value": "150",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-1713",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Project Sycamore Orangeburg",
      "customer_or_developer": "Project Sycamore - Orangeburg",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Orangeburg",
      "county_or_zone": "Orangeburg",
      "queue_id": "1713",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2026-06",
      "capacity_claims": [
        {
          "value_mw": 25.3,
          "unit": "MW",
          "raw_value": "25.3",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 25.3,
          "unit": "MW",
          "raw_value": "25.3",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "G"
    },
    {
      "id": "NYISO-GB25-1714",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Hudson Valley Data Center",
      "customer_or_developer": "Robert Delcalzo",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Orangeburg",
      "county_or_zone": "Orangeburg",
      "queue_id": "1714",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2027-02",
      "capacity_claims": [
        {
          "value_mw": 25,
          "unit": "MW",
          "raw_value": "25",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 25,
          "unit": "MW",
          "raw_value": "25",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "G"
    },
    {
      "id": "NYISO-GB25-1715",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "1547 CSR - Orangeburg LLC",
      "customer_or_developer": "Jerry Martin",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Orangeburg",
      "county_or_zone": "Orangeburg",
      "queue_id": "1715",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2027-01",
      "capacity_claims": [
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "G"
    },
    {
      "id": "NYISO-GB25-1716",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Orangeburg Expansion Phase 2",
      "customer_or_developer": "DataBank Holdings, LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Orangeburg",
      "county_or_zone": "Orangeburg",
      "queue_id": "1716",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2027-12",
      "capacity_claims": [
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "G"
    },
    {
      "id": "NYISO-GB25-1717",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Proposed Datacenters at 450 Broadway, Buchanan, NY 10511",
      "customer_or_developer": "Holtec Decommissioning International (HDI)",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Westchester",
      "county_or_zone": "Westchester",
      "queue_id": "1717",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2026-09",
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "H"
    },
    {
      "id": "NYISO-GB25-1721",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Brookhaven Logistics Center",
      "customer_or_developer": "WF Industrial XII LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Suffolk",
      "county_or_zone": "Suffolk",
      "queue_id": "1721",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2027-01",
      "capacity_claims": [
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "K"
    },
    {
      "id": "NYISO-GB25-1725",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Greenidge 200 MW Data Center Project",
      "customer_or_developer": "Greenidge Generation, LLC",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Yates",
      "county_or_zone": "Yates",
      "queue_id": "1725",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2028-03",
      "capacity_claims": [
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 200,
          "unit": "MW",
          "raw_value": "200",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "C"
    },
    {
      "id": "NYISO-GB25-1726",
      "evidence_type": "nyiso_gold_book_large_load_record",
      "project_name": "Data & Technology Campus",
      "customer_or_developer": "Riverview Innovation & Technology Campus, Inc.",
      "utility_or_provider": "NYISO",
      "jurisdiction": "New York, US",
      "location": "Niagara",
      "county_or_zone": "Niagara",
      "queue_id": "1726",
      "status": "2025 Gold Book large-load interconnection request",
      "planned_in_service": "2027-01",
      "capacity_claims": [
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book summer value"
        },
        {
          "value_mw": 300,
          "unit": "MW",
          "raw_value": "300",
          "qualifier": "NYISO 2025 Gold Book winter value"
        }
      ],
      "source_authority": "NYISO primary source",
      "source_url": "https://www.nyiso.com/documents/20142/2226333/2025-Gold-Book-Public.pdf/088438e1-02f1-5316-211b-dbca17c01b4b",
      "capture_date": "2026-09-26",
      "source_scope": "2025 Load & Capacity Data Report, Table IV-7 Load Interconnection Requests",
      "notes": "Historical NYISO large-load interconnection table. The Gold Book explicitly says these projects are in the NYISO Interconnection Queue. This record is non-additive to current queue/project layers and does not assert operating status. Original NYISO Gold Book zone code retained in nyiso_zone_code.",
      "nyiso_zone_code": "A"
    },
    {
      "id": "XCEL-GOOGLE-PINE-ISLAND-2026",
      "evidence_type": "utility_named_data_center_service_project",
      "project_name": "Google Pine Island Data Center / Project Skyway",
      "customer_or_developer": "Google",
      "utility_or_provider": "Xcel Energy",
      "jurisdiction": "Minnesota, US",
      "location": "Pine Island, MN",
      "county_or_zone": "Olmsted County",
      "status": "electric service agreement signed; route permit process underway",
      "planned_in_service": "service infrastructure construction targeted 2027-2028",
      "capacity_claims": [],
      "source_authority": "utility + municipal primary sources",
      "source_url": "https://newsroom.xcelenergy.com/news/xcel-energy-to-power-new-google-data-center-in-minnesota",
      "source_urls": [
        "https://newsroom.xcelenergy.com/news/xcel-energy-to-power-new-google-data-center-in-minnesota",
        "https://pineislandmn.gov/skyway",
        "https://xcelenergytransmission.com/projects/skyway/"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "Xcel/municipal Project Skyway and Google/Xcel agreement",
      "notes": "Xcel and Google publicly identify the Pine Island data center and associated electric-service agreement. The public materials disclose 1,400 MW wind + 200 MW solar + 300 MW storage associated with the clean-energy buildout, but those are generation/storage resources, not the data-center load; no load MW is inferred."
