{
  "schema_version": 1,
  "title": "MISO complete public interconnection queue",
  "source_url": "https://www.misoenergy.org/api/giqueue/getprojects",
  "captured_at": "2026-10-25T14:23:53Z",
  "accounting": "Complete public generator-interconnection queue layer; not added to the conservative large-load core.",
  "record_count": 3995,
  "records": [
    {
      "source_row_number": 1,
      "normalized": {
        "queue_id": "J4182",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "",
        "queue_date": "2025-10-08T00:37:52+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "ERAS Study Cycle 2",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489632,
        "projectNumber": "J4182",
        "queueDate": "2025-10-08T00:37:52+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "",
        "state": "",
        "studyCycle": "ERAS Study Cycle 2",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2,
      "normalized": {
        "queue_id": "J4176",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "",
        "queue_date": "2025-10-06T23:46:01+00:00",
        "withdrawn_date": "2026-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1750.0,
        "summer_net_mw": 1750.0,
        "winter_net_mw": 1750.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489633,
        "projectNumber": "J4176",
        "queueDate": "2025-10-06T23:46:01+00:00",
        "withdrawnDate": "2026-01-02T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 1750.0,
        "winterNetMW": 1750.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3,
      "normalized": {
        "queue_id": "J4186",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "",
        "queue_date": "2025-10-07T19:20:31+00:00",
        "withdrawn_date": "2026-07-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1540.0,
        "summer_net_mw": 1540.0,
        "winter_net_mw": 1540.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489634,
        "projectNumber": "J4186",
        "queueDate": "2025-10-07T19:20:31+00:00",
        "withdrawnDate": "2026-07-01T04:00:00+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 1540.0,
        "winterNetMW": 1540.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 4,
      "normalized": {
        "queue_id": "J4177",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2025-10-07T23:07:23+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 735.0,
        "summer_net_mw": 735.0,
        "winter_net_mw": 735.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489635,
        "projectNumber": "J4177",
        "queueDate": "2025-10-07T23:07:23+00:00",
        "inService": "2030-01-02T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 735.0,
        "winterNetMW": 735.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 5,
      "normalized": {
        "queue_id": "J4179",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2025-10-07T20:34:28+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 735.0,
        "summer_net_mw": 735.0,
        "winter_net_mw": 735.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489636,
        "projectNumber": "J4179",
        "queueDate": "2025-10-07T20:34:28+00:00",
        "inService": "2030-01-02T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 735.0,
        "winterNetMW": 735.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 6,
      "normalized": {
        "queue_id": "J4184",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2025-10-07T20:25:22+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 755.0,
        "summer_net_mw": 755.0,
        "winter_net_mw": 755.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489637,
        "projectNumber": "J4184",
        "queueDate": "2025-10-07T20:25:22+00:00",
        "inService": "2030-02-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 755.0,
        "winterNetMW": 755.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 7,
      "normalized": {
        "queue_id": "J4175",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "",
        "queue_date": "2025-10-07T19:08:44+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 770.0,
        "summer_net_mw": 770.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489638,
        "projectNumber": "J4175",
        "queueDate": "2025-10-07T19:08:44+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 770.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 8,
      "normalized": {
        "queue_id": "J4181",
        "county": "",
        "state": "",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "",
        "queue_date": "2025-10-07T20:21:33+00:00",
        "withdrawn_date": "2026-04-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 755.0,
        "summer_net_mw": 755.0,
        "winter_net_mw": 755.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489639,
        "projectNumber": "J4181",
        "queueDate": "2025-10-07T20:21:33+00:00",
        "withdrawnDate": "2026-04-28T04:00:00+00:00",
        "inService": "2030-02-01T05:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 755.0,
        "winterNetMW": 755.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 9,
      "normalized": {
        "queue_id": "J4146",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "",
        "queue_date": "2025-09-06T01:17:28+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2028-08-04T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-08-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "0MW GIA",
        "study_group": "NA",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489640,
        "projectNumber": "J4146",
        "queueDate": "2025-09-06T01:17:28+00:00",
        "inService": "2028-08-04T04:00:00+00:00",
        "negInService": "2028-08-04T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "",
        "state": "",
        "studyCycle": "0MW GIA",
        "studyGroup": "NA",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 10,
      "normalized": {
        "queue_id": "J4183",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "",
        "queue_date": "2025-10-07T01:41:17+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 99.9,
        "summer_net_mw": 99.9,
        "winter_net_mw": 99.9,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 23.0,
        "dp1_nris_mw": 23.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489641,
        "projectNumber": "J4183",
        "queueDate": "2025-10-07T01:41:17+00:00",
        "inService": "2027-04-28T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 99.9,
        "winterNetMW": 99.9,
        "dp1ErisMw": 23.0,
        "dp1NrisMw": 23.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 11,
      "normalized": {
        "queue_id": "J4180",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2025-10-07T20:00:44+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 755.0,
        "summer_net_mw": 755.0,
        "winter_net_mw": 755.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489642,
        "projectNumber": "J4180",
        "queueDate": "2025-10-07T20:00:44+00:00",
        "inService": "2030-01-02T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 755.0,
        "winterNetMW": 755.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 12,
      "normalized": {
        "queue_id": "J4187",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2025-10-07T20:12:47+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 755.0,
        "summer_net_mw": 755.0,
        "winter_net_mw": 755.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489643,
        "projectNumber": "J4187",
        "queueDate": "2025-10-07T20:12:47+00:00",
        "inService": "2030-01-02T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 755.0,
        "winterNetMW": 755.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 13,
      "normalized": {
        "queue_id": "J4185",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "",
        "queue_date": "2025-10-07T19:50:56+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 755.0,
        "summer_net_mw": 755.0,
        "winter_net_mw": 755.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489644,
        "projectNumber": "J4185",
        "queueDate": "2025-10-07T19:50:56+00:00",
        "inService": "2030-01-02T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 755.0,
        "winterNetMW": 755.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 14,
      "normalized": {
        "queue_id": "J3464",
        "county": "Story",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Fernald",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489645,
        "projectNumber": "J3464",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Story",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fernald",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 15,
      "normalized": {
        "queue_id": "J3834",
        "county": "Gibson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Francisco 345.0kV",
        "queue_date": "2024-09-19T04:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489646,
        "projectNumber": "J3834",
        "queueDate": "2024-09-19T04:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Gibson",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Francisco 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 16,
      "normalized": {
        "queue_id": "J3463",
        "county": "Jefferson",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "LORMAN SS (CE) - FAYETTE 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-06-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489647,
        "projectNumber": "J3463",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-06-09T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Jefferson",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LORMAN SS (CE) - FAYETTE 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 17,
      "normalized": {
        "queue_id": "J3462",
        "county": "Tama",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Dysart - Traer 161kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-06-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 187.0,
        "summer_net_mw": 187.0,
        "winter_net_mw": 187.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489648,
        "projectNumber": "J3462",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-06-04T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Tama",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dysart - Traer 161kV",
        "summerNetMW": 187.0,
        "winterNetMW": 187.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 18,
      "normalized": {
        "queue_id": "J3461",
        "county": "Muscatine",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SUB 56 - SUB 89 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 156.0,
        "summer_net_mw": 156.0,
        "winter_net_mw": 156.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 156.0,
        "dp1_nris_mw": 156.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489649,
        "projectNumber": "J3461",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Muscatine",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SUB 56 - SUB 89 161.0kV",
        "summerNetMW": 156.0,
        "winterNetMW": 156.0,
        "dp1ErisMw": 156.0,
        "dp1NrisMw": 156.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 19,
      "normalized": {
        "queue_id": "J3485",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "RAPSON",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489650,
        "projectNumber": "J3485",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RAPSON",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 20,
      "normalized": {
        "queue_id": "J3483",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4RANTOUL  - 4RISING   138.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 137.4,
        "summer_net_mw": 137.4,
        "winter_net_mw": 137.4,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489651,
        "projectNumber": "J3483",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4RANTOUL  - 4RISING   138.0kV",
        "summerNetMW": 137.4,
        "winterNetMW": 137.4,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 21,
      "normalized": {
        "queue_id": "J3833",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Buffalo 115 kV",
        "queue_date": "2024-10-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489652,
        "projectNumber": "J3833",
        "queueDate": "2024-10-01T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Buffalo 115 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 22,
      "normalized": {
        "queue_id": "J3487",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "CAYUGA 345",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489653,
        "projectNumber": "J3487",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CAYUGA 345",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 23,
      "normalized": {
        "queue_id": "J3482",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489654,
        "projectNumber": "J3482",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Other_",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 24,
      "normalized": {
        "queue_id": "J3484",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "EL DORADO EHV - SAREPTA 345/115 SS 345.0kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-02-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489655,
        "projectNumber": "J3484",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-02-28T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "EL DORADO EHV - SAREPTA 345/115 SS 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 25,
      "normalized": {
        "queue_id": "J3490",
        "county": "Caldwell",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Caldwell County",
        "queue_date": "2024-03-21T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489656,
        "projectNumber": "J3490",
        "queueDate": "2024-03-21T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Caldwell",
        "state": "KY",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Caldwell County",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 26,
      "normalized": {
        "queue_id": "J3491",
        "county": "Posey",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-04-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489657,
        "projectNumber": "J3491",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-04-11T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Posey",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 27,
      "normalized": {
        "queue_id": "J3319",
        "county": "Webster",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "SAREPTA 345/115 SS",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-05-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489658,
        "projectNumber": "J3319",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-05-23T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Webster",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SAREPTA 345/115 SS",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 28,
      "normalized": {
        "queue_id": "J3336",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "RINGLE",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 41.8,
        "summer_net_mw": 41.8,
        "winter_net_mw": 41.8,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 41.8,
        "dp1_nris_mw": 41.8,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489659,
        "projectNumber": "J3336",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RINGLE",
        "summerNetMW": 41.8,
        "winterNetMW": 41.8,
        "dp1ErisMw": 41.8,
        "dp1NrisMw": 41.8,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 29,
      "normalized": {
        "queue_id": "J3296",
        "county": "Hamilton",
        "state": "IL",
        "transmission_owner": "Southern Illinois Power Cooperative",
        "poi": "Hamilton",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 202.19,
        "dp1_nris_mw": 202.19,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489660,
        "projectNumber": "J3296",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "Southern Illinois Power Cooperative",
        "county": "Hamilton",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hamilton",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 202.19,
        "dp1NrisMw": 202.19,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 30,
      "normalized": {
        "queue_id": "J3792",
        "county": "Gratiot",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ALMA - VESTABURG 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489661,
        "projectNumber": "J3792",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "ALMA - VESTABURG 138.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 31,
      "normalized": {
        "queue_id": "J3402",
        "county": "Juneau",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "New J1502 TO Switching Station (Emerson)",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489662,
        "projectNumber": "J3402",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Juneau",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "New J1502 TO Switching Station (Emerson)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 32,
      "normalized": {
        "queue_id": "J3457",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 215.0,
        "summer_net_mw": 215.0,
        "winter_net_mw": 215.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-02-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 215.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489663,
        "projectNumber": "J3457",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "inService": "2027-02-28T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "summerNetMW": 215.0,
        "winterNetMW": 215.0,
        "dp1ErisMw": 215.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 33,
      "normalized": {
        "queue_id": "J3794",
        "county": "Daviess",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Daviess County - Utica 69.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489664,
        "projectNumber": "J3794",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-25T04:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Daviess",
        "state": "KY",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Daviess County - Utica 69.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 34,
      "normalized": {
        "queue_id": "J3793",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "East Leesville - Rodemacher 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489665,
        "projectNumber": "J3793",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "East Leesville - Rodemacher 230.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 35,
      "normalized": {
        "queue_id": "J3297",
        "county": "St. Clair",
        "state": "IL",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Herzog",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489666,
        "projectNumber": "J3297",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "St. Clair",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Herzog",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 36,
      "normalized": {
        "queue_id": "J3298",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Towerline",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489667,
        "projectNumber": "J3298",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Towerline",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 37,
      "normalized": {
        "queue_id": "J3802",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "RITCHIE SWYD - TARLETON 230.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489668,
        "projectNumber": "J3802",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-04T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RITCHIE SWYD - TARLETON 230.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 38,
      "normalized": {
        "queue_id": "J3776",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "TittabawASSEe",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489669,
        "projectNumber": "J3776",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TittabawASSEe",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 39,
      "normalized": {
        "queue_id": "J3777",
        "county": "Cheboygan",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MC GULPIN - RIGGSVILLE (MILL CREEK) 138.0kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 91.8,
        "summer_net_mw": 91.8,
        "winter_net_mw": 91.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 91.8,
        "dp1_nris_mw": 91.8,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489670,
        "projectNumber": "J3777",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Cheboygan",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MC GULPIN - RIGGSVILLE (MILL CREEK) 138.0kV",
        "summerNetMW": 91.8,
        "winterNetMW": 91.8,
        "dp1ErisMw": 91.8,
        "dp1NrisMw": 91.8,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 40,
      "normalized": {
        "queue_id": "J3779",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-08-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489671,
        "projectNumber": "J3779",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-08-13T04:00:00+00:00",
        "inService": "2026-10-15T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 41,
      "normalized": {
        "queue_id": "J3795",
        "county": "Knox",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7FABIUS - 7MAYWOOD 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 91.0,
        "summer_net_mw": 91.0,
        "winter_net_mw": 91.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489672,
        "projectNumber": "J3795",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-25T04:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Knox",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7FABIUS - 7MAYWOOD 345.0kV",
        "summerNetMW": 91.0,
        "winterNetMW": 91.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 42,
      "normalized": {
        "queue_id": "J3797",
        "county": "Edgar",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7KANSAS   - 08SUGCRK 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 141.23,
        "summer_net_mw": 141.23,
        "winter_net_mw": 141.23,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 141.23,
        "dp1_nris_mw": 109.8,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489673,
        "projectNumber": "J3797",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Edgar",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7KANSAS   - 08SUGCRK 345.0kV",
        "summerNetMW": 141.23,
        "winterNetMW": 141.23,
        "dp1ErisMw": 141.23,
        "dp1NrisMw": 109.8,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 43,
      "normalized": {
        "queue_id": "J4178",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "",
        "queue_date": "2025-10-07T19:42:02+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 755.0,
        "summer_net_mw": 755.0,
        "winter_net_mw": 755.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489674,
        "projectNumber": "J4178",
        "queueDate": "2025-10-07T19:42:02+00:00",
        "inService": "2030-01-02T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 755.0,
        "winterNetMW": 755.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 44,
      "normalized": {
        "queue_id": "J3831",
        "county": "Madison",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Noblesville (Duke) - Fall Creek (AEP/PJM) 345.0kV",
        "queue_date": "2024-10-08T04:00:00+00:00",
        "withdrawn_date": "2025-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 240.0,
        "summer_net_mw": 215.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489675,
        "projectNumber": "J3831",
        "queueDate": "2024-10-08T04:00:00+00:00",
        "withdrawnDate": "2025-12-22T05:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Madison",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Noblesville (Duke) - Fall Creek (AEP/PJM) 345.0kV",
        "summerNetMW": 215.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 45,
      "normalized": {
        "queue_id": "J3832",
        "county": "Macomb",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Lenox 120kV Substation (Bus #264749)",
        "queue_date": "2024-07-30T04:00:00+00:00",
        "withdrawn_date": "2025-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-05T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489676,
        "projectNumber": "J3832",
        "queueDate": "2024-07-30T04:00:00+00:00",
        "withdrawnDate": "2025-12-22T05:00:00+00:00",
        "inService": "2028-04-05T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Macomb",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Lenox 120kV Substation (Bus #264749)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 46,
      "normalized": {
        "queue_id": "J3486",
        "county": "Muskegon",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Rogers 138 kV Substation",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489677,
        "projectNumber": "J3486",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-25T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Muskegon",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rogers 138 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 47,
      "normalized": {
        "queue_id": "J3492",
        "county": "Posey",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-04-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489678,
        "projectNumber": "J3492",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-04-11T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Posey",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 48,
      "normalized": {
        "queue_id": "J3337",
        "county": "Stoddard",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5VANDUSER",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 230.0,
        "summer_net_mw": 230.0,
        "winter_net_mw": 230.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489679,
        "projectNumber": "J3337",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Stoddard",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "5VANDUSER",
        "summerNetMW": 230.0,
        "winterNetMW": 230.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 49,
      "normalized": {
        "queue_id": "J3400",
        "county": "Deuel",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Astoria 345kV substation",
        "queue_date": "2024-03-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 142.2,
        "summer_net_mw": 142.2,
        "winter_net_mw": 142.2,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-19T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 142.2,
        "dp1_nris_mw": 142.2,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489680,
        "projectNumber": "J3400",
        "queueDate": "2024-03-20T04:00:00+00:00",
        "inService": "2028-04-19T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Deuel",
        "state": "SD",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Astoria 345kV substation",
        "summerNetMW": 142.2,
        "winterNetMW": 142.2,
        "dp1ErisMw": 142.2,
        "dp1NrisMw": 142.2,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 50,
      "normalized": {
        "queue_id": "J3407",
        "county": "Manistee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "LINDEMAN - TIPPY 138.0kV",
        "queue_date": "2024-04-11T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489681,
        "projectNumber": "J3407",
        "queueDate": "2024-04-11T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2028-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Manistee",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LINDEMAN - TIPPY 138.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 51,
      "normalized": {
        "queue_id": "J3488",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "CAYUGA 345",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489682,
        "projectNumber": "J3488",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CAYUGA 345",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 52,
      "normalized": {
        "queue_id": "J3493",
        "county": "McDonough",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489683,
        "projectNumber": "J3493",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "McDonough",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 53,
      "normalized": {
        "queue_id": "J3456",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "San Jose Rail Switching Station",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489684,
        "projectNumber": "J3456",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "San Jose Rail Switching Station",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 54,
      "normalized": {
        "queue_id": "J3293",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport IGCC - Amo 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489685,
        "projectNumber": "J3293",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport IGCC - Amo 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 55,
      "normalized": {
        "queue_id": "J3294",
        "county": "Daviess",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "GPC Primary - Sandborn Primary 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489686,
        "projectNumber": "J3294",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-16T04:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Daviess",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GPC Primary - Sandborn Primary 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 56,
      "normalized": {
        "queue_id": "J3778",
        "county": "Otter Tail",
        "state": "MN",
        "transmission_owner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "poi": "Fergus Falls MRES/WMMPA",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489687,
        "projectNumber": "J3778",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-08-15T04:00:00+00:00",
        "transmissionOwner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "county": "Otter Tail",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fergus Falls MRES/WMMPA",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 57,
      "normalized": {
        "queue_id": "J3335",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 222.0,
        "summer_net_mw": 222.0,
        "winter_net_mw": 222.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489688,
        "projectNumber": "J3335",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 222.0,
        "winterNetMW": 222.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 58,
      "normalized": {
        "queue_id": "J3334",
        "county": "LaPorte",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "MAPLE",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489689,
        "projectNumber": "J3334",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "LaPorte",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MAPLE",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 59,
      "normalized": {
        "queue_id": "J3498",
        "county": "Knox",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7FARGO - 7SANDBURG 345.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489690,
        "projectNumber": "J3498",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Knox",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7FARGO - 7SANDBURG 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 60,
      "normalized": {
        "queue_id": "J3608",
        "county": "Henry",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "New Castle I Avenue",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 77.6,
        "summer_net_mw": 77.6,
        "winter_net_mw": 77.6,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489691,
        "projectNumber": "J3608",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Henry",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "New Castle I Avenue",
        "summerNetMW": 77.6,
        "winterNetMW": 77.6,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 61,
      "normalized": {
        "queue_id": "J3372",
        "county": "Macoupin",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Rezzy",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489692,
        "projectNumber": "J3372",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macoupin",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rezzy",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 62,
      "normalized": {
        "queue_id": "J3295",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cole - Penton Road 230.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489693,
        "projectNumber": "J3295",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cole - Penton Road 230.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 63,
      "normalized": {
        "queue_id": "J3299",
        "county": "Jefferson",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "BEVIL",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489694,
        "projectNumber": "J3299",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jefferson",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BEVIL",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 64,
      "normalized": {
        "queue_id": "J3824",
        "county": "Roberts",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Twin Brooks 345 kV Substation",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2024-06-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489695,
        "projectNumber": "J3824",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2024-06-28T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Roberts",
        "state": "SD",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Twin Brooks 345 kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 65,
      "normalized": {
        "queue_id": "J3500",
        "county": "Chisago",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "CHISAGO COUNTY",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489696,
        "projectNumber": "J3500",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chisago",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CHISAGO COUNTY",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 66,
      "normalized": {
        "queue_id": "J3549",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "NOT IN DROPDOWN MENU",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 515.0,
        "summer_net_mw": 484.5,
        "winter_net_mw": 515.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489697,
        "projectNumber": "J3549",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NOT IN DROPDOWN MENU",
        "summerNetMW": 484.5,
        "winterNetMW": 515.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 67,
      "normalized": {
        "queue_id": "J3502",
        "county": "Van Buren",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ARGENTA - PALISADES 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489698,
        "projectNumber": "J3502",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Van Buren",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ARGENTA - PALISADES 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 68,
      "normalized": {
        "queue_id": "J3548",
        "county": "Marshall",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Laurel",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-07-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 62.0,
        "summer_net_mw": 62.0,
        "winter_net_mw": 62.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489699,
        "projectNumber": "J3548",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-07-09T04:00:00+00:00",
        "inService": "2027-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Marshall",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Laurel",
        "summerNetMW": 62.0,
        "winterNetMW": 62.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 69,
      "normalized": {
        "queue_id": "J3550",
        "county": "Dubois",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Duff - Dubois 138.0 kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489700,
        "projectNumber": "J3550",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2027-09-10T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Dubois",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Duff - Dubois 138.0 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 70,
      "normalized": {
        "queue_id": "J3574",
        "county": "Wayne",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489701,
        "projectNumber": "J3574",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Wayne",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 71,
      "normalized": {
        "queue_id": "J3612",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Fisher - Many 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489702,
        "projectNumber": "J3612",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fisher - Many 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 72,
      "normalized": {
        "queue_id": "J3614",
        "county": "Ashley",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "CROSSETT NORTH - HAMBURG 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489703,
        "projectNumber": "J3614",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ashley",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CROSSETT NORTH - HAMBURG 115.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 73,
      "normalized": {
        "queue_id": "J3610",
        "county": "Tyler",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "DOUCETTE",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489704,
        "projectNumber": "J3610",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-03-25T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Tyler",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DOUCETTE",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 74,
      "normalized": {
        "queue_id": "J3671",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4NEOGA 2 - 4SHELBYVL E 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-07-27T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489705,
        "projectNumber": "J3671",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-07-27T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4NEOGA 2 - 4SHELBYVL E 138.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 75,
      "normalized": {
        "queue_id": "J3798",
        "county": "Winnebago",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Bison - Colby 345kV",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 320.0,
        "summer_net_mw": 320.0,
        "winter_net_mw": 320.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 320.0,
        "dp1_nris_mw": 320.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489706,
        "projectNumber": "J3798",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Winnebago",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bison - Colby 345kV",
        "summerNetMW": 320.0,
        "winterNetMW": 320.0,
        "dp1ErisMw": 320.0,
        "dp1NrisMw": 320.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 76,
      "normalized": {
        "queue_id": "J3499",
        "county": "Kosciusko",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "LEESBURG - DEEDSVILLE (DUKE) 345.0kV",
        "queue_date": "2024-04-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489707,
        "projectNumber": "J3499",
        "queueDate": "2024-04-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Kosciusko",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LEESBURG - DEEDSVILLE (DUKE) 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 77,
      "normalized": {
        "queue_id": "J3501",
        "county": "Wexford",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KEYSTONE - TIPPY 138.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489708,
        "projectNumber": "J3501",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Wexford",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "KEYSTONE - TIPPY 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 78,
      "normalized": {
        "queue_id": "J3544",
        "county": "Tama",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Abbott",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 62.0,
        "summer_net_mw": 62.0,
        "winter_net_mw": 62.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489709,
        "projectNumber": "J3544",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-09T04:00:00+00:00",
        "inService": "2027-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Tama",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Abbott",
        "summerNetMW": 62.0,
        "winterNetMW": 62.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 79,
      "normalized": {
        "queue_id": "J3682",
        "county": "Muskegon",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "FOUR MILE - WHITE ROAD 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489710,
        "projectNumber": "J3682",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "FOUR MILE - WHITE ROAD 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 80,
      "normalized": {
        "queue_id": "J3701",
        "county": "Taylor",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "ORIENT - NORTHBORO 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489711,
        "projectNumber": "J3701",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Taylor",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "ORIENT - NORTHBORO 345.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 81,
      "normalized": {
        "queue_id": "J3551",
        "county": "Mahaska",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "BEACON",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489712,
        "projectNumber": "J3551",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2027-09-10T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Mahaska",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BEACON",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 82,
      "normalized": {
        "queue_id": "J3611",
        "county": "Hamilton",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7W_FRFT_E - 7NORRIS   345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489713,
        "projectNumber": "J3611",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2026-12-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Hamilton",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7W_FRFT_E - 7NORRIS   345.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 83,
      "normalized": {
        "queue_id": "J3609",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "NELSON 138 SWYD - LONGVILLE (CLECO) 138.0kV",
        "queue_date": "2024-04-02T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 93.1,
        "summer_net_mw": 93.1,
        "winter_net_mw": 93.1,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-27T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489714,
        "projectNumber": "J3609",
        "queueDate": "2024-04-02T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2027-12-27T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "NELSON 138 SWYD - LONGVILLE (CLECO) 138.0kV",
        "summerNetMW": 93.1,
        "winterNetMW": 93.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 84,
      "normalized": {
        "queue_id": "J3672",
        "county": "Big Stone",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South - Alexandira 345kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489715,
        "projectNumber": "J3672",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-10-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Big Stone",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Big Stone South - Alexandira 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 85,
      "normalized": {
        "queue_id": "J3690",
        "county": "Scott",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5STODDARD - 5MORLEY (AECI) 161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489716,
        "projectNumber": "J3690",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Scott",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5STODDARD - 5MORLEY (AECI) 161.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 86,
      "normalized": {
        "queue_id": "J3708",
        "county": "Jefferson",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "LEGEND",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 770.0,
        "summer_net_mw": 735.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489717,
        "projectNumber": "J3708",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2027-04-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jefferson",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LEGEND",
        "summerNetMW": 735.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 87,
      "normalized": {
        "queue_id": "J3709",
        "county": "Marion",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Georgetown",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 47.0,
        "summer_net_mw": 47.0,
        "winter_net_mw": 47.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489718,
        "projectNumber": "J3709",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-07-31T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Marion",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Georgetown",
        "summerNetMW": 47.0,
        "winterNetMW": 47.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 88,
      "normalized": {
        "queue_id": "J1896",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Henderson to AB Brown 138 kV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489719,
        "projectNumber": "J1896",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Henderson to AB Brown 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 89,
      "normalized": {
        "queue_id": "J2125",
        "county": "Clay",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Xenia to W Mt Vernon 345 kV",
        "queue_date": "2021-08-21T04:00:00+00:00",
        "withdrawn_date": "2024-08-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489720,
        "projectNumber": "J2125",
        "queueDate": "2021-08-21T04:00:00+00:00",
        "withdrawnDate": "2024-08-16T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Clay",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Xenia to W Mt Vernon 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 90,
      "normalized": {
        "queue_id": "J2144",
        "county": "Jasper",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Schahfer 345 kV Sub",
        "queue_date": "2021-09-02T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 195.0,
        "summer_net_mw": 155.2,
        "winter_net_mw": 195.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489721,
        "projectNumber": "J2144",
        "queueDate": "2021-09-02T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Jasper",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Schahfer 345 kV Sub",
        "summerNetMW": 155.2,
        "winterNetMW": 195.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 91,
      "normalized": {
        "queue_id": "J3607",
        "county": "Henry",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "New Castle I Avenue",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 47.4,
        "summer_net_mw": 47.4,
        "winter_net_mw": 47.4,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489722,
        "projectNumber": "J3607",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Henry",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "New Castle I Avenue",
        "summerNetMW": 47.4,
        "winterNetMW": 47.4,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 92,
      "normalized": {
        "queue_id": "J3613",
        "county": "Ashley",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "CROSSETT NORTH - HAMBURG 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489723,
        "projectNumber": "J3613",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ashley",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CROSSETT NORTH - HAMBURG 115.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 93,
      "normalized": {
        "queue_id": "J3715",
        "county": "Jackson",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489724,
        "projectNumber": "J3715",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Jackson",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 94,
      "normalized": {
        "queue_id": "J2207",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Henderson to AB Brown 138 kV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489725,
        "projectNumber": "J2207",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Henderson to AB Brown 138 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 95,
      "normalized": {
        "queue_id": "J3615",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "STUTTGART NORTH SS - STUTTGART RICUSKEY 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489726,
        "projectNumber": "J3615",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STUTTGART NORTH SS - STUTTGART RICUSKEY 115.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 96,
      "normalized": {
        "queue_id": "J3669",
        "county": "Stevens",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South - Alexandria 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489727,
        "projectNumber": "J3669",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-02-01T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Stevens",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Big Stone South - Alexandria 345.0kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 97,
      "normalized": {
        "queue_id": "J3691",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "REYNOLDS",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489728,
        "projectNumber": "J3691",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REYNOLDS",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 98,
      "normalized": {
        "queue_id": "J3692",
        "county": "Cheboygan",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "PORT CALCITE - RIGGSVILLE 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489729,
        "projectNumber": "J3692",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Cheboygan",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PORT CALCITE - RIGGSVILLE 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 99,
      "normalized": {
        "queue_id": "J2286",
        "county": "Polk",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Praire - Winger 230kV",
        "queue_date": "2021-07-14T04:00:00+00:00",
        "withdrawn_date": "2021-09-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489730,
        "projectNumber": "J2286",
        "queueDate": "2021-07-14T04:00:00+00:00",
        "withdrawnDate": "2021-09-10T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Polk",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Praire - Winger 230kV",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 100,
      "normalized": {
        "queue_id": "J3725",
        "county": "Louisa",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SUB 93 LOUISA - SUB T HASKINS 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489731,
        "projectNumber": "J3725",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Louisa",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SUB 93 LOUISA - SUB T HASKINS 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 101,
      "normalized": {
        "queue_id": "J3724",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "",
        "poi": "Sandford",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 132.0,
        "summer_net_mw": 132.0,
        "winter_net_mw": 132.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 132.0,
        "dp1_nris_mw": 132.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489732,
        "projectNumber": "J3724",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sandford",
        "summerNetMW": 132.0,
        "winterNetMW": 132.0,
        "dp1ErisMw": 132.0,
        "dp1NrisMw": 132.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 102,
      "normalized": {
        "queue_id": "J3733",
        "county": "Gibson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Oakland City  - Old Ben Coal 138.0kV",
        "queue_date": "2024-05-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Transfer",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-17T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489733,
        "projectNumber": "J3733",
        "queueDate": "2024-05-25T04:00:00+00:00",
        "inService": "2028-04-17T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Gibson",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Oakland City  - Old Ben Coal 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Transfer",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 103,
      "normalized": {
        "queue_id": "J3405",
        "county": "St. Louis",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Shannon - Minntac 230kV",
        "queue_date": "2024-04-10T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 144.0,
        "summer_net_mw": 144.0,
        "winter_net_mw": 144.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-09T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489734,
        "projectNumber": "J3405",
        "queueDate": "2024-04-10T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-06-09T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "St. Louis",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Shannon - Minntac 230kV",
        "summerNetMW": 144.0,
        "winterNetMW": 144.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 104,
      "normalized": {
        "queue_id": "J3410",
        "county": "Washington",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7PR STATE - 7MTVERNW 345.0kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-08-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489735,
        "projectNumber": "J3410",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-08-15T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Washington",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7PR STATE - 7MTVERNW 345.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 105,
      "normalized": {
        "queue_id": "J2194",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Merom - Gibson 345 kV Line",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489736,
        "projectNumber": "J2194",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Merom - Gibson 345 kV Line",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 106,
      "normalized": {
        "queue_id": "J2076",
        "county": "San Jacinto",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "COLEY CREEK to PELICAN ROAD 138 kV",
        "queue_date": "2021-08-09T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489737,
        "projectNumber": "J2076",
        "queueDate": "2021-08-09T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "San Jacinto",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "COLEY CREEK to PELICAN ROAD 138 kV",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 107,
      "normalized": {
        "queue_id": "J3718",
        "county": "Greene",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Roodhouse West",
        "queue_date": "2024-03-20T04:00:00+00:00",
        "withdrawn_date": "2025-12-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489738,
        "projectNumber": "J3718",
        "queueDate": "2024-03-20T04:00:00+00:00",
        "withdrawnDate": "2025-12-24T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Greene",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Roodhouse West",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 108,
      "normalized": {
        "queue_id": "J3727",
        "county": "Madison",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mississippi",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 225.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489739,
        "projectNumber": "J3727",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Madison",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mississippi",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 225.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 109,
      "normalized": {
        "queue_id": "J2182",
        "county": "Tallahatchie",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "webb 115 kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2021-09-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489740,
        "projectNumber": "J2182",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2021-09-17T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tallahatchie",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "webb 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 110,
      "normalized": {
        "queue_id": "J3404",
        "county": "Macon",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489741,
        "projectNumber": "J3404",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-08-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Macon",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 111,
      "normalized": {
        "queue_id": "J3406",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Nelson - Carlyss (J2154 POI)",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-09T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489742,
        "projectNumber": "J3406",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2028-04-09T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Nelson - Carlyss (J2154 POI)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 112,
      "normalized": {
        "queue_id": "J3411",
        "county": "Randolph",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5ADAIR    - 5THMHIL (AECI)  161.0kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489743,
        "projectNumber": "J3411",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Randolph",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "5ADAIR    - 5THMHIL (AECI)  161.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 113,
      "normalized": {
        "queue_id": "J3417",
        "county": "Macon",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Oreana",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489744,
        "projectNumber": "J3417",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-06T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macon",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Oreana",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 114,
      "normalized": {
        "queue_id": "J3415",
        "county": "Mercer",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Coyote Switchyard",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": "2025-07-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489745,
        "projectNumber": "J3415",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "withdrawnDate": "2025-07-24T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Mercer",
        "state": "ND",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Coyote Switchyard",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 115,
      "normalized": {
        "queue_id": "J3408",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "HARTBURG - AEP LAYFIELD 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-05-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 450.0,
        "summer_net_mw": 450.0,
        "winter_net_mw": 450.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489746,
        "projectNumber": "J3408",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-05-23T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HARTBURG - AEP LAYFIELD 500.0kV",
        "summerNetMW": 450.0,
        "winterNetMW": 450.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 116,
      "normalized": {
        "queue_id": "J3418",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7AUSTIN - 7TURNER 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 220.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489747,
        "projectNumber": "J3418",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7AUSTIN - 7TURNER 345.0kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 220.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 117,
      "normalized": {
        "queue_id": "J3606",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "PARKIN - KUHN ROAD 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 197.7,
        "summer_net_mw": 197.7,
        "winter_net_mw": 197.7,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489748,
        "projectNumber": "J3606",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PARKIN - KUHN ROAD 161.0kV",
        "summerNetMW": 197.7,
        "winterNetMW": 197.7,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 118,
      "normalized": {
        "queue_id": "J3670",
        "county": "LaSalle",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Corbin 138 kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-03-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489749,
        "projectNumber": "J3670",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-03-13T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "LaSalle",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Corbin 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 119,
      "normalized": {
        "queue_id": "J2103",
        "county": "Jasper",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Buna SW to Call Transmission Line",
        "queue_date": "2021-09-01T04:00:00+00:00",
        "withdrawn_date": "2021-12-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489750,
        "projectNumber": "J2103",
        "queueDate": "2021-09-01T04:00:00+00:00",
        "withdrawnDate": "2021-12-03T05:00:00+00:00",
        "inService": "2024-10-04T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jasper",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Buna SW to Call Transmission Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 120,
      "normalized": {
        "queue_id": "J3419",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "SEASIDE",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489751,
        "projectNumber": "J3419",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SEASIDE",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 121,
      "normalized": {
        "queue_id": "J3438",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MURPHY",
        "queue_date": "2024-03-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489752,
        "projectNumber": "J3438",
        "queueDate": "2024-03-26T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MURPHY",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 122,
      "normalized": {
        "queue_id": "J3441",
        "county": "Houston",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489753,
        "projectNumber": "J3441",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Houston",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 123,
      "normalized": {
        "queue_id": "J3409",
        "county": "Newton",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "HARTBURG - CYPRESS 500.0kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489754,
        "projectNumber": "J3409",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Newton",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "HARTBURG - CYPRESS 500.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 124,
      "normalized": {
        "queue_id": "J3421",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "SEASIDE",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489755,
        "projectNumber": "J3421",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SEASIDE",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 125,
      "normalized": {
        "queue_id": "J3416",
        "county": "Otsego",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "VAN TYLE",
        "queue_date": "2024-03-21T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489756,
        "projectNumber": "J3416",
        "queueDate": "2024-03-21T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Otsego",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "VAN TYLE",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 126,
      "normalized": {
        "queue_id": "J3422",
        "county": "Lawrence",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SWIFTON - AECC HOXIE SOUTH 161.0kV",
        "queue_date": "2024-03-26T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489757,
        "projectNumber": "J3422",
        "queueDate": "2024-03-26T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lawrence",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SWIFTON - AECC HOXIE SOUTH 161.0kV",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 127,
      "normalized": {
        "queue_id": "J3447",
        "county": "Perry",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Purvis Bulk 161 - Hintonville 161 161.0kV",
        "queue_date": "2024-03-26T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489758,
        "projectNumber": "J3447",
        "queueDate": "2024-03-26T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Perry",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Purvis Bulk 161 - Hintonville 161 161.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 128,
      "normalized": {
        "queue_id": "J3423",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "PECAN ST - AECC BALCH 161.0kV",
        "queue_date": "2024-05-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489759,
        "projectNumber": "J3423",
        "queueDate": "2024-05-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-04T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PECAN ST - AECC BALCH 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 129,
      "normalized": {
        "queue_id": "J3420",
        "county": "McPherson",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Ellendale 345 - Twin Brooks 345.0kV",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489760,
        "projectNumber": "J3420",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "McPherson",
        "state": "SD",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale 345 - Twin Brooks 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 130,
      "normalized": {
        "queue_id": "J3427",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "DELL EHV - NEW MADRID (AECI) 500.0kV",
        "queue_date": "2024-03-26T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489761,
        "projectNumber": "J3427",
        "queueDate": "2024-03-26T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DELL EHV - NEW MADRID (AECI) 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 131,
      "normalized": {
        "queue_id": "J3444",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC PINEBERGEN",
        "queue_date": "2024-03-26T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489762,
        "projectNumber": "J3444",
        "queueDate": "2024-03-26T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC PINEBERGEN",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 132,
      "normalized": {
        "queue_id": "J3248",
        "county": "Posey",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "AB Brown - Farm Bureau 138.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489763,
        "projectNumber": "J3248",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Posey",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AB Brown - Farm Bureau 138.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 133,
      "normalized": {
        "queue_id": "J3450",
        "county": "Panola",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BATESVILLE [MS] - MOON LAKE SS 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489764,
        "projectNumber": "J3450",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-23T04:00:00+00:00",
        "inService": "2028-08-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Panola",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BATESVILLE [MS] - MOON LAKE SS 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 134,
      "normalized": {
        "queue_id": "J3428",
        "county": "McPherson",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Ellendale 345 - Twin Brooks 345.0kV",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489765,
        "projectNumber": "J3428",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "McPherson",
        "state": "SD",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale 345 - Twin Brooks 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 135,
      "normalized": {
        "queue_id": "J3247",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "SPELTERVILLE",
        "queue_date": "2024-04-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489766,
        "projectNumber": "J3247",
        "queueDate": "2024-04-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SPELTERVILLE",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 136,
      "normalized": {
        "queue_id": "J3259",
        "county": "Renville",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Cedar Mountain",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489767,
        "projectNumber": "J3259",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-06T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Renville",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 137,
      "normalized": {
        "queue_id": "J3269",
        "county": "Hamilton",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7W_FRFT_E - 7NORRIS   345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-11-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489768,
        "projectNumber": "J3269",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2027-11-02T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Hamilton",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7W_FRFT_E - 7NORRIS   345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 138,
      "normalized": {
        "queue_id": "J2338",
        "county": "McPherson",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Ellendale - Twin Brooks 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489769,
        "projectNumber": "J2338",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-07T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "McPherson",
        "state": "SD",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale - Twin Brooks 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 139,
      "normalized": {
        "queue_id": "J3256",
        "county": "Clark",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4GALLATIN - 4KANSAS   138.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489770,
        "projectNumber": "J3256",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clark",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4GALLATIN - 4KANSAS   138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 140,
      "normalized": {
        "queue_id": "J2325",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Bastrop to Sterlington 115 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489771,
        "projectNumber": "J2325",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bastrop to Sterlington 115 kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 141,
      "normalized": {
        "queue_id": "J3268",
        "county": "Gratiot",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "REGAL",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489772,
        "projectNumber": "J3268",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2027-09-10T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REGAL",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 142,
      "normalized": {
        "queue_id": "J3274",
        "county": "Ogemaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "GALLAGHER - TWINING 138.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 290.0,
        "summer_net_mw": 290.0,
        "winter_net_mw": 290.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 290.0,
        "dp1_nris_mw": 290.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489773,
        "projectNumber": "J3274",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ogemaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GALLAGHER - TWINING 138.0kV",
        "summerNetMW": 290.0,
        "winterNetMW": 290.0,
        "dp1ErisMw": 290.0,
        "dp1NrisMw": 290.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 143,
      "normalized": {
        "queue_id": "J2342",
        "county": "Worth",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Worth County",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 230.0,
        "summer_net_mw": 230.0,
        "winter_net_mw": 230.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-05-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 141.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489774,
        "projectNumber": "J2342",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-05-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Worth",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Worth County",
        "summerNetMW": 230.0,
        "winterNetMW": 230.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 141.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 144,
      "normalized": {
        "queue_id": "J2336",
        "county": "Union",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Sterlington - Downsville 115 kV Line",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489775,
        "projectNumber": "J2336",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-08-29T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Union",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sterlington - Downsville 115 kV Line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 145,
      "normalized": {
        "queue_id": "J2333",
        "county": "McPherson",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Ellendale - Twin Brooks 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489776,
        "projectNumber": "J2333",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-07T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "McPherson",
        "state": "SD",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale - Twin Brooks 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 146,
      "normalized": {
        "queue_id": "J2354",
        "county": "Marinette",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Crivitz",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 65.0,
        "summer_net_mw": 65.0,
        "winter_net_mw": 65.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489777,
        "projectNumber": "J2354",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marinette",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Crivitz",
        "summerNetMW": 65.0,
        "winterNetMW": 65.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 147,
      "normalized": {
        "queue_id": "J2352",
        "county": "Woodbury",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Raun - Lehigh 345 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 118.0,
        "summer_net_mw": 118.0,
        "winter_net_mw": 118.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489778,
        "projectNumber": "J2352",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-07T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Woodbury",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Raun - Lehigh 345 kV",
        "summerNetMW": 118.0,
        "winterNetMW": 118.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 148,
      "normalized": {
        "queue_id": "J2337",
        "county": "St. Francois",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "St. Francois 138kV 4ST FRANC 1 bus 345774",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489779,
        "projectNumber": "J2337",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-28T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "St. Francois",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "St. Francois 138kV 4ST FRANC 1 bus 345774",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 149,
      "normalized": {
        "queue_id": "J2344",
        "county": "Stutsman",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Jamestown 345 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489780,
        "projectNumber": "J2344",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-07T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Stutsman",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jamestown 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 150,
      "normalized": {
        "queue_id": "J2329",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Wabash River-Whitesville South 230 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489781,
        "projectNumber": "J2329",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wabash River-Whitesville South 230 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 151,
      "normalized": {
        "queue_id": "J2351",
        "county": "Clay",
        "state": "AR",
        "transmission_owner": "",
        "poi": "AECC RECTOR NORTH - RECTOR 161kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489782,
        "projectNumber": "J2351",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Clay",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC RECTOR NORTH - RECTOR 161kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 152,
      "normalized": {
        "queue_id": "J2350",
        "county": "Pulaski",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WHITE BLUFF EHV - WRIGHTSVILLE 115.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 115.5,
        "summer_net_mw": 115.5,
        "winter_net_mw": 115.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 115.5,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489783,
        "projectNumber": "J2350",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pulaski",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "WHITE BLUFF EHV - WRIGHTSVILLE 115.0kV",
        "summerNetMW": 115.5,
        "winterNetMW": 115.5,
        "dp1ErisMw": 115.5,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 153,
      "normalized": {
        "queue_id": "J2326",
        "county": "Outagamie",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Werner West",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489784,
        "projectNumber": "J2326",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2025-10-28T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Outagamie",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Werner West",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 154,
      "normalized": {
        "queue_id": "J2327",
        "county": "LaMoure",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Ellendale 345 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489785,
        "projectNumber": "J2327",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-07T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "LaMoure",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale 345 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 155,
      "normalized": {
        "queue_id": "J2339",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cocodrie-Forest Hill 230kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489786,
        "projectNumber": "J2339",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cocodrie-Forest Hill 230kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 156,
      "normalized": {
        "queue_id": "J2335",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Plover 115 kV Substation (J1573 substation)",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489787,
        "projectNumber": "J2335",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Plover 115 kV Substation (J1573 substation)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 157,
      "normalized": {
        "queue_id": "J2356",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Cash-Newport AB 161 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489788,
        "projectNumber": "J2356",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cash-Newport AB 161 kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 158,
      "normalized": {
        "queue_id": "J2331",
        "county": "Franklin",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "West Frankfort East Substation 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 127.0,
        "summer_net_mw": 127.0,
        "winter_net_mw": 127.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489789,
        "projectNumber": "J2331",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Franklin",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "West Frankfort East Substation 345kV",
        "summerNetMW": 127.0,
        "winterNetMW": 127.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 159,
      "normalized": {
        "queue_id": "J3449",
        "county": "Pope",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MORRILTON EAST - ATKINS 161.0kV",
        "queue_date": "2024-03-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489790,
        "projectNumber": "J3449",
        "queueDate": "2024-03-26T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pope",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MORRILTON EAST - ATKINS 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 160,
      "normalized": {
        "queue_id": "J3240",
        "county": "Fulton",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-14T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489791,
        "projectNumber": "J3240",
        "queueDate": "2024-04-14T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fulton",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 161,
      "normalized": {
        "queue_id": "J2332",
        "county": "Cottonwood",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lyon County - Cedar Mountain 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489792,
        "projectNumber": "J2332",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cottonwood",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lyon County - Cedar Mountain 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 162,
      "normalized": {
        "queue_id": "J2343",
        "county": "Marion",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Georgetown  - North 138.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 130.0,
        "dp1_nris_mw": 130.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489793,
        "projectNumber": "J2343",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Marion",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Georgetown  - North 138.0kV",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 130.0,
        "dp1NrisMw": 130.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 163,
      "normalized": {
        "queue_id": "J2323",
        "county": "Webster",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Webster-Lehigh 345kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489794,
        "projectNumber": "J2323",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Webster",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Webster-Lehigh 345kV",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 164,
      "normalized": {
        "queue_id": "J2330",
        "county": "Leflore",
        "state": "MS",
        "transmission_owner": "",
        "poi": "GREENWOOD",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489795,
        "projectNumber": "J2330",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Leflore",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "GREENWOOD",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 165,
      "normalized": {
        "queue_id": "J2341",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Ricuskey-Woodward 230kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489796,
        "projectNumber": "J2341",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ricuskey-Woodward 230kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 166,
      "normalized": {
        "queue_id": "J2340",
        "county": "Rush",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "RUSHVILLE 69 kV - HEMILROY 69 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 43.0,
        "summer_net_mw": 43.0,
        "winter_net_mw": 43.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489797,
        "projectNumber": "J2340",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Rush",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RUSHVILLE 69 kV - HEMILROY 69 kV",
        "summerNetMW": 43.0,
        "winterNetMW": 43.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 167,
      "normalized": {
        "queue_id": "J2357",
        "county": "Lafourche",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Thibodaux 230 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489798,
        "projectNumber": "J2357",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Lafourche",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Thibodaux 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 168,
      "normalized": {
        "queue_id": "J2353",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "REYNOLDS - BURR OAK 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 190.0,
        "dp1_nris_mw": 190.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489799,
        "projectNumber": "J2353",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REYNOLDS - BURR OAK 345.0kV",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 190.0,
        "dp1NrisMw": 190.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 169,
      "normalized": {
        "queue_id": "J3242",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Flint 138 kv",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-05-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489800,
        "projectNumber": "J3242",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-05-05T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Flint 138 kv",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 170,
      "normalized": {
        "queue_id": "J3243",
        "county": "Parke",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489801,
        "projectNumber": "J3243",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Parke",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 171,
      "normalized": {
        "queue_id": "J3258",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "TYLER",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489802,
        "projectNumber": "J3258",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-22T05:00:00+00:00",
        "inService": "2028-09-06T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TYLER",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 172,
      "normalized": {
        "queue_id": "J3265",
        "county": "Brookings",
        "state": "SD",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "BROOKINGS COUNTY",
        "queue_date": "2024-04-11T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-17T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489803,
        "projectNumber": "J3265",
        "queueDate": "2024-04-11T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-17T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Brookings",
        "state": "SD",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BROOKINGS COUNTY",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 173,
      "normalized": {
        "queue_id": "J2328",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Keo 500kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489804,
        "projectNumber": "J2328",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Keo 500kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 174,
      "normalized": {
        "queue_id": "J2345",
        "county": "Marathon",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Gardner Park-Stone Lake 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489805,
        "projectNumber": "J2345",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2028-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marathon",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gardner Park-Stone Lake 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 175,
      "normalized": {
        "queue_id": "J2355",
        "county": "Greene",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "A Tap on 4JERSEYVL-4ROODHSE",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489806,
        "projectNumber": "J2355",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-11-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Greene",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "A Tap on 4JERSEYVL-4ROODHSE",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 176,
      "normalized": {
        "queue_id": "J2348",
        "county": "Webster",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Minden to Sarepta 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489807,
        "projectNumber": "J2348",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Webster",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Minden to Sarepta 115 kV",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 177,
      "normalized": {
        "queue_id": "J3249",
        "county": "Vanderburgh",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Elliott - Francisco 138.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489808,
        "projectNumber": "J3249",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Vanderburgh",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Elliott - Francisco 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 178,
      "normalized": {
        "queue_id": "J3270",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC AUBREY - RITCHIE SWYD 230.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489809,
        "projectNumber": "J3270",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-04T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC AUBREY - RITCHIE SWYD 230.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 179,
      "normalized": {
        "queue_id": "J2346",
        "county": "Murray",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lyon County - Cedar Mountain 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489810,
        "projectNumber": "J2346",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Murray",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lyon County - Cedar Mountain 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 180,
      "normalized": {
        "queue_id": "J2347",
        "county": "Roscommon",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Higgins - Mio Dam 138 kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489811,
        "projectNumber": "J2347",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Roscommon",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Higgins - Mio Dam 138 kV Line",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 181,
      "normalized": {
        "queue_id": "J3320",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ROOSEVELT",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-05-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489812,
        "projectNumber": "J3320",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-05-05T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ROOSEVELT",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 182,
      "normalized": {
        "queue_id": "J3324",
        "county": "Palo Alto",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "PALO ALTO - KOSSUTH COUNTY 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489813,
        "projectNumber": "J3324",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Palo Alto",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PALO ALTO - KOSSUTH COUNTY 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 183,
      "normalized": {
        "queue_id": "J3272",
        "county": "Concordia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "VIDALIA",
        "queue_date": "2024-04-10T04:00:00+00:00",
        "withdrawn_date": "2025-08-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 85.0,
        "summer_net_mw": 85.0,
        "winter_net_mw": 85.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-09T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489814,
        "projectNumber": "J3272",
        "queueDate": "2024-04-10T04:00:00+00:00",
        "withdrawnDate": "2025-08-18T04:00:00+00:00",
        "inService": "2028-04-09T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Concordia",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "VIDALIA",
        "summerNetMW": 85.0,
        "winterNetMW": 85.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 184,
      "normalized": {
        "queue_id": "J3271",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 230.0,
        "summer_net_mw": 230.0,
        "winter_net_mw": 230.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489815,
        "projectNumber": "J3271",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-03T04:00:00+00:00",
        "inService": "2028-09-04T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV",
        "summerNetMW": 230.0,
        "winterNetMW": 230.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 185,
      "normalized": {
        "queue_id": "J3343",
        "county": "Knox",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4MONM BLVD W - 4CASTRO_JCT 138.0kV",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489816,
        "projectNumber": "J3343",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Knox",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4MONM BLVD W - 4CASTRO_JCT 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 186,
      "normalized": {
        "queue_id": "J3365",
        "county": "Tangipahoa",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "AMITE - KENTWOOD 115.0kV",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": "2025-09-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489817,
        "projectNumber": "J3365",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "withdrawnDate": "2025-09-05T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Tangipahoa",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AMITE - KENTWOOD 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 187,
      "normalized": {
        "queue_id": "J3368",
        "county": "St. Landry",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Ville Platte - West Fork 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 199.9,
        "summer_net_mw": 199.9,
        "winter_net_mw": 199.9,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 199.9,
        "dp1_nris_mw": 199.9,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489818,
        "projectNumber": "J3368",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-10-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Landry",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ville Platte - West Fork 230.0kV",
        "summerNetMW": 199.9,
        "winterNetMW": 199.9,
        "dp1ErisMw": 199.9,
        "dp1NrisMw": 199.9,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 188,
      "normalized": {
        "queue_id": "J3378",
        "county": "Jackson",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "DANVILLE [LA]",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489819,
        "projectNumber": "J3378",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jackson",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "DANVILLE [LA]",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 189,
      "normalized": {
        "queue_id": "J3451",
        "county": "Alcona",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "IOSCO - SPRUCE ROAD 138.0kV",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489820,
        "projectNumber": "J3451",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Alcona",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "IOSCO - SPRUCE ROAD 138.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 190,
      "normalized": {
        "queue_id": "J3448",
        "county": "Grant",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "NELSON DEWEY (ATC) - GRAN GRAE (ATC) 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489821,
        "projectNumber": "J3448",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Grant",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NELSON DEWEY (ATC) - GRAN GRAE (ATC) 161.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 191,
      "normalized": {
        "queue_id": "J3358",
        "county": "De Witt",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Tabor",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489822,
        "projectNumber": "J3358",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "De Witt",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tabor",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 192,
      "normalized": {
        "queue_id": "J3376",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "Blytheville North",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489823,
        "projectNumber": "J3376",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Blytheville North",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 193,
      "normalized": {
        "queue_id": "J2349",
        "county": "Jackson",
        "state": "IL",
        "transmission_owner": "Southern Illinois Power Cooperative",
        "poi": "Jackson to Campbell Hill 161kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489824,
        "projectNumber": "J2349",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-07-31T04:00:00+00:00",
        "transmissionOwner": "Southern Illinois Power Cooperative",
        "county": "Jackson",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jackson to Campbell Hill 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 194,
      "normalized": {
        "queue_id": "J3257",
        "county": "Pulaski",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "EAST WINAMAC - MONTICELLO 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489825,
        "projectNumber": "J3257",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Pulaski",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "EAST WINAMAC - MONTICELLO 138.0kV",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 195,
      "normalized": {
        "queue_id": "J3266",
        "county": "Sargent",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Forman 230 kV Substation",
        "queue_date": "2024-04-11T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-17T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489826,
        "projectNumber": "J3266",
        "queueDate": "2024-04-11T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-17T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Sargent",
        "state": "ND",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Forman 230 kV Substation",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 196,
      "normalized": {
        "queue_id": "J3315",
        "county": "Pike",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "COLONIAL PIPELINE - FERNWOOD 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-07-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489827,
        "projectNumber": "J3315",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-07-09T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Pike",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "COLONIAL PIPELINE - FERNWOOD 115.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 197,
      "normalized": {
        "queue_id": "J3359",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Eastern Substation 138 kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489828,
        "projectNumber": "J3359",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2030-12-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Eastern Substation 138 kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 198,
      "normalized": {
        "queue_id": "J3445",
        "county": "Olmsted",
        "state": "MN",
        "transmission_owner": "GridUnity",
        "poi": "Westside",
        "queue_date": "2024-04-11T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 49.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 49.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489829,
        "projectNumber": "J3445",
        "queueDate": "2024-04-11T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "GridUnity",
        "county": "Olmsted",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Westside",
        "summerNetMW": 45.0,
        "winterNetMW": 49.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 199,
      "normalized": {
        "queue_id": "J3342",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "J2192 POI",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 110.0,
        "dp1_nris_mw": 110.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489830,
        "projectNumber": "J3342",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J2192 POI",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 110.0,
        "dp1NrisMw": 110.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 200,
      "normalized": {
        "queue_id": "J3344",
        "county": "Knox",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7FARGO - 7SANDBURG 345.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489831,
        "projectNumber": "J3344",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Knox",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7FARGO - 7SANDBURG 345.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 201,
      "normalized": {
        "queue_id": "J3364",
        "county": "St. Martin",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "ST MARTINVILLE (L-625A) TAP - CADE SS 69.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489832,
        "projectNumber": "J3364",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Martin",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ST MARTINVILLE (L-625A) TAP - CADE SS 69.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 202,
      "normalized": {
        "queue_id": "J3377",
        "county": "Madison",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "DELHI - TALLULAH 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489833,
        "projectNumber": "J3377",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Madison",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "DELHI - TALLULAH 115.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 203,
      "normalized": {
        "queue_id": "J3379",
        "county": "Johnson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7JORD - 7MASS 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-02-18T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489834,
        "projectNumber": "J3379",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-02-18T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Johnson",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "7JORD - 7MASS 345.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 204,
      "normalized": {
        "queue_id": "J3435",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 210.0,
        "summer_net_mw": 210.0,
        "winter_net_mw": 210.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489835,
        "projectNumber": "J3435",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "summerNetMW": 210.0,
        "winterNetMW": 210.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 205,
      "normalized": {
        "queue_id": "J3437",
        "county": "Ogemaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "LIVINGSTON - TITTABAWASSEE 345.0kV",
        "queue_date": "2024-05-06T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Wind/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489836,
        "projectNumber": "J3437",
        "queueDate": "2024-05-06T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ogemaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LIVINGSTON - TITTABAWASSEE 345.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Wind/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 206,
      "normalized": {
        "queue_id": "J3452",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489837,
        "projectNumber": "J3452",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 207,
      "normalized": {
        "queue_id": "J4389",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-25T21:42:22+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 430.0,
        "summer_net_mw": 430.0,
        "winter_net_mw": 430.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489838,
        "projectNumber": "J4389",
        "queueDate": "2026-09-25T21:42:22+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 430.0,
        "winterNetMW": 430.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 208,
      "normalized": {
        "queue_id": "S1184",
        "county": "Fayette",
        "state": "",
        "transmission_owner": "METC",
        "poi": "Ramsey",
        "queue_date": "2026-04-04T02:04:30+00:00",
        "withdrawn_date": "2026-09-22T04:00:00+00:00",
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489839,
        "projectNumber": "S1184",
        "queueDate": "2026-04-04T02:04:30+00:00",
        "withdrawnDate": "2026-09-22T04:00:00+00:00",
        "inService": "2027-06-07T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Fayette",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Ramsey",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 209,
      "normalized": {
        "queue_id": "S1156",
        "county": "",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-04-13T22:38:55+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 632.0,
        "summer_net_mw": 632.0,
        "winter_net_mw": 632.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489840,
        "projectNumber": "S1156",
        "queueDate": "2026-04-13T22:38:55+00:00",
        "inService": "2026-08-29T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "TX",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 632.0,
        "winterNetMW": 632.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 210,
      "normalized": {
        "queue_id": "J3429",
        "county": "Pemiscot",
        "state": "MO",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "JIM HILL - HAYTI SOUTH 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489841,
        "projectNumber": "J3429",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pemiscot",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "JIM HILL - HAYTI SOUTH 161.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 211,
      "normalized": {
        "queue_id": "J3439",
        "county": "Sherburne",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "RICE LAKE SWITCH ELSM11 - ZIMMERMAN TAP - SS2858 - ELS1 69.0kV",
        "queue_date": "2024-04-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 72.0,
        "summer_net_mw": 72.0,
        "winter_net_mw": 72.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 72.0,
        "dp1_nris_mw": 72.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489842,
        "projectNumber": "J3439",
        "queueDate": "2024-04-11T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Sherburne",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RICE LAKE SWITCH ELSM11 - ZIMMERMAN TAP - SS2858 - ELS1 69.0kV",
        "summerNetMW": 72.0,
        "winterNetMW": 72.0,
        "dp1ErisMw": 72.0,
        "dp1NrisMw": 72.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 212,
      "normalized": {
        "queue_id": "J3443",
        "county": "Big Stone",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South - Alexandira 345kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Wind/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489843,
        "projectNumber": "J3443",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Big Stone",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Big Stone South - Alexandira 345kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 213,
      "normalized": {
        "queue_id": "J3446",
        "county": "Kent",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gaines substation 138kV",
        "queue_date": "2024-04-04T04:00:00+00:00",
        "withdrawn_date": "2025-09-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489844,
        "projectNumber": "J3446",
        "queueDate": "2024-04-04T04:00:00+00:00",
        "withdrawnDate": "2025-09-12T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Kent",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gaines substation 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 214,
      "normalized": {
        "queue_id": "R5098",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-05-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489845,
        "projectNumber": "R5098",
        "queueDate": "2026-05-26T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 215,
      "normalized": {
        "queue_id": "S1157",
        "county": "",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-04-13T22:36:28+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 534.0,
        "summer_net_mw": 534.0,
        "winter_net_mw": 534.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489846,
        "projectNumber": "S1157",
        "queueDate": "2026-04-13T22:36:28+00:00",
        "inService": "2026-08-29T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "TX",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 534.0,
        "winterNetMW": 534.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 216,
      "normalized": {
        "queue_id": "S1171",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "White Bluff EHV 500MW",
        "queue_date": "2026-05-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489847,
        "projectNumber": "S1171",
        "queueDate": "2026-05-26T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "White Bluff EHV 500MW",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 217,
      "normalized": {
        "queue_id": "S1186",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "",
        "queue_date": "2026-05-27T05:05:59+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-03T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489848,
        "projectNumber": "S1186",
        "queueDate": "2026-05-27T05:05:59+00:00",
        "inService": "2028-01-03T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 218,
      "normalized": {
        "queue_id": "J3809",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Winnebago",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2026-06-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 199.99,
        "summer_net_mw": 199.99,
        "winter_net_mw": 199.99,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489849,
        "projectNumber": "J3809",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2026-06-03T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Winnebago",
        "summerNetMW": 199.99,
        "winterNetMW": 199.99,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 219,
      "normalized": {
        "queue_id": "J3729",
        "county": "Franklin",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Benton Northwest",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489850,
        "projectNumber": "J3729",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-02-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Franklin",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Benton Northwest",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 220,
      "normalized": {
        "queue_id": "J3884",
        "county": "Benton",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "BENTON COUNTY 345 - START DBL CKT W/EW LINE 345.0kV",
        "queue_date": "2025-02-09T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489851,
        "projectNumber": "J3884",
        "queueDate": "2025-02-09T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Benton",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BENTON COUNTY 345 - START DBL CKT W/EW LINE 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 221,
      "normalized": {
        "queue_id": "J3425",
        "county": "Jasper",
        "state": "TX",
        "transmission_owner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "poi": "Peachtree Substation",
        "queue_date": "2024-04-10T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 59.2,
        "summer_net_mw": 59.2,
        "winter_net_mw": 59.2,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489852,
        "projectNumber": "J3425",
        "queueDate": "2024-04-10T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "county": "Jasper",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Peachtree Substation",
        "summerNetMW": 59.2,
        "winterNetMW": 59.2,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 222,
      "normalized": {
        "queue_id": "J4258",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-08-06T21:56:48+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 787.3,
        "summer_net_mw": 787.3,
        "winter_net_mw": 787.3,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-02-22T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489853,
        "projectNumber": "J4258",
        "queueDate": "2026-08-06T21:56:48+00:00",
        "inService": "2031-02-22T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 787.3,
        "winterNetMW": 787.3,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 223,
      "normalized": {
        "queue_id": "J3871",
        "county": "St. Charles",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "WATERFORD 500 SS",
        "queue_date": "2024-12-19T05:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 770.0,
        "summer_net_mw": 735.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489854,
        "projectNumber": "J3871",
        "queueDate": "2024-12-19T05:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-11-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Charles",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "WATERFORD 500 SS",
        "summerNetMW": 735.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 224,
      "normalized": {
        "queue_id": "J3722",
        "county": "Hillsdale",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "COLDWATER - MOORE ROAD 138.0kV",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489855,
        "projectNumber": "J3722",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Hillsdale",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "COLDWATER - MOORE ROAD 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 225,
      "normalized": {
        "queue_id": "J3527",
        "county": "Allamakee",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lansing - Postville (DPC) 161kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 136.0,
        "summer_net_mw": 136.0,
        "winter_net_mw": 136.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489856,
        "projectNumber": "J3527",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Allamakee",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lansing - Postville (DPC) 161kV",
        "summerNetMW": 136.0,
        "winterNetMW": 136.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 226,
      "normalized": {
        "queue_id": "J3528",
        "county": "Jasper",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CASEY    - 7NEWTON   345.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 225.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489857,
        "projectNumber": "J3528",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2026-12-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jasper",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7CASEY    - 7NEWTON   345.0kV",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 225.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 227,
      "normalized": {
        "queue_id": "J3598",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-02-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 9.0,
        "summer_net_mw": 9.0,
        "winter_net_mw": 9.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489858,
        "projectNumber": "J3598",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-02-19T05:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 9.0,
        "winterNetMW": 9.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 228,
      "normalized": {
        "queue_id": "J3605",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "JACINTO",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 465.0,
        "summer_net_mw": 430.0,
        "winter_net_mw": 465.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489859,
        "projectNumber": "J3605",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2027-10-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "JACINTO",
        "summerNetMW": 430.0,
        "winterNetMW": 465.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 229,
      "normalized": {
        "queue_id": "J3721",
        "county": "Spencer",
        "state": "IN",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Culley - Dubois 138.0kV",
        "queue_date": "2024-03-20T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489860,
        "projectNumber": "J3721",
        "queueDate": "2024-03-20T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Spencer",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Culley - Dubois 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 230,
      "normalized": {
        "queue_id": "J3529",
        "county": "Mahnomen",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Mahnomen - Winger 115.0kV",
        "queue_date": "2024-05-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 64.0,
        "summer_net_mw": 64.0,
        "winter_net_mw": 64.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 64.0,
        "dp1_nris_mw": 64.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489861,
        "projectNumber": "J3529",
        "queueDate": "2024-05-20T04:00:00+00:00",
        "inService": "2028-05-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Mahnomen",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mahnomen - Winger 115.0kV",
        "summerNetMW": 64.0,
        "winterNetMW": 64.0,
        "dp1ErisMw": 64.0,
        "dp1NrisMw": 64.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 231,
      "normalized": {
        "queue_id": "J3843",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "GOSS - SLATE 345.0kV",
        "queue_date": "2024-11-21T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489862,
        "projectNumber": "J3843",
        "queueDate": "2024-11-21T05:00:00+00:00",
        "inService": "2027-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "GOSS - SLATE 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 232,
      "normalized": {
        "queue_id": "J3842",
        "county": "Richland",
        "state": "LA",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Smalling 230kV Substation",
        "queue_date": "2024-10-31T04:00:00+00:00",
        "withdrawn_date": "2025-09-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 770.0,
        "summer_net_mw": 735.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489863,
        "projectNumber": "J3842",
        "queueDate": "2024-10-31T04:00:00+00:00",
        "withdrawnDate": "2025-09-11T04:00:00+00:00",
        "inService": "2028-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Richland",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "ERIS",
        "poiName": "Smalling 230kV Substation",
        "summerNetMW": 735.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 233,
      "normalized": {
        "queue_id": "J3599",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "Lunsford",
        "queue_date": "2024-04-10T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489864,
        "projectNumber": "J3599",
        "queueDate": "2024-04-10T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Lunsford",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 234,
      "normalized": {
        "queue_id": "J3600",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "OAK RIDGE (LA) - SWARTZ 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489865,
        "projectNumber": "J3600",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "OAK RIDGE (LA) - SWARTZ 115.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 235,
      "normalized": {
        "queue_id": "J3858",
        "county": "Livingston",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Madrid Substation 120 kV - Bus number 265650",
        "queue_date": "2024-12-18T05:00:00+00:00",
        "withdrawn_date": "2026-07-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489866,
        "projectNumber": "J3858",
        "queueDate": "2024-12-18T05:00:00+00:00",
        "withdrawnDate": "2026-07-22T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Livingston",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Madrid Substation 120 kV - Bus number 265650",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 236,
      "normalized": {
        "queue_id": "J3850",
        "county": "Pine",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "ROCK CREEK",
        "queue_date": "2024-12-31T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489867,
        "projectNumber": "J3850",
        "queueDate": "2024-12-31T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Pine",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ROCK CREEK",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 237,
      "normalized": {
        "queue_id": "J3453",
        "county": "Holmes",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489868,
        "projectNumber": "J3453",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Holmes",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 238,
      "normalized": {
        "queue_id": "R5092",
        "county": "Washington",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "4JORD - 4ASHLEY 138.0kV",
        "queue_date": "2026-04-10T09:43:08+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489869,
        "projectNumber": "R5092",
        "queueDate": "2026-04-10T09:43:08+00:00",
        "inService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Washington",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "4JORD - 4ASHLEY 138.0kV",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 239,
      "normalized": {
        "queue_id": "J4340",
        "county": "",
        "state": "",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "",
        "queue_date": "2026-09-09T05:25:22+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 415.0,
        "summer_net_mw": 415.0,
        "winter_net_mw": 415.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489870,
        "projectNumber": "J4340",
        "queueDate": "2026-09-09T05:25:22+00:00",
        "inService": "2030-01-15T05:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 415.0,
        "winterNetMW": 415.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 240,
      "normalized": {
        "queue_id": "J3805",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Coffeen North-Ramsey East-4557",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489871,
        "projectNumber": "J3805",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Coffeen North-Ramsey East-4557",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 241,
      "normalized": {
        "queue_id": "J3728",
        "county": "Franklin",
        "state": "IL",
        "transmission_owner": "Southern Illinois Power Cooperative",
        "poi": "Ameren E. West Frankfort - Franklin 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489872,
        "projectNumber": "J3728",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-02-01T05:00:00+00:00",
        "transmissionOwner": "Southern Illinois Power Cooperative",
        "county": "Franklin",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ameren E. West Frankfort - Franklin 138.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 242,
      "normalized": {
        "queue_id": "J3604",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Merom (HED) -  Dresser 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 650.0,
        "summer_net_mw": 650.0,
        "winter_net_mw": 650.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 650.0,
        "dp1_nris_mw": 650.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489873,
        "projectNumber": "J3604",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Merom (HED) -  Dresser 345.0kV",
        "summerNetMW": 650.0,
        "winterNetMW": 650.0,
        "dp1ErisMw": 650.0,
        "dp1NrisMw": 650.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 243,
      "normalized": {
        "queue_id": "J3603",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "OAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489874,
        "projectNumber": "J3603",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "OAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 244,
      "normalized": {
        "queue_id": "J3859",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Other_",
        "queue_date": "2024-12-17T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489875,
        "projectNumber": "J3859",
        "queueDate": "2024-12-17T05:00:00+00:00",
        "inService": "2028-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 245,
      "normalized": {
        "queue_id": "J3852",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "KIRK",
        "queue_date": "2024-12-31T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489876,
        "projectNumber": "J3852",
        "queueDate": "2024-12-31T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "KIRK",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 246,
      "normalized": {
        "queue_id": "J3835",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2024-07-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489877,
        "projectNumber": "J3835",
        "queueDate": "2024-07-18T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 247,
      "normalized": {
        "queue_id": "J3836",
        "county": "Eaton",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ONEIDA",
        "queue_date": "2024-10-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489878,
        "projectNumber": "J3836",
        "queueDate": "2024-10-24T04:00:00+00:00",
        "inService": "2028-10-06T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Eaton",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ONEIDA",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 248,
      "normalized": {
        "queue_id": "J3837",
        "county": "Van Buren",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ARGENTA - PALISADES 345.0kV",
        "queue_date": "2024-12-02T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489879,
        "projectNumber": "J3837",
        "queueDate": "2024-12-02T05:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Van Buren",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ARGENTA - PALISADES 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 249,
      "normalized": {
        "queue_id": "J3857",
        "county": "Iosco",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ALCONA - WHITTEMORE 138.0kV",
        "queue_date": "2024-12-26T05:00:00+00:00",
        "withdrawn_date": "2026-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 105.0,
        "summer_net_mw": 105.0,
        "winter_net_mw": 105.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489880,
        "projectNumber": "J3857",
        "queueDate": "2024-12-26T05:00:00+00:00",
        "withdrawnDate": "2026-04-16T04:00:00+00:00",
        "inService": "2030-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Iosco",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ALCONA - WHITTEMORE 138.0kV",
        "summerNetMW": 105.0,
        "winterNetMW": 105.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 250,
      "normalized": {
        "queue_id": "J3851",
        "county": "McDonough",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Macomb West",
        "queue_date": "2024-12-31T05:00:00+00:00",
        "withdrawn_date": "2025-12-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489881,
        "projectNumber": "J3851",
        "queueDate": "2024-12-31T05:00:00+00:00",
        "withdrawnDate": "2025-12-19T05:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McDonough",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Macomb West",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 251,
      "normalized": {
        "queue_id": "J3856",
        "county": "Wabash",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "08GIBSON (PSI) - 7ALBION   345.0kV",
        "queue_date": "2024-12-26T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 235.0,
        "summer_net_mw": 235.0,
        "winter_net_mw": 235.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 235.0,
        "dp1_nris_mw": 153.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489882,
        "projectNumber": "J3856",
        "queueDate": "2024-12-26T05:00:00+00:00",
        "inService": "2030-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Wabash",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "08GIBSON (PSI) - 7ALBION   345.0kV",
        "summerNetMW": 235.0,
        "winterNetMW": 235.0,
        "dp1ErisMw": 235.0,
        "dp1NrisMw": 153.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 252,
      "normalized": {
        "queue_id": "J3458",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "TWIST - PARKIN 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489883,
        "projectNumber": "J3458",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-25T04:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TWIST - PARKIN 161.0kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 253,
      "normalized": {
        "queue_id": "J3719",
        "county": "Miami",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greentown  - Walton. 230.0kV",
        "queue_date": "2024-03-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489884,
        "projectNumber": "J3719",
        "queueDate": "2024-03-20T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Miami",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greentown  - Walton. 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 254,
      "normalized": {
        "queue_id": "J3720",
        "county": "Ralls",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5SPALDNG (AECI) - 5PENOCRK  161.0kV",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489885,
        "projectNumber": "J3720",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Ralls",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5SPALDNG (AECI) - 5PENOCRK  161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 255,
      "normalized": {
        "queue_id": "J3800",
        "county": "Baraga",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Silver River",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1.8,
        "summer_net_mw": 1.8,
        "winter_net_mw": 1.8,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2019-01-21T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 1.8,
        "dp1_nris_mw": 1.8,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489886,
        "projectNumber": "J3800",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2019-01-21T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Baraga",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Silver River",
        "summerNetMW": 1.8,
        "winterNetMW": 1.8,
        "dp1ErisMw": 1.8,
        "dp1NrisMw": 1.8,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 256,
      "normalized": {
        "queue_id": "J3460",
        "county": "St. Clair",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "FITZ",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 290.0,
        "summer_net_mw": 290.0,
        "winter_net_mw": 290.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489887,
        "projectNumber": "J3460",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "St. Clair",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FITZ",
        "summerNetMW": 290.0,
        "winterNetMW": 290.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 257,
      "normalized": {
        "queue_id": "J3873",
        "county": "Gibson",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Owensville Primary",
        "queue_date": "2024-12-19T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489888,
        "projectNumber": "J3873",
        "queueDate": "2024-12-19T05:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Gibson",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Owensville Primary",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 258,
      "normalized": {
        "queue_id": "J3521",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Neoga",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 350.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489889,
        "projectNumber": "J3521",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Neoga",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 350.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 259,
      "normalized": {
        "queue_id": "J3723",
        "county": "Wexford",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KEYSTONE - LUDINGTON 345.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489890,
        "projectNumber": "J3723",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Wexford",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "KEYSTONE - LUDINGTON 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 260,
      "normalized": {
        "queue_id": "J3543",
        "county": "Dakota",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Chub Lake 115 kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 135.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489891,
        "projectNumber": "J3543",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Dakota",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Chub Lake 115 kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 135.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 261,
      "normalized": {
        "queue_id": "J3489",
        "county": "McDonough",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 105.0,
        "summer_net_mw": 105.0,
        "winter_net_mw": 105.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489892,
        "projectNumber": "J3489",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "McDonough",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 105.0,
        "winterNetMW": 105.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 262,
      "normalized": {
        "queue_id": "J4330",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2026-09-03T00:02:01+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 163.0,
        "summer_net_mw": 163.0,
        "winter_net_mw": 163.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489893,
        "projectNumber": "J4330",
        "queueDate": "2026-09-03T00:02:01+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 163.0,
        "winterNetMW": 163.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 263,
      "normalized": {
        "queue_id": "J4288",
        "county": "",
        "state": "",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "",
        "queue_date": "2026-08-18T20:43:39+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489894,
        "projectNumber": "J4288",
        "queueDate": "2026-08-18T20:43:39+00:00",
        "inService": "2029-08-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 264,
      "normalized": {
        "queue_id": "J4292",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-01T00:40:58+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 242.3,
        "summer_net_mw": 242.3,
        "winter_net_mw": 242.3,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489895,
        "projectNumber": "J4292",
        "queueDate": "2026-09-01T00:40:58+00:00",
        "inService": "2030-04-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 242.3,
        "winterNetMW": 242.3,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 265,
      "normalized": {
        "queue_id": "J4293",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-01T00:45:02+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 242.8,
        "summer_net_mw": 242.8,
        "winter_net_mw": 242.8,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489896,
        "projectNumber": "J4293",
        "queueDate": "2026-09-01T00:45:02+00:00",
        "inService": "2030-04-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 242.8,
        "winterNetMW": 242.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 266,
      "normalized": {
        "queue_id": "J3602",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Transfer",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 110.0,
        "dp1_nris_mw": 110.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489897,
        "projectNumber": "J3602",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 110.0,
        "dp1NrisMw": 110.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Pending Transfer",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 267,
      "normalized": {
        "queue_id": "J3601",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "OAK RIDGE (LA) - SWARTZ 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489898,
        "projectNumber": "J3601",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "OAK RIDGE (LA) - SWARTZ 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 268,
      "normalized": {
        "queue_id": "J3841",
        "county": "Richland",
        "state": "LA",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Smalling 230kV Substation",
        "queue_date": "2024-10-31T04:00:00+00:00",
        "withdrawn_date": "2025-09-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 770.0,
        "summer_net_mw": 735.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489899,
        "projectNumber": "J3841",
        "queueDate": "2024-10-31T04:00:00+00:00",
        "withdrawnDate": "2025-09-11T04:00:00+00:00",
        "inService": "2028-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Richland",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "ERIS",
        "poiName": "Smalling 230kV Substation",
        "summerNetMW": 735.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 269,
      "normalized": {
        "queue_id": "J3844",
        "county": "St. Joseph",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BATAVIA - MORROW  138.0kV",
        "queue_date": "2024-11-26T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489900,
        "projectNumber": "J3844",
        "queueDate": "2024-11-26T05:00:00+00:00",
        "inService": "2029-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "St. Joseph",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BATAVIA - MORROW  138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 270,
      "normalized": {
        "queue_id": "J3825",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "230kV Greenacres Substation",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 770.0,
        "summer_net_mw": 730.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489901,
        "projectNumber": "J3825",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "230kV Greenacres Substation",
        "summerNetMW": 730.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 271,
      "normalized": {
        "queue_id": "J3475",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "PRAIRIE POWER, INC. PPI",
        "poi": "Indian Creek",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489902,
        "projectNumber": "J3475",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2028-05-13T04:00:00+00:00",
        "transmissionOwner": "PRAIRIE POWER, INC. PPI",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Indian Creek",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 272,
      "normalized": {
        "queue_id": "J3854",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4PURO - 4HAVANA3 138.0kV",
        "queue_date": "2024-12-26T05:00:00+00:00",
        "withdrawn_date": "2025-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 44.33,
        "summer_net_mw": 44.33,
        "winter_net_mw": 44.33,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-03T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489903,
        "projectNumber": "J3854",
        "queueDate": "2024-12-26T05:00:00+00:00",
        "withdrawnDate": "2025-04-09T04:00:00+00:00",
        "inService": "2028-01-03T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "4PURO - 4HAVANA3 138.0kV",
        "summerNetMW": 44.33,
        "winterNetMW": 44.33,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 273,
      "normalized": {
        "queue_id": "J3855",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "CANTON - PICKENS 230.0kV",
        "queue_date": "2024-12-26T05:00:00+00:00",
        "withdrawn_date": "2025-12-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 197.5,
        "summer_net_mw": 197.5,
        "winter_net_mw": 197.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489904,
        "projectNumber": "J3855",
        "queueDate": "2024-12-26T05:00:00+00:00",
        "withdrawnDate": "2025-12-31T05:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "ERIS",
        "poiName": "CANTON - PICKENS 230.0kV",
        "summerNetMW": 197.5,
        "winterNetMW": 197.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 274,
      "normalized": {
        "queue_id": "J3474",
        "county": "Allegan",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BUCK CREEK - HAZELWOOD 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 128.0,
        "summer_net_mw": 128.0,
        "winter_net_mw": 128.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489905,
        "projectNumber": "J3474",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Allegan",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BUCK CREEK - HAZELWOOD 138.0kV",
        "summerNetMW": 128.0,
        "winterNetMW": 128.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 275,
      "normalized": {
        "queue_id": "J3476",
        "county": "St. Croix",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Pine Lake Tap - APPLE RIVER  (DPC) 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489906,
        "projectNumber": "J3476",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "St. Croix",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pine Lake Tap - APPLE RIVER  (DPC) 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 276,
      "normalized": {
        "queue_id": "J3799",
        "county": "Livingston",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "BLACKFOOT - MADRID 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 1452.0,
        "summer_net_mw": 1452.0,
        "winter_net_mw": 1452.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 1452.0,
        "dp1_nris_mw": 1452.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489907,
        "projectNumber": "J3799",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2030-04-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Livingston",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BLACKFOOT - MADRID 345.0kV",
        "summerNetMW": 1452.0,
        "winterNetMW": 1452.0,
        "dp1ErisMw": 1452.0,
        "dp1NrisMw": 1452.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 277,
      "normalized": {
        "queue_id": "J3459",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "CASH - NEWPORT AB 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489908,
        "projectNumber": "J3459",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CASH - NEWPORT AB 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 278,
      "normalized": {
        "queue_id": "J4296",
        "county": "Vermillion",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-08-29T02:17:46+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1440.0,
        "summer_net_mw": 1440.0,
        "winter_net_mw": 1440.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489909,
        "projectNumber": "J4296",
        "queueDate": "2026-08-29T02:17:46+00:00",
        "inService": "2031-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 1440.0,
        "winterNetMW": 1440.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 279,
      "normalized": {
        "queue_id": "J4409",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-09-04T15:48:13+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1440.0,
        "summer_net_mw": 1440.0,
        "winter_net_mw": 1440.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489910,
        "projectNumber": "J4409",
        "queueDate": "2026-09-04T15:48:13+00:00",
        "inService": "2031-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 1440.0,
        "winterNetMW": 1440.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 280,
      "normalized": {
        "queue_id": "J4302",
        "county": "",
        "state": "",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "",
        "queue_date": "2026-09-08T19:22:08+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489911,
        "projectNumber": "J4302",
        "queueDate": "2026-09-08T19:22:08+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 281,
      "normalized": {
        "queue_id": "J4312",
        "county": "",
        "state": "",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "",
        "queue_date": "2026-09-05T00:46:39+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489912,
        "projectNumber": "J4312",
        "queueDate": "2026-09-05T00:46:39+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 282,
      "normalized": {
        "queue_id": "J4314",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-08-28T16:50:51+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489913,
        "projectNumber": "J4314",
        "queueDate": "2026-08-28T16:50:51+00:00",
        "inService": "2031-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 283,
      "normalized": {
        "queue_id": "J4306",
        "county": "Ford",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Other_",
        "queue_date": "2026-09-08T17:16:50+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489914,
        "projectNumber": "J4306",
        "queueDate": "2026-09-08T17:16:50+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Ford",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 284,
      "normalized": {
        "queue_id": "J4289",
        "county": "Goodhue",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "North Rochester - Prairie Island 345.0kV",
        "queue_date": "2026-08-25T20:50:47+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 215.0,
        "summer_net_mw": 215.0,
        "winter_net_mw": 215.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489915,
        "projectNumber": "J4289",
        "queueDate": "2026-08-25T20:50:47+00:00",
        "inService": "2030-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Goodhue",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "North Rochester - Prairie Island 345.0kV",
        "summerNetMW": 215.0,
        "winterNetMW": 215.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 285,
      "normalized": {
        "queue_id": "J4327",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-08-28T16:52:05+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489916,
        "projectNumber": "J4327",
        "queueDate": "2026-08-28T16:52:05+00:00",
        "inService": "2031-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 286,
      "normalized": {
        "queue_id": "J4282",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "",
        "queue_date": "2026-09-01T05:00:35+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 242.8,
        "summer_net_mw": 242.8,
        "winter_net_mw": 242.8,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489917,
        "projectNumber": "J4282",
        "queueDate": "2026-09-01T05:00:35+00:00",
        "inService": "2030-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 242.8,
        "winterNetMW": 242.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 287,
      "normalized": {
        "queue_id": "J4315",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-08-28T16:53:30+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489918,
        "projectNumber": "J4315",
        "queueDate": "2026-08-28T16:53:30+00:00",
        "inService": "2031-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 288,
      "normalized": {
        "queue_id": "J4294",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-03T22:01:48+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489919,
        "projectNumber": "J4294",
        "queueDate": "2026-09-03T22:01:48+00:00",
        "inService": "2031-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 289,
      "normalized": {
        "queue_id": "J4337",
        "county": "",
        "state": "",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "",
        "queue_date": "2026-09-03T23:31:22+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489920,
        "projectNumber": "J4337",
        "queueDate": "2026-09-03T23:31:22+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 290,
      "normalized": {
        "queue_id": "J4326",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-21T18:56:36+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489921,
        "projectNumber": "J4326",
        "queueDate": "2026-09-21T18:56:36+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 291,
      "normalized": {
        "queue_id": "J4316",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-08-28T16:59:05+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489922,
        "projectNumber": "J4316",
        "queueDate": "2026-08-28T16:59:05+00:00",
        "inService": "2031-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 292,
      "normalized": {
        "queue_id": "J4318",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2026-09-08T21:38:49+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489923,
        "projectNumber": "J4318",
        "queueDate": "2026-09-08T21:38:49+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 293,
      "normalized": {
        "queue_id": "J4283",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "",
        "queue_date": "2026-09-01T05:02:38+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 243.4,
        "summer_net_mw": 243.4,
        "winter_net_mw": 243.4,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489924,
        "projectNumber": "J4283",
        "queueDate": "2026-09-01T05:02:38+00:00",
        "inService": "2030-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 243.4,
        "winterNetMW": 243.4,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 294,
      "normalized": {
        "queue_id": "J4286",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "",
        "queue_date": "2026-08-29T01:04:17+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 770.0,
        "summer_net_mw": 770.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489925,
        "projectNumber": "J4286",
        "queueDate": "2026-08-29T01:04:17+00:00",
        "inService": "2030-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 770.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 295,
      "normalized": {
        "queue_id": "J4341",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2026-09-08T21:45:16+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489926,
        "projectNumber": "J4341",
        "queueDate": "2026-09-08T21:45:16+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 296,
      "normalized": {
        "queue_id": "J4345",
        "county": "",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "",
        "queue_date": "2026-09-08T22:05:03+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489927,
        "projectNumber": "J4345",
        "queueDate": "2026-09-08T22:05:03+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 297,
      "normalized": {
        "queue_id": "J4402",
        "county": "Vermilion",
        "state": "",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "J2192 POI",
        "queue_date": "2026-09-11T01:36:53+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489928,
        "projectNumber": "J4402",
        "queueDate": "2026-09-11T01:36:53+00:00",
        "inService": "2030-07-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Vermilion",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "J2192 POI",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 298,
      "normalized": {
        "queue_id": "J4319",
        "county": "",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "",
        "queue_date": "2026-09-08T21:58:34+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489929,
        "projectNumber": "J4319",
        "queueDate": "2026-09-08T21:58:34+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 299,
      "normalized": {
        "queue_id": "J4393",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "",
        "queue_date": "2026-09-10T07:02:56+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489930,
        "projectNumber": "J4393",
        "queueDate": "2026-09-10T07:02:56+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 300,
      "normalized": {
        "queue_id": "J4323",
        "county": "",
        "state": "",
        "transmission_owner": "ELECTRIC AVENUE LLC",
        "poi": "",
        "queue_date": "2026-09-10T07:20:19+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489931,
        "projectNumber": "J4323",
        "queueDate": "2026-09-10T07:20:19+00:00",
        "inService": "2030-05-31T04:00:00+00:00",
        "transmissionOwner": "ELECTRIC AVENUE LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 301,
      "normalized": {
        "queue_id": "J4308",
        "county": "",
        "state": "",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "",
        "queue_date": "2026-09-09T23:09:09+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489932,
        "projectNumber": "J4308",
        "queueDate": "2026-09-09T23:09:09+00:00",
        "inService": "2030-05-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 302,
      "normalized": {
        "queue_id": "J4338",
        "county": "",
        "state": "",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "",
        "queue_date": "2026-09-03T21:51:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489933,
        "projectNumber": "J4338",
        "queueDate": "2026-09-03T21:51:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 303,
      "normalized": {
        "queue_id": "J4403",
        "county": "Montgomery",
        "state": "",
        "transmission_owner": "",
        "poi": "4PANA - 4OAKLEY 138.0kV",
        "queue_date": "2026-09-12T02:00:59+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489934,
        "projectNumber": "J4403",
        "queueDate": "2026-09-12T02:00:59+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Montgomery",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "4PANA - 4OAKLEY 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 304,
      "normalized": {
        "queue_id": "J4317",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-05T01:14:49+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489935,
        "projectNumber": "J4317",
        "queueDate": "2026-09-05T01:14:49+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 305,
      "normalized": {
        "queue_id": "J4404",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "",
        "queue_date": "2026-09-10T02:49:22+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 490.0,
        "summer_net_mw": 490.0,
        "winter_net_mw": 490.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489936,
        "projectNumber": "J4404",
        "queueDate": "2026-09-10T02:49:22+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 490.0,
        "winterNetMW": 490.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 306,
      "normalized": {
        "queue_id": "J4352",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-04T01:43:28+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489937,
        "projectNumber": "J4352",
        "queueDate": "2026-09-04T01:43:28+00:00",
        "inService": "2031-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 307,
      "normalized": {
        "queue_id": "J4351",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-05T06:47:45+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489938,
        "projectNumber": "J4351",
        "queueDate": "2026-09-05T06:47:45+00:00",
        "inService": "2031-09-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 308,
      "normalized": {
        "queue_id": "J4332",
        "county": "",
        "state": "",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "",
        "queue_date": "2026-09-03T20:49:39+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489939,
        "projectNumber": "J4332",
        "queueDate": "2026-09-03T20:49:39+00:00",
        "inService": "2031-06-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 309,
      "normalized": {
        "queue_id": "J4394",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-09T23:12:13+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489940,
        "projectNumber": "J4394",
        "queueDate": "2026-09-09T23:12:13+00:00",
        "inService": "2030-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 310,
      "normalized": {
        "queue_id": "J4395",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-11T01:02:37+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489941,
        "projectNumber": "J4395",
        "queueDate": "2026-09-11T01:02:37+00:00",
        "inService": "2031-04-20T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 311,
      "normalized": {
        "queue_id": "J4322",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-09-10T01:06:12+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489942,
        "projectNumber": "J4322",
        "queueDate": "2026-09-10T01:06:12+00:00",
        "inService": "2030-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 312,
      "normalized": {
        "queue_id": "J4371",
        "county": "",
        "state": "",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "",
        "queue_date": "2026-09-09T22:46:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489943,
        "projectNumber": "J4371",
        "queueDate": "2026-09-09T22:46:00+00:00",
        "inService": "2031-10-15T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 313,
      "normalized": {
        "queue_id": "J4295",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "",
        "queue_date": "2026-08-28T20:00:20+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 770.0,
        "summer_net_mw": 770.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489944,
        "projectNumber": "J4295",
        "queueDate": "2026-08-28T20:00:20+00:00",
        "inService": "2030-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 770.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 314,
      "normalized": {
        "queue_id": "J4367",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-10T20:06:09+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489945,
        "projectNumber": "J4367",
        "queueDate": "2026-09-10T20:06:09+00:00",
        "inService": "2031-05-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 315,
      "normalized": {
        "queue_id": "J4368",
        "county": "",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "",
        "queue_date": "2026-09-12T00:49:43+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489946,
        "projectNumber": "J4368",
        "queueDate": "2026-09-12T00:49:43+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "E-NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 316,
      "normalized": {
        "queue_id": "J4370",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-09T22:39:23+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-09T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489947,
        "projectNumber": "J4370",
        "queueDate": "2026-09-09T22:39:23+00:00",
        "inService": "2031-10-09T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 317,
      "normalized": {
        "queue_id": "J4373",
        "county": "",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "",
        "queue_date": "2026-09-10T01:09:10+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489948,
        "projectNumber": "J4373",
        "queueDate": "2026-09-10T01:09:10+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 318,
      "normalized": {
        "queue_id": "J4298",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-09-08T01:52:17+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 976.1,
        "summer_net_mw": 976.1,
        "winter_net_mw": 976.1,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489949,
        "projectNumber": "J4298",
        "queueDate": "2026-09-08T01:52:17+00:00",
        "inService": "2031-05-02T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 976.1,
        "winterNetMW": 976.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 319,
      "normalized": {
        "queue_id": "J4339",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-09-08T01:52:03+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 770.0,
        "summer_net_mw": 770.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489950,
        "projectNumber": "J4339",
        "queueDate": "2026-09-08T01:52:03+00:00",
        "inService": "2031-05-02T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 770.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 320,
      "normalized": {
        "queue_id": "J4344",
        "county": "Macon",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Oreana",
        "queue_date": "2026-09-09T19:54:08+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489951,
        "projectNumber": "J4344",
        "queueDate": "2026-09-09T19:54:08+00:00",
        "inService": "2028-09-06T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macon",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Oreana",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 321,
      "normalized": {
        "queue_id": "J4401",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-09-08T23:05:46+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 123.0,
        "summer_net_mw": 123.0,
        "winter_net_mw": 123.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2005-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489952,
        "projectNumber": "J4401",
        "queueDate": "2026-09-08T23:05:46+00:00",
        "inService": "2005-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 123.0,
        "winterNetMW": 123.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 322,
      "normalized": {
        "queue_id": "J4375",
        "county": "",
        "state": "",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "",
        "queue_date": "2026-09-09T23:28:14+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489953,
        "projectNumber": "J4375",
        "queueDate": "2026-09-09T23:28:14+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 323,
      "normalized": {
        "queue_id": "J4396",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-10T00:04:27+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489954,
        "projectNumber": "J4396",
        "queueDate": "2026-09-10T00:04:27+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 324,
      "normalized": {
        "queue_id": "J4342",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "",
        "queue_date": "2026-09-09T01:52:43+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 976.1,
        "summer_net_mw": 976.1,
        "winter_net_mw": 976.1,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489955,
        "projectNumber": "J4342",
        "queueDate": "2026-09-09T01:52:43+00:00",
        "inService": "2031-05-02T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 976.1,
        "winterNetMW": 976.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 325,
      "normalized": {
        "queue_id": "J4397",
        "county": "",
        "state": "",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "",
        "queue_date": "2026-09-09T18:58:09+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489956,
        "projectNumber": "J4397",
        "queueDate": "2026-09-09T18:58:09+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 326,
      "normalized": {
        "queue_id": "J4377",
        "county": "",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "",
        "queue_date": "2026-09-11T01:27:03+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489957,
        "projectNumber": "J4377",
        "queueDate": "2026-09-11T01:27:03+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 327,
      "normalized": {
        "queue_id": "J4381",
        "county": "",
        "state": "",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "",
        "queue_date": "2026-09-10T01:10:18+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489958,
        "projectNumber": "J4381",
        "queueDate": "2026-09-10T01:10:18+00:00",
        "inService": "2030-05-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 328,
      "normalized": {
        "queue_id": "J4369",
        "county": "",
        "state": "",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "",
        "queue_date": "2026-09-01T07:50:27+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 950.0,
        "summer_net_mw": 950.0,
        "winter_net_mw": 950.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489959,
        "projectNumber": "J4369",
        "queueDate": "2026-09-01T07:50:27+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 950.0,
        "winterNetMW": 950.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 329,
      "normalized": {
        "queue_id": "J4372",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-12T00:08:59+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 470.0,
        "summer_net_mw": 470.0,
        "winter_net_mw": 470.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489960,
        "projectNumber": "J4372",
        "queueDate": "2026-09-12T00:08:59+00:00",
        "inService": "2031-12-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 470.0,
        "winterNetMW": 470.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 330,
      "normalized": {
        "queue_id": "J4303",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-09T00:49:01+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489961,
        "projectNumber": "J4303",
        "queueDate": "2026-09-09T00:49:01+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 331,
      "normalized": {
        "queue_id": "J4346",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "",
        "queue_date": "2026-09-10T17:45:02+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489962,
        "projectNumber": "J4346",
        "queueDate": "2026-09-10T17:45:02+00:00",
        "inService": "2031-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 332,
      "normalized": {
        "queue_id": "J4407",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-10T02:18:23+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489963,
        "projectNumber": "J4407",
        "queueDate": "2026-09-10T02:18:23+00:00",
        "inService": "2031-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 333,
      "normalized": {
        "queue_id": "J4304",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-09T05:44:23+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489964,
        "projectNumber": "J4304",
        "queueDate": "2026-09-09T05:44:23+00:00",
        "inService": "2031-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 334,
      "normalized": {
        "queue_id": "J4374",
        "county": "",
        "state": "",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "",
        "queue_date": "2026-09-10T01:16:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489965,
        "projectNumber": "J4374",
        "queueDate": "2026-09-10T01:16:06+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 335,
      "normalized": {
        "queue_id": "J4376",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-09T18:42:21+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489966,
        "projectNumber": "J4376",
        "queueDate": "2026-09-09T18:42:21+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 336,
      "normalized": {
        "queue_id": "J4299",
        "county": "",
        "state": "",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "",
        "queue_date": "2026-09-09T01:50:43+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 770.0,
        "summer_net_mw": 770.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489967,
        "projectNumber": "J4299",
        "queueDate": "2026-09-09T01:50:43+00:00",
        "inService": "2031-05-02T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 770.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 337,
      "normalized": {
        "queue_id": "J4387",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-09-10T23:51:40+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489968,
        "projectNumber": "J4387",
        "queueDate": "2026-09-10T23:51:40+00:00",
        "inService": "2031-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 338,
      "normalized": {
        "queue_id": "J4390",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-09-11T00:00:15+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489969,
        "projectNumber": "J4390",
        "queueDate": "2026-09-11T00:00:15+00:00",
        "inService": "2031-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 339,
      "normalized": {
        "queue_id": "J4350",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-11T15:37:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489970,
        "projectNumber": "J4350",
        "queueDate": "2026-09-11T15:37:00+00:00",
        "inService": "2031-01-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 340,
      "normalized": {
        "queue_id": "J4405",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-09-11T23:34:10+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489971,
        "projectNumber": "J4405",
        "queueDate": "2026-09-11T23:34:10+00:00",
        "inService": "2031-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 341,
      "normalized": {
        "queue_id": "J4406",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-09T15:35:57+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 523.96,
        "summer_net_mw": 523.96,
        "winter_net_mw": 523.96,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489972,
        "projectNumber": "J4406",
        "queueDate": "2026-09-09T15:35:57+00:00",
        "inService": "2030-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 523.96,
        "winterNetMW": 523.96,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 342,
      "normalized": {
        "queue_id": "J4349",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-09T22:41:18+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 178.0,
        "summer_net_mw": 178.0,
        "winter_net_mw": 178.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489973,
        "projectNumber": "J4349",
        "queueDate": "2026-09-09T22:41:18+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 178.0,
        "winterNetMW": 178.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 343,
      "normalized": {
        "queue_id": "J4324",
        "county": "Starke",
        "state": "",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "",
        "queue_date": "2026-09-09T17:56:41+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 976.1,
        "summer_net_mw": 976.1,
        "winter_net_mw": 976.1,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489974,
        "projectNumber": "J4324",
        "queueDate": "2026-09-09T17:56:41+00:00",
        "inService": "2031-05-02T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Starke",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 976.1,
        "winterNetMW": 976.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 344,
      "normalized": {
        "queue_id": "J4386",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-09-10T23:59:59+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489975,
        "projectNumber": "J4386",
        "queueDate": "2026-09-10T23:59:59+00:00",
        "inService": "2031-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 345,
      "normalized": {
        "queue_id": "J4379",
        "county": "",
        "state": "",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "",
        "queue_date": "2026-09-11T01:36:58+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489976,
        "projectNumber": "J4379",
        "queueDate": "2026-09-11T01:36:58+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 346,
      "normalized": {
        "queue_id": "J4380",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-09-10T01:11:49+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489977,
        "projectNumber": "J4380",
        "queueDate": "2026-09-10T01:11:49+00:00",
        "inService": "2030-05-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 347,
      "normalized": {
        "queue_id": "J4383",
        "county": "",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "",
        "queue_date": "2026-09-11T01:14:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489978,
        "projectNumber": "J4383",
        "queueDate": "2026-09-11T01:14:00+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 348,
      "normalized": {
        "queue_id": "J4398",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "",
        "queue_date": "2026-09-09T23:12:23+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-01-14T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489979,
        "projectNumber": "J4398",
        "queueDate": "2026-09-09T23:12:23+00:00",
        "inService": "2031-01-14T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 349,
      "normalized": {
        "queue_id": "J4382",
        "county": "",
        "state": "",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "",
        "queue_date": "2026-09-10T01:11:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489980,
        "projectNumber": "J4382",
        "queueDate": "2026-09-10T01:11:00+00:00",
        "inService": "2030-05-31T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 350,
      "normalized": {
        "queue_id": "J4111",
        "county": "Hot Spring",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "SHERIDAN EHV - MAGNET COVE 500.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2025-12-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 650.0,
        "summer_net_mw": 650.0,
        "winter_net_mw": 650.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489981,
        "projectNumber": "J4111",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2025-12-19T05:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Hot Spring",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SHERIDAN EHV - MAGNET COVE 500.0kV",
        "summerNetMW": 650.0,
        "winterNetMW": 650.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 351,
      "normalized": {
        "queue_id": "J4113",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Killdeer",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 787.4,
        "summer_net_mw": 787.4,
        "winter_net_mw": 787.4,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 525.0,
        "dp1_nris_mw": 525.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489982,
        "projectNumber": "J4113",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Killdeer",
        "summerNetMW": 787.4,
        "winterNetMW": 787.4,
        "dp1ErisMw": 525.0,
        "dp1NrisMw": 525.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 352,
      "normalized": {
        "queue_id": "J3765",
        "county": "St. James",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "ST JAMES",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 8.0,
        "summer_net_mw": 8.0,
        "winter_net_mw": 8.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-04-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489983,
        "projectNumber": "J3765",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2024-04-18T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. James",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "ST JAMES",
        "summerNetMW": 8.0,
        "winterNetMW": 8.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 353,
      "normalized": {
        "queue_id": "J4320",
        "county": "",
        "state": "",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "",
        "queue_date": "2026-09-09T07:35:15+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489984,
        "projectNumber": "J4320",
        "queueDate": "2026-09-09T07:35:15+00:00",
        "inService": "2029-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 354,
      "normalized": {
        "queue_id": "J4347",
        "county": "",
        "state": "",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "",
        "queue_date": "2026-09-11T00:59:40+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489985,
        "projectNumber": "J4347",
        "queueDate": "2026-09-11T00:59:40+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 355,
      "normalized": {
        "queue_id": "J3742",
        "county": "Otter Tail",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Wahpeton - Fergus Falls 230.0kV",
        "queue_date": "2024-06-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489986,
        "projectNumber": "J3742",
        "queueDate": "2024-06-06T04:00:00+00:00",
        "inService": "2028-12-15T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Otter Tail",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wahpeton - Fergus Falls 230.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 356,
      "normalized": {
        "queue_id": "J4385",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-09-10T22:22:23+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-24T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489987,
        "projectNumber": "J4385",
        "queueDate": "2026-09-10T22:22:23+00:00",
        "inService": "2031-10-24T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "E-NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 357,
      "normalized": {
        "queue_id": "J4348",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-10T22:34:11+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489988,
        "projectNumber": "J4348",
        "queueDate": "2026-09-10T22:34:11+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 358,
      "normalized": {
        "queue_id": "J4114",
        "county": "Washington",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SUB T HASKINS",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 525.0,
        "summer_net_mw": 525.0,
        "winter_net_mw": 525.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 525.0,
        "dp1_nris_mw": 525.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489989,
        "projectNumber": "J4114",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-07-31T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Washington",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SUB T HASKINS",
        "summerNetMW": 525.0,
        "winterNetMW": 525.0,
        "dp1ErisMw": 525.0,
        "dp1NrisMw": 525.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 359,
      "normalized": {
        "queue_id": "J3763",
        "county": "Wayne",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "DBGEN GIS",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 7.5,
        "summer_net_mw": 7.5,
        "winter_net_mw": 7.5,
        "proposed_completion_date": null,
        "generation_type": "Waste Heat Recovery",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 7.5,
        "dp1_nris_mw": 7.5,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489990,
        "projectNumber": "J3763",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Wayne",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DBGEN GIS",
        "summerNetMW": 7.5,
        "winterNetMW": 7.5,
        "dp1ErisMw": 7.5,
        "dp1NrisMw": 7.5,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Waste Heat Recovery",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 360,
      "normalized": {
        "queue_id": "J3761",
        "county": "Ogemaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "GALLAGHER - TWINING 138.0kV",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 145.8,
        "summer_net_mw": 145.8,
        "winter_net_mw": 145.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 145.8,
        "dp1_nris_mw": 145.8,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489991,
        "projectNumber": "J3761",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "inService": "2027-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ogemaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GALLAGHER - TWINING 138.0kV",
        "summerNetMW": 145.8,
        "winterNetMW": 145.8,
        "dp1ErisMw": 145.8,
        "dp1NrisMw": 145.8,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 361,
      "normalized": {
        "queue_id": "J4112",
        "county": "Rock Island",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "OAK GROVE - SUB 93 LOUISA 345.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2026-08-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489992,
        "projectNumber": "J4112",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2026-08-25T04:00:00+00:00",
        "inService": "2030-10-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Rock Island",
        "state": "IL",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "OAK GROVE - SUB 93 LOUISA 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 362,
      "normalized": {
        "queue_id": "J3748",
        "county": "Washington",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Gerald Andrus 230 kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489993,
        "projectNumber": "J3748",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Washington",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gerald Andrus 230 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 363,
      "normalized": {
        "queue_id": "J3764",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Andes Substation 230 kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489994,
        "projectNumber": "J3764",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Andes Substation 230 kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 364,
      "normalized": {
        "queue_id": "J3473",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489995,
        "projectNumber": "J3473",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 365,
      "normalized": {
        "queue_id": "J3756",
        "county": "Marquette",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Huron",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 4.2,
        "summer_net_mw": 4.2,
        "winter_net_mw": 4.2,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2019-01-21T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 4.2,
        "dp1_nris_mw": 4.2,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489996,
        "projectNumber": "J3756",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2019-01-21T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marquette",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Huron",
        "summerNetMW": 4.2,
        "winterNetMW": 4.2,
        "dp1ErisMw": 4.2,
        "dp1NrisMw": 4.2,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 366,
      "normalized": {
        "queue_id": "J3746",
        "county": "Grant",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Rodemacher - Sherwood 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489997,
        "projectNumber": "J3746",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Grant",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rodemacher - Sherwood 230.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 367,
      "normalized": {
        "queue_id": "J3504",
        "county": "Bollinger",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5HERITAGE - 5FREDTN  161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489998,
        "projectNumber": "J3504",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Bollinger",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5HERITAGE - 5FREDTN  161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 368,
      "normalized": {
        "queue_id": "J3523",
        "county": "Barron",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "BARRON  - WASHCO  161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 115.0,
        "dp1_nris_mw": 115.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3489999,
        "projectNumber": "J3523",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Barron",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BARRON  - WASHCO  161.0kV",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 115.0,
        "dp1NrisMw": 115.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 369,
      "normalized": {
        "queue_id": "J3750",
        "county": "Mercer",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "OAK GROVE - SANDBURG (AMRN) 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490000,
        "projectNumber": "J3750",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-10-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Mercer",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "OAK GROVE - SANDBURG (AMRN) 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 370,
      "normalized": {
        "queue_id": "J3766",
        "county": "Pottawattamie",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "ROLLING HILLS - PONY CREEK 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 235.0,
        "summer_net_mw": 235.0,
        "winter_net_mw": 235.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490001,
        "projectNumber": "J3766",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-04-09T04:00:00+00:00",
        "inService": "2026-10-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Pottawattamie",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ROLLING HILLS - PONY CREEK 345.0kV",
        "summerNetMW": 235.0,
        "winterNetMW": 235.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 371,
      "normalized": {
        "queue_id": "J3506",
        "county": "Pike",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hull 138kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2024-08-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490002,
        "projectNumber": "J3506",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2024-08-13T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Pike",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hull 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 372,
      "normalized": {
        "queue_id": "J3554",
        "county": "Adair",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SOUTHERN HILLS",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-07-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 96.0,
        "summer_net_mw": 96.0,
        "winter_net_mw": 96.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490003,
        "projectNumber": "J3554",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-07-09T04:00:00+00:00",
        "inService": "2027-10-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Adair",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SOUTHERN HILLS",
        "summerNetMW": 96.0,
        "winterNetMW": 96.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 373,
      "normalized": {
        "queue_id": "J4378",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-10T22:34:05+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490004,
        "projectNumber": "J4378",
        "queueDate": "2026-09-10T22:34:05+00:00",
        "inService": "2031-05-07T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 374,
      "normalized": {
        "queue_id": "J4384",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-09T22:42:43+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 770.0,
        "summer_net_mw": 770.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490005,
        "projectNumber": "J4384",
        "queueDate": "2026-09-09T22:42:43+00:00",
        "inService": "2031-12-31T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 770.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 375,
      "normalized": {
        "queue_id": "J4325",
        "county": "",
        "state": "",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "",
        "queue_date": "2026-09-09T18:37:25+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490006,
        "projectNumber": "J4325",
        "queueDate": "2026-09-09T18:37:25+00:00",
        "inService": "2029-05-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 376,
      "normalized": {
        "queue_id": "J3503",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Morrison Ditch 345 kV substation (LRTP projects 15 & 16) - BUS #255210",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490007,
        "projectNumber": "J3503",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Morrison Ditch 345 kV substation (LRTP projects 15 & 16) - BUS #255210",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 377,
      "normalized": {
        "queue_id": "J3552",
        "county": "McLeod",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Hutchinson Municipal - GRE Big Swan 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 112.0,
        "summer_net_mw": 112.0,
        "winter_net_mw": 112.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 112.0,
        "dp1_nris_mw": 112.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490008,
        "projectNumber": "J3552",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-10-31T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "McLeod",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hutchinson Municipal - GRE Big Swan 115.0kV",
        "summerNetMW": 112.0,
        "winterNetMW": 112.0,
        "dp1ErisMw": 112.0,
        "dp1NrisMw": 112.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 378,
      "normalized": {
        "queue_id": "J3555",
        "county": "Boone",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "BEAVER CREEK",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-07-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 84.0,
        "summer_net_mw": 84.0,
        "winter_net_mw": 84.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490009,
        "projectNumber": "J3555",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-07-09T04:00:00+00:00",
        "inService": "2027-10-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Boone",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BEAVER CREEK",
        "summerNetMW": 84.0,
        "winterNetMW": 84.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 379,
      "normalized": {
        "queue_id": "J3588",
        "county": "Lawrence",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "J2733 Sub",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490010,
        "projectNumber": "J3588",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lawrence",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J2733 Sub",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 380,
      "normalized": {
        "queue_id": "J3553",
        "county": "Adair",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Orient Energy Center Substation",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 263.0,
        "summer_net_mw": 244.0,
        "winter_net_mw": 263.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490011,
        "projectNumber": "J3553",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-11-30T05:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Adair",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Orient Energy Center Substation",
        "summerNetMW": 244.0,
        "winterNetMW": 263.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 381,
      "normalized": {
        "queue_id": "J3590",
        "county": "Humphreys",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BELZONI - BELZONI TAP SS 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490012,
        "projectNumber": "J3590",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Humphreys",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BELZONI - BELZONI TAP SS 115.0kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 382,
      "normalized": {
        "queue_id": "J3631",
        "county": "Vermilion",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "GUEYDAN TAP - MORSE 69.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490013,
        "projectNumber": "J3631",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-12-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Vermilion",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GUEYDAN TAP - MORSE 69.0kV",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 383,
      "normalized": {
        "queue_id": "J3628",
        "county": "Jefferson",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "FRANKLIN EHV - GRAND GULF TRANSMISSION 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490014,
        "projectNumber": "J3628",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2027-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Jefferson",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FRANKLIN EHV - GRAND GULF TRANSMISSION 500.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 384,
      "normalized": {
        "queue_id": "J4388",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-12T12:03:41+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 499.0,
        "summer_net_mw": 499.0,
        "winter_net_mw": 499.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490015,
        "projectNumber": "J4388",
        "queueDate": "2026-09-12T12:03:41+00:00",
        "inService": "2028-02-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 499.0,
        "winterNetMW": 499.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 385,
      "normalized": {
        "queue_id": "J3741",
        "county": "Cleveland",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WOODWARD 115 SUB - RISON 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 155.0,
        "summer_net_mw": 155.0,
        "winter_net_mw": 155.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490016,
        "projectNumber": "J3741",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cleveland",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WOODWARD 115 SUB - RISON 115.0kV",
        "summerNetMW": 155.0,
        "winterNetMW": 155.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 386,
      "normalized": {
        "queue_id": "J3587",
        "county": "Jefferson",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "PORT ACRES BULK",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Co-gen",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490017,
        "projectNumber": "J3587",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jefferson",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "PORT ACRES BULK",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Co-gen",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 387,
      "normalized": {
        "queue_id": "J3629",
        "county": "Bolivar",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "DELTA SWYD - DREW [MS] 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 210.0,
        "summer_net_mw": 210.0,
        "winter_net_mw": 210.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490018,
        "projectNumber": "J3629",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2027-12-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Bolivar",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DELTA SWYD - DREW [MS] 115.0kV",
        "summerNetMW": 210.0,
        "winterNetMW": 210.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 388,
      "normalized": {
        "queue_id": "J3589",
        "county": "Lincoln",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "FRANKLIN EHV - MCCOMB 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490019,
        "projectNumber": "J3589",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Lincoln",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FRANKLIN EHV - MCCOMB 115.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 389,
      "normalized": {
        "queue_id": "J3586",
        "county": "Montgomery",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "JACINTO - PEACH CREEK 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 205.8,
        "summer_net_mw": 205.8,
        "winter_net_mw": 205.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 205.8,
        "dp1_nris_mw": 165.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490020,
        "projectNumber": "J3586",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Montgomery",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "JACINTO - PEACH CREEK 230.0kV",
        "summerNetMW": 205.8,
        "winterNetMW": 205.8,
        "dp1ErisMw": 205.8,
        "dp1NrisMw": 165.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 390,
      "normalized": {
        "queue_id": "J3591",
        "county": "St. Helena",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "MCKNIGHT - PLANT DANIEL 500.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 400.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490021,
        "projectNumber": "J3591",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-29T05:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Helena",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MCKNIGHT - PLANT DANIEL 500.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 400.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 391,
      "normalized": {
        "queue_id": "J3630",
        "county": "East Feliciana",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "MOLER - COLFEL 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 77.0,
        "summer_net_mw": 77.0,
        "winter_net_mw": 77.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 77.0,
        "dp1_nris_mw": 77.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490022,
        "projectNumber": "J3630",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-06-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "East Feliciana",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MOLER - COLFEL 230.0kV",
        "summerNetMW": 77.0,
        "winterNetMW": 77.0,
        "dp1ErisMw": 77.0,
        "dp1NrisMw": 77.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 392,
      "normalized": {
        "queue_id": "J3625",
        "county": "Winn",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "JELD WEN - WINNFIELD 115 SUB 115.0kV",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 82.0,
        "summer_net_mw": 82.0,
        "winter_net_mw": 82.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-27T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490023,
        "projectNumber": "J3625",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2027-10-27T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Winn",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "JELD WEN - WINNFIELD 115 SUB 115.0kV",
        "summerNetMW": 82.0,
        "winterNetMW": 82.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 393,
      "normalized": {
        "queue_id": "J3254",
        "county": "Pulaski",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "5CAPE GIR3 - 5JOPPA SR 161.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490024,
        "projectNumber": "J3254",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2026-12-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Pulaski",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5CAPE GIR3 - 5JOPPA SR 161.0kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 394,
      "normalized": {
        "queue_id": "J3331",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Petersburg - Sullivan (AEP/PJM) 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 470.0,
        "summer_net_mw": 470.0,
        "winter_net_mw": 470.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 470.0,
        "dp1_nris_mw": 470.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490025,
        "projectNumber": "J3331",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Petersburg - Sullivan (AEP/PJM) 345.0kV",
        "summerNetMW": 470.0,
        "winterNetMW": 470.0,
        "dp1ErisMw": 470.0,
        "dp1NrisMw": 470.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 395,
      "normalized": {
        "queue_id": "J3332",
        "county": "Calumet",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Forest Junction - Cypress 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490026,
        "projectNumber": "J3332",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Calumet",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Forest Junction - Cypress 345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 396,
      "normalized": {
        "queue_id": "J3751",
        "county": "Madison",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7COFFEEN  - 7ROXFORD  345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 236.0,
        "summer_net_mw": 236.0,
        "winter_net_mw": 236.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490027,
        "projectNumber": "J3751",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Madison",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7COFFEEN  - 7ROXFORD  345.0kV",
        "summerNetMW": 236.0,
        "winterNetMW": 236.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 397,
      "normalized": {
        "queue_id": "J3747",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WHITE BLUFF EHV - KEO EHV 500.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490028,
        "projectNumber": "J3747",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WHITE BLUFF EHV - KEO EHV 500.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 398,
      "normalized": {
        "queue_id": "J3276",
        "county": "Pulaski",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mound City",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-08-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490029,
        "projectNumber": "J3276",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-08-27T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Pulaski",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mound City",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 399,
      "normalized": {
        "queue_id": "J3413",
        "county": "Pulaski",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "L.R. 145TH ST - L.R. PORT 115.0kV",
        "queue_date": "2024-03-29T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490030,
        "projectNumber": "J3413",
        "queueDate": "2024-03-29T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-07-18T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pulaski",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "L.R. 145TH ST - L.R. PORT 115.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 400,
      "normalized": {
        "queue_id": "J3505",
        "county": "Bollinger",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5HERITAGE - 5FREDTN  161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490031,
        "projectNumber": "J3505",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Bollinger",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5HERITAGE - 5FREDTN  161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 401,
      "normalized": {
        "queue_id": "J3524",
        "county": "Watonwan",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Crandall - Fieldon 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490032,
        "projectNumber": "J3524",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Watonwan",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Crandall - Fieldon 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 402,
      "normalized": {
        "queue_id": "J3522",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Bison",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490033,
        "projectNumber": "J3522",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bison",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 403,
      "normalized": {
        "queue_id": "J3592",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 57.0,
        "summer_net_mw": 57.0,
        "winter_net_mw": 57.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 57.0,
        "dp1_nris_mw": 37.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490034,
        "projectNumber": "J3592",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "summerNetMW": 57.0,
        "winterNetMW": 57.0,
        "dp1ErisMw": 57.0,
        "dp1NrisMw": 37.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 404,
      "normalized": {
        "queue_id": "J3861",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "WAGNER",
        "queue_date": "2024-12-13T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490035,
        "projectNumber": "J3861",
        "queueDate": "2024-12-13T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2028-07-28T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "WAGNER",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 405,
      "normalized": {
        "queue_id": "J3863",
        "county": "Itasca",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Boswell 230 - Blackberry 230kV",
        "queue_date": "2024-12-11T05:00:00+00:00",
        "withdrawn_date": "2025-07-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490036,
        "projectNumber": "J3863",
        "queueDate": "2024-12-11T05:00:00+00:00",
        "withdrawnDate": "2025-07-07T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Itasca",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Boswell 230 - Blackberry 230kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 406,
      "normalized": {
        "queue_id": "J3627",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "JONESBORO (APL) - CASH 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490037,
        "projectNumber": "J3627",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "JONESBORO (APL) - CASH 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 407,
      "normalized": {
        "queue_id": "J3275",
        "county": "Benton",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Mud Lake - Benton County (GRE) 230kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 249.0,
        "summer_net_mw": 249.0,
        "winter_net_mw": 249.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 249.0,
        "dp1_nris_mw": 249.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490038,
        "projectNumber": "J3275",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-04T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Benton",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mud Lake - Benton County (GRE) 230kV",
        "summerNetMW": 249.0,
        "winterNetMW": 249.0,
        "dp1ErisMw": 249.0,
        "dp1NrisMw": 249.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 408,
      "normalized": {
        "queue_id": "J3339",
        "county": "Hendricks",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "AMO",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490039,
        "projectNumber": "J3339",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Hendricks",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AMO",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 409,
      "normalized": {
        "queue_id": "J3414",
        "county": "Posey",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490040,
        "projectNumber": "J3414",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Posey",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 410,
      "normalized": {
        "queue_id": "J3412",
        "county": "Ford",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490041,
        "projectNumber": "J3412",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Ford",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 411,
      "normalized": {
        "queue_id": "J3839",
        "county": "Union",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "MARION SS (LAGEN) - HUTTIG SS 115.0kV",
        "queue_date": "2024-05-31T04:00:00+00:00",
        "withdrawn_date": "2026-01-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490042,
        "projectNumber": "J3839",
        "queueDate": "2024-05-31T04:00:00+00:00",
        "withdrawnDate": "2026-01-04T05:00:00+00:00",
        "inService": "2028-07-03T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Union",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "MARION SS (LAGEN) - HUTTIG SS 115.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 412,
      "normalized": {
        "queue_id": "J3862",
        "county": "Deuel",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Astoria - Deuel County 345.0kV",
        "queue_date": "2024-12-11T05:00:00+00:00",
        "withdrawn_date": "2025-08-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490043,
        "projectNumber": "J3862",
        "queueDate": "2024-12-11T05:00:00+00:00",
        "withdrawnDate": "2025-08-20T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Deuel",
        "state": "SD",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Astoria - Deuel County 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 413,
      "normalized": {
        "queue_id": "J3657",
        "county": "Washington",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Greer Solar substation J1458",
        "queue_date": "2024-04-04T04:00:00+00:00",
        "withdrawn_date": "2025-10-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490044,
        "projectNumber": "J3657",
        "queueDate": "2024-04-04T04:00:00+00:00",
        "withdrawnDate": "2025-10-06T04:00:00+00:00",
        "inService": "2028-06-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Washington",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greer Solar substation J1458",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 414,
      "normalized": {
        "queue_id": "J3355",
        "county": "Fulton",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4IPAVA 3 - 4HAVANA2 138.0kV",
        "queue_date": "2024-04-10T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.6,
        "summer_net_mw": 100.6,
        "winter_net_mw": 100.6,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490045,
        "projectNumber": "J3355",
        "queueDate": "2024-04-10T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fulton",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "4IPAVA 3 - 4HAVANA2 138.0kV",
        "summerNetMW": 100.6,
        "winterNetMW": 100.6,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 415,
      "normalized": {
        "queue_id": "J3356",
        "county": "Pike",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "RATTS - ALGIERS 69.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 65.0,
        "summer_net_mw": 65.0,
        "winter_net_mw": 65.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490046,
        "projectNumber": "J3356",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Pike",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RATTS - ALGIERS 69.0kV",
        "summerNetMW": 65.0,
        "winterNetMW": 65.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 416,
      "normalized": {
        "queue_id": "J3845",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "BROWNSTOWN - ENRICO FERMI #3 345.0kV",
        "queue_date": "2024-11-27T05:00:00+00:00",
        "withdrawn_date": "2026-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-02-09T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490047,
        "projectNumber": "J3845",
        "queueDate": "2024-11-27T05:00:00+00:00",
        "withdrawnDate": "2026-04-16T04:00:00+00:00",
        "inService": "2029-02-09T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BROWNSTOWN - ENRICO FERMI #3 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 417,
      "normalized": {
        "queue_id": "J3864",
        "county": "Shiawassee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "GOSS - THETFORD 345.0kV",
        "queue_date": "2024-12-09T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 230.0,
        "summer_net_mw": 230.0,
        "winter_net_mw": 230.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 230.0,
        "dp1_nris_mw": 230.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490048,
        "projectNumber": "J3864",
        "queueDate": "2024-12-09T05:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "GOSS - THETFORD 345.0kV",
        "summerNetMW": 230.0,
        "winterNetMW": 230.0,
        "dp1ErisMw": 230.0,
        "dp1NrisMw": 230.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 418,
      "normalized": {
        "queue_id": "J3866",
        "county": "Lapeer",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "BENNET - GREENWOOD 120.0kV",
        "queue_date": "2024-12-06T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490049,
        "projectNumber": "J3866",
        "queueDate": "2024-12-06T05:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Lapeer",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BENNET - GREENWOOD 120.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 419,
      "normalized": {
        "queue_id": "J3867",
        "county": "Iroquois",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Watseka",
        "queue_date": "2024-12-02T05:00:00+00:00",
        "withdrawn_date": "2025-12-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490050,
        "projectNumber": "J3867",
        "queueDate": "2024-12-02T05:00:00+00:00",
        "withdrawnDate": "2025-12-29T05:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Iroquois",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Watseka",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 420,
      "normalized": {
        "queue_id": "J3860",
        "county": "Peoria",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7FARGO - 7SANDBURG 345.0kV",
        "queue_date": "2025-01-27T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490051,
        "projectNumber": "J3860",
        "queueDate": "2025-01-27T05:00:00+00:00",
        "inService": "2030-04-02T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Peoria",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7FARGO - 7SANDBURG 345.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 421,
      "normalized": {
        "queue_id": "J3660",
        "county": "Rock Island",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Oak Grove 161 kV sub",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490052,
        "projectNumber": "J3660",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Rock Island",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Oak Grove 161 kV sub",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 422,
      "normalized": {
        "queue_id": "J3652",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BEECHER - KNOWLES 138.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490053,
        "projectNumber": "J3652",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BEECHER - KNOWLES 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 423,
      "normalized": {
        "queue_id": "J3654",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490054,
        "projectNumber": "J3654",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 424,
      "normalized": {
        "queue_id": "J3659",
        "county": "Avoyelles",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Yellow Bayou",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.25,
        "summer_net_mw": 90.25,
        "winter_net_mw": 90.25,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-27T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490055,
        "projectNumber": "J3659",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-12-27T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Avoyelles",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Yellow Bayou",
        "summerNetMW": 90.25,
        "winterNetMW": 90.25,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 425,
      "normalized": {
        "queue_id": "J3696",
        "county": "Montcalm",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "NELSON ROAD - VERGENNES 345.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 225.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490056,
        "projectNumber": "J3696",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2026-12-30T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Montcalm",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NELSON ROAD - VERGENNES 345.0kV",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 225.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 426,
      "normalized": {
        "queue_id": "J3697",
        "county": "Jennings",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 44.0,
        "summer_net_mw": 44.0,
        "winter_net_mw": 44.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490057,
        "projectNumber": "J3697",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Jennings",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 44.0,
        "winterNetMW": 44.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 427,
      "normalized": {
        "queue_id": "J3698",
        "county": "Roscommon",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "HIGGINS - MIO DAM 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490058,
        "projectNumber": "J3698",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-10-16T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Roscommon",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HIGGINS - MIO DAM 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 428,
      "normalized": {
        "queue_id": "J2295",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Merom Substation 345kV",
        "queue_date": "2021-09-09T04:00:00+00:00",
        "withdrawn_date": "2023-04-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490059,
        "projectNumber": "J2295",
        "queueDate": "2021-09-09T04:00:00+00:00",
        "withdrawnDate": "2023-04-04T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Merom Substation 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 429,
      "normalized": {
        "queue_id": "J2281",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Reynolds 138 kV",
        "queue_date": "2021-08-20T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490060,
        "projectNumber": "J2281",
        "queueDate": "2021-08-20T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-10-07T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reynolds 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 430,
      "normalized": {
        "queue_id": "J3816",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BULLOCK - SAGINAW RIVER 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490061,
        "projectNumber": "J3816",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BULLOCK - SAGINAW RIVER 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 431,
      "normalized": {
        "queue_id": "J3653",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490062,
        "projectNumber": "J3653",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Line tap on Superior-Wayne 120kV line at 42.275480, -83.628250",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 432,
      "normalized": {
        "queue_id": "J3662",
        "county": "Monroe",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Valmeyer 138kV.",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490063,
        "projectNumber": "J3662",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Monroe",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Valmeyer 138kV.",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 433,
      "normalized": {
        "queue_id": "J3712",
        "county": "Peoria",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7FARGO - 7SANDBURG 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 350.0,
        "dp1_nris_mw": 350.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490064,
        "projectNumber": "J3712",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Peoria",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7FARGO - 7SANDBURG 345.0kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 350.0,
        "dp1NrisMw": 350.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 434,
      "normalized": {
        "queue_id": "J1854",
        "county": "Wabash",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Wabash - Greentown 138kV",
        "queue_date": "2021-08-18T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490065,
        "projectNumber": "J1854",
        "queueDate": "2021-08-18T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Wabash",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wabash - Greentown 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 435,
      "normalized": {
        "queue_id": "J2096",
        "county": "Terrebonne",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Schriever 230 kV Substation",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490066,
        "projectNumber": "J2096",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Terrebonne",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "Schriever 230 kV Substation",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 436,
      "normalized": {
        "queue_id": "J2522",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC Manila - Dell EHV 161 kV (J2089 POI)",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490067,
        "projectNumber": "J2522",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC Manila - Dell EHV 161 kV (J2089 POI)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 437,
      "normalized": {
        "queue_id": "J2437",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BRINKLEY EAST - AECC AUBREY 230.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490068,
        "projectNumber": "J2437",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "BRINKLEY EAST - AECC AUBREY 230.0kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 438,
      "normalized": {
        "queue_id": "J2406",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Pickens - Canton 230 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490069,
        "projectNumber": "J2406",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pickens - Canton 230 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 439,
      "normalized": {
        "queue_id": "J2527",
        "county": "Allen",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Caney 138 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490070,
        "projectNumber": "J2527",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Allen",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Caney 138 kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 440,
      "normalized": {
        "queue_id": "J3711",
        "county": "Calhoun",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490071,
        "projectNumber": "J3711",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2029-11-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Calhoun",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 441,
      "normalized": {
        "queue_id": "J3713",
        "county": "Wapello",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ottumwa Generation - Woody 161kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490072,
        "projectNumber": "J3713",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Wapello",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Ottumwa Generation - Woody 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 442,
      "normalized": {
        "queue_id": "J2126",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Garner SS to Seracy  Price 115kV line",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2024-08-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490073,
        "projectNumber": "J2126",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2024-08-16T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Garner SS to Seracy  Price 115kV line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 443,
      "normalized": {
        "queue_id": "J2137",
        "county": "Ohio",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "345 kV Wilson Substation",
        "queue_date": "2021-10-26T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 78.23,
        "summer_net_mw": 78.23,
        "winter_net_mw": 78.23,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490074,
        "projectNumber": "J2137",
        "queueDate": "2021-10-26T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-10-15T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Ohio",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "345 kV Wilson Substation",
        "summerNetMW": 78.23,
        "winterNetMW": 78.23,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 444,
      "normalized": {
        "queue_id": "J3626",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490075,
        "projectNumber": "J3626",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2027-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 445,
      "normalized": {
        "queue_id": "J3333",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "MAJESTIC - MILAN 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490076,
        "projectNumber": "J3333",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MAJESTIC - MILAN 345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 446,
      "normalized": {
        "queue_id": "J3345",
        "county": "Moultrie",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Faraday",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490077,
        "projectNumber": "J3345",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Moultrie",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Faraday",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 447,
      "normalized": {
        "queue_id": "J3354",
        "county": "Clinton",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Hanover",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": "2025-09-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490078,
        "projectNumber": "J3354",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "withdrawnDate": "2025-09-05T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clinton",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hanover",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 448,
      "normalized": {
        "queue_id": "J3735",
        "county": "Genesee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BEVERIDGE 138kV",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490079,
        "projectNumber": "J3735",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BEVERIDGE 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 449,
      "normalized": {
        "queue_id": "J2535",
        "county": "Vermilion",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cooper - Leesville 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 210.0,
        "summer_net_mw": 210.0,
        "winter_net_mw": 210.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490080,
        "projectNumber": "J2535",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Vermilion",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cooper - Leesville 138 kV",
        "summerNetMW": 210.0,
        "winterNetMW": 210.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 450,
      "normalized": {
        "queue_id": "J3865",
        "county": "Shiawassee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "CORNELL - LAYTON 138.0kV",
        "queue_date": "2024-12-08T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490081,
        "projectNumber": "J3865",
        "queueDate": "2024-12-08T05:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "CORNELL - LAYTON 138.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 451,
      "normalized": {
        "queue_id": "J3655",
        "county": "Dallas",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "OVERLAND TRAIL - FALLOW AVENUE 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490082,
        "projectNumber": "J3655",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Dallas",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "OVERLAND TRAIL - FALLOW AVENUE 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 452,
      "normalized": {
        "queue_id": "J3658",
        "county": "Clark",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "GURDON - BEIRNE 115.0kV",
        "queue_date": "2024-03-25T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490083,
        "projectNumber": "J3658",
        "queueDate": "2024-03-25T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clark",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GURDON - BEIRNE 115.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 453,
      "normalized": {
        "queue_id": "J3656",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "BAUER",
        "queue_date": "2024-03-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490084,
        "projectNumber": "J3656",
        "queueDate": "2024-03-26T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BAUER",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 454,
      "normalized": {
        "queue_id": "J2460",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "White Bluff EHV 500kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490085,
        "projectNumber": "J2460",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "White Bluff EHV 500kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 455,
      "normalized": {
        "queue_id": "J2506",
        "county": "Boone",
        "state": "MO",
        "transmission_owner": "CITY OF COLUMBIA, MISSOURI (WATER AND LIGHT DEPT.)",
        "poi": "5BOLSTAD 161kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490086,
        "projectNumber": "J2506",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "CITY OF COLUMBIA, MISSOURI (WATER AND LIGHT DEPT.)",
        "county": "Boone",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5BOLSTAD 161kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 456,
      "normalized": {
        "queue_id": "J2132",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Cayuga 230 kV",
        "queue_date": "2022-10-31T04:00:00+00:00",
        "withdrawn_date": "2024-08-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490087,
        "projectNumber": "J2132",
        "queueDate": "2022-10-31T04:00:00+00:00",
        "withdrawnDate": "2024-08-16T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cayuga 230 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 457,
      "normalized": {
        "queue_id": "J2291",
        "county": "Polk",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Winger",
        "queue_date": "2021-09-07T04:00:00+00:00",
        "withdrawn_date": "2021-12-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-07-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490088,
        "projectNumber": "J2291",
        "queueDate": "2021-09-07T04:00:00+00:00",
        "withdrawnDate": "2021-12-07T05:00:00+00:00",
        "inService": "2025-07-23T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Polk",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Winger",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 458,
      "normalized": {
        "queue_id": "J2526",
        "county": "Red River",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Layfield - Western Kraft 230.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490089,
        "projectNumber": "J2526",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Red River",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Layfield - Western Kraft 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 459,
      "normalized": {
        "queue_id": "J2380",
        "county": "Meade",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Meade County 161kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490090,
        "projectNumber": "J2380",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-11-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Meade",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Meade County 161kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 460,
      "normalized": {
        "queue_id": "J2409",
        "county": "Independence",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "INDEPENDENCE-ISES 500kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490091,
        "projectNumber": "J2409",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Independence",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDEPENDENCE-ISES 500kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 461,
      "normalized": {
        "queue_id": "J2458",
        "county": "Conway",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Pleasant Hill 500kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490092,
        "projectNumber": "J2458",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Conway",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pleasant Hill 500kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 462,
      "normalized": {
        "queue_id": "J2534",
        "county": "Mason",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Pere Marquette 138 KV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490093,
        "projectNumber": "J2534",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Mason",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pere Marquette 138 KV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 463,
      "normalized": {
        "queue_id": "J2456",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "",
        "poi": "AECC AUBREY-RITCHIE SES SWITCHYARD 230 KV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490094,
        "projectNumber": "J2456",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC AUBREY-RITCHIE SES SWITCHYARD 230 KV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 464,
      "normalized": {
        "queue_id": "J2363",
        "county": "Washington",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Marshalltown-Laurel 161kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 226.0,
        "summer_net_mw": 226.0,
        "winter_net_mw": 226.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490095,
        "projectNumber": "J2363",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washington",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Marshalltown-Laurel 161kV",
        "summerNetMW": 226.0,
        "winterNetMW": 226.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 465,
      "normalized": {
        "queue_id": "J2515",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "White Bluff EHV 500kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490096,
        "projectNumber": "J2515",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "White Bluff EHV 500kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 466,
      "normalized": {
        "queue_id": "J2459",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "White Bluff EHV 500kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490097,
        "projectNumber": "J2459",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "White Bluff EHV 500kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 467,
      "normalized": {
        "queue_id": "J2508",
        "county": "Webster",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "El Dorado Ehv - Sarepta 345kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490098,
        "projectNumber": "J2508",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Webster",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "El Dorado Ehv - Sarepta 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 468,
      "normalized": {
        "queue_id": "J2365",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Werner West - Rocky Run 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490099,
        "projectNumber": "J2365",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Werner West - Rocky Run 345kV",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 469,
      "normalized": {
        "queue_id": "J2529",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cocodrie - Hineston 230kV line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490100,
        "projectNumber": "J2529",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cocodrie - Hineston 230kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 470,
      "normalized": {
        "queue_id": "J2368",
        "county": "LaMoure",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Ellendale 345kV SS",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490101,
        "projectNumber": "J2368",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "LaMoure",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale 345kV SS",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 471,
      "normalized": {
        "queue_id": "J2369",
        "county": "Taylor",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Madison-Orient 345kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490102,
        "projectNumber": "J2369",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Taylor",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Madison-Orient 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 472,
      "normalized": {
        "queue_id": "J2453",
        "county": "Cumberland",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Casey West 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490103,
        "projectNumber": "J2453",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Cumberland",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Casey West 345kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 473,
      "normalized": {
        "queue_id": "J2408",
        "county": "Switzerland",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Fairview 138 kV Substation",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-07T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490104,
        "projectNumber": "J2408",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-03-07T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Switzerland",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fairview 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 474,
      "normalized": {
        "queue_id": "J3731",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport  - Vincennes 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490105,
        "projectNumber": "J3731",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport  - Vincennes 138.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 475,
      "normalized": {
        "queue_id": "J2530",
        "county": "Clinton",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Thorntown to Kokomo HP 230 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490106,
        "projectNumber": "J2530",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clinton",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Thorntown to Kokomo HP 230 kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 476,
      "normalized": {
        "queue_id": "J2510",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Stuttgart Rcuskey - Woodward 230kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490107,
        "projectNumber": "J2510",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stuttgart Rcuskey - Woodward 230kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 477,
      "normalized": {
        "queue_id": "J2511",
        "county": "Conway",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Pleasant Hill 500kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 85.0,
        "summer_net_mw": 85.0,
        "winter_net_mw": 85.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490108,
        "projectNumber": "J2511",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Conway",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pleasant Hill 500kV Substation",
        "summerNetMW": 85.0,
        "winterNetMW": 85.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 478,
      "normalized": {
        "queue_id": "J2364",
        "county": "Page",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Madison-Orient 345kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490109,
        "projectNumber": "J2364",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Page",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Madison-Orient 345kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 479,
      "normalized": {
        "queue_id": "J2523",
        "county": "Independence",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS INC. EAI",
        "poi": "INDEPENDENCE-ISES",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490110,
        "projectNumber": "J2523",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS INC. EAI",
        "county": "Independence",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "INDEPENDENCE-ISES",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 480,
      "normalized": {
        "queue_id": "J2366",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Werner West - Rocky Run 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490111,
        "projectNumber": "J2366",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Werner West - Rocky Run 345kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 481,
      "normalized": {
        "queue_id": "J2497",
        "county": "Jefferson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "West Mt. Vernon",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-07T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490112,
        "projectNumber": "J2497",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-03-07T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jefferson",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "West Mt. Vernon",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 482,
      "normalized": {
        "queue_id": "J2516",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "White Bluff EHV 500kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490113,
        "projectNumber": "J2516",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "White Bluff EHV 500kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 483,
      "normalized": {
        "queue_id": "J2524",
        "county": "Stoddard",
        "state": "MO",
        "transmission_owner": "",
        "poi": "5STODDARD - 5MORLEY (AECI) 161kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490114,
        "projectNumber": "J2524",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Stoddard",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "5STODDARD - 5MORLEY (AECI) 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 484,
      "normalized": {
        "queue_id": "J2411",
        "county": "De Soto",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Red River-Mansfield 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490115,
        "projectNumber": "J2411",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "De Soto",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Red River-Mansfield 138kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 485,
      "normalized": {
        "queue_id": "J2416",
        "county": "Trempealeau",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "North Rochester-Briggs Road 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490116,
        "projectNumber": "J2416",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Trempealeau",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "North Rochester-Briggs Road 345kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 486,
      "normalized": {
        "queue_id": "J2384",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4PANA 1 - 4SHELBYVL E 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490117,
        "projectNumber": "J2384",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "4PANA 1 - 4SHELBYVL E 138.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 487,
      "normalized": {
        "queue_id": "J2537",
        "county": "Shawano",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Highway 22 345 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490118,
        "projectNumber": "J2537",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Shawano",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Highway 22 345 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 488,
      "normalized": {
        "queue_id": "J2496",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Reynolds 345 kV Substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-07T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 400.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490119,
        "projectNumber": "J2496",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2026-03-07T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reynolds 345 kV Substation",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 400.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 489,
      "normalized": {
        "queue_id": "J2413",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hoopeston West 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490120,
        "projectNumber": "J2413",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hoopeston West 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 490,
      "normalized": {
        "queue_id": "J2415",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Richard 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490121,
        "projectNumber": "J2415",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Richard 138kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 491,
      "normalized": {
        "queue_id": "J2359",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Other_",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 58.5,
        "summer_net_mw": 58.5,
        "winter_net_mw": 58.5,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490122,
        "projectNumber": "J2359",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 58.5,
        "winterNetMW": 58.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 492,
      "normalized": {
        "queue_id": "J2370",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BOLTON - RAYMOND-CAPLINE 115.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490123,
        "projectNumber": "J2370",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BOLTON - RAYMOND-CAPLINE 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 493,
      "normalized": {
        "queue_id": "J2420",
        "county": "Faribault",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Huntley 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 95.0,
        "summer_net_mw": 95.0,
        "winter_net_mw": 95.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490124,
        "projectNumber": "J2420",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Faribault",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Huntley 345kV",
        "summerNetMW": 95.0,
        "winterNetMW": 95.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 494,
      "normalized": {
        "queue_id": "J2544",
        "county": "Shawano",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Highway 22 345 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 95.0,
        "summer_net_mw": 95.0,
        "winter_net_mw": 95.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490125,
        "projectNumber": "J2544",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Shawano",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Highway 22 345 kV Substation",
        "summerNetMW": 95.0,
        "winterNetMW": 95.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 495,
      "normalized": {
        "queue_id": "J2423",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "",
        "poi": "Columbia-North Madison 345kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490126,
        "projectNumber": "J2423",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Columbia-North Madison 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 496,
      "normalized": {
        "queue_id": "J2425",
        "county": "Montgomery",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "7ENON - 7MONTGMRY 345kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490127,
        "projectNumber": "J2425",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Montgomery",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7ENON - 7MONTGMRY 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 497,
      "normalized": {
        "queue_id": "J2487",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gallagher-Tittabawassee 345kV Transmission Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490128,
        "projectNumber": "J2487",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gallagher-Tittabawassee 345kV Transmission Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 498,
      "normalized": {
        "queue_id": "J2484",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490129,
        "projectNumber": "J2484",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 499,
      "normalized": {
        "queue_id": "J2426",
        "county": "Marion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Kinmundy 138kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490130,
        "projectNumber": "J2426",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Marion",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kinmundy 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 500,
      "normalized": {
        "queue_id": "J2488",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Almeda Junction-Shale 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490131,
        "projectNumber": "J2488",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Almeda Junction-Shale 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 501,
      "normalized": {
        "queue_id": "J2427",
        "county": "Marion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Kinmundy 138kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490132,
        "projectNumber": "J2427",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Marion",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kinmundy 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 502,
      "normalized": {
        "queue_id": "J2367",
        "county": "LaMoure",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Ellendale 345kV SS",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490133,
        "projectNumber": "J2367",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "LaMoure",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale 345kV SS",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 503,
      "normalized": {
        "queue_id": "J2385",
        "county": "Franklin",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "SWARTZ 115 KV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 179.0,
        "summer_net_mw": 179.0,
        "winter_net_mw": 179.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490134,
        "projectNumber": "J2385",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Franklin",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SWARTZ 115 KV",
        "summerNetMW": 179.0,
        "winterNetMW": 179.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 504,
      "normalized": {
        "queue_id": "J2407",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Dresser-Merom (HED) 345kV line break",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490135,
        "projectNumber": "J2407",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dresser-Merom (HED) 345kV line break",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 505,
      "normalized": {
        "queue_id": "J2410",
        "county": "Pottawattamie",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Pony Creek-Rolling Hills Wind 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490136,
        "projectNumber": "J2410",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Pottawattamie",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pony Creek-Rolling Hills Wind 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 506,
      "normalized": {
        "queue_id": "J2414",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hoopeston 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490137,
        "projectNumber": "J2414",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hoopeston 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 507,
      "normalized": {
        "queue_id": "J2358",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Other_",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 113.98,
        "summer_net_mw": 113.98,
        "winter_net_mw": 113.98,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490138,
        "projectNumber": "J2358",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 113.98,
        "winterNetMW": 113.98,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 508,
      "normalized": {
        "queue_id": "J2417",
        "county": "Trempealeau",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "North Rochester-Briggs Road 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490139,
        "projectNumber": "J2417",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Trempealeau",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "North Rochester-Briggs Road 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 509,
      "normalized": {
        "queue_id": "J2376",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4PANA 1 - 4SHELBYVL E 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490140,
        "projectNumber": "J2376",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "4PANA 1 - 4SHELBYVL E 138.0kV",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 510,
      "normalized": {
        "queue_id": "J2419",
        "county": "Faribault",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Huntley 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490141,
        "projectNumber": "J2419",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Faribault",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Huntley 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 511,
      "normalized": {
        "queue_id": "J2421",
        "county": "Rush",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greensboro-Gwynneville 345kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490142,
        "projectNumber": "J2421",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Rush",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greensboro-Gwynneville 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 512,
      "normalized": {
        "queue_id": "J2485",
        "county": "Livingston",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "BLACKFOOT - MADRID 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490143,
        "projectNumber": "J2485",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Livingston",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BLACKFOOT - MADRID 345.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 513,
      "normalized": {
        "queue_id": "J2424",
        "county": "Evangeline",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Manuel 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490144,
        "projectNumber": "J2424",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Manuel 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 514,
      "normalized": {
        "queue_id": "J2490",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Tuscola-Arrowhead 120kV Transmission Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490145,
        "projectNumber": "J2490",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tuscola-Arrowhead 120kV Transmission Line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 515,
      "normalized": {
        "queue_id": "J2434",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hoopeston West 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490146,
        "projectNumber": "J2434",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2028-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hoopeston West 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 516,
      "normalized": {
        "queue_id": "J2494",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Clare Jct to Vernon Jct 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 178.0,
        "summer_net_mw": 178.0,
        "winter_net_mw": 178.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490147,
        "projectNumber": "J2494",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Clare Jct to Vernon Jct 138 kV",
        "summerNetMW": 178.0,
        "winterNetMW": 178.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 517,
      "normalized": {
        "queue_id": "J2433",
        "county": "Wadena",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Wing River-Riverton 230kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490148,
        "projectNumber": "J2433",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Wadena",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wing River-Riverton 230kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 518,
      "normalized": {
        "queue_id": "J2444",
        "county": "Van Buren",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ARGENTA - TWIN BRANCH 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 220.0,
        "dp1_nris_mw": 220.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490149,
        "projectNumber": "J2444",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Van Buren",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ARGENTA - TWIN BRANCH 345.0kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 220.0,
        "dp1NrisMw": 220.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 519,
      "normalized": {
        "queue_id": "J2436",
        "county": "Webster",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Webster-Lehigh 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490150,
        "projectNumber": "J2436",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Webster",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Webster-Lehigh 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 520,
      "normalized": {
        "queue_id": "J2435",
        "county": "Webster",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Webster-Wright 161kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490151,
        "projectNumber": "J2435",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Webster",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Webster-Wright 161kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 521,
      "normalized": {
        "queue_id": "J2438",
        "county": "Montgomery",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "7MONTGMRY -7ENON 345kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490152,
        "projectNumber": "J2438",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Montgomery",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7MONTGMRY -7ENON 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 522,
      "normalized": {
        "queue_id": "J2461",
        "county": "Christian",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Pana 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2022-11-30T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490153,
        "projectNumber": "J2461",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2022-11-30T05:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Christian",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pana 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 523,
      "normalized": {
        "queue_id": "J2463",
        "county": "Washington",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Baldwin",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490154,
        "projectNumber": "J2463",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Washington",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Baldwin",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 524,
      "normalized": {
        "queue_id": "J2495",
        "county": "Benton",
        "state": "MN",
        "transmission_owner": "",
        "poi": "Benton County 115 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490155,
        "projectNumber": "J2495",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2026-04-29T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Benton",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Benton County 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 525,
      "normalized": {
        "queue_id": "J2462",
        "county": "Worth",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ledyard-Colby 345kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490156,
        "projectNumber": "J2462",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Worth",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ledyard-Colby 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 526,
      "normalized": {
        "queue_id": "J2525",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Dunn - Oak Ridge 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490157,
        "projectNumber": "J2525",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dunn - Oak Ridge 115 kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 527,
      "normalized": {
        "queue_id": "J2532",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Latham",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490158,
        "projectNumber": "J2532",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Latham",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 528,
      "normalized": {
        "queue_id": "J2501",
        "county": "Goodhue",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "NORTH ROCHESTER",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490159,
        "projectNumber": "J2501",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2024-11-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Goodhue",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NORTH ROCHESTER",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 529,
      "normalized": {
        "queue_id": "J2465",
        "county": "Logan",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Goose Creek Energy Center to Maroa East 345 kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490160,
        "projectNumber": "J2465",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2028-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Logan",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Goose Creek Energy Center to Maroa East 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 530,
      "normalized": {
        "queue_id": "J2467",
        "county": "Evangeline",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Manuel 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 105.0,
        "summer_net_mw": 105.0,
        "winter_net_mw": 105.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490161,
        "projectNumber": "J2467",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Manuel 138kV",
        "summerNetMW": 105.0,
        "winterNetMW": 105.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 531,
      "normalized": {
        "queue_id": "J2481",
        "county": "Pocahontas",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Webster-Irvington 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490162,
        "projectNumber": "J2481",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Pocahontas",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Webster-Irvington 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 532,
      "normalized": {
        "queue_id": "J2412",
        "county": "Pulaski",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "LR Alexander 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490163,
        "projectNumber": "J2412",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pulaski",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LR Alexander 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 533,
      "normalized": {
        "queue_id": "J2498",
        "county": "Hamilton",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Hortonville-Noblesville Line 345 kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-07T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490164,
        "projectNumber": "J2498",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-03-07T05:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Hamilton",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hortonville-Noblesville Line 345 kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 534,
      "normalized": {
        "queue_id": "J2499",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Blendon 138 kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-07T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490165,
        "projectNumber": "J2499",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "inService": "2026-03-07T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Blendon 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 535,
      "normalized": {
        "queue_id": "J2418",
        "county": "Marshall",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Burr Oak 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490166,
        "projectNumber": "J2418",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Marshall",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Burr Oak 138kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 536,
      "normalized": {
        "queue_id": "J2545",
        "county": "Buchanan",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490167,
        "projectNumber": "J2545",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Buchanan",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Duane Arnold",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 537,
      "normalized": {
        "queue_id": "J2546",
        "county": "Deuel",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Astoria 345kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490168,
        "projectNumber": "J2546",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Deuel",
        "state": "SD",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Astoria 345kV",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 538,
      "normalized": {
        "queue_id": "J2422",
        "county": "Washington",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Baldwin",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490169,
        "projectNumber": "J2422",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Washington",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Baldwin",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 539,
      "normalized": {
        "queue_id": "J2486",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "LALLENDORF - MONROE 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 85.0,
        "summer_net_mw": 85.0,
        "winter_net_mw": 85.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 85.0,
        "dp1_nris_mw": 85.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490170,
        "projectNumber": "J2486",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LALLENDORF - MONROE 345.0kV",
        "summerNetMW": 85.0,
        "winterNetMW": 85.0,
        "dp1ErisMw": 85.0,
        "dp1NrisMw": 85.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 540,
      "normalized": {
        "queue_id": "J2491",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Edenville - Price Rd. Jct 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490171,
        "projectNumber": "J2491",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edenville - Price Rd. Jct 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 541,
      "normalized": {
        "queue_id": "J2429",
        "county": "Dane",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "North Madison 69kV Substation",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490172,
        "projectNumber": "J2429",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dane",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "North Madison 69kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 542,
      "normalized": {
        "queue_id": "J2430",
        "county": "Concordia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Red Gum 115kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490173,
        "projectNumber": "J2430",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Concordia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Red Gum 115kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 543,
      "normalized": {
        "queue_id": "J2431",
        "county": "St. Francis",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "West Memphis-Genpower Keo 500kV Line Break (located at \"CHALKBLUFFPV\" 500kV POI SS, co-located with ",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490174,
        "projectNumber": "J2431",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "St. Francis",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "West Memphis-Genpower Keo 500kV Line Break (located at \"CHALKBLUFFPV\" 500kV POI SS, co-located with ",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 544,
      "normalized": {
        "queue_id": "J2492",
        "county": "Wilkin",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Wahpeton 230kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490175,
        "projectNumber": "J2492",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-07T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Wilkin",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wahpeton 230kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 545,
      "normalized": {
        "queue_id": "J2505",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Bon Wier to Cooper 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490176,
        "projectNumber": "J2505",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bon Wier to Cooper 138 kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 546,
      "normalized": {
        "queue_id": "J2382",
        "county": "Randolph",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5ADAIR    - 5THMHIL (AECI)  161.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-24T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 115.0,
        "dp1_nris_mw": 115.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490177,
        "projectNumber": "J2382",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-04-24T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Randolph",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5ADAIR    - 5THMHIL (AECI)  161.0kV",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 115.0,
        "dp1NrisMw": 115.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 547,
      "normalized": {
        "queue_id": "J2464",
        "county": "Worth",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ledyard-Colby 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490178,
        "projectNumber": "J2464",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Worth",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ledyard-Colby 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 548,
      "normalized": {
        "queue_id": "J2518",
        "county": "LaMoure",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Jamestown 345 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490179,
        "projectNumber": "J2518",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-07T04:00:00+00:00",
        "inService": "2024-11-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "LaMoure",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jamestown 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 549,
      "normalized": {
        "queue_id": "J2466",
        "county": "Howard",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Hazleton-Mitchell County 345kV line",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490180,
        "projectNumber": "J2466",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Howard",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hazleton-Mitchell County 345kV line",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 550,
      "normalized": {
        "queue_id": "J2541",
        "county": "Graves",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Bryan Road",
        "queue_date": "2025-10-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490181,
        "projectNumber": "J2541",
        "queueDate": "2025-10-22T04:00:00+00:00",
        "inService": "2026-03-01T05:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Graves",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bryan Road",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 551,
      "normalized": {
        "queue_id": "J2542",
        "county": "Clark",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Vesta Rd 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490182,
        "projectNumber": "J2542",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clark",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Vesta Rd 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 552,
      "normalized": {
        "queue_id": "J2533",
        "county": "Union",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Bernice - Vienna 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490183,
        "projectNumber": "J2533",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Union",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bernice - Vienna 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 553,
      "normalized": {
        "queue_id": "J2392",
        "county": "Mason",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "PERE MARQUETTE 138 KV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490184,
        "projectNumber": "J2392",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Mason",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PERE MARQUETTE 138 KV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 554,
      "normalized": {
        "queue_id": "J2468",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado East 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490185,
        "projectNumber": "J2468",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "El Dorado East 115kV",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 555,
      "normalized": {
        "queue_id": "J2469",
        "county": "Linn",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Sub K (Tiffin)-Duane Arnold 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490186,
        "projectNumber": "J2469",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sub K (Tiffin)-Duane Arnold 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 556,
      "normalized": {
        "queue_id": "J2381",
        "county": "Union",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "DOWNSVILLE- RUSTON EAST (LAGEN) 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490187,
        "projectNumber": "J2381",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Union",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DOWNSVILLE- RUSTON EAST (LAGEN) 115 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 557,
      "normalized": {
        "queue_id": "J2372",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Bloomington Brokaw 138kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490188,
        "projectNumber": "J2372",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bloomington Brokaw 138kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 558,
      "normalized": {
        "queue_id": "J2538",
        "county": "Clark",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Speed  - Trimble (LGEE) 345.0kV",
        "queue_date": "2025-10-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490189,
        "projectNumber": "J2538",
        "queueDate": "2025-10-22T04:00:00+00:00",
        "inService": "2026-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clark",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Speed  - Trimble (LGEE) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 559,
      "normalized": {
        "queue_id": "J2540",
        "county": "Graves",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Bryan Road",
        "queue_date": "2025-10-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490190,
        "projectNumber": "J2540",
        "queueDate": "2025-10-22T04:00:00+00:00",
        "inService": "2026-03-01T05:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Graves",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bryan Road",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 560,
      "normalized": {
        "queue_id": "J2452",
        "county": "Cleveland",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Sheridan EHV- EL Dorado EHV 500 Kv",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490191,
        "projectNumber": "J2452",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cleveland",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sheridan EHV- EL Dorado EHV 500 Kv",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 561,
      "normalized": {
        "queue_id": "J2371",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "",
        "poi": "DUNN - OAK RIDGE (LA) 115.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490192,
        "projectNumber": "J2371",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "DUNN - OAK RIDGE (LA) 115.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 562,
      "normalized": {
        "queue_id": "J2441",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "West Bay - Centennial 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490193,
        "projectNumber": "J2441",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "West Bay - Centennial 138 kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 563,
      "normalized": {
        "queue_id": "J2443",
        "county": "Kosciusko",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Leesburg 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490194,
        "projectNumber": "J2443",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Kosciusko",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Leesburg 345 kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 564,
      "normalized": {
        "queue_id": "J2483",
        "county": "Amite",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "GILLSBURG SS (CE)-LIBERTY115 Kv",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": "2023-03-21T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 105.0,
        "summer_net_mw": 105.0,
        "winter_net_mw": 105.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490195,
        "projectNumber": "J2483",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "withdrawnDate": "2023-03-21T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Amite",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GILLSBURG SS (CE)-LIBERTY115 Kv",
        "summerNetMW": 105.0,
        "winterNetMW": 105.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 565,
      "normalized": {
        "queue_id": "J2386",
        "county": "Poinsett",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Marked Tree 161 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490196,
        "projectNumber": "J2386",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Poinsett",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Marked Tree 161 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 566,
      "normalized": {
        "queue_id": "J2479",
        "county": "Concordia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Red Gum to Metropolis 115 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490197,
        "projectNumber": "J2479",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Concordia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Red Gum to Metropolis 115 kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 567,
      "normalized": {
        "queue_id": "J2489",
        "county": "Red River",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Western Kraft-Layfield 230 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490198,
        "projectNumber": "J2489",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Red River",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Western Kraft-Layfield 230 kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 568,
      "normalized": {
        "queue_id": "J2507",
        "county": "Pike",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta to Petersburg (IP&L) 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490199,
        "projectNumber": "J2507",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Pike",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gibson Sta to Petersburg (IP&L) 345 kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 569,
      "normalized": {
        "queue_id": "J2520",
        "county": "Adams",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Saratoga-ACEC Badger West 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490200,
        "projectNumber": "J2520",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Adams",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Saratoga-ACEC Badger West 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 570,
      "normalized": {
        "queue_id": "J2442",
        "county": "Ripley",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Batesville 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 84.0,
        "summer_net_mw": 84.0,
        "winter_net_mw": 84.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490201,
        "projectNumber": "J2442",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Ripley",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Batesville 138 kV",
        "summerNetMW": 84.0,
        "winterNetMW": 84.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 571,
      "normalized": {
        "queue_id": "J2512",
        "county": "Kosciusko",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Leesburg 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 173.0,
        "summer_net_mw": 173.0,
        "winter_net_mw": 173.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490202,
        "projectNumber": "J2512",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Kosciusko",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Leesburg 345 kV",
        "summerNetMW": 173.0,
        "winterNetMW": 173.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 572,
      "normalized": {
        "queue_id": "J2514",
        "county": "Pike",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta to Petersburg (IP&L) 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490203,
        "projectNumber": "J2514",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Pike",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gibson Sta to Petersburg (IP&L) 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 573,
      "normalized": {
        "queue_id": "J2521",
        "county": "Poinsett",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Marked Tree 161 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490204,
        "projectNumber": "J2521",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Poinsett",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Marked Tree 161 kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 574,
      "normalized": {
        "queue_id": "J2440",
        "county": "Benton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "GOODLAND - MORRISON DITCH 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490205,
        "projectNumber": "J2440",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-07-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Benton",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "GOODLAND - MORRISON DITCH 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 575,
      "normalized": {
        "queue_id": "J2552",
        "county": "Rock Island",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SUB 39 - CORDOVA 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490206,
        "projectNumber": "J2552",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-18T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Rock Island",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SUB 39 - CORDOVA 345.0kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 576,
      "normalized": {
        "queue_id": "J2428",
        "county": "Coahoma",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Clarksdale 115kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490207,
        "projectNumber": "J2428",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Coahoma",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Clarksdale 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 577,
      "normalized": {
        "queue_id": "J2493",
        "county": "Arenac",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gallagher - Tittabawassee 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 184.0,
        "summer_net_mw": 184.0,
        "winter_net_mw": 184.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490208,
        "projectNumber": "J2493",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Arenac",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gallagher - Tittabawassee 345 kV",
        "summerNetMW": 184.0,
        "winterNetMW": 184.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 578,
      "normalized": {
        "queue_id": "J2432",
        "county": "Tunica",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Lula-Tunica 115kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490209,
        "projectNumber": "J2432",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tunica",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lula-Tunica 115kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 579,
      "normalized": {
        "queue_id": "J2439",
        "county": "Marathon",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Gardner Park-Stone Lake 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490210,
        "projectNumber": "J2439",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2028-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marathon",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gardner Park-Stone Lake 345kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 580,
      "normalized": {
        "queue_id": "J2502",
        "county": "Morton",
        "state": "ND",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Square Butte 230 kV Substation East",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-02-27T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490211,
        "projectNumber": "J2502",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2025-02-27T05:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Morton",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Square Butte 230 kV Substation East",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 581,
      "normalized": {
        "queue_id": "J2470",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Donahue-Marksville 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490212,
        "projectNumber": "J2470",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Donahue-Marksville 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 582,
      "normalized": {
        "queue_id": "J2539",
        "county": "Clark",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Trimble (LGEE) - Speed 345 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490213,
        "projectNumber": "J2539",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clark",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Trimble (LGEE) - Speed 345 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 583,
      "normalized": {
        "queue_id": "J2390",
        "county": "Fulton",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Ipava 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 350.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490214,
        "projectNumber": "J2390",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Fulton",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Ipava 138kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 350.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 584,
      "normalized": {
        "queue_id": "J2405",
        "county": "Jefferson",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Peters Road 230 kV substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490215,
        "projectNumber": "J2405",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-14T04:00:00+00:00",
        "inService": "2026-07-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jefferson",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Peters Road 230 kV substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 585,
      "normalized": {
        "queue_id": "J2476",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Otego 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490216,
        "projectNumber": "J2476",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Otego 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 586,
      "normalized": {
        "queue_id": "J2482",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490217,
        "projectNumber": "J2482",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 587,
      "normalized": {
        "queue_id": "J2504",
        "county": "Coles",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mattoon East 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490218,
        "projectNumber": "J2504",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Coles",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mattoon East 138 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 588,
      "normalized": {
        "queue_id": "J2513",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Wabash River-Whitesville South 230 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490219,
        "projectNumber": "J2513",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wabash River-Whitesville South 230 kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 589,
      "normalized": {
        "queue_id": "J2517",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC  Aubrey to Brinkley East 230 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490220,
        "projectNumber": "J2517",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC  Aubrey to Brinkley East 230 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 590,
      "normalized": {
        "queue_id": "J2519",
        "county": "Richland",
        "state": "LA",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Smalling",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 600.0,
        "summer_net_mw": 600.0,
        "winter_net_mw": 600.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 600.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490221,
        "projectNumber": "J2519",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Richland",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Smalling",
        "summerNetMW": 600.0,
        "winterNetMW": 600.0,
        "dp1ErisMw": 600.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 591,
      "normalized": {
        "queue_id": "J2379",
        "county": "Clay",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Xenia",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490222,
        "projectNumber": "J2379",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Clay",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Xenia",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 592,
      "normalized": {
        "queue_id": "J2548",
        "county": "McCracken",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Bryan Road - McCracken County 161.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490223,
        "projectNumber": "J2548",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-07-18T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "McCracken",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bryan Road - McCracken County 161.0kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 593,
      "normalized": {
        "queue_id": "J2550",
        "county": "Yellow Medicine",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "HAZEL CREEK",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490224,
        "projectNumber": "J2550",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2030-07-18T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Yellow Medicine",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HAZEL CREEK",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 594,
      "normalized": {
        "queue_id": "J2551",
        "county": "Putnam",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Putnam",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 110.0,
        "dp1_nris_mw": 110.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490225,
        "projectNumber": "J2551",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-18T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Putnam",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Putnam",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 110.0,
        "dp1NrisMw": 110.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 595,
      "normalized": {
        "queue_id": "J2383",
        "county": "Macon",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Faraday",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-05-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490226,
        "projectNumber": "J2383",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-05-07T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Macon",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Faraday",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 596,
      "normalized": {
        "queue_id": "J2393",
        "county": "Coles",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Kansas West Substation 138kV",
        "queue_date": "2023-08-25T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 164.0,
        "summer_net_mw": 164.0,
        "winter_net_mw": 164.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490227,
        "projectNumber": "J2393",
        "queueDate": "2023-08-25T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Coles",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kansas West Substation 138kV",
        "summerNetMW": 164.0,
        "winterNetMW": 164.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 597,
      "normalized": {
        "queue_id": "J2445",
        "county": "Greene",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Karma 161kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490228,
        "projectNumber": "J2445",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Greene",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Karma 161kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 598,
      "normalized": {
        "queue_id": "J2553",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Killdeer",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 210.0,
        "summer_net_mw": 210.0,
        "winter_net_mw": 210.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 210.0,
        "dp1_nris_mw": 210.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490229,
        "projectNumber": "J2553",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Killdeer",
        "summerNetMW": 210.0,
        "winterNetMW": 210.0,
        "dp1ErisMw": 210.0,
        "dp1NrisMw": 210.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 599,
      "normalized": {
        "queue_id": "J2555",
        "county": "Ingham",
        "state": "MI",
        "transmission_owner": "",
        "poi": "DELHI to TOMPKINS 138kV",
        "queue_date": "2023-08-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490230,
        "projectNumber": "J2555",
        "queueDate": "2023-08-28T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Ingham",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DELHI to TOMPKINS 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 600,
      "normalized": {
        "queue_id": "J2377",
        "county": "Peoria",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CLINTON  - 7BROKAW 345.0kV",
        "queue_date": "2024-11-07T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490231,
        "projectNumber": "J2377",
        "queueDate": "2024-11-07T05:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Peoria",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7CLINTON  - 7BROKAW 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 601,
      "normalized": {
        "queue_id": "J2394",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Independence ISES - Powerline Road 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490232,
        "projectNumber": "J2394",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Independence ISES - Powerline Road 500 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 602,
      "normalized": {
        "queue_id": "J2471",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Beecher-Cement City 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490233,
        "projectNumber": "J2471",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Beecher-Cement City 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 603,
      "normalized": {
        "queue_id": "J2451",
        "county": "Chicot",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Gerald Andrus SES Switchyard-Lake Village Bagby 230 Kv",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490234,
        "projectNumber": "J2451",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Chicot",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gerald Andrus SES Switchyard-Lake Village Bagby 230 Kv",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 604,
      "normalized": {
        "queue_id": "J2387",
        "county": "Stoddard",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Stoddard 161 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490235,
        "projectNumber": "J2387",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Stoddard",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stoddard 161 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 605,
      "normalized": {
        "queue_id": "J2500",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Bon Wier to Cooper 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490236,
        "projectNumber": "J2500",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bon Wier to Cooper 138 kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 606,
      "normalized": {
        "queue_id": "J2375",
        "county": "Macon",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Faraday",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-05-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490237,
        "projectNumber": "J2375",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-05-07T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Macon",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Faraday",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 607,
      "normalized": {
        "queue_id": "J2446",
        "county": "Dunn",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Allen S King - Eau Claire 345.0kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490238,
        "projectNumber": "J2446",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dunn",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Allen S King - Eau Claire 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 608,
      "normalized": {
        "queue_id": "J2404",
        "county": "East Baton Rouge",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "EAST",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 38.81,
        "summer_net_mw": 38.81,
        "winter_net_mw": 38.81,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 38.8,
        "dp1_nris_mw": 38.8,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490239,
        "projectNumber": "J2404",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "East Baton Rouge",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "EAST",
        "summerNetMW": 38.81,
        "winterNetMW": 38.81,
        "dp1ErisMw": 38.8,
        "dp1NrisMw": 38.8,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 609,
      "normalized": {
        "queue_id": "J2388",
        "county": "Macon",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Faraday",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490240,
        "projectNumber": "J2388",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Macon",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Faraday",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 610,
      "normalized": {
        "queue_id": "J2503",
        "county": "Lincoln",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Downsville - Ruston East 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490241,
        "projectNumber": "J2503",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Lincoln",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Downsville - Ruston East 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 611,
      "normalized": {
        "queue_id": "J2528",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Parkin to Kuhn Road 161 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490242,
        "projectNumber": "J2528",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Parkin to Kuhn Road 161 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 612,
      "normalized": {
        "queue_id": "J2474",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4AUSTIN - 4VIRDEN   138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490243,
        "projectNumber": "J2474",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "4AUSTIN - 4VIRDEN   138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 613,
      "normalized": {
        "queue_id": "J2450",
        "county": "Tippecanoe",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "WESTWOOD 345 KV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490244,
        "projectNumber": "J2450",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Tippecanoe",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WESTWOOD 345 KV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 614,
      "normalized": {
        "queue_id": "J2401",
        "county": "Johnson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7W_FRFT_E - 7SHAWNEE FP 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490245,
        "projectNumber": "J2401",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Johnson",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "7W_FRFT_E - 7SHAWNEE FP 345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 615,
      "normalized": {
        "queue_id": "J2403",
        "county": "Johnson",
        "state": "IL",
        "transmission_owner": "",
        "poi": "7JORD - 7MASS 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490246,
        "projectNumber": "J2403",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Johnson",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "7JORD - 7MASS 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 616,
      "normalized": {
        "queue_id": "J2531",
        "county": "Union",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Bernice - Vienna 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490247,
        "projectNumber": "J2531",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Union",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bernice - Vienna 115 kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 617,
      "normalized": {
        "queue_id": "J2395",
        "county": "Calhoun",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490248,
        "projectNumber": "J2395",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Calhoun",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 618,
      "normalized": {
        "queue_id": "J1864",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Emery 161kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2021-10-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490249,
        "projectNumber": "J1864",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2021-10-12T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Emery 161kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 619,
      "normalized": {
        "queue_id": "J3732",
        "county": "Saline",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Niles 138 kV (J1208/J1209) to be built near existing Harco Tap",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490250,
        "projectNumber": "J3732",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2026-12-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Saline",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Niles 138 kV (J1208/J1209) to be built near existing Harco Tap",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 620,
      "normalized": {
        "queue_id": "J2454",
        "county": "Montcalm",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Eureka - Vestaburg 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-12T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490251,
        "projectNumber": "J2454",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-12T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Montcalm",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Eureka - Vestaburg 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 621,
      "normalized": {
        "queue_id": "J2477",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 600.0,
        "summer_net_mw": 600.0,
        "winter_net_mw": 600.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 600.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490252,
        "projectNumber": "J2477",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "summerNetMW": 600.0,
        "winterNetMW": 600.0,
        "dp1ErisMw": 600.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 622,
      "normalized": {
        "queue_id": "J2478",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 550.0,
        "summer_net_mw": 550.0,
        "winter_net_mw": 550.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 550.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490253,
        "projectNumber": "J2478",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV",
        "summerNetMW": 550.0,
        "winterNetMW": 550.0,
        "dp1ErisMw": 550.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 623,
      "normalized": {
        "queue_id": "J2480",
        "county": "Daviess",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Reid to Daviess County 161 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490254,
        "projectNumber": "J2480",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Daviess",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reid to Daviess County 161 kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 624,
      "normalized": {
        "queue_id": "J2547",
        "county": "McCracken",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Bryan Road - McCracken County 161.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490255,
        "projectNumber": "J2547",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-07-18T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "McCracken",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bryan Road - McCracken County 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 625,
      "normalized": {
        "queue_id": "J2361",
        "county": "Perry",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC Oppelo 161 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 105.0,
        "summer_net_mw": 105.0,
        "winter_net_mw": 105.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490256,
        "projectNumber": "J2361",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-22T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Perry",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC Oppelo 161 kV Substation",
        "summerNetMW": 105.0,
        "winterNetMW": 105.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 626,
      "normalized": {
        "queue_id": "J2360",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "TH Pfizer Jct. - Worthington (HED)",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-05-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490257,
        "projectNumber": "J2360",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-05-07T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TH Pfizer Jct. - Worthington (HED)",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 627,
      "normalized": {
        "queue_id": "J2472",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Merom (HED) 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-05-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490258,
        "projectNumber": "J2472",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-05-07T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Merom (HED) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 628,
      "normalized": {
        "queue_id": "J2455",
        "county": "La Crosse",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "FRENCH ISLAND",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 92.0,
        "summer_net_mw": 92.0,
        "winter_net_mw": 92.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 92.0,
        "dp1_nris_mw": 92.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490259,
        "projectNumber": "J2455",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "La Crosse",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FRENCH ISLAND",
        "summerNetMW": 92.0,
        "winterNetMW": 92.0,
        "dp1ErisMw": 92.0,
        "dp1NrisMw": 92.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 629,
      "normalized": {
        "queue_id": "J2448",
        "county": "Webster",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Haynesville South to Sarepta 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490260,
        "projectNumber": "J2448",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Webster",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Haynesville South to Sarepta 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 630,
      "normalized": {
        "queue_id": "J2378",
        "county": "Macomb",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "LENOX - ST.CLAIR 120.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 152.0,
        "summer_net_mw": 152.0,
        "winter_net_mw": 152.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 152.0,
        "dp1_nris_mw": 152.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490261,
        "projectNumber": "J2378",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Macomb",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LENOX - ST.CLAIR 120.0kV",
        "summerNetMW": 152.0,
        "winterNetMW": 152.0,
        "dp1ErisMw": 152.0,
        "dp1NrisMw": 152.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 631,
      "normalized": {
        "queue_id": "J2389",
        "county": "Adams",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Monument",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490262,
        "projectNumber": "J2389",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Adams",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Monument",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 632,
      "normalized": {
        "queue_id": "J2475",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Toll Rd 120kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490263,
        "projectNumber": "J2475",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Toll Rd 120kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 633,
      "normalized": {
        "queue_id": "J2391",
        "county": "Tallahatchie",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Webb 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490264,
        "projectNumber": "J2391",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tallahatchie",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Webb 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 634,
      "normalized": {
        "queue_id": "J2449",
        "county": "Faulkner",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Mayflower EHV 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490265,
        "projectNumber": "J2449",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Faulkner",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mayflower EHV 500 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 635,
      "normalized": {
        "queue_id": "J2536",
        "county": "LaSalle",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Fox River - Ottawa 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490266,
        "projectNumber": "J2536",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "LaSalle",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fox River - Ottawa 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 636,
      "normalized": {
        "queue_id": "J3661",
        "county": "Henry",
        "state": "IA",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "7MAYWOOD - 7SUB T  3 345.0kV",
        "queue_date": "2024-04-14T04:00:00+00:00",
        "withdrawn_date": "2025-09-02T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490267,
        "projectNumber": "J3661",
        "queueDate": "2024-04-14T04:00:00+00:00",
        "withdrawnDate": "2025-09-02T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Henry",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7MAYWOOD - 7SUB T  3 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 637,
      "normalized": {
        "queue_id": "J3707",
        "county": "Putnam",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-07-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490268,
        "projectNumber": "J3707",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-07-01T04:00:00+00:00",
        "inService": "2027-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Putnam",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 638,
      "normalized": {
        "queue_id": "J1892",
        "county": "Otsego",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Livingston - Keystone 345 kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 64.8,
        "summer_net_mw": 64.8,
        "winter_net_mw": 64.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490269,
        "projectNumber": "J1892",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Otsego",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Livingston - Keystone 345 kV",
        "summerNetMW": 64.8,
        "winterNetMW": 64.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 639,
      "normalized": {
        "queue_id": "J4108",
        "county": "Webster",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "SAREPTA",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2026-01-27T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490270,
        "projectNumber": "J4108",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2026-01-27T05:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Webster",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SAREPTA",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 640,
      "normalized": {
        "queue_id": "J2509",
        "county": "Tippecanoe",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Westwood 345 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490271,
        "projectNumber": "J2509",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Tippecanoe",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Westwood 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 641,
      "normalized": {
        "queue_id": "J2549",
        "county": "Clark",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Sub T to Maywood 345kV line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490272,
        "projectNumber": "J2549",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-07-18T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Clark",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sub T to Maywood 345kV line",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 642,
      "normalized": {
        "queue_id": "J4036",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "WYNNE INDUSTRIAL",
        "queue_date": "2025-07-01T04:00:00+00:00",
        "withdrawn_date": "2025-12-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490273,
        "projectNumber": "J4036",
        "queueDate": "2025-07-01T04:00:00+00:00",
        "withdrawnDate": "2025-12-31T05:00:00+00:00",
        "inService": "2029-09-06T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "WYNNE INDUSTRIAL",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 643,
      "normalized": {
        "queue_id": "J4240",
        "county": "Grant",
        "state": "",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Big Stone South 345 kV substation",
        "queue_date": "2026-05-13T02:35:53+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490274,
        "projectNumber": "J4240",
        "queueDate": "2026-05-13T02:35:53+00:00",
        "inService": "2031-06-28T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Grant",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Big Stone South 345 kV substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 644,
      "normalized": {
        "queue_id": "J2447",
        "county": "Murray",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2025-10-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490275,
        "projectNumber": "J2447",
        "queueDate": "2025-10-22T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Murray",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 645,
      "normalized": {
        "queue_id": "J2457",
        "county": "Orleans",
        "state": "LA",
        "transmission_owner": "ENTERGY NEW ORLEANS, LLC ENTO",
        "poi": "PATERSON",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 40.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490276,
        "projectNumber": "J2457",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY NEW ORLEANS, LLC ENTO",
        "county": "Orleans",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PATERSON",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 40.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 646,
      "normalized": {
        "queue_id": "J2374",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "J1557 Sub",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490277,
        "projectNumber": "J2374",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J1557 Sub",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 647,
      "normalized": {
        "queue_id": "J2543",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "West Bay - Centennial 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490278,
        "projectNumber": "J2543",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "West Bay - Centennial 138 kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 648,
      "normalized": {
        "queue_id": "J2473",
        "county": "Marion",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Hanna 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490279,
        "projectNumber": "J2473",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Marion",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hanna 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 649,
      "normalized": {
        "queue_id": "J2399",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Independence ISES - Powerline Road 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490280,
        "projectNumber": "J2399",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Independence ISES - Powerline Road 500 kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 650,
      "normalized": {
        "queue_id": "J2400",
        "county": "Bienville",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Sailes Substation 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490281,
        "projectNumber": "J2400",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Bienville",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Sailes Substation 115kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 651,
      "normalized": {
        "queue_id": "J2402",