    },
    {
      "id": "ENTERGY-GOOGLE-WEST-MEMPHIS-2025",
      "evidence_type": "utility_named_data_center_service_project",
      "project_name": "Google West Memphis Data Center",
      "customer_or_developer": "Google",
      "utility_or_provider": "Entergy Arkansas",
      "jurisdiction": "Arkansas, US",
      "location": "West Memphis, AR",
      "county_or_zone": "Crittenden County",
      "status": "announced / utility service ecosystem under development",
      "capacity_claims": [],
      "source_authority": "Google + Entergy primary sources",
      "source_url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
      "source_urls": [
        "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
        "https://www.entergy.com/datacenters/arkansas"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "Google Arkansas data-center announcement and Entergy Arkansas data-center service page",
      "notes": "Google publicly identifies West Memphis as its first Arkansas data center. Google announced a new 600 MW solar project with Entergy as an associated energy investment; that 600 MW figure is not treated as data-center load."
    },
    {
      "id": "ENTERGY-AWS-CLINTON-MS-2026",
      "evidence_type": "utility_named_data_center_service_project",
      "project_name": "AWS Clinton Data Center",
      "customer_or_developer": "Amazon Web Services",
      "utility_or_provider": "Entergy Mississippi",
      "jurisdiction": "Mississippi, US",
      "location": "Clinton, MS",
      "county_or_zone": "Hinds County",
      "status": "under construction / development",
      "planned_in_service": "not publicly stated",
      "capacity_claims": [],
      "source_authority": "utility primary source",
      "source_url": "https://www.entergy.com/blog/amazons-1-billion-investment-in-clinton-celebrated-with-ribbon-cutting",
      "capture_date": "2026-09-26",
      "source_scope": "Entergy Mississippi June 12, 2026 project report",
      "notes": "Entergy identifies Amazon Web Services and the former Delphi facility in Clinton as a data-center project. No project load MW is published in the cited utility source; capital investment is not converted into electrical capacity."
    },
    {
      "id": "ALABAMA-QTS-BESSEMER-PROJECT-MARVEL-2026",
      "evidence_type": "utility_service_project_secondary_capacity",
      "project_name": "QTS Bessemer / Project Marvel",
      "customer_or_developer": "QTS Data Centers / Logistics Land Investment LLC",
      "utility_or_provider": "Alabama Power",
      "jurisdiction": "Alabama, US",
      "location": "Bessemer, AL",
      "county_or_zone": "Jefferson County",
      "status": "planned / approved local land use",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1,200 MW",
          "qualifier": "reported planned utility power availability / campus capacity",
          "source_url": "https://www.compute-atlas.com/facilities/qts-marvel-bessemer-al",
          "capture_date": "2026-09-25"
        }
      ],
      "source_authority": "secondary facility registry with public-source citations",
      "source_url": "https://www.compute-atlas.com/facilities/qts-marvel-bessemer-al",
      "source_urls": [
        "https://www.compute-atlas.com/facilities/qts-marvel-bessemer-al",
        "https://registry.deploy.report/datacenters/facilities/qts-project-marvel-bessemer-al"
      ],
      "capture_date": "2026-09-26",
      "source_scope": "Publicly researched facility record; Alabama Power service linkage",
      "notes": "The public research record reports 1,200 MW planned and identifies Alabama Power as utility. This is secondary evidence rather than a directly published Alabama Power MW disclosure, so it is not promoted into the core queue total."
    },
    {
      "id": "ALABAMA-CLOVERLEAF-RED-CLAY-2026",
      "evidence_type": "utility_service_project_secondary_capacity",
      "project_name": "Cloverleaf Infrastructure / Project Red Clay",
      "customer_or_developer": "Cloverleaf Infrastructure",
      "utility_or_provider": "Alabama Power",
      "jurisdiction": "Alabama, US",
      "location": "Lowndes County, AL",
      "county_or_zone": "Lowndes County",
      "status": "large-load project reported; service arrangements developing",
      "capacity_claims": [
        {
          "value_mw": 1500,
          "unit": "MW",
          "raw_value": "1,500 MW",
          "qualifier": "reported requested energy capacity from Alabama Power",
          "source_url": "https://www.compute-atlas.com/facilities/cloverleaf-red-clay-lowndes-al",
          "capture_date": "2026-09-26"
        }
      ],
      "source_authority": "secondary facility registry citing local reporting",
      "source_url": "https://www.compute-atlas.com/facilities/cloverleaf-red-clay-lowndes-al",
      "capture_date": "2026-09-26",
      "source_scope": "Compute Atlas public facility record",
      "notes": "The cited public facility record reports a 1,500 MW energy-capacity request from Alabama Power. This remains secondary evidence; exact utility-contract status is not asserted."