        "county": "Johnson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7W_FRFT_E - 7SHAWNEE FP 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490282,
        "projectNumber": "J2402",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Johnson",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "7W_FRFT_E - 7SHAWNEE FP 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 652,
      "normalized": {
        "queue_id": "S1166",
        "county": "",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-05-04T19:33:45+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 108.93,
        "summer_net_mw": 108.93,
        "winter_net_mw": 108.93,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490283,
        "projectNumber": "S1166",
        "queueDate": "2026-05-04T19:33:45+00:00",
        "inService": "2029-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "MN",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 108.93,
        "winterNetMW": 108.93,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 653,
      "normalized": {
        "queue_id": "J4359",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-09-03T21:30:04+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490284,
        "projectNumber": "J4359",
        "queueDate": "2026-09-03T21:30:04+00:00",
        "inService": "2031-05-07T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 654,
      "normalized": {
        "queue_id": "J2373",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "230kV Graywood or (new) Big Lake",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-01-25T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Waste Heat Recovery",
        "facility_type": "Steam Turbine (including Nuclear, Geothermal and Solar Steam)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490285,
        "projectNumber": "J2373",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-01-25T05:00:00+00:00",
        "inService": "2025-01-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "230kV Graywood or (new) Big Lake",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Waste Heat Recovery",
        "facilityType": "Steam Turbine (including Nuclear, Geothermal and Solar Steam)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 655,
      "normalized": {
        "queue_id": "J3663",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "OAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490286,
        "projectNumber": "J3663",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "OAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 656,
      "normalized": {
        "queue_id": "S1177",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-05-22T08:19:27+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-10T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490287,
        "projectNumber": "S1177",
        "queueDate": "2026-05-22T08:19:27+00:00",
        "inService": "2028-01-10T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 657,
      "normalized": {
        "queue_id": "J3244",
        "county": "Parke",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Parke County REMC",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": "2025-09-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490288,
        "projectNumber": "J3244",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "withdrawnDate": "2025-09-05T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Parke",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Parke County REMC",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 658,
      "normalized": {
        "queue_id": "J2396",
        "county": "Calhoun",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490289,
        "projectNumber": "J2396",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Calhoun",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 659,
      "normalized": {
        "queue_id": "J2397",
        "county": "Calhoun",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490290,
        "projectNumber": "J2397",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Calhoun",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 660,
      "normalized": {
        "queue_id": "J4023",
        "county": "Clay",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Wabash River  -  Staunton 230.0kV",
        "queue_date": "2025-02-03T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490291,
        "projectNumber": "J4023",
        "queueDate": "2025-02-03T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clay",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Wabash River  -  Staunton 230.0kV",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 661,
      "normalized": {
        "queue_id": "J4246",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-06-25T21:45:49+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 280.0,
        "summer_net_mw": 280.0,
        "winter_net_mw": 280.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-05-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490292,
        "projectNumber": "J4246",
        "queueDate": "2026-06-25T21:45:49+00:00",
        "inService": "2029-05-04T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 280.0,
        "winterNetMW": 280.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 662,
      "normalized": {
        "queue_id": "J2398",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Independence ISES - Powerline Road 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490293,
        "projectNumber": "J2398",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Independence ISES - Powerline Road 500 kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 663,
      "normalized": {
        "queue_id": "J2362",
        "county": "Fountain",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "VEEDERSBURG WEST 230kV Substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490294,
        "projectNumber": "J2362",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Fountain",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "VEEDERSBURG WEST 230kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 664,
      "normalized": {
        "queue_id": "J2200",
        "county": "Scott",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "BLUE LAKE",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": "2021-11-30T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490295,
        "projectNumber": "J2200",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "withdrawnDate": "2021-11-30T05:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Scott",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BLUE LAKE",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 665,
      "normalized": {
        "queue_id": "J4069",
        "county": "Marathon",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Kelly - Ackley 115.0kV",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 169.93,
        "summer_net_mw": 169.93,
        "winter_net_mw": 169.93,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 169.93,
        "dp1_nris_mw": 169.93,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490296,
        "projectNumber": "J4069",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marathon",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Kelly - Ackley 115.0kV",
        "summerNetMW": 169.93,
        "winterNetMW": 169.93,
        "dp1ErisMw": 169.93,
        "dp1NrisMw": 169.93,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 666,
      "normalized": {
        "queue_id": "S1116",
        "county": "Tallahatchie",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "WEBB",
        "queue_date": "2025-08-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2027-06-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490297,
        "projectNumber": "S1116",
        "queueDate": "2025-08-31T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "negInService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tallahatchie",
        "state": "MS",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "WEBB",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 667,
      "normalized": {
        "queue_id": "S1189",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "",
        "queue_date": "2026-06-02T17:13:54+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490298,
        "projectNumber": "S1189",
        "queueDate": "2026-06-02T17:13:54+00:00",
        "inService": "2028-11-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 668,
      "normalized": {
        "queue_id": "J3263",
        "county": "Desha",
        "state": "AK",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "DUMAS - REED SS 115.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490299,
        "projectNumber": "J3263",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-25T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Desha",
        "state": "AK",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DUMAS - REED SS 115.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 669,
      "normalized": {
        "queue_id": "J3287",
        "county": "Osceola",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Hersey Interconnection",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 110.0,
        "dp1_nris_mw": 110.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490300,
        "projectNumber": "J3287",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Osceola",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hersey Interconnection",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 110.0,
        "dp1NrisMw": 110.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 670,
      "normalized": {
        "queue_id": "J3301",
        "county": "Prairie",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "DES ARC - COTTON PLANT 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490301,
        "projectNumber": "J3301",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Prairie",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DES ARC - COTTON PLANT 115.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 671,
      "normalized": {
        "queue_id": "J3303",
        "county": "Prairie",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490302,
        "projectNumber": "J3303",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Prairie",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 672,
      "normalized": {
        "queue_id": "S1082",
        "county": "Muskegon",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "DU PONT - WHITE LAKE 138.0kV",
        "queue_date": "2025-01-13T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2029-05-12T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490303,
        "projectNumber": "S1082",
        "queueDate": "2025-01-13T05:00:00+00:00",
        "inService": "2028-04-30T04:00:00+00:00",
        "negInService": "2029-05-12T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "DU PONT - WHITE LAKE 138.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 673,
      "normalized": {
        "queue_id": "S1093",
        "county": "Mitchell",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Mitchell County",
        "queue_date": "2025-03-06T05:00:00+00:00",
        "withdrawn_date": "2026-06-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 202.0,
        "summer_net_mw": 202.0,
        "winter_net_mw": 202.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490304,
        "projectNumber": "S1093",
        "queueDate": "2025-03-06T05:00:00+00:00",
        "withdrawnDate": "2026-06-18T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Mitchell",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Mitchell County",
        "summerNetMW": 202.0,
        "winterNetMW": 202.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 674,
      "normalized": {
        "queue_id": "J3304",
        "county": "Clark",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "ETTA - MCNEIL EHV 500.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490305,
        "projectNumber": "J3304",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clark",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ETTA - MCNEIL EHV 500.0kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 675,
      "normalized": {
        "queue_id": "J1032",
        "county": "Wabasha County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Briggs Rd. - N. Rochester 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490306,
        "projectNumber": "J1032",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Wabasha County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Briggs Rd. - N. Rochester 345 kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 676,
      "normalized": {
        "queue_id": "J1033",
        "county": "Stoddard County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Stoddard - Morely 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490307,
        "projectNumber": "J1033",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-10T05:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Stoddard County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stoddard - Morely 161 kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 677,
      "normalized": {
        "queue_id": "J1011",
        "county": "Kenosha County,Racine County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Arcadian - Zion 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-05-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 400.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490308,
        "projectNumber": "J1011",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-05-19T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Kenosha County,Racine County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Arcadian - Zion 345kV Line Tap",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 400.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 678,
      "normalized": {
        "queue_id": "J4241",
        "county": "St. Charles",
        "state": "",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "SIOUX",
        "queue_date": "2026-05-28T18:29:18+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 2220.0,
        "summer_net_mw": 2220.0,
        "winter_net_mw": 2220.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490309,
        "projectNumber": "J4241",
        "queueDate": "2026-05-28T18:29:18+00:00",
        "inService": "2030-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "St. Charles",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "SIOUX",
        "summerNetMW": 2220.0,
        "winterNetMW": 2220.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 679,
      "normalized": {
        "queue_id": "J4265",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-08-18T21:43:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-08-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490310,
        "projectNumber": "J4265",
        "queueDate": "2026-08-18T21:43:06+00:00",
        "inService": "2031-08-12T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 680,
      "normalized": {
        "queue_id": "J4290",
        "county": "",
        "state": "",
        "transmission_owner": "CITY OF AMES",
        "poi": "",
        "queue_date": "2026-08-19T19:06:19+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 54.0,
        "summer_net_mw": 54.0,
        "winter_net_mw": 54.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490311,
        "projectNumber": "J4290",
        "queueDate": "2026-08-19T19:06:19+00:00",
        "inService": "2030-01-01T05:00:00+00:00",
        "transmissionOwner": "CITY OF AMES",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 54.0,
        "winterNetMW": 54.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 681,
      "normalized": {
        "queue_id": "J4110",
        "county": "Lafayette",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Rork - Sellers Road 230.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490312,
        "projectNumber": "J4110",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "Lafayette",
        "state": "LA",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Rork - Sellers Road 230.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 682,
      "normalized": {
        "queue_id": "J4109",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "DONALDSONVILLE - EVERGREEN 230.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2025-12-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1300.0,
        "summer_net_mw": 1300.0,
        "winter_net_mw": 1300.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490313,
        "projectNumber": "J4109",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2025-12-19T05:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "DONALDSONVILLE - EVERGREEN 230.0kV",
        "summerNetMW": 1300.0,
        "winterNetMW": 1300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 683,
      "normalized": {
        "queue_id": "J1043",
        "county": "Montcalm County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Vergennes - Nelson Rd 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2023-02-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 374.4,
        "summer_net_mw": 374.4,
        "winter_net_mw": 374.4,
        "proposed_completion_date": "2024-05-31T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2021-05-03T04:00:00+00:00",
        "in_service": "2021-06-13T04:00:00+00:00",
        "gia_to_execute": "2020-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 374.4,
        "dp1_nris_mw": 374.4,
        "dp2_eris_mw": 374.4,
        "dp2_nris_mw": 374.4,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490314,
        "projectNumber": "J1043",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2023-02-09T05:00:00+00:00",
        "doneDate": "2021-05-03T04:00:00+00:00",
        "inService": "2021-06-13T04:00:00+00:00",
        "giaToExec": "2020-12-22T05:00:00+00:00",
        "negInService": "2024-05-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Montcalm County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Vergennes - Nelson Rd 345 kV Line Tap",
        "summerNetMW": 374.4,
        "winterNetMW": 374.4,
        "dp1ErisMw": 374.4,
        "dp1NrisMw": 374.4,
        "dp2ErisMw": 374.4,
        "dp2NrisMw": 374.4,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 684,
      "normalized": {
        "queue_id": "J1044",
        "county": "Walworth County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "North Lake Geneva - Sugar Creek - Burlington 138kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-10-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490315,
        "projectNumber": "J1044",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-10-24T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Walworth County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Lake Geneva - Sugar Creek - Burlington 138kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 685,
      "normalized": {
        "queue_id": "S1164",
        "county": "MIssissippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Dell - Manila 161 kV",
        "queue_date": "2026-05-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490316,
        "projectNumber": "S1164",
        "queueDate": "2026-05-11T04:00:00+00:00",
        "inService": "2028-08-03T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "MIssissippi",
        "state": "AR",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Dell - Manila 161 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 686,
      "normalized": {
        "queue_id": "J3250",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "FLOYD - EMERY (ITCM) 161.0kV",
        "queue_date": "2024-04-14T04:00:00+00:00",
        "withdrawn_date": "2025-09-02T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490317,
        "projectNumber": "J3250",
        "queueDate": "2024-04-14T04:00:00+00:00",
        "withdrawnDate": "2025-09-02T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FLOYD - EMERY (ITCM) 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 687,
      "normalized": {
        "queue_id": "J1038",
        "county": "Grant County",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTPW",
        "poi": "Grant Co. - E. Fergus Falls - Hoot Lake 115 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 32.5,
        "summer_net_mw": 32.5,
        "winter_net_mw": 32.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490318,
        "projectNumber": "J1038",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTPW",
        "county": "Grant County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Grant Co. - E. Fergus Falls - Hoot Lake 115 kV Line Tap",
        "summerNetMW": 32.5,
        "winterNetMW": 32.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 688,
      "normalized": {
        "queue_id": "J1046",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Majestic - Lemoyne 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-11-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490319,
        "projectNumber": "J1046",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-11-21T05:00:00+00:00",
        "inService": "2020-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Majestic - Lemoyne 345 kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 689,
      "normalized": {
        "queue_id": "J3262",
        "county": "Jefferson",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Stowell",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490320,
        "projectNumber": "J3262",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jefferson",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stowell",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 690,
      "normalized": {
        "queue_id": "J3302",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "P.B. SOUTH - VARNER 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 105.0,
        "summer_net_mw": 105.0,
        "winter_net_mw": 105.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490321,
        "projectNumber": "J3302",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "P.B. SOUTH - VARNER 115.0kV",
        "summerNetMW": 105.0,
        "winterNetMW": 105.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 691,
      "normalized": {
        "queue_id": "J3305",
        "county": "Adams",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-01-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490322,
        "projectNumber": "J3305",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-01-17T05:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Adams",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 692,
      "normalized": {
        "queue_id": "J1030",
        "county": "Polk County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC.",
        "poi": "Poco - Menard 138kV Line Tao",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2023-01-23T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-10-22T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2020-03-20T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490323,
        "projectNumber": "J1030",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-10-22T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2020-03-20T04:00:00+00:00",
        "negInService": "2023-01-23T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC.",
        "county": "Polk County",
        "state": "TX",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Poco - Menard 138kV Line Tao",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 693,
      "normalized": {
        "queue_id": "J1034",
        "county": "Stoddard County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Stoddard - Morley 161kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 225.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 225.0,
        "dp2_nris_mw": 225.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490324,
        "projectNumber": "J1034",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Stoddard County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stoddard - Morley 161kV Line Tap",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 225.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 225.0,
        "dp2NrisMw": 225.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 694,
      "normalized": {
        "queue_id": "J1036",
        "county": "Cottonwood County",
        "state": "MN",
        "transmission_owner": "Xcel Energy",
        "poi": "Lakefield Generation SW 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-02-15T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490325,
        "projectNumber": "J1036",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-02-15T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "Xcel Energy",
        "county": "Cottonwood County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lakefield Generation SW 345kV Substation",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 695,
      "normalized": {
        "queue_id": "S1120",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Edwardsport  - Washington Mun",
        "queue_date": "2025-09-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-07-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490326,
        "projectNumber": "S1120",
        "queueDate": "2025-09-08T04:00:00+00:00",
        "inService": "2027-07-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Edwardsport  - Washington Mun",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 696,
      "normalized": {
        "queue_id": "J4242",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "",
        "queue_date": "2026-05-22T23:48:28+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490327,
        "projectNumber": "J4242",
        "queueDate": "2026-05-22T23:48:28+00:00",
        "inService": "2031-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 697,
      "normalized": {
        "queue_id": "J3245",
        "county": "Breckinridge",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Meade County - New Hardinsburg 161.0kV",
        "queue_date": "2024-03-26T04:00:00+00:00",
        "withdrawn_date": "2025-09-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490328,
        "projectNumber": "J3245",
        "queueDate": "2024-03-26T04:00:00+00:00",
        "withdrawnDate": "2025-09-05T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Breckinridge",
        "state": "KY",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Meade County - New Hardinsburg 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 698,
      "normalized": {
        "queue_id": "J3246",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "PRAIRIE POWER, INC. PPI",
        "poi": "Fancy Creek 138kV Substation",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490329,
        "projectNumber": "J3246",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-01-15T05:00:00+00:00",
        "transmissionOwner": "PRAIRIE POWER, INC. PPI",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fancy Creek 138kV Substation",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 699,
      "normalized": {
        "queue_id": "J1013",
        "county": "Branch County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Batavia 138kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-12-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490330,
        "projectNumber": "J1013",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-12-02T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Batavia 138kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 700,
      "normalized": {
        "queue_id": "J1014",
        "county": "Jackson County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Tompkins - Blackstone 138kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-12-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490331,
        "projectNumber": "J1014",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-12-02T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Jackson County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tompkins - Blackstone 138kV Line",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 701,
      "normalized": {
        "queue_id": "J1039",
        "county": "Warren County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Enon - Montogomery 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490332,
        "projectNumber": "J1039",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-10T05:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Warren County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Enon - Montogomery 345kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 702,
      "normalized": {
        "queue_id": "J1047",
        "county": "Walworth County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "North Lake Geneva - Sugar Creek - Burlington 138kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-10-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490333,
        "projectNumber": "J1047",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-10-24T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Walworth County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Lake Geneva - Sugar Creek - Burlington 138kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 703,
      "normalized": {
        "queue_id": "J3251",
        "county": "Genesee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "THETFORD",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490334,
        "projectNumber": "J3251",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "THETFORD",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 704,
      "normalized": {
        "queue_id": "J3264",
        "county": "Otsego",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "LIVINGSTON CO",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490335,
        "projectNumber": "J3264",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Otsego",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LIVINGSTON CO",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 705,
      "normalized": {
        "queue_id": "J1053",
        "county": "Jefferson County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Concord SW YD 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-05-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490336,
        "projectNumber": "J1053",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-05-19T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Jefferson County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Concord SW YD 138 kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 706,
      "normalized": {
        "queue_id": "J1080",
        "county": "DeWitt County,McLean County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Brokaw - Clinton 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-03-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490337,
        "projectNumber": "J1080",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-03-22T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "DeWitt County,McLean County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brokaw - Clinton 345kV Line Tap",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 707,
      "normalized": {
        "queue_id": "J1031",
        "county": "Henry County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Fall Creek - New Castle 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490338,
        "projectNumber": "J1031",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-07T05:00:00+00:00",
        "inService": "2020-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Henry County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fall Creek - New Castle 138 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 708,
      "normalized": {
        "queue_id": "J1040",
        "county": "McIntosh County",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "Wishek Junction 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2023-05-14T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-02-07T05:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2022-02-01T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490339,
        "projectNumber": "J1040",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-02-07T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2022-02-01T05:00:00+00:00",
        "negInService": "2023-05-14T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "McIntosh County",
        "state": "ND",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wishek Junction 230 kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 709,
      "normalized": {
        "queue_id": "J1054",
        "county": "Goodhue County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Cannon Falls 115kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490340,
        "projectNumber": "J1054",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Goodhue County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cannon Falls 115kV Substation",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 710,
      "normalized": {
        "queue_id": "J1081",
        "county": "Polk County",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTPW",
        "poi": "Winger 115kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-03-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490341,
        "projectNumber": "J1081",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-03-28T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTPW",
        "county": "Polk County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Winger 115kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 711,
      "normalized": {
        "queue_id": "J1010",
        "county": "Kenosha County,Racine County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Arcadian - Zion 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-05-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 400.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490342,
        "projectNumber": "J1010",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-05-19T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Kenosha County,Racine County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Arcadian - Zion 345kV Line Tap",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 400.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 712,
      "normalized": {
        "queue_id": "J1035",
        "county": "Washington County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Fayetteville - Marigold 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-10-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490343,
        "projectNumber": "J1035",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-10-15T04:00:00+00:00",
        "inService": "2021-07-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Washington County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fayetteville - Marigold 138 kV Line Tap",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 713,
      "normalized": {
        "queue_id": "J1045",
        "county": "Murray County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Fenton - Chanarambie 115kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": "2024-07-30T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-02-07T05:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2022-02-07T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 20.0,
        "dp2_nris_mw": 20.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490344,
        "projectNumber": "J1045",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-02-07T05:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2022-02-07T05:00:00+00:00",
        "negInService": "2024-07-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Murray County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fenton - Chanarambie 115kV Line Tap",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 20.0,
        "dp2NrisMw": 20.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 714,
      "normalized": {
        "queue_id": "J1015",
        "county": "Otsego County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gaylord 138kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-03-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490345,
        "projectNumber": "J1015",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-03-27T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Otsego County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gaylord 138kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 715,
      "normalized": {
        "queue_id": "J1084",
        "county": "Clinton County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Rock Creek 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2023-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-06-15T04:00:00+00:00",
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-06-15T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490346,
        "projectNumber": "J1084",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-06-15T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2021-06-15T04:00:00+00:00",
        "negInService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Clinton County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rock Creek 345 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 716,
      "normalized": {
        "queue_id": "J1092",
        "county": "Saint Croix County",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Three Lakes 115 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2021-06-15T04:00:00+00:00",
        "in_service": "2022-09-30T04:00:00+00:00",
        "gia_to_execute": "2021-06-15T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490347,
        "projectNumber": "J1092",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-06-15T04:00:00+00:00",
        "inService": "2022-09-30T04:00:00+00:00",
        "giaToExec": "2021-06-15T04:00:00+00:00",
        "negInService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Saint Croix County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Three Lakes 115 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 717,
      "normalized": {
        "queue_id": "J1067",
        "county": "Jasper County,Pulaski County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Reynolds - Burr Oak 345kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 240.0,
        "summer_net_mw": 240.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": "2023-10-20T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 240.0,
        "dp1_nris_mw": 240.0,
        "dp2_eris_mw": 240.0,
        "dp2_nris_mw": 240.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490348,
        "projectNumber": "J1067",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2023-10-20T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper County,Pulaski County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynolds - Burr Oak 345kV Line",
        "summerNetMW": 240.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 240.0,
        "dp1NrisMw": 240.0,
        "dp2ErisMw": 240.0,
        "dp2NrisMw": 240.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 718,
      "normalized": {
        "queue_id": "J1068",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Dorset 120 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-11-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490349,
        "projectNumber": "J1068",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-11-21T05:00:00+00:00",
        "inService": "2020-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Dorset 120 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 719,
      "normalized": {
        "queue_id": "J1088",
        "county": "Shiawassee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Cornell - Layton 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-02-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": "2020-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490350,
        "projectNumber": "J1088",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-02-04T05:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "giaToExec": "2020-12-22T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cornell - Layton 138 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 720,
      "normalized": {
        "queue_id": "J1075",
        "county": "Cass County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Argenta - Weeds Lake - Hiple 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-11-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490351,
        "projectNumber": "J1075",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-11-01T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Cass County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Argenta - Weeds Lake - Hiple 345kV Line Tap",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 721,
      "normalized": {
        "queue_id": "J1049",
        "county": "Forrest County",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Purvis 161 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490352,
        "projectNumber": "J1049",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Forrest County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Purvis 161 kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 722,
      "normalized": {
        "queue_id": "J1019",
        "county": "Boone County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Overton - McCredie 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-10-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490353,
        "projectNumber": "J1019",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-10-03T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Boone County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Overton - McCredie 345 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 723,
      "normalized": {
        "queue_id": "J1050",
        "county": "Boone County,Hamilton County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Doud Tap 161 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": "2022-07-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2022-01-17T05:00:00+00:00",
        "in_service": "2022-06-03T04:00:00+00:00",
        "gia_to_execute": "2022-01-18T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 225.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 225.0,
        "dp2_nris_mw": 225.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490354,
        "projectNumber": "J1050",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-01-17T05:00:00+00:00",
        "inService": "2022-06-03T04:00:00+00:00",
        "giaToExec": "2022-01-18T05:00:00+00:00",
        "negInService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Boone County,Hamilton County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Doud Tap 161 kV Substation",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 225.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 225.0,
        "dp2NrisMw": 225.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 724,
      "normalized": {
        "queue_id": "J1060",
        "county": "St. Francis County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "West Memphis - Keo 500 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": "2023-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-08-19T04:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2020-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 450.0,
        "dp2_nris_mw": 400.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490355,
        "projectNumber": "J1060",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-08-19T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2020-03-30T04:00:00+00:00",
        "negInService": "2023-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "St. Francis County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "West Memphis - Keo 500 kV Line Tap",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 450.0,
        "dp2NrisMw": 400.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 725,
      "normalized": {
        "queue_id": "J3252",
        "county": "St. Clair",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "FITZ",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-05-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490356,
        "projectNumber": "J3252",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-05-23T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "St. Clair",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FITZ",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 726,
      "normalized": {
        "queue_id": "J3261",
        "county": "Tunica",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Tunica 230 kV (337160)",
        "queue_date": "2024-03-26T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490357,
        "projectNumber": "J3261",
        "queueDate": "2024-03-26T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tunica",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tunica 230 kV (337160)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 727,
      "normalized": {
        "queue_id": "J1061",
        "county": "Wabasha County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Briggs Rd - N. Rochester 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490358,
        "projectNumber": "J1061",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Wabasha County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Briggs Rd - N. Rochester 345 kV Line Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 728,
      "normalized": {
        "queue_id": "J1063",
        "county": "Clinton County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "New London - Frankfort 230kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 195.0,
        "summer_net_mw": 195.0,
        "winter_net_mw": 195.0,
        "proposed_completion_date": "2022-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-03-09T05:00:00+00:00",
        "in_service": "2022-10-31T04:00:00+00:00",
        "gia_to_execute": "2021-03-29T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 195.0,
        "dp1_nris_mw": 195.0,
        "dp2_eris_mw": 195.0,
        "dp2_nris_mw": 195.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490359,
        "projectNumber": "J1063",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-03-09T05:00:00+00:00",
        "inService": "2022-10-31T04:00:00+00:00",
        "giaToExec": "2021-03-29T04:00:00+00:00",
        "negInService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Clinton County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "New London - Frankfort 230kV Line Tap",
        "summerNetMW": 195.0,
        "winterNetMW": 195.0,
        "dp1ErisMw": 195.0,
        "dp1NrisMw": 195.0,
        "dp2ErisMw": 195.0,
        "dp2NrisMw": 195.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 729,
      "normalized": {
        "queue_id": "J3260",
        "county": "LaSalle",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4NLASALLE RB - 4WED_FOXR 138.0kV",
        "queue_date": "2024-03-28T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 97.0,
        "summer_net_mw": 97.0,
        "winter_net_mw": 97.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490360,
        "projectNumber": "J3260",
        "queueDate": "2024-03-28T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-01-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "LaSalle",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4NLASALLE RB - 4WED_FOXR 138.0kV",
        "summerNetMW": 97.0,
        "winterNetMW": 97.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 730,
      "normalized": {
        "queue_id": "J3267",
        "county": "Genesee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "THETFORD",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-05-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490361,
        "projectNumber": "J3267",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-05-23T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "THETFORD",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 731,
      "normalized": {
        "queue_id": "J1057",
        "county": "Jackson County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Brewster - Heron Lake 161 kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490362,
        "projectNumber": "J1057",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Jackson County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brewster - Heron Lake 161 kV Line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 732,
      "normalized": {
        "queue_id": "J1071",
        "county": "Oceana County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Donaldson 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-01-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-03-26T04:00:00+00:00",
        "in_service": "2021-01-20T05:00:00+00:00",
        "gia_to_execute": "2021-03-26T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490363,
        "projectNumber": "J1071",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-03-26T04:00:00+00:00",
        "inService": "2021-01-20T05:00:00+00:00",
        "giaToExec": "2021-03-26T04:00:00+00:00",
        "negInService": "2021-01-15T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Oceana County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Donaldson 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 733,
      "normalized": {
        "queue_id": "J1085",
        "county": "Marathon County,Taylor County,Wood County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Gardner Park - J821 POI - Stone Lake 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-05-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490364,
        "projectNumber": "J1085",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-05-19T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Marathon County,Taylor County,Wood County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gardner Park - J821 POI - Stone Lake 345 kV Line Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 734,
      "normalized": {
        "queue_id": "J1065",
        "county": "Gratiot County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Alma - Vestaburg 138kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-11-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490365,
        "projectNumber": "J1065",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-11-21T05:00:00+00:00",
        "inService": "2020-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Alma - Vestaburg 138kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 735,
      "normalized": {
        "queue_id": "J1059",
        "county": "Cape Girardeau County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Kelso - Lutesville 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490366,
        "projectNumber": "J1059",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-07T05:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Cape Girardeau County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kelso - Lutesville 345 kV Line Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 736,
      "normalized": {
        "queue_id": "J1086",
        "county": "Nobles County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Elk - Brewster 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490367,
        "projectNumber": "J1086",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Nobles County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Elk - Brewster 161 kV Line Tap",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 737,
      "normalized": {
        "queue_id": "J1073",
        "county": "Iberville Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Webre 500 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490368,
        "projectNumber": "J1073",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Iberville Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Webre 500 kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 738,
      "normalized": {
        "queue_id": "J1093",
        "county": "Desha County,Drew County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Reed Switch 115kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490369,
        "projectNumber": "J1093",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Desha County,Drew County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reed Switch 115kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 739,
      "normalized": {
        "queue_id": "J3286",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "KILGORE - MICAH 120.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490370,
        "projectNumber": "J3286",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "KILGORE - MICAH 120.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 740,
      "normalized": {
        "queue_id": "J3300",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "CASH - NEWPORT AB 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490371,
        "projectNumber": "J3300",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CASH - NEWPORT AB 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 741,
      "normalized": {
        "queue_id": "J3232",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "CAYUGA STATION",
        "queue_date": "2024-04-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 475.5,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490372,
        "projectNumber": "J3232",
        "queueDate": "2024-04-11T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CAYUGA STATION",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 475.5,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 742,
      "normalized": {
        "queue_id": "J1041",
        "county": "Jackson County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Brewster - Heron Lake 161 kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490373,
        "projectNumber": "J1041",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Jackson County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brewster - Heron Lake 161 kV Line",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 743,
      "normalized": {
        "queue_id": "J1042",
        "county": "Walworth County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "North Lake Geneva 138kV Substation",
        "queue_date": "2018-03-09T05:00:00+00:00",
        "withdrawn_date": "2023-08-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-09-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2021-05-18T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-05-18T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 180.0,
        "dp2_nris_mw": 180.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490374,
        "projectNumber": "J1042",
        "queueDate": "2018-03-09T05:00:00+00:00",
        "withdrawnDate": "2023-08-09T04:00:00+00:00",
        "doneDate": "2021-05-18T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-05-18T04:00:00+00:00",
        "negInService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Walworth County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Lake Geneva 138kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 180.0,
        "dp2NrisMw": 180.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 744,
      "normalized": {
        "queue_id": "J1012",
        "county": "Scott County",
        "state": "IL",
        "transmission_owner": "PRAIRIE POWER, INC. PPI",
        "poi": "Jacksonville Ind. Park - Winchester 138kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-03-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490375,
        "projectNumber": "J1012",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-03-28T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "PRAIRIE POWER, INC. PPI",
        "county": "Scott County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Jacksonville Ind. Park - Winchester 138kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 745,
      "normalized": {
        "queue_id": "J1037",
        "county": "Murray County",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Moon Lake 69kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 15.0,
        "summer_net_mw": 15.0,
        "winter_net_mw": 15.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490376,
        "projectNumber": "J1037",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-15T04:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Murray County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Moon Lake 69kV Substation",
        "summerNetMW": 15.0,
        "winterNetMW": 15.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 746,
      "normalized": {
        "queue_id": "J1017",
        "county": "Carroll County,White County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC PSI",
        "poi": "Springboro 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-10-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490377,
        "projectNumber": "J1017",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-10-03T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC PSI",
        "county": "Carroll County,White County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Springboro 138 kV Substation",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 747,
      "normalized": {
        "queue_id": "J1076",
        "county": "St. James Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Vacherie Sub 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-01-06T05:00:00+00:00",
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": "2020-07-01T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490378,
        "projectNumber": "J1076",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-01-06T05:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "giaToExec": "2020-07-01T04:00:00+00:00",
        "negInService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "St. James Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Vacherie Sub 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 748,
      "normalized": {
        "queue_id": "J1078",
        "county": "Mississippi County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "San Souci 500 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490379,
        "projectNumber": "J1078",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "San Souci 500 kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 749,
      "normalized": {
        "queue_id": "J1018",
        "county": "Miami County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC PSI",
        "poi": "Peru South East - Greentown 230 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-10-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490380,
        "projectNumber": "J1018",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-10-03T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC PSI",
        "county": "Miami County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Peru South East - Greentown 230 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 750,
      "normalized": {
        "queue_id": "J1051",
        "county": "Jefferson County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Concord 138kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-05-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490381,
        "projectNumber": "J1051",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-05-19T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Jefferson County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Concord 138kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 751,
      "normalized": {
        "queue_id": "J1097",
        "county": "Lonoke County,Pulaski County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "KEO EHV 500 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490382,
        "projectNumber": "J1097",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke County,Pulaski County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "KEO EHV 500 kV Substation",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 752,
      "normalized": {
        "queue_id": "J1098",
        "county": "Jackson County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lakefield 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 40.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490383,
        "projectNumber": "J1098",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2022-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Jackson County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lakefield 345 kV Substation",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 40.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 753,
      "normalized": {
        "queue_id": "J1099",
        "county": "Iberville Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Derrick 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490384,
        "projectNumber": "J1099",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Iberville Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Derrick 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 754,
      "normalized": {
        "queue_id": "J1121",
        "county": "Marathon County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Stone Lake - (Pershing) - Gardner Park 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-05-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490385,
        "projectNumber": "J1121",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-05-19T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Marathon County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stone Lake - (Pershing) - Gardner Park 345 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 755,
      "normalized": {
        "queue_id": "J1124",
        "county": "Olmsted County",
        "state": "MN",
        "transmission_owner": "SMMPA",
        "poi": "Byron 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-06-15T04:00:00+00:00",
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": "2021-06-15T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490386,
        "projectNumber": "J1124",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-06-15T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "giaToExec": "2021-06-15T04:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "SMMPA",
        "county": "Olmsted County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Byron 345kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 756,
      "normalized": {
        "queue_id": "J1142",
        "county": "St. James Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Vacherie 230kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": "2020-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service (with Provisional GIA)",
        "approval_date": "2020-07-10T04:00:00+00:00",
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": "2018-12-12T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 20.0,
        "dp2_nris_mw": 20.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490387,
        "projectNumber": "J1142",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-07-10T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "giaToExec": "2018-12-12T05:00:00+00:00",
        "negInService": "2020-07-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "St. James Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Vacherie 230kV Substation",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 20.0,
        "dp2NrisMw": 20.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service (with Provisional GIA)"
      }
    },
    {
      "source_row_number": 757,
      "normalized": {
        "queue_id": "J1102",
        "county": "Logan County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Fogarty 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": "2021-12-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-09-13T04:00:00+00:00",
        "in_service": "2021-06-13T04:00:00+00:00",
        "gia_to_execute": "2021-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 70.0,
        "dp1_nris_mw": 70.0,
        "dp2_eris_mw": 70.0,
        "dp2_nris_mw": 70.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490388,
        "projectNumber": "J1102",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-09-13T04:00:00+00:00",
        "inService": "2021-06-13T04:00:00+00:00",
        "giaToExec": "2021-03-08T05:00:00+00:00",
        "negInService": "2021-12-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Logan County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fogarty 138 kV Substation",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 70.0,
        "dp1NrisMw": 70.0,
        "dp2ErisMw": 70.0,
        "dp2NrisMw": 70.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 758,
      "normalized": {
        "queue_id": "J1127",
        "county": "Green County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Albany - Bass Creek 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 49.9,
        "summer_net_mw": 49.9,
        "winter_net_mw": 49.9,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490389,
        "projectNumber": "J1127",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-10-25T04:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Green County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Albany - Bass Creek 138 kV Line Tap",
        "summerNetMW": 49.9,
        "winterNetMW": 49.9,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 759,
      "normalized": {
        "queue_id": "J1129",
        "county": "Rock County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Paddock - Townline Rd 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 65.0,
        "summer_net_mw": 65.0,
        "winter_net_mw": 65.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490390,
        "projectNumber": "J1129",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-10-25T04:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Rock County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Paddock - Townline Rd 138 kV Line Tap",
        "summerNetMW": 65.0,
        "winterNetMW": 65.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 760,
      "normalized": {
        "queue_id": "J1146",
        "county": "Mississippi County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "San Souci 500 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 10.0,
        "summer_net_mw": 10.0,
        "winter_net_mw": 10.0,
        "proposed_completion_date": "2020-10-10T04:00:00+00:00",
        "generation_type": "Coal",
        "facility_type": "Combined Cycle",
        "post_gia_status": "In Service",
        "approval_date": "2020-08-12T04:00:00+00:00",
        "in_service": "2019-01-04T05:00:00+00:00",
        "gia_to_execute": "2020-06-03T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 10.0,
        "dp1_nris_mw": 10.0,
        "dp2_eris_mw": 10.0,
        "dp2_nris_mw": 10.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490391,
        "projectNumber": "J1146",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-08-12T04:00:00+00:00",
        "inService": "2019-01-04T05:00:00+00:00",
        "giaToExec": "2020-06-03T04:00:00+00:00",
        "negInService": "2020-10-10T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Mississippi County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "San Souci 500 kV Substation",
        "summerNetMW": 10.0,
        "winterNetMW": 10.0,
        "dp1ErisMw": 10.0,
        "dp1NrisMw": 10.0,
        "dp2ErisMw": 10.0,
        "dp2NrisMw": 10.0,
        "fuelType": "Coal",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 761,
      "normalized": {
        "queue_id": "J1172",
        "county": "Genesee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Dort - Garfield 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2023-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-05-03T04:00:00+00:00",
        "in_service": "2021-07-01T04:00:00+00:00",
        "gia_to_execute": "2020-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490392,
        "projectNumber": "J1172",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-05-03T04:00:00+00:00",
        "inService": "2021-07-01T04:00:00+00:00",
        "giaToExec": "2020-12-22T05:00:00+00:00",
        "negInService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Dort - Garfield 138 kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 762,
      "normalized": {
        "queue_id": "J1190",
        "county": "Clinton County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Calamus East 161 kV Substation",
        "queue_date": "2019-01-22T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-26T05:00:00+00:00",
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490393,
        "projectNumber": "J1190",
        "queueDate": "2019-01-22T05:00:00+00:00",
        "doneDate": "2023-01-26T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2023-01-26T05:00:00+00:00",
        "negInService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Clinton County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Calamus East 161 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 763,
      "normalized": {
        "queue_id": "J1125",
        "county": "Cross County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Wynne South - Wynne East AECC 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": "2023-03-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-08-12T04:00:00+00:00",
        "in_service": "2021-07-31T04:00:00+00:00",
        "gia_to_execute": "2020-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 135.0,
        "dp2_eris_mw": 135.0,
        "dp2_nris_mw": 135.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490394,
        "projectNumber": "J1125",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-08-12T04:00:00+00:00",
        "inService": "2021-07-31T04:00:00+00:00",
        "giaToExec": "2020-03-30T04:00:00+00:00",
        "negInService": "2023-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Cross County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wynne South - Wynne East AECC 161 kV Line Tap",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 135.0,
        "dp2ErisMw": 135.0,
        "dp2NrisMw": 135.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 764,
      "normalized": {
        "queue_id": "J1143",
        "county": "Morrison County",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER",
        "poi": "Blanchard - Little Falls 115 kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490395,
        "projectNumber": "J1143",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-08-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER",
        "county": "Morrison County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Blanchard - Little Falls 115 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 765,
      "normalized": {
        "queue_id": "J1104",
        "county": "Washington County,Waukesha County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Germantown - Bark River 138kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-10-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490396,
        "projectNumber": "J1104",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-10-24T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Washington County,Waukesha County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Germantown - Bark River 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 766,
      "normalized": {
        "queue_id": "J1105",
        "county": "Dakota County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Hampton Corners 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490397,
        "projectNumber": "J1105",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dakota County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hampton Corners 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 767,
      "normalized": {
        "queue_id": "J1106",
        "county": "Redwood County",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Lyon County - Cedar Mountain 345 kV Circuit 2 Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 414.0,
        "summer_net_mw": 414.0,
        "winter_net_mw": 414.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 414.0,
        "dp1_nris_mw": 414.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490398,
        "projectNumber": "J1106",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Redwood County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lyon County - Cedar Mountain 345 kV Circuit 2 Line",
        "summerNetMW": 414.0,
        "winterNetMW": 414.0,
        "dp1ErisMw": 414.0,
        "dp1NrisMw": 414.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 768,
      "normalized": {
        "queue_id": "J1148",
        "county": "Posey County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "AB Brown 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 54.0,
        "summer_net_mw": 54.0,
        "winter_net_mw": 54.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490399,
        "projectNumber": "J1148",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-07T05:00:00+00:00",
        "inService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Posey County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "AB Brown 138 kV Substation",
        "summerNetMW": 54.0,
        "winterNetMW": 54.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 769,
      "normalized": {
        "queue_id": "J1174",
        "county": "Worth County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ledyard - Colby 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": "2024-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-02-07T05:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2022-02-07T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 165.0,
        "dp1_nris_mw": 165.0,
        "dp2_eris_mw": 165.0,
        "dp2_nris_mw": 165.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490400,
        "projectNumber": "J1174",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-02-07T05:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2022-02-07T05:00:00+00:00",
        "negInService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Worth County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ledyard - Colby 345 kV Line Tap",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 165.0,
        "dp1NrisMw": 165.0,
        "dp2ErisMw": 165.0,
        "dp2NrisMw": 165.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 770,
      "normalized": {
        "queue_id": "J1192",
        "county": "Eaton County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Oneida 138kV Substation",
        "queue_date": "2019-03-25T04:00:00+00:00",
        "withdrawn_date": "2022-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": "2024-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2021-07-01T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 35.0,
        "dp1_nris_mw": 35.0,
        "dp2_eris_mw": 35.0,
        "dp2_nris_mw": 35.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490401,
        "projectNumber": "J1192",
        "queueDate": "2019-03-25T04:00:00+00:00",
        "withdrawnDate": "2022-10-25T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2021-07-01T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2024-07-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Eaton County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Oneida 138kV Substation",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 35.0,
        "dp1NrisMw": 35.0,
        "dp2ErisMw": 35.0,
        "dp2NrisMw": 35.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 771,
      "normalized": {
        "queue_id": "J1062",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Majestic - Lemoyne 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2021-04-23T04:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2020-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490402,
        "projectNumber": "J1062",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-04-23T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2020-12-22T05:00:00+00:00",
        "negInService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Majestic - Lemoyne 345 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 772,
      "normalized": {
        "queue_id": "J1083",
        "county": "Eaton County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Oneida138kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-12-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490403,
        "projectNumber": "J1083",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-12-02T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Eaton County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Oneida138kV Substation",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 773,
      "normalized": {
        "queue_id": "J1090",
        "county": "Ingham County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Tompkins - Churchill Jct 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-02-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": "2020-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 90.0,
        "dp1_nris_mw": 90.0,
        "dp2_eris_mw": 90.0,
        "dp2_nris_mw": 90.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490404,
        "projectNumber": "J1090",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-02-04T05:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "giaToExec": "2020-12-22T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ingham County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tompkins - Churchill Jct 138 kV Line Tap",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 90.0,
        "dp1NrisMw": 90.0,
        "dp2ErisMw": 90.0,
        "dp2NrisMw": 90.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 774,
      "normalized": {
        "queue_id": "J1064",
        "county": "Ionia County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Marquette - Vergennes 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-11-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490405,
        "projectNumber": "J1064",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-11-21T05:00:00+00:00",
        "inService": "2020-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ionia County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Marquette - Vergennes 138 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 775,
      "normalized": {
        "queue_id": "J1175",
        "county": "Worth County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ledyard - Colby 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": "2024-06-30T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": "2022-02-07T05:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2022-02-07T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 165.0,
        "dp1_nris_mw": 165.0,
        "dp2_eris_mw": 165.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490406,
        "projectNumber": "J1175",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-02-07T05:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2022-02-07T05:00:00+00:00",
        "negInService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Worth County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Ledyard - Colby 345kV Line Tap",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 165.0,
        "dp1NrisMw": 165.0,
        "dp2ErisMw": 165.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 776,
      "normalized": {
        "queue_id": "J1195",
        "county": "Branch County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Wagner 138 kV Substation",
        "queue_date": "2019-04-24T04:00:00+00:00",
        "withdrawn_date": "2020-01-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.4,
        "summer_net_mw": 150.4,
        "winter_net_mw": 150.4,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490407,
        "projectNumber": "J1195",
        "queueDate": "2019-04-24T04:00:00+00:00",
        "withdrawnDate": "2020-01-03T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wagner 138 kV Substation",
        "summerNetMW": 150.4,
        "winterNetMW": 150.4,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 777,
      "normalized": {
        "queue_id": "J1091",
        "county": "Craighead County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Power Line Road 161 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490408,
        "projectNumber": "J1091",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Power Line Road 161 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 778,
      "normalized": {
        "queue_id": "J1072",
        "county": "Mower County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Adams 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2023-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-06-15T04:00:00+00:00",
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-06-15T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490409,
        "projectNumber": "J1072",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-06-15T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2021-06-15T04:00:00+00:00",
        "negInService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Mower County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Adams 345 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 779,
      "normalized": {
        "queue_id": "J1016",
        "county": "Gibson County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Francisco - Toyota Z75 138kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490410,
        "projectNumber": "J1016",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-06T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Gibson County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Francisco - Toyota Z75 138kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 780,
      "normalized": {
        "queue_id": "J1048",
        "county": "Mecosta County,Montcalm County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Vergennes - Nelson Road 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-03-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490411,
        "projectNumber": "J1048",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-03-28T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Mecosta County,Montcalm County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Vergennes - Nelson Road 345kV Line Tap",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 781,
      "normalized": {
        "queue_id": "J1066",
        "county": "Pike County",
        "state": "IL",
        "transmission_owner": "PRAIRIE POWER, INC. PPI",
        "poi": "El Dara Junction - Pittsfield 69 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-05-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 44.0,
        "summer_net_mw": 44.0,
        "winter_net_mw": 44.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490412,
        "projectNumber": "J1066",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-05-17T04:00:00+00:00",
        "inService": "2019-07-31T04:00:00+00:00",
        "transmissionOwner": "PRAIRIE POWER, INC. PPI",
        "county": "Pike County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "E-NRIS",
        "poiName": "El Dara Junction - Pittsfield 69 kV Line Tap",
        "summerNetMW": 44.0,
        "winterNetMW": 44.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 782,
      "normalized": {
        "queue_id": "J1094",
        "county": "Washington County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Prest 138kV Switching Station",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-01-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490413,
        "projectNumber": "J1094",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2024-01-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Washington County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Prest 138kV Switching Station",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 783,
      "normalized": {
        "queue_id": "J1052",
        "county": "Jackson County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Beecher - Seamless East 138kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-03-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490414,
        "projectNumber": "J1052",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-03-27T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Jackson County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Beecher - Seamless East 138kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 784,
      "normalized": {
        "queue_id": "J1055",
        "county": "Mason County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mason Substation 138 kV Bus",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 144.0,
        "summer_net_mw": 144.0,
        "winter_net_mw": 144.0,
        "proposed_completion_date": "2020-10-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2021-11-13T05:00:00+00:00",
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": "2019-07-31T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 144.0,
        "dp1_nris_mw": 144.0,
        "dp2_eris_mw": 144.0,
        "dp2_nris_mw": 144.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490415,
        "projectNumber": "J1055",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-11-13T05:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "giaToExec": "2019-07-31T04:00:00+00:00",
        "negInService": "2020-10-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mason Substation 138 kV Bus",
        "summerNetMW": 144.0,
        "winterNetMW": 144.0,
        "dp1ErisMw": 144.0,
        "dp1NrisMw": 144.0,
        "dp2ErisMw": 144.0,
        "dp2NrisMw": 144.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 785,
      "normalized": {
        "queue_id": "J1191",
        "county": "Boone County",
        "state": "MO",
        "transmission_owner": "City of Columbia, MO",
        "poi": "Bolstad 69 kV Substation",
        "queue_date": "2019-02-04T05:00:00+00:00",
        "withdrawn_date": "2025-02-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 64.0,
        "summer_net_mw": 64.0,
        "winter_net_mw": 64.0,
        "proposed_completion_date": "2025-02-28T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 64.0,
        "dp1_nris_mw": 64.0,
        "dp2_eris_mw": 64.0,
        "dp2_nris_mw": 64.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490416,
        "projectNumber": "J1191",
        "queueDate": "2019-02-04T05:00:00+00:00",
        "withdrawnDate": "2025-02-10T05:00:00+00:00",
        "inService": "2022-07-31T04:00:00+00:00",
        "negInService": "2025-02-28T05:00:00+00:00",
        "transmissionOwner": "City of Columbia, MO",
        "county": "Boone County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bolstad 69 kV Substation",
        "summerNetMW": 64.0,
        "winterNetMW": 64.0,
        "dp1ErisMw": 64.0,
        "dp1NrisMw": 64.0,
        "dp2ErisMw": 64.0,
        "dp2NrisMw": 64.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 786,
      "normalized": {
        "queue_id": "J1176",
        "county": "Cerro Gordo County,Worth County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lime Creek 161 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490417,
        "projectNumber": "J1176",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-15T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo County,Worth County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lime Creek 161 kV Substation",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 787,
      "normalized": {
        "queue_id": "J1069",
        "county": "Jasper County,Pulaski County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Reynolds 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-04-20T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490418,
        "projectNumber": "J1069",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper County,Pulaski County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynolds 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 788,
      "normalized": {
        "queue_id": "J1096",
        "county": "Saline County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Norris City North - Muddy 138 kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-01-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490419,
        "projectNumber": "J1096",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2024-01-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Saline County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Norris City North - Muddy 138 kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 789,
      "normalized": {
        "queue_id": "J1079",
        "county": "St. Charles Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Waterford 1&2 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490420,
        "projectNumber": "J1079",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Charles Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Waterford 1&2 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 790,
      "normalized": {
        "queue_id": "J1123",
        "county": "Audrain County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Spencer Creek 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490421,
        "projectNumber": "J1123",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-02T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Audrain County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Spencer Creek 345 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 791,
      "normalized": {
        "queue_id": "J1082",
        "county": "Grundy County,Mercer County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Zachary 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-03-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490422,
        "projectNumber": "J1082",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-03-28T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Grundy County,Mercer County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Zachary 345 kV Substation",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 792,
      "normalized": {
        "queue_id": "J1056",
        "county": "Monroe County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lulu - Monroe 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-11-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490423,
        "projectNumber": "J1056",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-11-21T05:00:00+00:00",
        "inService": "2020-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Monroe County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lulu - Monroe 345 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 793,
      "normalized": {
        "queue_id": "J1177",
        "county": "Schuyler County",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Hughes 345 kV Switching Station (J541 POI)",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490424,
        "projectNumber": "J1177",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Schuyler County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hughes 345 kV Switching Station (J541 POI)",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 794,
      "normalized": {
        "queue_id": "J1178",
        "county": "Eaton County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Oneida 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-08-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 65.0,
        "summer_net_mw": 65.0,
        "winter_net_mw": 65.0,
        "proposed_completion_date": "2023-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2021-05-03T04:00:00+00:00",
        "in_service": "2020-07-01T04:00:00+00:00",
        "gia_to_execute": "2020-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 65.0,
        "dp1_nris_mw": 65.0,
        "dp2_eris_mw": 65.0,
        "dp2_nris_mw": 65.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490425,
        "projectNumber": "J1178",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-08-06T04:00:00+00:00",
        "doneDate": "2021-05-03T04:00:00+00:00",
        "inService": "2020-07-01T04:00:00+00:00",
        "giaToExec": "2020-12-22T05:00:00+00:00",
        "negInService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Eaton County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Oneida 138 kV Substation",
        "summerNetMW": 65.0,
        "winterNetMW": 65.0,
        "dp1ErisMw": 65.0,
        "dp1NrisMw": 65.0,
        "dp2ErisMw": 65.0,
        "dp2NrisMw": 65.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 795,
      "normalized": {
        "queue_id": "J1100",
        "county": "Grimes County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Grimes 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490426,
        "projectNumber": "J1100",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Grimes County",
        "state": "TX",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Grimes 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 796,
      "normalized": {
        "queue_id": "J1101",
        "county": "Manitowoc County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Kewaunee 138kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2025-11-20T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": "2023-08-15T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Withdrawn",
        "approval_date": "2021-04-12T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-04-12T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 20.0,
        "dp2_nris_mw": 20.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490427,
        "projectNumber": "J1101",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2025-11-20T05:00:00+00:00",
        "doneDate": "2021-04-12T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-04-12T04:00:00+00:00",
        "negInService": "2023-08-15T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Manitowoc County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kewaunee 138kV Substation",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 20.0,
        "dp2NrisMw": 20.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 797,
      "normalized": {
        "queue_id": "J1070",
        "county": "Washington County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "SE Greenville 115kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490428,
        "projectNumber": "J1070",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Washington County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "SE Greenville 115kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 798,
      "normalized": {
        "queue_id": "J1058",
        "county": "Lake County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Schahfer-St. John 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2021-10-15T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490429,
        "projectNumber": "J1058",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2021-10-15T04:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "Lake County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Schahfer-St. John 345kV Line Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 799,
      "normalized": {
        "queue_id": "J1198",
        "county": "Jasper County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Newton 345kV Substation",
        "queue_date": "2019-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 51.8,
        "summer_net_mw": 51.8,
        "winter_net_mw": 51.8,
        "proposed_completion_date": "2023-04-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-15T04:00:00+00:00",
        "gia_to_execute": "2022-04-22T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 51.8,
        "dp1_nris_mw": 51.8,
        "dp2_eris_mw": 51.8,
        "dp2_nris_mw": 51.8,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490430,
        "projectNumber": "J1198",
        "queueDate": "2019-04-25T04:00:00+00:00",
        "inService": "2021-06-15T04:00:00+00:00",
        "giaToExec": "2022-04-22T04:00:00+00:00",
        "negInService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jasper County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Newton 345kV Substation",
        "summerNetMW": 51.8,
        "winterNetMW": 51.8,
        "dp1ErisMw": 51.8,
        "dp1NrisMw": 51.8,
        "dp2ErisMw": 51.8,
        "dp2NrisMw": 51.8,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 800,
      "normalized": {
        "queue_id": "J1283",
        "county": "Jefferson County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "White Bluff - Arsenal C and White Bluff - Arsenal D 115kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2019-09-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 269.99,
        "summer_net_mw": 269.99,
        "winter_net_mw": 269.99,
        "proposed_completion_date": null,
        "generation_type": "Waste Heat Recovery",
        "facility_type": "Co-gen",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490431,
        "projectNumber": "J1283",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2019-09-05T04:00:00+00:00",
        "inService": "2023-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "White Bluff - Arsenal C and White Bluff - Arsenal D 115kV Line",
        "summerNetMW": 269.99,
        "winterNetMW": 269.99,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Waste Heat Recovery",
        "facilityType": "Co-gen",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 801,
      "normalized": {
        "queue_id": "J1284",
        "county": "Linn County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold - Tiffin (MEC) 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490432,
        "projectNumber": "J1284",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Duane Arnold - Tiffin (MEC) 345 kV Line Tap",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 802,
      "normalized": {
        "queue_id": "J1274",
        "county": "Posey County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Point 69kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490433,
        "projectNumber": "J1274",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Posey County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Point 69kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 803,
      "normalized": {
        "queue_id": "J1087",
        "county": "Scott County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Miner - Kelso 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-12-02T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490434,
        "projectNumber": "J1087",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2023-12-02T05:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Scott County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Miner - Kelso 161 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 804,
      "normalized": {
        "queue_id": "J1074",
        "county": "Gibson County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Francisco 138 kV sub",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2023-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-11-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": "2021-03-29T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490435,
        "projectNumber": "J1074",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2023-10-27T04:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "giaToExec": "2021-03-29T04:00:00+00:00",
        "negInService": "2022-11-15T05:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Gibson County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Francisco 138 kV sub",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 805,
      "normalized": {
        "queue_id": "J1089",
        "county": "Shiawassee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Cornell - Bell Rd 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-02-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": "2020-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 170.0,
        "dp2_nris_mw": 170.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490436,
        "projectNumber": "J1089",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-02-04T05:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "giaToExec": "2020-12-22T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cornell - Bell Rd 138 kV Line Tap",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 170.0,
        "dp2NrisMw": 170.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 806,
      "normalized": {
        "queue_id": "J1095",
        "county": "DeSoto County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Twinkletown 230kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490437,
        "projectNumber": "J1095",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "DeSoto County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Twinkletown 230kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 807,
      "normalized": {
        "queue_id": "J1077",
        "county": "Cass County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Argenta - Weeds Lake - Hiple 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-11-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490438,
        "projectNumber": "J1077",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-11-01T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Cass County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Argenta - Weeds Lake - Hiple 345kV Line Tap",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 808,
      "normalized": {
        "queue_id": "J1120",
        "county": "Jefferson County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Big Hill CO - Bayou Farms CO 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490439,
        "projectNumber": "J1120",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-23T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jefferson County",
        "state": "TX",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Big Hill CO - Bayou Farms CO 138 kV Line Tap",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 809,
      "normalized": {
        "queue_id": "J1126",
        "county": "Tuscola County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "ITC Bauer - Grassmere - Rapson (Kirk Sub) 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-11-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1.1,
        "summer_net_mw": 1.1,
        "winter_net_mw": 1.1,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490440,
        "projectNumber": "J1126",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-11-01T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Tuscola County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "ITC Bauer - Grassmere - Rapson (Kirk Sub) 345kV Substation",
        "summerNetMW": 1.1,
        "winterNetMW": 1.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 810,
      "normalized": {
        "queue_id": "J1128",
        "county": "Freeborn County",
        "state": "MN",
        "transmission_owner": "SMMPA",
        "poi": "Hayward - Murphy Creek 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490441,
        "projectNumber": "J1128",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "transmissionOwner": "SMMPA",
        "county": "Freeborn County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hayward - Murphy Creek 161 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 811,
      "normalized": {
        "queue_id": "J1122",
        "county": "Pottawattamie County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Council Bluffs - Fallow Avenue 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490442,
        "projectNumber": "J1122",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Pottawattamie County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Council Bluffs - Fallow Avenue 345 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 812,
      "normalized": {
        "queue_id": "J1140",
        "county": "Benton County",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER",
        "poi": "Platte River 115 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490443,
        "projectNumber": "J1140",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2020-08-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER",
        "county": "Benton County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Platte River 115 kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 813,
      "normalized": {
        "queue_id": "J1179",
        "county": "Chisago County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Rush City - Red Rock 230 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490444,
        "projectNumber": "J1179",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chisago County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rush City - Red Rock 230 kV Line Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 814,
      "normalized": {
        "queue_id": "J1197",
        "county": "LaSalle County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Corbin 138kV Substation",
        "queue_date": "2019-04-25T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490445,
        "projectNumber": "J1197",
        "queueDate": "2019-04-25T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2021-06-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "LaSalle County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Corbin 138kV Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 815,
      "normalized": {
        "queue_id": "J1145",
        "county": "Callaway County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Overton - (McCrede) - Montgomery 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-03-31T04:00:00+00:00",
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": "2022-04-01T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490446,
        "projectNumber": "J1145",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-03-31T04:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "giaToExec": "2022-04-01T04:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Callaway County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Overton - (McCrede) - Montgomery 345 kV Line Tap",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 816,
      "normalized": {
        "queue_id": "J1147",
        "county": "St. Francis County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Moses - McCrory 161 kV Line tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490447,
        "projectNumber": "J1147",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-24T05:00:00+00:00",
        "inService": "2021-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "St. Francis County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Moses - McCrory 161 kV Line tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 817,
      "normalized": {
        "queue_id": "J1141",
        "county": "Manistee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Filer - BoxbdJ - Stronach 138kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-09-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 17.0,
        "summer_net_mw": 17.0,
        "winter_net_mw": 17.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490448,
        "projectNumber": "J1141",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-09-07T04:00:00+00:00",
        "inService": "2019-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Manistee County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Filer - BoxbdJ - Stronach 138kV Line Tap",
        "summerNetMW": 17.0,
        "winterNetMW": 17.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 818,
      "normalized": {
        "queue_id": "J1144",
        "county": "Covington County,Lamar County",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY",
        "poi": "Moselle - Columbia 161kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 96.0,
        "summer_net_mw": 96.0,
        "winter_net_mw": 96.0,
        "proposed_completion_date": "2022-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-09-10T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2020-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 96.0,
        "dp1_nris_mw": 96.0,
        "dp2_eris_mw": 96.0,
        "dp2_nris_mw": 96.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490449,
        "projectNumber": "J1144",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-09-10T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2020-03-30T04:00:00+00:00",
        "negInService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY",
        "county": "Covington County,Lamar County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Moselle - Columbia 161kV Line Tap",
        "summerNetMW": 96.0,
        "winterNetMW": 96.0,
        "dp1ErisMw": 96.0,
        "dp1NrisMw": 96.0,
        "dp2ErisMw": 96.0,
        "dp2NrisMw": 96.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 819,
      "normalized": {
        "queue_id": "J1242",
        "county": "Hancock County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hamilton Line 796 Tap to Audrian 69kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-05-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490450,
        "projectNumber": "J1242",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-05-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Hancock County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "E-NRIS",
        "poiName": "Hamilton Line 796 Tap to Audrian 69kV Line",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 820,
      "normalized": {
        "queue_id": "J1286",
        "county": "Evangeline Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Manuel 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-11-29T05:00:00+00:00",
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2021-11-29T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490451,
        "projectNumber": "J1286",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-29T05:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2021-11-29T05:00:00+00:00",
        "negInService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "Evangeline Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Manuel 138 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 821,
      "normalized": {
        "queue_id": "J1107",
        "county": "Cape Girardeau County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Kelso - Lutesville 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-11-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490452,
        "projectNumber": "J1107",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Cape Girardeau County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kelso - Lutesville 345 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 822,
      "normalized": {
        "queue_id": "J1149",
        "county": "Yellow Medicine County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Hazel Creek 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-11-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490453,
        "projectNumber": "J1149",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-11-15T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Yellow Medicine County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hazel Creek 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 823,
      "normalized": {
        "queue_id": "J1287",
        "county": "Tunica County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Tunica - Crenshaw 115kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490454,
        "projectNumber": "J1287",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-05T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Tunica County",
        "state": "MS",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tunica - Crenshaw 115kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 824,
      "normalized": {
        "queue_id": "J1245",
        "county": "Arkansas County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Stuttgart Ricuskey - Woodward 230 kV",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490455,
        "projectNumber": "J1245",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stuttgart Ricuskey - Woodward 230 kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 825,
      "normalized": {
        "queue_id": "J1278",
        "county": "Polk County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Corrigan Bulk - Staley 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490456,
        "projectNumber": "J1278",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-05T04:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Polk County",
        "state": "TX",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Corrigan Bulk - Staley 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 826,
      "normalized": {
        "queue_id": "J1251",
        "county": "Marquette County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Arnold - Perkins 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-06-12T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-09-08T04:00:00+00:00",
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-09-09T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 80.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490457,
        "projectNumber": "J1251",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-09-08T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2022-09-09T04:00:00+00:00",
        "negInService": "2025-06-12T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Marquette County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Arnold - Perkins 138 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 80.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 827,
      "normalized": {
        "queue_id": "J1103",
        "county": "Tuscola County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Bauer - (Kirk) - Ringle 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-06-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490458,
        "projectNumber": "J1103",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-06-30T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Tuscola County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bauer - (Kirk) - Ringle 345kV Line Tap",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 828,
      "normalized": {
        "queue_id": "J1108",
        "county": "Douglas County",
        "state": "MN",
        "transmission_owner": "MISSOURI RIVER ENERGY SERVICES",
        "poi": "Alexandria 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490459,
        "projectNumber": "J1108",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-06-13T04:00:00+00:00",
        "transmissionOwner": "MISSOURI RIVER ENERGY SERVICES",
        "county": "Douglas County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Alexandria 345 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 829,
      "normalized": {
        "queue_id": "J1170",
        "county": "Cass County",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Bison 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490460,
        "projectNumber": "J1170",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass County",
        "state": "ND",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bison 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 830,
      "normalized": {
        "queue_id": "J1193",
        "county": "Morton County",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Heskitt 115 kV Switchyard",
        "queue_date": "2019-04-22T04:00:00+00:00",
        "withdrawn_date": "2020-04-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 103.1,
        "summer_net_mw": 103.1,
        "winter_net_mw": 103.1,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490461,
        "projectNumber": "J1193",
        "queueDate": "2019-04-22T04:00:00+00:00",
        "withdrawnDate": "2020-04-28T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Morton County",
        "state": "ND",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Heskitt 115 kV Switchyard",
        "summerNetMW": 103.1,
        "winterNetMW": 103.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 831,
      "normalized": {
        "queue_id": "J1291",
        "county": "Catahoula Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Standard - Red Gum 115 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-01-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490462,
        "projectNumber": "J1291",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-01-14T05:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Catahoula Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Standard - Red Gum 115 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 832,
      "normalized": {
        "queue_id": "J1281",
        "county": "Ashley County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Crossett - Monticello East 115kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2024-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": "2022-01-28T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490463,
        "projectNumber": "J1281",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "giaToExec": "2022-01-28T05:00:00+00:00",
        "negInService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ashley County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crossett - Monticello East 115kV Line",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 833,
      "normalized": {
        "queue_id": "J1194",
        "county": "Midland County,Saginaw County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Murphy 138 kV Substation",
        "queue_date": "2019-04-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 225.2,
        "summer_net_mw": 225.2,
        "winter_net_mw": 225.2,
        "proposed_completion_date": "2021-11-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service (with Provisional GIA)",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": "2020-08-04T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 225.2,
        "dp1_nris_mw": 225.2,
        "dp2_eris_mw": 225.2,
        "dp2_nris_mw": 225.2,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490464,
        "projectNumber": "J1194",
        "queueDate": "2019-04-24T04:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "giaToExec": "2020-08-04T04:00:00+00:00",
        "negInService": "2021-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland County,Saginaw County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Murphy 138 kV Substation",
        "summerNetMW": 225.2,
        "winterNetMW": 225.2,
        "dp1ErisMw": 225.2,
        "dp1NrisMw": 225.2,
        "dp2ErisMw": 225.2,
        "dp2NrisMw": 225.2,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service (with Provisional GIA)"
      }
    },
    {
      "source_row_number": 834,
      "normalized": {
        "queue_id": "J1196",
        "county": "Sanilac County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Greenwood - Rapson (Banner) 345 kV Line Tap",
        "queue_date": "2019-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-08-09T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-10-31T04:00:00+00:00",
        "in_service": "2022-08-29T04:00:00+00:00",
        "gia_to_execute": "2022-10-31T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490465,
        "projectNumber": "J1196",
        "queueDate": "2019-04-25T04:00:00+00:00",
        "doneDate": "2022-10-31T04:00:00+00:00",
        "inService": "2022-08-29T04:00:00+00:00",
        "giaToExec": "2022-10-31T04:00:00+00:00",
        "negInService": "2025-08-09T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Sanilac County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greenwood - Rapson (Banner) 345 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 835,
      "normalized": {
        "queue_id": "J1109",
        "county": "Cass County",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Bison 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 207.0,
        "summer_net_mw": 207.0,
        "winter_net_mw": 207.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490466,
        "projectNumber": "J1109",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass County",
        "state": "ND",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bison 345kV Substation",
        "summerNetMW": 207.0,
        "winterNetMW": 207.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 836,
      "normalized": {
        "queue_id": "J1171",
        "county": "Dodge County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Butternut 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-01-26T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-05-19T04:00:00+00:00",
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": "2021-05-19T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490467,
        "projectNumber": "J1171",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-05-19T04:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "giaToExec": "2021-05-19T04:00:00+00:00",
        "negInService": "2023-01-26T05:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Dodge County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Butternut 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 837,
      "normalized": {
        "queue_id": "J1282",
        "county": "Beauregard Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cooper - Penton Road 230kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490468,
        "projectNumber": "J1282",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-18T04:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cooper - Penton Road 230kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 838,
      "normalized": {
        "queue_id": "J1262",
        "county": "Wayne County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Waterman 120kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": "2022-06-01T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2019-06-01T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 25.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 25.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490469,
        "projectNumber": "J1262",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2019-06-01T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Wayne County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Waterman 120kV Substation",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 25.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 25.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 839,
      "normalized": {
        "queue_id": "J1173",
        "county": "Lenawee County",
        "state": "MI",
        "transmission_owner": "CONSUMERS ENERGY COMPANY EDC",
        "poi": "Raisin - METC Tap 138kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-06-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490470,
        "projectNumber": "J1173",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-06-30T04:00:00+00:00",
        "inService": "2019-12-01T05:00:00+00:00",
        "transmissionOwner": "CONSUMERS ENERGY COMPANY EDC",
        "county": "Lenawee County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Raisin - METC Tap 138kV Line Tap",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 840,
      "normalized": {
        "queue_id": "J1199",
        "county": "Fulton County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Duck Creek 345kV Substation",
        "queue_date": "2019-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": "2023-06-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-15T04:00:00+00:00",
        "gia_to_execute": "2022-04-22T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 20.0,
        "dp2_nris_mw": 20.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490471,
        "projectNumber": "J1199",
        "queueDate": "2019-04-25T04:00:00+00:00",
        "inService": "2021-06-15T04:00:00+00:00",
        "giaToExec": "2022-04-22T04:00:00+00:00",
        "negInService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fulton County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Duck Creek 345kV Substation",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 20.0,
        "dp2NrisMw": 20.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 841,
      "normalized": {
        "queue_id": "J1240",
        "county": "Audrain County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Spencer Creek 345kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2019-11-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490472,
        "projectNumber": "J1240",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2019-11-01T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Audrain County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Spencer Creek 345kV Substation",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 842,
      "normalized": {
        "queue_id": "J1241",
        "county": "Jefferson County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "West Mt Vernon - Xenia 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-12-10T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 165.0,
        "dp1_nris_mw": 165.0,
        "dp2_eris_mw": 165.0,
        "dp2_nris_mw": 165.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490473,
        "projectNumber": "J1241",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "giaToExec": "2023-03-30T04:00:00+00:00",
        "negInService": "2024-12-10T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jefferson County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "West Mt Vernon - Xenia 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 165.0,
        "dp1NrisMw": 165.0,
        "dp2ErisMw": 165.0,
        "dp2NrisMw": 165.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 843,
      "normalized": {
        "queue_id": "J1285",
        "county": "Linn County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold - Tiffin (MEC) 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490474,
        "projectNumber": "J1285",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Duane Arnold - Tiffin (MEC) 345 kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 844,
      "normalized": {
        "queue_id": "J1288",
        "county": "Vermillion County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Cayuga - Sugar Creek 345kVLine",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 667.2,
        "summer_net_mw": 606.7,
        "winter_net_mw": 667.2,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490475,
        "projectNumber": "J1288",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-04-16T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cayuga - Sugar Creek 345kVLine",
        "summerNetMW": 606.7,
        "winterNetMW": 667.2,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 845,
      "normalized": {
        "queue_id": "J1243",
        "county": "McDonough County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Macomb West #2 - Blandlnsville Tap 69kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-05-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490476,
        "projectNumber": "J1243",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-05-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McDonough County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "E-NRIS",
        "poiName": "Macomb West #2 - Blandlnsville Tap 69kV Line",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 846,
      "normalized": {
        "queue_id": "J1273",
        "county": "Marshall County,Starke County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Burr Oak - East Winnamac 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2019-11-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490477,
        "projectNumber": "J1273",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2019-11-05T05:00:00+00:00",
        "inService": "2023-09-29T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "Marshall County,Starke County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Burr Oak - East Winnamac 138 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 847,
      "normalized": {
        "queue_id": "J1275",
        "county": "Henderson County",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BRPS",
        "poi": "Henderson 161 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490478,
        "projectNumber": "J1275",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BRPS",
        "county": "Henderson County",
        "state": "KY",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Henderson 161 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 848,
      "normalized": {
        "queue_id": "J1253",
        "county": "Fond du Lac County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "South Fond Du Lac to Fitzgerald 345 kV line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2024-10-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2024-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490479,
        "projectNumber": "J1253",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2024-10-18T04:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Fond du Lac County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "South Fond Du Lac to Fitzgerald 345 kV line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 849,
      "normalized": {
        "queue_id": "J1244",
        "county": "Houghton County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Winona - Toivola - Portage Tap - Atlantic Mine 69kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-03-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 38.4,
        "summer_net_mw": 38.4,
        "winter_net_mw": 38.4,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 38.4,
        "dp1_nris_mw": 38.4,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490480,
        "projectNumber": "J1244",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-03-08T05:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Houghton County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Winona - Toivola - Portage Tap - Atlantic Mine 69kV Line",
        "summerNetMW": 38.4,
        "winterNetMW": 38.4,
        "dp1ErisMw": 38.4,
        "dp1NrisMw": 38.4,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 850,
      "normalized": {
        "queue_id": "J1246",
        "county": "Iberville Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Bayou Labutte 500kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 725.2,
        "summer_net_mw": 725.2,
        "winter_net_mw": 725.2,
        "proposed_completion_date": "2025-09-20T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": "2022-04-06T04:00:00+00:00",
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": "2022-04-06T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 705.0,
        "dp1_nris_mw": 705.0,
        "dp2_eris_mw": 705.2,
        "dp2_nris_mw": 705.2,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490481,
        "projectNumber": "J1246",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-04-06T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "giaToExec": "2022-04-06T04:00:00+00:00",
        "negInService": "2025-09-20T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Iberville Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bayou Labutte 500kV Substation",
        "summerNetMW": 725.2,
        "winterNetMW": 725.2,
        "dp1ErisMw": 705.0,
        "dp1NrisMw": 705.0,
        "dp2ErisMw": 705.2,
        "dp2NrisMw": 705.2,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 851,
      "normalized": {
        "queue_id": "J1276",
        "county": "Posey County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Point 69kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2023-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 47.1,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490482,
        "projectNumber": "J1276",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2023-03-07T05:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Posey County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Point 69kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 47.1,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 852,
      "normalized": {
        "queue_id": "J1247",
        "county": "St. Mary,St. Mary Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Ivanhoe 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 16.98,
        "summer_net_mw": 16.98,
        "winter_net_mw": 16.98,
        "proposed_completion_date": "2021-10-31T04:00:00+00:00",
        "generation_type": "Waste Heat Recovery",
        "facility_type": "Co-gen",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-05-31T04:00:00+00:00",
        "in_service": "2020-08-01T04:00:00+00:00",
        "gia_to_execute": "2020-03-11T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 30.98,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 30.98,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490483,
        "projectNumber": "J1247",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-05-31T04:00:00+00:00",
        "inService": "2020-08-01T04:00:00+00:00",
        "giaToExec": "2020-03-11T04:00:00+00:00",
        "negInService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "St. Mary,St. Mary Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Ivanhoe 138kV Substation",
        "summerNetMW": 16.98,
        "winterNetMW": 16.98,
        "dp1ErisMw": 30.98,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 30.98,
        "dp2NrisMw": 0.0,
        "fuelType": "Waste Heat Recovery",
        "facilityType": "Co-gen",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 853,
      "normalized": {
        "queue_id": "J1254",
        "county": "Knox County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Merom - Gibson - Wheatland 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490484,
        "projectNumber": "J1254",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Merom - Gibson - Wheatland 345kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 854,
      "normalized": {
        "queue_id": "J1289",
        "county": "Morgan County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Turner - Austin 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-11-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490485,
        "projectNumber": "J1289",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2024-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Morgan County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Turner - Austin 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 855,
      "normalized": {
        "queue_id": "J1279",
        "county": "Hardin County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Rye - Cypress 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490486,
        "projectNumber": "J1279",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-18T04:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Hardin County",
        "state": "TX",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rye - Cypress 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 856,
      "normalized": {
        "queue_id": "J1250",
        "county": "Clay County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Datto-Corning North 161 kV line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490487,
        "projectNumber": "J1250",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clay County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Datto-Corning North 161 kV line",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 857,
      "normalized": {
        "queue_id": "J1256",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Dorset 120 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-05-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490488,
        "projectNumber": "J1256",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-05-06T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Dorset 120 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 858,
      "normalized": {
        "queue_id": "J1258",
        "county": "Lonoke County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "KEO EHV 500 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2024-10-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2021-11-29T05:00:00+00:00",
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490489,
        "projectNumber": "J1258",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-29T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "negInService": "2024-10-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Lonoke County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "KEO EHV 500 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 859,
      "normalized": {
        "queue_id": "J1277",
        "county": "Liberty County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Pintail 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490490,
        "projectNumber": "J1277",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty County",
        "state": "TX",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pintail 138 kV Substation",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 860,
      "normalized": {
        "queue_id": "J1248",
        "county": "Calhoun County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Marshall - Black Stone 138 kV line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490491,
        "projectNumber": "J1248",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Marshall - Black Stone 138 kV line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 861,
      "normalized": {
        "queue_id": "J1257",
        "county": "Tangipahoa Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Chicken Farm - Amite 115 kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": "2024-09-24T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-11-30T05:00:00+00:00",
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2021-11-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 20.0,
        "dp2_nris_mw": 20.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490492,
        "projectNumber": "J1257",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-30T05:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2021-11-30T05:00:00+00:00",
        "negInService": "2024-09-24T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Tangipahoa Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Chicken Farm - Amite 115 kV Line",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 20.0,
        "dp2NrisMw": 20.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 862,
      "normalized": {
        "queue_id": "J1280",
        "county": "Monroe County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Brinkley East - Clarendon 115kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490493,
        "projectNumber": "J1280",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-05T04:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Monroe County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brinkley East - Clarendon 115kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 863,
      "normalized": {
        "queue_id": "J1255",
        "county": "Ionia County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Marquette - Vergennes 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-10-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-10-31T04:00:00+00:00",
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-10-31T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490494,
        "projectNumber": "J1255",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-10-31T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2022-10-31T04:00:00+00:00",
        "negInService": "2025-10-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ionia County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Marquette - Vergennes 138 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 864,
      "normalized": {
        "queue_id": "J1249",
        "county": "Lamar County",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY",
        "poi": "Morrow 161 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 600.0,
        "summer_net_mw": 600.0,
        "winter_net_mw": 600.0,
        "proposed_completion_date": "2022-07-24T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "In Service",
        "approval_date": "2022-01-20T05:00:00+00:00",
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": "2022-01-21T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 600.0,
        "dp1_nris_mw": 600.0,
        "dp2_eris_mw": 600.0,
        "dp2_nris_mw": 600.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490495,
        "projectNumber": "J1249",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-01-20T05:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "giaToExec": "2022-01-21T05:00:00+00:00",
        "negInService": "2022-07-24T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY",
        "county": "Lamar County",
        "state": "MS",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Morrow 161 kV Substation",
        "summerNetMW": 600.0,
        "winterNetMW": 600.0,
        "dp1ErisMw": 600.0,
        "dp1NrisMw": 600.0,
        "dp2ErisMw": 600.0,
        "dp2NrisMw": 600.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 865,
      "normalized": {
        "queue_id": "J1290",
        "county": "Evangeline Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Manuel 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490496,
        "projectNumber": "J1290",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Manuel 138 kV Substation",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 866,
      "normalized": {
        "queue_id": "J1252",
        "county": "Marquette County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Arnold - Perkins 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-02-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490497,
        "projectNumber": "J1252",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-02-08T05:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Marquette County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Arnold - Perkins 138 kV Line Tap",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 867,
      "normalized": {
        "queue_id": "J1259",
        "county": "Pike County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Colonial Pipeline - Kentwood 115 kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490498,
        "projectNumber": "J1259",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Pike County",
        "state": "MS",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Colonial Pipeline - Kentwood 115 kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 868,
      "normalized": {
        "queue_id": "J1261",
        "county": "Monroe County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Clarendon - Brinkley East 115kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490499,
        "projectNumber": "J1261",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-05T04:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Monroe County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Clarendon - Brinkley East 115kV Line",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 869,
      "normalized": {
        "queue_id": "J1260",
        "county": "Desha County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Dumas - Reed 115kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 164.0,
        "summer_net_mw": 164.0,
        "winter_net_mw": 164.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490500,
        "projectNumber": "J1260",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-05T04:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Desha County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Dumas - Reed 115kV Line",
        "summerNetMW": 164.0,
        "winterNetMW": 164.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 870,
      "normalized": {
        "queue_id": "J1313",
        "county": "Greene County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "161kV bus at Karma substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-26T05:00:00+00:00",
        "in_service": "2022-06-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490501,
        "projectNumber": "J1313",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2023-01-26T05:00:00+00:00",
        "inService": "2022-06-30T04:00:00+00:00",
        "giaToExec": "2023-01-26T05:00:00+00:00",
        "negInService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Greene County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "161kV bus at Karma substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 871,
      "normalized": {
        "queue_id": "J1324",
        "county": "Montgomery County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Midway 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-05-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490502,
        "projectNumber": "J1324",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-05-11T04:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Montgomery County",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Midway 138kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 872,
      "normalized": {
        "queue_id": "J1326",
        "county": "Dane County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Rockdale 345 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2025-06-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490503,
        "projectNumber": "J1326",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Dane County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rockdale 345 kV Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 873,
      "normalized": {
        "queue_id": "J1315",
        "county": "Cottonwood County,Murray County,Redwood County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lyon County - Cedar Mountain 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-09-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 600.0,
        "summer_net_mw": 600.0,
        "winter_net_mw": 600.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 600.0,
        "dp1_nris_mw": 600.0,
        "dp2_eris_mw": 600.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490504,
        "projectNumber": "J1315",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-09-01T04:00:00+00:00",
        "inService": "2022-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cottonwood County,Murray County,Redwood County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lyon County - Cedar Mountain 345 kV Line Tap",
        "summerNetMW": 600.0,
        "winterNetMW": 600.0,
        "dp1ErisMw": 600.0,
        "dp1NrisMw": 600.0,
        "dp2ErisMw": 600.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 874,
      "normalized": {
        "queue_id": "J1327",
        "county": "Ionia County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Marquette - Vergennes 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-02-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490505,
        "projectNumber": "J1327",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-02-08T05:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ionia County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Marquette - Vergennes 138 kV Line Tap",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 875,
      "normalized": {
        "queue_id": "J1318",
        "county": "Rush County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Rushville 69kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490506,
        "projectNumber": "J1318",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Rush County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rushville 69kV Substation",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 876,
      "normalized": {
        "queue_id": "J1333",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Schahfer - Burr Oak 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 199.5,
        "summer_net_mw": 199.5,
        "winter_net_mw": 199.5,
        "proposed_completion_date": "2024-06-15T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2022-07-27T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 199.5,
        "dp1_nris_mw": 199.5,
        "dp2_eris_mw": 199.5,
        "dp2_nris_mw": 199.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490507,
        "projectNumber": "J1333",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2022-07-27T04:00:00+00:00",
        "negInService": "2024-06-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Schahfer - Burr Oak 345kV Line",
        "summerNetMW": 199.5,
        "winterNetMW": 199.5,
        "dp1ErisMw": 199.5,
        "dp1NrisMw": 199.5,
        "dp2ErisMw": 199.5,
        "dp2NrisMw": 199.5,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 877,
      "normalized": {
        "queue_id": "J1292",
        "county": "Ionia County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Thompson Road 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2026-08-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": "2024-09-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2021-05-01T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 198.0,
        "dp1_nris_mw": 198.0,
        "dp2_eris_mw": 198.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490508,
        "projectNumber": "J1292",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2026-08-25T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2021-05-01T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ionia County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Thompson Road 138kV Substation",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 198.0,
        "dp1NrisMw": 198.0,
        "dp2ErisMw": 198.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 878,
      "normalized": {
        "queue_id": "J1323",
        "county": "LaGrange County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Lagrange 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": "2025-06-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 25.0,
        "dp1_nris_mw": 25.0,
        "dp2_eris_mw": 25.0,
        "dp2_nris_mw": 25.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490509,
        "projectNumber": "J1323",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "LaGrange County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lagrange 138 kV Substation",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 25.0,
        "dp1NrisMw": 25.0,
        "dp2ErisMw": 25.0,
        "dp2NrisMw": 25.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 879,
      "normalized": {
        "queue_id": "J1317",
        "county": "Sanilac County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Bennet 120kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-01-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490510,
        "projectNumber": "J1317",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-01-03T05:00:00+00:00",
        "inService": "2022-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Sanilac County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bennet 120kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 880,
      "normalized": {
        "queue_id": "J1329",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Majestic - Milan 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": "2025-10-30T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-10-31T04:00:00+00:00",
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-10-31T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 20.0,
        "dp2_nris_mw": 20.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490511,
        "projectNumber": "J1329",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-10-31T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2022-10-31T04:00:00+00:00",
        "negInService": "2025-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Majestic - Milan 345 kV Line Tap",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 20.0,
        "dp2NrisMw": 20.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 881,
      "normalized": {
        "queue_id": "J1325",
        "county": "Rock County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Magnolia 161 kV substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-08-23T04:00:00+00:00",
        "in_service": "2022-06-30T04:00:00+00:00",
        "gia_to_execute": "2022-08-23T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 80.0,
        "dp2_nris_mw": 72.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490512,
        "projectNumber": "J1325",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-23T04:00:00+00:00",
        "inService": "2022-06-30T04:00:00+00:00",
        "giaToExec": "2022-08-23T04:00:00+00:00",
        "negInService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Rock County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Magnolia 161 kV substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 80.0,
        "dp2NrisMw": 72.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 882,
      "normalized": {
        "queue_id": "J1314",
        "county": "Polk County",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE",
        "poi": "Apple River 161 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-08-26T04:00:00+00:00",
        "in_service": "2022-06-30T04:00:00+00:00",
        "gia_to_execute": "2022-08-26T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490513,
        "projectNumber": "J1314",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-26T04:00:00+00:00",
        "inService": "2022-06-30T04:00:00+00:00",
        "giaToExec": "2022-08-26T04:00:00+00:00",
        "negInService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE",
        "county": "Polk County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Apple River 161 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 883,
      "normalized": {
        "queue_id": "J1331",
        "county": "St. Clair County",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Greenwood 120 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-02-28T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2022-06-30T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490514,
        "projectNumber": "J1331",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2022-06-30T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2025-02-28T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "St. Clair County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greenwood 120 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 884,
      "normalized": {
        "queue_id": "J1321",
        "county": "Story County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "O'Brien - Kossuth 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 65.0,
        "summer_net_mw": 65.0,
        "winter_net_mw": 65.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 65.0,
        "dp1_nris_mw": 65.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490515,
        "projectNumber": "J1321",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-21T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Story County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "O'Brien - Kossuth 345 kV Line Tap",
        "summerNetMW": 65.0,
        "winterNetMW": 65.0,
        "dp1ErisMw": 65.0,
        "dp1NrisMw": 65.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 885,
      "normalized": {
        "queue_id": "J1316",
        "county": "Kenosha County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Paris 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2025-10-30T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490516,
        "projectNumber": "J1316",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2025-10-30T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Kenosha County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Paris 138 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 886,
      "normalized": {
        "queue_id": "J1346",
        "county": "Wayne County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Brownstown 345kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-05-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 382.0,
        "summer_net_mw": 334.0,
        "winter_net_mw": 382.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490517,
        "projectNumber": "J1346",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-05-29T04:00:00+00:00",
        "inService": "2022-01-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Wayne County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brownstown 345kV Substation",
        "summerNetMW": 334.0,
        "winterNetMW": 382.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 887,
      "normalized": {
        "queue_id": "J1344",
        "county": "Mills County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Hastings 69 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-03-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 48.0,
        "summer_net_mw": 48.0,
        "winter_net_mw": 48.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490518,
        "projectNumber": "J1344",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-03-05T05:00:00+00:00",
        "inService": "2022-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Mills County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hastings 69 kV Substation",
        "summerNetMW": 48.0,
        "winterNetMW": 48.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 888,
      "normalized": {
        "queue_id": "J1345",
        "county": "Dodge County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "North Beaver Dam 69kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-03-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 25.0,
        "dp1_nris_mw": 25.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490519,
        "projectNumber": "J1345",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-03-08T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Dodge County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Beaver Dam 69kV Substation",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 25.0,
        "dp1NrisMw": 25.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 889,
      "normalized": {
        "queue_id": "J1328",
        "county": "Grant County",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTPW",
        "poi": "Big Stone South 345kV Sub",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490520,
        "projectNumber": "J1328",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-22T05:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTPW",
        "county": "Grant County",
        "state": "SD",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Big Stone South 345kV Sub",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 890,
      "normalized": {
        "queue_id": "J1319",
        "county": "Huron County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Rapson 120kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 117.5,
        "summer_net_mw": 117.5,
        "winter_net_mw": 117.5,
        "proposed_completion_date": "2022-08-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2021-09-30T04:00:00+00:00",
        "gia_to_execute": "2022-02-21T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 117.5,
        "dp1_nris_mw": 117.5,
        "dp2_eris_mw": 112.0,
        "dp2_nris_mw": 112.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490521,
        "projectNumber": "J1319",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-09-30T04:00:00+00:00",
        "giaToExec": "2022-02-21T05:00:00+00:00",
        "negInService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Huron County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rapson 120kV Substation",
        "summerNetMW": 117.5,
        "winterNetMW": 117.5,
        "dp1ErisMw": 117.5,
        "dp1NrisMw": 117.5,
        "dp2ErisMw": 112.0,
        "dp2NrisMw": 112.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 891,
      "normalized": {
        "queue_id": "J1330",
        "county": "Randolph County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Baldwin 345kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490522,
        "projectNumber": "J1330",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Randolph County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Baldwin 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 892,
      "normalized": {
        "queue_id": "J1320",
        "county": "Branch County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Coldwater - Batavia 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-04-20T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-04-20T04:00:00+00:00",
        "gia_to_execute": "2022-11-15T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490523,
        "projectNumber": "J1320",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2019-04-20T04:00:00+00:00",
        "giaToExec": "2022-11-15T05:00:00+00:00",
        "negInService": "2025-04-20T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Coldwater - Batavia 138kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 893,