    },
    {
      "id": "ALABAMA-VOLTCORE-SOMERVILLE-2026",
      "evidence_type": "utility_service_project_secondary_capacity",
      "project_name": "Sovereign Gazelle Bitcoin Mining Data Center / Somerville",
      "customer_or_developer": "Sovereign Gazelle",
      "utility_or_provider": "Alabama Power",
      "jurisdiction": "Alabama, US",
      "location": "Somerville, AL",
      "county_or_zone": "Morgan County",
      "status": "proposed / stalled by local right-of-way issues",
      "capacity_claims": [
        {
          "value_mw": 50,
          "unit": "MW",
          "raw_value": "50 MW",
          "qualifier": "reported planned bitcoin-mining/data-center load",
          "source_url": "https://suedatacenters.org/data-centers/sovereign-gazelle-somerville-al",
          "capture_date": "2026-09-26"
        }
      ],
      "source_authority": "secondary facility research record",
      "source_url": "https://suedatacenters.org/data-centers/sovereign-gazelle-somerville-al",
      "capture_date": "2026-09-26",
      "source_scope": "SUE Data Centers public facility record",
      "notes": "The source reports a 50 MW plan and says utility connections were approved; it also states VoltCore is the EPC/engineering contractor rather than site owner/operator. This is secondary evidence and remains outside the core queue total."
    },
    {
      "id": "ENTERGY-META-RICHLAND-PARISH-2025",
      "evidence_type": "utility_named_data_center_service_project",
      "project_name": "Meta Northeast Louisiana Data Center",
      "customer_or_developer": "Meta Platforms, Inc.",
      "utility_or_provider": "Entergy Louisiana",
      "jurisdiction": "Louisiana, US",
      "location": "Richland Parish, LA",
      "county_or_zone": "Richland Parish",
      "status": "under construction / development",
      "planned_in_service": "construction through 2030",
      "capacity_claims": [
        {
          "value_mw": 1500,
          "unit": "MW",
          "raw_value": "1,500-megawatt data center",
          "qualifier": "Entergy description of data-center scale",
          "source_url": "https://www.entergy.com/news/meta-selects-northeast-louisiana-as-site-10-billion-data-center",
          "capture_date": "2026-09-26"
        }
      ],
      "source_authority": "utility primary source",
      "source_url": "https://www.entergy.com/news/meta-selects-northeast-louisiana-as-site-10-billion-data-center",
      "capture_date": "2026-09-26",
      "source_scope": "Entergy Louisiana project announcement",
      "notes": "Entergy publicly describes Meta's Northeast Louisiana project as a 1,500 MW data center and says Entergy will add generation to meet growing demand including the data center. No separate queue ID is inferred."
    },
    {
      "id": "ENTERGY-AWS-MADISON-COUNTY-MS-2025",
      "evidence_type": "utility_named_data_center_service_project",
      "project_name": "Amazon Web Services Madison County Data Center",
      "customer_or_developer": "Amazon Web Services",
      "utility_or_provider": "Entergy Mississippi",
      "jurisdiction": "Mississippi, US",
      "location": "Madison County, MS",
      "county_or_zone": "Madison County",
      "status": "expansion / development",
      "capacity_claims": [
        {
          "value_mw": 650,
          "unit": "MW",
          "raw_value": "650-MW data center project",
          "qualifier": "Entergy description of project scale",
          "source_url": "https://www.entergy.com/blog/entergy-welcomed-energy-industry-leaders-new-orleans",
          "capture_date": "2026-09-26"
        }
      ],
      "source_authority": "utility primary source",
      "source_url": "https://www.entergy.com/blog/entergy-welcomed-energy-industry-leaders-new-orleans",
      "capture_date": "2026-09-26",
      "source_scope": "Entergy corporate/EEI growth article",
      "notes": "Entergy describes the AWS Madison County project as a 650 MW data center project. This is a utility primary-source statement but the article does not provide a public queue/POI identifier; no such identifier is inferred."
    },
    {
      "id": "DOMINION-EDSALL-DATA-CENTER-176MW-2024",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "Edsall Lines and Substation Project / Fairfax data center customer",
      "customer_or_developer": "Customer not publicly named in filing",
      "utility_or_provider": "Dominion Energy Virginia",
      "jurisdiction": "Virginia, US",
      "location": "Fairfax County, VA",
      "county_or_zone": "Fairfax County",
      "status": "service planning / transmission project",
      "capacity_claims": [
        {
          "value_mw": 176,
          "unit": "MW",
          "raw_value": "176 megawatts",
          "qualifier": "projected load requested by data-center customer",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/edsall/pdfs/application-volume-2-of-3-2024-edsall.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/edsall/pdfs/application-volume-2-of-3-2024-edsall.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "230 kV Edsall Lines and Substation Project, Application Volume 2",
      "notes": "Dominion's filing states the customer requested 176 MW of projected load for a planned data-center development in Fairfax County. Customer name is not public in the cited filing."
    },
    {
      "id": "DOMINION-LAKESIDE-MEC-240MW-2023",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "Lakeside Campus / MEC DP",
      "customer_or_developer": "MEC (customer name not otherwise identified in filing)",
      "utility_or_provider": "Dominion Energy Virginia",
      "jurisdiction": "Virginia, US",
      "location": "Mecklenburg County, VA",
      "county_or_zone": "Mecklenburg County",
      "status": "service planning / transmission project",
      "capacity_claims": [
        {
          "value_mw": 240,
          "unit": "MW",
          "raw_value": "240 MW at full build-out",
          "qualifier": "MEC data-center DP request",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/jeffress/pdfs/jeffress-scc-application-vol-1-of-3.pdf",
          "capture_date": "2023"
        },
        {
          "value_mw": 24,
          "unit": "MW",
          "raw_value": "24 MW in 2025",
          "qualifier": "summer peak forecast",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/jeffress/pdfs/jeffress-scc-application-vol-1-of-3.pdf",
          "capture_date": "2023"
        },
        {
          "value_mw": 30,
          "unit": "MW",
          "raw_value": "30 MW in 2026",
          "qualifier": "summer peak forecast",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/jeffress/pdfs/jeffress-scc-application-vol-1-of-3.pdf",
          "capture_date": "2023"
        },
        {
          "value_mw": 60,
          "unit": "MW",
          "raw_value": "60 MW in 2027",
          "qualifier": "summer peak forecast",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/jeffress/pdfs/jeffress-scc-application-vol-1-of-3.pdf",
          "capture_date": "2023"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/jeffress/pdfs/jeffress-scc-application-vol-1-of-3.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Jeffress SCC Application Volume 1",
      "notes": "Dominion's filing states MEC's DP request served a data-center customer and projects 240 MW at full build-out with 24/30/60 MW near-term summer-peak values. This is a planned service profile, not measured consumption."
    },
    {
      "id": "DOMINION-LEESBURG-AREA-1372MW-2024",
      "evidence_type": "utility_data_center_service_area_record",
      "project_name": "Leesburg Load Area — three data-center customer campuses",
      "customer_or_developer": "Three customers; names confidential in filing",
      "utility_or_provider": "Dominion Energy Virginia",
      "jurisdiction": "Virginia, US",
      "location": "Eastern Loudoun County, VA",
      "county_or_zone": "Loudoun County",
      "status": "service planning / area transmission project",
      "capacity_claims": [
        {
          "value_mw": 1372,
          "unit": "MW",
          "raw_value": "approximately 1,372 MW",
          "qualifier": "combined projected customer load plus emerging area load",
          "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-2-of-3-2024.pdf",
          "capture_date": "2024"
        }
      ],
      "source_authority": "Dominion Energy regulatory filing",
      "source_url": "https://www.dominionenergy.com/-/media/content/about/power-line-projects/nova/pdfs/application-documents/application-volume-2-of-3-2024.pdf",
      "capture_date": "2026-09-26",
      "source_scope": "Leesburg Load Area data-center service planning",
      "notes": "The 1,372 MW figure covers combined projected customer load and emerging load in the area; it is an area-level figure and must not be added to the three campus records separately."
    },
    {
      "id": "GA-GEORGIA-POWER-HILLS-BRIDGE-LARGE-LOAD-2026",
      "evidence_type": "utility_named_large_load_transmission_project",
      "project_name": "Hills Bridge–Speedway 500 kV Transmission Project",
      "customer_or_developer": "Customer not publicly named",
      "utility_or_provider": "Georgia Power",
      "jurisdiction": "Georgia, US",
      "location": "Henry and Clayton Counties, GA",
      "county_or_zone": "Henry / Clayton Counties",
      "status": "transmission project under development",
      "capacity_claims": [],
      "source_authority": "utility primary source",
      "source_url": "https://www.georgiapower.com/about/grid-reliability/grid-projects/transmission-projects/hills-bridge-speedway.html",
      "capture_date": "2026-09-26",
      "source_scope": "Georgia Power project page",
      "notes": "Georgia Power states the transmission project is being developed to serve a specific large-load customer. No project MW is published on the cited page, so no load capacity is inferred."
    },
    {
      "id": "ALABAMA-POWER-DOTIER-CONTRACT-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "Dotier LLC — Alabama Power electric-service contract",
      "customer_or_developer": "Dotier LLC (Meta subsidiary)",
      "utility_or_provider": "Alabama Power",
      "jurisdiction": "Alabama, US",
      "location": "Montgomery, AL",
      "county_or_zone": "Montgomery County",
      "status": "contract filed with Alabama PSC",
      "capacity_claims": [],
      "source_authority": "Alabama PSC filing reporting / utility contract evidence",
      "source_url": "https://energyandpolicy.org/alabama-power-data-center-contracts-redacted/",
      "capture_date": "2026-09-26",
      "source_scope": "Alabama Power large-load contract filed June 18, 2026",
      "notes": "Alabama Power filed a contract with Dotier LLC on June 18, 2026. Public contract capacity is redacted. Alabama environmental permitting identifies Dotier Data Center at 1055 Hyundai Boulevard, Montgomery. No load MW is inferred from unrelated generator ratings or investment figures."