      "normalized": {
        "queue_id": "J1322",
        "county": "Eaton County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Battle Creek - Oneida 345kV Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-01-26T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490524,
        "projectNumber": "J1322",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-01-26T05:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Eaton County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Battle Creek - Oneida 345kV Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 894,
      "normalized": {
        "queue_id": "J1366",
        "county": "Eau Claire County",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Tremval - Seven Mile 161 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-04-02T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490525,
        "projectNumber": "J1366",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-04-02T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Eau Claire County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tremval - Seven Mile 161 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 895,
      "normalized": {
        "queue_id": "J1368",
        "county": "Pointe Coupee,Pointe Coupee Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Fancy Point - Waterloo 230 kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2021-11-30T05:00:00+00:00",
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2021-04-28T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 130.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 40.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490526,
        "projectNumber": "J1368",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-30T05:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2021-04-28T04:00:00+00:00",
        "negInService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Pointe Coupee,Pointe Coupee Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fancy Point - Waterloo 230 kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 130.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 40.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 896,
      "normalized": {
        "queue_id": "J1349",
        "county": "Cottonwood County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Crandall 345 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 335.0,
        "summer_net_mw": 335.0,
        "winter_net_mw": 335.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Wind",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 335.0,
        "dp1_nris_mw": 335.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490527,
        "projectNumber": "J1349",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-22T05:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cottonwood County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crandall 345 kV Substation",
        "summerNetMW": 335.0,
        "winterNetMW": 335.0,
        "dp1ErisMw": 335.0,
        "dp1NrisMw": 335.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Wind",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 897,
      "normalized": {
        "queue_id": "J1367",
        "county": "St. Mary,St. Mary Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Caneland 230kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 95.0,
        "summer_net_mw": 95.0,
        "winter_net_mw": 95.0,
        "proposed_completion_date": "2022-09-19T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-04-15T04:00:00+00:00",
        "in_service": "2021-07-01T04:00:00+00:00",
        "gia_to_execute": "2022-04-15T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 95.0,
        "dp1_nris_mw": 95.0,
        "dp2_eris_mw": 95.0,
        "dp2_nris_mw": 48.65,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490528,
        "projectNumber": "J1367",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-04-15T04:00:00+00:00",
        "inService": "2021-07-01T04:00:00+00:00",
        "giaToExec": "2022-04-15T04:00:00+00:00",
        "negInService": "2022-09-19T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "St. Mary,St. Mary Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Caneland 230kV Substation",
        "summerNetMW": 95.0,
        "winterNetMW": 95.0,
        "dp1ErisMw": 95.0,
        "dp1NrisMw": 95.0,
        "dp2ErisMw": 95.0,
        "dp2NrisMw": 48.65,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 898,
      "normalized": {
        "queue_id": "J1350",
        "county": "Monroe County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Milan – Monroe – Morocco 345 kV Point",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2023-04-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-04-20T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2022-10-31T04:00:00+00:00",
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": "2022-10-31T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490529,
        "projectNumber": "J1350",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2023-04-07T04:00:00+00:00",
        "doneDate": "2022-10-31T04:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "giaToExec": "2022-10-31T04:00:00+00:00",
        "negInService": "2025-04-20T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Monroe County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Milan – Monroe – Morocco 345 kV Point",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 899,
      "normalized": {
        "queue_id": "J1370",
        "county": "Chippewa County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "9 Mile SW STA - Dafter 69kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-03-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490530,
        "projectNumber": "J1370",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-03-08T05:00:00+00:00",
        "inService": "2021-03-01T05:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Chippewa County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "9 Mile SW STA - Dafter 69kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 900,
      "normalized": {
        "queue_id": "J1351",
        "county": "Madison Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Tallulah - Delhi 115kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490531,
        "projectNumber": "J1351",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-05T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Madison Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tallulah - Delhi 115kV Line Tap",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 901,
      "normalized": {
        "queue_id": "J1372",
        "county": "Pointe Coupee,Pointe Coupee Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Fancy Point - Waterloo 230 kV Line (J1368 POI)",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2021-11-30T05:00:00+00:00",
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2021-04-28T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 65.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 20.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490532,
        "projectNumber": "J1372",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-30T05:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2021-04-28T04:00:00+00:00",
        "negInService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Pointe Coupee,Pointe Coupee Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fancy Point - Waterloo 230 kV Line (J1368 POI)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 65.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 20.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 902,
      "normalized": {
        "queue_id": "J1373",
        "county": "White County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Griffithville - Searcy Price 115 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 95.0,
        "summer_net_mw": 95.0,
        "winter_net_mw": 95.0,
        "proposed_completion_date": "2023-03-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2021-03-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 95.0,
        "dp1_nris_mw": 80.75,
        "dp2_eris_mw": 95.0,
        "dp2_nris_mw": 80.75,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490533,
        "projectNumber": "J1373",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2021-03-17T04:00:00+00:00",
        "negInService": "2023-03-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "White County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Griffithville - Searcy Price 115 kV Line Tap",
        "summerNetMW": 95.0,
        "winterNetMW": 95.0,
        "dp1ErisMw": 95.0,
        "dp1NrisMw": 80.75,
        "dp2ErisMw": 95.0,
        "dp2NrisMw": 80.75,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 903,
      "normalized": {
        "queue_id": "J1369",
        "county": "Dubois County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Dubois - Culley 138kV line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 85.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490534,
        "projectNumber": "J1369",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-07-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Dubois County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Dubois - Culley 138kV line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 85.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 904,
      "normalized": {
        "queue_id": "J1352",
        "county": "Montgomery County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Spencer Creek - Montgomery 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2024-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490535,
        "projectNumber": "J1352",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Montgomery County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Spencer Creek - Montgomery 345kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 905,
      "normalized": {
        "queue_id": "J1374",
        "county": "Grant County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "ATC Ebenezer Sub on Lancaster-Eden 138kv line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 95.0,
        "summer_net_mw": 95.0,
        "winter_net_mw": 95.0,
        "proposed_completion_date": "2024-08-08T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": "2022-09-08T04:00:00+00:00",
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-09-09T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 67.2,
        "dp1_nris_mw": 67.2,
        "dp2_eris_mw": 67.2,
        "dp2_nris_mw": 67.2,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490536,
        "projectNumber": "J1374",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-09-08T04:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "giaToExec": "2022-09-09T04:00:00+00:00",
        "negInService": "2024-08-08T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Grant County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "ATC Ebenezer Sub on Lancaster-Eden 138kv line",
        "summerNetMW": 95.0,
        "winterNetMW": 95.0,
        "dp1ErisMw": 67.2,
        "dp1NrisMw": 67.2,
        "dp2ErisMw": 67.2,
        "dp2NrisMw": 67.2,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 906,
      "normalized": {
        "queue_id": "J1417",
        "county": "Worth County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ledyard - Colby 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490537,
        "projectNumber": "J1417",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-21T05:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Worth County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ledyard - Colby 345 kV Line Tap",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 907,
      "normalized": {
        "queue_id": "J1426",
        "county": "Benton County",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Benton County 115kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-08-26T04:00:00+00:00",
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-08-26T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490538,
        "projectNumber": "J1426",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-26T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-08-26T04:00:00+00:00",
        "negInService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Benton County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Benton County 115kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 908,
      "normalized": {
        "queue_id": "J1396",
        "county": "Pike County",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Ratts-Victory 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-08-20T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 60.0,
        "dp2_nris_mw": 60.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490539,
        "projectNumber": "J1396",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2024-08-20T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Pike County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ratts-Victory 161kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 60.0,
        "dp2NrisMw": 60.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 909,
      "normalized": {
        "queue_id": "J1347",
        "county": "Scott County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC",
        "poi": "Pelahatchie - Scott 115 kV Line Tap",
        "queue_date": "2019-04-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": "2023-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2021-03-22T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 175.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490540,
        "projectNumber": "J1347",
        "queueDate": "2019-04-26T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2021-03-22T04:00:00+00:00",
        "negInService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC",
        "county": "Scott County",
        "state": "MS",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Pelahatchie - Scott 115 kV Line Tap",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 175.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 910,
      "normalized": {
        "queue_id": "J1353",
        "county": "Lake County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Green Acres138kV Subtation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2023-09-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-05-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490541,
        "projectNumber": "J1353",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2023-09-05T04:00:00+00:00",
        "inService": "2023-05-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "Lake County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Green Acres138kV Subtation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 911,
      "normalized": {
        "queue_id": "J1365",
        "county": "Tama County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Traer 161-kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 169.4,
        "summer_net_mw": 169.4,
        "winter_net_mw": 169.4,
        "proposed_completion_date": "2024-09-06T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 169.4,
        "dp1_nris_mw": 169.4,
        "dp2_eris_mw": 169.4,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490542,
        "projectNumber": "J1365",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2023-01-26T05:00:00+00:00",
        "negInService": "2024-09-06T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Tama County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Traer 161-kV Substation",
        "summerNetMW": 169.4,
        "winterNetMW": 169.4,
        "dp1ErisMw": 169.4,
        "dp1NrisMw": 169.4,
        "dp2ErisMw": 169.4,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 912,
      "normalized": {
        "queue_id": "J1348",
        "county": "Vermillion County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Cayuga - Sugar Creek 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-04-20T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490543,
        "projectNumber": "J1348",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2025-04-20T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Vermillion County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cayuga - Sugar Creek 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 913,
      "normalized": {
        "queue_id": "J1427",
        "county": "Benton County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold 345kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490544,
        "projectNumber": "J1427",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Benton County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Duane Arnold 345kV Substation",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 914,
      "normalized": {
        "queue_id": "J1416",
        "county": "Worth County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Worth County - Glenworth 161 kV Line tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 149.0,
        "summer_net_mw": 149.0,
        "winter_net_mw": 149.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 149.0,
        "dp1_nris_mw": 149.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490545,
        "projectNumber": "J1416",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-21T05:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Worth County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Worth County - Glenworth 161 kV Line tap",
        "summerNetMW": 149.0,
        "winterNetMW": 149.0,
        "dp1ErisMw": 149.0,
        "dp1NrisMw": 149.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 915,
      "normalized": {
        "queue_id": "J1428",
        "county": "Cass County",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTPW",
        "poi": "Buffalo 345kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490546,
        "projectNumber": "J1428",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTPW",
        "county": "Cass County",
        "state": "ND",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Buffalo 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 916,
      "normalized": {
        "queue_id": "J1418",
        "county": "Pulaski County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Joppa-Joppa North Bus 161kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490547,
        "projectNumber": "J1418",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-01-02T05:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Pulaski County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Joppa-Joppa North Bus 161kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 917,
      "normalized": {
        "queue_id": "J1371",
        "county": "Yellow Medicine County",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTPW",
        "poi": "Astoria 345kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490548,
        "projectNumber": "J1371",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-07T05:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTPW",
        "county": "Yellow Medicine County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Astoria 345kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 918,
      "normalized": {
        "queue_id": "J1429",
        "county": "Juneau County",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPCM",
        "poi": "Whistiling Wings 69 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-05-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 24.0,
        "summer_net_mw": 24.0,
        "winter_net_mw": 24.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490549,
        "projectNumber": "J1429",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-05-18T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPCM",
        "county": "Juneau County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Whistiling Wings 69 kV Substation",
        "summerNetMW": 24.0,
        "winterNetMW": 24.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 919,
      "normalized": {
        "queue_id": "J1397",
        "county": "Juneau County",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPCM",
        "poi": "Whistling Wings 69 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-05-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490550,
        "projectNumber": "J1397",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-05-18T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPCM",
        "county": "Juneau County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Whistling Wings 69 kV Substation",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 920,
      "normalized": {
        "queue_id": "J1398",
        "county": "Pike County",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Ratts 161kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490551,
        "projectNumber": "J1398",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-12-01T05:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Pike County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ratts 161kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 921,
      "normalized": {
        "queue_id": "J1419",
        "county": "Greene County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport - Amo 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-05-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490552,
        "projectNumber": "J1419",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-05-20T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Greene County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Edwardsport - Amo 345 kV Line Tap",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 922,
      "normalized": {
        "queue_id": "J1432",
        "county": "Clinton County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Salem  - Rock Creek 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2025-09-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": "2022-10-31T04:00:00+00:00",
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-10-31T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490553,
        "projectNumber": "J1432",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-10-31T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-10-31T04:00:00+00:00",
        "negInService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Clinton County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Salem  - Rock Creek 345kV Line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 923,
      "normalized": {
        "queue_id": "J1421",
        "county": "East Feliciana Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Moler 230 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2024-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2021-10-20T04:00:00+00:00",
        "gia_to_execute": "2021-06-01T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 300.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490554,
        "projectNumber": "J1421",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-10-20T04:00:00+00:00",
        "giaToExec": "2021-06-01T04:00:00+00:00",
        "negInService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "East Feliciana Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Moler 230 kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 300.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 924,
      "normalized": {
        "queue_id": "J1433",
        "county": "Washington Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Lagen Holton-Franklinton 115kV (J1184)",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2019-10-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490555,
        "projectNumber": "J1433",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2019-10-22T04:00:00+00:00",
        "inService": "2021-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lagen Holton-Franklinton 115kV (J1184)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 925,
      "normalized": {
        "queue_id": "J1395",
        "county": "Lyon County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Hawks Nest Lake - Lyon County 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-09-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490556,
        "projectNumber": "J1395",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-09-01T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lyon County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hawks Nest Lake - Lyon County 345 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 926,
      "normalized": {
        "queue_id": "J1430",
        "county": "Calhoun County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Verona - Foundary 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490557,
        "projectNumber": "J1430",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Verona - Foundary 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 927,
      "normalized": {
        "queue_id": "J1436",
        "county": "Morehouse Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Oak Ridge 115 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2023-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2021-11-29T05:00:00+00:00",
        "in_service": "2022-11-15T05:00:00+00:00",
        "gia_to_execute": "2021-11-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490558,
        "projectNumber": "J1436",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-29T05:00:00+00:00",
        "inService": "2022-11-15T05:00:00+00:00",
        "giaToExec": "2021-11-30T05:00:00+00:00",
        "negInService": "2023-07-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Morehouse Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Oak Ridge 115 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 928,
      "normalized": {
        "queue_id": "J1431",
        "county": "St. James Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Vacherie 230kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-04-07T04:00:00+00:00",
        "in_service": "2021-06-01T04:00:00+00:00",
        "gia_to_execute": "2022-04-09T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 90.0,
        "dp1_nris_mw": 90.0,
        "dp2_eris_mw": 90.0,
        "dp2_nris_mw": 90.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490559,
        "projectNumber": "J1431",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-04-07T04:00:00+00:00",
        "inService": "2021-06-01T04:00:00+00:00",
        "giaToExec": "2022-04-09T04:00:00+00:00",
        "negInService": "2024-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "St. James Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Vacherie 230kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 90.0,
        "dp1NrisMw": 90.0,
        "dp2ErisMw": 90.0,
        "dp2NrisMw": 90.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 929,
      "normalized": {
        "queue_id": "J1420",
        "county": "Rock Island County",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Sub #107 69 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-03-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 48.0,
        "summer_net_mw": 48.0,
        "winter_net_mw": 48.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490560,
        "projectNumber": "J1420",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-03-05T05:00:00+00:00",
        "inService": "2022-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Rock Island County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sub #107 69 kV Substation",
        "summerNetMW": 48.0,
        "winterNetMW": 48.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 930,
      "normalized": {
        "queue_id": "J1439",
        "county": "Tunica County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Lula - Tunica 115 kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490561,
        "projectNumber": "J1439",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Tunica County",
        "state": "MS",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lula - Tunica 115 kV Line",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 931,
      "normalized": {
        "queue_id": "J1440",
        "county": "Tunica County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Lula - Tunica 115 kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": "2024-12-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-01-25T05:00:00+00:00",
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490562,
        "projectNumber": "J1440",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-01-25T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "giaToExec": "2022-01-26T05:00:00+00:00",
        "negInService": "2024-12-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Tunica County",
        "state": "MS",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lula - Tunica 115 kV Line",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 932,
      "normalized": {
        "queue_id": "J1445",
        "county": "Benton County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Mayhew Lake 115kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-10-04T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490563,
        "projectNumber": "J1445",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-10-04T04:00:00+00:00",
        "negInService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Benton County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mayhew Lake 115kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 933,
      "normalized": {
        "queue_id": "J1399",
        "county": "Ingham County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Delhi - Churchill - Tompkins  138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": "2025-03-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 90.0,
        "dp1_nris_mw": 90.0,
        "dp2_eris_mw": 90.0,
        "dp2_nris_mw": 90.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490564,
        "projectNumber": "J1399",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ingham County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Delhi - Churchill - Tompkins  138kV Line",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 90.0,
        "dp1NrisMw": 90.0,
        "dp2ErisMw": 90.0,
        "dp2NrisMw": 90.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 934,
      "normalized": {
        "queue_id": "J1438",
        "county": "Fayette County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Windsor - Hazelton 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-06-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490565,
        "projectNumber": "J1438",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-06-28T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Fayette County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Windsor - Hazelton 161kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 935,
      "normalized": {
        "queue_id": "J1402",
        "county": "Jackson County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Cash  - Newport AB161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2023-02-01T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": "2021-11-29T05:00:00+00:00",
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": "2021-11-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490566,
        "projectNumber": "J1402",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-29T05:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "giaToExec": "2021-11-30T05:00:00+00:00",
        "negInService": "2023-02-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Jackson County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cash  - Newport AB161kV Line",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 936,
      "normalized": {
        "queue_id": "J1441",
        "county": "Terrebonne Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Schriever 230 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-04-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-04-06T04:00:00+00:00",
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-04-02T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490567,
        "projectNumber": "J1441",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-04-19T04:00:00+00:00",
        "doneDate": "2022-04-06T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-04-02T04:00:00+00:00",
        "negInService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Terrebonne Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Schriever 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 937,
      "normalized": {
        "queue_id": "J1404",
        "county": "Sunflower County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Drew 115kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-07-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 167.0,
        "summer_net_mw": 167.0,
        "winter_net_mw": 167.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490568,
        "projectNumber": "J1404",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-07-23T04:00:00+00:00",
        "inService": "2022-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Sunflower County",
        "state": "MS",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Drew 115kV Substation",
        "summerNetMW": 167.0,
        "winterNetMW": 167.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 938,
      "normalized": {
        "queue_id": "J1442",
        "county": "Polk County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC.",
        "poi": "Rich (SHECO) - Livingston 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": "2025-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-08-04T04:00:00+00:00",
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-08-04T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 105.0,
        "dp1_nris_mw": 105.0,
        "dp2_eris_mw": 105.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490569,
        "projectNumber": "J1442",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-04T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "giaToExec": "2022-08-04T04:00:00+00:00",
        "negInService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC.",
        "county": "Polk County",
        "state": "TX",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Rich (SHECO) - Livingston 138 kV Line Tap",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 105.0,
        "dp1NrisMw": 105.0,
        "dp2ErisMw": 105.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 939,
      "normalized": {
        "queue_id": "J1400",
        "county": "Crittenden County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Marked Tree - Marion 161 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490570,
        "projectNumber": "J1400",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-07-30T04:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Marked Tree - Marion 161 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 940,
      "normalized": {
        "queue_id": "J1434",
        "county": "Monroe County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "J907 230kV Sub, Brinkley East - Aubrey 230 kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2024-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2022-01-25T05:00:00+00:00",
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490571,
        "projectNumber": "J1434",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-01-25T05:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-01-26T05:00:00+00:00",
        "negInService": "2024-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Monroe County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "J907 230kV Sub, Brinkley East - Aubrey 230 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 941,
      "normalized": {
        "queue_id": "J1423",
        "county": "Ottawa County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Campbell - Blendon 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-06-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490572,
        "projectNumber": "J1423",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-06-11T04:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Campbell - Blendon 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 942,
      "normalized": {
        "queue_id": "J1435",
        "county": "Dubuque County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Center Grove 161kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490573,
        "projectNumber": "J1435",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Dubuque County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Center Grove 161kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 943,
      "normalized": {
        "queue_id": "J1424",
        "county": "Beauregard Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cooper - Penton Road 230kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-09-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-11-29T05:00:00+00:00",
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2021-11-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490574,
        "projectNumber": "J1424",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-29T05:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2021-11-30T05:00:00+00:00",
        "negInService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Cooper - Penton Road 230kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 944,
      "normalized": {
        "queue_id": "J1425",
        "county": "Jefferson County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Pine Bluff International Paper 115 kV substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 114.0,
        "summer_net_mw": 114.0,
        "winter_net_mw": 114.0,
        "proposed_completion_date": "2022-05-19T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "In Service",
        "approval_date": "2022-01-27T05:00:00+00:00",
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": "2022-01-28T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 114.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 114.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490575,
        "projectNumber": "J1425",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-01-27T05:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "giaToExec": "2022-01-28T05:00:00+00:00",
        "negInService": "2022-05-19T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Jefferson County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Pine Bluff International Paper 115 kV substation",
        "summerNetMW": 114.0,
        "winterNetMW": 114.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 114.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 114.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 945,
      "normalized": {
        "queue_id": "J1443",
        "county": "Union County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Texas Eastern F SS - Strong SS 115 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-01-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490576,
        "projectNumber": "J1443",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-01-14T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Texas Eastern F SS - Strong SS 115 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 946,
      "normalized": {
        "queue_id": "J1444",
        "county": "Linn County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold 345kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2015-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490577,
        "projectNumber": "J1444",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2015-08-01T04:00:00+00:00",
        "negInService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Duane Arnold 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 947,
      "normalized": {
        "queue_id": "J1487",
        "county": "Freeborn County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Freeborn 161kV substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490578,
        "projectNumber": "J1487",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-18T05:00:00+00:00",
        "inService": "2021-05-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Freeborn County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Freeborn 161kV substation",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 948,
      "normalized": {
        "queue_id": "J1489",
        "county": "Ralls County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Maywood - Spencer Creek 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-05-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490579,
        "projectNumber": "J1489",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-05-22T04:00:00+00:00",
        "inService": "2024-03-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Ralls County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Maywood - Spencer Creek 345 kV Line Tap",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 949,
      "normalized": {
        "queue_id": "J1479",
        "county": "Des Moines County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Burlington 161 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490580,
        "projectNumber": "J1479",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-18T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Des Moines County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Burlington 161 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 950,
      "normalized": {
        "queue_id": "J1481",
        "county": "Howard County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Greentown 230 kV substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-08-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-15T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490581,
        "projectNumber": "J1481",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-15T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-08-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Howard County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greentown 230 kV substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 951,
      "normalized": {
        "queue_id": "J1476",
        "county": "Union County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Creston East 69 kV Substation (J1132)",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490582,
        "projectNumber": "J1476",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Union County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Creston East 69 kV Substation (J1132)",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 952,
      "normalized": {
        "queue_id": "J1480",
        "county": "Black Hawk County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Shawlis - Electric Farms 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-08-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490583,
        "projectNumber": "J1480",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-04-14T04:00:00+00:00",
        "inService": "2020-08-04T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Black Hawk County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Shawlis - Electric Farms 161kV Line",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 953,
      "normalized": {
        "queue_id": "J310",
        "county": "Dodge County,Steele County",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "West Owatonna-AL Corn Dist-Byron 161kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-02-11T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2017-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490584,
        "projectNumber": "J310",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-02-11T05:00:00+00:00",
        "inService": "2017-09-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Dodge County,Steele County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "West Owatonna-AL Corn Dist-Byron 161kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 954,
      "normalized": {
        "queue_id": "J662",
        "county": "Crittenden County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Marked Tree - Marion 161kV Line",
        "queue_date": "2016-07-11T04:00:00+00:00",
        "withdrawn_date": "2019-01-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.05,
        "summer_net_mw": 100.05,
        "winter_net_mw": 100.05,
        "proposed_completion_date": "2020-07-31T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2018-10-09T04:00:00+00:00",
        "in_service": "2018-10-15T04:00:00+00:00",
        "gia_to_execute": "2018-05-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.05,
        "dp1_nris_mw": 100.05,
        "dp2_eris_mw": 100.05,
        "dp2_nris_mw": 100.05,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490585,
        "projectNumber": "J662",
        "queueDate": "2016-07-11T04:00:00+00:00",
        "withdrawnDate": "2019-01-03T05:00:00+00:00",
        "doneDate": "2018-10-09T04:00:00+00:00",
        "inService": "2018-10-15T04:00:00+00:00",
        "giaToExec": "2018-05-15T04:00:00+00:00",
        "negInService": "2020-07-31T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Crittenden County",
        "state": "AR",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Marked Tree - Marion 161kV Line",
        "summerNetMW": 100.05,
        "winterNetMW": 100.05,
        "dp1ErisMw": 100.05,
        "dp1NrisMw": 100.05,
        "dp2ErisMw": 100.05,
        "dp2NrisMw": 100.05,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 955,
      "normalized": {
        "queue_id": "J635",
        "county": "Concordia Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub",
        "queue_date": "2016-05-09T04:00:00+00:00",
        "withdrawn_date": "2017-06-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2018-02-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490586,
        "projectNumber": "J635",
        "queueDate": "2016-05-09T04:00:00+00:00",
        "withdrawnDate": "2017-06-15T04:00:00+00:00",
        "inService": "2018-02-28T05:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Concordia Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tap - Entergy 115kV T-line Natchez/South Plantation (ID:668) 1mile from Plantation Sub",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 956,
      "normalized": {
        "queue_id": "J679",
        "county": "Carroll County",
        "state": "MS",
        "transmission_owner": "Entergy",
        "poi": "Greenwood - Winona 115kV",
        "queue_date": "2016-07-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-04-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2018-10-12T04:00:00+00:00",
        "in_service": "2018-05-15T04:00:00+00:00",
        "gia_to_execute": "2018-05-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490587,
        "projectNumber": "J679",
        "queueDate": "2016-07-11T04:00:00+00:00",
        "doneDate": "2018-10-12T04:00:00+00:00",
        "inService": "2018-05-15T04:00:00+00:00",
        "giaToExec": "2018-05-15T04:00:00+00:00",
        "negInService": "2021-04-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Carroll County",
        "state": "MS",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greenwood - Winona 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 957,
      "normalized": {
        "queue_id": "J1488",
        "county": "Randolph County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "McCredie - Montgomery 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 500.0,
        "dp2_nris_mw": 500.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490588,
        "projectNumber": "J1488",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2024-03-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Randolph County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "McCredie - Montgomery 345 kV Line Tap",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 500.0,
        "dp2NrisMw": 500.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 958,
      "normalized": {
        "queue_id": "J1477",
        "county": "Scott County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Sub 56 161 kV Substation (J1131)",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2024-10-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-26T05:00:00+00:00",
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490589,
        "projectNumber": "J1477",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2023-01-26T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "giaToExec": "2023-01-26T05:00:00+00:00",
        "negInService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Scott County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sub 56 161 kV Substation (J1131)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 959,
      "normalized": {
        "queue_id": "J1484",
        "county": "Union County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Texas Eastern F SS - Strong SS 115 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-01-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490590,
        "projectNumber": "J1484",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-01-14T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Texas Eastern F SS - Strong SS 115 kV Line Tap",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 960,
      "normalized": {
        "queue_id": "J203",
        "county": "Sanilac County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Greenwood - Banner 345kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2012-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490591,
        "projectNumber": "J203",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-09T05:00:00+00:00",
        "inService": "2012-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Sanilac County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greenwood - Banner 345kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 961,
      "normalized": {
        "queue_id": "J659",
        "county": "Franklin Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Winnsboro to Gilbert 115 kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490592,
        "projectNumber": "J659",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2019-04-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Franklin Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Winnsboro to Gilbert 115 kV line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 962,
      "normalized": {
        "queue_id": "J628",
        "county": "Grand Forks County,Nelson County",
        "state": "ND",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Ramsey - Prairie 230kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-11-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": "2021-09-12T04:00:00+00:00",
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2021-09-13T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 400.0,
        "dp2_eris_mw": 400.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490593,
        "projectNumber": "J628",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-11-09T05:00:00+00:00",
        "doneDate": "2021-09-12T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2021-09-13T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Grand Forks County,Nelson County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Ramsey - Prairie 230kV Line Tap",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 400.0,
        "dp2ErisMw": 400.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 963,
      "normalized": {
        "queue_id": "J680",
        "county": "Ashley County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Crosset West 115kV Substation",
        "queue_date": "2016-07-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-04-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2018-10-09T04:00:00+00:00",
        "in_service": "2018-04-15T04:00:00+00:00",
        "gia_to_execute": "2018-05-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490594,
        "projectNumber": "J680",
        "queueDate": "2016-07-11T04:00:00+00:00",
        "doneDate": "2018-10-09T04:00:00+00:00",
        "inService": "2018-04-15T04:00:00+00:00",
        "giaToExec": "2018-05-15T04:00:00+00:00",
        "negInService": "2021-04-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Ashley County",
        "state": "AR",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crosset West 115kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 964,
      "normalized": {
        "queue_id": "J683",
        "county": "West Baton Rouge Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Wilbert - Livonia 138kV Substation (~1.5 mi from Wilbert)",
        "queue_date": "2016-07-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2020-01-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2018-09-11T04:00:00+00:00",
        "in_service": "2018-02-28T05:00:00+00:00",
        "gia_to_execute": "2018-05-14T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490595,
        "projectNumber": "J683",
        "queueDate": "2016-07-11T04:00:00+00:00",
        "doneDate": "2018-09-11T04:00:00+00:00",
        "inService": "2018-02-28T05:00:00+00:00",
        "giaToExec": "2018-05-14T04:00:00+00:00",
        "negInService": "2020-01-31T05:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "West Baton Rouge Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wilbert - Livonia 138kV Substation (~1.5 mi from Wilbert)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 965,
      "normalized": {
        "queue_id": "J1483",
        "county": "Iowa County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Hill Valley 345 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-09-09T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 99.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490596,
        "projectNumber": "J1483",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "giaToExec": "2022-09-09T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Iowa County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Hill Valley 345 kV Substation",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 99.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 966,
      "normalized": {
        "queue_id": "J1485",
        "county": "Deuel County",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTPW",
        "poi": "Astoria 345 kV Substation (J493/J510)",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2027-10-30T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490597,
        "projectNumber": "J1485",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "negInService": "2027-10-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTPW",
        "county": "Deuel County",
        "state": "SD",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Astoria 345 kV Substation (J493/J510)",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 967,
      "normalized": {
        "queue_id": "J636",
        "county": "Rapides Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Shady Oaks - Coughlin 138kV Line",
        "queue_date": "2016-05-09T04:00:00+00:00",
        "withdrawn_date": "2017-06-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 52.0,
        "summer_net_mw": 52.0,
        "winter_net_mw": 52.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2016-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490598,
        "projectNumber": "J636",
        "queueDate": "2016-05-09T04:00:00+00:00",
        "withdrawnDate": "2017-06-20T04:00:00+00:00",
        "inService": "2016-05-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "Rapides Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Shady Oaks - Coughlin 138kV Line",
        "summerNetMW": 52.0,
        "winterNetMW": 52.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 968,
      "normalized": {
        "queue_id": "J444",
        "county": "Wayne County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Waterman/Navarre 230kV",
        "queue_date": "2015-05-07T04:00:00+00:00",
        "withdrawn_date": "2018-04-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 235.0,
        "summer_net_mw": 235.0,
        "winter_net_mw": 235.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2017-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490599,
        "projectNumber": "J444",
        "queueDate": "2015-05-07T04:00:00+00:00",
        "withdrawnDate": "2018-04-12T04:00:00+00:00",
        "inService": "2017-01-31T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Wayne County",
        "state": "MI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Waterman/Navarre 230kV",
        "summerNetMW": 235.0,
        "winterNetMW": 235.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 969,
      "normalized": {
        "queue_id": "J663",
        "county": "Phillips County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Robert E Ritchie 230kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2022-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-03-20T04:00:00+00:00",
        "in_service": "2018-10-01T04:00:00+00:00",
        "gia_to_execute": "2019-10-03T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490600,
        "projectNumber": "J663",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-03-20T04:00:00+00:00",
        "inService": "2018-10-01T04:00:00+00:00",
        "giaToExec": "2019-10-03T04:00:00+00:00",
        "negInService": "2022-05-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Phillips County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Robert E Ritchie 230kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 970,
      "normalized": {
        "queue_id": "J441",
        "county": "Dodge County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Byron 345 kV Substation",
        "queue_date": "2015-04-15T04:00:00+00:00",
        "withdrawn_date": "2019-08-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": "2019-09-18T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2018-09-01T04:00:00+00:00",
        "gia_to_execute": "2017-11-27T05:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 170.0,
        "dp2_nris_mw": 170.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490601,
        "projectNumber": "J441",
        "queueDate": "2015-04-15T04:00:00+00:00",
        "withdrawnDate": "2019-08-09T04:00:00+00:00",
        "inService": "2018-09-01T04:00:00+00:00",
        "giaToExec": "2017-11-27T05:00:00+00:00",
        "negInService": "2019-09-18T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dodge County",
        "state": "MN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Byron 345 kV Substation",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 170.0,
        "dp2NrisMw": 170.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 971,
      "normalized": {
        "queue_id": "J447",
        "county": "Cerro Gordo County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Emery 161 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-10-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490602,
        "projectNumber": "J447",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-10-24T04:00:00+00:00",
        "inService": "2021-07-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Emery 161 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 972,
      "normalized": {
        "queue_id": "J467",
        "county": "Douglas County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Sidnay-Kansas 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 102.0,
        "summer_net_mw": 102.0,
        "winter_net_mw": 102.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2017-11-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490603,
        "projectNumber": "J467",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2017-11-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Douglas County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sidnay-Kansas 345kV Line",
        "summerNetMW": 102.0,
        "winterNetMW": 102.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 973,
      "normalized": {
        "queue_id": "J697",
        "county": "Morehouse Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Oak Ridge 115 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2022-10-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2019-11-25T05:00:00+00:00",
        "in_service": "2022-10-15T04:00:00+00:00",
        "gia_to_execute": "2019-06-03T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490604,
        "projectNumber": "J697",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-11-25T05:00:00+00:00",
        "inService": "2022-10-15T04:00:00+00:00",
        "giaToExec": "2019-06-03T04:00:00+00:00",
        "negInService": "2022-10-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Morehouse Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Oak Ridge 115 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 974,
      "normalized": {
        "queue_id": "J647",
        "county": "Muskegon County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BC Cobb - Four Mile 138kV Line",
        "queue_date": "2016-06-20T04:00:00+00:00",
        "withdrawn_date": "2018-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 147.4,
        "summer_net_mw": 147.4,
        "winter_net_mw": 147.4,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 124.95,
        "dp1_nris_mw": 124.95,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490605,
        "projectNumber": "J647",
        "queueDate": "2016-06-20T04:00:00+00:00",
        "withdrawnDate": "2018-09-06T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon County",
        "state": "MI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "BC Cobb - Four Mile 138kV Line",
        "summerNetMW": 147.4,
        "winterNetMW": 147.4,
        "dp1ErisMw": 124.95,
        "dp1NrisMw": 124.95,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 975,
      "normalized": {
        "queue_id": "J646",
        "county": "Macomb County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Carbon - connecting to ITC at Jewel, St-Clair and Spokane substations",
        "queue_date": "2016-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 1.6,
        "summer_net_mw": 1.6,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2010-07-01T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-04-26T04:00:00+00:00",
        "in_service": "2010-07-01T04:00:00+00:00",
        "gia_to_execute": "2018-12-12T05:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 1.6,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 1.6,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490606,
        "projectNumber": "J646",
        "queueDate": "2016-06-16T04:00:00+00:00",
        "doneDate": "2019-04-26T04:00:00+00:00",
        "inService": "2010-07-01T04:00:00+00:00",
        "giaToExec": "2018-12-12T05:00:00+00:00",
        "negInService": "2010-07-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Macomb County",
        "state": "MI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Carbon - connecting to ITC at Jewel, St-Clair and Spokane substations",
        "summerNetMW": 1.6,
        "winterNetMW": 0.0,
        "dp1ErisMw": 1.6,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 1.6,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 976,
      "normalized": {
        "queue_id": "J478",
        "county": "Clinton County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Thorntown - New London - Kokomo 230kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2018-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490607,
        "projectNumber": "J478",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-04-17T04:00:00+00:00",
        "inService": "2018-07-01T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Clinton County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Thorntown - New London - Kokomo 230kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 977,
      "normalized": {
        "queue_id": "J771",
        "county": "Stearns County",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Lake Koronis-Paynesville 69kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490608,
        "projectNumber": "J771",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2019-07-31T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Stearns County",
        "state": "MN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lake Koronis-Paynesville 69kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 978,
      "normalized": {
        "queue_id": "J746",
        "county": "McHenry County,McLean County,Ward County",
        "state": "ND",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Stanton-McHenry 230kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-08-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490609,
        "projectNumber": "J746",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-08-09T04:00:00+00:00",
        "inService": "2020-08-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "McHenry County,McLean County,Ward County",
        "state": "ND",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stanton-McHenry 230kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 979,
      "normalized": {
        "queue_id": "J640",
        "county": "St. Helena Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Amite - Liberty 115kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490610,
        "projectNumber": "J640",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2019-04-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "St. Helena Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Amite - Liberty 115kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 980,
      "normalized": {
        "queue_id": "J458",
        "county": "Clark County",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "On proposed Big Stone-Ellendale 345 kV line approx. 76 miles west of Big Stone",
        "queue_date": "2015-05-18T04:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490611,
        "projectNumber": "J458",
        "queueDate": "2015-05-18T04:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2019-09-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Clark County",
        "state": "SD",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "On proposed Big Stone-Ellendale 345 kV line approx. 76 miles west of Big Stone",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 981,
      "normalized": {
        "queue_id": "J776",
        "county": "Franklin County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Black Hawk-Killdeer 345kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490612,
        "projectNumber": "J776",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2019-11-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Franklin County",
        "state": "IA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Black Hawk-Killdeer 345kV",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 982,
      "normalized": {
        "queue_id": "J748",
        "county": "Plymouth County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Highland - Raun 345kV Line Tap",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2021-10-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2020-03-20T04:00:00+00:00",
        "in_service": "2020-10-01T04:00:00+00:00",
        "gia_to_execute": "2019-10-14T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 175.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490613,
        "projectNumber": "J748",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "doneDate": "2020-03-20T04:00:00+00:00",
        "inService": "2020-10-01T04:00:00+00:00",
        "giaToExec": "2019-10-14T04:00:00+00:00",
        "negInService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Plymouth County",
        "state": "IA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Highland - Raun 345kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 175.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 983,
      "normalized": {
        "queue_id": "J698",
        "county": "Chicot County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Lake Village Bagby 115 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2015-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490614,
        "projectNumber": "J698",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2015-11-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Chicot County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lake Village Bagby 115 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 984,
      "normalized": {
        "queue_id": "J779",
        "county": "Emmons County,Logan County",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "Bismarck-Linton 115kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-08-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 51.0,
        "summer_net_mw": 51.0,
        "winter_net_mw": 51.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.4,
        "dp1_nris_mw": 50.4,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490615,
        "projectNumber": "J779",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-08-09T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "Emmons County,Logan County",
        "state": "ND",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bismarck-Linton 115kV",
        "summerNetMW": 51.0,
        "winterNetMW": 51.0,
        "dp1ErisMw": 50.4,
        "dp1NrisMw": 50.4,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 985,
      "normalized": {
        "queue_id": "J782",
        "county": "Stoddard County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Stoddart sub 161kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2018-05-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490616,
        "projectNumber": "J782",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2018-05-31T04:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Stoddard County",
        "state": "MO",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stoddart sub 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 986,
      "normalized": {
        "queue_id": "J783",
        "county": "Spencer County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Grandview Sub",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": "2021-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-07-24T04:00:00+00:00",
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": "2019-04-18T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 70.0,
        "dp1_nris_mw": 69.9,
        "dp2_eris_mw": 70.0,
        "dp2_nris_mw": 69.9,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490617,
        "projectNumber": "J783",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "doneDate": "2019-07-24T04:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "giaToExec": "2019-04-18T04:00:00+00:00",
        "negInService": "2021-04-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Spencer County",
        "state": "IN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Grandview Sub",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 70.0,
        "dp1NrisMw": 69.9,
        "dp2ErisMw": 70.0,
        "dp2NrisMw": 69.9,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 987,
      "normalized": {
        "queue_id": "J749",
        "county": "Gratiot County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Redstone 138 kV Substation",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2018-05-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2018-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490618,
        "projectNumber": "J749",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2018-05-01T04:00:00+00:00",
        "inService": "2018-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot County",
        "state": "MI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Redstone 138 kV Substation",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 988,
      "normalized": {
        "queue_id": "J753",
        "county": "Breckinridge County",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION",
        "poi": "Hardinsburg Sub 161kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2025-10-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-03-08T05:00:00+00:00",
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": "2018-11-13T05:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490619,
        "projectNumber": "J753",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2025-10-31T04:00:00+00:00",
        "doneDate": "2019-03-08T05:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "giaToExec": "2018-11-13T05:00:00+00:00",
        "negInService": "2021-04-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION",
        "county": "Breckinridge County",
        "state": "KY",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hardinsburg Sub 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 989,
      "normalized": {
        "queue_id": "J785",
        "county": "Jackson County,Martin County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lakefield Junction - Huntley 345 kV line (Tap)",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 105.0,
        "summer_net_mw": 105.0,
        "winter_net_mw": 105.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 105.0,
        "dp1_nris_mw": 105.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490620,
        "projectNumber": "J785",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Jackson County,Martin County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lakefield Junction - Huntley 345 kV line (Tap)",
        "summerNetMW": 105.0,
        "winterNetMW": 105.0,
        "dp1ErisMw": 105.0,
        "dp1NrisMw": 105.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 990,
      "normalized": {
        "queue_id": "J793",
        "county": "St. Clair County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Belle River - Fitz #2 345 kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 1175.0,
        "summer_net_mw": 1175.0,
        "winter_net_mw": 1175.0,
        "proposed_completion_date": "2021-05-14T04:00:00+00:00",
        "generation_type": "Combined Cycle",
        "facility_type": "Combined Cycle",
        "post_gia_status": "In Service",
        "approval_date": "2020-10-26T04:00:00+00:00",
        "in_service": "2021-05-14T04:00:00+00:00",
        "gia_to_execute": "2019-05-06T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 1209.0,
        "dp1_nris_mw": 1209.0,
        "dp2_eris_mw": 1209.0,
        "dp2_nris_mw": 1175.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490621,
        "projectNumber": "J793",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-10-26T04:00:00+00:00",
        "inService": "2021-05-14T04:00:00+00:00",
        "giaToExec": "2019-05-06T04:00:00+00:00",
        "negInService": "2021-05-14T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "St. Clair County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Belle River - Fitz #2 345 kV Line Tap",
        "summerNetMW": 1175.0,
        "winterNetMW": 1175.0,
        "dp1ErisMw": 1209.0,
        "dp1NrisMw": 1209.0,
        "dp2ErisMw": 1209.0,
        "dp2NrisMw": 1175.0,
        "fuelType": "Combined Cycle",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 991,
      "normalized": {
        "queue_id": "J794",
        "county": "Gratiot County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "J589 138kV Substation (Regal - Summerton 138kV Line)",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 12.5,
        "summer_net_mw": 12.5,
        "winter_net_mw": 12.5,
        "proposed_completion_date": "2018-10-26T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2020-06-18T04:00:00+00:00",
        "in_service": "2018-09-10T04:00:00+00:00",
        "gia_to_execute": "2018-02-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 12.5,
        "dp1_nris_mw": 12.5,
        "dp2_eris_mw": 12.5,
        "dp2_nris_mw": 12.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490622,
        "projectNumber": "J794",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-06-18T04:00:00+00:00",
        "inService": "2018-09-10T04:00:00+00:00",
        "giaToExec": "2018-02-06T05:00:00+00:00",
        "negInService": "2018-10-26T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "J589 138kV Substation (Regal - Summerton 138kV Line)",
        "summerNetMW": 12.5,
        "winterNetMW": 12.5,
        "dp1ErisMw": 12.5,
        "dp1NrisMw": 12.5,
        "dp2ErisMw": 12.5,
        "dp2NrisMw": 12.5,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 992,
      "normalized": {
        "queue_id": "J757",
        "county": "Morgan County,Sangamon County",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Austin-Meredosia 345kV line",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 303.6,
        "summer_net_mw": 303.6,
        "winter_net_mw": 303.6,
        "proposed_completion_date": "2021-10-31T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-05-31T04:00:00+00:00",
        "in_service": "2020-08-14T04:00:00+00:00",
        "gia_to_execute": "2019-01-07T05:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 303.6,
        "dp1_nris_mw": 303.6,
        "dp2_eris_mw": 303.6,
        "dp2_nris_mw": 303.6,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490623,
        "projectNumber": "J757",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "doneDate": "2019-05-31T04:00:00+00:00",
        "inService": "2020-08-14T04:00:00+00:00",
        "giaToExec": "2019-01-07T05:00:00+00:00",
        "negInService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Morgan County,Sangamon County",
        "state": "IL",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Austin-Meredosia 345kV line",
        "summerNetMW": 303.6,
        "winterNetMW": 303.6,
        "dp1ErisMw": 303.6,
        "dp1NrisMw": 303.6,
        "dp2ErisMw": 303.6,
        "dp2NrisMw": 303.6,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 993,
      "normalized": {
        "queue_id": "J1437",
        "county": "Carroll County",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION",
        "poi": "AECC Dry Creek 161kV Switchyard Station",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": "2024-05-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-12-22T05:00:00+00:00",
        "in_service": "2021-04-30T04:00:00+00:00",
        "gia_to_execute": "2021-11-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 180.0,
        "dp2_nris_mw": 180.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490624,
        "projectNumber": "J1437",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-12-22T05:00:00+00:00",
        "inService": "2021-04-30T04:00:00+00:00",
        "giaToExec": "2021-11-30T05:00:00+00:00",
        "negInService": "2024-05-01T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION",
        "county": "Carroll County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "AECC Dry Creek 161kV Switchyard Station",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 180.0,
        "dp2NrisMw": 180.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 994,
      "normalized": {
        "queue_id": "J1422",
        "county": "Edwards County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Albion - Olney 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-10-20T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490625,
        "projectNumber": "J1422",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-10-20T04:00:00+00:00",
        "negInService": "2024-10-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Edwards County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Albion - Olney 138 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 995,
      "normalized": {
        "queue_id": "J1401",
        "county": "Branch County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Batavia - Wagner 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2023-11-17T05:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490626,
        "projectNumber": "J1401",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2023-11-17T05:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2024-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Batavia - Wagner 138kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 996,
      "normalized": {
        "queue_id": "J1403",
        "county": "Ionia County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Marquette 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-03-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490627,
        "projectNumber": "J1403",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-03-08T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ionia County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Marquette 138 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 997,
      "normalized": {
        "queue_id": "J1478",
        "county": "Des Moines County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Huntwoods 69 kV substation (J1135)",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 25.0,
        "dp1_nris_mw": 25.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490628,
        "projectNumber": "J1478",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-18T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Des Moines County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Huntwoods 69 kV substation (J1135)",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 25.0,
        "dp1NrisMw": 25.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 998,
      "normalized": {
        "queue_id": "J1482",
        "county": "White County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Monticello - Springboro 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-15T04:00:00+00:00",
        "gia_to_execute": "2022-06-27T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490629,
        "projectNumber": "J1482",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-15T04:00:00+00:00",
        "giaToExec": "2022-06-27T04:00:00+00:00",
        "negInService": "2024-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "White County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Monticello - Springboro 138 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 999,
      "normalized": {
        "queue_id": "J1490",
        "county": "Randolph County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "McCredie - Montgomery 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 1000.0,
        "summer_net_mw": 1000.0,
        "winter_net_mw": 1000.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 1000.0,
        "dp1_nris_mw": 1000.0,
        "dp2_eris_mw": 1000.0,
        "dp2_nris_mw": 940.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490630,
        "projectNumber": "J1490",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2024-03-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Randolph County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "McCredie - Montgomery 345 kV Line Tap",
        "summerNetMW": 1000.0,
        "winterNetMW": 1000.0,
        "dp1ErisMw": 1000.0,
        "dp1NrisMw": 1000.0,
        "dp2ErisMw": 1000.0,
        "dp2NrisMw": 940.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1000,
      "normalized": {
        "queue_id": "J632",
        "county": "Berrien County,Van Buren County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Argenta - Plaisades 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2018-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490631,
        "projectNumber": "J632",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-09T05:00:00+00:00",
        "inService": "2018-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Berrien County,Van Buren County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Argenta - Plaisades 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1001,
      "normalized": {
        "queue_id": "J418",
        "county": "Polk County",
        "state": "TX",
        "transmission_owner": "Entergy",
        "poi": "Rich - Livingston 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2016-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490632,
        "projectNumber": "J418",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2016-11-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Polk County",
        "state": "TX",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rich - Livingston 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1002,
      "normalized": {
        "queue_id": "J639",
        "county": "West Baton Rouge Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Addis - Big Cajun 230kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2022-10-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2020-11-25T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2019-12-02T05:00:00+00:00",
        "in_service": "2019-04-01T04:00:00+00:00",
        "gia_to_execute": "2019-06-03T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490633,
        "projectNumber": "J639",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2022-10-31T04:00:00+00:00",
        "doneDate": "2019-12-02T05:00:00+00:00",
        "inService": "2019-04-01T04:00:00+00:00",
        "giaToExec": "2019-06-03T04:00:00+00:00",
        "negInService": "2020-11-25T05:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "West Baton Rouge Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Addis - Big Cajun 230kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1003,
      "normalized": {
        "queue_id": "J687",
        "county": "Orleans Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Nasa 115kV Substation",
        "queue_date": "2016-07-11T04:00:00+00:00",
        "withdrawn_date": "2017-02-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490634,
        "projectNumber": "J687",
        "queueDate": "2016-07-11T04:00:00+00:00",
        "withdrawnDate": "2017-02-17T05:00:00+00:00",
        "inService": "2019-06-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Orleans Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Nasa 115kV Substation",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1004,
      "normalized": {
        "queue_id": "J701",
        "county": "Tuscola County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Rapson - Grasssmere - Bauer 345kV Line Tap (Kirk 345 kV Sub)",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 49.0,
        "summer_net_mw": 49.0,
        "winter_net_mw": 49.0,
        "proposed_completion_date": "2018-10-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2020-05-06T04:00:00+00:00",
        "in_service": "2017-09-15T04:00:00+00:00",
        "gia_to_execute": "2018-04-24T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 49.0,
        "dp1_nris_mw": 49.0,
        "dp2_eris_mw": 49.0,
        "dp2_nris_mw": 49.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490635,
        "projectNumber": "J701",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-05-06T04:00:00+00:00",
        "inService": "2017-09-15T04:00:00+00:00",
        "giaToExec": "2018-04-24T04:00:00+00:00",
        "negInService": "2018-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Tuscola County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rapson - Grasssmere - Bauer 345kV Line Tap (Kirk 345 kV Sub)",
        "summerNetMW": 49.0,
        "winterNetMW": 49.0,
        "dp1ErisMw": 49.0,
        "dp1NrisMw": 49.0,
        "dp2ErisMw": 49.0,
        "dp2NrisMw": 49.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1005,
      "normalized": {
        "queue_id": "J658",
        "county": "Audrain County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Spencer Creek 345 kV Substation",
        "queue_date": "2016-07-07T04:00:00+00:00",
        "withdrawn_date": "2017-06-21T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.05,
        "summer_net_mw": 100.05,
        "winter_net_mw": 100.05,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2018-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490636,
        "projectNumber": "J658",
        "queueDate": "2016-07-07T04:00:00+00:00",
        "withdrawnDate": "2017-06-21T04:00:00+00:00",
        "inService": "2018-09-15T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Audrain County",
        "state": "MO",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Spencer Creek 345 kV Substation",
        "summerNetMW": 100.05,
        "winterNetMW": 100.05,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1006,
      "normalized": {
        "queue_id": "J747",
        "county": "Deuel County",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Brooking County - Big Stone South (J510 Tap - J630 Tap) 345kV Line",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2017-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490637,
        "projectNumber": "J747",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2017-10-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Deuel County",
        "state": "SD",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brooking County - Big Stone South (J510 Tap - J630 Tap) 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1007,
      "normalized": {
        "queue_id": "J657",
        "county": "Manitowoc County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Kewaunee - Shoto 138kV Line (at the existing Mishicot Tap)",
        "queue_date": "2016-07-08T04:00:00+00:00",
        "withdrawn_date": "2018-04-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.8,
        "summer_net_mw": 100.8,
        "winter_net_mw": 100.8,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490638,
        "projectNumber": "J657",
        "queueDate": "2016-07-08T04:00:00+00:00",
        "withdrawnDate": "2018-04-10T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Manitowoc County",
        "state": "WI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kewaunee - Shoto 138kV Line (at the existing Mishicot Tap)",
        "summerNetMW": 100.8,
        "winterNetMW": 100.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1008,
      "normalized": {
        "queue_id": "J777",
        "county": "Franklin County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Whispering Willow 161kV substation",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-08-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490639,
        "projectNumber": "J777",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-08-09T04:00:00+00:00",
        "inService": "2019-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin County",
        "state": "IA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Whispering Willow 161kV substation",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1009,
      "normalized": {
        "queue_id": "J780",
        "county": "Sheridan County",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Harvey - Underwood 230kV Line",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490640,
        "projectNumber": "J780",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2020-12-15T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Sheridan County",
        "state": "ND",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Harvey - Underwood 230kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1010,
      "normalized": {
        "queue_id": "J752",
        "county": "Tuscola County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ringle 345kV Switchyard",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2019-10-04T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-10-10T04:00:00+00:00",
        "in_service": "2020-01-02T05:00:00+00:00",
        "gia_to_execute": "2019-05-13T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490641,
        "projectNumber": "J752",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "doneDate": "2019-10-10T04:00:00+00:00",
        "inService": "2020-01-02T05:00:00+00:00",
        "giaToExec": "2019-05-13T04:00:00+00:00",
        "negInService": "2019-10-04T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Tuscola County",
        "state": "MI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ringle 345kV Switchyard",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1011,
      "normalized": {
        "queue_id": "J756",
        "county": "Logan County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mason City to Fogarty 138kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 202.4,
        "summer_net_mw": 202.4,
        "winter_net_mw": 202.4,
        "proposed_completion_date": "2020-04-23T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-03-26T04:00:00+00:00",
        "in_service": "2019-08-15T04:00:00+00:00",
        "gia_to_execute": "2018-11-13T05:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 202.4,
        "dp1_nris_mw": 202.4,
        "dp2_eris_mw": 202.4,
        "dp2_nris_mw": 202.4,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490642,
        "projectNumber": "J756",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "doneDate": "2019-03-26T04:00:00+00:00",
        "inService": "2019-08-15T04:00:00+00:00",
        "giaToExec": "2018-11-13T05:00:00+00:00",
        "negInService": "2020-04-23T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Logan County",
        "state": "IL",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mason City to Fogarty 138kV",
        "summerNetMW": 202.4,
        "winterNetMW": 202.4,
        "dp1ErisMw": 202.4,
        "dp1NrisMw": 202.4,
        "dp2ErisMw": 202.4,
        "dp2NrisMw": 202.4,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1012,
      "normalized": {
        "queue_id": "J836",
        "county": "Kossuth County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ledyard 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-09-30T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2021-05-19T04:00:00+00:00",
        "in_service": "2021-11-01T04:00:00+00:00",
        "gia_to_execute": "2021-05-19T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490643,
        "projectNumber": "J836",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2021-05-19T04:00:00+00:00",
        "inService": "2021-11-01T04:00:00+00:00",
        "giaToExec": "2021-05-19T04:00:00+00:00",
        "negInService": "2022-09-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Kossuth County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Ledyard 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1013,
      "normalized": {
        "queue_id": "J750",
        "county": "Morgan County",
        "state": "IL",
        "transmission_owner": "City of Springfield, IL - CWLP",
        "poi": "Westchester 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2025-07-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2022-05-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2020-01-14T05:00:00+00:00",
        "in_service": "2019-08-15T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490644,
        "projectNumber": "J750",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2025-07-07T04:00:00+00:00",
        "doneDate": "2020-01-14T05:00:00+00:00",
        "inService": "2019-08-15T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2022-05-15T04:00:00+00:00",
        "transmissionOwner": "City of Springfield, IL - CWLP",
        "county": "Morgan County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Westchester 138kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1014,
      "normalized": {
        "queue_id": "J754",
        "county": "Montgomery County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Cayuga - Nucor 345kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2020-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 303.6,
        "summer_net_mw": 303.6,
        "winter_net_mw": 303.6,
        "proposed_completion_date": "2020-04-30T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2019-04-11T04:00:00+00:00",
        "in_service": "2019-03-08T05:00:00+00:00",
        "gia_to_execute": "2018-11-13T05:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 303.6,
        "dp1_nris_mw": 303.6,
        "dp2_eris_mw": 303.6,
        "dp2_nris_mw": 303.6,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490645,
        "projectNumber": "J754",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2020-09-30T04:00:00+00:00",
        "doneDate": "2019-04-11T04:00:00+00:00",
        "inService": "2019-03-08T05:00:00+00:00",
        "giaToExec": "2018-11-13T05:00:00+00:00",
        "negInService": "2020-04-30T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Montgomery County",
        "state": "IN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cayuga - Nucor 345kV",
        "summerNetMW": 303.6,
        "winterNetMW": 303.6,
        "dp1ErisMw": 303.6,
        "dp1NrisMw": 303.6,
        "dp2ErisMw": 303.6,
        "dp2NrisMw": 303.6,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1015,
      "normalized": {
        "queue_id": "J816",
        "county": "Cass County",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Buffalo 115kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490646,
        "projectNumber": "J816",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2022-09-15T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Cass County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Buffalo 115kV Substation",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1016,
      "normalized": {
        "queue_id": "J817",
        "county": "Warren County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Warrenton 161kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 139.0,
        "summer_net_mw": 139.0,
        "winter_net_mw": 139.0,
        "proposed_completion_date": "2021-10-29T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2019-12-17T05:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 139.0,
        "dp1_nris_mw": 139.0,
        "dp2_eris_mw": 139.0,
        "dp2_nris_mw": 139.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490647,
        "projectNumber": "J817",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-17T05:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2021-10-29T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Warren County",
        "state": "MO",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Warrenton 161kV Substation",
        "summerNetMW": 139.0,
        "winterNetMW": 139.0,
        "dp1ErisMw": 139.0,
        "dp1NrisMw": 139.0,
        "dp2ErisMw": 139.0,
        "dp2NrisMw": 139.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1017,
      "normalized": {
        "queue_id": "J819",
        "county": "Lafayette County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Darlington 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-05-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.9,
        "summer_net_mw": 99.9,
        "winter_net_mw": 99.9,
        "proposed_completion_date": "2021-09-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2020-05-20T04:00:00+00:00",
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": "2019-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.9,
        "dp1_nris_mw": 99.9,
        "dp2_eris_mw": 99.9,
        "dp2_nris_mw": 99.9,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490648,
        "projectNumber": "J819",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-05-26T04:00:00+00:00",
        "doneDate": "2020-05-20T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "giaToExec": "2019-11-14T05:00:00+00:00",
        "negInService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Lafayette County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Darlington 138kV Substation",
        "summerNetMW": 99.9,
        "winterNetMW": 99.9,
        "dp1ErisMw": 99.9,
        "dp1NrisMw": 99.9,
        "dp2ErisMw": 99.9,
        "dp2NrisMw": 99.9,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1018,
      "normalized": {
        "queue_id": "J840",
        "county": "Humboldt County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Kossuth - Webster 345 kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490649,
        "projectNumber": "J840",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2021-07-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Humboldt County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kossuth - Webster 345 kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1019,
      "normalized": {
        "queue_id": "J805",
        "county": "Shelby County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Gwynneville 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 199.0,
        "summer_net_mw": 199.0,
        "winter_net_mw": 199.0,
        "proposed_completion_date": "2022-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-05-08T04:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-11-11T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 199.0,
        "dp1_nris_mw": 199.0,
        "dp2_eris_mw": 199.0,
        "dp2_nris_mw": 199.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490650,
        "projectNumber": "J805",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-05-08T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2019-11-11T05:00:00+00:00",
        "negInService": "2022-05-01T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Shelby County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gwynneville 345kV Substation",
        "summerNetMW": 199.0,
        "winterNetMW": 199.0,
        "dp1ErisMw": 199.0,
        "dp1NrisMw": 199.0,
        "dp2ErisMw": 199.0,
        "dp2NrisMw": 199.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1020,
      "normalized": {
        "queue_id": "J806",
        "county": "Calhoun County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Rice Creek - Vrooman 138kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 149.0,
        "summer_net_mw": 149.0,
        "winter_net_mw": 149.0,
        "proposed_completion_date": "2021-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-05-11T04:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2020-01-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 149.0,
        "dp1_nris_mw": 149.0,
        "dp2_eris_mw": 149.0,
        "dp2_nris_mw": 149.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490651,
        "projectNumber": "J806",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-05-11T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2020-01-06T05:00:00+00:00",
        "negInService": "2021-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rice Creek - Vrooman 138kV Line Tap",
        "summerNetMW": 149.0,
        "winterNetMW": 149.0,
        "dp1ErisMw": 149.0,
        "dp1NrisMw": 149.0,
        "dp2ErisMw": 149.0,
        "dp2NrisMw": 149.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1021,
      "normalized": {
        "queue_id": "J822",
        "county": "Lonoke County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Lynch SES Switchyard - Carlisle 115kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-01-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490652,
        "projectNumber": "J822",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2019-01-30T05:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Lonoke County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lynch SES Switchyard - Carlisle 115kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1022,
      "normalized": {
        "queue_id": "J829",
        "county": "Sullivan County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Dresser - Merom 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2022-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-05-26T04:00:00+00:00",
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": "2019-11-21T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490653,
        "projectNumber": "J829",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-05-26T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "giaToExec": "2019-11-21T05:00:00+00:00",
        "negInService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Sullivan County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Dresser - Merom 345kV Line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1023,
      "normalized": {
        "queue_id": "J818",
        "county": "Jefferson County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Jefferson 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 149.0,
        "summer_net_mw": 149.0,
        "winter_net_mw": 149.0,
        "proposed_completion_date": "2022-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-05-06T04:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-11-01T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 149.0,
        "dp1_nris_mw": 149.0,
        "dp2_eris_mw": 149.0,
        "dp2_nris_mw": 149.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490654,
        "projectNumber": "J818",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-05-06T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2019-11-01T04:00:00+00:00",
        "negInService": "2022-04-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Jefferson County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Jefferson 138kV Substation",
        "summerNetMW": 149.0,
        "winterNetMW": 149.0,
        "dp1ErisMw": 149.0,
        "dp1NrisMw": 149.0,
        "dp2ErisMw": 149.0,
        "dp2NrisMw": 149.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1024,
      "normalized": {
        "queue_id": "J838",
        "county": "White County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Reynolds 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.1,
        "summer_net_mw": 200.1,
        "winter_net_mw": 200.1,
        "proposed_completion_date": "2021-08-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-10-21T04:00:00+00:00",
        "in_service": "2020-08-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 40.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490655,
        "projectNumber": "J838",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-10-21T04:00:00+00:00",
        "inService": "2020-08-01T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2021-08-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "White County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynolds 345kV Substation",
        "summerNetMW": 200.1,
        "winterNetMW": 200.1,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 40.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1025,
      "normalized": {
        "queue_id": "J824",
        "county": "Sullivan County,Vigo County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Vigo-Farmersburg Junction 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490656,
        "projectNumber": "J824",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-04-17T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Sullivan County,Vigo County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Vigo-Farmersburg Junction 138kV Line",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1026,
      "normalized": {
        "queue_id": "J809",
        "county": "Ottawa County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Bass Creek - Black River 138 kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490657,
        "projectNumber": "J809",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-09T05:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bass Creek - Black River 138 kV Line Tap",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1027,
      "normalized": {
        "queue_id": "J826",
        "county": "McLean County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Weedman Substation 138kV Bus",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-05-28T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-12-17T05:00:00+00:00",
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490658,
        "projectNumber": "J826",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-17T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2021-05-28T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Weedman Substation 138kV Bus",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1028,
      "normalized": {
        "queue_id": "J821",
        "county": "Marathon County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Wein - Stratford 115 kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-05-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.9,
        "summer_net_mw": 99.9,
        "winter_net_mw": 99.9,
        "proposed_completion_date": "2021-08-27T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2019-10-17T04:00:00+00:00",
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": "2019-05-10T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.9,
        "dp1_nris_mw": 99.9,
        "dp2_eris_mw": 99.9,
        "dp2_nris_mw": 99.9,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490659,
        "projectNumber": "J821",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-05-26T04:00:00+00:00",
        "doneDate": "2019-10-17T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "giaToExec": "2019-05-10T04:00:00+00:00",
        "negInService": "2021-08-27T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Marathon County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wein - Stratford 115 kV Line Tap",
        "summerNetMW": 99.9,
        "winterNetMW": 99.9,
        "dp1ErisMw": 99.9,
        "dp1NrisMw": 99.9,
        "dp2ErisMw": 99.9,
        "dp2NrisMw": 99.9,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1029,
      "normalized": {
        "queue_id": "J808",
        "county": "Randolph County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Aster Substation 138kV Bus",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": "2020-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-05-06T04:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-01-17T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 99.0,
        "dp2_nris_mw": 99.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490660,
        "projectNumber": "J808",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-05-06T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2019-01-17T05:00:00+00:00",
        "negInService": "2020-07-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Randolph County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Aster Substation 138kV Bus",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 99.0,
        "dp2NrisMw": 99.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1030,
      "normalized": {
        "queue_id": "J823",
        "county": "Clark County",
        "state": "MO",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Twin Rivers - Twin Rivers Tap - Palmyra 161kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-02-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490661,
        "projectNumber": "J823",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-02-06T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Clark County",
        "state": "MO",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Twin Rivers - Twin Rivers Tap - Palmyra 161kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1031,
      "normalized": {
        "queue_id": "J827",
        "county": "Fountain County,Montgomery County,Tippecanoe County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Lafayette - Veedsburg West - Attica 230kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490662,
        "projectNumber": "J827",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Fountain County,Montgomery County,Tippecanoe County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lafayette - Veedsburg West - Attica 230kV Line",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1032,
      "normalized": {
        "queue_id": "J828",
        "county": "Montgomery County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Crawfordsville - Linden Tap 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-02-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 151.8,
        "summer_net_mw": 151.8,
        "winter_net_mw": 151.8,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490663,
        "projectNumber": "J828",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-02-07T05:00:00+00:00",
        "inService": "2020-08-01T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Montgomery County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crawfordsville - Linden Tap 138kV Line",
        "summerNetMW": 151.8,
        "winterNetMW": 151.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1033,
      "normalized": {
        "queue_id": "J807",
        "county": "Lafayette County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Darlington - Hillman 138kV Line (Falcon Substation J395)",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-05-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 41.4,
        "summer_net_mw": 41.4,
        "winter_net_mw": 41.4,
        "proposed_completion_date": "2021-08-27T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2019-10-17T04:00:00+00:00",
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": "2019-05-10T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 41.4,
        "dp1_nris_mw": 41.4,
        "dp2_eris_mw": 41.4,
        "dp2_nris_mw": 41.4,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490664,
        "projectNumber": "J807",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-05-26T04:00:00+00:00",
        "doneDate": "2019-10-17T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "giaToExec": "2019-05-10T04:00:00+00:00",
        "negInService": "2021-08-27T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Lafayette County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Darlington - Hillman 138kV Line (Falcon Substation J395)",
        "summerNetMW": 41.4,
        "winterNetMW": 41.4,
        "dp1ErisMw": 41.4,
        "dp1NrisMw": 41.4,
        "dp2ErisMw": 41.4,
        "dp2NrisMw": 41.4,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1034,
      "normalized": {
        "queue_id": "J841",
        "county": "Saginaw County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Orr RD 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-01-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 725.0,
        "summer_net_mw": 702.0,
        "winter_net_mw": 725.0,
        "proposed_completion_date": null,
        "generation_type": "Combined Cycle",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-04-01T04:00:00+00:00",
        "gia_to_execute": "2020-01-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 725.0,
        "dp1_nris_mw": 725.0,
        "dp2_eris_mw": 725.0,
        "dp2_nris_mw": 702.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490665,
        "projectNumber": "J841",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-01-24T05:00:00+00:00",
        "inService": "2020-04-01T04:00:00+00:00",
        "giaToExec": "2020-01-06T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Orr RD 138 kV Substation",
        "summerNetMW": 702.0,
        "winterNetMW": 725.0,
        "dp1ErisMw": 725.0,
        "dp1NrisMw": 725.0,
        "dp2ErisMw": 725.0,
        "dp2NrisMw": 702.0,
        "fuelType": "Combined Cycle",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1035,
      "normalized": {
        "queue_id": "J831",
        "county": "Ozaukee County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Port Washington Generating Switchyard 138 kV",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 48.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 48.0,
        "proposed_completion_date": "2019-10-28T04:00:00+00:00",
        "generation_type": "Combined Cycle",
        "facility_type": "Combined Cycle",
        "post_gia_status": "In Service",
        "approval_date": "2019-11-12T05:00:00+00:00",
        "in_service": "2017-06-16T04:00:00+00:00",
        "gia_to_execute": "2019-08-01T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 48.0,
        "dp1_nris_mw": 48.0,
        "dp2_eris_mw": 48.0,
        "dp2_nris_mw": 48.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490666,
        "projectNumber": "J831",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-11-12T05:00:00+00:00",
        "inService": "2017-06-16T04:00:00+00:00",
        "giaToExec": "2019-08-01T04:00:00+00:00",
        "negInService": "2019-10-28T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Ozaukee County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Port Washington Generating Switchyard 138 kV",
        "summerNetMW": 40.0,
        "winterNetMW": 48.0,
        "dp1ErisMw": 48.0,
        "dp1NrisMw": 48.0,
        "dp2ErisMw": 48.0,
        "dp2NrisMw": 48.0,
        "fuelType": "Combined Cycle",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1036,
      "normalized": {
        "queue_id": "J810",
        "county": "Audubon County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Atlantic to Adair 161 kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-08-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.5,
        "summer_net_mw": 139.6,
        "winter_net_mw": 145.5,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490667,
        "projectNumber": "J810",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-08-31T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Audubon County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Atlantic to Adair 161 kV line",
        "summerNetMW": 139.6,
        "winterNetMW": 145.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1037,
      "normalized": {
        "queue_id": "J844",
        "county": "Knox County",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Sandburg Substation 138kV Bus",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2021-05-28T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-12-10T05:00:00+00:00",
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 147.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 147.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490668,
        "projectNumber": "J844",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-10T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2021-05-28T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Knox County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Sandburg Substation 138kV Bus",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 147.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 147.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1038,
      "normalized": {
        "queue_id": "J815",
        "county": "Christian County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Taylorville South-Austin (formerly Pawnee)138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2026-03-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2022-10-28T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-04-16T04:00:00+00:00",
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": "2019-11-04T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490669,
        "projectNumber": "J815",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2026-03-02T05:00:00+00:00",
        "doneDate": "2020-04-16T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "giaToExec": "2019-11-04T05:00:00+00:00",
        "negInService": "2022-10-28T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Christian County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Taylorville South-Austin (formerly Pawnee)138kV Line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1039,
      "normalized": {
        "queue_id": "J842",
        "county": "Gibson County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Gibson - Brown 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-02-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-09-14T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-07-01T04:00:00+00:00",
        "gia_to_execute": "2019-11-21T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490670,
        "projectNumber": "J842",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-02-10T05:00:00+00:00",
        "inService": "2020-07-01T04:00:00+00:00",
        "giaToExec": "2019-11-21T05:00:00+00:00",
        "negInService": "2022-09-14T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Gibson County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gibson - Brown 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1040,
      "normalized": {
        "queue_id": "J825",
        "county": "Green County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "North Monroe - Albany 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.9,
        "summer_net_mw": 99.9,
        "winter_net_mw": 99.9,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490671,
        "projectNumber": "J825",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Green County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Monroe - Albany 138kV Line",
        "summerNetMW": 99.9,
        "winterNetMW": 99.9,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1041,
      "normalized": {
        "queue_id": "J843",
        "county": "Gibson County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Gibson - Francisco 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-02-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2021-09-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-07-01T04:00:00+00:00",
        "gia_to_execute": "2019-11-21T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490672,
        "projectNumber": "J843",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-02-10T05:00:00+00:00",
        "inService": "2020-07-01T04:00:00+00:00",
        "giaToExec": "2019-11-21T05:00:00+00:00",
        "negInService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Gibson County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gibson - Francisco 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1042,
      "normalized": {
        "queue_id": "J812",
        "county": "Van Buren County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Covert - Palisades 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2017-10-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1217.0,
        "summer_net_mw": 1108.0,
        "winter_net_mw": 1217.0,
        "proposed_completion_date": null,
        "generation_type": "Combined Cycle",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2017-06-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490673,
        "projectNumber": "J812",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2017-10-26T04:00:00+00:00",
        "inService": "2017-06-16T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Van Buren County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Covert - Palisades 345kV Line",
        "summerNetMW": 1108.0,
        "winterNetMW": 1217.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Combined Cycle",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1043,
      "normalized": {
        "queue_id": "J837",
        "county": "White County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Reynolds 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.1,
        "summer_net_mw": 200.1,
        "winter_net_mw": 200.1,
        "proposed_completion_date": "2021-08-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-10-21T04:00:00+00:00",
        "in_service": "2020-08-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.1,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 200.1,
        "dp2_nris_mw": 80.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490674,
        "projectNumber": "J837",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-10-21T04:00:00+00:00",
        "inService": "2020-08-01T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2021-08-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "White County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynolds 345kV Substation",
        "summerNetMW": 200.1,
        "winterNetMW": 200.1,
        "dp1ErisMw": 200.1,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 200.1,
        "dp2NrisMw": 80.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1044,
      "normalized": {
        "queue_id": "J820",
        "county": "Eaton County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Oneida 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2017-08-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.05,
        "summer_net_mw": 100.05,
        "winter_net_mw": 100.05,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490675,
        "projectNumber": "J820",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2017-08-03T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Eaton County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Oneida 345kV Substation",
        "summerNetMW": 100.05,
        "winterNetMW": 100.05,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1045,
      "normalized": {
        "queue_id": "J839",
        "county": "Lapeer County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Otsego Tap - Otsego 120 kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-05-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-03-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2020-04-01T04:00:00+00:00",
        "gia_to_execute": "2020-01-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 58.0,
        "dp1_nris_mw": 58.0,
        "dp2_eris_mw": 58.0,
        "dp2_nris_mw": 58.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490676,
        "projectNumber": "J839",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-05-27T04:00:00+00:00",
        "inService": "2020-04-01T04:00:00+00:00",
        "giaToExec": "2020-01-06T05:00:00+00:00",
        "negInService": "2023-03-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Lapeer County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Otsego Tap - Otsego 120 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 58.0,
        "dp1NrisMw": 58.0,
        "dp2ErisMw": 58.0,
        "dp2NrisMw": 58.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1046,
      "normalized": {
        "queue_id": "J830",
        "county": "Madison County",
        "state": "MS",
        "transmission_owner": "Entergy",
        "poi": "Canton South to Hoy Road 230 kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-11-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-03-05T05:00:00+00:00",
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": "2019-09-12T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490677,
        "projectNumber": "J830",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-03-05T05:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "giaToExec": "2019-09-12T04:00:00+00:00",
        "negInService": "2021-11-15T05:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Madison County",
        "state": "MS",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Canton South to Hoy Road 230 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1047,
      "normalized": {
        "queue_id": "J835",
        "county": "Morgan County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Meredosia - Austin 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490678,
        "projectNumber": "J835",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-04-17T04:00:00+00:00",
        "inService": "2020-07-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Morgan County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Meredosia - Austin 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1048,
      "normalized": {
        "queue_id": "J866",
        "county": "Tunica County",
        "state": "MS",
        "transmission_owner": "Entergy",
        "poi": "Batesville - Robert E. Ritchie 230 kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2021-07-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-04-06T04:00:00+00:00",
        "in_service": "2020-03-30T04:00:00+00:00",
        "gia_to_execute": "2019-10-03T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490679,
        "projectNumber": "J866",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-04-06T04:00:00+00:00",
        "inService": "2020-03-30T04:00:00+00:00",
        "giaToExec": "2019-10-03T04:00:00+00:00",
        "negInService": "2021-07-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Tunica County",
        "state": "MS",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Batesville - Robert E. Ritchie 230 kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1049,
      "normalized": {
        "queue_id": "J813",
        "county": "Clay County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Louisville South Substation 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 275.0,
        "summer_net_mw": 275.0,
        "winter_net_mw": 275.0,
        "proposed_completion_date": "2021-10-29T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-12-16T05:00:00+00:00",
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490680,
        "projectNumber": "J813",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-16T05:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2021-10-29T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clay County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Louisville South Substation 138kV Line",
        "summerNetMW": 275.0,
        "winterNetMW": 275.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1050,
      "normalized": {
        "queue_id": "J834",
        "county": "Phillips County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Robert E Ritchie 230kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-11-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-03-06T05:00:00+00:00",
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-10-03T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490681,
        "projectNumber": "J834",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-03-06T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2019-10-03T04:00:00+00:00",
        "negInService": "2021-11-15T05:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Phillips County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Robert E Ritchie 230kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1051,
      "normalized": {
        "queue_id": "J847",
        "county": "Jasper County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Schahfer Tap 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": "2021-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-09-17T04:00:00+00:00",
        "in_service": "2020-04-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-19T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 90.0,
        "dp1_nris_mw": 90.0,
        "dp2_eris_mw": 90.0,
        "dp2_nris_mw": 90.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490682,
        "projectNumber": "J847",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-09-17T04:00:00+00:00",
        "inService": "2020-04-01T04:00:00+00:00",
        "giaToExec": "2019-07-19T04:00:00+00:00",
        "negInService": "2021-04-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Schahfer Tap 138kV Substation",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 90.0,
        "dp1NrisMw": 90.0,
        "dp2ErisMw": 90.0,
        "dp2NrisMw": 90.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1052,
      "normalized": {
        "queue_id": "J879",
        "county": "Baraga County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "North Lake 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-05-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490683,
        "projectNumber": "J879",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-05-11T04:00:00+00:00",
        "inService": "2020-09-23T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Baraga County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Lake 138 kV Substation",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1053,
      "normalized": {
        "queue_id": "J877",
        "county": "Palo Alto County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Obrien - Kossuth 345kV Line (J529 & J590 New Substation)",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2023-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-05-19T04:00:00+00:00",
        "in_service": "2021-09-30T04:00:00+00:00",
        "gia_to_execute": "2021-05-19T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490684,
        "projectNumber": "J877",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2021-05-19T04:00:00+00:00",
        "inService": "2021-09-30T04:00:00+00:00",
        "giaToExec": "2021-05-19T04:00:00+00:00",
        "negInService": "2023-07-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Palo Alto County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Obrien - Kossuth 345kV Line (J529 & J590 New Substation)",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1054,
      "normalized": {
        "queue_id": "J880",
        "county": "Ward County",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Magic City 230kV sub",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-10-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490685,
        "projectNumber": "J880",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-10-24T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Ward County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Magic City 230kV sub",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1055,
      "normalized": {
        "queue_id": "J867",
        "county": "Polk County",
        "state": "TX",
        "transmission_owner": "Entergy",
        "poi": "Gulf Livingston - SHECO Menard",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490686,
        "projectNumber": "J867",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2019-09-29T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Polk County",
        "state": "TX",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gulf Livingston - SHECO Menard",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1056,
      "normalized": {
        "queue_id": "J882",
        "county": "Montgomery County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Coffeen North 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2017-08-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 15.0,
        "summer_net_mw": 15.0,
        "winter_net_mw": 15.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490687,
        "projectNumber": "J882",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2017-08-08T04:00:00+00:00",
        "inService": "2019-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Montgomery County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Coffeen North 138kV Substation",
        "summerNetMW": 15.0,
        "winterNetMW": 15.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1057,
      "normalized": {
        "queue_id": "J883",
        "county": "Pulaski County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Monticello-East Winamac",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-12-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": "2022-05-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2019-12-04T05:00:00+00:00",
        "in_service": "2020-10-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 80.0,
        "dp2_nris_mw": 80.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490688,
        "projectNumber": "J883",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-12-04T05:00:00+00:00",
        "doneDate": "2019-12-04T05:00:00+00:00",
        "inService": "2020-10-01T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2022-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Pulaski County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Monticello-East Winamac",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 80.0,
        "dp2NrisMw": 80.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1058,
      "normalized": {
        "queue_id": "J851",
        "county": "Henry County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Fall Creek - New Castle 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490689,
        "projectNumber": "J851",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2019-10-01T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Henry County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fall Creek - New Castle 138kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1059,
      "normalized": {
        "queue_id": "J876",
        "county": "Faribault County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Huntley 345kV sub",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-07-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490690,
        "projectNumber": "J876",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-07-23T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Faribault County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Huntley 345kV sub",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1060,
      "normalized": {
        "queue_id": "J848",
        "county": "Christian County",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Pana Substation 138kV Bus",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2026-01-20T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2021-05-28T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-04-17T04:00:00+00:00",
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": "2019-07-23T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 235.0,
        "dp2_nris_mw": 235.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490691,
        "projectNumber": "J848",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2026-01-20T05:00:00+00:00",
        "doneDate": "2020-04-17T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "giaToExec": "2019-07-23T04:00:00+00:00",
        "negInService": "2021-05-28T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Christian County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pana Substation 138kV Bus",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 235.0,
        "dp2NrisMw": 235.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1061,
      "normalized": {
        "queue_id": "J881",
        "county": "Jasper County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Newton 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2017-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490692,
        "projectNumber": "J881",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2017-07-17T04:00:00+00:00",
        "inService": "2019-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jasper County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Newton 138kV Substation",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1062,
      "normalized": {
        "queue_id": "J850",
        "county": "Rock County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "RCEC Bradford - W. Darien 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2022-09-24T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-04-24T04:00:00+00:00",
        "in_service": "2021-09-30T04:00:00+00:00",
        "gia_to_execute": "2019-11-08T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490693,
        "projectNumber": "J850",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-04-24T04:00:00+00:00",
        "inService": "2021-09-30T04:00:00+00:00",
        "giaToExec": "2019-11-08T05:00:00+00:00",
        "negInService": "2022-09-24T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Rock County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "RCEC Bradford - W. Darien 138kV Line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1063,
      "normalized": {
        "queue_id": "J868",
        "county": "Concordia Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Plantation 115 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 37.2,
        "summer_net_mw": 37.2,
        "winter_net_mw": 37.2,
        "proposed_completion_date": "1990-12-03T05:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-03-05T05:00:00+00:00",
        "in_service": null,
        "gia_to_execute": "2019-09-12T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 25.33,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 23.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490694,
        "projectNumber": "J868",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-03-05T05:00:00+00:00",
        "giaToExec": "2019-09-12T04:00:00+00:00",
        "negInService": "1990-12-03T05:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Concordia Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Plantation 115 kV Substation",
        "summerNetMW": 37.2,
        "winterNetMW": 37.2,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 25.33,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 23.5,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1064,
      "normalized": {
        "queue_id": "J870",
        "county": "Grant County,Iowa County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Eden - Wyoming Valley 138kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2020-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-02-21T05:00:00+00:00",
        "in_service": "2021-09-10T04:00:00+00:00",
        "gia_to_execute": "2019-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490695,
        "projectNumber": "J870",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-02-21T05:00:00+00:00",
        "inService": "2021-09-10T04:00:00+00:00",
        "giaToExec": "2019-11-14T05:00:00+00:00",
        "negInService": "2020-08-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Grant County,Iowa County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Eden - Wyoming Valley 138kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1065,
      "normalized": {
        "queue_id": "J873",
        "county": "Hardin County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Killdeer- Blackhawk 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490696,
        "projectNumber": "J873",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2021-07-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Hardin County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Killdeer- Blackhawk 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1066,
      "normalized": {
        "queue_id": "J855",
        "county": "Grant County,Iowa County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Lancaster - Eden 138 kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2020-11-06T05:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-11-14T05:00:00+00:00",
        "in_service": "2019-08-01T04:00:00+00:00",
        "gia_to_execute": "2019-08-26T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 99.99,
        "dp2_nris_mw": 99.99,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490697,
        "projectNumber": "J855",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-11-14T05:00:00+00:00",
        "inService": "2019-08-01T04:00:00+00:00",
        "giaToExec": "2019-08-26T04:00:00+00:00",
        "negInService": "2020-11-06T05:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Grant County,Iowa County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lancaster - Eden 138 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 99.99,
        "dp2NrisMw": 99.99,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1067,
      "normalized": {
        "queue_id": "J871",
        "county": "Grant County,Iowa County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Eden - Wyoming Valley 138kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-02-21T05:00:00+00:00",
        "in_service": "2021-09-10T04:00:00+00:00",
        "gia_to_execute": "2019-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490698,
        "projectNumber": "J871",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-02-21T05:00:00+00:00",
        "inService": "2021-09-10T04:00:00+00:00",
        "giaToExec": "2019-11-14T05:00:00+00:00",
        "negInService": "2021-08-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Grant County,Iowa County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Eden - Wyoming Valley 138kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1068,
      "normalized": {
        "queue_id": "J885",
        "county": "Worth County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "J407 Glenworth 161kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 64.0,
        "summer_net_mw": 64.0,
        "winter_net_mw": 64.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 64.0,
        "dp1_nris_mw": 64.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490699,
        "projectNumber": "J885",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Worth County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "J407 Glenworth 161kV Substation",
        "summerNetMW": 64.0,
        "winterNetMW": 64.0,
        "dp1ErisMw": 64.0,
        "dp1NrisMw": 64.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1069,
      "normalized": {
        "queue_id": "J937",
        "county": "Calhoun County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Argenta - Tompkins 345kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-10-21T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 535.0,
        "summer_net_mw": 507.0,
        "winter_net_mw": 535.0,
        "proposed_completion_date": "2022-12-29T05:00:00+00:00",
        "generation_type": "Combined Cycle",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Withdrawn",
        "approval_date": "2020-06-11T04:00:00+00:00",
        "in_service": "2020-05-01T04:00:00+00:00",
        "gia_to_execute": "2020-01-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 535.0,
        "dp1_nris_mw": 535.0,
        "dp2_eris_mw": 535.0,
        "dp2_nris_mw": 507.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490700,
        "projectNumber": "J937",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-10-21T04:00:00+00:00",
        "doneDate": "2020-06-11T04:00:00+00:00",
        "inService": "2020-05-01T04:00:00+00:00",
        "giaToExec": "2020-01-06T05:00:00+00:00",
        "negInService": "2022-12-29T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Argenta - Tompkins 345kV Line Tap",
        "summerNetMW": 507.0,
        "winterNetMW": 535.0,
        "dp1ErisMw": 535.0,
        "dp1NrisMw": 535.0,
        "dp2ErisMw": 535.0,
        "dp2NrisMw": 507.0,
        "fuelType": "Combined Cycle",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1070,
      "normalized": {
        "queue_id": "J896",
        "county": "Crawford County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Victory 161 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-06-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490701,
        "projectNumber": "J896",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-06-18T04:00:00+00:00",
        "inService": "2019-10-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Crawford County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Victory 161 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1071,
      "normalized": {
        "queue_id": "J852",
        "county": "Ouachita Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Rilla - Riverton 115kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490702,
        "projectNumber": "J852",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2019-07-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Ouachita Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rilla - Riverton 115kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1072,
      "normalized": {
        "queue_id": "J853",
        "county": "White County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Norris City North Substation 138kV Bus",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 149.0,
        "summer_net_mw": 149.0,
        "winter_net_mw": 149.0,
        "proposed_completion_date": "2021-05-28T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2019-12-20T05:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 149.0,
        "dp1_nris_mw": 149.0,
        "dp2_eris_mw": 149.0,
        "dp2_nris_mw": 149.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490703,
        "projectNumber": "J853",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-20T05:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2021-05-28T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "White County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Norris City North Substation 138kV Bus",
        "summerNetMW": 149.0,
        "winterNetMW": 149.0,
        "dp1ErisMw": 149.0,
        "dp1NrisMw": 149.0,
        "dp2ErisMw": 149.0,
        "dp2NrisMw": 149.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1073,
      "normalized": {
        "queue_id": "J854",
        "county": "Randolph County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Baldwin 138KV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2017-08-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490704,
        "projectNumber": "J854",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2017-08-08T04:00:00+00:00",
        "inService": "2019-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Randolph County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Baldwin 138KV Substation",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1074,
      "normalized": {
        "queue_id": "J874",
        "county": "Murray County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Fenton - Chanarambie 115kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-07-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-05-19T04:00:00+00:00",
        "in_service": "2021-09-30T04:00:00+00:00",
        "gia_to_execute": "2021-05-19T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490705,
        "projectNumber": "J874",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2021-05-19T04:00:00+00:00",
        "inService": "2021-09-30T04:00:00+00:00",
        "giaToExec": "2021-05-19T04:00:00+00:00",
        "negInService": "2024-07-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Murray County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fenton - Chanarambie 115kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1075,
      "normalized": {
        "queue_id": "J906",
        "county": "Muskegon County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Kenowa - Ludington 345 kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-02-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2020-07-01T04:00:00+00:00",
        "gia_to_execute": "2020-01-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490706,
        "projectNumber": "J906",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-02-07T05:00:00+00:00",
        "inService": "2020-07-01T04:00:00+00:00",
        "giaToExec": "2020-01-06T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kenowa - Ludington 345 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1076,
      "normalized": {
        "queue_id": "J898",
        "county": "Howard County",
        "state": "IA",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE",
        "poi": "Rice - Beaver Creek 161kV line tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-11-30T05:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-09-26T04:00:00+00:00",
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": "2021-09-27T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490707,
        "projectNumber": "J898",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2021-09-26T04:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "giaToExec": "2021-09-27T04:00:00+00:00",
        "negInService": "2023-11-30T05:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE",
        "county": "Howard County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Rice - Beaver Creek 161kV line tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1077,
      "normalized": {
        "queue_id": "J832",
        "county": "Cheboygan County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Port Calcite - Riggsville 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-06-02T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2022-12-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2020-06-12T04:00:00+00:00",
        "in_service": "2020-04-01T04:00:00+00:00",
        "gia_to_execute": "2020-01-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 91.0,
        "dp1_nris_mw": 91.0,
        "dp2_eris_mw": 91.0,
        "dp2_nris_mw": 91.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490708,
        "projectNumber": "J832",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-06-02T04:00:00+00:00",
        "doneDate": "2020-06-12T04:00:00+00:00",
        "inService": "2020-04-01T04:00:00+00:00",
        "giaToExec": "2020-01-06T05:00:00+00:00",
        "negInService": "2022-12-31T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Cheboygan County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Port Calcite - Riggsville 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 91.0,
        "dp1NrisMw": 91.0,
        "dp2ErisMw": 91.0,
        "dp2NrisMw": 91.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1078,
      "normalized": {
        "queue_id": "J833",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Milan-Pioneer 120kV line tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-10-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2022-04-29T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2020-06-17T04:00:00+00:00",
        "in_service": "2020-04-01T04:00:00+00:00",
        "gia_to_execute": "2020-01-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490709,
        "projectNumber": "J833",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-10-22T04:00:00+00:00",
        "doneDate": "2020-06-17T04:00:00+00:00",
        "inService": "2020-04-01T04:00:00+00:00",
        "giaToExec": "2020-01-06T05:00:00+00:00",
        "negInService": "2022-04-29T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Milan-Pioneer 120kV line tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1079,
      "normalized": {
        "queue_id": "J928",
        "county": "Delta County,Schoolcraft County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Garden Corners 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 79.99,
        "summer_net_mw": 79.99,
        "winter_net_mw": 79.99,
        "proposed_completion_date": "2019-10-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-04-19T04:00:00+00:00",
        "in_service": "2019-08-15T04:00:00+00:00",
        "gia_to_execute": "2019-01-23T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 79.99,
        "dp1_nris_mw": 79.99,
        "dp2_eris_mw": 79.99,
        "dp2_nris_mw": 79.99,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490710,
        "projectNumber": "J928",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-04-19T04:00:00+00:00",
        "inService": "2019-08-15T04:00:00+00:00",
        "giaToExec": "2019-01-23T05:00:00+00:00",
        "negInService": "2019-10-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Delta County,Schoolcraft County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Garden Corners 138 kV Substation",
        "summerNetMW": 79.99,
        "winterNetMW": 79.99,
        "dp1ErisMw": 79.99,
        "dp1NrisMw": 79.99,
        "dp2ErisMw": 79.99,
        "dp2NrisMw": 79.99,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1080,
      "normalized": {
        "queue_id": "J907",
        "county": "Monroe County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Brinkley East - Aubrey 230 kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-03-24T04:00:00+00:00",
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-10-03T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490711,
        "projectNumber": "J907",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-03-24T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "giaToExec": "2019-10-03T04:00:00+00:00",
        "negInService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Monroe County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brinkley East - Aubrey 230 kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1081,
      "normalized": {
        "queue_id": "J927",
        "county": "Faribault County,Freeborn County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Walters 69 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490712,
        "projectNumber": "J927",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Faribault County,Freeborn County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Walters 69 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1082,
      "normalized": {
        "queue_id": "J916",
        "county": "Cottonwood County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Mountain Lake 69kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 2.0,
        "summer_net_mw": 2.0,
        "winter_net_mw": 2.0,
        "proposed_completion_date": null,
        "generation_type": "Diesel",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-07-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 2.0,
        "dp1_nris_mw": 2.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490713,
        "projectNumber": "J916",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2020-07-06T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cottonwood County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mountain Lake 69kV Substation",
        "summerNetMW": 2.0,
        "winterNetMW": 2.0,
        "dp1ErisMw": 2.0,
        "dp1NrisMw": 2.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Diesel",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1083,
      "normalized": {
        "queue_id": "J845",
        "county": "Ford County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Gibson City South - Paxton East 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": "2021-06-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-12-06T05:00:00+00:00",
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-22T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 52.0,
        "dp2_eris_mw": 120.0,
        "dp2_nris_mw": 52.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490714,
        "projectNumber": "J845",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-06T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2019-07-22T04:00:00+00:00",
        "negInService": "2021-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Ford County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gibson City South - Paxton East 138kV Line",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 52.0,
        "dp2ErisMw": 120.0,
        "dp2NrisMw": 52.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1084,
      "normalized": {
        "queue_id": "J814",
        "county": "Clark County",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Eau Claire - Arpin 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-02-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.9,
        "summer_net_mw": 99.9,
        "winter_net_mw": 99.9,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490715,
        "projectNumber": "J814",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-02-04T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Clark County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Eau Claire - Arpin 345kV Line",
        "summerNetMW": 99.9,
        "winterNetMW": 99.9,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1085,
      "normalized": {
        "queue_id": "J846",
        "county": "Hillsdale County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Moore Roadtyd - Coldwater Creek 138 kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490716,
        "projectNumber": "J846",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-09T05:00:00+00:00",
        "inService": "2020-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Hillsdale County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Moore Roadtyd - Coldwater Creek 138 kV Line Tap",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1086,
      "normalized": {
        "queue_id": "J878",
        "county": "Kenosha County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Paris 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-04-28T04:00:00+00:00",
        "in_service": "2021-09-10T04:00:00+00:00",
        "gia_to_execute": "2019-11-08T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490717,
        "projectNumber": "J878",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-04-28T04:00:00+00:00",
        "inService": "2021-09-10T04:00:00+00:00",
        "giaToExec": "2019-11-08T05:00:00+00:00",
        "negInService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Kenosha County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Paris 138kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1087,
      "normalized": {
        "queue_id": "J849",
        "county": "Delta County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Chandler 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2022-04-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": "2022-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2019-06-26T04:00:00+00:00",
        "in_service": "2020-04-01T04:00:00+00:00",
        "gia_to_execute": "2019-01-24T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 125.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490718,
        "projectNumber": "J849",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2022-04-19T04:00:00+00:00",
        "doneDate": "2019-06-26T04:00:00+00:00",