    },
    {
      "id": "ALABAMA-POWER-NEBIUS-CONTRACT-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "Alabama ADC Holdings LLC — Alabama Power electric-service contract",
      "customer_or_developer": "Alabama ADC Holdings LLC (Nebius affiliate)",
      "utility_or_provider": "Alabama Power",
      "jurisdiction": "Alabama, US",
      "location": "Birmingham, AL",
      "county_or_zone": "Jefferson County",
      "status": "contract filed with Alabama PSC",
      "capacity_claims": [],
      "source_authority": "Alabama PSC contract transmittal / public contract evidence",
      "source_url": "https://www.scribd.com/document/1068237120/Alabama-Power-electronic-filing-contract-for-electric-service-with-Alabama-ADC-Holdings-LLC",
      "capture_date": "2026-09-26",
      "source_scope": "Alabama Power electric-service contract filed July 24, 2026",
      "notes": "The public contract version is redacted. Independent public records identify Alabama ADC Holdings LLC as a Nebius affiliate and identify the Birmingham AI data-center site. Contract capacity remains unknown in the public contract; no MW is inferred."
    },
    {
      "id": "ALABAMA-POWER-WOOSTOR-CONTRACT-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "Woostor LLC — Alabama Power electric-service contract",
      "customer_or_developer": "Woostor LLC",
      "utility_or_provider": "Alabama Power",
      "jurisdiction": "Alabama, US",
      "location": null,
      "county_or_zone": null,
      "status": "contract filed with Alabama PSC",
      "capacity_claims": [],
      "source_authority": "Alabama PSC contract evidence / secondary filing review",
      "source_url": "https://energyandpolicy.org/alabama-power-data-center-contracts-redacted/",
      "capture_date": "2026-09-26",
      "source_scope": "Alabama Power electric-service contract filed August 14, 2026",
      "notes": "The public contract is redacted and the customer/site has not been identified in the public sources reviewed. This record is intentionally unlocated; it should not be assigned an Alabama city centroid because that would imply a false site."
    },
    {
      "id": "ERCOT-30INR0031-CALDWELL-2026",
      "evidence_type": "secondary_data_center_interconnection_project",
      "project_name": "Caldwell County Energy Center",
      "customer_or_developer": "Caldwell County Energy Center, LLC",
      "utility_or_provider": "ERCOT",
      "jurisdiction": "Texas, US",
      "location": "Caldwell County, TX",
      "county_or_zone": "Caldwell County",
      "queue_id": "30INR0031",
      "status": "SS Completed, FIS Started, No IA",
      "planned_in_service": "2025-02-03",
      "capacity_claims": [
        {
          "value_mw": 1500,
          "unit": "MW",
          "raw_value": "1,500 MW",
          "qualifier": "public facility tracker interconnection capacity"
        }
      ],
      "source_authority": "secondary public facility/permit tracker",
      "source_url": "https://savrn.com/data-center-permits-tracker",
      "capture_date": "2026-09-26",
      "source_scope": "Current Data Center Permits Tracker",
      "notes": "Named ERCOT data-center interconnection project. Treat as secondary facility evidence and potentially overlapping with the core ERCOT queue row; not added to core totals."
    },
    {
      "id": "ERCOT-33INR0005-BULLOCK-2026",
      "evidence_type": "secondary_data_center_interconnection_project",
      "project_name": "Bullock Data Center",
      "customer_or_developer": "Bullock Data Center, LLC",
      "utility_or_provider": "ERCOT",
      "jurisdiction": "Texas, US",
      "location": "Hill County, TX",
      "county_or_zone": "Hill County",
      "queue_id": "33INR0005",
      "status": "SS Completed, FIS Started, No IA",
      "planned_in_service": "2026-06-12",
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1,400 MW",
          "qualifier": "public facility tracker interconnection capacity"
        }
      ],
      "source_authority": "secondary public facility/permit tracker",
      "source_url": "https://savrn.com/data-center-permits-tracker",
      "capture_date": "2026-09-26",
      "source_scope": "Current Data Center Permits Tracker",
      "notes": "Named ERCOT data-center interconnection project. Secondary source; likely overlaps ERCOT queue data and is therefore non-additive."
    },
    {
      "id": "ERCOT-33INR0006-LIBERTY-2026",
      "evidence_type": "secondary_data_center_interconnection_project",
      "project_name": "Liberty Thermal Energy Center / Liberty Data Center I",
      "customer_or_developer": "Liberty Data Center I, LLC",
      "utility_or_provider": "ERCOT",
      "jurisdiction": "Texas, US",
      "location": "Hill County, TX",
      "county_or_zone": "Hill County",
      "queue_id": "33INR0006",
      "status": "SS Completed, FIS Started, No IA",
      "planned_in_service": "2026-06-12",
      "capacity_claims": [
        {
          "value_mw": 1400,
          "unit": "MW",
          "raw_value": "1,400 MW",
          "qualifier": "public facility tracker interconnection capacity"
        }
      ],
      "source_authority": "secondary public facility/permit tracker",
      "source_url": "https://savrn.com/data-center-permits-tracker",
      "capture_date": "2026-09-26",
      "source_scope": "Current Data Center Permits Tracker",
      "notes": "Named ERCOT data-center interconnection project. Secondary source; likely overlaps ERCOT queue data and is therefore non-additive."