        "inService": "2020-04-01T04:00:00+00:00",
        "giaToExec": "2019-01-24T05:00:00+00:00",
        "negInService": "2022-04-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Delta County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Chandler 138 kV Substation",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 125.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1088,
      "normalized": {
        "queue_id": "J869",
        "county": "Sherburne County",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Cable - Cable Tap 69kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-10-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 49.98,
        "summer_net_mw": 49.98,
        "winter_net_mw": 49.98,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490719,
        "projectNumber": "J869",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-10-24T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Sherburne County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cable - Cable Tap 69kV Substation",
        "summerNetMW": 49.98,
        "winterNetMW": 49.98,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1089,
      "normalized": {
        "queue_id": "J917",
        "county": "Liberty County",
        "state": "TX",
        "transmission_owner": "Entergy",
        "poi": "Tarkington - New Long John 138kV line tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 78.0,
        "summer_net_mw": 78.0,
        "winter_net_mw": 78.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490720,
        "projectNumber": "J917",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2019-11-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Liberty County",
        "state": "TX",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tarkington - New Long John 138kV line tap",
        "summerNetMW": 78.0,
        "winterNetMW": 78.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1090,
      "normalized": {
        "queue_id": "J900",
        "county": "Livingston Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Coly - Vignes 230kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490721,
        "projectNumber": "J900",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Livingston Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Coly - Vignes 230kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1091,
      "normalized": {
        "queue_id": "J919",
        "county": "Jackson County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Cash - Newport AB 161 kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": "2022-02-02T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-11-21T05:00:00+00:00",
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": "2019-06-03T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 180.0,
        "dp2_nris_mw": 180.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490722,
        "projectNumber": "J919",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-11-21T05:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "giaToExec": "2019-06-03T04:00:00+00:00",
        "negInService": "2022-02-02T05:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Jackson County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cash - Newport AB 161 kV Line Tap",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 180.0,
        "dp2NrisMw": 180.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1092,
      "normalized": {
        "queue_id": "J901",
        "county": "Redwood County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lyon County - Cedar Mountain Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-05-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490723,
        "projectNumber": "J901",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-05-26T04:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Redwood County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Lyon County - Cedar Mountain Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1093,
      "normalized": {
        "queue_id": "J920",
        "county": "Pulaski County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Joppa 161 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2017-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490724,
        "projectNumber": "J920",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2017-08-29T04:00:00+00:00",
        "inService": "2019-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Pulaski County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Joppa 161 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1094,
      "normalized": {
        "queue_id": "J910",
        "county": "Hinds County",
        "state": "MS",
        "transmission_owner": "Entergy",
        "poi": "Clinton Industrial 230kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490725,
        "projectNumber": "J910",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Hinds County",
        "state": "MS",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Clinton Industrial 230kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1095,
      "normalized": {
        "queue_id": "J884",
        "county": "McLean County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Brokaw - Gibson City South 138 kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-05-28T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490726,
        "projectNumber": "J884",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-12-18T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2021-05-28T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brokaw - Gibson City South 138 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1096,
      "normalized": {
        "queue_id": "J872",
        "county": "Macon County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Blue Mount tap on the Pana-Route 51D-1462 138kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490727,
        "projectNumber": "J872",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macon County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Blue Mount tap on the Pana-Route 51D-1462 138kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1097,
      "normalized": {
        "queue_id": "J933",
        "county": "Day County",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Ellendale - Big Stone South 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490728,
        "projectNumber": "J933",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Day County",
        "state": "SD",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ellendale - Big Stone South 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1098,
      "normalized": {
        "queue_id": "J911",
        "county": "Montgomery County",
        "state": "TX",
        "transmission_owner": "Entergy",
        "poi": "Porter 230kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490729,
        "projectNumber": "J911",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Montgomery County",
        "state": "TX",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Porter 230kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1099,
      "normalized": {
        "queue_id": "J934",
        "county": "Crittenden County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Kuhn 161kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-02-28T05:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-09-12T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 180.0,
        "dp2_nris_mw": 180.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490730,
        "projectNumber": "J934",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-02-28T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2019-09-12T04:00:00+00:00",
        "negInService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Crittenden County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kuhn 161kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 180.0,
        "dp2NrisMw": 180.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1100,
      "normalized": {
        "queue_id": "J922",
        "county": "Chicot County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Lake Village Bagby - Chicot 115kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490731,
        "projectNumber": "J922",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2020-06-30T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Chicot County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lake Village Bagby - Chicot 115kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1101,
      "normalized": {
        "queue_id": "J875",
        "county": "Lenawee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Par - Raisin Road 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2022-11-18T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-08-06T04:00:00+00:00",
        "in_service": "2020-09-10T04:00:00+00:00",
        "gia_to_execute": "2020-01-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490732,
        "projectNumber": "J875",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-08-06T04:00:00+00:00",
        "inService": "2020-09-10T04:00:00+00:00",
        "giaToExec": "2020-01-06T05:00:00+00:00",
        "negInService": "2022-11-18T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Par - Raisin Road 138kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1102,
      "normalized": {
        "queue_id": "J938",
        "county": "Palo Alto County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Emmestburg - Freedom 69kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2017-10-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490733,
        "projectNumber": "J938",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2017-10-09T04:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Palo Alto County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Emmestburg - Freedom 69kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1103,
      "normalized": {
        "queue_id": "J951",
        "county": "Kittson County",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Donaldson - Warsaw 115 kV Line Tap",
        "queue_date": "2018-02-02T05:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2018-11-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490734,
        "projectNumber": "J951",
        "queueDate": "2018-02-02T05:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2018-11-15T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Kittson County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Donaldson - Warsaw 115 kV Line Tap",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1104,
      "normalized": {
        "queue_id": "J944",
        "county": "New Madrid County",
        "state": "MO",
        "transmission_owner": "Entergy",
        "poi": "Portageville - New Madrid 161kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2019-12-17T05:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-10T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490735,
        "projectNumber": "J944",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-17T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2019-07-10T04:00:00+00:00",
        "negInService": "2022-10-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "New Madrid County",
        "state": "MO",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Portageville - New Madrid 161kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1105,
      "normalized": {
        "queue_id": "J939",
        "county": "Wright County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Clarion-Eagle Grove 69kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-10-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 38.0,
        "summer_net_mw": 38.0,
        "winter_net_mw": 38.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490736,
        "projectNumber": "J939",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-10-12T04:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Wright County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Clarion-Eagle Grove 69kV line",
        "summerNetMW": 38.0,
        "winterNetMW": 38.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1106,
      "normalized": {
        "queue_id": "J897",
        "county": "Grand Forks County",
        "state": "ND",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Prairie - Ramsey 230 kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": "2024-10-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2022-08-03T04:00:00+00:00",
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": "2021-09-13T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 190.0,
        "dp1_nris_mw": 190.0,
        "dp2_eris_mw": 190.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490737,
        "projectNumber": "J897",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "doneDate": "2022-08-03T04:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "giaToExec": "2021-09-13T04:00:00+00:00",
        "negInService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Grand Forks County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Prairie - Ramsey 230 kV line",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 190.0,
        "dp1NrisMw": 190.0,
        "dp2ErisMw": 190.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1107,
      "normalized": {
        "queue_id": "J899",
        "county": "Carroll County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Green Forest South - Harrison West 161kV",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490738,
        "projectNumber": "J899",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-03-25T04:00:00+00:00",
        "inService": "2019-10-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Carroll County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Green Forest South - Harrison West 161kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1108,
      "normalized": {
        "queue_id": "J931",
        "county": "Ottawa County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Kenowa 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-04-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490739,
        "projectNumber": "J931",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-04-23T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kenowa 345kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1109,
      "normalized": {
        "queue_id": "J909",
        "county": "Tangipahoa Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Amite 115 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2022-02-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-11-22T05:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-06-06T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490740,
        "projectNumber": "J909",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-11-22T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2019-06-06T04:00:00+00:00",
        "negInService": "2022-02-15T05:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Tangipahoa Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Amite 115 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1110,
      "normalized": {
        "queue_id": "J921",
        "county": "Ionia County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Thompson Road 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-04-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 146.7,
        "summer_net_mw": 146.7,
        "winter_net_mw": 146.7,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 146.7,
        "dp1_nris_mw": 146.7,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490741,
        "projectNumber": "J921",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-04-23T04:00:00+00:00",
        "inService": "2019-07-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ionia County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Thompson Road 138 kV Substation",
        "summerNetMW": 146.7,
        "winterNetMW": 146.7,
        "dp1ErisMw": 146.7,
        "dp1NrisMw": 146.7,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1111,
      "normalized": {
        "queue_id": "J984",
        "county": "Gratiot County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Nelson Road – Murphy 345kV line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-10-31T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-05-07T04:00:00+00:00",
        "in_service": "2021-06-01T04:00:00+00:00",
        "gia_to_execute": "2020-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490742,
        "projectNumber": "J984",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-05-07T04:00:00+00:00",
        "inService": "2021-06-01T04:00:00+00:00",
        "giaToExec": "2020-12-22T05:00:00+00:00",
        "negInService": "2022-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Nelson Road – Murphy 345kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1112,
      "normalized": {
        "queue_id": "J971",
        "county": "Nobles County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Nobles Co - Fenton 115 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490743,
        "projectNumber": "J971",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Nobles County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Nobles Co - Fenton 115 kV Line Tap",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1113,
      "normalized": {
        "queue_id": "J955",
        "county": "Sangamon County",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Austin Substation 345kV Bus",
        "queue_date": "2018-03-08T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 1165.0,
        "summer_net_mw": 1040.0,
        "winter_net_mw": 1165.0,
        "proposed_completion_date": "2025-01-31T05:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-04-26T04:00:00+00:00",
        "in_service": "2021-11-01T04:00:00+00:00",
        "gia_to_execute": "2022-04-27T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 1165.0,
        "dp1_nris_mw": 1165.0,
        "dp2_eris_mw": 1165.0,
        "dp2_nris_mw": 1165.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490744,
        "projectNumber": "J955",
        "queueDate": "2018-03-08T05:00:00+00:00",
        "doneDate": "2022-04-26T04:00:00+00:00",
        "inService": "2021-11-01T04:00:00+00:00",
        "giaToExec": "2022-04-27T04:00:00+00:00",
        "negInService": "2025-01-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Sangamon County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Austin Substation 345kV Bus",
        "summerNetMW": 1040.0,
        "winterNetMW": 1165.0,
        "dp1ErisMw": 1165.0,
        "dp1NrisMw": 1165.0,
        "dp2ErisMw": 1165.0,
        "dp2NrisMw": 1165.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1114,
      "normalized": {
        "queue_id": "J947",
        "county": "Grant County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Potosis - Hillman 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-04-17T04:00:00+00:00",
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": "2019-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490745,
        "projectNumber": "J947",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-04-17T04:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "giaToExec": "2019-11-14T05:00:00+00:00",
        "negInService": "2023-07-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Grant County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Potosis - Hillman 138kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1115,
      "normalized": {
        "queue_id": "J929",
        "county": "McIntosh County",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Wishek 41.6 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-10-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490746,
        "projectNumber": "J929",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-10-24T04:00:00+00:00",
        "inService": "2021-06-30T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "McIntosh County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wishek 41.6 kV Substation",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1116,
      "normalized": {
        "queue_id": "J908",
        "county": "Tallahatchie County",
        "state": "MS",
        "transmission_owner": "Entergy",
        "poi": "Webb 115kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-03-04T05:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-09-12T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490747,
        "projectNumber": "J908",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-03-04T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2019-09-12T04:00:00+00:00",
        "negInService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Tallahatchie County",
        "state": "MS",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Webb 115kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1117,
      "normalized": {
        "queue_id": "J912",
        "county": "Christian County",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Pana Substation 138kV Bus",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-09-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-04-16T04:00:00+00:00",
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": "2019-11-04T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490748,
        "projectNumber": "J912",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-04-16T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "giaToExec": "2019-11-04T05:00:00+00:00",
        "negInService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Christian County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pana Substation 138kV Bus",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1118,
      "normalized": {
        "queue_id": "J914",
        "county": "Manistee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Filer City 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490749,
        "projectNumber": "J914",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-09T05:00:00+00:00",
        "inService": "2019-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Manistee County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Filer City 138 kV Substation",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1119,
      "normalized": {
        "queue_id": "J940",
        "county": "Burleigh County",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Jamestown - Center 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-02-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490750,
        "projectNumber": "J940",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-02-06T05:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Burleigh County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Jamestown - Center 345kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1120,
      "normalized": {
        "queue_id": "J941",
        "county": "Grant County",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Big Stone-Brookings County 345KV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-11-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490751,
        "projectNumber": "J941",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-11-01T04:00:00+00:00",
        "inService": "2020-07-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Grant County",
        "state": "SD",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Big Stone-Brookings County 345KV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1121,
      "normalized": {
        "queue_id": "J942",
        "county": "Craighead County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Cash - Newport AB 161kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 107.0,
        "summer_net_mw": 107.0,
        "winter_net_mw": 107.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 107.0,
        "dp1_nris_mw": 107.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490752,
        "projectNumber": "J942",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-03-25T04:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Craighead County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cash - Newport AB 161kV Line Tap",
        "summerNetMW": 107.0,
        "winterNetMW": 107.0,
        "dp1ErisMw": 107.0,
        "dp1NrisMw": 107.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1122,
      "normalized": {
        "queue_id": "J953",
        "county": "Johnson County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "AMIL.IOW_AFRYT",
        "queue_date": "2018-03-08T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 2.0,
        "summer_net_mw": 1.83,
        "winter_net_mw": 2.0,
        "proposed_completion_date": null,
        "generation_type": "Diesel",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-12T04:00:00+00:00",
        "in_service": "2006-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 1.83,
        "dp1_nris_mw": 2.0,
        "dp2_eris_mw": 1.83,
        "dp2_nris_mw": 2.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490753,
        "projectNumber": "J953",
        "queueDate": "2018-03-08T05:00:00+00:00",
        "doneDate": "2022-08-12T04:00:00+00:00",
        "inService": "2006-01-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Johnson County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "E-NRIS",
        "poiName": "AMIL.IOW_AFRYT",
        "summerNetMW": 1.83,
        "winterNetMW": 2.0,
        "dp1ErisMw": 1.83,
        "dp1NrisMw": 2.0,
        "dp2ErisMw": 1.83,
        "dp2NrisMw": 2.0,
        "fuelType": "Diesel",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1123,
      "normalized": {
        "queue_id": "J956",
        "county": "Ralls County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Spencer Creek 345kV Substation",
        "queue_date": "2018-03-09T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2021-12-22T05:00:00+00:00",
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": "2021-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490754,
        "projectNumber": "J956",
        "queueDate": "2018-03-09T05:00:00+00:00",
        "doneDate": "2021-12-22T05:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "giaToExec": "2021-12-22T05:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Ralls County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Spencer Creek 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1124,
      "normalized": {
        "queue_id": "J973",
        "county": "Coles County,Edgar County",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Kansas West 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-03-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490755,
        "projectNumber": "J973",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-03-19T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Coles County,Edgar County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kansas West 345kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1125,
      "normalized": {
        "queue_id": "J949",
        "county": "Coles County",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Kansas Substation 138kV Bus #3",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2020-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2019-12-10T05:00:00+00:00",
        "in_service": "2020-08-31T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 170.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490756,
        "projectNumber": "J949",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-10T05:00:00+00:00",
        "inService": "2020-08-31T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2020-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Coles County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kansas Substation 138kV Bus #3",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 170.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1126,
      "normalized": {
        "queue_id": "J957",
        "county": "Mercer County,Putnam County,Sullivan County",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Maywood 345kV Substation",
        "queue_date": "2018-03-09T05:00:00+00:00",
        "withdrawn_date": "2019-03-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 800.0,
        "summer_net_mw": 800.0,
        "winter_net_mw": 800.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2010-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490757,
        "projectNumber": "J957",
        "queueDate": "2018-03-09T05:00:00+00:00",
        "withdrawnDate": "2019-03-19T04:00:00+00:00",
        "inService": "2010-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Mercer County,Putnam County,Sullivan County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Maywood 345kV Substation",
        "summerNetMW": 800.0,
        "winterNetMW": 800.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1127,
      "normalized": {
        "queue_id": "J930",
        "county": "Sioux County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Boyden - Sheldon 69kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2017-11-16T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 38.0,
        "summer_net_mw": 38.0,
        "winter_net_mw": 38.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490758,
        "projectNumber": "J930",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2017-11-16T05:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Sioux County",
        "state": "IA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Boyden - Sheldon 69kV line",
        "summerNetMW": 38.0,
        "winterNetMW": 38.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1128,
      "normalized": {
        "queue_id": "J932",
        "county": "Liberty County",
        "state": "TX",
        "transmission_owner": "Entergy",
        "poi": "Porter - China 230 kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490759,
        "projectNumber": "J932",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Liberty County",
        "state": "TX",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Porter - China 230 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1129,
      "normalized": {
        "queue_id": "J903",
        "county": "Henry County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Greensboro 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-12-06T05:00:00+00:00",
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490760,
        "projectNumber": "J903",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-06T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2023-05-01T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Henry County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greensboro 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1130,
      "normalized": {
        "queue_id": "J913",
        "county": "White County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Reynolds 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-08-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2019-12-03T05:00:00+00:00",
        "in_service": "2020-08-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 160.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490761,
        "projectNumber": "J913",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-03T05:00:00+00:00",
        "inService": "2020-08-01T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2022-08-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "White County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynolds 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 160.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1131,
      "normalized": {
        "queue_id": "J972",
        "county": "St. Francis County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Hughes-Forest City South 161kv line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490762,
        "projectNumber": "J972",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "St. Francis County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hughes-Forest City South 161kv line",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1132,
      "normalized": {
        "queue_id": "J948",
        "county": "Poinsett County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Harrisburg Tap - Harrisburg 161kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490763,
        "projectNumber": "J948",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Poinsett County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Harrisburg Tap - Harrisburg 161kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1133,
      "normalized": {
        "queue_id": "J987",
        "county": "Montgomery County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Montgomery 161kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490764,
        "projectNumber": "J987",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-20T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Montgomery County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Montgomery 161kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1134,
      "normalized": {
        "queue_id": "J974",
        "county": "Fulton County,Peoria County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mapleridge 345kV Switching Station",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2025-06-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2023-10-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-15T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 225.0,
        "dp2_nris_mw": 225.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490765,
        "projectNumber": "J974",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2025-06-25T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-15T04:00:00+00:00",
        "negInService": "2023-10-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fulton County,Peoria County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mapleridge 345kV Switching Station",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 225.0,
        "dp2NrisMw": 225.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1135,
      "normalized": {
        "queue_id": "J989",
        "county": "Oakland County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Halsey 138kV Substation",
        "queue_date": "2018-02-12T05:00:00+00:00",
        "withdrawn_date": "2020-06-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490766,
        "projectNumber": "J989",
        "queueDate": "2018-02-12T05:00:00+00:00",
        "withdrawnDate": "2020-06-30T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Oakland County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Halsey 138kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1136,
      "normalized": {
        "queue_id": "J959",
        "county": "Fayette County",
        "state": "IA",
        "transmission_owner": "SMMPA",
        "poi": "Windsor 161kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490767,
        "projectNumber": "J959",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "SMMPA",
        "county": "Fayette County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Windsor 161kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1137,
      "normalized": {
        "queue_id": "J960",
        "county": "Presque Isle County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Livingston 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-03-21T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490768,
        "projectNumber": "J960",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-03-21T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Presque Isle County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Livingston 345kV Substation",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1138,
      "normalized": {
        "queue_id": "J993",
        "county": "Boone County",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Hortonville - Whitestown 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-11-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490769,
        "projectNumber": "J993",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Boone County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hortonville - Whitestown 345kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1139,
      "normalized": {
        "queue_id": "J926",
        "county": "Saint Croix County",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Pine Lake - Apple River 161 kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 101.28,
        "summer_net_mw": 101.28,
        "winter_net_mw": 101.28,
        "proposed_completion_date": "2023-09-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-06-03T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-06-04T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 101.28,
        "dp1_nris_mw": 101.28,
        "dp2_eris_mw": 101.28,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490770,
        "projectNumber": "J926",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2021-06-03T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-06-04T04:00:00+00:00",
        "negInService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Saint Croix County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Pine Lake - Apple River 161 kV Line",
        "summerNetMW": 101.28,
        "winterNetMW": 101.28,
        "dp1ErisMw": 101.28,
        "dp1NrisMw": 101.28,
        "dp2ErisMw": 101.28,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1140,
      "normalized": {
        "queue_id": "J981",
        "county": "Washington County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Sub T 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490771,
        "projectNumber": "J981",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2021-03-01T05:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Washington County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sub T 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1141,
      "normalized": {
        "queue_id": "J902",
        "county": "Ashley County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "AECC Mist to Montrose 115 kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.96,
        "summer_net_mw": 99.96,
        "winter_net_mw": 99.96,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490772,
        "projectNumber": "J902",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Ashley County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "AECC Mist to Montrose 115 kV line",
        "summerNetMW": 99.96,
        "winterNetMW": 99.96,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1142,
      "normalized": {
        "queue_id": "J935",
        "county": "Hubbard County",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Hubbard - Badoura 230kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-02-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490773,
        "projectNumber": "J935",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-02-04T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Hubbard County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hubbard - Badoura 230kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1143,
      "normalized": {
        "queue_id": "J923",
        "county": "Montgomery County",
        "state": "TX",
        "transmission_owner": "Entergy",
        "poi": "Porter 230kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490774,
        "projectNumber": "J923",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Montgomery County",
        "state": "TX",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Porter 230kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1144,
      "normalized": {
        "queue_id": "J936",
        "county": "Calhoun County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Argenta - Tompkins 345kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 535.0,
        "summer_net_mw": 507.0,
        "winter_net_mw": 535.0,
        "proposed_completion_date": null,
        "generation_type": "Combined Cycle",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490775,
        "projectNumber": "J936",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-09T05:00:00+00:00",
        "inService": "2020-05-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Argenta - Tompkins 345kV Line Tap",
        "summerNetMW": 507.0,
        "winterNetMW": 535.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Combined Cycle",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1145,
      "normalized": {
        "queue_id": "J979",
        "county": "Christian County",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Pana Substation 345kV Bus",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-10-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 170.0,
        "dp2_nris_mw": 170.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490776,
        "projectNumber": "J979",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-10-18T04:00:00+00:00",
        "inService": "2021-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Christian County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pana Substation 345kV Bus",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 170.0,
        "dp2NrisMw": 170.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1146,
      "normalized": {
        "queue_id": "J992",
        "county": "Cass County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Walton 230kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490777,
        "projectNumber": "J992",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Cass County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Walton 230kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1147,
      "normalized": {
        "queue_id": "J945",
        "county": "Washington County",
        "state": "MS",
        "transmission_owner": "Entergy",
        "poi": "Gerald Andrus - Clinton Industrial 230 kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490778,
        "projectNumber": "J945",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Washington County",
        "state": "MS",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gerald Andrus - Clinton Industrial 230 kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1148,
      "normalized": {
        "queue_id": "J986",
        "county": "Wood County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Port Edwards - Sand Lake 138kV",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 149.76,
        "summer_net_mw": 149.76,
        "winter_net_mw": 149.76,
        "proposed_completion_date": "2022-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2021-05-05T04:00:00+00:00",
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-05-05T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 149.76,
        "dp1_nris_mw": 149.76,
        "dp2_eris_mw": 149.76,
        "dp2_nris_mw": 149.76,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490779,
        "projectNumber": "J986",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-05-05T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2021-05-05T04:00:00+00:00",
        "negInService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Wood County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Port Edwards - Sand Lake 138kV",
        "summerNetMW": 149.76,
        "winterNetMW": 149.76,
        "dp1ErisMw": 149.76,
        "dp1NrisMw": 149.76,
        "dp2ErisMw": 149.76,
        "dp2NrisMw": 149.76,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1149,
      "normalized": {
        "queue_id": "J904",
        "county": "Ashley County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Hamburg - Mist 115kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490780,
        "projectNumber": "J904",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Ashley County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hamburg - Mist 115kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1150,
      "normalized": {
        "queue_id": "J924",
        "county": "Monroe County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Brinkley East - Aubrey 230 kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490781,
        "projectNumber": "J924",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Monroe County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brinkley East - Aubrey 230 kV line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1151,
      "normalized": {
        "queue_id": "J994",
        "county": "Callaway County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Guthrie 161 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490782,
        "projectNumber": "J994",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-20T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Callaway County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Guthrie 161 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1152,
      "normalized": {
        "queue_id": "J997",
        "county": "LaMoure County",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "Ellendale 345 kV Sub, 230 kV Bus - 661098",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490783,
        "projectNumber": "J997",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "LaMoure County",
        "state": "ND",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ellendale 345 kV Sub, 230 kV Bus - 661098",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1153,
      "normalized": {
        "queue_id": "J905",
        "county": "Pipestone County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Buffalo Ridge 115kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 40.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490784,
        "projectNumber": "J905",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Pipestone County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Buffalo Ridge 115kV Substation",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 40.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1154,
      "normalized": {
        "queue_id": "J925",
        "county": "Shiawassee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "North Cournna - Bell Road 138 kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-04-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490785,
        "projectNumber": "J925",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-04-24T04:00:00+00:00",
        "inService": "2019-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Cournna - Bell Road 138 kV line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1155,
      "normalized": {
        "queue_id": "J915",
        "county": "Liberty County",
        "state": "TX",
        "transmission_owner": "Entergy",
        "poi": "Parkway - East Gate 138kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490786,
        "projectNumber": "J915",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Liberty County",
        "state": "TX",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Parkway - East Gate 138kV line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1156,
      "normalized": {
        "queue_id": "J943",
        "county": "Lincoln County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "J460 substation on the Brookings - H081 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-03-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490787,
        "projectNumber": "J943",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-03-12T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lincoln County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "J460 substation on the Brookings - H081 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1157,
      "normalized": {
        "queue_id": "J952",
        "county": "Corson County",
        "state": "SD",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "McLaughlin - McIntosh Junction 115 kV Line Tap",
        "queue_date": "2018-02-05T05:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 54.0,
        "summer_net_mw": 54.0,
        "winter_net_mw": 54.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 54.0,
        "dp1_nris_mw": 54.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490788,
        "projectNumber": "J952",
        "queueDate": "2018-02-05T05:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "Corson County",
        "state": "SD",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "McLaughlin - McIntosh Junction 115 kV Line Tap",
        "summerNetMW": 54.0,
        "winterNetMW": 54.0,
        "dp1ErisMw": 54.0,
        "dp1NrisMw": 54.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1158,
      "normalized": {
        "queue_id": "J982",
        "county": "Dickinson County,Emmet County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Obrien County - Kossuth 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2024-03-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": "2022-02-07T05:00:00+00:00",
        "in_service": "2021-06-01T04:00:00+00:00",
        "gia_to_execute": "2022-02-07T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490789,
        "projectNumber": "J982",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-02-07T05:00:00+00:00",
        "inService": "2021-06-01T04:00:00+00:00",
        "giaToExec": "2022-02-07T05:00:00+00:00",
        "negInService": "2024-03-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Dickinson County,Emmet County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Obrien County - Kossuth 345 kV Line Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1159,
      "normalized": {
        "queue_id": "J983",
        "county": "Brown County,LaSalle County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Oglesby - Minonk Tap 138kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-11-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490790,
        "projectNumber": "J983",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-11-01T04:00:00+00:00",
        "inService": "2021-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Brown County,LaSalle County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Oglesby - Minonk Tap 138kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1160,
      "normalized": {
        "queue_id": "J954",
        "county": "Johnson County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "AMIL.IOW_AFRYT",
        "queue_date": "2018-03-08T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 1.4,
        "summer_net_mw": 1.4,
        "winter_net_mw": 1.4,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-12T04:00:00+00:00",
        "in_service": "2016-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 1.4,
        "dp1_nris_mw": 1.4,
        "dp2_eris_mw": 1.4,
        "dp2_nris_mw": 1.4,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490791,
        "projectNumber": "J954",
        "queueDate": "2018-03-08T05:00:00+00:00",
        "doneDate": "2022-08-12T04:00:00+00:00",
        "inService": "2016-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Johnson County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "E-NRIS",
        "poiName": "AMIL.IOW_AFRYT",
        "summerNetMW": 1.4,
        "winterNetMW": 1.4,
        "dp1ErisMw": 1.4,
        "dp1NrisMw": 1.4,
        "dp2ErisMw": 1.4,
        "dp2NrisMw": 1.4,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1161,
      "normalized": {
        "queue_id": "J946",
        "county": "Cass County",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Bison 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-05-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490792,
        "projectNumber": "J946",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-05-26T04:00:00+00:00",
        "inService": "2020-07-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bison 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1162,
      "normalized": {
        "queue_id": "J985",
        "county": "Scott County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Miner - Kelso 161kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490793,
        "projectNumber": "J985",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-06T05:00:00+00:00",
        "inService": "2020-12-01T05:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Scott County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Miner - Kelso 161kV Line Tap",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1163,
      "normalized": {
        "queue_id": "J990",
        "county": "Dubuque County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Salem 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-02-15T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490794,
        "projectNumber": "J990",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-02-15T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Dubuque County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Salem 345kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1164,
      "normalized": {
        "queue_id": "J977",
        "county": "Jackson County,Martin County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Jackson North 161kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490795,
        "projectNumber": "J977",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-03-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Jackson County,Martin County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Jackson North 161kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1165,
      "normalized": {
        "queue_id": "J999",
        "county": "Linn County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Fairfax 161kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490796,
        "projectNumber": "J999",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fairfax 161kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1166,
      "normalized": {
        "queue_id": "J1359",
        "county": "Linn County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Oakridge 69 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 95.0,
        "summer_net_mw": 95.0,
        "winter_net_mw": 95.0,
        "proposed_completion_date": "2025-03-01T05:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 95.0,
        "dp1_nris_mw": 95.0,
        "dp2_eris_mw": 95.0,
        "dp2_nris_mw": 95.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490797,
        "projectNumber": "J1359",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "negInService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Oakridge 69 kV Substation",
        "summerNetMW": 95.0,
        "winterNetMW": 95.0,
        "dp1ErisMw": 95.0,
        "dp1NrisMw": 95.0,
        "dp2ErisMw": 95.0,
        "dp2NrisMw": 95.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1167,
      "normalized": {
        "queue_id": "J988",
        "county": "Wayne County",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY",
        "poi": "W Waynesboro 230kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490798,
        "projectNumber": "J988",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY",
        "county": "Wayne County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "W Waynesboro 230kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1168,
      "normalized": {
        "queue_id": "J958",
        "county": "Lincoln County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Buffalo Ridge 115kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490799,
        "projectNumber": "J958",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lincoln County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Buffalo Ridge 115kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1169,
      "normalized": {
        "queue_id": "J2322",
        "county": "Evangeline",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Coughlin - Pine Prairie 138.0kV",
        "queue_date": "2025-11-20T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-07-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490800,
        "projectNumber": "J2322",
        "queueDate": "2025-11-20T05:00:00+00:00",
        "inService": "2025-07-02T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Coughlin - Pine Prairie 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1170,
      "normalized": {
        "queue_id": "J1491",
        "county": "Marion",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "IPL EW Stout North  Yard 138 kV Substation",
        "queue_date": "2020-06-03T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490801,
        "projectNumber": "J1491",
        "queueDate": "2020-06-03T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2022-12-15T05:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Marion",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "IPL EW Stout North  Yard 138 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1171,
      "normalized": {
        "queue_id": "J1495",
        "county": "Goodhue",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "North Rochester 161kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2023-01-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490802,
        "projectNumber": "J1495",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2023-01-31T05:00:00+00:00",
        "inService": "2023-10-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Goodhue",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Rochester 161kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1172,
      "normalized": {
        "queue_id": "J1497",
        "county": "Jefferson",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Concord 138 kV",
        "queue_date": "2020-06-11T04:00:00+00:00",
        "withdrawn_date": "2023-06-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 110.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 110.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490803,
        "projectNumber": "J1497",
        "queueDate": "2020-06-11T04:00:00+00:00",
        "withdrawnDate": "2023-06-29T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Jefferson",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Concord 138 kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 110.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 110.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1173,
      "normalized": {
        "queue_id": "J975",
        "county": "Cass County",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Buffalo 115kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-07-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490804,
        "projectNumber": "J975",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-07-28T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Cass County",
        "state": "ND",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Buffalo 115kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1174,
      "normalized": {
        "queue_id": "J976",
        "county": "Warren County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Montgomery - Enon 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 300.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490805,
        "projectNumber": "J976",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Warren County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Montgomery - Enon 345kV Line Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 300.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1175,
      "normalized": {
        "queue_id": "J978",
        "county": "Montcalm County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Eureka - Vestaburg 138kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-11-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490806,
        "projectNumber": "J978",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-11-21T05:00:00+00:00",
        "inService": "2021-03-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Montcalm County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Eureka - Vestaburg 138kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1176,
      "normalized": {
        "queue_id": "J991",
        "county": "Clay County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Xenia 345kV Switching Station",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490807,
        "projectNumber": "J991",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clay County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Xenia 345kV Switching Station",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1177,
      "normalized": {
        "queue_id": "J996",
        "county": "Lenawee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Beecher - Moraco 138kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": "2022-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-04-27T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2020-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 80.0,
        "dp2_nris_mw": 80.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490808,
        "projectNumber": "J996",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-04-27T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2020-12-22T05:00:00+00:00",
        "negInService": "2022-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Beecher - Moraco 138kV Line",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 80.0,
        "dp2NrisMw": 80.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1178,
      "normalized": {
        "queue_id": "J1486",
        "county": "Waupaca County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Harrison North 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-03-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 2.5,
        "summer_net_mw": 2.5,
        "winter_net_mw": 2.5,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490809,
        "projectNumber": "J1486",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-03-17T04:00:00+00:00",
        "inService": "2021-12-31T05:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Waupaca County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Harrison North 138kV Substation",
        "summerNetMW": 2.5,
        "winterNetMW": 2.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1179,
      "normalized": {
        "queue_id": "J980",
        "county": "Christian County",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Pana Substation 345kV Bus",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490810,
        "projectNumber": "J980",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-06T05:00:00+00:00",
        "inService": "2021-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Christian County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pana Substation 345kV Bus",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1180,
      "normalized": {
        "queue_id": "J995",
        "county": "Brown County,Jersey County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "NW Jerseyville Northwest Substation 138kV Bus",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490811,
        "projectNumber": "J995",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-06T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Brown County,Jersey County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "NW Jerseyville Northwest Substation 138kV Bus",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1181,
      "normalized": {
        "queue_id": "J1501",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Auburn North 138kV",
        "queue_date": "2020-06-17T04:00:00+00:00",
        "withdrawn_date": "2021-04-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490812,
        "projectNumber": "J1501",
        "queueDate": "2020-06-17T04:00:00+00:00",
        "withdrawnDate": "2021-04-20T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Auburn North 138kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1182,
      "normalized": {
        "queue_id": "J1502",
        "county": "Juneau",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Briggs Road - North Madison 345.0kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": "2026-01-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 225.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 225.0,
        "dp2_nris_mw": 225.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490813,
        "projectNumber": "J1502",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "inService": "2023-03-31T04:00:00+00:00",
        "negInService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Juneau",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Briggs Road - North Madison 345.0kV",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 225.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 225.0,
        "dp2NrisMw": 225.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1183,
      "normalized": {
        "queue_id": "J1503",
        "county": "Faribault",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Huntley",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2027-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 120.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490814,
        "projectNumber": "J1503",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Faribault",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Huntley",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 120.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1184,
      "normalized": {
        "queue_id": "J1504",
        "county": "Faribault",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Huntley",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2027-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 120.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490815,
        "projectNumber": "J1504",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Faribault",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Huntley",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 120.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1185,
      "normalized": {
        "queue_id": "J998",
        "county": "Dallas County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Adel - Waukee 69kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490816,
        "projectNumber": "J998",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Dallas County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Adel - Waukee 69kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1186,
      "normalized": {
        "queue_id": "J1498",
        "county": "Murray",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Chanarambie 115 kV Substation",
        "queue_date": "2020-06-09T04:00:00+00:00",
        "withdrawn_date": "2023-01-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490817,
        "projectNumber": "J1498",
        "queueDate": "2020-06-09T04:00:00+00:00",
        "withdrawnDate": "2023-01-31T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Murray",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Chanarambie 115 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1187,
      "normalized": {
        "queue_id": "J1493",
        "county": "Hubbard",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Hubbard 115kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2021-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490818,
        "projectNumber": "J1493",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2021-01-05T05:00:00+00:00",
        "inService": "2023-10-15T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Hubbard",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hubbard 115kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1188,
      "normalized": {
        "queue_id": "J1494",
        "county": "Chisago",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Chisago 115kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2023-01-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490819,
        "projectNumber": "J1494",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2023-01-31T05:00:00+00:00",
        "inService": "2023-10-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chisago",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Chisago 115kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1189,
      "normalized": {
        "queue_id": "J1496",
        "county": "Olmsted",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Byron 161kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2021-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490820,
        "projectNumber": "J1496",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2021-11-17T05:00:00+00:00",
        "inService": "2023-10-15T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Olmsted",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Byron 161kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1190,
      "normalized": {
        "queue_id": "J1506",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Barkers Corner - Bogalusa 230 kV Line",
        "queue_date": "2020-06-09T04:00:00+00:00",
        "withdrawn_date": "2020-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490821,
        "projectNumber": "J1506",
        "queueDate": "2020-06-09T04:00:00+00:00",
        "withdrawnDate": "2020-12-22T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Barkers Corner - Bogalusa 230 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1191,
      "normalized": {
        "queue_id": "J1509",
        "county": "Leflore",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Greenwood - Pickens 115 kV",
        "queue_date": "2020-06-10T04:00:00+00:00",
        "withdrawn_date": "2024-01-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": "2023-06-20T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490822,
        "projectNumber": "J1509",
        "queueDate": "2020-06-10T04:00:00+00:00",
        "withdrawnDate": "2024-01-17T05:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "giaToExec": "2023-06-20T04:00:00+00:00",
        "negInService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Leflore",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greenwood - Pickens 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1192,
      "normalized": {
        "queue_id": "J1510",
        "county": "Wood",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Arpin 345kV",
        "queue_date": "2020-06-16T04:00:00+00:00",
        "withdrawn_date": "2023-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490823,
        "projectNumber": "J1510",
        "queueDate": "2020-06-16T04:00:00+00:00",
        "withdrawnDate": "2023-11-17T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Wood",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Arpin 345kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1193,
      "normalized": {
        "queue_id": "J1505",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Talisheek - Bogalusa 230 kV Line",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490824,
        "projectNumber": "J1505",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-12-22T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Talisheek - Bogalusa 230 kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1194,
      "normalized": {
        "queue_id": "J1507",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Barkers Corner - Bogalusa 230 kV Line",
        "queue_date": "2020-06-09T04:00:00+00:00",
        "withdrawn_date": "2020-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490825,
        "projectNumber": "J1507",
        "queueDate": "2020-06-09T04:00:00+00:00",
        "withdrawnDate": "2020-12-22T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Barkers Corner - Bogalusa 230 kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1195,
      "normalized": {
        "queue_id": "J1511",
        "county": "Chisago",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Scandia to Lawrence Creek 69kV",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": "2021-01-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 26.0,
        "summer_net_mw": 26.0,
        "winter_net_mw": 26.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490826,
        "projectNumber": "J1511",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "withdrawnDate": "2021-01-06T05:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chisago",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Scandia to Lawrence Creek 69kV",
        "summerNetMW": 26.0,
        "winterNetMW": 26.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1196,
      "normalized": {
        "queue_id": "J1514",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Driver 203kV  Substation",
        "queue_date": "2021-12-08T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-03-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490827,
        "projectNumber": "J1514",
        "queueDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "negInService": "2023-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Driver 203kV  Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1197,
      "normalized": {
        "queue_id": "J1519",
        "county": "Bollinger",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "St. Francois to Lutesville 345 kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2026-09-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 180.0,
        "dp2_nris_mw": 180.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490828,
        "projectNumber": "J1519",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2026-09-01T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2025-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Bollinger",
        "state": "MO",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "St. Francois to Lutesville 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 180.0,
        "dp2NrisMw": 180.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1198,
      "normalized": {
        "queue_id": "J1520",
        "county": "Worth",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Other_",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": "2027-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 108.0,
        "dp2_eris_mw": 135.0,
        "dp2_nris_mw": 108.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490829,
        "projectNumber": "J1520",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Worth",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 108.0,
        "dp2ErisMw": 135.0,
        "dp2NrisMw": 108.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1199,
      "normalized": {
        "queue_id": "J1508",
        "county": "Marathon",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "B-54 Wien to McMillan 115KV",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 98.9,
        "summer_net_mw": 98.9,
        "winter_net_mw": 98.9,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 98.9,
        "dp1_nris_mw": 98.9,
        "dp2_eris_mw": 98.9,
        "dp2_nris_mw": 98.9,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490830,
        "projectNumber": "J1508",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marathon",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "B-54 Wien to McMillan 115KV",
        "summerNetMW": 98.9,
        "winterNetMW": 98.9,
        "dp1ErisMw": 98.9,
        "dp1NrisMw": 98.9,
        "dp2ErisMw": 98.9,
        "dp2NrisMw": 98.9,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1200,
      "normalized": {
        "queue_id": "J1518",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Hillsdale North",
        "queue_date": "2024-08-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": "2027-11-19T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 185.0,
        "dp1_nris_mw": 185.0,
        "dp2_eris_mw": 185.0,
        "dp2_nris_mw": 185.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490831,
        "projectNumber": "J1518",
        "queueDate": "2024-08-29T04:00:00+00:00",
        "inService": "2025-06-20T04:00:00+00:00",
        "negInService": "2027-11-19T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hillsdale North",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 185.0,
        "dp1NrisMw": 185.0,
        "dp2ErisMw": 185.0,
        "dp2NrisMw": 185.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1201,
      "normalized": {
        "queue_id": "J1500",
        "county": "George",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "SE Greene Co 230kV substation",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490832,
        "projectNumber": "J1500",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "George",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "SE Greene Co 230kV substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1202,
      "normalized": {
        "queue_id": "J1512",
        "county": "Lafayette",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Darlington 138KV",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 98.9,
        "summer_net_mw": 98.9,
        "winter_net_mw": 98.9,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490833,
        "projectNumber": "J1512",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Lafayette",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Darlington 138KV",
        "summerNetMW": 98.9,
        "winterNetMW": 98.9,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1203,
      "normalized": {
        "queue_id": "J1513",
        "county": "Waupaca",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Clintonville",
        "queue_date": "2022-02-22T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2026-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490834,
        "projectNumber": "J1513",
        "queueDate": "2022-02-22T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "negInService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Waupaca",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Clintonville",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1204,
      "normalized": {
        "queue_id": "J1515",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Tittabawassee  to Murphy 345kV",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": "2021-01-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490835,
        "projectNumber": "J1515",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "withdrawnDate": "2021-01-23T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tittabawassee  to Murphy 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1205,
      "normalized": {
        "queue_id": "J1522",
        "county": "Muskegon",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Grassmere 345kV",
        "queue_date": "2020-06-12T04:00:00+00:00",
        "withdrawn_date": "2020-11-30T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490836,
        "projectNumber": "J1522",
        "queueDate": "2020-06-12T04:00:00+00:00",
        "withdrawnDate": "2020-11-30T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Grassmere 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1206,
      "normalized": {
        "queue_id": "J1526",
        "county": "St. Clair",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Greenwood 345kV",
        "queue_date": "2020-06-14T04:00:00+00:00",
        "withdrawn_date": "2024-09-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-05-13T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490837,
        "projectNumber": "J1526",
        "queueDate": "2020-06-14T04:00:00+00:00",
        "withdrawnDate": "2024-09-12T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2026-05-13T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "St. Clair",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greenwood 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1207,
      "normalized": {
        "queue_id": "J2321",
        "county": "Lamar",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Columbia to Plant Morrow 161kV",
        "queue_date": "2022-05-16T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490838,
        "projectNumber": "J2321",
        "queueDate": "2022-05-16T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2025-04-30T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Lamar",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Columbia to Plant Morrow 161kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1208,
      "normalized": {
        "queue_id": "J1492",
        "county": "Kent",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gaines 138kV",
        "queue_date": "2020-06-12T04:00:00+00:00",
        "withdrawn_date": "2023-02-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490839,
        "projectNumber": "J1492",
        "queueDate": "2020-06-12T04:00:00+00:00",
        "withdrawnDate": "2023-02-22T05:00:00+00:00",
        "inService": "2023-08-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Kent",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gaines 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1209,
      "normalized": {
        "queue_id": "J1499",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado East - Sterlington 115 kV",
        "queue_date": "2020-06-08T04:00:00+00:00",
        "withdrawn_date": "2023-02-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490840,
        "projectNumber": "J1499",
        "queueDate": "2020-06-08T04:00:00+00:00",
        "withdrawnDate": "2023-02-10T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "El Dorado East - Sterlington 115 kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1210,
      "normalized": {
        "queue_id": "J1516",
        "county": "St. Clair",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Fitz  120kV",
        "queue_date": "2020-06-15T04:00:00+00:00",
        "withdrawn_date": "2025-06-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490841,
        "projectNumber": "J1516",
        "queueDate": "2020-06-15T04:00:00+00:00",
        "withdrawnDate": "2025-06-18T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "St. Clair",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fitz  120kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1211,
      "normalized": {
        "queue_id": "J1517",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Hillsdale North 230 kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490842,
        "projectNumber": "J1517",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2023-10-02T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hillsdale North 230 kV",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1212,
      "normalized": {
        "queue_id": "J1524",
        "county": "Pipestone",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Buffalo Ridge to Pipestone 115kV",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": "2021-01-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490843,
        "projectNumber": "J1524",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "withdrawnDate": "2021-01-06T05:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Pipestone",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Buffalo Ridge to Pipestone 115kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1213,
      "normalized": {
        "queue_id": "J1523",
        "county": "Leflore",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Greenwood - Pickens 115 kV",
        "queue_date": "2020-06-10T04:00:00+00:00",
        "withdrawn_date": "2023-02-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490844,
        "projectNumber": "J1523",
        "queueDate": "2020-06-10T04:00:00+00:00",
        "withdrawnDate": "2023-02-10T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Leflore",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greenwood - Pickens 115 kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1214,
      "normalized": {
        "queue_id": "J1525",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GRASSMERE",
        "queue_date": "2020-06-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-04-30T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490845,
        "projectNumber": "J1525",
        "queueDate": "2020-06-12T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2026-04-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "GRASSMERE",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1215,
      "normalized": {
        "queue_id": "J1528",
        "county": "Dunn",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "EAU CLAIRE (ENDPOINT A) TO AS KING (ENDPOINT B) 345 KV",
        "queue_date": "2022-03-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2027-06-06T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490846,
        "projectNumber": "J1528",
        "queueDate": "2022-03-17T04:00:00+00:00",
        "inService": "2024-06-06T04:00:00+00:00",
        "negInService": "2027-06-06T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dunn",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "EAU CLAIRE (ENDPOINT A) TO AS KING (ENDPOINT B) 345 KV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1216,
      "normalized": {
        "queue_id": "J1532",
        "county": "Page",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Clarinda-Coburg 69 kV",
        "queue_date": "2021-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2026-09-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490847,
        "projectNumber": "J1532",
        "queueDate": "2021-04-16T04:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "negInService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Page",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Clarinda-Coburg 69 kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1217,
      "normalized": {
        "queue_id": "J1536",
        "county": "Isabella",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Summerton (1) 138 kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2020-11-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490848,
        "projectNumber": "J1536",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2020-11-24T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Isabella",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Summerton (1) 138 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1218,
      "normalized": {
        "queue_id": "J1539",
        "county": "West Baton Rouge",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "J683 POI 138 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 146.0,
        "summer_net_mw": 146.0,
        "winter_net_mw": 146.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490849,
        "projectNumber": "J1539",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "West Baton Rouge",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "J683 POI 138 kV",
        "summerNetMW": 146.0,
        "winterNetMW": 146.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1219,
      "normalized": {
        "queue_id": "J1527",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Kenowa 345kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2024-09-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490850,
        "projectNumber": "J1527",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2024-09-12T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kenowa 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1220,
      "normalized": {
        "queue_id": "J1531",
        "county": "Sherburne",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Sheroc Substation 345kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490851,
        "projectNumber": "J1531",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2023-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Sherburne",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sheroc Substation 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1221,
      "normalized": {
        "queue_id": "J1542",
        "county": "St. James",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Thibodaux - Vacherie 230kV",
        "queue_date": "2020-06-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": "2026-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-19T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 30.0,
        "dp2_eris_mw": 135.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490852,
        "projectNumber": "J1542",
        "queueDate": "2020-06-14T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2023-01-19T05:00:00+00:00",
        "negInService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. James",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Thibodaux - Vacherie 230kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 30.0,
        "dp2ErisMw": 135.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1222,
      "normalized": {
        "queue_id": "J1543",
        "county": "Grand Traverse",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Ludington to Keystone 345kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2020-09-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490853,
        "projectNumber": "J1543",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2020-09-18T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Grand Traverse",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ludington to Keystone 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1223,
      "normalized": {
        "queue_id": "J1533",
        "county": "Adams",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Creston-Adams County 161kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2021-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490854,
        "projectNumber": "J1533",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2021-11-17T05:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Adams",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Creston-Adams County 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1224,
      "normalized": {
        "queue_id": "J1537",
        "county": "Genesee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Thetford #1  - Dort 138kV T-Line",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2022-12-01T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-07-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490855,
        "projectNumber": "J1537",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2022-12-01T05:00:00+00:00",
        "inService": "2024-07-04T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Thetford #1  - Dort 138kV T-Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1225,
      "normalized": {
        "queue_id": "J1540",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Bison-Alexandria 345kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2020-12-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490856,
        "projectNumber": "J1540",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2020-12-02T05:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bison-Alexandria 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1226,
      "normalized": {
        "queue_id": "J1546",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Milan - Monroe 345 kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2020-11-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490857,
        "projectNumber": "J1546",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2020-11-24T05:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Milan - Monroe 345 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1227,
      "normalized": {
        "queue_id": "J1548",
        "county": "Putnam",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Amo-Edwardsport IGCC 345kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490858,
        "projectNumber": "J1548",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Putnam",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Amo-Edwardsport IGCC 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1228,
      "normalized": {
        "queue_id": "J1558",
        "county": "Pope",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MORELAND",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": "2023-08-04T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490859,
        "projectNumber": "J1558",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "giaToExec": "2023-08-04T04:00:00+00:00",
        "negInService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pope",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "MORELAND",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1229,
      "normalized": {
        "queue_id": "J1552",
        "county": "Jackson",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Blackstone to Marshall 138kV (J1310 POI)",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2022-01-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490860,
        "projectNumber": "J1552",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2022-01-06T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Jackson",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Blackstone to Marshall 138kV (J1310 POI)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1230,
      "normalized": {
        "queue_id": "J1553",
        "county": "Clinton",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BINGHAM",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-08-02T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490861,
        "projectNumber": "J1553",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2025-08-02T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Clinton",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "BINGHAM",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1231,
      "normalized": {
        "queue_id": "J1538",
        "county": "Livingston",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Hammond - Coly 230 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-09-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 268.0,
        "summer_net_mw": 268.0,
        "winter_net_mw": 268.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490862,
        "projectNumber": "J1538",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-09-16T04:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Livingston",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hammond - Coly 230 kV",
        "summerNetMW": 268.0,
        "winterNetMW": 268.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1232,
      "normalized": {
        "queue_id": "J1544",
        "county": "Morton",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Mandan BN-Northwest Mandan 115kV Line",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490863,
        "projectNumber": "J1544",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-11-17T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Morton",
        "state": "ND",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mandan BN-Northwest Mandan 115kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1233,
      "normalized": {
        "queue_id": "J1557",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GREENWOOD - RAPSON (BANNER) 345.0kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 293.0,
        "summer_net_mw": 293.0,
        "winter_net_mw": 293.0,
        "proposed_completion_date": "2026-08-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 293.0,
        "dp1_nris_mw": 293.0,
        "dp2_eris_mw": 293.0,
        "dp2_nris_mw": 293.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490864,
        "projectNumber": "J1557",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "GREENWOOD - RAPSON (BANNER) 345.0kV",
        "summerNetMW": 293.0,
        "winterNetMW": 293.0,
        "dp1ErisMw": 293.0,
        "dp1NrisMw": 293.0,
        "dp2ErisMw": 293.0,
        "dp2NrisMw": 293.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1234,
      "normalized": {
        "queue_id": "J1564",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Talisheek - Bogalusa 230 kV Line",
        "queue_date": "2020-06-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-12-22T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490865,
        "projectNumber": "J1564",
        "queueDate": "2020-06-08T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2025-12-22T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Talisheek - Bogalusa 230 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1235,
      "normalized": {
        "queue_id": "J1545",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Crossett North to North Bastrop 115 kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2020-12-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490866,
        "projectNumber": "J1545",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2020-12-21T05:00:00+00:00",
        "inService": "2024-01-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crossett North to North Bastrop 115 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1236,
      "normalized": {
        "queue_id": "J1547",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Killdeer to Blackhawk 345kV Line Tap",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490867,
        "projectNumber": "J1547",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-10-01T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Killdeer to Blackhawk 345kV Line Tap",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1237,
      "normalized": {
        "queue_id": "J1551",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Crossett North to North Bastrop 115 kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2020-12-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 195.0,
        "summer_net_mw": 195.0,
        "winter_net_mw": 195.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490868,
        "projectNumber": "J1551",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2020-12-21T05:00:00+00:00",
        "inService": "2024-01-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crossett North to North Bastrop 115 kV",
        "summerNetMW": 195.0,
        "winterNetMW": 195.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1238,
      "normalized": {
        "queue_id": "J1555",
        "county": "Hillsdale",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Moore Road Substation 138kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-11-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490869,
        "projectNumber": "J1555",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-11-24T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Hillsdale",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Moore Road Substation 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1239,
      "normalized": {
        "queue_id": "J1521",
        "county": "Day",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone to Ellendale (BS3ELR) 345kV (J933)",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2021-11-16T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 199.5,
        "summer_net_mw": 199.5,
        "winter_net_mw": 199.5,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490870,
        "projectNumber": "J1521",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2021-11-16T05:00:00+00:00",
        "inService": "2022-10-31T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Day",
        "state": "SD",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Big Stone to Ellendale (BS3ELR) 345kV (J933)",
        "summerNetMW": 199.5,
        "winterNetMW": 199.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1240,
      "normalized": {
        "queue_id": "J1529",
        "county": "Carroll",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Tap Carroll (635320) - Auburn (635328) 69 kV line at about midpoint",
        "queue_date": "2021-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2026-09-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490871,
        "projectNumber": "J1529",
        "queueDate": "2021-04-16T04:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "negInService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Carroll",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tap Carroll (635320) - Auburn (635328) 69 kV line at about midpoint",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1241,
      "normalized": {
        "queue_id": "J1530",
        "county": "Mills",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Tap Hastings (635033) - Macedonia (635069) 69 kV line at about midpoint",
        "queue_date": "2021-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2026-03-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490872,
        "projectNumber": "J1530",
        "queueDate": "2021-04-16T04:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "negInService": "2026-03-01T05:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Mills",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tap Hastings (635033) - Macedonia (635069) 69 kV line at about midpoint",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1242,
      "normalized": {
        "queue_id": "J1534",
        "county": "Olmsted",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Byron",
        "queue_date": "2025-04-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490873,
        "projectNumber": "J1534",
        "queueDate": "2025-04-14T04:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Olmsted",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Byron",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1243,
      "normalized": {
        "queue_id": "J1556",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Northern Fibre 138kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2021-02-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490874,
        "projectNumber": "J1556",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2021-02-23T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Northern Fibre 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1244,
      "normalized": {
        "queue_id": "J1560",
        "county": "Iberia",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Patoutville Substation (138kV bus)",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490875,
        "projectNumber": "J1560",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Iberia",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Patoutville Substation (138kV bus)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1245,
      "normalized": {
        "queue_id": "J1565",
        "county": "Lawrence",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Bedford - Columbus 345kV line (Line #34517)",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2024-01-16T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490876,
        "projectNumber": "J1565",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2024-01-16T05:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Lawrence",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bedford - Columbus 345kV line (Line #34517)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1246,
      "normalized": {
        "queue_id": "J1569",
        "county": "Pierce",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Red Wing to Herbert 69kV (Redwing - Bay City - Esdaile - Herbert)",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2021-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 44.0,
        "summer_net_mw": 44.0,
        "winter_net_mw": 44.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490877,
        "projectNumber": "J1569",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2021-01-05T05:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Pierce",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Red Wing to Herbert 69kV (Redwing - Bay City - Esdaile - Herbert)",
        "summerNetMW": 44.0,
        "winterNetMW": 44.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1247,
      "normalized": {
        "queue_id": "J1566",
        "county": "Martin",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Rutland",
        "queue_date": "2022-02-11T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490878,
        "projectNumber": "J1566",
        "queueDate": "2022-02-11T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Martin",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rutland",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1248,
      "normalized": {
        "queue_id": "J1570",
        "county": "Rock",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Magnolia 161 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490879,
        "projectNumber": "J1570",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Rock",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Magnolia 161 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1249,
      "normalized": {
        "queue_id": "J1535",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport - Peabody Tap 138 kV Line",
        "queue_date": "2020-06-10T04:00:00+00:00",
        "withdrawn_date": "2021-03-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490880,
        "projectNumber": "J1535",
        "queueDate": "2020-06-10T04:00:00+00:00",
        "withdrawnDate": "2021-03-15T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Edwardsport - Peabody Tap 138 kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1250,
      "normalized": {
        "queue_id": "J1541",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Donaldsonville 230kV",
        "queue_date": "2020-06-21T04:00:00+00:00",
        "withdrawn_date": "2020-09-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490881,
        "projectNumber": "J1541",
        "queueDate": "2020-06-21T04:00:00+00:00",
        "withdrawnDate": "2020-09-18T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Donaldsonville 230kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1251,
      "normalized": {
        "queue_id": "J1571",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MOROCCO",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-04-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 175.0,
        "dp2_nris_mw": 175.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490882,
        "projectNumber": "J1571",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2025-04-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "MOROCCO",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 175.0,
        "dp2NrisMw": 175.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1252,
      "normalized": {
        "queue_id": "J1575",
        "county": "Marshall",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "115 kV transmission line from Warsaw to Donaldson owned by Otter Tail Power Company",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": "2028-08-03T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 70.0,
        "dp1_nris_mw": 70.0,
        "dp2_eris_mw": 70.0,
        "dp2_nris_mw": 70.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490883,
        "projectNumber": "J1575",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2025-12-01T05:00:00+00:00",
        "negInService": "2028-08-03T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Marshall",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "115 kV transmission line from Warsaw to Donaldson owned by Otter Tail Power Company",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 70.0,
        "dp1NrisMw": 70.0,
        "dp2ErisMw": 70.0,
        "dp2NrisMw": 70.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1253,
      "normalized": {
        "queue_id": "J1580",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Cobb - Archer Junction  138kV #2",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": "2020-11-30T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490884,
        "projectNumber": "J1580",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "withdrawnDate": "2020-11-30T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cobb - Archer Junction  138kV #2",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1254,
      "normalized": {
        "queue_id": "J1583",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Donaldsonville - Evergreen 230kV",
        "queue_date": "2020-06-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": "2025-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-19T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 175.0,
        "dp2_nris_mw": 175.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490885,
        "projectNumber": "J1583",
        "queueDate": "2020-06-14T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2023-01-19T05:00:00+00:00",
        "negInService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Donaldsonville - Evergreen 230kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 175.0,
        "dp2NrisMw": 175.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1255,
      "normalized": {
        "queue_id": "J1549",
        "county": "Clinton",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Rock Creek-DeWitt 161kV line",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490886,
        "projectNumber": "J1549",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Clinton",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rock Creek-DeWitt 161kV line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1256,
      "normalized": {
        "queue_id": "J1550",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BARTON LAKE - BATAVIA 138.0kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2024-07-04T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490887,
        "projectNumber": "J1550",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2024-07-04T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "BARTON LAKE - BATAVIA 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1257,
      "normalized": {
        "queue_id": "J1554",
        "county": "Ionia",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "American Bumper Junction to David Junction 138Kv",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-11-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490888,
        "projectNumber": "J1554",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-11-24T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ionia",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "American Bumper Junction to David Junction 138Kv",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1258,
      "normalized": {
        "queue_id": "J1561",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Richard 138kV",
        "queue_date": "2021-10-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2026-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": "2023-08-04T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490889,
        "projectNumber": "J1561",
        "queueDate": "2021-10-20T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "giaToExec": "2023-08-04T04:00:00+00:00",
        "negInService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Richard 138kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1259,
      "normalized": {
        "queue_id": "J1584",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Toomey  138kV",
        "queue_date": "2020-06-21T04:00:00+00:00",
        "withdrawn_date": "2020-09-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490890,
        "projectNumber": "J1584",
        "queueDate": "2020-06-21T04:00:00+00:00",
        "withdrawnDate": "2020-09-18T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Toomey  138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1260,
      "normalized": {
        "queue_id": "J1586",
        "county": "Calhoun",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Argenta to Tompkins 345kV line",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 499.0,
        "summer_net_mw": 499.0,
        "winter_net_mw": 499.0,
        "proposed_completion_date": "2025-06-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-30T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 499.0,
        "dp1_nris_mw": 499.0,
        "dp2_eris_mw": 499.0,
        "dp2_nris_mw": 499.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490891,
        "projectNumber": "J1586",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-09-30T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Argenta to Tompkins 345kV line",
        "summerNetMW": 499.0,
        "winterNetMW": 499.0,
        "dp1ErisMw": 499.0,
        "dp1NrisMw": 499.0,
        "dp2ErisMw": 499.0,
        "dp2NrisMw": 499.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1261,
      "normalized": {
        "queue_id": "J1567",
        "county": "Outagamie",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Werber W -  Hiway 22 345 kV line",
        "queue_date": "2022-02-22T05:00:00+00:00",
        "withdrawn_date": "2023-06-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490892,
        "projectNumber": "J1567",
        "queueDate": "2022-02-22T05:00:00+00:00",
        "withdrawnDate": "2023-06-22T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Outagamie",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Werber W -  Hiway 22 345 kV line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1262,
      "normalized": {
        "queue_id": "J1568",
        "county": "Renville",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Franklin 115kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2021-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490893,
        "projectNumber": "J1568",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2021-01-05T05:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Renville",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Franklin 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1263,
      "normalized": {
        "queue_id": "J2099",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Rocky Run to Werner West 345 kV",
        "queue_date": "2022-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 399.04,
        "summer_net_mw": 399.04,
        "winter_net_mw": 399.04,
        "proposed_completion_date": "2028-02-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 399.03,
        "dp1_nris_mw": 399.03,
        "dp2_eris_mw": 399.03,
        "dp2_nris_mw": 195.79,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490894,
        "projectNumber": "J2099",
        "queueDate": "2022-06-22T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "negInService": "2028-02-15T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Rocky Run to Werner West 345 kV",
        "summerNetMW": 399.04,
        "winterNetMW": 399.04,
        "dp1ErisMw": 399.03,
        "dp1NrisMw": 399.03,
        "dp2ErisMw": 399.03,
        "dp2NrisMw": 195.79,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1264,
      "normalized": {
        "queue_id": "J2100",
        "county": "Van Buren",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ARGENTA - PALISADES 345.0kV",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2029-07-12T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490895,
        "projectNumber": "J2100",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "negInService": "2029-07-12T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Van Buren",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "ARGENTA - PALISADES 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1265,
      "normalized": {
        "queue_id": "J1576",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Angie to Adams Creek 230 kV",
        "queue_date": "2022-03-03T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-11-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2026-01-15T05:00:00+00:00",
        "gia_to_execute": "2023-01-19T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 70.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490896,
        "projectNumber": "J1576",
        "queueDate": "2022-03-03T05:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2026-01-15T05:00:00+00:00",
        "giaToExec": "2023-01-19T05:00:00+00:00",
        "negInService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Angie to Adams Creek 230 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 70.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1266,
      "normalized": {
        "queue_id": "J1588",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "BISON",
        "queue_date": "2024-04-30T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490897,
        "projectNumber": "J1588",
        "queueDate": "2024-04-30T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "BISON",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1267,
      "normalized": {
        "queue_id": "J2214",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Fisher 230 kV",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 62.0,
        "summer_net_mw": 62.0,
        "winter_net_mw": 62.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 62.0,
        "dp1_nris_mw": 62.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490898,
        "projectNumber": "J2214",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Fisher 230 kV",
        "summerNetMW": 62.0,
        "winterNetMW": 62.0,
        "dp1ErisMw": 62.0,
        "dp1NrisMw": 62.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1268,
      "normalized": {
        "queue_id": "J2215",
        "county": "Lake",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "SCHAHFER GEN STA - ST. JOHN 345.0kV",
        "queue_date": "2022-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2027-09-30T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 300.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490899,
        "projectNumber": "J2215",
        "queueDate": "2022-03-25T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "negInService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Lake",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SCHAHFER GEN STA - ST. JOHN 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 300.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1269,
      "normalized": {
        "queue_id": "J2219",
        "county": "Olmsted",
        "state": "MN",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "ROCHESTER - WABACO    161.0kV",
        "queue_date": "2021-07-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": "2028-12-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 180.0,
        "dp2_nris_mw": 180.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490900,
        "projectNumber": "J2219",
        "queueDate": "2021-07-22T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2028-12-15T05:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Olmsted",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ROCHESTER - WABACO    161.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 180.0,
        "dp2NrisMw": 180.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1270,
      "normalized": {
        "queue_id": "J2104",
        "county": "Murray",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2025-09-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 230.0,
        "summer_net_mw": 230.0,
        "winter_net_mw": 230.0,
        "proposed_completion_date": "2028-04-28T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 230.0,
        "dp1_nris_mw": 230.0,
        "dp2_eris_mw": 230.0,
        "dp2_nris_mw": 230.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490901,
        "projectNumber": "J2104",
        "queueDate": "2025-09-17T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2028-04-28T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Murray",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 230.0,
        "winterNetMW": 230.0,
        "dp1ErisMw": 230.0,
        "dp1NrisMw": 230.0,
        "dp2ErisMw": 230.0,
        "dp2NrisMw": 230.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1271,
      "normalized": {
        "queue_id": "J1573",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Plover",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 130.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490902,
        "projectNumber": "J1573",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Plover",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 130.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1272,
      "normalized": {
        "queue_id": "J1574",
        "county": "West Carroll",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Darnell 115kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-08-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490903,
        "projectNumber": "J1574",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-08-03T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "West Carroll",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Darnell 115kV",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1273,
      "normalized": {
        "queue_id": "J2218",
        "county": "Manitowoc",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "SHOTO",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490904,
        "projectNumber": "J2218",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Manitowoc",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "SHOTO",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1274,
      "normalized": {
        "queue_id": "J2101",
        "county": "Morton",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Mandan 230 kV",
        "queue_date": "2021-08-06T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490905,
        "projectNumber": "J2101",
        "queueDate": "2021-08-06T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Morton",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mandan 230 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1275,
      "normalized": {
        "queue_id": "J1577",
        "county": "Grant",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "HARDIN WEST SS - SHERIDAN 115.0kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2025-10-15T04:00:00+00:00",
        "gia_to_execute": "2023-08-04T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490906,
        "projectNumber": "J1577",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2025-10-15T04:00:00+00:00",
        "giaToExec": "2023-08-04T04:00:00+00:00",
        "negInService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Grant",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "HARDIN WEST SS - SHERIDAN 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1276,
      "normalized": {
        "queue_id": "J1578",
        "county": "Bartholomew",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Columbus -Greenwood Clark Twp 230kV line (Circuit ID 23019)",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2025-08-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490907,
        "projectNumber": "J1578",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2025-08-20T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Bartholomew",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Columbus -Greenwood Clark Twp 230kV line (Circuit ID 23019)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1277,
      "normalized": {
        "queue_id": "J2102",
        "county": "Buffalo",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Alma",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490908,
        "projectNumber": "J2102",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Buffalo",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Alma",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1278,
      "normalized": {
        "queue_id": "J2106",
        "county": "Story",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Story County 161 kV",
        "queue_date": "2021-08-03T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490909,
        "projectNumber": "J2106",
        "queueDate": "2021-08-03T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Story",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "Story County 161 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1279,
      "normalized": {
        "queue_id": "J1579",
        "county": "Edwards",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Albion-Crossville 138kV Line",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490910,
        "projectNumber": "J1579",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Edwards",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Albion-Crossville 138kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1280,
      "normalized": {
        "queue_id": "J1581",
        "county": "Nobles",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "NOBLES COUNTY",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490911,
        "projectNumber": "J1581",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Nobles",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "NOBLES COUNTY",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1281,
      "normalized": {
        "queue_id": "J2107",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Rocky Run to Werner West 345 kV line",
        "queue_date": "2022-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 399.04,
        "summer_net_mw": 399.04,
        "winter_net_mw": 399.04,
        "proposed_completion_date": "2028-02-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 399.03,
        "dp1_nris_mw": 399.03,
        "dp2_eris_mw": 399.03,
        "dp2_nris_mw": 195.79,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490912,
        "projectNumber": "J2107",
        "queueDate": "2022-06-22T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "negInService": "2028-02-15T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Rocky Run to Werner West 345 kV line",
        "summerNetMW": 399.04,
        "winterNetMW": 399.04,
        "dp1ErisMw": 399.03,
        "dp1NrisMw": 399.03,
        "dp2ErisMw": 399.03,
        "dp2NrisMw": 195.79,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1282,
      "normalized": {
        "queue_id": "J2225",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "REID EHV 345 KV SUBSTATION",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490913,
        "projectNumber": "J2225",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REID EHV 345 KV SUBSTATION",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1283,
      "normalized": {
        "queue_id": "J1582",
        "county": "St. Croix",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Pine Lake to Three Lakes 115 kV",
        "queue_date": "2022-02-28T05:00:00+00:00",
        "withdrawn_date": "2023-01-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490914,
        "projectNumber": "J1582",
        "queueDate": "2022-02-28T05:00:00+00:00",
        "withdrawnDate": "2023-01-31T05:00:00+00:00",
        "inService": "2024-06-06T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "St. Croix",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pine Lake to Three Lakes 115 kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1284,
      "normalized": {
        "queue_id": "J1585",
        "county": "Moniteau",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Apache Tap - Barnett 161kV line",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2023-11-28T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490915,
        "projectNumber": "J1585",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2023-11-28T05:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Moniteau",
        "state": "MO",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Apache Tap - Barnett 161kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1285,
      "normalized": {
        "queue_id": "J2109",
        "county": "St. James",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Vacherie 230 kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490916,
        "projectNumber": "J2109",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. James",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Vacherie 230 kV",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1286,
      "normalized": {
        "queue_id": "J2227",
        "county": "Trempealeau",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Independence - Bridge Creek 69.0kV",
        "queue_date": "2025-07-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 89.0,
        "summer_net_mw": 89.0,
        "winter_net_mw": 89.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 89.0,
        "dp1_nris_mw": 89.0,
        "dp2_eris_mw": 80.1,
        "dp2_nris_mw": 80.1,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490917,
        "projectNumber": "J2227",
        "queueDate": "2025-07-14T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Trempealeau",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Independence - Bridge Creek 69.0kV",
        "summerNetMW": 89.0,
        "winterNetMW": 89.0,
        "dp1ErisMw": 89.0,
        "dp1NrisMw": 89.0,
        "dp2ErisMw": 80.1,
        "dp2NrisMw": 80.1,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1287,
      "normalized": {
        "queue_id": "J2216",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Sandcut-Rockville 138kV",
        "queue_date": "2022-04-08T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490918,
        "projectNumber": "J2216",
        "queueDate": "2022-04-08T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sandcut-Rockville 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1288,
      "normalized": {
        "queue_id": "J2217",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Brinkley East - Aubrey 230 kV Line",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": "2023-11-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490919,
        "projectNumber": "J2217",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "withdrawnDate": "2023-11-10T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Brinkley East - Aubrey 230 kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1289,
      "normalized": {
        "queue_id": "J1559",
        "county": "Conway",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Morrilton East Substation (161kV bus)",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": "2023-08-04T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 140.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490920,
        "projectNumber": "J1559",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "giaToExec": "2023-08-04T04:00:00+00:00",
        "negInService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Conway",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Morrilton East Substation (161kV bus)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 140.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1290,
      "normalized": {
        "queue_id": "J1562",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV",
        "queue_date": "2020-06-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-01-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-18T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490921,
        "projectNumber": "J1562",
        "queueDate": "2020-06-12T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "giaToExec": "2023-01-18T05:00:00+00:00",
        "negInService": "2025-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1291,
      "normalized": {
        "queue_id": "J2220",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Donaldsonville - Evergreen 230 kV",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490922,
        "projectNumber": "J2220",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Donaldsonville - Evergreen 230 kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1292,
      "normalized": {
        "queue_id": "J2222",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Penton Road to Nelson 230 kV",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": "2023-11-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490923,
        "projectNumber": "J2222",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "withdrawnDate": "2023-11-07T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Penton Road to Nelson 230 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1293,
      "normalized": {
        "queue_id": "J2108",
        "county": "Johnson",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "IC ENRON - SUB JIC 161 kV",
        "queue_date": "2021-08-09T04:00:00+00:00",
        "withdrawn_date": "2023-10-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490924,
        "projectNumber": "J2108",
        "queueDate": "2021-08-09T04:00:00+00:00",
        "withdrawnDate": "2023-10-10T04:00:00+00:00",
        "inService": "2024-11-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Johnson",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "IC ENRON - SUB JIC 161 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1294,
      "normalized": {
        "queue_id": "J2112",
        "county": "Hardin",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Warren to Kountze 138 kV",
        "queue_date": "2021-12-01T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 115.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490925,
        "projectNumber": "J2112",
        "queueDate": "2021-12-01T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Hardin",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Warren to Kountze 138 kV",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 115.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1295,
      "normalized": {
        "queue_id": "J2115",
        "county": "Macon",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Faraday 138kV",
        "queue_date": "2021-08-20T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 98.3,
        "summer_net_mw": 98.3,
        "winter_net_mw": 98.3,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 98.3,
        "dp1_nris_mw": 98.3,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490926,
        "projectNumber": "J2115",
        "queueDate": "2021-08-20T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-09-16T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macon",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Faraday 138kV",
        "summerNetMW": 98.3,
        "winterNetMW": 98.3,
        "dp1ErisMw": 98.3,
        "dp1NrisMw": 98.3,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1296,
      "normalized": {
        "queue_id": "J2116",
        "county": "Cook",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "COVIL",
        "queue_date": "2023-12-08T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 18.0,
        "summer_net_mw": 18.0,
        "winter_net_mw": 18.0,
        "proposed_completion_date": "2027-03-01T05:00:00+00:00",
        "generation_type": "Diesel",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 18.0,
        "dp2_eris_mw": 18.0,
        "dp2_nris_mw": 18.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490927,
        "projectNumber": "J2116",
        "queueDate": "2023-12-08T05:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "negInService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Cook",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "COVIL",
        "summerNetMW": 18.0,
        "winterNetMW": 18.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 18.0,
        "dp2ErisMw": 18.0,
        "dp2NrisMw": 18.0,
        "fuelType": "Diesel",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1297,
      "normalized": {
        "queue_id": "J1563",
        "county": "Putnam",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Whitesville - Wabash River 230kV line",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490928,
        "projectNumber": "J1563",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Putnam",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Whitesville - Wabash River 230kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1298,
      "normalized": {
        "queue_id": "J1572",
        "county": "Faribault",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Huntley to Blue Earth 161kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490929,
        "projectNumber": "J1572",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2023-10-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Faribault",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Huntley to Blue Earth 161kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1299,
      "normalized": {
        "queue_id": "J1587",
        "county": "Muskegon",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Du Pont to Cobb 138 KV (J1375 POI)",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-09-08T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490930,
        "projectNumber": "J1587",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2025-09-08T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Muskegon",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Du Pont to Cobb 138 KV (J1375 POI)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1300,
      "normalized": {
        "queue_id": "J2213",
        "county": "Marshall",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "HIPLE",
        "queue_date": "2022-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490931,
        "projectNumber": "J2213",
        "queueDate": "2022-03-25T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Marshall",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HIPLE",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1301,
      "normalized": {
        "queue_id": "J2230",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Merom (HED) 345.0kV",
        "queue_date": "2022-03-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490932,
        "projectNumber": "J2230",
        "queueDate": "2022-03-24T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Gibson Sta - Merom (HED) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1302,
      "normalized": {
        "queue_id": "J2232",
        "county": "Tipton",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Tipton West 230 kV",
        "queue_date": "2021-08-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490933,
        "projectNumber": "J2232",
        "queueDate": "2021-08-06T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Tipton",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tipton West 230 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1303,
      "normalized": {
        "queue_id": "J2121",
        "county": "Callaway",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "McCredie - Overton 345 kV",
        "queue_date": "2021-08-06T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490934,
        "projectNumber": "J2121",
        "queueDate": "2021-08-06T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Callaway",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "McCredie - Overton 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1304,
      "normalized": {
        "queue_id": "J2122",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Nuthatch Switching Substation",
        "queue_date": "2021-08-04T04:00:00+00:00",
        "withdrawn_date": "2026-06-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 33.0,
        "summer_net_mw": 33.0,
        "winter_net_mw": 33.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 33.0,
        "dp1_nris_mw": 33.0,
        "dp2_eris_mw": 33.0,
        "dp2_nris_mw": 33.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490935,
        "projectNumber": "J2122",
        "queueDate": "2021-08-04T04:00:00+00:00",
        "withdrawnDate": "2026-06-22T04:00:00+00:00",
        "inService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Nuthatch Switching Substation",
        "summerNetMW": 33.0,
        "winterNetMW": 33.0,
        "dp1ErisMw": 33.0,
        "dp1NrisMw": 33.0,
        "dp2ErisMw": 33.0,
        "dp2NrisMw": 33.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1305,
      "normalized": {
        "queue_id": "J2221",
        "county": "Clark",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Speed",
        "queue_date": "2021-08-20T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490936,
        "projectNumber": "J2221",
        "queueDate": "2021-08-20T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2025-09-16T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clark",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Speed",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1306,
      "normalized": {
        "queue_id": "J2105",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Killdeer 345 kV Substation",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490937,
        "projectNumber": "J2105",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-10T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Killdeer 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1307,
      "normalized": {
        "queue_id": "J2237",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Brinkley East - Aubrey 230 kV Line",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": "2027-05-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 185.0,
        "dp1_nris_mw": 185.0,
        "dp2_eris_mw": 185.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490938,
        "projectNumber": "J2237",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "negInService": "2027-05-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Brinkley East - Aubrey 230 kV Line",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 185.0,
        "dp1NrisMw": 185.0,
        "dp2ErisMw": 185.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1308,
      "normalized": {
        "queue_id": "J2124",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Rising",
        "queue_date": "2021-08-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490939,
        "projectNumber": "J2124",
        "queueDate": "2021-08-06T04:00:00+00:00",
        "inService": "2022-12-02T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rising",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1309,
      "normalized": {
        "queue_id": "J2223",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Cash - Newport AB 161 kV",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": "2023-11-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490940,
        "projectNumber": "J2223",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "withdrawnDate": "2023-11-07T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Cash - Newport AB 161 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1310,
      "normalized": {
        "queue_id": "J2224",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Derrick 230 kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490941,
        "projectNumber": "J2224",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Derrick 230 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1311,
      "normalized": {
        "queue_id": "J2226",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "GOODLAND - MORRISON DITCH 138.0kV",
        "queue_date": "2022-06-14T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490942,
        "projectNumber": "J2226",
        "queueDate": "2022-06-14T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GOODLAND - MORRISON DITCH 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1312,
      "normalized": {
        "queue_id": "J2113",
        "county": "Daviess",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Reid - Daviess Co 161 kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490943,
        "projectNumber": "J2113",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Daviess",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reid - Daviess Co 161 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1313,
      "normalized": {
        "queue_id": "J2233",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7BUNSONVILLE - 7SIDNEY   345.0kV",
        "queue_date": "2022-06-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490944,
        "projectNumber": "J2233",
        "queueDate": "2022-06-14T04:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7BUNSONVILLE - 7SIDNEY   345.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1314,
      "normalized": {
        "queue_id": "J2240",
        "county": "Nevada",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Prescott 337507 to Emmett 337505",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490945,
        "projectNumber": "J2240",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-02-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Nevada",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Prescott 337507 to Emmett 337505",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1315,
      "normalized": {
        "queue_id": "J2129",
        "county": "Barry",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Bradley 138 kV Substation",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2028-04-15T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490946,
        "projectNumber": "J2129",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "negInService": "2028-04-15T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Barry",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Bradley 138 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1316,
      "normalized": {
        "queue_id": "J2130",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Clinton 230kV",
        "queue_date": "2022-03-25T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490947,
        "projectNumber": "J2130",
        "queueDate": "2022-03-25T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Clinton 230kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1317,
      "normalized": {
        "queue_id": "J2228",
        "county": "Concordia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Red Gum",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490948,
        "projectNumber": "J2228",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Concordia",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Red Gum",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1318,
      "normalized": {
        "queue_id": "J2229",
        "county": "Wabash",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Miami Wabash - Mier 138 kV",
        "queue_date": "2021-08-06T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490949,
        "projectNumber": "J2229",
        "queueDate": "2021-08-06T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Wabash",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Miami Wabash - Mier 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1319,
      "normalized": {
        "queue_id": "J2117",
        "county": "Wood",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Saratoga - Badger West 138.0kV",
        "queue_date": "2022-04-05T04:00:00+00:00",
        "withdrawn_date": "2025-05-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490950,
        "projectNumber": "J2117",
        "queueDate": "2022-04-05T04:00:00+00:00",
        "withdrawnDate": "2025-05-05T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Wood",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Saratoga - Badger West 138.0kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1320,
      "normalized": {
        "queue_id": "J2231",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Sherrill 115kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 97.5,
        "summer_net_mw": 97.5,
        "winter_net_mw": 97.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 97.49,
        "dp1_nris_mw": 97.49,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490951,
        "projectNumber": "J2231",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-02-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Sherrill 115kV",
        "summerNetMW": 97.5,
        "winterNetMW": 97.5,
        "dp1ErisMw": 97.49,
        "dp1NrisMw": 97.49,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1321,
      "normalized": {
        "queue_id": "J2119",
        "county": "Hillsdale",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2022-01-18T05:00:00+00:00",
        "withdrawn_date": "2025-03-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 30.0,
        "dp1_nris_mw": 12.6,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490952,
        "projectNumber": "J2119",
        "queueDate": "2022-01-18T05:00:00+00:00",
        "withdrawnDate": "2025-03-03T05:00:00+00:00",
        "inService": "2025-11-30T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Hillsdale",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 30.0,
        "dp1NrisMw": 12.6,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1322,
      "normalized": {
        "queue_id": "J2234",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Henderson to AB Brown 138 kV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490953,
        "projectNumber": "J2234",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Henderson to AB Brown 138 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1323,
      "normalized": {
        "queue_id": "J2120",
        "county": "Linn",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Fairfax",
        "queue_date": "2021-08-04T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490954,
        "projectNumber": "J2120",
        "queueDate": "2021-08-04T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fairfax",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1324,
      "normalized": {
        "queue_id": "J2235",
        "county": "San Jacinto",
        "state": "TX",
        "transmission_owner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "poi": "Shepherd Substation",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490955,
        "projectNumber": "J2235",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2022-12-02T05:00:00+00:00",
        "transmissionOwner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "county": "San Jacinto",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Shepherd Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1325,
      "normalized": {
        "queue_id": "J2247",
        "county": "Marshall",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Woodhall",
        "queue_date": "2022-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 178.0,
        "summer_net_mw": 178.0,
        "winter_net_mw": 178.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 178.0,
        "dp1_nris_mw": 178.0,
        "dp2_eris_mw": 178.0,
        "dp2_nris_mw": 178.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490956,
        "projectNumber": "J2247",
        "queueDate": "2022-03-25T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Marshall",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Woodhall",
        "summerNetMW": 178.0,
        "winterNetMW": 178.0,
        "dp1ErisMw": 178.0,
        "dp1NrisMw": 178.0,
        "dp2ErisMw": 178.0,
        "dp2NrisMw": 178.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1326,
      "normalized": {
        "queue_id": "J2138",
        "county": "Hardin",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Rye Co - Cypress 138kV",
        "queue_date": "2021-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490957,
        "projectNumber": "J2138",
        "queueDate": "2021-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Hardin",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Rye Co - Cypress 138kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1327,
      "normalized": {
        "queue_id": "J2251",
        "county": "Grant",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greentown 230 kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490958,
        "projectNumber": "J2251",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Grant",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greentown 230 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1328,
      "normalized": {
        "queue_id": "J2253",
        "county": "Tyler",
        "state": "TX",
        "transmission_owner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "poi": "Fork Creek Substation",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490959,
        "projectNumber": "J2253",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2022-12-02T05:00:00+00:00",
        "transmissionOwner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "county": "Tyler",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Fork Creek Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1329,
      "normalized": {
        "queue_id": "J2148",
        "county": "Outagamie",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Werner West 138 kV",
        "queue_date": "2021-10-18T04:00:00+00:00",
        "withdrawn_date": "2025-11-12T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490960,
        "projectNumber": "J2148",
        "queueDate": "2021-10-18T04:00:00+00:00",
        "withdrawnDate": "2025-11-12T05:00:00+00:00",
        "inService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Outagamie",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Werner West 138 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1330,
      "normalized": {
        "queue_id": "J2149",
        "county": "Saline",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WHITE BLUFF EHV - HENSLEY 115.0kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2026-01-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 240.0,
        "summer_net_mw": 240.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 112.0,
        "dp1_nris_mw": 112.0,
        "dp2_eris_mw": 112.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490961,
        "projectNumber": "J2149",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2026-01-13T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Saline",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "WHITE BLUFF EHV - HENSLEY 115.0kV",
        "summerNetMW": 240.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 112.0,
        "dp1NrisMw": 112.0,
        "dp2ErisMw": 112.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1331,
      "normalized": {
        "queue_id": "J2150",
        "county": "Jefferson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Madison 138 kV",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490962,
        "projectNumber": "J2150",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Jefferson",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Madison 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1332,
      "normalized": {
        "queue_id": "J2152",
        "county": "Tangipahoa",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "INDEPENDENCE [LA] - HAMMOND 230.0kV",
        "queue_date": "2023-11-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 120.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490963,
        "projectNumber": "J2152",
        "queueDate": "2023-11-30T05:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Tangipahoa",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "INDEPENDENCE [LA] - HAMMOND 230.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 120.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1333,
      "normalized": {
        "queue_id": "J2154",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Carlyss - Nelson 230kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490964,
        "projectNumber": "J2154",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "Carlyss - Nelson 230kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1334,
      "normalized": {
        "queue_id": "J2161",
        "county": "Fulton",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Ipava 138KV",
        "queue_date": "2021-08-31T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490965,
        "projectNumber": "J2161",
        "queueDate": "2021-08-31T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Fulton",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ipava 138KV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1335,
      "normalized": {
        "queue_id": "J2164",
        "county": "Pike",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Petersburg 345 kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490966,
        "projectNumber": "J2164",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Pike",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Petersburg 345 kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1336,
      "normalized": {
        "queue_id": "J2166",
        "county": "Taylor",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Clarinda - Braddyville 161 kV line",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490967,
        "projectNumber": "J2166",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Taylor",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Clarinda - Braddyville 161 kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1337,
      "normalized": {
        "queue_id": "J2238",
        "county": "Maries",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "The Franks (Bus #300041) - Bland (Bus #344154) 345 kV Line",
        "queue_date": "2025-07-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490968,
        "projectNumber": "J2238",
        "queueDate": "2025-07-16T04:00:00+00:00",
        "inService": "2024-02-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Maries",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "The Franks (Bus #300041) - Bland (Bus #344154) 345 kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1338,
      "normalized": {
        "queue_id": "J2239",
        "county": "Washington",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Belgrade - Pilot Knob 161 kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490969,
        "projectNumber": "J2239",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Washington",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Belgrade - Pilot Knob 161 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1339,
      "normalized": {
        "queue_id": "J2114",
        "county": "Tyler",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "DOUCETTE  to DEER 138 kV",
        "queue_date": "2021-12-01T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490970,
        "projectNumber": "J2114",
        "queueDate": "2021-12-01T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Tyler",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "DOUCETTE  to DEER 138 kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1340,
      "normalized": {
        "queue_id": "J2118",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Whiting - Morocco 138kV",
        "queue_date": "2021-09-29T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490971,
        "projectNumber": "J2118",
        "queueDate": "2021-09-29T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Whiting - Morocco 138kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1341,
      "normalized": {
        "queue_id": "J2128",
        "county": "Coles",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7ARLAND - 7FARADAY 345.0kV",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2026-12-01T05:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490972,
        "projectNumber": "J2128",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "inService": "2024-08-31T04:00:00+00:00",
        "negInService": "2026-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Coles",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "7ARLAND - 7FARADAY 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1342,
      "normalized": {
        "queue_id": "J2241",
        "county": "Benton",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Cayuga sub (Jordan Creek Wind J515 POI) 345 kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 320.0,
        "summer_net_mw": 320.0,
        "winter_net_mw": 320.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490973,
        "projectNumber": "J2241",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Benton",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "Cayuga sub (Jordan Creek Wind J515 POI) 345 kV",
        "summerNetMW": 320.0,
        "winterNetMW": 320.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1343,
      "normalized": {
        "queue_id": "J2236",
        "county": "Howard",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greentown 230 kV",
        "queue_date": "2021-08-06T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490974,
        "projectNumber": "J2236",
        "queueDate": "2021-08-06T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Howard",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greentown 230 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1344,
      "normalized": {
        "queue_id": "J2123",
        "county": "Dubois",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Duff 138KV",
        "queue_date": "2021-09-01T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490975,
        "projectNumber": "J2123",
        "queueDate": "2021-09-01T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Dubois",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Duff 138KV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1345,
      "normalized": {
        "queue_id": "J2127",
        "county": "Jefferson Davis",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Silver Creek 115kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 172.5,
        "summer_net_mw": 172.5,
        "winter_net_mw": 172.5,
        "proposed_completion_date": "2027-07-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 172.5,
        "dp1_nris_mw": 172.5,
        "dp2_eris_mw": 172.5,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490976,
        "projectNumber": "J2127",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "negInService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Jefferson Davis",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Silver Creek 115kV",
        "summerNetMW": 172.5,
        "winterNetMW": 172.5,
        "dp1ErisMw": 172.5,
        "dp1NrisMw": 172.5,
        "dp2ErisMw": 172.5,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1346,
      "normalized": {
        "queue_id": "J2131",
        "county": "Jasper",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CASEY    - 7NEWTON   345.0kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490977,
        "projectNumber": "J2131",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jasper",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7CASEY    - 7NEWTON   345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1347,
      "normalized": {
        "queue_id": "J2243",
        "county": "Tyler",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Warren 138kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490978,
        "projectNumber": "J2243",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-02-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Tyler",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Warren 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1348,
      "normalized": {
        "queue_id": "J2244",
        "county": "Grant",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MABELVALE EHV to WHITE BLUFF EHV 115kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490979,
        "projectNumber": "J2244",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Grant",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "MABELVALE EHV to WHITE BLUFF EHV 115kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1349,
      "normalized": {
        "queue_id": "J2133",
        "county": "White",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Garner 115 kV Substation",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2029-04-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490980,
        "projectNumber": "J2133",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "negInService": "2029-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "White",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Garner 115 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1350,
      "normalized": {
        "queue_id": "J2134",
        "county": "Grant",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WHITE BLUFF EHV - WRIGHTSVILLE 115.0kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2026-01-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 195.0,
        "dp1_nris_mw": 195.0,
        "dp2_eris_mw": 195.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490981,
        "projectNumber": "J2134",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2026-01-13T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Grant",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "WHITE BLUFF EHV - WRIGHTSVILLE 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 195.0,
        "dp1NrisMw": 195.0,
        "dp2ErisMw": 195.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1351,
      "normalized": {
        "queue_id": "J2245",
        "county": "St. Tammany",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Mandeville - North Slidell 230kV Line (not listed on TTF, but both substations seem to have breakers",
        "queue_date": "2021-08-30T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490982,
        "projectNumber": "J2245",
        "queueDate": "2021-08-30T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Tammany",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Mandeville - North Slidell 230kV Line (not listed on TTF, but both substations seem to have breakers",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1352,
      "normalized": {
        "queue_id": "J2135",
        "county": "Evangeline",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Ville Platte - West Fork 230kV",
        "queue_date": "2021-08-11T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490983,
        "projectNumber": "J2135",
        "queueDate": "2021-08-11T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Ville Platte - West Fork 230kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1353,
      "normalized": {
        "queue_id": "J2248",
        "county": "Pulaski",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "White Bluff EHV to Wrightsville 115kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490984,
        "projectNumber": "J2248",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pulaski",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "White Bluff EHV to Wrightsville 115kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1354,
      "normalized": {
        "queue_id": "J2139",
        "county": "Livingston",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "BLACKFOOT - MADRID 345.0kV",
        "queue_date": "2021-09-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2029-01-26T05:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490985,
        "projectNumber": "J2139",
        "queueDate": "2021-09-02T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2029-01-26T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Livingston",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "BLACKFOOT - MADRID 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1355,
      "normalized": {
        "queue_id": "J2242",
        "county": "Polk",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "SHECO",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490986,
        "projectNumber": "J2242",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Polk",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "SHECO",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1356,
      "normalized": {
        "queue_id": "J2246",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "REID EHV 345 kV Substation",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490987,
        "projectNumber": "J2246",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REID EHV 345 kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1357,
      "normalized": {
        "queue_id": "J2249",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Bayou Cove",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 144.0,
        "summer_net_mw": 144.0,
        "winter_net_mw": 144.0,
        "proposed_completion_date": "2027-11-14T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 144.0,
        "dp1_nris_mw": 144.0,
        "dp2_eris_mw": 144.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490988,
        "projectNumber": "J2249",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-11-14T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Bayou Cove",
        "summerNetMW": 144.0,
        "winterNetMW": 144.0,
        "dp1ErisMw": 144.0,
        "dp1NrisMw": 144.0,
        "dp2ErisMw": 144.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1358,
      "normalized": {
        "queue_id": "J2147",
        "county": "Daviess",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Daviess County - Utica 69kV",
        "queue_date": "2021-11-24T05:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 56.0,
        "summer_net_mw": 56.0,
        "winter_net_mw": 56.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490989,
        "projectNumber": "J2147",
        "queueDate": "2021-11-24T05:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Daviess",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Daviess County - Utica 69kV",
        "summerNetMW": 56.0,
        "winterNetMW": 56.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1359,
      "normalized": {
        "queue_id": "J2136",
        "county": "Iroquois",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Gilman South",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 190.9,
        "summer_net_mw": 190.9,
        "winter_net_mw": 190.9,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 190.9,
        "dp1_nris_mw": 190.9,
        "dp2_eris_mw": 190.9,
        "dp2_nris_mw": 190.9,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490990,
        "projectNumber": "J2136",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Iroquois",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gilman South",
        "summerNetMW": 190.9,
        "winterNetMW": 190.9,
        "dp1ErisMw": 190.9,
        "dp1NrisMw": 190.9,
        "dp2ErisMw": 190.9,
        "dp2NrisMw": 190.9,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1360,
      "normalized": {
        "queue_id": "J2140",
        "county": "Monroe",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Brinkley East to Clarendon 115 kV",
        "queue_date": "2021-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490991,
        "projectNumber": "J2140",
        "queueDate": "2021-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Monroe",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Brinkley East to Clarendon 115 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1361,
      "normalized": {
        "queue_id": "J2151",
        "county": "Saline",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Muddy to West Frankfort 138 kV line",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 135.0,
        "dp2_nris_mw": 135.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490992,
        "projectNumber": "J2151",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Saline",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Muddy to West Frankfort 138 kV line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 135.0,
        "dp2NrisMw": 135.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1362,
      "normalized": {
        "queue_id": "J2153",
        "county": "Ashley",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Ashley Switchyard",
        "queue_date": "2021-08-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-04-30T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 145.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 134.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490993,
        "projectNumber": "J2153",
        "queueDate": "2021-08-11T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "negInService": "2027-04-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ashley",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Ashley Switchyard",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 145.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 134.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1363,
      "normalized": {
        "queue_id": "J2250",
        "county": "Stutsman",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Ellendale 345",
        "queue_date": "2021-11-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490994,
        "projectNumber": "J2250",
        "queueDate": "2021-11-01T04:00:00+00:00",
        "inService": "2024-04-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Stutsman",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Ellendale 345",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1364,
      "normalized": {
        "queue_id": "J2252",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Cash - Newport AB",
        "queue_date": "2022-07-13T04:00:00+00:00",
        "withdrawn_date": "2026-03-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2027-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490995,
        "projectNumber": "J2252",
        "queueDate": "2022-07-13T04:00:00+00:00",
        "withdrawnDate": "2026-03-16T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Cash - Newport AB",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1365,
      "normalized": {
        "queue_id": "J2143",
        "county": "Chicot",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Lake Village Bagby 115 KV",
        "queue_date": "2021-10-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2027-03-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-02-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490996,
        "projectNumber": "J2143",
        "queueDate": "2021-10-15T04:00:00+00:00",
        "inService": "2025-02-15T05:00:00+00:00",
        "negInService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Chicot",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Lake Village Bagby 115 KV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1366,
      "normalized": {
        "queue_id": "J2255",
        "county": "Ripley",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Batesville 345 kV",
        "queue_date": "2021-08-06T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490997,
        "projectNumber": "J2255",
        "queueDate": "2021-08-06T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Ripley",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Batesville 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1367,
      "normalized": {
        "queue_id": "J2155",
        "county": "New Madrid",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Other_",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Transfer",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490998,
        "projectNumber": "J2155",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "inService": "2024-05-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "New Madrid",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Transfer",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1368,
      "normalized": {
        "queue_id": "J2165",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "JACINTO - SHECO BATISTE CREEK 230.0kV",
        "queue_date": "2021-11-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": "2027-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 145.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 145.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3490999,
        "projectNumber": "J2165",
        "queueDate": "2021-11-03T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "negInService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "JACINTO - SHECO BATISTE CREEK 230.0kV",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 145.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 145.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1369,
      "normalized": {
        "queue_id": "J2160",
        "county": "Bartholomew",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gallagher to Columbus 230KV",
        "queue_date": "2021-09-01T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491000,
        "projectNumber": "J2160",
        "queueDate": "2021-09-01T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Bartholomew",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gallagher to Columbus 230KV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1370,
      "normalized": {
        "queue_id": "J2162",
        "county": "Leflore",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Itta Benna - Moorhead 115KV",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491001,
        "projectNumber": "J2162",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Leflore",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Itta Benna - Moorhead 115KV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1371,
      "normalized": {
        "queue_id": "J2169",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Deridder - Centennial 138-kV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 98.9,
        "summer_net_mw": 98.9,
        "winter_net_mw": 98.9,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491002,
        "projectNumber": "J2169",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Deridder - Centennial 138-kV",
        "summerNetMW": 98.9,
        "winterNetMW": 98.9,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1372,
      "normalized": {
        "queue_id": "J2171",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Aster to Commodore",
        "queue_date": "2022-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Wind",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 500.0,
        "dp2_nris_mw": 500.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491003,
        "projectNumber": "J2171",
        "queueDate": "2022-03-25T04:00:00+00:00",
        "inService": "2024-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Aster to Commodore",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 500.0,
        "dp2NrisMw": 500.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Wind",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1373,
      "normalized": {
        "queue_id": "J2141",
        "county": "Monroe",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Brinkley East to Clarendon 115 kV",
        "queue_date": "2021-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491004,
        "projectNumber": "J2141",
        "queueDate": "2021-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Monroe",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Brinkley East to Clarendon 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1374,
      "normalized": {
        "queue_id": "J2142",
        "county": "Adair",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Maywood - Zachary 345 kV line",
        "queue_date": "2021-11-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Transfer",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491005,
        "projectNumber": "J2142",
        "queueDate": "2021-11-03T04:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Adair",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Maywood - Zachary 345 kV line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Transfer",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1375,
      "normalized": {
        "queue_id": "J2177",
        "county": "Tipton",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Tipton West 230 kV",
        "queue_date": "2021-08-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 67.0,
        "summer_net_mw": 67.0,
        "winter_net_mw": 67.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 67.0,
        "dp1_nris_mw": 67.0,
        "dp2_eris_mw": 67.0,
        "dp2_nris_mw": 67.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491006,
        "projectNumber": "J2177",
        "queueDate": "2021-08-09T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Tipton",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tipton West 230 kV",
        "summerNetMW": 67.0,
        "winterNetMW": 67.0,
        "dp1ErisMw": 67.0,
        "dp1NrisMw": 67.0,
        "dp2ErisMw": 67.0,
        "dp2NrisMw": 67.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1376,
      "normalized": {
        "queue_id": "J2178",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Merom 345 kV",
        "queue_date": "2021-08-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491007,
        "projectNumber": "J2178",
        "queueDate": "2021-08-06T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Merom 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1377,
      "normalized": {
        "queue_id": "J2145",
        "county": "Ohio",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Wilson EHV",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491008,
        "projectNumber": "J2145",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-10-15T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Ohio",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wilson EHV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1378,
      "normalized": {
        "queue_id": "J2254",
        "county": "Pike",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Petersburg 345 kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491009,
        "projectNumber": "J2254",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Pike",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Petersburg 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1379,
      "normalized": {
        "queue_id": "J2146",
        "county": "Hopkins",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Hopkins County 161kV Substation",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 45.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491010,
        "projectNumber": "J2146",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Hopkins",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hopkins County 161kV Substation",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 45.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1380,
      "normalized": {
        "queue_id": "J2156",
        "county": "Johnson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Massac - Jordan 345kV",
        "queue_date": "2022-06-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491011,
        "projectNumber": "J2156",
        "queueDate": "2022-06-28T04:00:00+00:00",
        "inService": "2024-05-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Johnson",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Massac - Jordan 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1381,
      "normalized": {
        "queue_id": "J2157",
        "county": "Morton",
        "state": "ND",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Tri-County 230 kV Substation",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491012,
        "projectNumber": "J2157",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Morton",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tri-County 230 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1382,
      "normalized": {
        "queue_id": "J2158",
        "county": "Clark",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hutsonville - Neoga 138KV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491013,
        "projectNumber": "J2158",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clark",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hutsonville - Neoga 138KV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1383,
      "normalized": {
        "queue_id": "J2159",
        "county": "Clark",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hutsonville - Neoga 138KV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Transfer",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 40.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491014,
        "projectNumber": "J2159",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "inService": "2024-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clark",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hutsonville - Neoga 138KV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 40.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Transfer",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1384,
      "normalized": {
        "queue_id": "J2167",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Chalkley - Solac 230kV",
        "queue_date": "2021-11-03T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491015,
        "projectNumber": "J2167",
        "queueDate": "2021-11-03T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Chalkley - Solac 230kV",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1385,
      "normalized": {
        "queue_id": "J2179",
        "county": "Montgomery",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "MONTGOMERY",
        "queue_date": "2021-08-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Transfer",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491016,
        "projectNumber": "J2179",
        "queueDate": "2021-08-06T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Montgomery",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MONTGOMERY",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Transfer",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1386,
      "normalized": {
        "queue_id": "J2180",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Fisher",
        "queue_date": "2022-07-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2027-08-20T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491017,
        "projectNumber": "J2180",
        "queueDate": "2022-07-13T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-08-20T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Fisher",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1387,
      "normalized": {
        "queue_id": "J2189",
        "county": "McDonough",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hornsby Switching Station",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 15.6,
        "summer_net_mw": 15.6,
        "winter_net_mw": 15.6,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 15.6,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 15.6,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491018,
        "projectNumber": "J2189",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "inService": "2019-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McDonough",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Hornsby Switching Station",
        "summerNetMW": 15.6,
        "winterNetMW": 15.6,
        "dp1ErisMw": 15.6,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 15.6,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1388,
      "normalized": {
        "queue_id": "J2191",
        "county": "St. Mary",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Caneland 230kV Substation",
        "queue_date": "2021-10-28T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491019,
        "projectNumber": "J2191",
        "queueDate": "2021-10-28T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-12-15T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Mary",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Caneland 230kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1389,
      "normalized": {
        "queue_id": "J2168",
        "county": "Jefferson",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "China Substation",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 693.0,
        "summer_net_mw": 693.0,
        "winter_net_mw": 693.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491020,
        "projectNumber": "J2168",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jefferson",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "China Substation",
        "summerNetMW": 693.0,
        "winterNetMW": 693.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1390,
      "normalized": {
        "queue_id": "J2170",
        "county": "Clark",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Snyder 345 kV (J1180/J1475 POI)",
        "queue_date": "2022-04-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491021,
        "projectNumber": "J2170",
        "queueDate": "2022-04-05T04:00:00+00:00",
        "inService": "2024-01-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clark",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Snyder 345 kV (J1180/J1475 POI)",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1391,
      "normalized": {
        "queue_id": "J2184",
        "county": "Monroe",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Brinkley West Substation 115kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491022,
        "projectNumber": "J2184",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Monroe",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Brinkley West Substation 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1392,
      "normalized": {
        "queue_id": "J2185",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Rocky Run to Werner West 345 kV line",
        "queue_date": "2022-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 399.04,
        "summer_net_mw": 399.04,
        "winter_net_mw": 399.04,
        "proposed_completion_date": "2028-02-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 399.03,
        "dp1_nris_mw": 399.03,
        "dp2_eris_mw": 399.03,
        "dp2_nris_mw": 195.79,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491023,
        "projectNumber": "J2185",
        "queueDate": "2022-06-22T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "negInService": "2028-02-15T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Rocky Run to Werner West 345 kV line",
        "summerNetMW": 399.04,
        "winterNetMW": 399.04,
        "dp1ErisMw": 399.03,
        "dp1NrisMw": 399.03,
        "dp2ErisMw": 399.03,
        "dp2NrisMw": 195.79,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1393,
      "normalized": {
        "queue_id": "J2172",
        "county": "McDonough",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Macomb Northeast",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491024,
        "projectNumber": "J2172",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-11-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McDonough",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Macomb Northeast",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1394,
      "normalized": {
        "queue_id": "J2173",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BOLTON",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 396.0,
        "summer_net_mw": 396.0,
        "winter_net_mw": 396.0,
        "proposed_completion_date": "2027-12-15T05:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 396.0,
        "dp1_nris_mw": 396.0,
        "dp2_eris_mw": 396.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491025,
        "projectNumber": "J2173",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "negInService": "2027-12-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "BOLTON",
        "summerNetMW": 396.0,
        "winterNetMW": 396.0,
        "dp1ErisMw": 396.0,
        "dp1NrisMw": 396.0,
        "dp2ErisMw": 396.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1395,
      "normalized": {
        "queue_id": "J2190",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "DELL EHV - SAN SOUCI 500.0kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": "2027-10-22T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 500.0,
        "dp2_nris_mw": 425.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491026,
        "projectNumber": "J2190",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "inService": "2024-08-15T04:00:00+00:00",
        "negInService": "2027-10-22T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "DELL EHV - SAN SOUCI 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 500.0,
        "dp2NrisMw": 425.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1396,
      "normalized": {
        "queue_id": "J2197",
        "county": "Clay",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Xenia",
        "queue_date": "2025-01-10T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491027,
        "projectNumber": "J2197",
        "queueDate": "2025-01-10T05:00:00+00:00",
        "inService": "2024-10-07T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clay",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Xenia",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1397,
      "normalized": {
        "queue_id": "J2174",
        "county": "Tunica",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "ROBINSONVILLE - TUNICA 230/115 SUB 230.0kV",
        "queue_date": "2021-08-22T04:00:00+00:00",
        "withdrawn_date": "2025-01-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 390.0,
        "summer_net_mw": 390.0,
        "winter_net_mw": 390.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491028,
        "projectNumber": "J2174",
        "queueDate": "2021-08-22T04:00:00+00:00",
        "withdrawnDate": "2025-01-10T05:00:00+00:00",
        "inService": "2025-03-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tunica",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "ROBINSONVILLE - TUNICA 230/115 SUB 230.0kV",
        "summerNetMW": 390.0,
        "winterNetMW": 390.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1398,
      "normalized": {
        "queue_id": "J2175",
        "county": "Washington",
        "state": "MS",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Indianola to Gerald Andrus 230 kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491029,
        "projectNumber": "J2175",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-03-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Indianola to Gerald Andrus 230 kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1399,
      "normalized": {
        "queue_id": "J2163",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "230 kV: Penton Road to Roy S Nelson 230 kV",
        "queue_date": "2022-07-13T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491030,
        "projectNumber": "J2163",
        "queueDate": "2022-07-13T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "230 kV: Penton Road to Roy S Nelson 230 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1400,
      "normalized": {
        "queue_id": "J2176",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Hartburg - Rhodes 500 kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 680.0,
        "summer_net_mw": 680.0,
        "winter_net_mw": 680.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491031,
        "projectNumber": "J2176",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-03-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Hartburg - Rhodes 500 kV",
        "summerNetMW": 680.0,
        "winterNetMW": 680.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1401,
      "normalized": {
        "queue_id": "J2181",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "161 kV line tap of DELL EAST to Blytheville",
        "queue_date": "2022-07-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-07-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491032,
        "projectNumber": "J2181",
        "queueDate": "2022-07-13T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-07-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "161 kV line tap of DELL EAST to Blytheville",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1402,
      "normalized": {
        "queue_id": "J2183",
        "county": "Pointe Coupee",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Fancy Point - Waterloo",
        "queue_date": "2021-09-01T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491033,
        "projectNumber": "J2183",
        "queueDate": "2021-09-01T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2022-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Pointe Coupee",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS-Only",
        "poiName": "Fancy Point - Waterloo",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1403,
      "normalized": {
        "queue_id": "J2186",
        "county": "Fulton",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ipava-Maple Ridge 345kV (4573)",
        "queue_date": "2022-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 820.6,
        "summer_net_mw": 820.6,
        "winter_net_mw": 820.6,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 820.6,
        "dp1_nris_mw": 820.6,
        "dp2_eris_mw": 820.6,
        "dp2_nris_mw": 820.6,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491034,
        "projectNumber": "J2186",
        "queueDate": "2022-06-22T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fulton",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ipava-Maple Ridge 345kV (4573)",
        "summerNetMW": 820.6,
        "winterNetMW": 820.6,
        "dp1ErisMw": 820.6,
        "dp1NrisMw": 820.6,
        "dp2ErisMw": 820.6,
        "dp2NrisMw": 820.6,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1404,
      "normalized": {
        "queue_id": "J2187",
        "county": "LaPorte",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Stillwell 138kV",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": "2026-04-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 124.0,
        "summer_net_mw": 124.0,
        "winter_net_mw": 124.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 124.0,
        "dp1_nris_mw": 124.0,
        "dp2_eris_mw": 124.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491035,
        "projectNumber": "J2187",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "withdrawnDate": "2026-04-07T04:00:00+00:00",
        "inService": "2024-10-20T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaPorte",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stillwell 138kV",
        "summerNetMW": 124.0,
        "winterNetMW": 124.0,
        "dp1ErisMw": 124.0,
        "dp1NrisMw": 124.0,
        "dp2ErisMw": 124.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1405,
      "normalized": {
        "queue_id": "J2188",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia - South Fond du Lac 345.0kV",
        "queue_date": "2021-12-01T05:00:00+00:00",
        "withdrawn_date": "2024-10-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-07-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491036,
        "projectNumber": "J2188",
        "queueDate": "2021-12-01T05:00:00+00:00",
        "withdrawnDate": "2024-10-18T04:00:00+00:00",
        "inService": "2025-07-23T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Columbia - South Fond du Lac 345.0kV",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1406,
      "normalized": {
        "queue_id": "J2208",
        "county": "De Soto",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Mansfield (Bus #500530) to Red River Tap (Bus #500762) 138 kV",
        "queue_date": "2021-08-27T04:00:00+00:00",
        "withdrawn_date": "2026-02-12T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 99.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491037,
        "projectNumber": "J2208",
        "queueDate": "2021-08-27T04:00:00+00:00",
        "withdrawnDate": "2026-02-12T05:00:00+00:00",
        "inService": "2024-10-04T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "De Soto",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Mansfield (Bus #500530) to Red River Tap (Bus #500762) 138 kV",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 99.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1407,
      "normalized": {
        "queue_id": "J2192",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7BUNSONVILLE - 7SIDNEY   345.0kV",
        "queue_date": "2022-06-14T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.9,
        "summer_net_mw": 99.9,
        "winter_net_mw": 99.9,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.9,
        "dp1_nris_mw": 99.9,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491038,
        "projectNumber": "J2192",
        "queueDate": "2022-06-14T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7BUNSONVILLE - 7SIDNEY   345.0kV",
        "summerNetMW": 99.9,
        "winterNetMW": 99.9,
        "dp1ErisMw": 99.9,
        "dp1NrisMw": 99.9,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1408,
      "normalized": {
        "queue_id": "J2193",
        "county": "Waushara",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sand Lake",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2027-09-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491039,
        "projectNumber": "J2193",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Waushara",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Sand Lake",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1409,
      "normalized": {
        "queue_id": "J2195",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ramsey East 138 kV",
        "queue_date": "2025-01-10T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491040,
        "projectNumber": "J2195",
        "queueDate": "2025-01-10T05:00:00+00:00",
        "inService": "2024-10-07T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ramsey East 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1410,
      "normalized": {
        "queue_id": "J2196",
        "county": "Montgomery",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "AUSTIN 138 KV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491041,
        "projectNumber": "J2196",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2028-04-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Montgomery",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AUSTIN 138 KV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Wind/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1411,
      "normalized": {
        "queue_id": "J2209",
        "county": "Scott",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Oran 161kV Substation",
        "queue_date": "2021-12-23T05:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491042,
        "projectNumber": "J2209",
        "queueDate": "2021-12-23T05:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-09-16T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Scott",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Oran 161kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1412,
      "normalized": {
        "queue_id": "J1005",
        "county": "Midland County,Saginaw County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Murphy 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-06-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491043,
        "projectNumber": "J1005",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-06-30T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland County,Saginaw County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Murphy 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1413,
      "normalized": {
        "queue_id": "J2202",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Lacassine 69 kV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491044,
        "projectNumber": "J2202",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2022-12-02T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Lacassine 69 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1414,
      "normalized": {
        "queue_id": "J2203",
        "county": "Adams",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "East Quincy",
        "queue_date": "2022-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2028-08-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491045,
        "projectNumber": "J2203",
        "queueDate": "2022-03-25T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "negInService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Adams",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "East Quincy",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1415,
      "normalized": {
        "queue_id": "J2210",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Derrick 230 kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491046,
        "projectNumber": "J2210",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Derrick 230 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1416,
      "normalized": {
        "queue_id": "J1002",
        "county": "Waushara County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Wautoma 138kV Switchyard",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": "2023-01-26T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2021-05-05T04:00:00+00:00",
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": "2021-05-05T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 99.0,
        "dp2_nris_mw": 99.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491047,
        "projectNumber": "J1002",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-05-05T04:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "giaToExec": "2021-05-05T04:00:00+00:00",
        "negInService": "2023-01-26T05:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Waushara County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wautoma 138kV Switchyard",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 99.0,
        "dp2NrisMw": 99.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1417,
      "normalized": {
        "queue_id": "J2205",
        "county": "Callaway",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "J1145 New 345kV POI Substation (Ameren Overton-Montgomery 345kV Line)",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 300.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491048,
        "projectNumber": "J2205",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Callaway",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J1145 New 345kV POI Substation (Ameren Overton-Montgomery 345kV Line)",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 300.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1418,
      "normalized": {
        "queue_id": "J2212",
        "county": "Jefferson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Madison Michigan Ave",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491049,
        "projectNumber": "J2212",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Jefferson",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Madison Michigan Ave",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1419,
      "normalized": {
        "queue_id": "J1022",
        "county": "McLean County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Weedman Substation 138kV Bus",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2022-05-27T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491050,
        "projectNumber": "J1022",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2022-05-27T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Weedman Substation 138kV Bus",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1420,
      "normalized": {
        "queue_id": "J1023",
        "county": "Mississippi County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Osceola - Wilson 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 82.0,
        "summer_net_mw": 82.0,
        "winter_net_mw": 82.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491051,
        "projectNumber": "J1023",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-07-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Osceola - Wilson 161 kV Line Tap",
        "summerNetMW": 82.0,
        "winterNetMW": 82.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1421,
      "normalized": {
        "queue_id": "J2198",
        "county": "Jefferson",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Joachim 138kV",
        "queue_date": "2022-03-25T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491052,
        "projectNumber": "J2198",
        "queueDate": "2022-03-25T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Jefferson",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Joachim 138kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1422,
      "normalized": {
        "queue_id": "J2199",
        "county": "Anoka",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "COON CREEK",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491053,
        "projectNumber": "J2199",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Anoka",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "COON CREEK",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1423,
      "normalized": {
        "queue_id": "J1003",
        "county": "Dodge County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "North Beaver Dam 69 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2023-06-06T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2021-05-05T04:00:00+00:00",
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": "2021-05-05T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491054,
        "projectNumber": "J1003",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-05-05T04:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "giaToExec": "2021-05-05T04:00:00+00:00",
        "negInService": "2023-06-06T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Dodge County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Beaver Dam 69 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1424,
      "normalized": {
        "queue_id": "J1020",
        "county": "Jasper County",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Missionary 230kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491055,
        "projectNumber": "J1020",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-24T05:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Jasper County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Missionary 230kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1425,
      "normalized": {
        "queue_id": "J2201",
        "county": "Harrison",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Kenzig Road - HE Ramsey 345.0kV",
        "queue_date": "2021-12-07T05:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-29T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491056,
        "projectNumber": "J2201",
        "queueDate": "2021-12-07T05:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-11-29T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Harrison",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kenzig Road - HE Ramsey 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1426,
      "normalized": {
        "queue_id": "J2211",
        "county": "Brown",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Tower Dr",
        "queue_date": "2024-09-27T04:00:00+00:00",
        "withdrawn_date": "2025-11-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491057,
        "projectNumber": "J2211",
        "queueDate": "2024-09-27T04:00:00+00:00",
        "withdrawnDate": "2025-11-13T05:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Brown",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Tower Dr",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1427,
      "normalized": {
        "queue_id": "J1004",
        "county": "Mecosta County,Montcalm County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Kenowa - Nelson Road 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-11-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 800.0,
        "summer_net_mw": 800.0,
        "winter_net_mw": 800.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491058,
        "projectNumber": "J1004",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-11-01T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Mecosta County,Montcalm County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kenowa - Nelson Road 345kV Line Tap",
        "summerNetMW": 800.0,
        "winterNetMW": 800.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1428,
      "normalized": {
        "queue_id": "J1029",
        "county": "East Feliciana Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Fancy Point 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-03-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491059,
        "projectNumber": "J1029",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-03-13T04:00:00+00:00",
        "inService": "2020-09-28T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "East Feliciana Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fancy Point 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1429,
      "normalized": {
        "queue_id": "J1000",
        "county": "Grant County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Nelson Dewey - Lancaster 138kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2023-03-27T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2021-04-02T04:00:00+00:00",
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491060,
        "projectNumber": "J1000",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-04-02T04:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2023-03-27T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Grant County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Nelson Dewey - Lancaster 138kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1430,
      "normalized": {
        "queue_id": "J1001",
        "county": "Lincoln County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Buffalo Ridge 115kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 40.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491061,
        "projectNumber": "J1001",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lincoln County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Buffalo Ridge 115kV Substation",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 40.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1431,
      "normalized": {
        "queue_id": "J1024",
        "county": "Nodaway County",
        "state": "MO",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Maryville - Clarinda 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491062,
        "projectNumber": "J1024",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2022-09-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Nodaway County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Maryville - Clarinda 161 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1432,
      "normalized": {
        "queue_id": "J1008",
        "county": "Faribault County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Blue Earth IPL - Blue Earth 69kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491063,
        "projectNumber": "J1008",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Faribault County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Blue Earth IPL - Blue Earth 69kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1433,
      "normalized": {
        "queue_id": "J1021",
        "county": "Piatt County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Goose Creek 345kV Switchyard",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491064,
        "projectNumber": "J1021",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-02T05:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Piatt County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Goose Creek 345kV Switchyard",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1434,
      "normalized": {
        "queue_id": "J1006",
        "county": "Brookings County",
        "state": "SD",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Brookings - Yankee 115kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491065,
        "projectNumber": "J1006",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Brookings County",
        "state": "SD",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brookings - Yankee 115kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1435,
      "normalized": {
        "queue_id": "J1025",
        "county": "Knox County",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Zachary - Maywood 345 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2025-06-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": "2022-04-04T04:00:00+00:00",
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": "2022-04-04T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 290.0,
        "dp2_nris_mw": 290.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491066,
        "projectNumber": "J1025",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-04-04T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "giaToExec": "2022-04-04T04:00:00+00:00",
        "negInService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Knox County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Zachary - Maywood 345 kV Line Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 290.0,
        "dp2NrisMw": 290.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1436,
      "normalized": {
        "queue_id": "J1026",
        "county": "Audrain County,Ralls County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Spencer Creek 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": "2023-06-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": "2022-04-01T04:00:00+00:00",
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": "2022-04-01T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 350.0,
        "dp2_eris_mw": 380.0,
        "dp2_nris_mw": 265.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491067,
        "projectNumber": "J1026",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-04-01T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "giaToExec": "2022-04-01T04:00:00+00:00",
        "negInService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Audrain County,Ralls County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Spencer Creek 345 kV Substation",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 350.0,
        "dp2ErisMw": 380.0,
        "dp2NrisMw": 265.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1437,
      "normalized": {
        "queue_id": "J1130",
        "county": "Warren County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Baxter Wilson SES 115/500 kV Sw YD",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1110.0,
        "summer_net_mw": 966.0,
        "winter_net_mw": 1110.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491068,
        "projectNumber": "J1130",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2023-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Warren County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Baxter Wilson SES 115/500 kV Sw YD",
        "summerNetMW": 966.0,
        "winterNetMW": 1110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1438,
      "normalized": {
        "queue_id": "J1135",
        "county": "Des Moines County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Huntwoods 69 kV substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-02-07T05:00:00+00:00",
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": "2022-02-07T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491069,
        "projectNumber": "J1135",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-02-07T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "giaToExec": "2022-02-07T05:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Des Moines County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Huntwoods 69 kV substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1439,
      "normalized": {
        "queue_id": "J1027",
        "county": "Pike County",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Ratts 161 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2022-11-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": "2021-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491070,
        "projectNumber": "J1027",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "giaToExec": "2021-03-08T05:00:00+00:00",
        "negInService": "2022-11-15T05:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Pike County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ratts 161 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1440,
      "normalized": {
        "queue_id": "J1028",
        "county": "Pike County",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Ratts - Victory 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2022-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": "2021-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491071,
        "projectNumber": "J1028",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "giaToExec": "2021-03-08T05:00:00+00:00",
        "negInService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Pike County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ratts - Victory 161 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1441,
      "normalized": {
        "queue_id": "J1009",
        "county": "Kenosha County,Racine County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Pleasant Prairie - Racine 345kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-05-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 400.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491072,
        "projectNumber": "J1009",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-05-19T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Kenosha County,Racine County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pleasant Prairie - Racine 345kV Line Tap",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 400.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1442,
      "normalized": {
        "queue_id": "J1110",
        "county": "Mower County",
        "state": "MN",
        "transmission_owner": "SMMPA",
        "poi": "North Austin 161 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-06-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491073,
        "projectNumber": "J1110",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-06-18T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "SMMPA",
        "county": "Mower County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Austin 161 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1443,
      "normalized": {
        "queue_id": "J1112",
        "county": "Kosciusko County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Leesburg 138kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491074,
        "projectNumber": "J1112",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-10T05:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "Kosciusko County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Leesburg 138kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1444,
      "normalized": {
        "queue_id": "J1132",
        "county": "Union County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Creston East 69 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-02-07T05:00:00+00:00",
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": "2022-02-07T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491075,
        "projectNumber": "J1132",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-02-07T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "giaToExec": "2022-02-07T05:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Union County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Creston East 69 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1445,
      "normalized": {
        "queue_id": "J1115",
        "county": "Macon County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Latham - Oreana 345kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-09-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491076,
        "projectNumber": "J1115",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macon County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Latham - Oreana 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1446,
      "normalized": {
        "queue_id": "J1136",
        "county": "Hinds County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Tinnin Road 230kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-06-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-08-11T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491077,
        "projectNumber": "J1136",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-06-05T04:00:00+00:00",
        "inService": "2021-08-11T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Hinds County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tinnin Road 230kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1447,
      "normalized": {
        "queue_id": "J1151",
        "county": "Ascension Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Brittany 230kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 252.0,
        "summer_net_mw": 219.0,
        "winter_net_mw": 252.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491078,
        "projectNumber": "J1151",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Ascension Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brittany 230kV Substation",
        "summerNetMW": 219.0,
        "winterNetMW": 252.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1448,
      "normalized": {
        "queue_id": "J1152",
        "county": "Hancock County,Shelby County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gwynneville 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2022-07-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491079,
        "projectNumber": "J1152",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2022-07-19T04:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Hancock County,Shelby County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gwynneville 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1449,
      "normalized": {
        "queue_id": "J1131",
        "county": "Scott County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Sub 56 Davenport 161 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2024-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-06-16T04:00:00+00:00",
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2021-06-16T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491080,
        "projectNumber": "J1131",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-06-16T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2021-06-16T04:00:00+00:00",
        "negInService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Scott County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sub 56 Davenport 161 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1450,
      "normalized": {
        "queue_id": "J1133",
        "county": "Richland Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Dunn - Oakridge 115kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-08-11T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491081,
        "projectNumber": "J1133",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-10-01T04:00:00+00:00",
        "inService": "2021-08-11T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Richland Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Dunn - Oakridge 115kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1451,
      "normalized": {
        "queue_id": "J1116",
        "county": "Hancock County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Greensboro - Greenfield 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-10-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491082,
        "projectNumber": "J1116",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-10-03T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Hancock County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greensboro - Greenfield 138 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1452,
      "normalized": {
        "queue_id": "J1117",
        "county": "Ingham County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Green 138kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-05-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491083,
        "projectNumber": "J1117",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-05-30T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ingham County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Green 138kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1453,
      "normalized": {
        "queue_id": "J1139",
        "county": "Champaign County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Sidney Substation 138 kV Bus",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2023-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2020-10-31T04:00:00+00:00",
        "gia_to_execute": "2021-03-17T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 135.0,
        "dp2_nris_mw": 135.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491084,
        "projectNumber": "J1139",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "inService": "2020-10-31T04:00:00+00:00",
        "giaToExec": "2021-03-17T04:00:00+00:00",
        "negInService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Champaign County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sidney Substation 138 kV Bus",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 135.0,
        "dp2NrisMw": 135.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1454,
      "normalized": {
        "queue_id": "J1118",
        "county": "Piatt County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mahomet - Weedman 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-10-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491085,
        "projectNumber": "J1118",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-10-03T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Piatt County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mahomet - Weedman 138 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1455,
      "normalized": {
        "queue_id": "J1007",
        "county": "Crittenden County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Marion - Marked Tree 161kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-08-12T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2020-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 180.0,
        "dp2_nris_mw": 180.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491086,
        "projectNumber": "J1007",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-08-12T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2020-03-30T04:00:00+00:00",
        "negInService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Crittenden County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Marion - Marked Tree 161kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 180.0,
        "dp2NrisMw": 180.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1456,
      "normalized": {
        "queue_id": "J1111",
        "county": "Jackson County",
        "state": "IL",
        "transmission_owner": "Southern Illinois Power Cooperative",
        "poi": "Campbell Hill - Jackson 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491087,
        "projectNumber": "J1111",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-10T05:00:00+00:00",
        "inService": "2021-01-02T05:00:00+00:00",
        "transmissionOwner": "Southern Illinois Power Cooperative",
        "county": "Jackson County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Campbell Hill - Jackson 161 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1457,
      "normalized": {
        "queue_id": "J1113",
        "county": "Sunflower County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Delta - Ruleville 115kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 85.0,
        "summer_net_mw": 85.0,
        "winter_net_mw": 85.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491088,
        "projectNumber": "J1113",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Sunflower County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Delta - Ruleville 115kV Line Tap",
        "summerNetMW": 85.0,
        "winterNetMW": 85.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1458,
      "normalized": {
        "queue_id": "J1134",
        "county": "White County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Griffithville - Searcy Price 115 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-06-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-08-11T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491089,
        "projectNumber": "J1134",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-06-05T04:00:00+00:00",
        "inService": "2021-08-11T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "White County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Griffithville - Searcy Price 115 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1459,
      "normalized": {
        "queue_id": "J1137",
        "county": "Jackson County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Swifton - Hoxie South 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491090,
        "projectNumber": "J1137",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-28T04:00:00+00:00",
        "inService": "2021-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Swifton - Hoxie South 161 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1460,
      "normalized": {
        "queue_id": "J1119",
        "county": "Jackson County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Tompkins 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-06-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 600.0,
        "summer_net_mw": 600.0,
        "winter_net_mw": 600.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491091,
        "projectNumber": "J1119",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-06-10T04:00:00+00:00",
        "inService": "2021-01-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Jackson County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tompkins 345 kV Substation",
        "summerNetMW": 600.0,
        "winterNetMW": 600.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1461,
      "normalized": {
        "queue_id": "J1150",
        "county": "Miami County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Deedsville 345 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-08-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491092,
        "projectNumber": "J1150",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-08-10T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Miami County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Deedsville 345 kV Substation",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1462,
      "normalized": {
        "queue_id": "J1153",
        "county": "Sheboygan County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Holland 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2022-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2021-05-19T04:00:00+00:00",
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": "2021-05-19T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491093,
        "projectNumber": "J1153",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-05-19T04:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "giaToExec": "2021-05-19T04:00:00+00:00",
        "negInService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Sheboygan County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Holland 138 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1463,
      "normalized": {
        "queue_id": "J1155",
        "county": "Mississippi County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Driver 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2022-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-08-12T04:00:00+00:00",
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": "2020-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491094,
        "projectNumber": "J1155",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-08-12T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "giaToExec": "2020-03-30T04:00:00+00:00",
        "negInService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Mississippi County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Driver 230 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1464,
      "normalized": {
        "queue_id": "J1183",
        "county": "Delta County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Heritage Garden substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 1.35,
        "summer_net_mw": 1.35,
        "winter_net_mw": 1.35,
        "proposed_completion_date": "2019-10-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2021-04-02T04:00:00+00:00",
        "in_service": "2019-01-31T05:00:00+00:00",
        "gia_to_execute": "2021-04-02T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 1.35,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 1.35,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491095,
        "projectNumber": "J1183",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-04-02T04:00:00+00:00",
        "inService": "2019-01-31T05:00:00+00:00",
        "giaToExec": "2021-04-02T04:00:00+00:00",
        "negInService": "2019-10-15T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Delta County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Heritage Garden substation",
        "summerNetMW": 1.35,
        "winterNetMW": 1.35,
        "dp1ErisMw": 1.35,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 1.35,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1465,
      "normalized": {
        "queue_id": "J1180",
        "county": "Clark County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Casey West - Sullivan 345 kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2023-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2020-08-14T04:00:00+00:00",
        "gia_to_execute": "2021-03-17T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491096,
        "projectNumber": "J1180",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2020-08-14T04:00:00+00:00",
        "giaToExec": "2021-03-17T04:00:00+00:00",
        "negInService": "2023-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clark County",
        "state": "IL",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Casey West - Sullivan 345 kV Line",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1466,
      "normalized": {
        "queue_id": "J1158",
        "county": "St. James Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Vacherie 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": "2022-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-12-07T05:00:00+00:00",
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": "2020-07-01T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 70.0,
        "dp1_nris_mw": 70.0,
        "dp2_eris_mw": 70.0,
        "dp2_nris_mw": 70.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491097,
        "projectNumber": "J1158",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-12-07T05:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "giaToExec": "2020-07-01T04:00:00+00:00",
        "negInService": "2022-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "St. James Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Vacherie 230 kV Substation",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 70.0,
        "dp1NrisMw": 70.0,
        "dp2ErisMw": 70.0,
        "dp2NrisMw": 70.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1467,
      "normalized": {
        "queue_id": "J1159",
        "county": "Walker County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Mount Zion 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491098,
        "projectNumber": "J1159",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-28T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Walker County",
        "state": "TX",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mount Zion 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1468,
      "normalized": {
        "queue_id": "J1167",
        "county": "St. Francis County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC Forrest City West 161 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-01-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491099,
        "projectNumber": "J1167",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-01-14T05:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "St. Francis County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "AECC Forrest City West 161 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1469,
      "normalized": {
        "queue_id": "J1114",
        "county": "Plymouth County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "J506 Substation on Raun - Highland 345 kV Line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491100,
        "projectNumber": "J1114",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Plymouth County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "J506 Substation on Raun - Highland 345 kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1470,
      "normalized": {
        "queue_id": "J1138",
        "county": "Baraga County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "M38 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-12-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491101,
        "projectNumber": "J1138",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-12-07T05:00:00+00:00",
        "inService": "2020-09-23T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Baraga County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "M38 138 kV Substation",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1471,
      "normalized": {
        "queue_id": "J1154",
        "county": "Jefferson County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Jefferson 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2023-05-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-05-19T04:00:00+00:00",
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": "2021-05-19T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491102,
        "projectNumber": "J1154",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-05-19T04:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "giaToExec": "2021-05-19T04:00:00+00:00",
        "negInService": "2023-05-15T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Jefferson County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Jefferson 138 kV Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1472,
      "normalized": {
        "queue_id": "J1160",
        "county": "Adams County,Wood County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Sand Lake - Port Edwards 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-01-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.23,
        "summer_net_mw": 100.23,
        "winter_net_mw": 100.23,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491103,
        "projectNumber": "J1160",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-01-31T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Adams County,Wood County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sand Lake - Port Edwards 138 kV Line Tap",
        "summerNetMW": 100.23,
        "winterNetMW": 100.23,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1473,
      "normalized": {
        "queue_id": "J1181",
        "county": "Chickasaw County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Hazleton - Mitchell county 345 kV line",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-10-31T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2021-06-15T04:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2021-06-15T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491104,
        "projectNumber": "J1181",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-06-15T04:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2021-06-15T04:00:00+00:00",
        "negInService": "2022-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Chickasaw County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hazleton - Mitchell county 345 kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1474,
      "normalized": {
        "queue_id": "J1182",
        "county": "Adair County",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Zachary Substation 345 kV Bus",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2024-11-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2022-03-18T04:00:00+00:00",
        "in_service": "2021-11-15T05:00:00+00:00",
        "gia_to_execute": "2022-03-19T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491105,
        "projectNumber": "J1182",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-03-18T04:00:00+00:00",
        "inService": "2021-11-15T05:00:00+00:00",
        "giaToExec": "2022-03-19T04:00:00+00:00",
        "negInService": "2024-11-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Adair County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Zachary Substation 345 kV Bus",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1475,
      "normalized": {
        "queue_id": "J1185",
        "county": "Putnam County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Adair - Appanoose 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-04-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491106,
        "projectNumber": "J1185",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-04-24T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Putnam County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Adair - Appanoose 161 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1476,
      "normalized": {
        "queue_id": "J1166",
        "county": "Acadia Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Bayou Cove - Richard 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491107,
        "projectNumber": "J1166",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-28T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bayou Cove - Richard 138 kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1477,
      "normalized": {
        "queue_id": "J1157",
        "county": "Hinds County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Tinnin Road 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491108,
        "projectNumber": "J1157",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-28T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Hinds County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tinnin Road 230 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1478,
      "normalized": {
        "queue_id": "J1164",
        "county": "Rock County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Magnolia 161 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": "2024-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-04-06T04:00:00+00:00",
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-04-07T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 80.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491109,
        "projectNumber": "J1164",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-04-06T04:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "giaToExec": "2022-04-07T04:00:00+00:00",
        "negInService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Rock County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Magnolia 161 kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 80.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1479,
      "normalized": {
        "queue_id": "J1186",
        "county": "San Jacinto County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Pelican Road - Shepard 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491110,
        "projectNumber": "J1186",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-28T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "San Jacinto County",
        "state": "TX",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pelican Road - Shepard 138 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1480,
      "normalized": {
        "queue_id": "J1168",
        "county": "Liberty County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Pintail 138 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491111,
        "projectNumber": "J1168",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-28T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty County",
        "state": "TX",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pintail 138 kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1481,
      "normalized": {
        "queue_id": "J1188",
        "county": "Rock County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Sheepskin 69 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2022-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2021-05-18T04:00:00+00:00",
        "in_service": "2021-08-31T04:00:00+00:00",
        "gia_to_execute": "2021-05-18T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491112,
        "projectNumber": "J1188",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-05-18T04:00:00+00:00",
        "inService": "2021-08-31T04:00:00+00:00",
        "giaToExec": "2021-05-18T04:00:00+00:00",
        "negInService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Rock County",
        "state": "WI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sheepskin 69 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1482,
      "normalized": {
        "queue_id": "J1169",
        "county": "McCook County",
        "state": "SD",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Grant 115 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2024-07-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-02-07T05:00:00+00:00",
        "in_service": "2021-08-31T04:00:00+00:00",
        "gia_to_execute": "2022-02-07T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491113,
        "projectNumber": "J1169",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2022-02-07T05:00:00+00:00",
        "inService": "2021-08-31T04:00:00+00:00",
        "giaToExec": "2022-02-07T05:00:00+00:00",
        "negInService": "2024-07-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "McCook County",
        "state": "SD",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Grant 115 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1483,
      "normalized": {
        "queue_id": "J1200",
        "county": "Putnam County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Putnam 138kV Substation",
        "queue_date": "2019-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 24.2,
        "summer_net_mw": 24.2,
        "winter_net_mw": 24.2,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-15T04:00:00+00:00",
        "gia_to_execute": "2022-04-22T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 24.2,
        "dp1_nris_mw": 24.2,
        "dp2_eris_mw": 24.2,
        "dp2_nris_mw": 24.2,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491114,
        "projectNumber": "J1200",
        "queueDate": "2019-04-25T04:00:00+00:00",
        "inService": "2021-06-15T04:00:00+00:00",
        "giaToExec": "2022-04-22T04:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Putnam County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Putnam 138kV Substation",
        "summerNetMW": 24.2,
        "winterNetMW": 24.2,
        "dp1ErisMw": 24.2,
        "dp1NrisMw": 24.2,
        "dp2ErisMw": 24.2,
        "dp2NrisMw": 24.2,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1484,
      "normalized": {
        "queue_id": "J1201",
        "county": "Montgomery County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "North Coffeen 138kV Substation",
        "queue_date": "2019-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 44.2,
        "summer_net_mw": 44.2,
        "winter_net_mw": 44.2,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-15T04:00:00+00:00",
        "gia_to_execute": "2022-04-22T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 44.2,
        "dp1_nris_mw": 44.2,
        "dp2_eris_mw": 44.2,
        "dp2_nris_mw": 44.2,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491115,
        "projectNumber": "J1201",
        "queueDate": "2019-04-25T04:00:00+00:00",
        "inService": "2021-06-15T04:00:00+00:00",
        "giaToExec": "2022-04-22T04:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Montgomery County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Coffeen 138kV Substation",
        "summerNetMW": 44.2,
        "winterNetMW": 44.2,
        "dp1ErisMw": 44.2,
        "dp1NrisMw": 44.2,
        "dp2ErisMw": 44.2,
        "dp2NrisMw": 44.2,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1485,
      "normalized": {
        "queue_id": "J1189",
        "county": "Brown County,Martin County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Crane Solar 69kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 5.0,
        "summer_net_mw": 5.0,
        "winter_net_mw": 5.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2019-01-01T05:00:00+00:00",
        "gia_to_execute": "2020-05-11T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 4.95,
        "dp1_nris_mw": 4.95,
        "dp2_eris_mw": 4.95,
        "dp2_nris_mw": 4.95,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491116,
        "projectNumber": "J1189",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "inService": "2019-01-01T05:00:00+00:00",
        "giaToExec": "2020-05-11T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Brown County,Martin County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crane Solar 69kV Substation",
        "summerNetMW": 5.0,
        "winterNetMW": 5.0,
        "dp1ErisMw": 4.95,
        "dp1NrisMw": 4.95,
        "dp2ErisMw": 4.95,
        "dp2NrisMw": 4.95,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1486,
      "normalized": {
        "queue_id": "J1210",
        "county": "Iosco County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Whittemore - Twining 138kV Line",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2025-03-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491117,
        "projectNumber": "J1210",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2025-03-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Iosco County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Whittemore - Twining 138kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1487,
      "normalized": {
        "queue_id": "J1211",
        "county": "Isabella County",
        "state": "MI",
        "transmission_owner": "CONSUMERS ENERGY COMPANY EDC",
        "poi": "Vernon - METC Tap 138kV Line",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": "2021-02-11T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491118,
        "projectNumber": "J1211",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "withdrawnDate": "2021-02-11T05:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "CONSUMERS ENERGY COMPANY EDC",
        "county": "Isabella County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Vernon - METC Tap 138kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1488,
      "normalized": {
        "queue_id": "J1220",
        "county": "Rapides Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Rapides - Rodemacher 230 kV Line Tap",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491119,
        "projectNumber": "J1220",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rapides - Rodemacher 230 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1489,
      "normalized": {
        "queue_id": "J1161",
        "county": "Scott County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Miner - Kelso 161 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.23,
        "summer_net_mw": 100.23,
        "winter_net_mw": 100.23,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491120,
        "projectNumber": "J1161",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-01-07T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Scott County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Miner - Kelso 161 kV Line Tap",
        "summerNetMW": 100.23,
        "winterNetMW": 100.23,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1490,
      "normalized": {
        "queue_id": "J1162",
        "county": "Jefferson County",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Jacinto - China 230 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491121,
        "projectNumber": "J1162",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-28T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jefferson County",
        "state": "TX",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Jacinto - China 230 kV Line Tap",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1491,
      "normalized": {
        "queue_id": "J1156",
        "county": "Crittenden County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Kuhn Rd. - Parkin 161 kV line tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491122,
        "projectNumber": "J1156",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-28T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden County",
        "state": "AR",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kuhn Rd. - Parkin 161 kV line tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1492,
      "normalized": {
        "queue_id": "J1163",
        "county": "Quitman County,Tunica County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Crenshaw - Tunica 115kv Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491123,
        "projectNumber": "J1163",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-28T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Quitman County,Tunica County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crenshaw - Tunica 115kv Line Tap",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1493,
      "normalized": {
        "queue_id": "J1184",
        "county": "Washington Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Lagen Holton-Franklinton 115kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2021-04-09T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-10-09T04:00:00+00:00",
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": "2019-03-06T05:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491124,
        "projectNumber": "J1184",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-10-09T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "giaToExec": "2019-03-06T05:00:00+00:00",
        "negInService": "2021-04-09T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Washington Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lagen Holton-Franklinton 115kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1494,
      "normalized": {
        "queue_id": "J1165",
        "county": "Jefferson Davis Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "LC Bulk - Henning 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491125,
        "projectNumber": "J1165",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-28T04:00:00+00:00",
        "inService": "2020-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jefferson Davis Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "LC Bulk - Henning 138 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1495,
      "normalized": {
        "queue_id": "J1187",
        "county": "Mercer County",
        "state": "ND",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Stanton 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2021-03-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 151.8,
        "summer_net_mw": 151.8,
        "winter_net_mw": 151.8,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 151.8,
        "dp1_nris_mw": 151.8,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491126,
        "projectNumber": "J1187",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2021-03-09T05:00:00+00:00",
        "inService": "2022-05-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Mercer County",
        "state": "ND",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stanton 230 kV Substation",
        "summerNetMW": 151.8,
        "winterNetMW": 151.8,
        "dp1ErisMw": 151.8,
        "dp1NrisMw": 151.8,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1496,
      "normalized": {
        "queue_id": "J1213",
        "county": "Iron County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Taum Sauk 138kV Switchyard, Bus 1 & 2",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": "2024-11-02T04:00:00+00:00",
        "generation_type": "Hydro",
        "facility_type": "Hydroelectric",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-31T05:00:00+00:00",
        "gia_to_execute": "2023-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 60.0,
        "dp2_nris_mw": 60.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491127,
        "projectNumber": "J1213",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "inService": "2022-12-31T05:00:00+00:00",
        "giaToExec": "2023-03-30T04:00:00+00:00",
        "negInService": "2024-11-02T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Iron County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Taum Sauk 138kV Switchyard, Bus 1 & 2",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 60.0,
        "dp2NrisMw": 60.0,
        "fuelType": "Hydro",
        "facilityType": "Hydroelectric",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1497,
      "normalized": {
        "queue_id": "J1230",
        "county": "Wadena County",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Wing River- Riverton 230kV line",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491128,
        "projectNumber": "J1230",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Wadena County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wing River- Riverton 230kV line",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1498,
      "normalized": {
        "queue_id": "J1202",
        "county": "Randolph County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Baldwin Plant 345kV Switchyard - Baldwin Unit 2",
        "queue_date": "2019-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 68.4,
        "summer_net_mw": 68.4,
        "winter_net_mw": 68.4,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-15T04:00:00+00:00",
        "gia_to_execute": "2022-05-26T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 68.4,
        "dp1_nris_mw": 68.4,
        "dp2_eris_mw": 68.4,
        "dp2_nris_mw": 68.4,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491129,
        "projectNumber": "J1202",
        "queueDate": "2019-04-25T04:00:00+00:00",
        "inService": "2021-06-15T04:00:00+00:00",
        "giaToExec": "2022-05-26T04:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Randolph County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Baldwin Plant 345kV Switchyard - Baldwin Unit 2",
        "summerNetMW": 68.4,
        "winterNetMW": 68.4,
        "dp1ErisMw": 68.4,
        "dp1NrisMw": 68.4,
        "dp2ErisMw": 68.4,
        "dp2NrisMw": 68.4,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1499,
      "normalized": {
        "queue_id": "J1221",
        "county": "Wadena County",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Wing River- Riverton 230kV line",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2028-10-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 120.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491130,
        "projectNumber": "J1221",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "negInService": "2028-10-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Wadena County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wing River- Riverton 230kV line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 120.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1500,
      "normalized": {
        "queue_id": "J1231",
        "county": "Lyon County",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BRPS",
        "poi": "Barkley - Caldwell 161kV Line",
        "queue_date": "2019-04-28T04:00:00+00:00",
        "withdrawn_date": "2024-12-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": "2025-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 125.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491131,
        "projectNumber": "J1231",
        "queueDate": "2019-04-28T04:00:00+00:00",
        "withdrawnDate": "2024-12-13T05:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "giaToExec": "2023-03-30T04:00:00+00:00",
        "negInService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BRPS",
        "county": "Lyon County",
        "state": "KY",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Barkley - Caldwell 161kV Line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 125.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1501,
      "normalized": {
        "queue_id": "J1222",
        "county": "Ralls County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Spencer Creek 345 kV Substation",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491132,
        "projectNumber": "J1222",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Ralls County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Spencer Creek 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1502,
      "normalized": {
        "queue_id": "J1204",
        "county": "Cumberland County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Casey West 345kV Substation",
        "queue_date": "2019-04-26T04:00:00+00:00",
        "withdrawn_date": "2024-05-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 199.3,
        "summer_net_mw": 199.3,
        "winter_net_mw": 199.3,
        "proposed_completion_date": "2025-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2022-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 199.3,
        "dp1_nris_mw": 199.3,
        "dp2_eris_mw": 199.3,
        "dp2_nris_mw": 199.3,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491133,
        "projectNumber": "J1204",
        "queueDate": "2019-04-26T04:00:00+00:00",
        "withdrawnDate": "2024-05-03T04:00:00+00:00",
        "inService": "2022-06-01T04:00:00+00:00",
        "negInService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Cumberland County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Casey West 345kV Substation",
        "summerNetMW": 199.3,
        "winterNetMW": 199.3,
        "dp1ErisMw": 199.3,
        "dp1NrisMw": 199.3,
        "dp2ErisMw": 199.3,
        "dp2NrisMw": 199.3,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1503,
      "normalized": {
        "queue_id": "J1217",
        "county": "St. Landry Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Ville Platte - West Fork 230 kV Line Tap",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": "2021-03-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491134,
        "projectNumber": "J1217",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "withdrawnDate": "2021-03-18T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Landry Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ville Platte - West Fork 230 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1504,
      "normalized": {
        "queue_id": "J1224",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Majestic - Milan 345 kV Line Tap",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": "2025-10-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-10-31T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 153.0,
        "dp2_nris_mw": 153.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491135,
        "projectNumber": "J1224",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2022-10-31T04:00:00+00:00",
        "negInService": "2025-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Majestic - Milan 345 kV Line Tap",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 153.0,
        "dp2NrisMw": 153.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1505,
      "normalized": {
        "queue_id": "J1218",
        "county": "Muscatine County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Sub 92 345 kV",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-26T05:00:00+00:00",
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 160.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491136,
        "projectNumber": "J1218",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "doneDate": "2023-01-26T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "giaToExec": "2023-01-26T05:00:00+00:00",
        "negInService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Muscatine County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sub 92 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 160.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1506,
      "normalized": {
        "queue_id": "J1235",
        "county": "Knox County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport - Washington Mun, Linton 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2023-09-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491137,
        "projectNumber": "J1235",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "negInService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Edwardsport - Washington Mun, Linton 138kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1507,
      "normalized": {
        "queue_id": "J1233",
        "county": "Pike County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Cato 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2023-02-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 32.5,
        "summer_net_mw": 32.5,
        "winter_net_mw": 32.5,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 32.5,
        "dp1_nris_mw": 32.5,
        "dp2_eris_mw": 32.5,
        "dp2_nris_mw": 32.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491138,
        "projectNumber": "J1233",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2023-02-06T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Pike County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cato 138 kV Substation",
        "summerNetMW": 32.5,
        "winterNetMW": 32.5,
        "dp1ErisMw": 32.5,
        "dp1NrisMw": 32.5,
        "dp2ErisMw": 32.5,
        "dp2NrisMw": 32.5,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1508,
      "normalized": {
        "queue_id": "J1234",
        "county": "Knox County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport - Washington Mun, Linton 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2023-09-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491139,
        "projectNumber": "J1234",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "negInService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Edwardsport - Washington Mun, Linton 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1509,
      "normalized": {
        "queue_id": "J1215",
        "county": "Arkansas County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Stuttgart Ricuskey - Woodward 230 kV",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-01-25T05:00:00+00:00",
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-01-25T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 155.0,
        "dp1_nris_mw": 155.0,
        "dp2_eris_mw": 155.0,
        "dp2_nris_mw": 155.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491140,
        "projectNumber": "J1215",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "doneDate": "2022-01-25T05:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2022-01-25T05:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Arkansas County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stuttgart Ricuskey - Woodward 230 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 155.0,
        "dp1NrisMw": 155.0,
        "dp2ErisMw": 155.0,
        "dp2NrisMw": 155.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1510,
      "normalized": {
        "queue_id": "J1232",
        "county": "Coles County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Chesterville - Mattoon West 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": "2025-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 99.0,
        "dp2_nris_mw": 99.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491141,
        "projectNumber": "J1232",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2023-03-30T04:00:00+00:00",
        "negInService": "2025-07-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Coles County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Chesterville - Mattoon West 138kV Line",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 99.0,
        "dp2NrisMw": 99.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1511,
      "normalized": {
        "queue_id": "J1223",
        "county": "Pike County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "poi": "Colonial Pipeline  - Kentwood 115 kV Line",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": "2021-03-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491142,
        "projectNumber": "J1223",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "withdrawnDate": "2021-03-18T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC EMMP",
        "county": "Pike County",
        "state": "MS",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Colonial Pipeline  - Kentwood 115 kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1512,
      "normalized": {
        "queue_id": "J1225",
        "county": "Washington County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ashley-Turkey Hill Line 1482, between the Okawville and North Nashville substations",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491143,
        "projectNumber": "J1225",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2023-09-29T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Washington County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ashley-Turkey Hill Line 1482, between the Okawville and North Nashville substations",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1513,
      "normalized": {
        "queue_id": "J1206",
        "county": "Branch County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Newton 138kV Substation",
        "queue_date": "2019-04-26T04:00:00+00:00",
        "withdrawn_date": "2021-02-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491144,
        "projectNumber": "J1206",
        "queueDate": "2019-04-26T04:00:00+00:00",
        "withdrawnDate": "2021-02-10T05:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Newton 138kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1514,
      "normalized": {
        "queue_id": "J1219",
        "county": "Tangipahoa Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Chicken Farm - Amite 115 kV Line",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2024-09-24T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-11-30T05:00:00+00:00",
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2021-11-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491145,
        "projectNumber": "J1219",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "doneDate": "2021-11-30T05:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2021-11-30T05:00:00+00:00",
        "negInService": "2024-09-24T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Tangipahoa Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Chicken Farm - Amite 115 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1515,
      "normalized": {
        "queue_id": "J1212",
        "county": "Murray County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Chanarambie-Ellsborough 115kV Line",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491146,
        "projectNumber": "J1212",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Murray County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Chanarambie-Ellsborough 115kV Line",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1516,
      "normalized": {
        "queue_id": "J1214",
        "county": "Dane County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Rockdale 345 kV Substation",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2025-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 240.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491147,
        "projectNumber": "J1214",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Dane County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rockdale 345 kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 240.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1517,
      "normalized": {
        "queue_id": "J1226",
        "county": "Lenawee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Morocco 345 kV Substation",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2023-09-29T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491148,
        "projectNumber": "J1226",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2023-09-29T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Morocco 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1518,
      "normalized": {
        "queue_id": "J1236",
        "county": "St. Landry Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Ville Platte - West Form 230 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491149,
        "projectNumber": "J1236",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Landry Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ville Platte - West Form 230 kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1519,
      "normalized": {
        "queue_id": "J1203",
        "county": "Genesee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Thetford 345kV Substation",
        "queue_date": "2019-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": "2025-05-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2022-06-01T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 125.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491150,
        "projectNumber": "J1203",
        "queueDate": "2019-04-25T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2022-06-01T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2025-05-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Thetford 345kV Substation",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 125.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1520,
      "normalized": {
        "queue_id": "J1216",
        "county": "Washington County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ashley 138 kV Substation",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2026-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 185.0,
        "dp1_nris_mw": 185.0,
        "dp2_eris_mw": 185.0,
        "dp2_nris_mw": 185.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491151,
        "projectNumber": "J1216",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "negInService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Washington County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ashley 138 kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 185.0,
        "dp1NrisMw": 185.0,
        "dp2ErisMw": 185.0,
        "dp2NrisMw": 185.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1521,
      "normalized": {
        "queue_id": "J1205",
        "county": "Allen Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Centennial - West Bay 138kV Line",
        "queue_date": "2019-04-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": "2023-09-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2021-11-30T05:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2021-11-20T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491152,
        "projectNumber": "J1205",
        "queueDate": "2019-04-26T04:00:00+00:00",
        "doneDate": "2021-11-30T05:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2021-11-20T05:00:00+00:00",
        "negInService": "2023-09-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "Allen Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Centennial - West Bay 138kV Line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1522,
      "normalized": {
        "queue_id": "J1208",
        "county": "Saline County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Muddy - Crab Orchard 138 kV line",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": "2023-11-04T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 80.0,
        "dp2_nris_mw": 80.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491153,
        "projectNumber": "J1208",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "negInService": "2023-11-04T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Saline County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Muddy - Crab Orchard 138 kV line",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 80.0,
        "dp2NrisMw": 80.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1523,
      "normalized": {
        "queue_id": "J1237",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Majestic - Milan 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-01-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491154,
        "projectNumber": "J1237",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-01-03T05:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Majestic - Milan 345kV Line",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1524,
      "normalized": {
        "queue_id": "J1228",
        "county": "Faribault County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Huntley 161 kV Substation",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": "2019-11-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491155,
        "projectNumber": "J1228",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "withdrawnDate": "2019-11-05T05:00:00+00:00",
        "inService": "2023-09-29T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Faribault County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Huntley 161 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1525,
      "normalized": {
        "queue_id": "J1238",
        "county": "Rapides Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Rapides - Rodemacher 230 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491156,
        "projectNumber": "J1238",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rapides - Rodemacher 230 kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1526,
      "normalized": {
        "queue_id": "J1269",
        "county": "Warrick County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Elliott 69kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-07-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 47.6,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491157,
        "projectNumber": "J1269",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2023-03-30T04:00:00+00:00",
        "negInService": "2025-07-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Warrick County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Elliott 69kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 47.6,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1527,
      "normalized": {
        "queue_id": "J1207",
        "county": "Branch County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Newton 138kV Substation",
        "queue_date": "2019-04-26T04:00:00+00:00",
        "withdrawn_date": "2022-12-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Withdrawn",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": "2022-10-31T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 49.5,
        "dp2_eris_mw": 49.5,
        "dp2_nris_mw": 49.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491158,
        "projectNumber": "J1207",
        "queueDate": "2019-04-26T04:00:00+00:00",
        "withdrawnDate": "2022-12-02T05:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "giaToExec": "2022-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Newton 138kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 49.5,
        "dp2ErisMw": 49.5,
        "dp2NrisMw": 49.5,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1528,
      "normalized": {
        "queue_id": "J1239",
        "county": "Ouachita Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Rilla 115 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2024-10-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-11-29T05:00:00+00:00",
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": "2021-11-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 70.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491159,
        "projectNumber": "J1239",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-29T05:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "giaToExec": "2021-11-30T05:00:00+00:00",
        "negInService": "2024-10-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Ouachita Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Rilla 115 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 70.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1529,
      "normalized": {
        "queue_id": "J1267",
        "county": "Cross County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Fisher  - Cherry Valley 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491160,
        "projectNumber": "J1267",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-06T04:00:00+00:00",
        "inService": "2022-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fisher  - Cherry Valley 161kV Line",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1530,
      "normalized": {
        "queue_id": "J1268",
        "county": "Lincoln County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Pike - Troy 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2023-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-11-30T05:00:00+00:00",
        "gia_to_execute": "2022-04-22T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 88.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 70.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491161,
        "projectNumber": "J1268",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-11-30T05:00:00+00:00",
        "giaToExec": "2022-04-22T04:00:00+00:00",
        "negInService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Lincoln County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pike - Troy 161kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 88.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 70.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1531,
      "normalized": {
        "queue_id": "J1271",
        "county": "Vanderburgh County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Oak Grove 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491162,
        "projectNumber": "J1271",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Vanderburgh County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Oak Grove 138kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1532,
      "normalized": {
        "queue_id": "J1295",
        "county": "Gibson County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson - Francisco 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 280.0,
        "summer_net_mw": 280.0,
        "winter_net_mw": 280.0,
        "proposed_completion_date": "2023-12-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2023-02-28T05:00:00+00:00",
        "gia_to_execute": "2021-09-01T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 280.0,
        "dp1_nris_mw": 280.0,
        "dp2_eris_mw": 280.0,
        "dp2_nris_mw": 280.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491163,
        "projectNumber": "J1295",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-02-28T05:00:00+00:00",
        "giaToExec": "2021-09-01T04:00:00+00:00",
        "negInService": "2023-12-31T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Gibson County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gibson - Francisco 345kV Line",
        "summerNetMW": 280.0,
        "winterNetMW": 280.0,
        "dp1ErisMw": 280.0,
        "dp1NrisMw": 280.0,
        "dp2ErisMw": 280.0,
        "dp2NrisMw": 280.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1533,
      "normalized": {
        "queue_id": "J1308",
        "county": "Posey County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "AB Brown - Gibson 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2024-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": "2022-06-30T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 270.0,
        "dp2_nris_mw": 270.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491164,
        "projectNumber": "J1308",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "giaToExec": "2022-06-30T04:00:00+00:00",
        "negInService": "2024-04-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Posey County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "AB Brown - Gibson 345kV Line",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 270.0,
        "dp2NrisMw": 270.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1534,
      "normalized": {
        "queue_id": "J1298",
        "county": "Freeborn County",
        "state": "MN",
        "transmission_owner": "SMMPA",
        "poi": "Hayward - Murphy Creek 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2023-02-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491165,
        "projectNumber": "J1298",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2023-02-02T05:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "transmissionOwner": "SMMPA",
        "county": "Freeborn County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hayward - Murphy Creek 161kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1535,
      "normalized": {
        "queue_id": "J1293",
        "county": "Lee County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Brinkley East - Moro 115 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491166,
        "projectNumber": "J1293",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brinkley East - Moro 115 kV Line Tap",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1536,
      "normalized": {
        "queue_id": "J1304",
        "county": "Rock County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Paddock - Townline Road 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 65.0,
        "summer_net_mw": 65.0,
        "winter_net_mw": 65.0,
        "proposed_completion_date": "2023-08-11T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": "2022-03-28T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 65.0,
        "dp1_nris_mw": 65.0,
        "dp2_eris_mw": 65.0,
        "dp2_nris_mw": 65.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491167,
        "projectNumber": "J1304",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "giaToExec": "2022-03-28T04:00:00+00:00",
        "negInService": "2023-08-11T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Rock County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Paddock - Townline Road 138kV Line",
        "summerNetMW": 65.0,
        "winterNetMW": 65.0,
        "dp1ErisMw": 65.0,
        "dp1NrisMw": 65.0,
        "dp2ErisMw": 65.0,
        "dp2NrisMw": 65.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1537,
      "normalized": {
        "queue_id": "J1309",
        "county": "Arkansas County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Gillett 115 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2019-09-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 129.9,
        "summer_net_mw": 129.9,
        "winter_net_mw": 129.9,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491168,
        "projectNumber": "J1309",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2019-09-12T04:00:00+00:00",
        "inService": "2021-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gillett 115 kV Substation",
        "summerNetMW": 129.9,
        "winterNetMW": 129.9,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1538,
      "normalized": {
        "queue_id": "J1310",
        "county": "Jackson County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Blackstone - Marshall 138 kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": "2024-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2022-06-30T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 125.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491169,
        "projectNumber": "J1310",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2022-06-30T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Jackson County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Blackstone - Marshall 138 kV Line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 125.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1539,
      "normalized": {
        "queue_id": "J1334",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Schahfer - Burr Oak 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 199.5,
        "summer_net_mw": 199.5,
        "winter_net_mw": 199.5,
        "proposed_completion_date": "2024-06-15T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2022-07-27T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 199.5,
        "dp1_nris_mw": 199.5,
        "dp2_eris_mw": 199.5,
        "dp2_nris_mw": 199.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491170,
        "projectNumber": "J1334",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2022-07-27T04:00:00+00:00",
        "negInService": "2024-06-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Schahfer - Burr Oak 345kV Line",
        "summerNetMW": 199.5,
        "winterNetMW": 199.5,
        "dp1ErisMw": 199.5,
        "dp1NrisMw": 199.5,
        "dp2ErisMw": 199.5,
        "dp2NrisMw": 199.5,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1540,
      "normalized": {
        "queue_id": "J1306",
        "county": "Perry County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Commodore-Jordan 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491171,
        "projectNumber": "J1306",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Commodore-Jordan 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1541,
      "normalized": {
        "queue_id": "J1227",
        "county": "Spencer County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Dubois - FB Culley 138 kV Line Tap",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491172,
        "projectNumber": "J1227",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2023-09-29T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Spencer County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Dubois - FB Culley 138 kV Line Tap",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1542,
      "normalized": {
        "queue_id": "J1209",
        "county": "Saline County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Muddy - Crab Orchard 138kV Line",
        "queue_date": "2019-04-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": "2023-11-04T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 80.0,
        "dp2_nris_mw": 80.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491173,
        "projectNumber": "J1209",
        "queueDate": "2019-04-27T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "negInService": "2023-11-04T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Saline County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Muddy - Crab Orchard 138kV Line",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 80.0,
        "dp2NrisMw": 80.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1543,
      "normalized": {
        "queue_id": "J1229",
        "county": "Muscatine County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Sub 92 345 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2026-06-30T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-26T05:00:00+00:00",
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491174,
        "projectNumber": "J1229",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2023-01-26T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "giaToExec": "2023-01-26T05:00:00+00:00",
        "negInService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Muscatine County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sub 92 345 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1544,
      "normalized": {
        "queue_id": "J1263",
        "county": "Clark County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Casey  - Kansas West 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 408.6,
        "summer_net_mw": 408.6,
        "winter_net_mw": 408.6,
        "proposed_completion_date": "2025-01-01T05:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-01-01T05:00:00+00:00",
        "gia_to_execute": "2023-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 408.6,
        "dp1_nris_mw": 408.6,
        "dp2_eris_mw": 408.6,
        "dp2_nris_mw": 408.6,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491175,
        "projectNumber": "J1263",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-01-01T05:00:00+00:00",
        "giaToExec": "2023-03-30T04:00:00+00:00",
        "negInService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clark County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Casey  - Kansas West 345kV Line",
        "summerNetMW": 408.6,
        "winterNetMW": 408.6,
        "dp1ErisMw": 408.6,
        "dp1NrisMw": 408.6,
        "dp2ErisMw": 408.6,
        "dp2NrisMw": 408.6,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1545,
      "normalized": {
        "queue_id": "J1296",
        "county": "Gibson County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Francisco 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491176,
        "projectNumber": "J1296",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-12-01T05:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Gibson County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Francisco 138kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1546,
      "normalized": {
        "queue_id": "J1336",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Schahfer - Burr Oak 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 199.5,
        "summer_net_mw": 199.5,
        "winter_net_mw": 199.5,
        "proposed_completion_date": "2025-02-01T05:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-30T05:00:00+00:00",
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2022-07-27T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 199.5,
        "dp1_nris_mw": 199.5,
        "dp2_eris_mw": 199.5,
        "dp2_nris_mw": 199.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491177,
        "projectNumber": "J1336",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2023-01-30T05:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2022-07-27T04:00:00+00:00",
        "negInService": "2025-02-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Schahfer - Burr Oak 345kV Line",
        "summerNetMW": 199.5,
        "winterNetMW": 199.5,
        "dp1ErisMw": 199.5,
        "dp1NrisMw": 199.5,
        "dp2ErisMw": 199.5,
        "dp2NrisMw": 199.5,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1547,
      "normalized": {
        "queue_id": "J1264",
        "county": "Schoolcraft County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Blaney Park - Engadine - Hiawatha - Alger - Munising 69kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-05-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491178,
        "projectNumber": "J1264",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-05-11T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Schoolcraft County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Blaney Park - Engadine - Hiawatha - Alger - Munising 69kV Line",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1548,
      "normalized": {
        "queue_id": "J1265",
        "county": "LaGrange County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Wolcottville - South Milford 69kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2023-01-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 43.0,
        "summer_net_mw": 43.0,
        "winter_net_mw": 43.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 43.0,
        "dp1_nris_mw": 43.0,
        "dp2_eris_mw": 43.0,
        "dp2_nris_mw": 43.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491179,
        "projectNumber": "J1265",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2023-01-31T05:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "LaGrange County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wolcottville - South Milford 69kV Line",
        "summerNetMW": 43.0,
        "winterNetMW": 43.0,
        "dp1ErisMw": 43.0,
        "dp1NrisMw": 43.0,
        "dp2ErisMw": 43.0,
        "dp2NrisMw": 43.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1549,
      "normalized": {
        "queue_id": "J1270",
        "county": "Palo Alto County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Kossuth - O'Brien 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-10-19T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-29T04:00:00+00:00",
        "gia_to_execute": "2022-11-29T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491180,
        "projectNumber": "J1270",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-09-29T04:00:00+00:00",
        "giaToExec": "2022-11-29T05:00:00+00:00",
        "negInService": "2024-10-19T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Palo Alto County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kossuth - O'Brien 345 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1550,
      "normalized": {
        "queue_id": "J1272",
        "county": "Vanderburgh County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Angel Mound 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2025-07-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-09-02T04:00:00+00:00",
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 23.6,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491181,
        "projectNumber": "J1272",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-09-02T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2023-03-30T04:00:00+00:00",
        "negInService": "2025-07-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Vanderburgh County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Angel Mound 138kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 23.6,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1551,
      "normalized": {
        "queue_id": "J1307",
        "county": "Eaton County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Oneida - Battle Creek 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-03-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491182,
        "projectNumber": "J1307",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-03-08T05:00:00+00:00",
        "inService": "2022-12-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Eaton County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Oneida - Battle Creek 345kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1552,
      "normalized": {
        "queue_id": "J1297",
        "county": "Shiawassee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Cornell - Bell Road 138 kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": "2024-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 170.0,
        "dp2_nris_mw": 170.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491183,
        "projectNumber": "J1297",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cornell - Bell Road 138 kV Line",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 170.0,
        "dp2NrisMw": 170.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1553,
      "normalized": {
        "queue_id": "J1305",
        "county": "Green County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Albany - Bass Creek 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 49.9,
        "summer_net_mw": 49.9,
        "winter_net_mw": 49.9,
        "proposed_completion_date": "2023-05-05T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": "2022-03-28T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 49.9,
        "dp1_nris_mw": 49.9,
        "dp2_eris_mw": 49.9,
        "dp2_nris_mw": 49.9,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491184,
        "projectNumber": "J1305",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "giaToExec": "2022-03-28T04:00:00+00:00",
        "negInService": "2023-05-05T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Green County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Albany - Bass Creek 138kV Line",
        "summerNetMW": 49.9,
        "winterNetMW": 49.9,
        "dp1ErisMw": 49.9,
        "dp1NrisMw": 49.9,
        "dp2ErisMw": 49.9,
        "dp2NrisMw": 49.9,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1554,
      "normalized": {
        "queue_id": "J1337",
        "county": "Sherburne County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Sherburne County 345 kV substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491185,
        "projectNumber": "J1337",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2022-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Sherburne County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sherburne County 345 kV substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1555,
      "normalized": {
        "queue_id": "J1338",
        "county": "Audrain County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Spencer Creek - Montgomery 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491186,
        "projectNumber": "J1338",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-07-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Audrain County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Spencer Creek - Montgomery 345 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1556,
      "normalized": {
        "queue_id": "J1342",
        "county": "Starke County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Starke 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-05-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491187,
        "projectNumber": "J1342",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-05-20T04:00:00+00:00",
        "inService": "2023-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "Starke County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Starke 138kV Substation",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1557,
      "normalized": {
        "queue_id": "J1266",
        "county": "Marion County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Kinmundy - Salem 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": "2025-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 99.0,
        "dp2_nris_mw": 99.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491188,
        "projectNumber": "J1266",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2023-03-30T04:00:00+00:00",
        "negInService": "2025-07-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Marion County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kinmundy - Salem 138kV Line",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 99.0,
        "dp2NrisMw": 99.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1558,
      "normalized": {
        "queue_id": "J1303",
        "county": "Jackson County",
        "state": "IL",
        "transmission_owner": "Southern Illinois Power Cooperative",
        "poi": "Campbell Hill - Jackson 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2026-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 95.0,
        "dp1_nris_mw": 95.0,
        "dp2_eris_mw": 95.0,
        "dp2_nris_mw": 95.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491189,
        "projectNumber": "J1303",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "Southern Illinois Power Cooperative",
        "county": "Jackson County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Campbell Hill - Jackson 161kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 95.0,
        "dp1NrisMw": 95.0,
        "dp2ErisMw": 95.0,
        "dp2NrisMw": 95.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1559,
      "normalized": {
        "queue_id": "J1339",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Schahfer - Burr Oak 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 199.5,
        "summer_net_mw": 199.5,
        "winter_net_mw": 199.5,
        "proposed_completion_date": "2025-08-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2022-07-27T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 199.5,
        "dp1_nris_mw": 199.5,
        "dp2_eris_mw": 199.5,
        "dp2_nris_mw": 199.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491190,
        "projectNumber": "J1339",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2022-07-27T04:00:00+00:00",
        "negInService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Schahfer - Burr Oak 345kV Line",
        "summerNetMW": 199.5,
        "winterNetMW": 199.5,
        "dp1ErisMw": 199.5,
        "dp1NrisMw": 199.5,
        "dp2ErisMw": 199.5,
        "dp2NrisMw": 199.5,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1560,
      "normalized": {
        "queue_id": "J1301",
        "county": "Washington County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Prest 138kV Switching Station",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491191,
        "projectNumber": "J1301",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Washington County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Prest 138kV Switching Station",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1561,
      "normalized": {
        "queue_id": "J1294",
        "county": "Sunflower County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC",
        "poi": "Indianola - Cleveland 115kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": "2023-12-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-01-25T05:00:00+00:00",
        "in_service": "2022-06-01T04:00:00+00:00",
        "gia_to_execute": "2022-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 99.0,
        "dp2_nris_mw": 99.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491192,
        "projectNumber": "J1294",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-01-25T05:00:00+00:00",
        "inService": "2022-06-01T04:00:00+00:00",
        "giaToExec": "2022-01-26T05:00:00+00:00",
        "negInService": "2023-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC",
        "county": "Sunflower County",
        "state": "MS",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Indianola - Cleveland 115kV Line",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 99.0,
        "dp2NrisMw": 99.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1562,
      "normalized": {
        "queue_id": "J1335",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Schahfer - Burr Oak 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 199.5,
        "summer_net_mw": 199.5,
        "winter_net_mw": 199.5,
        "proposed_completion_date": "2024-06-24T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2022-07-27T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 199.5,
        "dp1_nris_mw": 199.5,
        "dp2_eris_mw": 199.5,
        "dp2_nris_mw": 199.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491193,
        "projectNumber": "J1335",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2022-07-27T04:00:00+00:00",
        "negInService": "2024-06-24T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Schahfer - Burr Oak 345kV Line",
        "summerNetMW": 199.5,
        "winterNetMW": 199.5,
        "dp1ErisMw": 199.5,
        "dp1NrisMw": 199.5,
        "dp2ErisMw": 199.5,
        "dp2NrisMw": 199.5,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1563,
      "normalized": {
        "queue_id": "J1299",
        "county": "Scott County",
        "state": "MO",
        "transmission_owner": "Ameren Missouri",
        "poi": "Miner - Kelso 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-04-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 149.0,
        "dp1_nris_mw": 149.0,
        "dp2_eris_mw": 149.0,
        "dp2_nris_mw": 149.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491194,
        "projectNumber": "J1299",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-04-30T04:00:00+00:00",
        "transmissionOwner": "Ameren Missouri",
        "county": "Scott County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Miner - Kelso 161kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 149.0,
        "dp1NrisMw": 149.0,
        "dp2ErisMw": 149.0,
        "dp2NrisMw": 149.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1564,
      "normalized": {
        "queue_id": "J1300",
        "county": "Nobles County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Brewster - Elk 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491195,
        "projectNumber": "J1300",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Nobles County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brewster - Elk 161kV Line",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1565,
      "normalized": {
        "queue_id": "J1340",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Schahfer - Burr Oak 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 199.5,
        "summer_net_mw": 199.5,
        "winter_net_mw": 199.5,
        "proposed_completion_date": "2025-06-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2022-07-27T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 199.5,
        "dp1_nris_mw": 199.5,
        "dp2_eris_mw": 199.5,
        "dp2_nris_mw": 199.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491196,
        "projectNumber": "J1340",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2022-07-27T04:00:00+00:00",
        "negInService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "Jasper County,Starke County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Schahfer - Burr Oak 345kV Line",
        "summerNetMW": 199.5,
        "winterNetMW": 199.5,
        "dp1ErisMw": 199.5,
        "dp1NrisMw": 199.5,
        "dp2ErisMw": 199.5,
        "dp2NrisMw": 199.5,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1566,
      "normalized": {
        "queue_id": "J1376",
        "county": "Cooper County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Barnett - Georgetown Overton 161 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491197,
        "projectNumber": "J1376",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-07-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Cooper County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Barnett - Georgetown Overton 161 kV Line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1567,
      "normalized": {
        "queue_id": "J1387",
        "county": "Jasper County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Circuit 6958 69 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": "2024-04-26T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-31T05:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 60.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491198,
        "projectNumber": "J1387",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-12-31T05:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2024-04-26T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Circuit 6958 69 kV Line Tap",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 60.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1568,
      "normalized": {
        "queue_id": "J1355",
        "county": "LaPorte County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Stillwell 138kV Subtation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": "2026-05-30T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-05-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 131.0,
        "dp1_nris_mw": 131.0,
        "dp2_eris_mw": 131.0,
        "dp2_nris_mw": 131.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491199,
        "projectNumber": "J1355",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-05-30T04:00:00+00:00",
        "negInService": "2026-05-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "LaPorte County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stillwell 138kV Subtation",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 131.0,
        "dp1NrisMw": 131.0,
        "dp2ErisMw": 131.0,
        "dp2NrisMw": 131.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1569,
      "normalized": {
        "queue_id": "J1388",
        "county": "Gibson County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Oakland City - Old Ben Coal 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-12-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491200,
        "projectNumber": "J1388",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2021-12-31T05:00:00+00:00",
        "negInService": "2024-12-15T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Gibson County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Oakland City - Old Ben Coal 138 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1570,
      "normalized": {
        "queue_id": "J1389",
        "county": "Saginaw County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Murphy Station - Nelson Road 345 kV Line tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": "2025-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-21T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 120.0,
        "dp2_nris_mw": 120.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491201,
        "projectNumber": "J1389",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2023-03-21T04:00:00+00:00",
        "negInService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Murphy Station - Nelson Road 345 kV Line tap",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 120.0,
        "dp2NrisMw": 120.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1571,
      "normalized": {
        "queue_id": "J1380",
        "county": "Beauregard Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cooper - Penton 230 kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491202,
        "projectNumber": "J1380",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-07-17T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cooper - Penton 230 kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1572,
      "normalized": {
        "queue_id": "J1357",
        "county": "Madison County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Madison 138 KV SUBSTATION",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-09-30T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-31T05:00:00+00:00",
        "in_service": "2023-05-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-31T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491203,
        "projectNumber": "J1357",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2023-01-31T05:00:00+00:00",
        "inService": "2023-05-30T04:00:00+00:00",
        "giaToExec": "2023-01-31T05:00:00+00:00",
        "negInService": "2025-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Madison County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Madison 138 KV SUBSTATION",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1573,
      "normalized": {
        "queue_id": "J1311",
        "county": "St. Clair County",
        "state": "IL",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Fayetteville Bee Hollow Road 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491204,
        "projectNumber": "J1311",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "St. Clair County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fayetteville Bee Hollow Road 138 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1574,
      "normalized": {
        "queue_id": "J1302",
        "county": "Saline County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Muddy - Norris City 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-02-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-01T05:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491205,
        "projectNumber": "J1302",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-12-01T05:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-02-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Saline County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Muddy - Norris City 138kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1575,
      "normalized": {
        "queue_id": "J1375",
        "county": "Muskegon County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Du Pont - Cobb  -White Lake 138kv",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-05-12T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2023-09-29T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491206,
        "projectNumber": "J1375",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2023-09-29T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2025-05-12T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Du Pont - Cobb  -White Lake 138kv",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1576,
      "normalized": {
        "queue_id": "J1385",
        "county": "Hendricks County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Stilesville 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491207,
        "projectNumber": "J1385",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Hendricks County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stilesville 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1577,
      "normalized": {
        "queue_id": "J1312",
        "county": "McCook County",
        "state": "SD",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Grant 115 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2025-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-26T05:00:00+00:00",
        "in_service": "2022-06-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491208,
        "projectNumber": "J1312",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2023-01-26T05:00:00+00:00",
        "inService": "2022-06-30T04:00:00+00:00",
        "giaToExec": "2023-01-26T05:00:00+00:00",
        "negInService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "McCook County",
        "state": "SD",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Grant 115 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1578,
      "normalized": {
        "queue_id": "J1386",
        "county": "Lake County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Green Acres 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491209,
        "projectNumber": "J1386",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "negInService": "2025-07-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Lake County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Green Acres 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1579,
      "normalized": {
        "queue_id": "J1378",
        "county": "Fountain County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Veedersburg West 230 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-11-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2022-06-16T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491210,
        "projectNumber": "J1378",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2022-06-16T04:00:00+00:00",
        "negInService": "2024-11-15T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Fountain County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Veedersburg West 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1580,