    },
    {
      "id": "EVERGY-DIGITAL-REALTY-KS-CENTRAL-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "Digital Realty — Evergy large-load ESA",
      "customer_or_developer": "Digital Realty",
      "utility_or_provider": "Evergy",
      "jurisdiction": "Evergy service territory / Kansas Central",
      "location": "Kansas Central",
      "status": "Signed; ESA announced May 2026",
      "capacity_claims": [],
      "source_authority": "Evergy primary investor presentation",
      "source_url": "https://investors.evergy.com/static-files/73352465-a5e0-4dbf-ac4b-98692902443f",
      "capture_date": "2026-08-11",
      "source_scope": "Evergy Q2 2026 Earnings Presentation, Data Center Announcements",
      "notes": "Evergy identifies the customer/project relationship and states the ESA is signed. Its presentation reports approximately 2.5 GW aggregate steady-state peak load for ESAs under LLPS but does not publish customer-by-customer MW; no individual MW is inferred."
    },
    {
      "id": "EVERGY-BEALE-KS-CENTRAL-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "Beale Infrastructure — Evergy large-load ESA",
      "customer_or_developer": "Beale Infrastructure",
      "utility_or_provider": "Evergy",
      "jurisdiction": "Evergy service territory / Kansas Central",
      "location": "Kansas Central",
      "status": "Signed; ESA announced February 2026",
      "capacity_claims": [],
      "source_authority": "Evergy primary investor presentation",
      "source_url": "https://investors.evergy.com/static-files/73352465-a5e0-4dbf-ac4b-98692902443f",
      "capture_date": "2026-08-11",
      "source_scope": "Evergy Q2 2026 Earnings Presentation, Data Center Announcements",
      "notes": "Evergy identifies the customer/project relationship and states the ESA is signed. Its presentation reports approximately 2.5 GW aggregate steady-state peak load for ESAs under LLPS but does not publish customer-by-customer MW; no individual MW is inferred."
    },
    {
      "id": "EVERGY-GOOGLE-MO-WEST-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "Google — Evergy large-load ESA",
      "customer_or_developer": "Google",
      "utility_or_provider": "Evergy",
      "jurisdiction": "Evergy service territory / MO West",
      "location": "MO West",
      "status": "Signed; ESA announced February 2026",
      "capacity_claims": [],
      "source_authority": "Evergy primary investor presentation",
      "source_url": "https://investors.evergy.com/static-files/73352465-a5e0-4dbf-ac4b-98692902443f",
      "capture_date": "2026-08-11",
      "source_scope": "Evergy Q2 2026 Earnings Presentation, Data Center Announcements",
      "notes": "Evergy identifies the customer/project relationship and states the ESA is signed. Its presentation reports approximately 2.5 GW aggregate steady-state peak load for ESAs under LLPS but does not publish customer-by-customer MW; no individual MW is inferred."
    },
    {
      "id": "EVERGY-GOOGLE-MO-METRO-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "Google — Evergy large-load ESA",
      "customer_or_developer": "Google",
      "utility_or_provider": "Evergy",
      "jurisdiction": "Evergy service territory / MO Metro",
      "location": "MO Metro",
      "status": "Signed; ESA announced February 2026",
      "capacity_claims": [],
      "source_authority": "Evergy primary investor presentation",
      "source_url": "https://investors.evergy.com/static-files/73352465-a5e0-4dbf-ac4b-98692902443f",
      "capture_date": "2026-08-11",
      "source_scope": "Evergy Q2 2026 Earnings Presentation, Data Center Announcements",
      "notes": "Evergy identifies the customer/project relationship and states the ESA is signed. Its presentation reports approximately 2.5 GW aggregate steady-state peak load for ESAs under LLPS but does not publish customer-by-customer MW; no individual MW is inferred."
    },
    {
      "id": "EVERGY-META-MO-WEST-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "Meta — Evergy large-load ESA",
      "customer_or_developer": "Meta",
      "utility_or_provider": "Evergy",
      "jurisdiction": "Evergy service territory / MO West",
      "location": "MO West",
      "status": "Signed; ESA announced February 2026",
      "capacity_claims": [],
      "source_authority": "Evergy primary investor presentation",
      "source_url": "https://investors.evergy.com/static-files/73352465-a5e0-4dbf-ac4b-98692902443f",
      "capture_date": "2026-08-11",
      "source_scope": "Evergy Q2 2026 Earnings Presentation, Data Center Announcements",
      "notes": "Evergy identifies the customer/project relationship and states the ESA is signed. Its presentation reports approximately 2.5 GW aggregate steady-state peak load for ESAs under LLPS but does not publish customer-by-customer MW; no individual MW is inferred."