      "normalized": {
        "queue_id": "J1379",
        "county": "Montcalm County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Eureka - Vestaburg 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-12-19T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491211,
        "projectNumber": "J1379",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2025-12-19T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Montcalm County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Eureka - Vestaburg 138 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1581,
      "normalized": {
        "queue_id": "J1377",
        "county": "Rock County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Wempletown - Rockdale 345kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 98.56,
        "summer_net_mw": 98.56,
        "winter_net_mw": 98.56,
        "proposed_completion_date": "2025-07-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-15T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 98.56,
        "dp1_nris_mw": 98.56,
        "dp2_eris_mw": 98.56,
        "dp2_nris_mw": 98.56,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491212,
        "projectNumber": "J1377",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-07-15T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2025-07-15T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Rock County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wempletown - Rockdale 345kV Line Tap",
        "summerNetMW": 98.56,
        "winterNetMW": 98.56,
        "dp1ErisMw": 98.56,
        "dp1NrisMw": 98.56,
        "dp2ErisMw": 98.56,
        "dp2NrisMw": 98.56,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1582,
      "normalized": {
        "queue_id": "J1354",
        "county": "Decatur County",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Decatur  County 138kV Switching Station",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 146.0,
        "summer_net_mw": 146.0,
        "winter_net_mw": 146.0,
        "proposed_completion_date": "2025-10-15T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-05-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 118.0,
        "dp1_nris_mw": 118.0,
        "dp2_eris_mw": 118.0,
        "dp2_nris_mw": 118.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491213,
        "projectNumber": "J1354",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-05-30T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-10-15T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Decatur County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Decatur  County 138kV Switching Station",
        "summerNetMW": 146.0,
        "winterNetMW": 146.0,
        "dp1ErisMw": 118.0,
        "dp1NrisMw": 118.0,
        "dp2ErisMw": 118.0,
        "dp2NrisMw": 118.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1583,
      "normalized": {
        "queue_id": "J1341",
        "county": "Buchanan County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Hazleton 345kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 398.0,
        "summer_net_mw": 398.0,
        "winter_net_mw": 398.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491214,
        "projectNumber": "J1341",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Buchanan County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hazleton 345kV Substation",
        "summerNetMW": 398.0,
        "winterNetMW": 398.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1584,
      "normalized": {
        "queue_id": "J1343",
        "county": "Cerro Gordo County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Emery - Lime Creek 161 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-03-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 96.0,
        "summer_net_mw": 96.0,
        "winter_net_mw": 96.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491215,
        "projectNumber": "J1343",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-03-05T05:00:00+00:00",
        "inService": "2022-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Emery - Lime Creek 161 kV Line Tap",
        "summerNetMW": 96.0,
        "winterNetMW": 96.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1585,
      "normalized": {
        "queue_id": "J1390",
        "county": "Bartholomew County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Gallagher Station - Columbus 230 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491216,
        "projectNumber": "J1390",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Bartholomew County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gallagher Station - Columbus 230 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1586,
      "normalized": {
        "queue_id": "J1381",
        "county": "Howard County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Greentown 230 kV substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491217,
        "projectNumber": "J1381",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Howard County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greentown 230 kV substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1587,
      "normalized": {
        "queue_id": "J1356",
        "county": "Martin County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Whitfield 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-05-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-05-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 74.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491218,
        "projectNumber": "J1356",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-05-20T04:00:00+00:00",
        "inService": "2023-05-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Martin County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Whitfield 138kV Substation",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 74.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1588,
      "normalized": {
        "queue_id": "J1382",
        "county": "Clark County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hutsonville - Neoga 138 kV Line tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-05-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491219,
        "projectNumber": "J1382",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "negInService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clark County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hutsonville - Neoga 138 kV Line tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1589,
      "normalized": {
        "queue_id": "J1392",
        "county": "LaGrange County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Lagrange 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491220,
        "projectNumber": "J1392",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "LaGrange County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lagrange 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1590,
      "normalized": {
        "queue_id": "J1360",
        "county": "Piatt County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Goose Creek 345kV Switchyard",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2024-06-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": "2022-06-25T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491221,
        "projectNumber": "J1360",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "giaToExec": "2022-06-25T04:00:00+00:00",
        "negInService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Piatt County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Goose Creek 345kV Switchyard",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1591,
      "normalized": {
        "queue_id": "J1358",
        "county": "LaPorte County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Luchtman - Michigan City138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": "2026-05-30T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-05-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 125.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491222,
        "projectNumber": "J1358",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-05-30T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2026-05-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "LaPorte County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Luchtman - Michigan City138kV Line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 125.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1592,
      "normalized": {
        "queue_id": "J1393",
        "county": "Pike County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Cato 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": "2026-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 130.0,
        "dp1_nris_mw": 130.0,
        "dp2_eris_mw": 130.0,
        "dp2_nris_mw": 130.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491223,
        "projectNumber": "J1393",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "negInService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Pike County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cato 138 kV Substation",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 130.0,
        "dp1NrisMw": 130.0,
        "dp2ErisMw": 130.0,
        "dp2NrisMw": 130.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1593,
      "normalized": {
        "queue_id": "J1384",
        "county": "Evangeline Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Ville Platte - West Fork 230 kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-07-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491224,
        "projectNumber": "J1384",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-07-22T04:00:00+00:00",
        "inService": "2022-04-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ville Platte - West Fork 230 kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1594,
      "normalized": {
        "queue_id": "J1362",
        "county": "Muskegon County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Kenowa - Ludington 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-02-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-08-27T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491225,
        "projectNumber": "J1362",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-02-13T05:00:00+00:00",
        "inService": "2021-08-27T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kenowa - Ludington 345 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1595,
      "normalized": {
        "queue_id": "J1383",
        "county": "Fulton County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ipava 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-06-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491226,
        "projectNumber": "J1383",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-06-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fulton County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ipava 138 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1596,
      "normalized": {
        "queue_id": "J1407",
        "county": "Porter County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "South Valparaiso 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 70.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491227,
        "projectNumber": "J1407",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Porter County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "South Valparaiso 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 70.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1597,
      "normalized": {
        "queue_id": "J1409",
        "county": "Henderson County",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BRPS",
        "poi": "Henderson 161 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491228,
        "projectNumber": "J1409",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BRPS",
        "county": "Henderson County",
        "state": "KY",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Henderson 161 kV Substation",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1598,
      "normalized": {
        "queue_id": "J1447",
        "county": "Porter County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Schahfer - Green Acres 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2024-02-27T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2025-07-25T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491229,
        "projectNumber": "J1447",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2024-02-27T05:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-07-25T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "Porter County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Schahfer - Green Acres 345kV Line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1599,
      "normalized": {
        "queue_id": "J1361",
        "county": "Washington Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Lagen Holton - Franklinton 115kV Line (J1184)",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2024-01-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-11-29T05:00:00+00:00",
        "in_service": "2021-10-31T04:00:00+00:00",
        "gia_to_execute": "2021-11-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491230,
        "projectNumber": "J1361",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-29T05:00:00+00:00",
        "inService": "2021-10-31T04:00:00+00:00",
        "giaToExec": "2021-11-30T05:00:00+00:00",
        "negInService": "2024-01-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Washington Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lagen Holton - Franklinton 115kV Line (J1184)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1600,
      "normalized": {
        "queue_id": "J1363",
        "county": "Audrain County",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Spencer Creek - Montgomery 345 kV Line Tap",
        "queue_date": "2019-04-26T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491231,
        "projectNumber": "J1363",
        "queueDate": "2019-04-26T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-07-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Audrain County",
        "state": "MO",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Spencer Creek - Montgomery 345 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1601,
      "normalized": {
        "queue_id": "J1412",
        "county": "Porter County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Lake George - Schahfer GEN STA 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491232,
        "projectNumber": "J1412",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-04-15T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "Porter County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lake George - Schahfer GEN STA 345 kV Line Tap",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1602,
      "normalized": {
        "queue_id": "J1449",
        "county": "Monroe County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Morocco 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-02-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491233,
        "projectNumber": "J1449",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-02-10T05:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Monroe County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Morocco 138kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1603,
      "normalized": {
        "queue_id": "J1364",
        "county": "Crittenden County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Marked Tree - Marion 161 kV Line tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491234,
        "projectNumber": "J1364",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-05T04:00:00+00:00",
        "inService": "2022-07-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Marked Tree - Marion 161 kV Line tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1604,
      "normalized": {
        "queue_id": "J1405",
        "county": "Greene County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Sanborn - Linton 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-05-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491235,
        "projectNumber": "J1405",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-05-20T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Greene County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sanborn - Linton 138 kV Line Tap",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1605,
      "normalized": {
        "queue_id": "J1411",
        "county": "Dane County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "N. Madison 345 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2025-10-30T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491236,
        "projectNumber": "J1411",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2025-10-30T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Dane County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "N. Madison 345 kV Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1606,
      "normalized": {
        "queue_id": "J1414",
        "county": "Clay County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Datto-Corning North 161 kV line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491237,
        "projectNumber": "J1414",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-04T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clay County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Datto-Corning North 161 kV line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1607,
      "normalized": {
        "queue_id": "J1466",
        "county": "Henderson County",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION",
        "poi": "Reid EHV 161 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2025-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-05-25T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491238,
        "projectNumber": "J1466",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-05-25T04:00:00+00:00",
        "negInService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION",
        "county": "Henderson County",
        "state": "KY",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reid EHV 161 kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1608,
      "normalized": {
        "queue_id": "J1456",
        "county": "Sheridan County",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTPW",
        "poi": "Harvey - Underwood 230 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-09-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 300.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491239,
        "projectNumber": "J1456",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-09-01T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTPW",
        "county": "Sheridan County",
        "state": "ND",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Harvey - Underwood 230 kV Line Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 300.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1609,
      "normalized": {
        "queue_id": "J1446",
        "county": "Wright County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lake Pulaski 115kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491240,
        "projectNumber": "J1446",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-21T05:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Wright County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lake Pulaski 115kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1610,
      "normalized": {
        "queue_id": "J1468",
        "county": "Dakota County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "West Hastings 115kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491241,
        "projectNumber": "J1468",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-21T05:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dakota County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "West Hastings 115kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1611,
      "normalized": {
        "queue_id": "J1459",
        "county": "Calhoun County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Argenta - Tompkins 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-01-27T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 670.0,
        "summer_net_mw": 670.0,
        "winter_net_mw": 670.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491242,
        "projectNumber": "J1459",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-01-27T05:00:00+00:00",
        "inService": "2024-03-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Argenta - Tompkins 345 kV Line Tap",
        "summerNetMW": 670.0,
        "winterNetMW": 670.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1612,
      "normalized": {
        "queue_id": "J1470",
        "county": "Benton County,Warren County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Cayuga CT 345kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": "2023-03-21T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-04-30T04:00:00+00:00",
        "gia_to_execute": "2022-11-11T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 30.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 30.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491243,
        "projectNumber": "J1470",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2019-04-30T04:00:00+00:00",
        "giaToExec": "2022-11-11T05:00:00+00:00",
        "negInService": "2023-03-21T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Benton County,Warren County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Cayuga CT 345kV Substation",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 30.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 30.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1613,
      "normalized": {
        "queue_id": "J1457",
        "county": "Vermillion County",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Sugar Creek - Cayuga 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491244,
        "projectNumber": "J1457",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-08-05T04:00:00+00:00",
        "inService": "2022-06-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sugar Creek - Cayuga 345 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1614,
      "normalized": {
        "queue_id": "J1451",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Dorset 120 kV Substation",
        "queue_date": "2019-04-26T04:00:00+00:00",
        "withdrawn_date": "2020-05-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491245,
        "projectNumber": "J1451",
        "queueDate": "2019-04-26T04:00:00+00:00",
        "withdrawnDate": "2020-05-06T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Dorset 120 kV Substation",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1615,
      "normalized": {
        "queue_id": "J1469",
        "county": "Crittenden County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Marion - Marked Tree 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491246,
        "projectNumber": "J1469",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-06T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Marion - Marked Tree 161kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1616,
      "normalized": {
        "queue_id": "J1460",
        "county": "Rock County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Sunrise 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2022-06-30T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 170.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491247,
        "projectNumber": "J1460",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-06-30T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Rock County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sunrise 138 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 170.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1617,
      "normalized": {
        "queue_id": "J1391",
        "county": "Dubois County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Duff 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-11-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491248,
        "projectNumber": "J1391",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-11-30T05:00:00+00:00",
        "negInService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Dubois County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Duff 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1618,
      "normalized": {
        "queue_id": "J1394",
        "county": "Shiawassee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Cornell - Layton138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-02-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491249,
        "projectNumber": "J1394",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-02-08T05:00:00+00:00",
        "inService": "2021-12-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cornell - Layton138kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1619,
      "normalized": {
        "queue_id": "J1406",
        "county": "Muskegon County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Kenowa - Ludington 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-02-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.2,
        "summer_net_mw": 25.2,
        "winter_net_mw": 25.2,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491250,
        "projectNumber": "J1406",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-02-07T05:00:00+00:00",
        "inService": "2021-09-03T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kenowa - Ludington 345 kV Line Tap",
        "summerNetMW": 25.2,
        "winterNetMW": 25.2,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1620,
      "normalized": {
        "queue_id": "J1408",
        "county": "Macoupin County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Virden 138kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2025-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-06-15T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-15T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491251,
        "projectNumber": "J1408",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2025-08-05T04:00:00+00:00",
        "inService": "2023-06-15T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2026-06-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macoupin County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Virden 138kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Wind/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1621,
      "normalized": {
        "queue_id": "J1410",
        "county": "Dane County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "N. Madison 345 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2025-10-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 240.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491252,
        "projectNumber": "J1410",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2022-11-14T05:00:00+00:00",
        "negInService": "2025-10-30T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Dane County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "N. Madison 345 kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 240.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1622,
      "normalized": {
        "queue_id": "J1413",
        "county": "Howard County,Mitchell County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Hazleton - Mitchell County 345 kV Line tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-09-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 235.0,
        "dp1_nris_mw": 215.0,
        "dp2_eris_mw": 235.0,
        "dp2_nris_mw": 188.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491253,
        "projectNumber": "J1413",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-09-01T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Howard County,Mitchell County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hazleton - Mitchell County 345 kV Line tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 235.0,
        "dp1NrisMw": 215.0,
        "dp2ErisMw": 235.0,
        "dp2NrisMw": 188.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1623,
      "normalized": {
        "queue_id": "J1448",
        "county": "Caldwell County",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BRPS",
        "poi": "Hopkins - Caldwell County - Barkely 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-05-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491254,
        "projectNumber": "J1448",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-05-20T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BRPS",
        "county": "Caldwell County",
        "state": "KY",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hopkins - Caldwell County - Barkely 161kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1624,
      "normalized": {
        "queue_id": "J1467",
        "county": "Fayette County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "ITC 161kV Windsor - Hazleton 161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491255,
        "projectNumber": "J1467",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Fayette County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "ITC 161kV Windsor - Hazleton 161kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1625,
      "normalized": {
        "queue_id": "J1450",
        "county": "Webster County",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BRPS",
        "poi": "Hopkins - Reid161kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491256,
        "projectNumber": "J1450",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BRPS",
        "county": "Webster County",
        "state": "KY",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hopkins - Reid161kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1626,
      "normalized": {
        "queue_id": "J1458",
        "county": "Washington County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC",
        "poi": "Ray Braswell - Tinnin - Gerald Andrus 230kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2024-12-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2022-01-25T05:00:00+00:00",
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 170.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491257,
        "projectNumber": "J1458",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-01-25T05:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-01-26T05:00:00+00:00",
        "negInService": "2024-12-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC",
        "county": "Washington County",
        "state": "MS",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ray Braswell - Tinnin - Gerald Andrus 230kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 170.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1627,
      "normalized": {
        "queue_id": "J1461",
        "county": "Carver County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "McLeod - Blue Lake 230kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491258,
        "projectNumber": "J1461",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Carver County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "McLeod - Blue Lake 230kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1628,
      "normalized": {
        "queue_id": "J1454",
        "county": "Mason County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mason 138 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 58.5,
        "summer_net_mw": 58.5,
        "winter_net_mw": 58.5,
        "proposed_completion_date": "2021-08-18T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service (with Provisional GIA)",
        "approval_date": null,
        "in_service": "2022-04-30T04:00:00+00:00",
        "gia_to_execute": "2020-12-22T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 40.9,
        "dp1_nris_mw": 40.9,
        "dp2_eris_mw": 40.9,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491259,
        "projectNumber": "J1454",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-04-30T04:00:00+00:00",
        "giaToExec": "2020-12-22T05:00:00+00:00",
        "negInService": "2021-08-18T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Mason 138 kV Substation",
        "summerNetMW": 58.5,
        "winterNetMW": 58.5,
        "dp1ErisMw": 40.9,
        "dp1NrisMw": 40.9,
        "dp2ErisMw": 40.9,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service (with Provisional GIA)"
      }
    },
    {
      "source_row_number": 1629,
      "normalized": {
        "queue_id": "J1472",
        "county": "Jackson County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Leoni - Parr Raod 138kV line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2024-03-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-08-17T04:00:00+00:00",
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-08-17T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491260,
        "projectNumber": "J1472",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-08-17T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-08-17T04:00:00+00:00",
        "negInService": "2024-03-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Jackson County",
        "state": "MI",
        "studyCycle": "DPP-2019",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Leoni - Parr Raod 138kV line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1630,
      "normalized": {
        "queue_id": "J1455",
        "county": "St. Mary,St. Mary Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Teche - Morbihan 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-09-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-04-15T04:00:00+00:00",
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-04-18T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491261,
        "projectNumber": "J1455",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-09-12T04:00:00+00:00",
        "doneDate": "2022-04-15T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-04-18T04:00:00+00:00",
        "negInService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Mary,St. Mary Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Teche - Morbihan 138kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1631,
      "normalized": {
        "queue_id": "J1473",
        "county": "Chisago County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lawrence Creek - Shafer 115kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491262,
        "projectNumber": "J1473",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-24T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chisago County",
        "state": "MN",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lawrence Creek - Shafer 115kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1632,
      "normalized": {
        "queue_id": "J1464",
        "county": "Macoupin County,Morgan County,Sangamon County",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Meredosia - Austin 345 kV Line tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 592.8,
        "summer_net_mw": 592.8,
        "winter_net_mw": 592.8,
        "proposed_completion_date": "2024-03-03T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2022-04-30T04:00:00+00:00",
        "gia_to_execute": "2022-11-23T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 592.8,
        "dp1_nris_mw": 592.8,
        "dp2_eris_mw": 592.8,
        "dp2_nris_mw": 592.8,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491263,
        "projectNumber": "J1464",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-04-30T04:00:00+00:00",
        "giaToExec": "2022-11-23T05:00:00+00:00",
        "negInService": "2024-03-03T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Macoupin County,Morgan County,Sangamon County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Meredosia - Austin 345 kV Line tap",
        "summerNetMW": 592.8,
        "winterNetMW": 592.8,
        "dp1ErisMw": 592.8,
        "dp1NrisMw": 592.8,
        "dp2ErisMw": 592.8,
        "dp2NrisMw": 592.8,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1633,
      "normalized": {
        "queue_id": "J1474",
        "county": "Chippewa County",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Pine Lake - Eagle Point 115kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2023-11-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-07-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2023-01-26T05:00:00+00:00",
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-26T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 180.0,
        "dp2_nris_mw": 180.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491264,
        "projectNumber": "J1474",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2023-11-14T05:00:00+00:00",
        "doneDate": "2023-01-26T05:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "giaToExec": "2023-01-26T05:00:00+00:00",
        "negInService": "2025-07-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chippewa County",
        "state": "WI",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pine Lake - Eagle Point 115kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 180.0,
        "dp2NrisMw": 180.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1634,
      "normalized": {
        "queue_id": "J1475",
        "county": "Clark County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Casey West - Sullivan 345 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2023-05-02T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-04-18T04:00:00+00:00",
        "gia_to_execute": "2022-06-27T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491265,
        "projectNumber": "J1475",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-04-18T04:00:00+00:00",
        "giaToExec": "2022-06-27T04:00:00+00:00",
        "negInService": "2023-05-02T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clark County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Casey West - Sullivan 345 kV Line Tap",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1635,
      "normalized": {
        "queue_id": "J1453",
        "county": "Mason County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Havana - Shockey 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 188.3,
        "summer_net_mw": 188.3,
        "winter_net_mw": 188.3,
        "proposed_completion_date": "2022-05-03T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2022-04-30T04:00:00+00:00",
        "gia_to_execute": "2022-03-18T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 165.0,
        "dp1_nris_mw": 165.0,
        "dp2_eris_mw": 165.0,
        "dp2_nris_mw": 165.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491266,
        "projectNumber": "J1453",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "inService": "2022-04-30T04:00:00+00:00",
        "giaToExec": "2022-03-18T04:00:00+00:00",
        "negInService": "2022-05-03T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason County",
        "state": "IL",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Havana - Shockey 138 kV Line Tap",
        "summerNetMW": 188.3,
        "winterNetMW": 188.3,
        "dp1ErisMw": 165.0,
        "dp1NrisMw": 165.0,
        "dp2ErisMw": 165.0,
        "dp2NrisMw": 165.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1636,
      "normalized": {
        "queue_id": "J1462",
        "county": "Acadia Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Acadia - Scanlan 138kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2020-08-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491267,
        "projectNumber": "J1462",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2020-08-06T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Acadia - Scanlan 138kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1637,
      "normalized": {
        "queue_id": "J1463",
        "county": "West Baton Rouge Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Addis - Big Cajun 230 kV Line Tap (J639)",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2024-06-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2023-11-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2022-04-07T04:00:00+00:00",
        "in_service": "2021-10-20T04:00:00+00:00",
        "gia_to_execute": "2022-04-07T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 45.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491268,
        "projectNumber": "J1463",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2024-06-04T04:00:00+00:00",
        "doneDate": "2022-04-07T04:00:00+00:00",
        "inService": "2021-10-20T04:00:00+00:00",
        "giaToExec": "2022-04-07T04:00:00+00:00",
        "negInService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "West Baton Rouge Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Addis - Big Cajun 230 kV Line Tap (J639)",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 45.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1638,
      "normalized": {
        "queue_id": "J703",
        "county": "Marquette County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Huron 138kV Substation -looping Lines FREG11 (National to Freeman) & Goose Lake (PI to Empire)",
        "queue_date": "2016-09-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 128.1,
        "summer_net_mw": 128.1,
        "winter_net_mw": 128.1,
        "proposed_completion_date": "2018-12-01T05:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2019-03-01T05:00:00+00:00",
        "gia_to_execute": "2017-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2016 AUG/2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 128.1,
        "dp1_nris_mw": 128.1,
        "dp2_eris_mw": 128.1,
        "dp2_nris_mw": 128.1,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491269,
        "projectNumber": "J703",
        "queueDate": "2016-09-08T04:00:00+00:00",
        "inService": "2019-03-01T05:00:00+00:00",
        "giaToExec": "2017-10-13T04:00:00+00:00",
        "negInService": "2018-12-01T05:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Marquette County",
        "state": "MI",
        "studyCycle": "DPP-2016 AUG/2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Huron 138kV Substation -looping Lines FREG11 (National to Freeman) & Goose Lake (PI to Empire)",
        "summerNetMW": 128.1,
        "winterNetMW": 128.1,
        "dp1ErisMw": 128.1,
        "dp1NrisMw": 128.1,
        "dp2ErisMw": 128.1,
        "dp2NrisMw": 128.1,
        "fuelType": "Gas",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1639,
      "normalized": {
        "queue_id": "J508",
        "county": "Clark County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "tap 115 kV line betwwen W Arkadelphia sub and Delarc sub at 3.85 miles from West Arkadelphia substat",
        "queue_date": "2015-11-16T05:00:00+00:00",
        "withdrawn_date": "2017-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 42.7,
        "summer_net_mw": 42.7,
        "winter_net_mw": 42.7,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2017-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491270,
        "projectNumber": "J508",
        "queueDate": "2015-11-16T05:00:00+00:00",
        "withdrawnDate": "2017-07-17T04:00:00+00:00",
        "inService": "2017-04-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Clark County",
        "state": "AR",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "tap 115 kV line betwwen W Arkadelphia sub and Delarc sub at 3.85 miles from West Arkadelphia substat",
        "summerNetMW": 42.7,
        "winterNetMW": 42.7,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1640,
      "normalized": {
        "queue_id": "J707",
        "county": "Barnes County",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Buffalo 345kV",
        "queue_date": "2016-09-09T04:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491271,
        "projectNumber": "J707",
        "queueDate": "2016-09-09T04:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2020-09-23T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Barnes County",
        "state": "ND",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Buffalo 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1641,
      "normalized": {
        "queue_id": "J579",
        "county": "Allegan County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Argenta 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2018-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491272,
        "projectNumber": "J579",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-09T05:00:00+00:00",
        "inService": "2018-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Allegan County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Argenta 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1642,
      "normalized": {
        "queue_id": "J580",
        "county": "Burleigh County",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "Nepoleon Sub 230kV",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 298.0,
        "summer_net_mw": 298.0,
        "winter_net_mw": 298.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 298.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491273,
        "projectNumber": "J580",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "Burleigh County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Nepoleon Sub 230kV",
        "summerNetMW": 298.0,
        "winterNetMW": 298.0,
        "dp1ErisMw": 298.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1643,
      "normalized": {
        "queue_id": "J1465",
        "county": "Pointe Coupee,Pointe Coupee Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Livonia - Colonial Springs 138kV line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-04-15T04:00:00+00:00",
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": "2022-04-08T04:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491274,
        "projectNumber": "J1465",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2022-04-15T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "giaToExec": "2022-04-08T04:00:00+00:00",
        "negInService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Pointe Coupee,Pointe Coupee Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Livonia - Colonial Springs 138kV line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1644,
      "normalized": {
        "queue_id": "J502",
        "county": "Orange County",
        "state": "TX",
        "transmission_owner": "Entergy",
        "poi": "McLewis 230 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491275,
        "projectNumber": "J502",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Orange County",
        "state": "TX",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "McLewis 230 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1645,
      "normalized": {
        "queue_id": "J556",
        "county": "Renville County",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Panther 230kV Substation",
        "queue_date": "2016-04-04T04:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 102.0,
        "summer_net_mw": 102.0,
        "winter_net_mw": 102.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491276,
        "projectNumber": "J556",
        "queueDate": "2016-04-04T04:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2019-12-31T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Renville County",
        "state": "MN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Panther 230kV Substation",
        "summerNetMW": 102.0,
        "winterNetMW": 102.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1646,
      "normalized": {
        "queue_id": "J706",
        "county": "Morton County",
        "state": "ND",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Tri-county 230kV sub",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491277,
        "projectNumber": "J706",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Morton County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tri-county 230kV sub",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1647,
      "normalized": {
        "queue_id": "J708",
        "county": "Posey County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "AB Brown 138 kV sub",
        "queue_date": "2016-09-09T04:00:00+00:00",
        "withdrawn_date": "2019-05-02T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 847.0,
        "summer_net_mw": 847.0,
        "winter_net_mw": 847.0,
        "proposed_completion_date": "2019-07-01T04:00:00+00:00",
        "generation_type": "Combined Cycle",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 847.0,
        "dp1_nris_mw": 847.0,
        "dp2_eris_mw": 847.0,
        "dp2_nris_mw": 847.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491278,
        "projectNumber": "J708",
        "queueDate": "2016-09-09T04:00:00+00:00",
        "withdrawnDate": "2019-05-02T04:00:00+00:00",
        "inService": "2022-06-01T04:00:00+00:00",
        "negInService": "2019-07-01T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Posey County",
        "state": "IN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "AB Brown 138 kV sub",
        "summerNetMW": 847.0,
        "winterNetMW": 847.0,
        "dp1ErisMw": 847.0,
        "dp1NrisMw": 847.0,
        "dp2ErisMw": 847.0,
        "dp2NrisMw": 847.0,
        "fuelType": "Combined Cycle",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1648,
      "normalized": {
        "queue_id": "J584",
        "county": "Green County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Blacksmith Tap - Spring Grove 69kV Line",
        "queue_date": "2016-05-09T04:00:00+00:00",
        "withdrawn_date": "2020-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": "2021-05-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2019-03-26T04:00:00+00:00",
        "in_service": "2018-09-15T04:00:00+00:00",
        "gia_to_execute": "2018-10-05T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 60.0,
        "dp2_nris_mw": 60.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491279,
        "projectNumber": "J584",
        "queueDate": "2016-05-09T04:00:00+00:00",
        "withdrawnDate": "2020-09-29T04:00:00+00:00",
        "doneDate": "2019-03-26T04:00:00+00:00",
        "inService": "2018-09-15T04:00:00+00:00",
        "giaToExec": "2018-10-05T04:00:00+00:00",
        "negInService": "2021-05-15T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Green County",
        "state": "WI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Blacksmith Tap - Spring Grove 69kV Line",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 60.0,
        "dp2NrisMw": 60.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1649,
      "normalized": {
        "queue_id": "J625",
        "county": "Meeker County,Renville County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Blue Lake 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-02-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491280,
        "projectNumber": "J625",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-02-04T05:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Meeker County,Renville County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Blue Lake 345kV Substation",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1650,
      "normalized": {
        "queue_id": "J762",
        "county": "Meade County",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION",
        "poi": "Meade Sub 161kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2021-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2019-03-08T05:00:00+00:00",
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": "2018-11-13T05:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491281,
        "projectNumber": "J762",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "doneDate": "2019-03-08T05:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "giaToExec": "2018-11-13T05:00:00+00:00",
        "negInService": "2021-04-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION",
        "county": "Meade County",
        "state": "KY",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Meade Sub 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1651,
      "normalized": {
        "queue_id": "J545",
        "county": "Lincoln County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Buffalo 115kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": "2022-12-15T05:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2021-05-19T04:00:00+00:00",
        "in_service": "2020-08-31T04:00:00+00:00",
        "gia_to_execute": "2021-05-19T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 110.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 110.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491282,
        "projectNumber": "J545",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2021-05-19T04:00:00+00:00",
        "inService": "2020-08-31T04:00:00+00:00",
        "giaToExec": "2021-05-19T04:00:00+00:00",
        "negInService": "2022-12-15T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lincoln County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Buffalo 115kV Substation",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 110.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 110.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1652,
      "normalized": {
        "queue_id": "J570",
        "county": "Atchison County",
        "state": "MO",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Cooper - Atchison 345kV Line",
        "queue_date": "2016-05-06T04:00:00+00:00",
        "withdrawn_date": "2019-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2018-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491283,
        "projectNumber": "J570",
        "queueDate": "2016-05-06T04:00:00+00:00",
        "withdrawnDate": "2019-08-05T04:00:00+00:00",
        "inService": "2018-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Atchison County",
        "state": "MO",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cooper - Atchison 345kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1653,
      "normalized": {
        "queue_id": "J709",
        "county": "Greene County",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY",
        "poi": "Green Substation 230kV",
        "queue_date": "2016-09-09T04:00:00+00:00",
        "withdrawn_date": "2019-01-11T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2020-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2018-10-17T04:00:00+00:00",
        "in_service": "2020-04-01T04:00:00+00:00",
        "gia_to_execute": "2018-05-16T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 60.0,
        "dp2_nris_mw": 60.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491284,
        "projectNumber": "J709",
        "queueDate": "2016-09-09T04:00:00+00:00",
        "withdrawnDate": "2019-01-11T05:00:00+00:00",
        "doneDate": "2018-10-17T04:00:00+00:00",
        "inService": "2020-04-01T04:00:00+00:00",
        "giaToExec": "2018-05-16T04:00:00+00:00",
        "negInService": "2020-04-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY",
        "county": "Greene County",
        "state": "MS",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Green Substation 230kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 60.0,
        "dp2NrisMw": 60.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1654,
      "normalized": {
        "queue_id": "J760",
        "county": "Rock County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "New Kitty Hawk 345kV substation",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": "2019-04-15T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "In Service",
        "approval_date": "2019-03-27T04:00:00+00:00",
        "in_service": "2019-04-08T04:00:00+00:00",
        "gia_to_execute": "2018-10-05T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 30.0,
        "dp1_nris_mw": 30.0,
        "dp2_eris_mw": 30.0,
        "dp2_nris_mw": 30.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491285,
        "projectNumber": "J760",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "doneDate": "2019-03-27T04:00:00+00:00",
        "inService": "2019-04-08T04:00:00+00:00",
        "giaToExec": "2018-10-05T04:00:00+00:00",
        "negInService": "2019-04-15T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Rock County",
        "state": "WI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "New Kitty Hawk 345kV substation",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 30.0,
        "dp1NrisMw": 30.0,
        "dp2ErisMw": 30.0,
        "dp2NrisMw": 30.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1655,
      "normalized": {
        "queue_id": "J761",
        "county": "Faribault County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Huntley 345 kV sub",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491286,
        "projectNumber": "J761",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Faribault County",
        "state": "MN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Huntley 345 kV sub",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1656,
      "normalized": {
        "queue_id": "J718",
        "county": "Fillmore County",
        "state": "MN",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE",
        "poi": "Cherry Grove 69kV Substation",
        "queue_date": "2016-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 49.98,
        "summer_net_mw": 49.98,
        "winter_net_mw": 49.98,
        "proposed_completion_date": "2023-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-04-21T04:00:00+00:00",
        "in_service": "2020-12-31T05:00:00+00:00",
        "gia_to_execute": "2019-10-14T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 49.98,
        "dp1_nris_mw": 49.98,
        "dp2_eris_mw": 45.0,
        "dp2_nris_mw": 45.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491287,
        "projectNumber": "J718",
        "queueDate": "2016-09-13T04:00:00+00:00",
        "doneDate": "2020-04-21T04:00:00+00:00",
        "inService": "2020-12-31T05:00:00+00:00",
        "giaToExec": "2019-10-14T04:00:00+00:00",
        "negInService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE",
        "county": "Fillmore County",
        "state": "MN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cherry Grove 69kV Substation",
        "summerNetMW": 49.98,
        "winterNetMW": 49.98,
        "dp1ErisMw": 49.98,
        "dp1NrisMw": 49.98,
        "dp2ErisMw": 45.0,
        "dp2NrisMw": 45.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1657,
      "normalized": {
        "queue_id": "J712",
        "county": "Iowa County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Hill Valley 138kV Substation",
        "queue_date": "2016-09-09T04:00:00+00:00",
        "withdrawn_date": "2018-04-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491288,
        "projectNumber": "J712",
        "queueDate": "2016-09-09T04:00:00+00:00",
        "withdrawnDate": "2018-04-10T04:00:00+00:00",
        "inService": "2020-09-20T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Iowa County",
        "state": "WI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hill Valley 138kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1658,
      "normalized": {
        "queue_id": "J758",
        "county": "Calhoun County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Verona-Foundry 138kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2022-04-08T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2019-10-25T04:00:00+00:00",
        "in_service": "2018-10-01T04:00:00+00:00",
        "gia_to_execute": "2019-05-24T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491289,
        "projectNumber": "J758",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "doneDate": "2019-10-25T04:00:00+00:00",
        "inService": "2018-10-01T04:00:00+00:00",
        "giaToExec": "2019-05-24T04:00:00+00:00",
        "negInService": "2022-04-08T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun County",
        "state": "MI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Verona-Foundry 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1659,
      "normalized": {
        "queue_id": "J1452",
        "county": "Red River Parish",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Carroll - Mansfield 138 kV Line Tap",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2021-03-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-30T04:00:00+00:00",
        "gia_to_execute": "2023-01-19T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491290,
        "projectNumber": "J1452",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2021-03-18T04:00:00+00:00",
        "inService": "2022-10-30T04:00:00+00:00",
        "giaToExec": "2023-01-19T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Red River Parish",
        "state": "LA",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Carroll - Mansfield 138 kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1660,
      "normalized": {
        "queue_id": "J1471",
        "county": "Lee County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "ITC 161kV Wever Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2022-02-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2019",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491291,
        "projectNumber": "J1471",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2022-02-21T05:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Lee County",
        "state": "IA",
        "studyCycle": "DPP-2019",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "ITC 161kV Wever Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1661,
      "normalized": {
        "queue_id": "J522",
        "county": "Mower County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Adams substation at 69 kV",
        "queue_date": "2015-11-16T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491292,
        "projectNumber": "J522",
        "queueDate": "2015-11-16T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Mower County",
        "state": "MN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Adams substation at 69 kV",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1662,
      "normalized": {
        "queue_id": "J704",
        "county": "Baraga County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "M38 Substation 138kV",
        "queue_date": "2016-09-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 54.9,
        "summer_net_mw": 54.9,
        "winter_net_mw": 54.9,
        "proposed_completion_date": "2018-12-01T05:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2019-03-01T05:00:00+00:00",
        "gia_to_execute": "2017-10-27T04:00:00+00:00",
        "study_cycle": "DPP-2016 AUG/2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 54.9,
        "dp1_nris_mw": 54.9,
        "dp2_eris_mw": 54.9,
        "dp2_nris_mw": 54.9,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491293,
        "projectNumber": "J704",
        "queueDate": "2016-09-08T04:00:00+00:00",
        "inService": "2019-03-01T05:00:00+00:00",
        "giaToExec": "2017-10-27T04:00:00+00:00",
        "negInService": "2018-12-01T05:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Baraga County",
        "state": "MI",
        "studyCycle": "DPP-2016 AUG/2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "M38 Substation 138kV",
        "summerNetMW": 54.9,
        "winterNetMW": 54.9,
        "dp1ErisMw": 54.9,
        "dp1NrisMw": 54.9,
        "dp2ErisMw": 54.9,
        "dp2NrisMw": 54.9,
        "fuelType": "Gas",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1663,
      "normalized": {
        "queue_id": "J705",
        "county": "Morton County",
        "state": "ND",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Tri-county 230 kV substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491294,
        "projectNumber": "J705",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Morton County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tri-county 230 kV substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1664,
      "normalized": {
        "queue_id": "J710",
        "county": "Lafayette Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "Duson - Scott line 69kV",
        "queue_date": "2016-09-09T04:00:00+00:00",
        "withdrawn_date": "2018-01-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": "2018-11-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2018-01-24T05:00:00+00:00",
        "in_service": "2018-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491295,
        "projectNumber": "J710",
        "queueDate": "2016-09-09T04:00:00+00:00",
        "withdrawnDate": "2018-01-24T05:00:00+00:00",
        "doneDate": "2018-01-24T05:00:00+00:00",
        "inService": "2018-06-01T04:00:00+00:00",
        "negInService": "2018-11-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Lafayette Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Duson - Scott line 69kV",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1665,
      "normalized": {
        "queue_id": "J711",
        "county": "Baraga County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Silver River 138kV",
        "queue_date": "2016-09-09T04:00:00+00:00",
        "withdrawn_date": "2018-12-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": "2020-09-23T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2020-09-23T04:00:00+00:00",
        "gia_to_execute": "2017-10-27T04:00:00+00:00",
        "study_cycle": "DPP-2016 AUG/2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 130.0,
        "dp1_nris_mw": 130.0,
        "dp2_eris_mw": 130.0,
        "dp2_nris_mw": 130.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491296,
        "projectNumber": "J711",
        "queueDate": "2016-09-09T04:00:00+00:00",
        "withdrawnDate": "2018-12-10T05:00:00+00:00",
        "inService": "2020-09-23T04:00:00+00:00",
        "giaToExec": "2017-10-27T04:00:00+00:00",
        "negInService": "2020-09-23T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Baraga County",
        "state": "MI",
        "studyCycle": "DPP-2016 AUG/2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Silver River 138kV",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 130.0,
        "dp1NrisMw": 130.0,
        "dp2ErisMw": 130.0,
        "dp2NrisMw": 130.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1666,
      "normalized": {
        "queue_id": "J759",
        "county": "Spencer County",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY REC, INC",
        "poi": "Troy 161kV Sub",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": "2020-07-02T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2019-02-15T05:00:00+00:00",
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": "2018-11-13T05:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 70.0,
        "dp1_nris_mw": 69.9,
        "dp2_eris_mw": 70.0,
        "dp2_nris_mw": 69.9,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491297,
        "projectNumber": "J759",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "doneDate": "2019-02-15T05:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "giaToExec": "2018-11-13T05:00:00+00:00",
        "negInService": "2020-07-02T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY REC, INC",
        "county": "Spencer County",
        "state": "IN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Troy 161kV Sub",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 70.0,
        "dp1NrisMw": 69.9,
        "dp2ErisMw": 70.0,
        "dp2NrisMw": 69.9,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1667,
      "normalized": {
        "queue_id": "J715",
        "county": "Marshall County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "McLean County-Oglesby 138kV Line 1382",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-05-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-12-09T05:00:00+00:00",
        "in_service": "2019-08-31T04:00:00+00:00",
        "gia_to_execute": "2019-06-01T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 98.0,
        "dp1_nris_mw": 98.0,
        "dp2_eris_mw": 98.0,
        "dp2_nris_mw": 98.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491298,
        "projectNumber": "J715",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-12-09T05:00:00+00:00",
        "inService": "2019-08-31T04:00:00+00:00",
        "giaToExec": "2019-06-01T04:00:00+00:00",
        "negInService": "2021-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Marshall County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "McLean County-Oglesby 138kV Line 1382",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 98.0,
        "dp1NrisMw": 98.0,
        "dp2ErisMw": 98.0,
        "dp2NrisMw": 98.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1668,
      "normalized": {
        "queue_id": "J731",
        "county": "Palo Alto County",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY COMPANY",
        "poi": "Kossuth-O'Brien 345kV",
        "queue_date": "2016-11-08T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491299,
        "projectNumber": "J731",
        "queueDate": "2016-11-08T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2020-09-23T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY COMPANY",
        "county": "Palo Alto County",
        "state": "IA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Kossuth-O'Brien 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1669,
      "normalized": {
        "queue_id": "J768",
        "county": "Story County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Story County Substation",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-08-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 12.0,
        "summer_net_mw": 12.0,
        "winter_net_mw": 12.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 12.0,
        "dp1_nris_mw": 12.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491300,
        "projectNumber": "J768",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-08-09T04:00:00+00:00",
        "inService": "2019-01-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Story County",
        "state": "IA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Story County Substation",
        "summerNetMW": 12.0,
        "winterNetMW": 12.0,
        "dp1ErisMw": 12.0,
        "dp1NrisMw": 12.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1670,
      "normalized": {
        "queue_id": "J720",
        "county": "Jackson County",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lakefield - Raun 345 kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2021-09-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-09-02T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491301,
        "projectNumber": "J720",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2019-09-02T04:00:00+00:00",
        "negInService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Jackson County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lakefield - Raun 345 kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1671,
      "normalized": {
        "queue_id": "J769",
        "county": "Renville County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Kingman Run-Bird Island 69kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 33.0,
        "summer_net_mw": 33.0,
        "winter_net_mw": 33.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491302,
        "projectNumber": "J769",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2019-07-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Renville County",
        "state": "MN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kingman Run-Bird Island 69kV",
        "summerNetMW": 33.0,
        "winterNetMW": 33.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1672,
      "normalized": {
        "queue_id": "J734",
        "county": "Ford County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Gibson City South Substation",
        "queue_date": "2016-11-10T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 57.1,
        "summer_net_mw": 57.1,
        "winter_net_mw": 57.1,
        "proposed_completion_date": "2017-09-01T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "In Service",
        "approval_date": "2019-02-19T05:00:00+00:00",
        "in_service": "2017-06-01T04:00:00+00:00",
        "gia_to_execute": "2018-11-13T05:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 11.5,
        "dp1_nris_mw": 11.5,
        "dp2_eris_mw": 11.5,
        "dp2_nris_mw": 11.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491303,
        "projectNumber": "J734",
        "queueDate": "2016-11-10T05:00:00+00:00",
        "doneDate": "2019-02-19T05:00:00+00:00",
        "inService": "2017-06-01T04:00:00+00:00",
        "giaToExec": "2018-11-13T05:00:00+00:00",
        "negInService": "2017-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Ford County",
        "state": "IL",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Gibson City South Substation",
        "summerNetMW": 57.1,
        "winterNetMW": 57.1,
        "dp1ErisMw": 11.5,
        "dp1NrisMw": 11.5,
        "dp2ErisMw": 11.5,
        "dp2NrisMw": 11.5,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1673,
      "normalized": {
        "queue_id": "J733",
        "county": "Franklin County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "J416 345 kV Interconnection Facilitities to be Owned by ITCM",
        "queue_date": "2016-11-08T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491304,
        "projectNumber": "J733",
        "queueDate": "2016-11-08T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2020-09-23T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin County",
        "state": "IA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "J416 345 kV Interconnection Facilitities to be Owned by ITCM",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1674,
      "normalized": {
        "queue_id": "J721",
        "county": "Codington County,Deuel County",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Big Stone South substation, Big Stone City",
        "queue_date": "2016-10-24T04:00:00+00:00",
        "withdrawn_date": "2019-08-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491305,
        "projectNumber": "J721",
        "queueDate": "2016-10-24T04:00:00+00:00",
        "withdrawnDate": "2019-08-09T04:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Codington County,Deuel County",
        "state": "SD",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Big Stone South substation, Big Stone City",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1675,
      "normalized": {
        "queue_id": "J722",
        "county": "Codington County,Deuel County",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTPW",
        "poi": "Big Stone South 230kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2026-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-09-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2021-10-04T04:00:00+00:00",
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": "2021-11-05T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491306,
        "projectNumber": "J722",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2026-08-28T04:00:00+00:00",
        "doneDate": "2021-10-04T04:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "giaToExec": "2021-11-05T04:00:00+00:00",
        "negInService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTPW",
        "county": "Codington County,Deuel County",
        "state": "SD",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Big Stone South 230kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1676,
      "normalized": {
        "queue_id": "J739",
        "county": "Lyon County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lyon County 345kV Substation",
        "queue_date": "2016-11-11T05:00:00+00:00",
        "withdrawn_date": "2019-08-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491307,
        "projectNumber": "J739",
        "queueDate": "2016-11-11T05:00:00+00:00",
        "withdrawnDate": "2019-08-09T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lyon County",
        "state": "MN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lyon County 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1677,
      "normalized": {
        "queue_id": "J728",
        "county": "Isabella County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Edenville Junction to Warren 138 kV Line",
        "queue_date": "2016-11-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.1,
        "summer_net_mw": 200.1,
        "winter_net_mw": 200.1,
        "proposed_completion_date": "2020-06-30T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-10-08T04:00:00+00:00",
        "in_service": "2019-09-03T04:00:00+00:00",
        "gia_to_execute": "2019-06-10T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.1,
        "dp1_nris_mw": 200.1,
        "dp2_eris_mw": 186.3,
        "dp2_nris_mw": 186.3,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491308,
        "projectNumber": "J728",
        "queueDate": "2016-11-02T04:00:00+00:00",
        "doneDate": "2019-10-08T04:00:00+00:00",
        "inService": "2019-09-03T04:00:00+00:00",
        "giaToExec": "2019-06-10T04:00:00+00:00",
        "negInService": "2020-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Isabella County",
        "state": "MI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Edenville Junction to Warren 138 kV Line",
        "summerNetMW": 200.1,
        "winterNetMW": 200.1,
        "dp1ErisMw": 200.1,
        "dp1NrisMw": 200.1,
        "dp2ErisMw": 186.3,
        "dp2NrisMw": 186.3,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1678,
      "normalized": {
        "queue_id": "J766",
        "county": "Oliver County",
        "state": "ND",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Square Butte 230kV Substation",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 3.84,
        "summer_net_mw": 3.84,
        "winter_net_mw": 3.84,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2018-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491309,
        "projectNumber": "J766",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2018-01-01T05:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Oliver County",
        "state": "ND",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Square Butte 230kV Substation",
        "summerNetMW": 3.84,
        "winterNetMW": 3.84,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1679,
      "normalized": {
        "queue_id": "J717",
        "county": "Isabella County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Edenville Junction to Warren 138 kV Line",
        "queue_date": "2016-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.1,
        "summer_net_mw": 200.1,
        "winter_net_mw": 200.1,
        "proposed_completion_date": "2020-06-30T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2019-10-08T04:00:00+00:00",
        "in_service": "2019-09-03T04:00:00+00:00",
        "gia_to_execute": "2019-06-10T04:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.1,
        "dp1_nris_mw": 200.1,
        "dp2_eris_mw": 200.1,
        "dp2_nris_mw": 200.1,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491310,
        "projectNumber": "J717",
        "queueDate": "2016-09-12T04:00:00+00:00",
        "doneDate": "2019-10-08T04:00:00+00:00",
        "inService": "2019-09-03T04:00:00+00:00",
        "giaToExec": "2019-06-10T04:00:00+00:00",
        "negInService": "2020-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Isabella County",
        "state": "MI",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Edenville Junction to Warren 138 kV Line",
        "summerNetMW": 200.1,
        "winterNetMW": 200.1,
        "dp1ErisMw": 200.1,
        "dp1NrisMw": 200.1,
        "dp2ErisMw": 200.1,
        "dp2NrisMw": 200.1,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1680,
      "normalized": {
        "queue_id": "J732",
        "county": "Douglas County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Arrowhead - Stone Lake 345kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 561.5,
        "summer_net_mw": 527.8,
        "winter_net_mw": 561.5,
        "proposed_completion_date": "2023-11-10T05:00:00+00:00",
        "generation_type": "Combined Cycle",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-07-29T04:00:00+00:00",
        "in_service": "2021-06-08T04:00:00+00:00",
        "gia_to_execute": "2019-11-21T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 561.5,
        "dp1_nris_mw": 561.5,
        "dp2_eris_mw": 561.5,
        "dp2_nris_mw": 561.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491311,
        "projectNumber": "J732",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-07-29T04:00:00+00:00",
        "inService": "2021-06-08T04:00:00+00:00",
        "giaToExec": "2019-11-21T05:00:00+00:00",
        "negInService": "2023-11-10T05:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Douglas County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Arrowhead - Stone Lake 345kV Line",
        "summerNetMW": 527.8,
        "winterNetMW": 561.5,
        "dp1ErisMw": 561.5,
        "dp1NrisMw": 561.5,
        "dp2ErisMw": 561.5,
        "dp2NrisMw": 561.5,
        "fuelType": "Combined Cycle",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1681,
      "normalized": {
        "queue_id": "J770",
        "county": "Renville County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Bird Island to Henryville Tap 69kV Line",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491312,
        "projectNumber": "J770",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2019-07-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Renville County",
        "state": "MN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bird Island to Henryville Tap 69kV Line",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1682,
      "normalized": {
        "queue_id": "J725",
        "county": "Murray County",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Cedar Mountain 345 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-02-15T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491313,
        "projectNumber": "J725",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-02-15T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Murray County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1683,
      "normalized": {
        "queue_id": "J740",
        "county": "Jasper County,Pulaski County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Reynold 345kV substation",
        "queue_date": "2016-11-11T05:00:00+00:00",
        "withdrawn_date": "2020-08-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2020-10-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Withdrawn",
        "approval_date": "2019-03-15T04:00:00+00:00",
        "in_service": "2020-09-23T04:00:00+00:00",
        "gia_to_execute": "2018-11-13T05:00:00+00:00",
        "study_cycle": "DPP-2017-FEB",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491314,
        "projectNumber": "J740",
        "queueDate": "2016-11-11T05:00:00+00:00",
        "withdrawnDate": "2020-08-10T04:00:00+00:00",
        "doneDate": "2019-03-15T04:00:00+00:00",
        "inService": "2020-09-23T04:00:00+00:00",
        "giaToExec": "2018-11-13T05:00:00+00:00",
        "negInService": "2020-10-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper County,Pulaski County",
        "state": "IN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynold 345kV substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1684,
      "normalized": {
        "queue_id": "J741",
        "county": "Emmons County,Logan County",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "Wishek - Linton 115kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-08-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 51.0,
        "summer_net_mw": 51.0,
        "winter_net_mw": 51.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.4,
        "dp1_nris_mw": 50.4,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491315,
        "projectNumber": "J741",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-08-09T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "Emmons County,Logan County",
        "state": "ND",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wishek - Linton 115kV",
        "summerNetMW": 51.0,
        "winterNetMW": 51.0,
        "dp1ErisMw": 50.4,
        "dp1NrisMw": 50.4,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1685,
      "normalized": {
        "queue_id": "J795",
        "county": "Gallatin County",
        "state": "IL",
        "transmission_owner": "Southern Illinois Power Cooperative",
        "poi": "Gallatin Junction 161 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 69.0,
        "summer_net_mw": 69.0,
        "winter_net_mw": 69.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491316,
        "projectNumber": "J795",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "Southern Illinois Power Cooperative",
        "county": "Gallatin County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gallatin Junction 161 kV Substation",
        "summerNetMW": 69.0,
        "winterNetMW": 69.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1686,
      "normalized": {
        "queue_id": "J797",
        "county": "Washington County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ashley 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-05-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491317,
        "projectNumber": "J797",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-05-30T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Washington County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ashley 138 kV Substation",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1687,
      "normalized": {
        "queue_id": "J800",
        "county": "White County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Crossville West Substation 138kV Bus - Albion South - Norris City 138 kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2022-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-04-22T04:00:00+00:00",
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": "2019-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491318,
        "projectNumber": "J800",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-04-22T04:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "giaToExec": "2019-11-14T05:00:00+00:00",
        "negInService": "2022-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "White County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crossville West Substation 138kV Bus - Albion South - Norris City 138 kV Line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1688,
      "normalized": {
        "queue_id": "J802",
        "county": "Vermillion County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Cayuga 345 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-05-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1244.0,
        "summer_net_mw": 1244.0,
        "winter_net_mw": 1244.0,
        "proposed_completion_date": null,
        "generation_type": "Combined Cycle",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491319,
        "projectNumber": "J802",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-05-22T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Vermillion County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cayuga 345 kV Substation",
        "summerNetMW": 1244.0,
        "winterNetMW": 1244.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Combined Cycle",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1689,
      "normalized": {
        "queue_id": "J796",
        "county": "Shiawassee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Goss 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 239.0,
        "summer_net_mw": 239.0,
        "winter_net_mw": 239.0,
        "proposed_completion_date": "2020-11-20T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-06-12T04:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-06-18T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 239.0,
        "dp1_nris_mw": 239.0,
        "dp2_eris_mw": 239.0,
        "dp2_nris_mw": 239.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491320,
        "projectNumber": "J796",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-06-12T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2019-06-18T04:00:00+00:00",
        "negInService": "2020-11-20T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Goss 138kV Substation",
        "summerNetMW": 239.0,
        "winterNetMW": 239.0,
        "dp1ErisMw": 239.0,
        "dp1NrisMw": 239.0,
        "dp2ErisMw": 239.0,
        "dp2NrisMw": 239.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1690,
      "normalized": {
        "queue_id": "J799",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Milan - Pioneer 120kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 189.0,
        "summer_net_mw": 189.0,
        "winter_net_mw": 189.0,
        "proposed_completion_date": "2021-11-11T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-05-13T04:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2020-01-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 189.0,
        "dp1_nris_mw": 189.0,
        "dp2_eris_mw": 189.0,
        "dp2_nris_mw": 189.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491321,
        "projectNumber": "J799",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-05-13T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2020-01-06T05:00:00+00:00",
        "negInService": "2021-11-11T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Milan - Pioneer 120kV Line Tap",
        "summerNetMW": 189.0,
        "winterNetMW": 189.0,
        "dp1ErisMw": 189.0,
        "dp1NrisMw": 189.0,
        "dp2ErisMw": 189.0,
        "dp2NrisMw": 189.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1691,
      "normalized": {
        "queue_id": "J801",
        "county": "Pierce County",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE",
        "poi": "Crystal Cave-Rock Elm 161kV line tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2024-07-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 74.0,
        "summer_net_mw": 74.0,
        "winter_net_mw": 74.0,
        "proposed_completion_date": "2023-11-10T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2021-05-19T04:00:00+00:00",
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-05-19T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 74.0,
        "dp1_nris_mw": 74.0,
        "dp2_eris_mw": 74.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491322,
        "projectNumber": "J801",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2024-07-22T04:00:00+00:00",
        "doneDate": "2021-05-19T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2021-05-19T04:00:00+00:00",
        "negInService": "2023-11-10T05:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE",
        "county": "Pierce County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Crystal Cave-Rock Elm 161kV line tap",
        "summerNetMW": 74.0,
        "winterNetMW": 74.0,
        "dp1ErisMw": 74.0,
        "dp1NrisMw": 74.0,
        "dp2ErisMw": 74.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1692,
      "normalized": {
        "queue_id": "J804",
        "county": "Decatur County",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY REC, INC",
        "poi": "Decatur 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 119.0,
        "summer_net_mw": 119.0,
        "winter_net_mw": 119.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491323,
        "projectNumber": "J804",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-04-16T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY REC, INC",
        "county": "Decatur County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Decatur 138kV Substation",
        "summerNetMW": 119.0,
        "winterNetMW": 119.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1693,
      "normalized": {
        "queue_id": "J803",
        "county": "Lyon County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Tracy 69 kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2023-04-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 32.5,
        "summer_net_mw": 32.5,
        "winter_net_mw": 32.5,
        "proposed_completion_date": "2023-11-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2021-05-19T04:00:00+00:00",
        "in_service": "2019-10-01T04:00:00+00:00",
        "gia_to_execute": "2021-05-19T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 32.5,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 32.5,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491324,
        "projectNumber": "J803",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2023-04-25T04:00:00+00:00",
        "doneDate": "2021-05-19T04:00:00+00:00",
        "inService": "2019-10-01T04:00:00+00:00",
        "giaToExec": "2021-05-19T04:00:00+00:00",
        "negInService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lyon County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Tracy 69 kV line",
        "summerNetMW": 32.5,
        "winterNetMW": 32.5,
        "dp1ErisMw": 32.5,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 32.5,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1694,
      "normalized": {
        "queue_id": "J887",
        "county": "Knox County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "G545 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2019-09-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491325,
        "projectNumber": "J887",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2020-09-30T04:00:00+00:00",
        "negInService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Knox County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "G545 138kV Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1695,
      "normalized": {
        "queue_id": "J713",
        "county": "Oliver County",
        "state": "ND",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Square Butte East 230kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2021-01-29T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491326,
        "projectNumber": "J713",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2021-01-29T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Oliver County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Square Butte East 230kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1696,
      "normalized": {
        "queue_id": "J714",
        "county": "Montgomery County",
        "state": "IN",
        "transmission_owner": "Duke Energy Corporation",
        "poi": "Frankfurt - Cayuga 230kV line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 192.0,
        "dp1_nris_mw": 192.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491327,
        "projectNumber": "J714",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-04-17T04:00:00+00:00",
        "inService": "2019-08-31T04:00:00+00:00",
        "transmissionOwner": "Duke Energy Corporation",
        "county": "Montgomery County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Frankfurt - Cayuga 230kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 192.0,
        "dp1NrisMw": 192.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1697,
      "normalized": {
        "queue_id": "J745",
        "county": "Nobles County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Nobles-Fenton 115kV",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491328,
        "projectNumber": "J745",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-04-09T04:00:00+00:00",
        "inService": "2021-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Nobles County",
        "state": "MN",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Nobles-Fenton 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1698,
      "normalized": {
        "queue_id": "J798",
        "county": "Walworth County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "University - Mukwanago UNIG52 Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 124.0,
        "summer_net_mw": 124.0,
        "winter_net_mw": 124.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491329,
        "projectNumber": "J798",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-08T05:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Walworth County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "University - Mukwanago UNIG52 Line Tap",
        "summerNetMW": 124.0,
        "winterNetMW": 124.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1699,
      "normalized": {
        "queue_id": "J767",
        "county": "Hancock County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lime Creek 161 kV substation",
        "queue_date": "2016-11-14T05:00:00+00:00",
        "withdrawn_date": "2019-08-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 12.0,
        "summer_net_mw": 12.0,
        "winter_net_mw": 12.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-FEB",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 12.0,
        "dp1_nris_mw": 12.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491330,
        "projectNumber": "J767",
        "queueDate": "2016-11-14T05:00:00+00:00",
        "withdrawnDate": "2019-08-09T04:00:00+00:00",
        "inService": "2019-01-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Hancock County",
        "state": "IA",
        "studyCycle": "DPP-2017-FEB",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lime Creek 161 kV substation",
        "summerNetMW": 12.0,
        "winterNetMW": 12.0,
        "dp1ErisMw": 12.0,
        "dp1NrisMw": 12.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1700,
      "normalized": {
        "queue_id": "J726",
        "county": "Cottonwood County",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Cedar Mountain 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-11-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491331,
        "projectNumber": "J726",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-11-19T05:00:00+00:00",
        "inService": "2019-09-15T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Cottonwood County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1701,
      "normalized": {
        "queue_id": "J743",
        "county": "Cass County",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Bison 345kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-10-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491332,
        "projectNumber": "J743",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-10-24T04:00:00+00:00",
        "inService": "2020-07-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bison 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1702,
      "normalized": {
        "queue_id": "J886",
        "county": "Manitowoc County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Kewaunee 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2020-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2019-11-25T05:00:00+00:00",
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": "2019-07-31T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491333,
        "projectNumber": "J886",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-11-25T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "giaToExec": "2019-07-31T04:00:00+00:00",
        "negInService": "2020-08-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Manitowoc County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kewaunee 138 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1703,
      "normalized": {
        "queue_id": "J856",
        "county": "Vanderburgh County",
        "state": "IN",
        "transmission_owner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "poi": "Scott (TWP 138/69) 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2023-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": "2021-03-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": "2019-11-15T05:00:00+00:00",
        "in_service": "2021-04-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-22T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 80.0,
        "dp2_nris_mw": 80.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491334,
        "projectNumber": "J856",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2023-03-07T05:00:00+00:00",
        "doneDate": "2019-11-15T05:00:00+00:00",
        "inService": "2021-04-01T04:00:00+00:00",
        "giaToExec": "2019-07-22T04:00:00+00:00",
        "negInService": "2021-03-15T04:00:00+00:00",
        "transmissionOwner": "Southern Indiana Gas & Electric Company d/b/a Vectren Energy Delivery of Indiana, Inc.",
        "county": "Vanderburgh County",
        "state": "IN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Scott (TWP 138/69) 138 kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 80.0,
        "dp2NrisMw": 80.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1704,
      "normalized": {
        "queue_id": "J857",
        "county": "Calhoun County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Verona - Foundry 138 kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 124.95,
        "summer_net_mw": 124.95,
        "winter_net_mw": 124.95,
        "proposed_completion_date": "2022-02-07T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-06-10T04:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2020-01-06T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 124.95,
        "dp1_nris_mw": 124.95,
        "dp2_eris_mw": 124.95,
        "dp2_nris_mw": 124.95,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491335,
        "projectNumber": "J857",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-06-10T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2020-01-06T05:00:00+00:00",
        "negInService": "2022-02-07T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Verona - Foundry 138 kV Line Tap",
        "summerNetMW": 124.95,
        "winterNetMW": 124.95,
        "dp1ErisMw": 124.95,
        "dp1NrisMw": 124.95,
        "dp2ErisMw": 124.95,
        "dp2NrisMw": 124.95,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1705,
      "normalized": {
        "queue_id": "J860",
        "county": "Jefferson Davis Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "New Jefferson Davis 138 kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-03-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491336,
        "projectNumber": "J860",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2020-03-30T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Jefferson Davis Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "New Jefferson Davis 138 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1706,
      "normalized": {
        "queue_id": "J861",
        "county": "Marquette County",
        "state": "MI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Dead River - Arnold 345 kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-05-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.96,
        "summer_net_mw": 99.96,
        "winter_net_mw": 99.96,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491337,
        "projectNumber": "J861",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-05-22T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Marquette County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Dead River - Arnold 345 kV Line",
        "summerNetMW": 99.96,
        "winterNetMW": 99.96,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1707,
      "normalized": {
        "queue_id": "J859",
        "county": "Cass County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Frederick North - Meredosia East 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 149.94,
        "summer_net_mw": 149.94,
        "winter_net_mw": 149.94,
        "proposed_completion_date": "2022-05-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-01-23T05:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-22T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 149.94,
        "dp1_nris_mw": 149.94,
        "dp2_eris_mw": 149.94,
        "dp2_nris_mw": 149.94,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491338,
        "projectNumber": "J859",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-01-23T05:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2019-07-22T04:00:00+00:00",
        "negInService": "2022-05-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Cass County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Frederick North - Meredosia East 138kV Line",
        "summerNetMW": 149.94,
        "winterNetMW": 149.94,
        "dp1ErisMw": 149.94,
        "dp1NrisMw": 149.94,
        "dp2ErisMw": 149.94,
        "dp2NrisMw": 149.94,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1708,
      "normalized": {
        "queue_id": "J890",
        "county": "Presque Isle County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Port Calcite - Riggsville 138kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491339,
        "projectNumber": "J890",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-09T05:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Presque Isle County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Port Calcite - Riggsville 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1709,
      "normalized": {
        "queue_id": "J893",
        "county": "White County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Searcy Price Sub 161kV",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2021-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2019-11-20T05:00:00+00:00",
        "in_service": "2021-08-01T04:00:00+00:00",
        "gia_to_execute": "2019-06-03T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491340,
        "projectNumber": "J893",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-11-20T05:00:00+00:00",
        "inService": "2021-08-01T04:00:00+00:00",
        "giaToExec": "2019-06-03T04:00:00+00:00",
        "negInService": "2021-08-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "White County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Searcy Price Sub 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1710,
      "normalized": {
        "queue_id": "J894",
        "county": "Woodruff County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "McCrory - Moses 161kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491341,
        "projectNumber": "J894",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2020-04-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Woodruff County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "McCrory - Moses 161kV Substation",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1711,
      "normalized": {
        "queue_id": "J888",
        "county": "George County",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY",
        "poi": "Benndale 69kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": "2019-07-22T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "In Service",
        "approval_date": "2019-08-19T04:00:00+00:00",
        "in_service": "2019-01-01T05:00:00+00:00",
        "gia_to_execute": "2019-06-06T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 25.0,
        "dp1_nris_mw": 25.0,
        "dp2_eris_mw": 25.0,
        "dp2_nris_mw": 25.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491342,
        "projectNumber": "J888",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2019-08-19T04:00:00+00:00",
        "inService": "2019-01-01T05:00:00+00:00",
        "giaToExec": "2019-06-06T04:00:00+00:00",
        "negInService": "2019-07-22T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY",
        "county": "George County",
        "state": "MS",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Benndale 69kV Substation",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 25.0,
        "dp1NrisMw": 25.0,
        "dp2ErisMw": 25.0,
        "dp2NrisMw": 25.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1712,
      "normalized": {
        "queue_id": "J863",
        "county": "Dakota County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Rosemount  - Nininger 115kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491343,
        "projectNumber": "J863",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-12-18T05:00:00+00:00",
        "inService": "2021-01-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dakota County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rosemount  - Nininger 115kV Line",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1713,
      "normalized": {
        "queue_id": "J865",
        "county": "St. Clair County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lee - Menlo 120kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 79.97,
        "summer_net_mw": 79.97,
        "winter_net_mw": 79.97,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491344,
        "projectNumber": "J865",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-09T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "St. Clair County",
        "state": "MI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lee - Menlo 120kV Line",
        "summerNetMW": 79.97,
        "winterNetMW": 79.97,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1714,
      "normalized": {
        "queue_id": "J964",
        "county": "Hinds County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC",
        "poi": "Edwards - Bolton 115kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-10-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491345,
        "projectNumber": "J964",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2020-10-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC",
        "county": "Hinds County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Edwards - Bolton 115kV Line Tap",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1715,
      "normalized": {
        "queue_id": "J862",
        "county": "Orleans Parish",
        "state": "LA",
        "transmission_owner": "Entergy",
        "poi": "NASA-Michoud 115 kV Line",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491346,
        "projectNumber": "J862",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-03-25T04:00:00+00:00",
        "inService": "2019-05-31T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Orleans Parish",
        "state": "LA",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "NASA-Michoud 115 kV Line",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1716,
      "normalized": {
        "queue_id": "J864",
        "county": "Richland County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Lone Rock 69kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 49.98,
        "summer_net_mw": 49.98,
        "winter_net_mw": 49.98,
        "proposed_completion_date": "2022-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-04-27T04:00:00+00:00",
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-11-14T05:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 49.98,
        "dp1_nris_mw": 49.98,
        "dp2_eris_mw": 49.98,
        "dp2_nris_mw": 49.98,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491347,
        "projectNumber": "J864",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-04-27T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "giaToExec": "2019-11-14T05:00:00+00:00",
        "negInService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Richland County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lone Rock 69kV Substation",
        "summerNetMW": 49.98,
        "winterNetMW": 49.98,
        "dp1ErisMw": 49.98,
        "dp1NrisMw": 49.98,
        "dp2ErisMw": 49.98,
        "dp2NrisMw": 49.98,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1717,
      "normalized": {
        "queue_id": "J858",
        "county": "Bradley County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Hilo 115 kV Switch",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2017-09-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491348,
        "projectNumber": "J858",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2017-09-01T04:00:00+00:00",
        "inService": "2019-09-29T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Bradley County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hilo 115 kV Switch",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1718,
      "normalized": {
        "queue_id": "J889",
        "county": "Nelson County",
        "state": "ND",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Ramsey - Prairie 230KV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-10-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491349,
        "projectNumber": "J889",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-10-24T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Nelson County",
        "state": "ND",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ramsey - Prairie 230KV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1719,
      "normalized": {
        "queue_id": "J891",
        "county": "Pipestone County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Buffalo Ridge - Pipestone 115kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-07-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491350,
        "projectNumber": "J891",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-07-23T04:00:00+00:00",
        "inService": "2020-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Pipestone County",
        "state": "MN",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Buffalo Ridge - Pipestone 115kV Line Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1720,
      "normalized": {
        "queue_id": "J892",
        "county": "Walworth County",
        "state": "WI",
        "transmission_owner": "American Transmission Co. LLC",
        "poi": "Bluff Creek (Tap) to Sugar Creek 138 kV line tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2018-03-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 74.97,
        "summer_net_mw": 74.97,
        "winter_net_mw": 74.97,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491351,
        "projectNumber": "J892",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2018-03-12T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "transmissionOwner": "American Transmission Co. LLC",
        "county": "Walworth County",
        "state": "WI",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bluff Creek (Tap) to Sugar Creek 138 kV line tap",
        "summerNetMW": 74.97,
        "winterNetMW": 74.97,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1721,
      "normalized": {
        "queue_id": "J965",
        "county": "Cottonwood County",
        "state": "MN",
        "transmission_owner": "Xcel Energy",
        "poi": "Lakefield Generation SW 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-11-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491352,
        "projectNumber": "J965",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-11-19T05:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "transmissionOwner": "Xcel Energy",
        "county": "Cottonwood County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lakefield Generation SW 345kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1722,
      "normalized": {
        "queue_id": "J968",
        "county": "Jasper County,White County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Reynolds 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2023-04-20T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "In Service",
        "approval_date": "2021-10-12T04:00:00+00:00",
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-10-13T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491353,
        "projectNumber": "J968",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-10-12T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "giaToExec": "2021-10-13T04:00:00+00:00",
        "negInService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper County,White County",
        "state": "IN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynolds 345kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1723,
      "normalized": {
        "queue_id": "J962",
        "county": "DeSoto County",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC",
        "poi": "Twinkletown 230 kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2022-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2020-08-12T04:00:00+00:00",
        "in_service": "2021-01-31T05:00:00+00:00",
        "gia_to_execute": "2020-03-30T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491354,
        "projectNumber": "J962",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2020-08-12T04:00:00+00:00",
        "inService": "2021-01-31T05:00:00+00:00",
        "giaToExec": "2020-03-30T04:00:00+00:00",
        "negInService": "2022-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC",
        "county": "DeSoto County",
        "state": "MS",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Twinkletown 230 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1724,
      "normalized": {
        "queue_id": "J967",
        "county": "Mower County",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Adams 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2023-08-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": "2021-06-15T04:00:00+00:00",
        "in_service": "2020-09-01T04:00:00+00:00",
        "gia_to_execute": "2021-06-15T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491355,
        "projectNumber": "J967",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-06-15T04:00:00+00:00",
        "inService": "2020-09-01T04:00:00+00:00",
        "giaToExec": "2021-06-15T04:00:00+00:00",
        "negInService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Mower County",
        "state": "MN",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Adams 345kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1725,
      "normalized": {
        "queue_id": "J895",
        "county": "Lonoke County",
        "state": "AR",
        "transmission_owner": "Entergy",
        "poi": "Carlisle - Lonoke East 115kV Line Tap",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": "2019-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 33.0,
        "summer_net_mw": 33.0,
        "winter_net_mw": 33.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2017-AUG",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491356,
        "projectNumber": "J895",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "withdrawnDate": "2019-01-07T05:00:00+00:00",
        "inService": "2020-04-01T04:00:00+00:00",
        "transmissionOwner": "Entergy",
        "county": "Lonoke County",
        "state": "AR",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Carlisle - Lonoke East 115kV Line Tap",
        "summerNetMW": 33.0,
        "winterNetMW": 33.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1726,
      "normalized": {
        "queue_id": "J961",
        "county": "West Baton Rouge Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Livonia - Wilbert 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2019-08-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491357,
        "projectNumber": "J961",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2019-08-29T04:00:00+00:00",
        "inService": "2021-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "West Baton Rouge Parish",
        "state": "LA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Livonia - Wilbert 138 kV Line Tap",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1727,
      "normalized": {
        "queue_id": "J963",
        "county": "Cedar County",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Bennett (CIPCO) - Graham 69 Kv Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 9.0,
        "summer_net_mw": 9.0,
        "winter_net_mw": 9.0,
        "proposed_completion_date": "2017-01-01T05:00:00+00:00",
        "generation_type": "Diesel",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "Not Started",
        "approval_date": "2021-06-15T04:00:00+00:00",
        "in_service": "2017-01-01T05:00:00+00:00",
        "gia_to_execute": "2021-06-16T04:00:00+00:00",
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 9.0,
        "dp1_nris_mw": 9.0,
        "dp2_eris_mw": 9.0,
        "dp2_nris_mw": 9.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491358,
        "projectNumber": "J963",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "doneDate": "2021-06-15T04:00:00+00:00",
        "inService": "2017-01-01T05:00:00+00:00",
        "giaToExec": "2021-06-16T04:00:00+00:00",
        "negInService": "2017-01-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cedar County",
        "state": "IA",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bennett (CIPCO) - Graham 69 Kv Line Tap",
        "summerNetMW": 9.0,
        "winterNetMW": 9.0,
        "dp1ErisMw": 9.0,
        "dp1NrisMw": 9.0,
        "dp2ErisMw": 9.0,
        "dp2NrisMw": 9.0,
        "fuelType": "Diesel",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1728,
      "normalized": {
        "queue_id": "J1415",
        "county": "Lonoke County",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "KEO EHV 500 kV Substation",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2024-10-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2021-11-29T05:00:00+00:00",
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": "2021-11-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491359,
        "projectNumber": "J1415",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "doneDate": "2021-11-29T05:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "giaToExec": "2021-11-30T05:00:00+00:00",
        "negInService": "2024-10-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Lonoke County",
        "state": "AR",
        "studyCycle": "DPP-2019",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "KEO EHV 500 kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1729,
      "normalized": {
        "queue_id": "J811",
        "county": "Fayette County",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ramsey East 138kV Substation",
        "queue_date": "2017-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": "2021-05-28T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": "2020-03-25T04:00:00+00:00",
        "in_service": "2019-09-01T04:00:00+00:00",
        "gia_to_execute": "2019-07-15T04:00:00+00:00",
        "study_cycle": "DPP-2017-AUG",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 99.0,
        "dp2_nris_mw": 99.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491360,
        "projectNumber": "J811",
        "queueDate": "2017-06-16T04:00:00+00:00",
        "doneDate": "2020-03-25T04:00:00+00:00",
        "inService": "2019-09-01T04:00:00+00:00",
        "giaToExec": "2019-07-15T04:00:00+00:00",
        "negInService": "2021-05-28T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette County",
        "state": "IL",
        "studyCycle": "DPP-2017-AUG",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ramsey East 138kV Substation",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 99.0,
        "dp2NrisMw": 99.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1730,
      "normalized": {
        "queue_id": "J1332",
        "county": "Jasper County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "poi": "Rollin Schahfer - Lake George 345kV Line",
        "queue_date": "2019-04-29T04:00:00+00:00",
        "withdrawn_date": "2024-03-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-04-20T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2022-04-20T04:00:00+00:00",
        "gia_to_execute": "2023-01-30T05:00:00+00:00",
        "study_cycle": "DPP-2019",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 194.0,
        "dp2_nris_mw": 194.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491361,
        "projectNumber": "J1332",
        "queueDate": "2019-04-29T04:00:00+00:00",
        "withdrawnDate": "2024-03-08T05:00:00+00:00",
        "inService": "2022-04-20T04:00:00+00:00",
        "giaToExec": "2023-01-30T05:00:00+00:00",
        "negInService": "2025-04-20T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIP",
        "county": "Jasper County",
        "state": "IN",
        "studyCycle": "DPP-2019",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rollin Schahfer - Lake George 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 194.0,
        "dp2NrisMw": 194.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1731,
      "normalized": {
        "queue_id": "J1688",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Rising 345kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-10-02T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491362,
        "projectNumber": "J1688",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-10-02T04:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rising 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1732,
      "normalized": {
        "queue_id": "J1689",
        "county": "Henry",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Cadiz 138kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491363,
        "projectNumber": "J1689",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Henry",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cadiz 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1733,
      "normalized": {
        "queue_id": "J1694",
        "county": "Lawrence",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Lost River 345kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491364,
        "projectNumber": "J1694",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Lawrence",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lost River 345kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1734,
      "normalized": {
        "queue_id": "J1696",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Reid EHV 161kV",
        "queue_date": "2020-06-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2026-06-12T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491365,
        "projectNumber": "J1696",
        "queueDate": "2020-06-11T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "negInService": "2026-06-12T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reid EHV 161kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1735,
      "normalized": {
        "queue_id": "J1702",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Faraday 345 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491366,
        "projectNumber": "J1702",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-14T05:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Faraday 345 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1736,
      "normalized": {
        "queue_id": "J1704",
        "county": "Shelby",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gwynneville 345kV Substation",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2023-11-28T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491367,
        "projectNumber": "J1704",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2023-11-28T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Shelby",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gwynneville 345kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1737,
      "normalized": {
        "queue_id": "J1690",
        "county": "Henry",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Lewisville 138kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-03-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491368,
        "projectNumber": "J1690",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-03-15T04:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Henry",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lewisville 138kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1738,
      "normalized": {
        "queue_id": "J1693",
        "county": "Chippewa",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Maynard XMSN 115kV Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-11-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491369,
        "projectNumber": "J1693",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-11-19T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chippewa",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Maynard XMSN 115kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1739,
      "normalized": {
        "queue_id": "J1698",
        "county": "St. Tammany",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Talisheek - North Slidell 230kV Line",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-12-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491370,
        "projectNumber": "J1698",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-12-21T05:00:00+00:00",
        "inService": "2023-08-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Tammany",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Talisheek - North Slidell 230kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1740,
      "normalized": {
        "queue_id": "J1699",
        "county": "Shelby",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "HE Lewis Creek 69 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 43.0,
        "summer_net_mw": 43.0,
        "winter_net_mw": 43.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491371,
        "projectNumber": "J1699",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Shelby",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "HE Lewis Creek 69 kV",
        "summerNetMW": 43.0,
        "winterNetMW": 43.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1741,
      "normalized": {
        "queue_id": "J1701",
        "county": "McDonough",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Macomb to Ipava 138kV line",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-09-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 191.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491372,
        "projectNumber": "J1701",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "negInService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McDonough",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Macomb to Ipava 138kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 191.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1742,
      "normalized": {
        "queue_id": "J1705",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "South Fond du Lac (Endpoint A) to Columbia (Endpoint B)  345 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-02-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-20T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491373,
        "projectNumber": "J1705",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-02-23T05:00:00+00:00",
        "inService": "2024-02-20T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "South Fond du Lac (Endpoint A) to Columbia (Endpoint B)  345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1743,
      "normalized": {
        "queue_id": "J969",
        "county": "Tuscola County",
        "state": "MI",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Kirk 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-11-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491374,
        "projectNumber": "J969",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-11-01T04:00:00+00:00",
        "inService": "2020-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Tuscola County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kirk 345kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1744,
      "normalized": {
        "queue_id": "J1692",
        "county": "Cass",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Walton 345 kV  Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 65.0,
        "summer_net_mw": 65.0,
        "winter_net_mw": 65.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491375,
        "projectNumber": "J1692",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-03T05:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Cass",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Walton 345 kV  Substation",
        "summerNetMW": 65.0,
        "winterNetMW": 65.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1745,
      "normalized": {
        "queue_id": "J1706",
        "county": "Green",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "North Monroe 138 kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2028-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491376,
        "projectNumber": "J1706",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "negInService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Green",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Monroe 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1746,
      "normalized": {
        "queue_id": "J1708",
        "county": "Grant",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "J947 Interconnection Substation",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2023-06-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491377,
        "projectNumber": "J1708",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2023-06-22T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Grant",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "J947 Interconnection Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1747,
      "normalized": {
        "queue_id": "J1695",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Aster 138kV Substation (Rebuild of North Coulterville 138kV)",
        "queue_date": "2023-12-12T05:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491378,
        "projectNumber": "J1695",
        "queueDate": "2023-12-12T05:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Aster 138kV Substation (Rebuild of North Coulterville 138kV)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1748,
      "normalized": {
        "queue_id": "J1697",
        "county": "Lawrence",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Shawswick to Pleasant Grove 138 kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491379,
        "projectNumber": "J1697",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Lawrence",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Shawswick to Pleasant Grove 138 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1749,
      "normalized": {
        "queue_id": "J1707",
        "county": "Dubois",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "DUFF 345KV",
        "queue_date": "2021-10-22T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 72.0,
        "summer_net_mw": 72.0,
        "winter_net_mw": 72.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491380,
        "projectNumber": "J1707",
        "queueDate": "2021-10-22T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Dubois",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "DUFF 345KV",
        "summerNetMW": 72.0,
        "winterNetMW": 72.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1750,
      "normalized": {
        "queue_id": "J1714",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ramsey East 138kV Substation",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491381,
        "projectNumber": "J1714",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ramsey East 138kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1751,
      "normalized": {
        "queue_id": "J1715",
        "county": "Decatur",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "HE Westport 138kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491382,
        "projectNumber": "J1715",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Decatur",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "HE Westport 138kV",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1752,
      "normalized": {
        "queue_id": "J1716",
        "county": "Fond du Lac",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "South Fond du Lac - Fitzgerald 345.0kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2024-10-21T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491383,
        "projectNumber": "J1716",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2024-10-21T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "negInService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Fond du Lac",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "South Fond du Lac - Fitzgerald 345.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1753,
      "normalized": {
        "queue_id": "J1703",
        "county": "Webster",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Reid to Hopkins County 161kV",
        "queue_date": "2022-02-11T05:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 74.0,
        "summer_net_mw": 74.0,
        "winter_net_mw": 74.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491384,
        "projectNumber": "J1703",
        "queueDate": "2022-02-11T05:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Webster",
        "state": "KY",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reid to Hopkins County 161kV",
        "summerNetMW": 74.0,
        "winterNetMW": 74.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1754,
      "normalized": {
        "queue_id": "J1711",
        "county": "Green",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "North Monroe 138kV Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-11-30T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491385,
        "projectNumber": "J1711",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-11-30T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Green",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Monroe 138kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1755,
      "normalized": {
        "queue_id": "J966",
        "county": "Putnam County,Sullivan County",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Zachary 345kV Substation",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2020-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491386,
        "projectNumber": "J966",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2020-03-25T04:00:00+00:00",
        "inService": "2020-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Putnam County,Sullivan County",
        "state": "MO",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Zachary 345kV Substation",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1756,
      "normalized": {
        "queue_id": "J970",
        "county": "Oscoda County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Mio Dam - Gaylord 138 kV Line Tap",
        "queue_date": "2018-03-12T04:00:00+00:00",
        "withdrawn_date": "2018-10-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2018-APR",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491387,
        "projectNumber": "J970",
        "queueDate": "2018-03-12T04:00:00+00:00",
        "withdrawnDate": "2018-10-17T04:00:00+00:00",
        "inService": "2020-01-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Oscoda County",
        "state": "MI",
        "studyCycle": "DPP-2018-APR",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mio Dam - Gaylord 138 kV Line Tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1757,
      "normalized": {
        "queue_id": "J1691",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Merom (HED) 345.0kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491388,
        "projectNumber": "J1691",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "negInService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Merom (HED) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1758,
      "normalized": {
        "queue_id": "J1700",
        "county": "Johnson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "FRANKLIN 230KV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-10-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 288.0,
        "summer_net_mw": 288.0,
        "winter_net_mw": 288.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491389,
        "projectNumber": "J1700",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-10-22T04:00:00+00:00",
        "inService": "2023-04-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Johnson",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "FRANKLIN 230KV",
        "summerNetMW": 288.0,
        "winterNetMW": 288.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1759,
      "normalized": {
        "queue_id": "J1712",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "North Coulterville - COMM 345kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2025-12-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 300.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491390,
        "projectNumber": "J1712",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2022-12-15T05:00:00+00:00",
        "negInService": "2025-12-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North Coulterville - COMM 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 300.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1760,
      "normalized": {
        "queue_id": "J1713",
        "county": "Macon",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Faraday (138 kV)",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 147.2,
        "summer_net_mw": 147.2,
        "winter_net_mw": 147.2,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 147.19,
        "dp1_nris_mw": 147.19,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491391,
        "projectNumber": "J1713",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Macon",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Faraday (138 kV)",
        "summerNetMW": 147.2,
        "winterNetMW": 147.2,
        "dp1ErisMw": 147.19,
        "dp1NrisMw": 147.19,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1761,
      "normalized": {
        "queue_id": "J1710",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "KEO EHV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2026-09-13T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 300.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491392,
        "projectNumber": "J1710",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-09-13T04:00:00+00:00",
        "negInService": "2026-09-13T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "KEO EHV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 300.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1762,
      "normalized": {
        "queue_id": "J1717",
        "county": "Decatur",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greensburg 138kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491393,
        "projectNumber": "J1717",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Decatur",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greensburg 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1763,
      "normalized": {
        "queue_id": "J1718",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Bunsonville 345kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-09-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491394,
        "projectNumber": "J1718",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-09-18T04:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bunsonville 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1764,
      "normalized": {
        "queue_id": "J1722",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Galloway - Remigton 115kV  Transmission Line",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-09T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491395,
        "projectNumber": "J1722",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-02-09T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Galloway - Remigton 115kV  Transmission Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1765,
      "normalized": {
        "queue_id": "J1723",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Wynne East to Wynne South 161kV line (J1125 sub)",
        "queue_date": "2021-11-02T04:00:00+00:00",
        "withdrawn_date": "2022-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 10.0,
        "summer_net_mw": 10.0,
        "winter_net_mw": 10.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 10.0,
        "dp1_nris_mw": 10.0,
        "dp2_eris_mw": 10.0,
        "dp2_nris_mw": 10.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491396,
        "projectNumber": "J1723",
        "queueDate": "2021-11-02T04:00:00+00:00",
        "withdrawnDate": "2022-08-05T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wynne East to Wynne South 161kV line (J1125 sub)",
        "summerNetMW": 10.0,
        "winterNetMW": 10.0,
        "dp1ErisMw": 10.0,
        "dp1NrisMw": 10.0,
        "dp2ErisMw": 10.0,
        "dp2NrisMw": 10.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1766,
      "normalized": {
        "queue_id": "J1725",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "San Jose Rail Splitter 138KV (G515)",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2027-06-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 14.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491397,
        "projectNumber": "J1725",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "San Jose Rail Splitter 138KV (G515)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 14.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1767,
      "normalized": {
        "queue_id": "J1719",
        "county": "Waushara",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sand Lake 138kV Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491398,
        "projectNumber": "J1719",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Waushara",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sand Lake 138kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1768,
      "normalized": {
        "queue_id": "J1720",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Fountain Prairie -North Randolph   138kV Transmission Line",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-05-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491399,
        "projectNumber": "J1720",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-05-20T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fountain Prairie -North Randolph   138kV Transmission Line",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1769,
      "normalized": {
        "queue_id": "J1709",
        "county": "Grimes",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "138 kV Grimes",
        "queue_date": "2022-01-21T05:00:00+00:00",
        "withdrawn_date": "2024-10-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-02-01T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Withdrawn",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2022-02-01T05:00:00+00:00",
        "gia_to_execute": "2023-01-18T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491400,
        "projectNumber": "J1709",
        "queueDate": "2022-01-21T05:00:00+00:00",
        "withdrawnDate": "2024-10-15T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2022-02-01T05:00:00+00:00",
        "giaToExec": "2023-01-18T05:00:00+00:00",
        "negInService": "2025-02-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Grimes",
        "state": "TX",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "138 kV Grimes",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1770,
      "normalized": {
        "queue_id": "J1726",
        "county": "Pulaski",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Reynolds - Burr 345kV",
        "queue_date": "2020-06-15T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491401,
        "projectNumber": "J1726",
        "queueDate": "2020-06-15T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Pulaski",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynolds - Burr 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1771,
      "normalized": {
        "queue_id": "J1724",
        "county": "LaPorte",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "LNG - STILLWELL 138kV line",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491402,
        "projectNumber": "J1724",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaPorte",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "LNG - STILLWELL 138kV line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1772,
      "normalized": {
        "queue_id": "J1591",
        "county": "Clay",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Staunton 138kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491403,
        "projectNumber": "J1591",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clay",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Staunton 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1773,
      "normalized": {
        "queue_id": "J1593",
        "county": "Rush",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greensboro-Gwynneville 345kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491404,
        "projectNumber": "J1593",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Rush",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greensboro-Gwynneville 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1774,
      "normalized": {
        "queue_id": "J1594",
        "county": "Clark",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone to Ellendale 345 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491405,
        "projectNumber": "J1594",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-11-17T05:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Clark",
        "state": "SD",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Big Stone to Ellendale 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1775,
      "normalized": {
        "queue_id": "J1730",
        "county": "Dunn",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Eau Claire to AS King 345 kV",
        "queue_date": "2022-03-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2027-06-06T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2024-06-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 300.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491406,
        "projectNumber": "J1730",
        "queueDate": "2022-03-17T04:00:00+00:00",
        "inService": "2024-06-06T04:00:00+00:00",
        "negInService": "2027-06-06T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dunn",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Eau Claire to AS King 345 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 300.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1776,
      "normalized": {
        "queue_id": "J1597",
        "county": "Wadena",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Wing River Substation 230kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2021-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491407,
        "projectNumber": "J1597",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2021-11-17T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Wadena",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wing River Substation 230kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1777,
      "normalized": {
        "queue_id": "J1598",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Goos Ferry",
        "queue_date": "2023-12-11T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 325.0,
        "summer_net_mw": 325.0,
        "winter_net_mw": 325.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 325.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 325.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491408,
        "projectNumber": "J1598",
        "queueDate": "2023-12-11T05:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Goos Ferry",
        "summerNetMW": 325.0,
        "winterNetMW": 325.0,
        "dp1ErisMw": 325.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 325.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1778,
      "normalized": {
        "queue_id": "J1599",
        "county": "Iberia",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Morbihan - Hopkins 138kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2026-02-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-09-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-18T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491409,
        "projectNumber": "J1599",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2026-02-13T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "giaToExec": "2023-01-18T05:00:00+00:00",
        "negInService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Iberia",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Morbihan - Hopkins 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1779,
      "normalized": {
        "queue_id": "J1605",
        "county": "Sherburne",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "SHERBURNE CO",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491410,
        "projectNumber": "J1605",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Sherburne",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "SHERBURNE CO",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1780,
      "normalized": {
        "queue_id": "J1607",
        "county": "Grant",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Hardin West SS to Sheridan 115 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2025-05-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-01-15T05:00:00+00:00",
        "gia_to_execute": "2023-08-04T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491411,
        "projectNumber": "J1607",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2024-01-15T05:00:00+00:00",
        "giaToExec": "2023-08-04T04:00:00+00:00",
        "negInService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Grant",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hardin West SS to Sheridan 115 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1781,
      "normalized": {
        "queue_id": "J1721",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "TH Pfizer Jct. - Worthington (HED)",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2025-11-26T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.12,
        "summer_net_mw": 175.12,
        "winter_net_mw": 175.12,
        "proposed_completion_date": "2026-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.12,
        "dp1_nris_mw": 175.12,
        "dp2_eris_mw": 175.12,
        "dp2_nris_mw": 175.12,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491412,
        "projectNumber": "J1721",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2025-11-26T05:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "negInService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "TH Pfizer Jct. - Worthington (HED)",
        "summerNetMW": 175.12,
        "winterNetMW": 175.12,
        "dp1ErisMw": 175.12,
        "dp1NrisMw": 175.12,
        "dp2ErisMw": 175.12,
        "dp2NrisMw": 175.12,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 1782,
      "normalized": {
        "queue_id": "J1589",
        "county": "Clinton",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Hubbardston - Tech Drive 138kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2022-01-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491413,
        "projectNumber": "J1589",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2022-01-04T05:00:00+00:00",
        "inService": "2022-12-15T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Clinton",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hubbardston - Tech Drive 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1783,
      "normalized": {
        "queue_id": "J1592",
        "county": "Pope",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MORRILTON EAST - Atkins 161 kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2023-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491414,
        "projectNumber": "J1592",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2023-12-08T05:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pope",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "MORRILTON EAST - Atkins 161 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1784,
      "normalized": {
        "queue_id": "J1595",
        "county": "St. Martin",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Kirk 138kV",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": "2021-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491415,
        "projectNumber": "J1595",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "withdrawnDate": "2021-01-05T05:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Martin",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kirk 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1785,
      "normalized": {
        "queue_id": "J1606",
        "county": "Fountain",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Attica 230kV Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-15T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491416,
        "projectNumber": "J1606",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-15T05:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Fountain",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Attica 230kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1786,
      "normalized": {
        "queue_id": "J1610",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "CITY WATER LIGHT & POWER",
        "poi": "Auburn North to Chatham Main 138kV",
        "queue_date": "2020-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-08-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491417,
        "projectNumber": "J1610",
        "queueDate": "2020-06-16T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "negInService": "2026-08-31T04:00:00+00:00",
        "transmissionOwner": "CITY WATER LIGHT & POWER",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Auburn North to Chatham Main 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1787,
      "normalized": {
        "queue_id": "J1590",
        "county": "Plymouth",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "REMSEN TOWNSHIP",
        "queue_date": "2024-06-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-09-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 40.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491418,
        "projectNumber": "J1590",
        "queueDate": "2024-06-05T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "negInService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Plymouth",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "REMSEN TOWNSHIP",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 40.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1788,
      "normalized": {
        "queue_id": "J1727",
        "county": "Hancock",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lime Creek 161kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 33.75,
        "summer_net_mw": 33.75,
        "winter_net_mw": 33.75,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491419,
        "projectNumber": "J1727",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Hancock",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lime Creek 161kV",
        "summerNetMW": 33.75,
        "winterNetMW": 33.75,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1789,
      "normalized": {
        "queue_id": "J1596",
        "county": "Waushara",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sand Lake 138kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2021-02-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491420,
        "projectNumber": "J1596",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2021-02-24T05:00:00+00:00",
        "inService": "2023-10-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Waushara",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sand Lake 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1790,
      "normalized": {
        "queue_id": "J1611",
        "county": "Morrison",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Langdon 115 kV Sub",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 174.0,
        "summer_net_mw": 174.0,
        "winter_net_mw": 174.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 120.0,
        "dp2_nris_mw": 120.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491421,
        "projectNumber": "J1611",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Morrison",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Langdon 115 kV Sub",
        "summerNetMW": 174.0,
        "winterNetMW": 174.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 120.0,
        "dp2NrisMw": 120.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1791,
      "normalized": {
        "queue_id": "J1613",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Bison Substation 345 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491422,
        "projectNumber": "J1613",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-11-17T05:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bison Substation 345 kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1792,