    },
    {
      "id": "MN-PUC-HARMONY-GROUP-ESA-26-159-2026",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "Minnesota Power / Harmony Group data-center ESA",
      "customer_or_developer": "Harmony Group, LLC (Alphabet/Google subsidiary)",
      "utility_or_provider": "Minnesota Power / Minnesota Public Utilities Commission",
      "jurisdiction": "Minnesota, US",
      "location": "Hermantown, MN",
      "status": "ESA filed; Commission review",
      "capacity_claims": [],
      "source_authority": "Minnesota PUC primary source",
      "source_url": "https://mn.gov/puc/activities/v-l-e-c/data-centers/",
      "capture_date": "2026-09-26",
      "source_scope": "Data Centers — Electric Service Agreements",
      "notes": "Minnesota PUC identifies the ESA, customer, location and docket 26-159. Some customer demand estimates may be nonpublic; no MW inferred."
    },
    {
      "id": "MN-PUC-ECHO-ZONE-ESA-26-170-2026",
      "evidence_type": "utility_data_center_service_project",
      "project_name": "Xcel Energy / Echo Zone data-center ESA",
      "customer_or_developer": "Echo Zone, LLC (Google subsidiary)",
      "utility_or_provider": "Xcel Energy / Minnesota Public Utilities Commission",
      "jurisdiction": "Minnesota, US",
      "location": "Pine Island, MN",
      "status": "ESA filed; Commission review",
      "capacity_claims": [],
      "source_authority": "Minnesota PUC primary source",
      "source_url": "https://mn.gov/puc/activities/v-l-e-c/data-centers/",
      "capture_date": "2026-09-26",
      "source_scope": "Data Centers — Electric Service Agreements",
      "notes": "Minnesota PUC identifies the ESA, customer, location and docket 26-170. Some customer load estimates may be nonpublic; no MW inferred."
    },
    {
      "id": "AES-INDIANA-GOOGLE-MONROVIA-2026",
      "evidence_type": "utility_named_data_center_project",
      "project_name": "Google Monrovia data center project",
      "customer_or_developer": "Google",
      "utility_or_provider": "AES Indiana",
      "jurisdiction": "Indiana, US",
      "location": "Monrovia, IN",
      "status": "proposed; electric-service agreement filed for regulatory approval",
      "capacity_claims": [
        {
          "value_mw": 1200,
          "unit": "MW",
          "raw_value": "1,200 MW spot load growth",
          "qualifier": "IURC filing says this transmission project likely corresponds to Google (Monrovia); qualified attribution, not a direct contract value",
          "source_url": "https://www.in.gov/iurc/files/PUBLIC-AES-2025-IRP-Comments-3-6-26FINAL_Redacted.pdf",
          "capture_date": "2026-03-06"
        }
      ],
      "source_authority": "AES Indiana primary + IURC filing",
      "source_url": "https://www.aesindiana.com/press-release/aes-indiana-google-partner",
      "capture_date": "2026-09-26",
      "source_scope": "AES Indiana April 23 2026 announcement + IURC filings",
      "notes": "AES Indiana identifies the proposed Google data center in Monrovia and the customer-specific service agreement. The 1,200 MW value is retained as qualified IURC transmission-project attribution, not asserted as a direct customer contract value."
    },
    {
      "id": "NV-26-05030-VIP-LANDCO-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "NV Energy large-load ESA — VIP LANDCO, LLC",
      "customer_or_developer": "VIP LANDCO, LLC",
      "utility_or_provider": "NV Energy",
      "jurisdiction": "Nevada, US",
      "location": "Las Vegas area",
      "status": "PSC filing; portions may be confidential",
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "capture_date": "2026-09-26",
      "source_scope": "Docket 26-05030 — Large Load Electric Service Agreement",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving VIP LANDCO, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05030-PROLOGIS-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "NV Energy large-load ESA — Prologis L.P.",
      "customer_or_developer": "Prologis L.P.",
      "utility_or_provider": "NV Energy",
      "jurisdiction": "Nevada, US",
      "location": "Las Vegas area",
      "status": "PSC filing; portions may be confidential",
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "capture_date": "2026-09-26",
      "source_scope": "Docket 26-05030 — Large Load Electric Service Agreement",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving Prologis L.P.. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05029-NOVVA-LAS-VEGAS-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "NV Energy large-load ESA — Novva Las Vegas, LLC",
      "customer_or_developer": "Novva Las Vegas, LLC",
      "utility_or_provider": "NV Energy",
      "jurisdiction": "Nevada, US",
      "location": "Las Vegas, NV",
      "status": "PSC filing; portions may be confidential",
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "capture_date": "2026-09-26",
      "source_scope": "Docket 26-05029 — Large Load Electric Service Agreement",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving Novva Las Vegas, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05029-PROTON-NLV-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "NV Energy large-load ESA — Proton NLV, LLC",
      "customer_or_developer": "Proton NLV, LLC",
      "utility_or_provider": "NV Energy",
      "jurisdiction": "Nevada, US",
      "location": "Las Vegas, NV",
      "status": "PSC filing; portions may be confidential",
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "capture_date": "2026-09-26",
      "source_scope": "Docket 26-05029 — Large Load Electric Service Agreement",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving Proton NLV, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05028-VANTAGE-NV11-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "NV Energy large-load ESA — Vantage Data Centers NV11, LLC",
      "customer_or_developer": "Vantage Data Centers NV11, LLC",
      "utility_or_provider": "NV Energy",
      "jurisdiction": "Nevada, US",
      "location": "Northern Nevada",
      "status": "PSC filing; portions may be confidential",
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "capture_date": "2026-09-26",
      "source_scope": "Docket 26-05028 — Large Load Electric Service Agreement",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving Vantage Data Centers NV11, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05027-PR-RNO-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "NV Energy large-load ESA — PR RNO Property Owner 1, LLC",
      "customer_or_developer": "PR RNO Property Owner 1, LLC",
      "utility_or_provider": "NV Energy",
      "jurisdiction": "Nevada, US",
      "location": "Reno area",
      "status": "PSC filing; portions may be confidential",
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "capture_date": "2026-09-26",
      "source_scope": "Docket 26-05027 — Large Load Electric Service Agreement",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving PR RNO Property Owner 1, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05027-SV-RNO-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "NV Energy large-load ESA — SV RNO Property Owner 1, LLC",
      "customer_or_developer": "SV RNO Property Owner 1, LLC",
      "utility_or_provider": "NV Energy",
      "jurisdiction": "Nevada, US",
      "location": "Reno area",
      "status": "PSC filing; portions may be confidential",
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "capture_date": "2026-09-26",
      "source_scope": "Docket 26-05027 — Large Load Electric Service Agreement",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving SV RNO Property Owner 1, LLC. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "NV-26-05026-AMAZON-NV-2026",
      "evidence_type": "utility_large_load_contract_record",
      "project_name": "NV Energy large-load ESA — Amazon Data Services, Inc.",
      "customer_or_developer": "Amazon Data Services, Inc.",
      "utility_or_provider": "NV Energy",
      "jurisdiction": "Nevada, US",
      "location": "Nevada service territory",
      "status": "PSC filing; portions may be confidential",
      "capacity_claims": [],
      "source_authority": "Nevada Public Utilities Commission primary docket index",
      "source_url": "https://pucweb1.state.nv.us/puc2/DktInfo.aspx",
      "capture_date": "2026-09-26",
      "source_scope": "Docket 26-05026 — Large Load Electric Service Agreement",
      "notes": "Nevada PUC public docket index identifies a large-load electric-service agreement involving Amazon Data Services, Inc.. Portions of applications may receive confidential treatment; no MW is inferred from the docket title. This is a utility-contract evidence record, not an additive queue row."
    },
    {
      "id": "BLACK-HILLS-CHEYENNE-1.8GW-2026",
      "evidence_type": "utility_large_load_service_project",
      "project_name": "Prospective 1.8 GW data center project",
      "customer_or_developer": "Prospective customer (not publicly named)",
      "utility_or_provider": "Wyoming Electric / Black Hills Energy",
      "jurisdiction": "Wyoming, US",
      "location": "Cheyenne, WY",
      "status": "generation reservation agreement; definitive ESA under negotiation",
      "capacity_claims": [
        {
          "value_mw": 1800,
          "unit": "MW",
          "raw_value": "1.8 GW data center",
          "qualifier": "prospective project seeking service under Wyoming Electric LPCS tariff",
          "source_url": "https://ir.blackhillscorp.com/news-releases/news-release-details/black-hills-corp-reaffirms-2026-earnings-guidance-reports-2026",
          "capture_date": "2026-08-05"
        }
      ],
      "source_authority": "utility primary source",
      "source_url": "https://ir.blackhillscorp.com/news-releases/news-release-details/black-hills-corp-reaffirms-2026-earnings-guidance-reports-2026",
      "capture_date": "2026-09-26",
      "source_scope": "Black Hills Q2 2026 results",
      "notes": "Black Hills reported a prospective 1.8 GW data-center project in Cheyenne with a generation reservation agreement. The customer is not publicly named in the cited source; the project is not treated as energized load."
    },
    {
      "id": "DUKE-WHITEFIBER-MADISON-NC-ESA-2025",
      "evidence_type": "utility_compute_service_agreement",
      "project_name": "WhiteFiber / Enovum NC-1 — Duke Energy ESA facility",
      "customer_or_developer": "WhiteFiber / Enovum NC-1 Bidco LLC",
      "utility_or_provider": "Duke Energy Carolinas",
      "jurisdiction": "North Carolina, US",
      "location": "805 Island Drive, Madison, NC",
      "status": "existing ESA assigned Aug. 4, 2025",
      "capacity_claims": [],
      "source_authority": "SEC-filed customer report",
      "source_url": "https://www.sec.gov/Archives/edgar/data/1710350/000121390026056212/R24.htm",
      "capture_date": "2026-09-26",
      "source_scope": "WhiteFiber 2026 quarterly filing",