      "normalized": {
        "queue_id": "J1616",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-08-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491423,
        "projectNumber": "J1616",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "negInService": "2026-08-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Edwardsport",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1793,
      "normalized": {
        "queue_id": "J1617",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Bunsonville 138kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491424,
        "projectNumber": "J1617",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bunsonville 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1794,
      "normalized": {
        "queue_id": "J1618",
        "county": "Ascension",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "ST. JAMES - WELCOME 230KV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2024-02-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491425,
        "projectNumber": "J1618",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2024-02-09T05:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Ascension",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "ST. JAMES - WELCOME 230KV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1795,
      "normalized": {
        "queue_id": "J1619",
        "county": "Webster",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Reid Switchyard 161kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": "2024-04-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 160.0,
        "dp2_nris_mw": 160.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491426,
        "projectNumber": "J1619",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Webster",
        "state": "KY",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reid Switchyard 161kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 160.0,
        "dp2NrisMw": 160.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1796,
      "normalized": {
        "queue_id": "J1620",
        "county": "Pipestone",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Split Rock - Pipestone 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": "2026-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491427,
        "projectNumber": "J1620",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Pipestone",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Split Rock - Pipestone 115.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1797,
      "normalized": {
        "queue_id": "J1615",
        "county": "Oconto",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Morgan",
        "queue_date": "2020-06-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2026-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491428,
        "projectNumber": "J1615",
        "queueDate": "2020-06-17T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "negInService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Oconto",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Morgan",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1798,
      "normalized": {
        "queue_id": "J1624",
        "county": "Bartholomew",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Columbus Denois Cr - Columbus 345 230 kV Transmission Line",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491429,
        "projectNumber": "J1624",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2024-08-04T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Bartholomew",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Columbus Denois Cr - Columbus 345 230 kV Transmission Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1799,
      "normalized": {
        "queue_id": "J1609",
        "county": "St. Joseph",
        "state": "MI",
        "transmission_owner": "CONSUMERS ENERGY COMPANY",
        "poi": "Simpson 138kV",
        "queue_date": "2020-06-20T04:00:00+00:00",
        "withdrawn_date": "2022-01-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491430,
        "projectNumber": "J1609",
        "queueDate": "2020-06-20T04:00:00+00:00",
        "withdrawnDate": "2022-01-06T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "CONSUMERS ENERGY COMPANY",
        "county": "St. Joseph",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Simpson 138kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1800,
      "normalized": {
        "queue_id": "J1612",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado East - Sterlington 115 kV",
        "queue_date": "2020-06-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2028-01-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": "2022-10-14T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491431,
        "projectNumber": "J1612",
        "queueDate": "2020-06-08T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "giaToExec": "2022-10-14T04:00:00+00:00",
        "negInService": "2028-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "El Dorado East - Sterlington 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1801,
      "normalized": {
        "queue_id": "J1614",
        "county": "Muskegon",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "White Road - Four Mile 138kV line",
        "queue_date": "2020-06-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2025-08-26T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-15T05:00:00+00:00",
        "gia_to_execute": "2022-12-12T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491432,
        "projectNumber": "J1614",
        "queueDate": "2020-06-11T04:00:00+00:00",
        "inService": "2024-02-15T05:00:00+00:00",
        "giaToExec": "2022-12-12T05:00:00+00:00",
        "negInService": "2025-08-26T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "White Road - Four Mile 138kV line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1802,
      "normalized": {
        "queue_id": "J1621",
        "county": "McPherson",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South to Ellendale 345kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491433,
        "projectNumber": "J1621",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-11-17T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "McPherson",
        "state": "SD",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Big Stone South to Ellendale 345kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1803,
      "normalized": {
        "queue_id": "J1626",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ramsey East 138kV bus",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2027-04-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-05T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491434,
        "projectNumber": "J1626",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2024-08-05T04:00:00+00:00",
        "negInService": "2027-04-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Ramsey East 138kV bus",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1804,
      "normalized": {
        "queue_id": "J1629",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia SW YD(ALTE) - South Fond Du Lac  SW YD 345 KV T-Line",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-07-18T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491435,
        "projectNumber": "J1629",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2024-07-18T04:00:00+00:00",
        "negInService": "2027-07-18T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Columbia SW YD(ALTE) - South Fond Du Lac  SW YD 345 KV T-Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1805,
      "normalized": {
        "queue_id": "J1628",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Goodland to Reynolds 138KV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491436,
        "projectNumber": "J1628",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2022-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Goodland to Reynolds 138KV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1806,
      "normalized": {
        "queue_id": "J1632",
        "county": "Caldwell",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Caldwell County -  Barkley 161kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491437,
        "projectNumber": "J1632",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Caldwell",
        "state": "KY",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Caldwell County -  Barkley 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1807,
      "normalized": {
        "queue_id": "J1728",
        "county": "Story",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Story County Substation 161kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 39.0,
        "summer_net_mw": 39.0,
        "winter_net_mw": 39.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491438,
        "projectNumber": "J1728",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Story",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Story County Substation 161kV",
        "summerNetMW": 39.0,
        "winterNetMW": 39.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1808,
      "normalized": {
        "queue_id": "J1729",
        "county": "Hancock",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lime Creek 161kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 43.0,
        "summer_net_mw": 43.0,
        "winter_net_mw": 43.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491439,
        "projectNumber": "J1729",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Hancock",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Lime Creek 161kV",
        "summerNetMW": 43.0,
        "winterNetMW": 43.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1809,
      "normalized": {
        "queue_id": "J1644",
        "county": "St. Landry",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Champange - Plaisance",
        "queue_date": "2020-06-10T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-12-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-18T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491440,
        "projectNumber": "J1644",
        "queueDate": "2020-06-10T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2023-01-18T05:00:00+00:00",
        "negInService": "2024-12-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Landry",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Champange - Plaisance",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1810,
      "normalized": {
        "queue_id": "J1645",
        "county": "Renville",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Panther 230kV Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491441,
        "projectNumber": "J1645",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-23T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Renville",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Panther 230kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1811,
      "normalized": {
        "queue_id": "J1600",
        "county": "Meade",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Flaherty Tap to Custer 69kV",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491442,
        "projectNumber": "J1600",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2022-10-31T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Meade",
        "state": "KY",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Flaherty Tap to Custer 69kV",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1812,
      "normalized": {
        "queue_id": "J1601",
        "county": "Marion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Merom - Gibson Station Tap 345 kV Line",
        "queue_date": "2020-06-09T04:00:00+00:00",
        "withdrawn_date": "2021-03-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491443,
        "projectNumber": "J1601",
        "queueDate": "2020-06-09T04:00:00+00:00",
        "withdrawnDate": "2021-03-15T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Marion",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Merom - Gibson Station Tap 345 kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1813,
      "normalized": {
        "queue_id": "J1602",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Rilla 115kV substation (Same as J1239)",
        "queue_date": "2021-11-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": "2024-10-15T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-19T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 25.0,
        "dp1_nris_mw": 25.0,
        "dp2_eris_mw": 25.0,
        "dp2_nris_mw": 25.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491444,
        "projectNumber": "J1602",
        "queueDate": "2021-11-02T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "giaToExec": "2023-01-19T05:00:00+00:00",
        "negInService": "2024-10-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rilla 115kV substation (Same as J1239)",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 25.0,
        "dp1NrisMw": 25.0,
        "dp2ErisMw": 25.0,
        "dp2NrisMw": 25.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1814,
      "normalized": {
        "queue_id": "J1603",
        "county": "Otsego",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Vantyle 138kV",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-08-02T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491445,
        "projectNumber": "J1603",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2025-08-02T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Otsego",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Vantyle 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1815,
      "normalized": {
        "queue_id": "J1633",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cooper Switching - Penton Road 230 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491446,
        "projectNumber": "J1633",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cooper Switching - Penton Road 230 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1816,
      "normalized": {
        "queue_id": "J1636",
        "county": "Pike",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Peno Creek Substation 161kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 44.0,
        "summer_net_mw": 44.0,
        "winter_net_mw": 44.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 44.0,
        "dp1_nris_mw": 44.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491447,
        "projectNumber": "J1636",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Pike",
        "state": "MO",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Peno Creek Substation 161kV",
        "summerNetMW": 44.0,
        "winterNetMW": 44.0,
        "dp1ErisMw": 44.0,
        "dp1NrisMw": 44.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1817,
      "normalized": {
        "queue_id": "J1649",
        "county": "McCracken",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Shell - McCracken County 69.0kV",
        "queue_date": "2021-03-10T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": "2025-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 60.0,
        "dp2_nris_mw": 60.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491448,
        "projectNumber": "J1649",
        "queueDate": "2021-03-10T05:00:00+00:00",
        "inService": "2022-10-31T04:00:00+00:00",
        "negInService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "McCracken",
        "state": "KY",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Shell - McCracken County 69.0kV",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 60.0,
        "dp2NrisMw": 60.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1818,
      "normalized": {
        "queue_id": "J1650",
        "county": "Logan",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Latham 345kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491449,
        "projectNumber": "J1650",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Logan",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Latham 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1819,
      "normalized": {
        "queue_id": "J1604",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "CITY OF HENDERSON, KY, UTILITY COMMISSION, DBA HENDERSON MUNICIPAL POWER AND LIGHT (BA)",
        "poi": "HMPL Sub No.7",
        "queue_date": "2020-07-10T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2026-08-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491450,
        "projectNumber": "J1604",
        "queueDate": "2020-07-10T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "negInService": "2026-08-31T04:00:00+00:00",
        "transmissionOwner": "CITY OF HENDERSON, KY, UTILITY COMMISSION, DBA HENDERSON MUNICIPAL POWER AND LIGHT (BA)",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "HMPL Sub No.7",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1820,
      "normalized": {
        "queue_id": "J1608",
        "county": "Ingham",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Tihart to Lovejoy Junction  138kv",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-11-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491451,
        "projectNumber": "J1608",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-11-24T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ingham",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tihart to Lovejoy Junction  138kv",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1821,
      "normalized": {
        "queue_id": "J1640",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Beech Grove - Ray Braswell 115 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-09-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491452,
        "projectNumber": "J1640",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-09-22T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Beech Grove - Ray Braswell 115 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1822,
      "normalized": {
        "queue_id": "J1642",
        "county": "Spencer",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "North East (Castle) - Culley 138kV",
        "queue_date": "2022-02-17T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491453,
        "projectNumber": "J1642",
        "queueDate": "2022-02-17T05:00:00+00:00",
        "inService": "2023-10-15T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Spencer",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "North East (Castle) - Culley 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1823,
      "normalized": {
        "queue_id": "J1622",
        "county": "Sheridan",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Harvey-Underwood 230kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2022-12-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491454,
        "projectNumber": "J1622",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2022-12-13T05:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Sheridan",
        "state": "ND",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Harvey-Underwood 230kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1824,
      "normalized": {
        "queue_id": "J1623",
        "county": "Orange",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Mitchell Lost River 345kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491455,
        "projectNumber": "J1623",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Orange",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mitchell Lost River 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1825,
      "normalized": {
        "queue_id": "J1647",
        "county": "Chippewa",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Maynard XMSN 115kV Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-11-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491456,
        "projectNumber": "J1647",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-11-19T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chippewa",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Maynard XMSN 115kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1826,
      "normalized": {
        "queue_id": "J1648",
        "county": "Searcy",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Searcy Price 161kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-12-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 10.0,
        "summer_net_mw": 10.0,
        "winter_net_mw": 10.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491457,
        "projectNumber": "J1648",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-12-14T05:00:00+00:00",
        "inService": "2021-08-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Searcy",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Searcy Price 161kV",
        "summerNetMW": 10.0,
        "winterNetMW": 10.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1827,
      "normalized": {
        "queue_id": "J1625",
        "county": "Tipton",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Kokomo - Tipton 230kV Transmission line",
        "queue_date": "2021-08-20T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-05T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491458,
        "projectNumber": "J1625",
        "queueDate": "2021-08-20T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2024-08-05T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Tipton",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kokomo - Tipton 230kV Transmission line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1828,
      "normalized": {
        "queue_id": "J1631",
        "county": "Clark",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Stonelake  to Gardner Park 345kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-11-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491459,
        "projectNumber": "J1631",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-11-24T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Clark",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stonelake  to Gardner Park 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1829,
      "normalized": {
        "queue_id": "J1651",
        "county": "Logan",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Howlett",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 149.5,
        "summer_net_mw": 149.5,
        "winter_net_mw": 149.5,
        "proposed_completion_date": "2028-02-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 105.0,
        "dp1_nris_mw": 105.0,
        "dp2_eris_mw": 105.0,
        "dp2_nris_mw": 31.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491460,
        "projectNumber": "J1651",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "negInService": "2028-02-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Logan",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Howlett",
        "summerNetMW": 149.5,
        "winterNetMW": 149.5,
        "dp1ErisMw": 105.0,
        "dp1NrisMw": 105.0,
        "dp2ErisMw": 105.0,
        "dp2NrisMw": 31.5,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1830,
      "normalized": {
        "queue_id": "J1652",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Sidney 138kV",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 116.0,
        "summer_net_mw": 116.0,
        "winter_net_mw": 116.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491461,
        "projectNumber": "J1652",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sidney 138kV",
        "summerNetMW": 116.0,
        "winterNetMW": 116.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1831,
      "normalized": {
        "queue_id": "J1635",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BUTTERS - NEWTON (MI AVE) 138.0kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-02-01T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-02-01T05:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491462,
        "projectNumber": "J1635",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2022-02-01T05:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2025-02-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "BUTTERS - NEWTON (MI AVE) 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1832,
      "normalized": {
        "queue_id": "J1639",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "345kV Allen Junction to Morocco",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2022-01-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491463,
        "projectNumber": "J1639",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2022-01-06T05:00:00+00:00",
        "inService": "2022-02-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "345kV Allen Junction to Morocco",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1833,
      "normalized": {
        "queue_id": "J1646",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "MORRISON DITCH",
        "queue_date": "2020-06-10T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2026-10-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491464,
        "projectNumber": "J1646",
        "queueDate": "2020-06-10T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "negInService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "MORRISON DITCH",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1834,
      "normalized": {
        "queue_id": "J1653",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "San Jose Rail 138kV",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2026-09-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491465,
        "projectNumber": "J1653",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "negInService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "San Jose Rail 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1835,
      "normalized": {
        "queue_id": "J1654",
        "county": "Genesee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Goss-Thetford 345kV Line",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2023-02-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491466,
        "projectNumber": "J1654",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2023-02-22T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Goss-Thetford 345kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1836,
      "normalized": {
        "queue_id": "J1655",
        "county": "Jefferson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "West Mt Vernon - Xenia 345kV Line (J1241)",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491467,
        "projectNumber": "J1655",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2022-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jefferson",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "West Mt Vernon - Xenia 345kV Line (J1241)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1837,
      "normalized": {
        "queue_id": "J1656",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Sydney to Bunsonville 345kV Line",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2025-03-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 412.0,
        "summer_net_mw": 412.0,
        "winter_net_mw": 412.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Wind",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491468,
        "projectNumber": "J1656",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2025-03-19T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sydney to Bunsonville 345kV Line",
        "summerNetMW": 412.0,
        "winterNetMW": 412.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Wind",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1838,
      "normalized": {
        "queue_id": "J1657",
        "county": "St. Croix",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Pine Lake to Apple River 161 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491469,
        "projectNumber": "J1657",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "negInService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "St. Croix",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pine Lake to Apple River 161 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1839,
      "normalized": {
        "queue_id": "J1658",
        "county": "Hillsdale",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "COLDWATER - MOORE ROAD 138.0kV",
        "queue_date": "2025-05-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": "2025-12-12T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": "2022-12-14T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491470,
        "projectNumber": "J1658",
        "queueDate": "2025-05-19T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "giaToExec": "2022-12-14T05:00:00+00:00",
        "negInService": "2025-12-12T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Hillsdale",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "COLDWATER - MOORE ROAD 138.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1840,
      "normalized": {
        "queue_id": "J1662",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Goodland Substation 138kV (Bus Name: 17Goodland)",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2023-10-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491471,
        "projectNumber": "J1662",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2023-10-17T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Goodland Substation 138kV (Bus Name: 17Goodland)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1841,
      "normalized": {
        "queue_id": "J1659",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "DORSET",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-02-01T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2022-02-01T05:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491472,
        "projectNumber": "J1659",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2022-02-01T05:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2025-02-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "DORSET",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1842,
      "normalized": {
        "queue_id": "J1660",
        "county": "Genesee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Goss-Thetford 345kV Line",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2022-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491473,
        "projectNumber": "J1660",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2022-01-05T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Goss-Thetford 345kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1843,
      "normalized": {
        "queue_id": "J1665",
        "county": "St. Clair",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Carrigan 120kV Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2022-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491474,
        "projectNumber": "J1665",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2022-01-05T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "St. Clair",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Carrigan 120kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1844,
      "normalized": {
        "queue_id": "J1670",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Crooked Lake 161kV at J586 POI",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2025-03-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-15T04:00:00+00:00",
        "gia_to_execute": "2022-08-08T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491475,
        "projectNumber": "J1670",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2023-10-15T04:00:00+00:00",
        "giaToExec": "2022-08-08T04:00:00+00:00",
        "negInService": "2025-03-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crooked Lake 161kV at J586 POI",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1845,
      "normalized": {
        "queue_id": "J1666",
        "county": "Ingham",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Oneida - Majestic 345 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2022-01-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491476,
        "projectNumber": "J1666",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2022-01-06T05:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ingham",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Oneida - Majestic 345 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1846,
      "normalized": {
        "queue_id": "J1671",
        "county": "Walker",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Rocky Creek to Lewis Creek 230kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-12-04T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": "2022-12-15T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491477,
        "projectNumber": "J1671",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "giaToExec": "2022-12-15T05:00:00+00:00",
        "negInService": "2025-12-04T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Walker",
        "state": "TX",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Rocky Creek to Lewis Creek 230kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1847,
      "normalized": {
        "queue_id": "J1676",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Brokaw - Clinton 345 kV line",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491478,
        "projectNumber": "J1676",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brokaw - Clinton 345 kV line",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1848,
      "normalized": {
        "queue_id": "J1678",
        "county": "Miami",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Deedsville 345 kV",
        "queue_date": "2022-04-06T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 74.7,
        "summer_net_mw": 74.7,
        "winter_net_mw": 74.7,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 74.7,
        "dp1_nris_mw": 74.7,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491479,
        "projectNumber": "J1678",
        "queueDate": "2022-04-06T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Miami",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Deedsville 345 kV",
        "summerNetMW": 74.7,
        "winterNetMW": 74.7,
        "dp1ErisMw": 74.7,
        "dp1NrisMw": 74.7,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1849,
      "normalized": {
        "queue_id": "J1627",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Reynolds 345KV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491480,
        "projectNumber": "J1627",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2022-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynolds 345KV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1850,
      "normalized": {
        "queue_id": "J1630",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Gerald Andrus-Tinnin Road 230 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491481,
        "projectNumber": "J1630",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gerald Andrus-Tinnin Road 230 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1851,
      "normalized": {
        "queue_id": "J1682",
        "county": "Boone",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Hortonville to Whitestown 345 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491482,
        "projectNumber": "J1682",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Boone",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hortonville to Whitestown 345 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1852,
      "normalized": {
        "queue_id": "J1683",
        "county": "Porter",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Babcock - Lake George 345 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-12-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491483,
        "projectNumber": "J1683",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-12-14T05:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Porter",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Babcock - Lake George 345 kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1853,
      "normalized": {
        "queue_id": "J1634",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "COOPER SWITCHING - PENTON ROAD 230 KV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491484,
        "projectNumber": "J1634",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "COOPER SWITCHING - PENTON ROAD 230 KV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1854,
      "normalized": {
        "queue_id": "J1637",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Wheatland Substation 345kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491485,
        "projectNumber": "J1637",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Wheatland Substation 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1855,
      "normalized": {
        "queue_id": "J1638",
        "county": "Hancock",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Skillman Substation 161kV",
        "queue_date": "2022-02-11T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491486,
        "projectNumber": "J1638",
        "queueDate": "2022-02-11T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Hancock",
        "state": "KY",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Skillman Substation 161kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1856,
      "normalized": {
        "queue_id": "J1641",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Worthington Substation 138kV",
        "queue_date": "2024-03-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491487,
        "projectNumber": "J1641",
        "queueDate": "2024-03-15T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Worthington Substation 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1857,
      "normalized": {
        "queue_id": "J1643",
        "county": "Genesee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Delaney 138kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-11-30T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491488,
        "projectNumber": "J1643",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-11-30T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Delaney 138kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1858,
      "normalized": {
        "queue_id": "J1661",
        "county": "Lapeer",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Imlay Pump 120kV Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-02-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491489,
        "projectNumber": "J1661",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-02-23T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Lapeer",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Imlay Pump 120kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1859,
      "normalized": {
        "queue_id": "J1663",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ARGENTA - TALLMADGE 345.0kV",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-08-02T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": "2023-03-07T05:00:00+00:00",
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491490,
        "projectNumber": "J1663",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "doneDate": "2023-03-07T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2025-08-02T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "ARGENTA - TALLMADGE 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1860,
      "normalized": {
        "queue_id": "J1667",
        "county": "Isabella",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Bard Rd to Clare Junction 138 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-12-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491491,
        "projectNumber": "J1667",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-12-21T05:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Isabella",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bard Rd to Clare Junction 138 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1861,
      "normalized": {
        "queue_id": "J1672",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Tinnin Road 230kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-11-16T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": "2023-01-19T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491492,
        "projectNumber": "J1672",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "giaToExec": "2023-01-19T05:00:00+00:00",
        "negInService": "2025-11-16T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tinnin Road 230kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1862,
      "normalized": {
        "queue_id": "J1675",
        "county": "Edgar",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Kansas 345kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2021-02-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491493,
        "projectNumber": "J1675",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2021-02-13T05:00:00+00:00",
        "inService": "2023-12-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Edgar",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kansas 345kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1863,
      "normalized": {
        "queue_id": "J1677",
        "county": "Macon",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Leghorn 345 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": "2026-01-29T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491494,
        "projectNumber": "J1677",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "negInService": "2026-01-29T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macon",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Leghorn 345 kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1864,
      "normalized": {
        "queue_id": "J1679",
        "county": "Clay",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7XENIA    - 7MTVERNW 345.0kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": "2026-04-20T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 125.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491495,
        "projectNumber": "J1679",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "negInService": "2026-04-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clay",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "7XENIA    - 7MTVERNW 345.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 125.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1865,
      "normalized": {
        "queue_id": "J1674",
        "county": "St. Tammany",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Talisheek - North Slidell 230kV Line",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-12-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491496,
        "projectNumber": "J1674",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-12-21T05:00:00+00:00",
        "inService": "2023-08-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Tammany",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Talisheek - North Slidell 230kV Line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1866,
      "normalized": {
        "queue_id": "J1684",
        "county": "Starke",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "SCHAHFER GEN STA - BURR OAK 345.0kV",
        "queue_date": "2023-08-04T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2029-04-17T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491497,
        "projectNumber": "J1684",
        "queueDate": "2023-08-04T04:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "negInService": "2029-04-17T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Starke",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "SCHAHFER GEN STA - BURR OAK 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1867,
      "normalized": {
        "queue_id": "J1680",
        "county": "Cass",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "345 kV Walton Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491498,
        "projectNumber": "J1680",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Cass",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "345 kV Walton Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1868,
      "normalized": {
        "queue_id": "J1681",
        "county": "Maries",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Bland to Franks 345kV line",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491499,
        "projectNumber": "J1681",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Maries",
        "state": "MO",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bland to Franks 345kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1869,
      "normalized": {
        "queue_id": "J1945",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Werner West - Rocky Run 345kV",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491500,
        "projectNumber": "J1945",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Werner West - Rocky Run 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1870,
      "normalized": {
        "queue_id": "J1946",
        "county": "Jasper",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SME",
        "poi": "230 kV Missionary Substation",
        "queue_date": "2021-08-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": "2029-06-15T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 350.0,
        "dp1_nris_mw": 350.0,
        "dp2_eris_mw": 350.0,
        "dp2_nris_mw": 350.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491501,
        "projectNumber": "J1946",
        "queueDate": "2021-08-19T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "negInService": "2029-06-15T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SME",
        "county": "Jasper",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "230 kV Missionary Substation",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 350.0,
        "dp1NrisMw": 350.0,
        "dp2ErisMw": 350.0,
        "dp2NrisMw": 350.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1871,
      "normalized": {
        "queue_id": "J1948",
        "county": "Marion",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "HANNIBAL WEST",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 195.0,
        "summer_net_mw": 195.0,
        "winter_net_mw": 195.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 195.0,
        "dp1_nris_mw": 195.0,
        "dp2_eris_mw": 195.0,
        "dp2_nris_mw": 195.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491502,
        "projectNumber": "J1948",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Marion",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HANNIBAL WEST",
        "summerNetMW": 195.0,
        "winterNetMW": 195.0,
        "dp1ErisMw": 195.0,
        "dp1NrisMw": 195.0,
        "dp2ErisMw": 195.0,
        "dp2NrisMw": 195.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1872,
      "normalized": {
        "queue_id": "J1949",
        "county": "Antrim",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Mancelona - Westwood 69kV",
        "queue_date": "2021-08-22T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.6,
        "summer_net_mw": 99.6,
        "winter_net_mw": 99.6,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491503,
        "projectNumber": "J1949",
        "queueDate": "2021-08-22T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Antrim",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Mancelona - Westwood 69kV",
        "summerNetMW": 99.6,
        "winterNetMW": 99.6,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1873,
      "normalized": {
        "queue_id": "J1685",
        "county": "Ascension",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Donaldsonville to Evergreen 230kV line",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491504,
        "projectNumber": "J1685",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-09-24T04:00:00+00:00",
        "inService": "2023-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Ascension",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Donaldsonville to Evergreen 230kV line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1874,
      "normalized": {
        "queue_id": "J1686",
        "county": "Evangeline",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Coughlin - Plaisance 138 kV",
        "queue_date": "2022-07-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-04T04:00:00+00:00",
        "gia_to_execute": "2023-06-27T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 70.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491505,
        "projectNumber": "J1686",
        "queueDate": "2022-07-07T04:00:00+00:00",
        "inService": "2023-09-04T04:00:00+00:00",
        "giaToExec": "2023-06-27T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Coughlin - Plaisance 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 70.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1875,
      "normalized": {
        "queue_id": "J1687",
        "county": "Decatur",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Decatur Switching Station 161kv",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491506,
        "projectNumber": "J1687",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Decatur",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Decatur Switching Station 161kv",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1876,
      "normalized": {
        "queue_id": "J1944",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GREENWOOD - RAPSON (BANNER) 345.0kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": "2027-11-08T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 185.0,
        "dp1_nris_mw": 185.0,
        "dp2_eris_mw": 185.0,
        "dp2_nris_mw": 185.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491507,
        "projectNumber": "J1944",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "negInService": "2027-11-08T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "GREENWOOD - RAPSON (BANNER) 345.0kV",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 185.0,
        "dp1NrisMw": 185.0,
        "dp2ErisMw": 185.0,
        "dp2NrisMw": 185.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1877,
      "normalized": {
        "queue_id": "J1951",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Lemoyne-Majestic 345kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491508,
        "projectNumber": "J1951",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Lemoyne-Majestic 345kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1878,
      "normalized": {
        "queue_id": "J1953",
        "county": "Concordia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Red Gum 115kV",
        "queue_date": "2022-07-20T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 264.6,
        "summer_net_mw": 264.6,
        "winter_net_mw": 264.6,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491509,
        "projectNumber": "J1953",
        "queueDate": "2022-07-20T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Concordia",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Red Gum 115kV",
        "summerNetMW": 264.6,
        "winterNetMW": 264.6,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1879,
      "normalized": {
        "queue_id": "J1664",
        "county": "St. Clair",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Carrigan 120kV Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491510,
        "projectNumber": "J1664",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "St. Clair",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Carrigan 120kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1880,
      "normalized": {
        "queue_id": "J1668",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Donaldsonville - Evergreen 230 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 194.0,
        "summer_net_mw": 194.0,
        "winter_net_mw": 194.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491511,
        "projectNumber": "J1668",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Donaldsonville - Evergreen 230 kV",
        "summerNetMW": 194.0,
        "winterNetMW": 194.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1881,
      "normalized": {
        "queue_id": "J1669",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "LAKE CHARLES BULK",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": "2025-12-04T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": "2022-11-28T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 165.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 165.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491512,
        "projectNumber": "J1669",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "giaToExec": "2022-11-28T05:00:00+00:00",
        "negInService": "2025-12-04T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "LAKE CHARLES BULK",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 165.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 165.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1882,
      "normalized": {
        "queue_id": "J1673",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Fisher - Marthaville 230.0kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2025-03-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-01-15T05:00:00+00:00",
        "gia_to_execute": "2023-08-04T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491513,
        "projectNumber": "J1673",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2024-01-15T05:00:00+00:00",
        "giaToExec": "2023-08-04T04:00:00+00:00",
        "negInService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fisher - Marthaville 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1883,
      "normalized": {
        "queue_id": "J1952",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Emery-Floyd 161kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 54.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491514,
        "projectNumber": "J1952",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Emery-Floyd 161kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 54.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1884,
      "normalized": {
        "queue_id": "J1954",
        "county": "Walworth",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "SW Delavan 138kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2023-06-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491515,
        "projectNumber": "J1954",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2023-06-05T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Walworth",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "SW Delavan 138kV",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1885,
      "normalized": {
        "queue_id": "J1955",
        "county": "Walworth",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "SW Delavan 138kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2023-06-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491516,
        "projectNumber": "J1955",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2023-06-05T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Walworth",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "SW Delavan 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1886,
      "normalized": {
        "queue_id": "J1957",
        "county": "Coahoma",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Clarksdale-Roundaway 115kV (co-located with J2284)",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491517,
        "projectNumber": "J1957",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Coahoma",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Clarksdale-Roundaway 115kV (co-located with J2284)",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1887,
      "normalized": {
        "queue_id": "J1960",
        "county": "Porter",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Starke - Flint Lake 138kV",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491518,
        "projectNumber": "J1960",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Porter",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Starke - Flint Lake 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1888,
      "normalized": {
        "queue_id": "J1961",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Buffalo 115kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 190.0,
        "dp1_nris_mw": 57.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491519,
        "projectNumber": "J1961",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Buffalo 115kV",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 190.0,
        "dp1NrisMw": 57.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1889,
      "normalized": {
        "queue_id": "J1947",
        "county": "Fountain",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 110.0,
        "dp1_nris_mw": 110.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491520,
        "projectNumber": "J1947",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Fountain",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 110.0,
        "dp1NrisMw": 110.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1890,
      "normalized": {
        "queue_id": "J1959",
        "county": "St. John the Baptist",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Waterford-Vacherie 230kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491521,
        "projectNumber": "J1959",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. John the Baptist",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Waterford-Vacherie 230kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1891,
      "normalized": {
        "queue_id": "J1962",
        "county": "Polk",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Livingston - Rich 138kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491522,
        "projectNumber": "J1962",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Polk",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Livingston - Rich 138kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1892,
      "normalized": {
        "queue_id": "J1963",
        "county": "Polk",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Livingston - Rich 138kV",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491523,
        "projectNumber": "J1963",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Polk",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Livingston - Rich 138kV",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1893,
      "normalized": {
        "queue_id": "J1956",
        "county": "St. John the Baptist",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Waterford 230kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491524,
        "projectNumber": "J1956",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. John the Baptist",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Waterford 230kV",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1894,
      "normalized": {
        "queue_id": "J1966",
        "county": "Clinton",
        "state": "IN",
        "transmission_owner": "WABASH VALLEY POWER ASSOCIATION, INC.",
        "poi": "Cayuga  -  Frankfort  230.0kV",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491525,
        "projectNumber": "J1966",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "WABASH VALLEY POWER ASSOCIATION, INC.",
        "county": "Clinton",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cayuga  -  Frankfort  230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1895,
      "normalized": {
        "queue_id": "J1969",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Lemoyne-Majestic 345kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491526,
        "projectNumber": "J1969",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Lemoyne-Majestic 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1896,
      "normalized": {
        "queue_id": "J1970",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4SIDNEY 1 - 4MIRA TAP 138.0kV",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491527,
        "projectNumber": "J1970",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4SIDNEY 1 - 4MIRA TAP 138.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1897,
      "normalized": {
        "queue_id": "J1972",
        "county": "Des Moines",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Denmark - Newport",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2023-10-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 115.0,
        "dp1_nris_mw": 115.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491528,
        "projectNumber": "J1972",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2023-10-10T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Des Moines",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Denmark - Newport",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 115.0,
        "dp1NrisMw": 115.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1898,
      "normalized": {
        "queue_id": "J1982",
        "county": "Gladwin",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Other_",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 25.0,
        "dp1_nris_mw": 25.0,
        "dp2_eris_mw": 25.0,
        "dp2_nris_mw": 25.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491529,
        "projectNumber": "J1982",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gladwin",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 25.0,
        "dp1NrisMw": 25.0,
        "dp2ErisMw": 25.0,
        "dp2NrisMw": 25.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1899,
      "normalized": {
        "queue_id": "J1732",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "ACEC Lewiston Tap (X-68) - ACEC Lewiston 138.0kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 98.4,
        "summer_net_mw": 98.4,
        "winter_net_mw": 98.4,
        "proposed_completion_date": "2025-12-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 98.4,
        "dp1_nris_mw": 98.4,
        "dp2_eris_mw": 98.4,
        "dp2_nris_mw": 98.4,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491530,
        "projectNumber": "J1732",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2024-12-31T05:00:00+00:00",
        "negInService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "ACEC Lewiston Tap (X-68) - ACEC Lewiston 138.0kV",
        "summerNetMW": 98.4,
        "winterNetMW": 98.4,
        "dp1ErisMw": 98.4,
        "dp1NrisMw": 98.4,
        "dp2ErisMw": 98.4,
        "dp2NrisMw": 98.4,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1900,
      "normalized": {
        "queue_id": "J1733",
        "county": "Allamakee",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lansing 161 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491531,
        "projectNumber": "J1733",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-11-17T05:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Allamakee",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lansing 161 kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1901,
      "normalized": {
        "queue_id": "J1988",
        "county": "Coahoma",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Roundaway Cepa 115kV",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.96,
        "summer_net_mw": 120.96,
        "winter_net_mw": 120.96,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491532,
        "projectNumber": "J1988",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Coahoma",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Roundaway Cepa 115kV",
        "summerNetMW": 120.96,
        "winterNetMW": 120.96,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1902,
      "normalized": {
        "queue_id": "J1831",
        "county": "Menard",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Shockey 138kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-08-15T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 175.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491533,
        "projectNumber": "J1831",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "negInService": "2026-08-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Menard",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Shockey 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 175.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1903,
      "normalized": {
        "queue_id": "J1991",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Genpower Keo 500kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491534,
        "projectNumber": "J1991",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Genpower Keo 500kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1904,
      "normalized": {
        "queue_id": "J1833",
        "county": "Lafourche",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Leeville 115kV",
        "queue_date": "2021-10-19T04:00:00+00:00",
        "withdrawn_date": "2026-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 115.1,
        "summer_net_mw": 115.1,
        "winter_net_mw": 115.1,
        "proposed_completion_date": "2025-10-01T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-19T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 115.1,
        "dp1_nris_mw": 115.1,
        "dp2_eris_mw": 115.1,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491535,
        "projectNumber": "J1833",
        "queueDate": "2021-10-19T04:00:00+00:00",
        "withdrawnDate": "2026-07-30T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "giaToExec": "2023-01-19T05:00:00+00:00",
        "negInService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Lafourche",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Leeville 115kV",
        "summerNetMW": 115.1,
        "winterNetMW": 115.1,
        "dp1ErisMw": 115.1,
        "dp1NrisMw": 115.1,
        "dp2ErisMw": 115.1,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1905,
      "normalized": {
        "queue_id": "J1737",
        "county": "Rush",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gwynville 345 kV",
        "queue_date": "2021-10-22T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 210.0,
        "summer_net_mw": 210.0,
        "winter_net_mw": 210.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491536,
        "projectNumber": "J1737",
        "queueDate": "2021-10-22T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Rush",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gwynville 345 kV",
        "summerNetMW": 210.0,
        "winterNetMW": 210.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1906,
      "normalized": {
        "queue_id": "J1836",
        "county": "Callaway",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Montgomery- Callaway- 7",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2027-12-30T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 275.0,
        "dp2_nris_mw": 275.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491537,
        "projectNumber": "J1836",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "negInService": "2027-12-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Callaway",
        "state": "MO",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Montgomery- Callaway- 7",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 275.0,
        "dp2NrisMw": 275.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1907,
      "normalized": {
        "queue_id": "J1958",
        "county": "St. John the Baptist",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Waterford 230kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491538,
        "projectNumber": "J1958",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. John the Baptist",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Waterford 230kV",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1908,
      "normalized": {
        "queue_id": "J1964",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "N Madison - Columbia",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 90.0,
        "dp1_nris_mw": 90.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491539,
        "projectNumber": "J1964",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "N Madison - Columbia",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 90.0,
        "dp1NrisMw": 90.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1909,
      "normalized": {
        "queue_id": "J1965",
        "county": "Callaway",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "7MCCREDIE - 7MONTGMRY 345.0kV",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491540,
        "projectNumber": "J1965",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Callaway",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7MCCREDIE - 7MONTGMRY 345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1910,
      "normalized": {
        "queue_id": "J1967",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Rantoul East 138kV",
        "queue_date": "2022-03-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 45.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491541,
        "projectNumber": "J1967",
        "queueDate": "2022-03-24T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rantoul East 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 45.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1911,
      "normalized": {
        "queue_id": "J1971",
        "county": "Dane",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Cardinal",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2023-06-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491542,
        "projectNumber": "J1971",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2023-06-05T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dane",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Cardinal",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1912,
      "normalized": {
        "queue_id": "J1973",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4SIDNEY 1 - 4MIRA TAP 138.0kV",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 40.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491543,
        "projectNumber": "J1973",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4SIDNEY 1 - 4MIRA TAP 138.0kV",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 40.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1913,
      "normalized": {
        "queue_id": "J1989",
        "county": "Brown",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Ellendale 345 - Twin Brooks 345.0kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491544,
        "projectNumber": "J1989",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Brown",
        "state": "SD",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale 345 - Twin Brooks 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1914,
      "normalized": {
        "queue_id": "J1990",
        "county": "Stutsman",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Ellendale 345kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 215.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491545,
        "projectNumber": "J1990",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Stutsman",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale 345kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 215.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1915,
      "normalized": {
        "queue_id": "J1974",
        "county": "Coles",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mattoon West",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491546,
        "projectNumber": "J1974",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Coles",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mattoon West",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1916,
      "normalized": {
        "queue_id": "J1979",
        "county": "Howard",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Hazleton-Mitchell County 345kV line",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491547,
        "projectNumber": "J1979",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Howard",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hazleton-Mitchell County 345kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1917,
      "normalized": {
        "queue_id": "J1735",
        "county": "Rock",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "J1304 POI 138 kV Substation",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2023-06-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491548,
        "projectNumber": "J1735",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2023-06-22T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Rock",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "J1304 POI 138 kV Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1918,
      "normalized": {
        "queue_id": "J1832",
        "county": "St. Landry",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Plaisance 138kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 145.09,
        "summer_net_mw": 145.09,
        "winter_net_mw": 145.09,
        "proposed_completion_date": "2024-07-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": "2022-08-10T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 145.0,
        "dp2_nris_mw": 90.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491549,
        "projectNumber": "J1832",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "giaToExec": "2022-08-10T04:00:00+00:00",
        "negInService": "2024-07-15T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Landry",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Plaisance 138kV",
        "summerNetMW": 145.09,
        "winterNetMW": 145.09,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 145.0,
        "dp2NrisMw": 90.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 1919,
      "normalized": {
        "queue_id": "J1980",
        "county": "Kent",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Vergennes 138kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491550,
        "projectNumber": "J1980",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Kent",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Vergennes 138kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1920,
      "normalized": {
        "queue_id": "J1731",
        "county": "Madison",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Noblesville to Fall Creek 345 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-03-12T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491551,
        "projectNumber": "J1731",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-03-12T05:00:00+00:00",
        "inService": "2022-02-01T05:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Madison",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Noblesville to Fall Creek 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1921,
      "normalized": {
        "queue_id": "J1834",
        "county": "Orange",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Sabine 138/230 kV Substation",
        "queue_date": "2021-12-16T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 126.0,
        "summer_net_mw": 66.7,
        "winter_net_mw": 126.0,
        "proposed_completion_date": "2025-05-25T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-25T04:00:00+00:00",
        "gia_to_execute": "2023-01-18T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 126.0,
        "dp1_nris_mw": 66.7,
        "dp2_eris_mw": 126.0,
        "dp2_nris_mw": 66.7,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491552,
        "projectNumber": "J1834",
        "queueDate": "2021-12-16T05:00:00+00:00",
        "inService": "2025-04-25T04:00:00+00:00",
        "giaToExec": "2023-01-18T05:00:00+00:00",
        "negInService": "2025-05-25T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Orange",
        "state": "TX",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sabine 138/230 kV Substation",
        "summerNetMW": 66.7,
        "winterNetMW": 126.0,
        "dp1ErisMw": 126.0,
        "dp1NrisMw": 66.7,
        "dp2ErisMw": 126.0,
        "dp2NrisMw": 66.7,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1922,
      "normalized": {
        "queue_id": "J1739",
        "county": "Waushara",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sand Lake 138kV Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-02-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491553,
        "projectNumber": "J1739",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-02-23T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Waushara",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Sand Lake 138kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1923,
      "normalized": {
        "queue_id": "J1983",
        "county": "Dane",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "N. Madison 69kV",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 25.0,
        "dp1_nris_mw": 25.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491554,
        "projectNumber": "J1983",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dane",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "N. Madison 69kV",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 25.0,
        "dp1NrisMw": 25.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1924,
      "normalized": {
        "queue_id": "J1985",
        "county": "Tangipahoa",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Chicken Farm - Amite",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491555,
        "projectNumber": "J1985",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Tangipahoa",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Chicken Farm - Amite",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1925,
      "normalized": {
        "queue_id": "J1838",
        "county": "Dane",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Christiana 138 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-02-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 320.0,
        "summer_net_mw": 320.0,
        "winter_net_mw": 320.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-02-12T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491556,
        "projectNumber": "J1838",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-02-23T05:00:00+00:00",
        "inService": "2025-02-12T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dane",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Christiana 138 kV",
        "summerNetMW": 320.0,
        "winterNetMW": 320.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1926,
      "normalized": {
        "queue_id": "J1742",
        "county": "Porter",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Babcock - Lake George 345 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-12-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 294.1,
        "summer_net_mw": 294.1,
        "winter_net_mw": 294.1,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491557,
        "projectNumber": "J1742",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-12-14T05:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Porter",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Babcock - Lake George 345 kV",
        "summerNetMW": 294.1,
        "winterNetMW": 294.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1927,
      "normalized": {
        "queue_id": "J1975",
        "county": "Coles",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mattoon West",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 40.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491558,
        "projectNumber": "J1975",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Coles",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mattoon West",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 40.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1928,
      "normalized": {
        "queue_id": "J1976",
        "county": "Porter",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Starke - Flint Lake 138kV",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491559,
        "projectNumber": "J1976",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Porter",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Starke - Flint Lake 138kV",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1929,
      "normalized": {
        "queue_id": "J1978",
        "county": "Pocahontas",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Lemars Tap-Little Sioux 161kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 52.5,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491560,
        "projectNumber": "J1978",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Pocahontas",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lemars Tap-Little Sioux 161kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 52.5,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1930,
      "normalized": {
        "queue_id": "J1984",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Tallmadge 138kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2026-01-27T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491561,
        "projectNumber": "J1984",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2026-01-27T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Tallmadge 138kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1931,
      "normalized": {
        "queue_id": "J1986",
        "county": "St. Charles",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Montgomery 161kV",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491562,
        "projectNumber": "J1986",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "St. Charles",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Montgomery 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1932,
      "normalized": {
        "queue_id": "J1734",
        "county": "Lee",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Burlington Generation - Wever 161kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2024-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service (with Provisional GIA)",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491563,
        "projectNumber": "J1734",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "negInService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Lee",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Burlington Generation - Wever 161kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service (with Provisional GIA)"
      }
    },
    {
      "source_row_number": 1933,
      "normalized": {
        "queue_id": "J1835",
        "county": "Spencer",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Culley to Grandview 138 KV line tap",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491564,
        "projectNumber": "J1835",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Spencer",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Culley to Grandview 138 KV line tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1934,
      "normalized": {
        "queue_id": "J1741",
        "county": "Cass",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Walton 345kV  Substation",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 270.0,
        "summer_net_mw": 270.0,
        "winter_net_mw": 270.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491565,
        "projectNumber": "J1741",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-03T05:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Cass",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Walton 345kV  Substation",
        "summerNetMW": 270.0,
        "winterNetMW": 270.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1935,
      "normalized": {
        "queue_id": "J1841",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Forrest City to Wynne S 161 KV Line",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 52.0,
        "summer_net_mw": 52.0,
        "winter_net_mw": 52.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491566,
        "projectNumber": "J1841",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Forrest City to Wynne S 161 KV Line",
        "summerNetMW": 52.0,
        "winterNetMW": 52.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1936,
      "normalized": {
        "queue_id": "J1746",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia 138 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2028-06-12T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491567,
        "projectNumber": "J1746",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "negInService": "2028-06-12T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Columbia 138 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1937,
      "normalized": {
        "queue_id": "J1847",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Murphy Creek 161kV substation",
        "queue_date": "2021-08-09T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491568,
        "projectNumber": "J1847",
        "queueDate": "2021-08-09T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Murphy Creek 161kV substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1938,
      "normalized": {
        "queue_id": "J1848",
        "county": "Van Buren",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Covert",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2023-08-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1235.0,
        "summer_net_mw": 1128.0,
        "winter_net_mw": 1235.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491569,
        "projectNumber": "J1848",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2023-08-15T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Van Buren",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS-Only",
        "poiName": "Covert",
        "summerNetMW": 1128.0,
        "winterNetMW": 1235.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1939,
      "normalized": {
        "queue_id": "J1736",
        "county": "Dubois",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Duff 138kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491570,
        "projectNumber": "J1736",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Dubois",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Duff 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1940,
      "normalized": {
        "queue_id": "J1738",
        "county": "McPherson",
        "state": "SD",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Leola Substation 41.6kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-05-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491571,
        "projectNumber": "J1738",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-02T05:00:00+00:00",
        "inService": "2023-05-15T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "McPherson",
        "state": "SD",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Leola Substation 41.6kV",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1941,
      "normalized": {
        "queue_id": "J1849",
        "county": "Hardin",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Cypress 230 kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-05-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491572,
        "projectNumber": "J1849",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "negInService": "2028-05-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Hardin",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Cypress 230 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1942,
      "normalized": {
        "queue_id": "J1852",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Bison 345 kV",
        "queue_date": "2022-06-16T04:00:00+00:00",
        "withdrawn_date": "2023-10-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491573,
        "projectNumber": "J1852",
        "queueDate": "2022-06-16T04:00:00+00:00",
        "withdrawnDate": "2023-10-09T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bison 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1943,
      "normalized": {
        "queue_id": "J1840",
        "county": "De Witt",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Clinton to Goose Creek-4545 345kV line",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491574,
        "projectNumber": "J1840",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-08-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "De Witt",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Clinton to Goose Creek-4545 345kV line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1944,
      "normalized": {
        "queue_id": "J1743",
        "county": "Miami",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Deedsville 345 kV Substation",
        "queue_date": "2022-04-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 292.9,
        "summer_net_mw": 292.9,
        "winter_net_mw": 292.9,
        "proposed_completion_date": "2026-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 292.89,
        "dp1_nris_mw": 292.89,
        "dp2_eris_mw": 292.89,
        "dp2_nris_mw": 292.89,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491575,
        "projectNumber": "J1743",
        "queueDate": "2022-04-06T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "negInService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Miami",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Deedsville 345 kV Substation",
        "summerNetMW": 292.9,
        "winterNetMW": 292.9,
        "dp1ErisMw": 292.89,
        "dp1NrisMw": 292.89,
        "dp2ErisMw": 292.89,
        "dp2NrisMw": 292.89,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1945,
      "normalized": {
        "queue_id": "J1744",
        "county": "Cumberland",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hutsonville - Neoga 138 kV",
        "queue_date": "2022-04-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 149.5,
        "summer_net_mw": 149.5,
        "winter_net_mw": 149.5,
        "proposed_completion_date": "2027-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 149.5,
        "dp1_nris_mw": 149.5,
        "dp2_eris_mw": 149.5,
        "dp2_nris_mw": 149.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491576,
        "projectNumber": "J1744",
        "queueDate": "2022-04-05T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "negInService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Cumberland",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hutsonville - Neoga 138 kV",
        "summerNetMW": 149.5,
        "winterNetMW": 149.5,
        "dp1ErisMw": 149.5,
        "dp1NrisMw": 149.5,
        "dp2ErisMw": 149.5,
        "dp2NrisMw": 149.5,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1946,
      "normalized": {
        "queue_id": "J1842",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "FORREST CITY N SS - WYNNE SOUTH 161.0kV",
        "queue_date": "2021-10-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": "2024-10-31T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-02-02T05:00:00+00:00",
        "gia_to_execute": "2022-11-17T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 135.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491577,
        "projectNumber": "J1842",
        "queueDate": "2021-10-19T04:00:00+00:00",
        "inService": "2026-02-02T05:00:00+00:00",
        "giaToExec": "2022-11-17T05:00:00+00:00",
        "negInService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "FORREST CITY N SS - WYNNE SOUTH 161.0kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 135.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1947,
      "normalized": {
        "queue_id": "J1740",
        "county": "Walworth",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "University to Mukwanago 138kV Line",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491578,
        "projectNumber": "J1740",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Walworth",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "University to Mukwanago 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1948,
      "normalized": {
        "queue_id": "J1837",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Pana - Route 51 138kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-03-12T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491579,
        "projectNumber": "J1837",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-03-12T05:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pana - Route 51 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1949,
      "normalized": {
        "queue_id": "J1853",
        "county": "Des Moines",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Denmark - Newport",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2023-10-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491580,
        "projectNumber": "J1853",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2023-10-09T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Des Moines",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Denmark - Newport",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1950,
      "normalized": {
        "queue_id": "J1856",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHOFFNER - NEWPORT",
        "queue_date": "2021-11-17T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 147.0,
        "dp1_nris_mw": 147.0,
        "dp2_eris_mw": 140.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491581,
        "projectNumber": "J1856",
        "queueDate": "2021-11-17T05:00:00+00:00",
        "inService": "2026-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "SHOFFNER - NEWPORT",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 147.0,
        "dp1NrisMw": 147.0,
        "dp2ErisMw": 140.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1951,
      "normalized": {
        "queue_id": "J1846",
        "county": "Renville",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "PANTHER",
        "queue_date": "2021-07-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-12-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491582,
        "projectNumber": "J1846",
        "queueDate": "2021-07-22T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Renville",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PANTHER",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1952,
      "normalized": {
        "queue_id": "J1850",
        "county": "St. Martin",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Kirk - Cecelia 138kV Line",
        "queue_date": "2021-11-24T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491583,
        "projectNumber": "J1850",
        "queueDate": "2021-11-24T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Martin",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Kirk - Cecelia 138kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1953,
      "normalized": {
        "queue_id": "J1745",
        "county": "Winnebago",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Fitzgerald 138 kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2028-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491584,
        "projectNumber": "J1745",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "negInService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Winnebago",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fitzgerald 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1954,
      "normalized": {
        "queue_id": "J1844",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "19CVTRY",
        "queue_date": "2020-12-31T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2029-02-06T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491585,
        "projectNumber": "J1844",
        "queueDate": "2020-12-31T05:00:00+00:00",
        "inService": "2024-10-07T04:00:00+00:00",
        "negInService": "2029-02-06T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "19CVTRY",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1955,
      "normalized": {
        "queue_id": "J1851",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "CROSSETT NORTH - BEEKMAN 115.0kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": "2026-11-15T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 195.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 185.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491586,
        "projectNumber": "J1851",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "negInService": "2026-11-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "CROSSETT NORTH - BEEKMAN 115.0kV",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 195.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 185.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1956,
      "normalized": {
        "queue_id": "J1750",
        "county": "Marquette",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Other_",
        "queue_date": "2022-04-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 149.7,
        "summer_net_mw": 149.7,
        "winter_net_mw": 149.7,
        "proposed_completion_date": "2026-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 149.7,
        "dp1_nris_mw": 149.7,
        "dp2_eris_mw": 149.7,
        "dp2_nris_mw": 149.7,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491587,
        "projectNumber": "J1750",
        "queueDate": "2022-04-06T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "negInService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marquette",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 149.7,
        "winterNetMW": 149.7,
        "dp1ErisMw": 149.7,
        "dp1NrisMw": 149.7,
        "dp2ErisMw": 149.7,
        "dp2NrisMw": 149.7,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1957,
      "normalized": {
        "queue_id": "J1855",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MALLORY 161",
        "queue_date": "2021-11-17T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 500.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491588,
        "projectNumber": "J1855",
        "queueDate": "2021-11-17T05:00:00+00:00",
        "inService": "2026-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "MALLORY 161",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 500.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1958,
      "normalized": {
        "queue_id": "J1857",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "EBONY SS -  5WM LEHI-W",
        "queue_date": "2021-11-17T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491589,
        "projectNumber": "J1857",
        "queueDate": "2021-11-17T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2026-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "EBONY SS -  5WM LEHI-W",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1959,
      "normalized": {
        "queue_id": "J1749",
        "county": "West Baton Rouge",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Addis - Big Cajun 230kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491590,
        "projectNumber": "J1749",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "West Baton Rouge",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Addis - Big Cajun 230kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1960,
      "normalized": {
        "queue_id": "J1751",
        "county": "Wood",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Saratoga - Badger West 138.0kV",
        "queue_date": "2022-04-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.5,
        "summer_net_mw": 150.5,
        "winter_net_mw": 150.5,
        "proposed_completion_date": "2026-05-02T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.5,
        "dp1_nris_mw": 150.5,
        "dp2_eris_mw": 150.5,
        "dp2_nris_mw": 150.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491591,
        "projectNumber": "J1751",
        "queueDate": "2022-04-06T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "negInService": "2026-05-02T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Wood",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Saratoga - Badger West 138.0kV",
        "summerNetMW": 150.5,
        "winterNetMW": 150.5,
        "dp1ErisMw": 150.5,
        "dp1NrisMw": 150.5,
        "dp2ErisMw": 150.5,
        "dp2NrisMw": 150.5,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1961,
      "normalized": {
        "queue_id": "J1863",
        "county": "Otsego",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Vantyle 138kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": "2026-06-12T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 60.0,
        "dp2_nris_mw": 60.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491592,
        "projectNumber": "J1863",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "negInService": "2026-06-12T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Otsego",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Vantyle 138kV",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 60.0,
        "dp2NrisMw": 60.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1962,
      "normalized": {
        "queue_id": "J1867",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Quinn",
        "queue_date": "2021-11-22T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491593,
        "projectNumber": "J1867",
        "queueDate": "2021-11-22T05:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Quinn",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1963,
      "normalized": {
        "queue_id": "J1755",
        "county": "Bureau",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Bureau County 138 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 147.2,
        "summer_net_mw": 147.2,
        "winter_net_mw": 147.2,
        "proposed_completion_date": "2025-08-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 147.19,
        "dp1_nris_mw": 147.19,
        "dp2_eris_mw": 147.19,
        "dp2_nris_mw": 147.19,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491594,
        "projectNumber": "J1755",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2022-08-01T04:00:00+00:00",
        "negInService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Bureau",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Bureau County 138 kV",
        "summerNetMW": 147.2,
        "winterNetMW": 147.2,
        "dp1ErisMw": 147.19,
        "dp1NrisMw": 147.19,
        "dp2ErisMw": 147.19,
        "dp2NrisMw": 147.19,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1964,
      "normalized": {
        "queue_id": "J1869",
        "county": "Winn",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Winnfield to Standard 115kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 78.0,
        "summer_net_mw": 78.0,
        "winter_net_mw": 78.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491595,
        "projectNumber": "J1869",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Winn",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Winnfield to Standard 115kV",
        "summerNetMW": 78.0,
        "winterNetMW": 78.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1965,
      "normalized": {
        "queue_id": "J1753",
        "county": "Green",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia-South Fond du Lac 345kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-12-01T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491596,
        "projectNumber": "J1753",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-12-01T05:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Green",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Columbia-South Fond du Lac 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1966,
      "normalized": {
        "queue_id": "J1860",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Morocco to Beecher 138kV (8.36 miles from Morocco)",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2025-03-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491597,
        "projectNumber": "J1860",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2025-03-03T05:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Morocco to Beecher 138kV (8.36 miles from Morocco)",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1967,
      "normalized": {
        "queue_id": "J1870",
        "county": "Tangipahoa",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Independence Substation 230kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-05-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 180.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491598,
        "projectNumber": "J1870",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "negInService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Tangipahoa",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Independence Substation 230kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 180.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1968,
      "normalized": {
        "queue_id": "J1873",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado 500kV Substation",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2028-11-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491599,
        "projectNumber": "J1873",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "negInService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "El Dorado 500kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1969,
      "normalized": {
        "queue_id": "J1861",
        "county": "LaPorte",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "STILLWELL - L.N.G. PLANT 138.0kV",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 45.0,
        "dp1_nris_mw": 45.0,
        "dp2_eris_mw": 45.0,
        "dp2_nris_mw": 45.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491600,
        "projectNumber": "J1861",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaPorte",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STILLWELL - L.N.G. PLANT 138.0kV",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 45.0,
        "dp1NrisMw": 45.0,
        "dp2ErisMw": 45.0,
        "dp2NrisMw": 45.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1970,
      "normalized": {
        "queue_id": "J1754",
        "county": "McHenry",
        "state": "ND",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "McHenry ND",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2022-12-12T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491601,
        "projectNumber": "J1754",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2022-12-12T05:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "McHenry",
        "state": "ND",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "McHenry ND",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1971,
      "normalized": {
        "queue_id": "J1880",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Argenta to Tallmadge 345kV (33 miles from Argenta)",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": "2027-09-15T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 60.0,
        "dp2_nris_mw": 60.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491602,
        "projectNumber": "J1880",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "negInService": "2027-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Argenta to Tallmadge 345kV (33 miles from Argenta)",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 60.0,
        "dp2NrisMw": 60.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1972,
      "normalized": {
        "queue_id": "J1882",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "San Jose Rail 138kV",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Transfer",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 45.0,
        "dp1_nris_mw": 45.0,
        "dp2_eris_mw": 45.0,
        "dp2_nris_mw": 45.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491603,
        "projectNumber": "J1882",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "San Jose Rail 138kV",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 45.0,
        "dp1NrisMw": 45.0,
        "dp2ErisMw": 45.0,
        "dp2NrisMw": 45.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Transfer",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1973,
      "normalized": {
        "queue_id": "J1866",
        "county": "Clark",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "T Corners 115kV Sub",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2023-10-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491604,
        "projectNumber": "J1866",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2023-10-09T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Clark",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "T Corners 115kV Sub",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1974,
      "normalized": {
        "queue_id": "J1868",
        "county": "Winn",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Winnfield to Standard 115kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 260.0,
        "summer_net_mw": 260.0,
        "winter_net_mw": 260.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491605,
        "projectNumber": "J1868",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Winn",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Winnfield to Standard 115kV",
        "summerNetMW": 260.0,
        "winterNetMW": 260.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1975,
      "normalized": {
        "queue_id": "J1762",
        "county": "Iron",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Crystal Falls - Aspen 69 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-02-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 22.5,
        "summer_net_mw": 22.5,
        "winter_net_mw": 22.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491606,
        "projectNumber": "J1762",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-02-19T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Iron",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crystal Falls - Aspen 69 kV",
        "summerNetMW": 22.5,
        "winterNetMW": 22.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1976,
      "normalized": {
        "queue_id": "J1883",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Rilla 115kV",
        "queue_date": "2021-07-21T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491607,
        "projectNumber": "J1883",
        "queueDate": "2021-07-21T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2023-06-10T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS-Only",
        "poiName": "Rilla 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1977,
      "normalized": {
        "queue_id": "J1756",
        "county": "Shelby",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Gwynneville to Sunnyside 345kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 309.0,
        "summer_net_mw": 309.0,
        "winter_net_mw": 309.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491608,
        "projectNumber": "J1756",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2023-03-31T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Shelby",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gwynneville to Sunnyside 345kV",
        "summerNetMW": 309.0,
        "winterNetMW": 309.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1978,
      "normalized": {
        "queue_id": "J1871",
        "county": "Tangipahoa",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Independence Substation 230kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491609,
        "projectNumber": "J1871",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Tangipahoa",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Independence Substation 230kV",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1979,
      "normalized": {
        "queue_id": "J1839",
        "county": "Macon",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Decatur ADM North 138 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 340.3,
        "summer_net_mw": 325.0,
        "winter_net_mw": 340.3,
        "proposed_completion_date": "2026-11-01T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 340.3,
        "dp1_nris_mw": 340.3,
        "dp2_eris_mw": 340.3,
        "dp2_nris_mw": 340.3,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491610,
        "projectNumber": "J1839",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2027-01-01T05:00:00+00:00",
        "negInService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macon",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Decatur ADM North 138 kV",
        "summerNetMW": 325.0,
        "winterNetMW": 340.3,
        "dp1ErisMw": 340.3,
        "dp1NrisMw": 340.3,
        "dp2ErisMw": 340.3,
        "dp2NrisMw": 340.3,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1980,
      "normalized": {
        "queue_id": "J1843",
        "county": "Dane",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Christiana 138 kV",
        "queue_date": "2022-01-06T05:00:00+00:00",
        "withdrawn_date": "2023-06-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 12.0,
        "summer_net_mw": 12.0,
        "winter_net_mw": 12.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-03-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 12.0,
        "dp1_nris_mw": 12.0,
        "dp2_eris_mw": 12.0,
        "dp2_nris_mw": 12.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491611,
        "projectNumber": "J1843",
        "queueDate": "2022-01-06T05:00:00+00:00",
        "withdrawnDate": "2023-06-22T04:00:00+00:00",
        "inService": "2023-03-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dane",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Christiana 138 kV",
        "summerNetMW": 12.0,
        "winterNetMW": 12.0,
        "dp1ErisMw": 12.0,
        "dp1NrisMw": 12.0,
        "dp2ErisMw": 12.0,
        "dp2NrisMw": 12.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1981,
      "normalized": {
        "queue_id": "J1845",
        "county": "Calhoun",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "18BATTLC",
        "queue_date": "2020-12-31T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2028-08-29T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491612,
        "projectNumber": "J1845",
        "queueDate": "2020-12-31T05:00:00+00:00",
        "inService": "2025-10-06T04:00:00+00:00",
        "negInService": "2028-08-29T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "18BATTLC",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1982,
      "normalized": {
        "queue_id": "J1747",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "J830 POI",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2024-07-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2022-02-28T05:00:00+00:00",
        "gia_to_execute": "2022-12-02T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491613,
        "projectNumber": "J1747",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2022-02-28T05:00:00+00:00",
        "giaToExec": "2022-12-02T05:00:00+00:00",
        "negInService": "2024-07-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "J830 POI",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1983,
      "normalized": {
        "queue_id": "J1758",
        "county": "Barnes",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Pillsburry Substation  230kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 42.0,
        "summer_net_mw": 42.0,
        "winter_net_mw": 42.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491614,
        "projectNumber": "J1758",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Barnes",
        "state": "ND",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pillsburry Substation  230kV",
        "summerNetMW": 42.0,
        "winterNetMW": 42.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1984,
      "normalized": {
        "queue_id": "J1874",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado 500kV Substation",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491615,
        "projectNumber": "J1874",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "El Dorado 500kV Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1985,
      "normalized": {
        "queue_id": "J1752",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Golden Sands - Arnott (O-119)",
        "queue_date": "2022-05-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 148.1,
        "summer_net_mw": 148.1,
        "winter_net_mw": 148.1,
        "proposed_completion_date": "2026-08-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 148.1,
        "dp1_nris_mw": 148.1,
        "dp2_eris_mw": 148.1,
        "dp2_nris_mw": 148.1,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491616,
        "projectNumber": "J1752",
        "queueDate": "2022-05-06T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "negInService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Golden Sands - Arnott (O-119)",
        "summerNetMW": 148.1,
        "winterNetMW": 148.1,
        "dp1ErisMw": 148.1,
        "dp1NrisMw": 148.1,
        "dp2ErisMw": 148.1,
        "dp2NrisMw": 148.1,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 1986,
      "normalized": {
        "queue_id": "J1862",
        "county": "Clinton",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Bingham West 138kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2025-03-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 45.0,
        "dp1_nris_mw": 45.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491617,
        "projectNumber": "J1862",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2025-03-03T05:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Clinton",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Bingham West 138kV",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 45.0,
        "dp1NrisMw": 45.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1987,
      "normalized": {
        "queue_id": "J1858",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS INC. EAI",
        "poi": "Sandy Bayou",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 440.0,
        "summer_net_mw": 440.0,
        "winter_net_mw": 440.0,
        "proposed_completion_date": "2028-03-20T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 440.0,
        "dp1_nris_mw": 440.0,
        "dp2_eris_mw": 440.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491618,
        "projectNumber": "J1858",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "inService": "2026-04-15T04:00:00+00:00",
        "negInService": "2028-03-20T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS INC. EAI",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Sandy Bayou",
        "summerNetMW": 440.0,
        "winterNetMW": 440.0,
        "dp1ErisMw": 440.0,
        "dp1NrisMw": 440.0,
        "dp2ErisMw": 440.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1988,
      "normalized": {
        "queue_id": "J1759",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Fisher to Mansfield Compressor 230 kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2025-03-01T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-01-15T05:00:00+00:00",
        "gia_to_execute": "2023-08-04T04:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491619,
        "projectNumber": "J1759",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2024-01-15T05:00:00+00:00",
        "giaToExec": "2023-08-04T04:00:00+00:00",
        "negInService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Fisher to Mansfield Compressor 230 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1989,
      "normalized": {
        "queue_id": "J1757",
        "county": "Coles",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Kansas - Faraday 345 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491620,
        "projectNumber": "J1757",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-14T05:00:00+00:00",
        "inService": "2023-04-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Coles",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kansas - Faraday 345 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1990,
      "normalized": {
        "queue_id": "J1872",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado 500kV Substation",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2028-11-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491621,
        "projectNumber": "J1872",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "negInService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "El Dorado 500kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1991,
      "normalized": {
        "queue_id": "J1760",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Timberland 230kV",
        "queue_date": "2020-06-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 205.0,
        "summer_net_mw": 205.0,
        "winter_net_mw": 205.0,
        "proposed_completion_date": "2023-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-18T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 215.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 205.0,
        "dp2_nris_mw": 60.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491622,
        "projectNumber": "J1760",
        "queueDate": "2020-06-15T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2023-01-18T05:00:00+00:00",
        "negInService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Timberland 230kV",
        "summerNetMW": 205.0,
        "winterNetMW": 205.0,
        "dp1ErisMw": 215.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 205.0,
        "dp2NrisMw": 60.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1992,
      "normalized": {
        "queue_id": "J1885",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "REID EHV 345 KV SUBSTATION",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491623,
        "projectNumber": "J1885",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REID EHV 345 KV SUBSTATION",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1993,
      "normalized": {
        "queue_id": "J1875",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado 500kV Substation",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491624,
        "projectNumber": "J1875",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "El Dorado 500kV Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1994,
      "normalized": {
        "queue_id": "J1876",
        "county": "Decatur",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greensburg",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491625,
        "projectNumber": "J1876",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Decatur",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greensburg",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1995,
      "normalized": {
        "queue_id": "J1765",
        "county": "Tipton",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Tipton West Substation 230kV",
        "queue_date": "2020-06-11T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 93.2,
        "summer_net_mw": 93.2,
        "winter_net_mw": 93.2,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491626,
        "projectNumber": "J1765",
        "queueDate": "2020-06-11T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Tipton",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Tipton West Substation 230kV",
        "summerNetMW": 93.2,
        "winterNetMW": 93.2,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1996,
      "normalized": {
        "queue_id": "J1895",
        "county": "Kenosha",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Balsam",
        "queue_date": "2023-10-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491627,
        "projectNumber": "J1895",
        "queueDate": "2023-10-03T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Kenosha",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Balsam",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1997,
      "normalized": {
        "queue_id": "J1761",
        "county": "Barnes",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Maple River 230kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 39.0,
        "summer_net_mw": 39.0,
        "winter_net_mw": 39.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491628,
        "projectNumber": "J1761",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Barnes",
        "state": "ND",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "E-NRIS",
        "poiName": "Maple River 230kV",
        "summerNetMW": 39.0,
        "winterNetMW": 39.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1998,
      "normalized": {
        "queue_id": "J1763",
        "county": "Cavalier",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Langdon Substation 115kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-12-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 33.0,
        "summer_net_mw": 33.0,
        "winter_net_mw": 33.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491629,
        "projectNumber": "J1763",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-12-21T05:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Cavalier",
        "state": "ND",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Langdon Substation 115kV",
        "summerNetMW": 33.0,
        "winterNetMW": 33.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 1999,
      "normalized": {
        "queue_id": "J1897",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "DELL EHV - SAN SOUCI 500.0kV",
        "queue_date": "2021-12-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": "2027-10-22T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 500.0,
        "dp2_nris_mw": 425.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491630,
        "projectNumber": "J1897",
        "queueDate": "2021-12-14T05:00:00+00:00",
        "inService": "2024-08-15T04:00:00+00:00",
        "negInService": "2027-10-22T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "DELL EHV - SAN SOUCI 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 500.0,
        "dp2NrisMw": 425.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2000,
      "normalized": {
        "queue_id": "J1903",
        "county": "Osceola",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Osceola (43.431167, -95.416667)",
        "queue_date": "2021-08-03T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491631,
        "projectNumber": "J1903",
        "queueDate": "2021-08-03T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Osceola",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "Osceola (43.431167, -95.416667)",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2001,
      "normalized": {
        "queue_id": "J1884",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia 345 kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491632,
        "projectNumber": "J1884",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Columbia 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2002,
      "normalized": {
        "queue_id": "J1886",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "REID EHV 345 KV SUBSTATION",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2022-11-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491633,
        "projectNumber": "J1886",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2022-11-22T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REID EHV 345 KV SUBSTATION",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2003,
      "normalized": {
        "queue_id": "J1904",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Richard 138 kV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2028-11-08T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-08T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491634,
        "projectNumber": "J1904",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "inService": "2025-11-08T05:00:00+00:00",
        "negInService": "2028-11-08T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Richard 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2004,
      "normalized": {
        "queue_id": "J1905",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Banner-Rapson 345kV Transmission Line",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491635,
        "projectNumber": "J1905",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Banner-Rapson 345kV Transmission Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2005,
      "normalized": {
        "queue_id": "J1877",
        "county": "Decatur",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greensburg 138kV",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491636,
        "projectNumber": "J1877",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Decatur",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greensburg 138kV",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2006,
      "normalized": {
        "queue_id": "J1893",
        "county": "Morton",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Mandan 230 kV",
        "queue_date": "2021-11-01T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491637,
        "projectNumber": "J1893",
        "queueDate": "2021-11-01T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-04-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Morton",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mandan 230 kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2007,
      "normalized": {
        "queue_id": "J1888",
        "county": "Oliver",
        "state": "ND",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Square Butte 230 kV Substation East",
        "queue_date": "2022-01-25T05:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491638,
        "projectNumber": "J1888",
        "queueDate": "2022-01-25T05:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-04-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Oliver",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Square Butte 230 kV Substation East",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2008,
      "normalized": {
        "queue_id": "J1889",
        "county": "Linn",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Mount Vernon",
        "queue_date": "2021-08-04T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": "2030-01-03T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 60.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 60.0,
        "dp2_nris_mw": 60.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491639,
        "projectNumber": "J1889",
        "queueDate": "2021-08-04T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "negInService": "2030-01-03T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mount Vernon",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 60.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 60.0,
        "dp2NrisMw": 60.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2009,
      "normalized": {
        "queue_id": "J1910",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gallagher-Tittabawassee 345kV Transmission Line",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491640,
        "projectNumber": "J1910",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Gallagher-Tittabawassee 345kV Transmission Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2010,
      "normalized": {
        "queue_id": "J1911",
        "county": "Livingston",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Madrid - Blackfoot 345kV",
        "queue_date": "2021-08-22T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491641,
        "projectNumber": "J1911",
        "queueDate": "2021-08-22T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Livingston",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Madrid - Blackfoot 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2011,
      "normalized": {
        "queue_id": "J1890",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "HARTBURG - AEP LAYFIELD 500.0kV",
        "queue_date": "2025-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 270.0,
        "summer_net_mw": 270.0,
        "winter_net_mw": 270.0,
        "proposed_completion_date": "2027-09-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 270.0,
        "dp1_nris_mw": 270.0,
        "dp2_eris_mw": 270.0,
        "dp2_nris_mw": 270.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491642,
        "projectNumber": "J1890",
        "queueDate": "2025-04-17T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "negInService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "HARTBURG - AEP LAYFIELD 500.0kV",
        "summerNetMW": 270.0,
        "winterNetMW": 270.0,
        "dp1ErisMw": 270.0,
        "dp1NrisMw": 270.0,
        "dp2ErisMw": 270.0,
        "dp2NrisMw": 270.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2012,
      "normalized": {
        "queue_id": "J1891",
        "county": "Attala",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "230 kV McAdams Substation",
        "queue_date": "2021-08-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-12-31T05:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491643,
        "projectNumber": "J1891",
        "queueDate": "2021-08-19T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Attala",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "230 kV McAdams Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2013,
      "normalized": {
        "queue_id": "J1767",
        "county": "Hancock",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Burt to Emery  161kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 37.0,
        "summer_net_mw": 37.0,
        "winter_net_mw": 37.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491644,
        "projectNumber": "J1767",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Hancock",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Burt to Emery  161kV",
        "summerNetMW": 37.0,
        "winterNetMW": 37.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2014,
      "normalized": {
        "queue_id": "J1899",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "DELL EHV - SAN SOUCI 500.0kV",
        "queue_date": "2021-12-22T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": "2027-10-22T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 500.0,
        "dp2_nris_mw": 425.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491645,
        "projectNumber": "J1899",
        "queueDate": "2021-12-22T05:00:00+00:00",
        "inService": "2024-08-15T04:00:00+00:00",
        "negInService": "2027-10-22T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "DELL EHV - SAN SOUCI 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 500.0,
        "dp2NrisMw": 425.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2015,
      "normalized": {
        "queue_id": "J1764",
        "county": "Perry",
        "state": "MO",
        "transmission_owner": "WABASH VALLEY POWER ASSOCIATION, INC.",
        "poi": "Seminary/Perryville 138kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2020-12-01T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491646,
        "projectNumber": "J1764",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2020-12-01T05:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "WABASH VALLEY POWER ASSOCIATION, INC.",
        "county": "Perry",
        "state": "MO",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Seminary/Perryville 138kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2016,
      "normalized": {
        "queue_id": "J1766",
        "county": "Fallon",
        "state": "MT",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Keystone XL (Pumping station - 14) - 115kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491647,
        "projectNumber": "J1766",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-11-17T05:00:00+00:00",
        "inService": "2023-10-15T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Fallon",
        "state": "MT",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Keystone XL (Pumping station - 14) - 115kV",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2017,
      "normalized": {
        "queue_id": "J1894",
        "county": "Kalamazoo",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Jaguar 138 kV",
        "queue_date": "2021-10-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2029-02-08T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491648,
        "projectNumber": "J1894",
        "queueDate": "2021-10-29T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "negInService": "2029-02-08T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Kalamazoo",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Jaguar 138 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2018,
      "normalized": {
        "queue_id": "J1769",
        "county": "Howard",
        "state": "IA",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Beaver Creek to Rice 161 kV line tap (same POI as J898)",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 80.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491649,
        "projectNumber": "J1769",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Howard",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Beaver Creek to Rice 161 kV line tap (same POI as J898)",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 80.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2019,
      "normalized": {
        "queue_id": "J1900",
        "county": "Wayne",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Brownstown 12  120kV",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-10-15T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491650,
        "projectNumber": "J1900",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "negInService": "2028-10-15T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Wayne",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Brownstown 12  120kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2020,
      "normalized": {
        "queue_id": "J1906",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BOGALUSA",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491651,
        "projectNumber": "J1906",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2022-12-02T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "BOGALUSA",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2021,
      "normalized": {
        "queue_id": "J1770",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hoopston 138kV",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491652,
        "projectNumber": "J1770",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Hoopston 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2022,
      "normalized": {
        "queue_id": "J1901",
        "county": "Webster",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "South Henderson",
        "queue_date": "2022-03-25T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491653,
        "projectNumber": "J1901",
        "queueDate": "2022-03-25T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Webster",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "South Henderson",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2023,
      "normalized": {
        "queue_id": "J1779",
        "county": "Dane",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Rockdale",
        "queue_date": "2021-09-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-10-27T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491654,
        "projectNumber": "J1779",
        "queueDate": "2021-09-01T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-10-27T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dane",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Rockdale",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2024,
      "normalized": {
        "queue_id": "J1922",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Cottage Grove-Karn 138 kV",
        "queue_date": "2021-08-19T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491655,
        "projectNumber": "J1922",
        "queueDate": "2021-08-19T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Cottage Grove-Karn 138 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2025,
      "normalized": {
        "queue_id": "J1925",
        "county": "Livingston",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Tihart-Latson 138 kV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491656,
        "projectNumber": "J1925",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Livingston",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Tihart-Latson 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2026,
      "normalized": {
        "queue_id": "J1784",
        "county": "Henry",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "New Castle to Hagerstown 69 kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 39.0,
        "summer_net_mw": 39.0,
        "winter_net_mw": 39.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491657,
        "projectNumber": "J1784",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Henry",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "New Castle to Hagerstown 69 kV",
        "summerNetMW": 39.0,
        "winterNetMW": 39.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2027,
      "normalized": {
        "queue_id": "J1902",
        "county": "Wayne",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "IRONTON",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-06-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491658,
        "projectNumber": "J1902",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "negInService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Wayne",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "IRONTON",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2028,
      "normalized": {
        "queue_id": "J1907",
        "county": "Newton",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Other",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491659,
        "projectNumber": "J1907",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2022-12-02T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Newton",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Other",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2029,
      "normalized": {
        "queue_id": "J1768",
        "county": "Orange",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Lost River Substation  345",
        "queue_date": "2020-06-16T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491660,
        "projectNumber": "J1768",
        "queueDate": "2020-06-16T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Orange",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Lost River Substation  345",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2030,
      "normalized": {
        "queue_id": "J1898",
        "county": "Olmsted",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Byron 161 kV",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-10-31T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491661,
        "projectNumber": "J1898",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "negInService": "2027-10-31T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Olmsted",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Byron 161 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 2031,
      "normalized": {
        "queue_id": "J1774",
        "county": "Warren",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Cayuga 345kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2023-07-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491662,
        "projectNumber": "J1774",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2023-07-20T04:00:00+00:00",
        "inService": "2023-05-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Warren",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Cayuga 345kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2032,
      "normalized": {
        "queue_id": "J1908",
        "county": "Evangeline",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cocodrie",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491663,
        "projectNumber": "J1908",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2022-12-02T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Cocodrie",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2033,
      "normalized": {
        "queue_id": "J1771",
        "county": "Cumberland",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Casey - Sullivan 345 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-03-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 197.3,
        "summer_net_mw": 197.3,
        "winter_net_mw": 197.3,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491664,
        "projectNumber": "J1771",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-03-15T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Cumberland",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Casey - Sullivan 345 kV",
        "summerNetMW": 197.3,
        "winterNetMW": 197.3,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2034,
      "normalized": {
        "queue_id": "J1772",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Reynolds 345KV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-03-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491665,
        "projectNumber": "J1772",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "negInService": "2026-03-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynolds 345KV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2035,
      "normalized": {
        "queue_id": "J1909",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gallagher-Tittabawassee 345kV Transmission Line",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491666,
        "projectNumber": "J1909",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Gallagher-Tittabawassee 345kV Transmission Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2036,
      "normalized": {
        "queue_id": "J1912",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Greenwood-Rapson 345kV Transmission Line",
        "queue_date": "2021-08-22T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491667,
        "projectNumber": "J1912",
        "queueDate": "2021-08-22T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Greenwood-Rapson 345kV Transmission Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2037,
      "normalized": {
        "queue_id": "J1776",
        "county": "Osceola",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Dickinson County Switch Yard 161kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 34.0,
        "summer_net_mw": 34.0,
        "winter_net_mw": 34.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491668,
        "projectNumber": "J1776",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Osceola",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Dickinson County Switch Yard 161kV",
        "summerNetMW": 34.0,
        "winterNetMW": 34.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2038,
      "normalized": {
        "queue_id": "J1918",
        "county": "Montcalm",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KENOWA - NELSON ROAD 345.0kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "LEGACY: Done",
        "capacity_mw": 132.0,
        "summer_net_mw": 132.0,
        "winter_net_mw": 132.0,
        "proposed_completion_date": "2026-01-09T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 132.0,
        "dp1_nris_mw": 132.0,
        "dp2_eris_mw": 132.0,
        "dp2_nris_mw": 132.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491669,
        "projectNumber": "J1918",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "negInService": "2026-01-09T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Montcalm",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "KENOWA - NELSON ROAD 345.0kV",
        "summerNetMW": 132.0,
        "winterNetMW": 132.0,
        "dp1ErisMw": 132.0,
        "dp1NrisMw": 132.0,
        "dp2ErisMw": 132.0,
        "dp2NrisMw": 132.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "LEGACY: Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 2039,
      "normalized": {
        "queue_id": "J1913",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Murphy-Tittabawassee 345kV Transmission Line",
        "queue_date": "2021-08-19T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491670,
        "projectNumber": "J1913",
        "queueDate": "2021-08-19T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Murphy-Tittabawassee 345kV Transmission Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2040,
      "normalized": {
        "queue_id": "J1777",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Aster 138kV Substation",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-12-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491671,
        "projectNumber": "J1777",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "negInService": "2026-12-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Aster 138kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2041,
      "normalized": {
        "queue_id": "J1914",
        "county": "Presque Isle",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "PORT CALCITE - ROCKPORT 138.0kV",
        "queue_date": "2023-10-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2026-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491672,
        "projectNumber": "J1914",
        "queueDate": "2023-10-05T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "negInService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Presque Isle",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "PORT CALCITE - ROCKPORT 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2042,
      "normalized": {
        "queue_id": "J1778",
        "county": "Kenosha",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Paris 138 kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2027-03-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491673,
        "projectNumber": "J1778",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-03-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Kenosha",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Paris 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2043,
      "normalized": {
        "queue_id": "J1785",
        "county": "LaPorte",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Maple 69 kV",
        "queue_date": "2022-01-11T05:00:00+00:00",
        "withdrawn_date": "2026-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-07-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 90.0,
        "dp2_nris_mw": 90.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491674,
        "projectNumber": "J1785",
        "queueDate": "2022-01-11T05:00:00+00:00",
        "withdrawnDate": "2026-01-09T05:00:00+00:00",
        "inService": "2024-07-12T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaPorte",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Maple 69 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 90.0,
        "dp2NrisMw": 90.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2044,
      "normalized": {
        "queue_id": "J1929",
        "county": "Cheboygan",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Other_",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": "2028-09-25T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 110.0,
        "dp1_nris_mw": 110.0,
        "dp2_eris_mw": 110.0,
        "dp2_nris_mw": 110.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491675,
        "projectNumber": "J1929",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "negInService": "2028-09-25T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Cheboygan",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 110.0,
        "dp1NrisMw": 110.0,
        "dp2ErisMw": 110.0,
        "dp2NrisMw": 110.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2045,
      "normalized": {
        "queue_id": "J1773",
        "county": "Lafayette",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Hill Valley to Cardinal 345kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2027-04-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 300.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491676,
        "projectNumber": "J1773",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "negInService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Lafayette",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hill Valley to Cardinal 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 300.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2046,
      "normalized": {
        "queue_id": "J1775",
        "county": "Calumet",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Forest Junction Substation 345kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-11-11T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491677,
        "projectNumber": "J1775",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-11-11T05:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Calumet",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Forest Junction Substation 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2047,
      "normalized": {
        "queue_id": "J1781",
        "county": "Iowa",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Hill Valley 345kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2027-04-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 300.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491678,
        "projectNumber": "J1781",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "negInService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Iowa",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Hill Valley 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 300.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 2048,
      "normalized": {
        "queue_id": "J1923",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Rapson 120 kV substation",
        "queue_date": "2021-08-19T04:00:00+00:00",
        "withdrawn_date": "2021-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491679,
        "projectNumber": "J1923",
        "queueDate": "2021-08-19T04:00:00+00:00",
        "withdrawnDate": "2021-12-22T05:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Rapson 120 kV substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2049,
      "normalized": {
        "queue_id": "J1786",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Merom (HED) 345.0kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491680,
        "projectNumber": "J1786",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "negInService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Merom (HED) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2050,
      "normalized": {
        "queue_id": "J1934",
        "county": "Kenosha",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Lakeview 138kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2028-10-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491681,
        "projectNumber": "J1934",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "negInService": "2028-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Kenosha",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Lakeview 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2051,
      "normalized": {
        "queue_id": "J1935",
        "county": "Dane",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "N. Madison 69kV",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491682,
        "projectNumber": "J1935",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dane",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "N. Madison 69kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2052,
      "normalized": {
        "queue_id": "J1790",
        "county": "Ashley",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Crossett - Monticello East 115 kV Line",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2023-02-16T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": "2022-11-28T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491683,
        "projectNumber": "J1790",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2023-02-16T05:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "giaToExec": "2022-11-28T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ashley",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Crossett - Monticello East 115 kV Line",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2053,
      "normalized": {
        "queue_id": "J1924",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Cottage Grove-Seven Mile 138 kV",
        "queue_date": "2021-08-22T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491684,
        "projectNumber": "J1924",
        "queueDate": "2021-08-22T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Cottage Grove-Seven Mile 138 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2054,
      "normalized": {
        "queue_id": "J1926",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mackinaw",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 60.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491685,
        "projectNumber": "J1926",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mackinaw",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 60.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2055,
      "normalized": {
        "queue_id": "J1915",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Almeda Junction-Shale 138kV Transmission Line",
        "queue_date": "2021-08-22T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491686,
        "projectNumber": "J1915",
        "queueDate": "2021-08-22T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Almeda Junction-Shale 138kV Transmission Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2056,
      "normalized": {
        "queue_id": "J1780",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2026-10-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-08-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2023-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491687,
        "projectNumber": "J1780",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2026-10-16T04:00:00+00:00",
        "inService": "2023-08-15T04:00:00+00:00",
        "negInService": "2026-08-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 2057,
      "normalized": {
        "queue_id": "J1787",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Beech Grove - Ray Braswell 115 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-09-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491688,
        "projectNumber": "J1787",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-09-22T04:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Beech Grove - Ray Braswell 115 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2058,
      "normalized": {
        "queue_id": "J1931",
        "county": "Iowa",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Hill Valley 345kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": "2027-07-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 40.0,
        "dp1_nris_mw": 12.0,
        "dp2_eris_mw": 40.0,
        "dp2_nris_mw": 12.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491689,
        "projectNumber": "J1931",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "negInService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Iowa",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Hill Valley 345kV",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 40.0,
        "dp1NrisMw": 12.0,
        "dp2ErisMw": 40.0,
        "dp2NrisMw": 12.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2059,
      "normalized": {
        "queue_id": "J1916",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "Michigan Electric Transmission Company LLC",
        "poi": "NEWTON",
        "queue_date": "2023-10-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-03-06T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491690,
        "projectNumber": "J1916",
        "queueDate": "2023-10-19T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "negInService": "2026-03-06T05:00:00+00:00",
        "transmissionOwner": "Michigan Electric Transmission Company LLC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "NEWTON",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2060,
      "normalized": {
        "queue_id": "J1917",
        "county": "Livingston",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "MADRID - MAJESTIC 345.0kV",
        "queue_date": "2021-08-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": "2028-01-14T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 165.0,
        "dp1_nris_mw": 165.0,
        "dp2_eris_mw": 148.5,
        "dp2_nris_mw": 148.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491691,
        "projectNumber": "J1917",
        "queueDate": "2021-08-19T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "negInService": "2028-01-14T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Livingston",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "MADRID - MAJESTIC 345.0kV",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 165.0,
        "dp1NrisMw": 165.0,
        "dp2ErisMw": 148.5,
        "dp2NrisMw": 148.5,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2061,
      "normalized": {
        "queue_id": "J1788",
        "county": "St. Mary",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Caneland 230 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-02-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491692,
        "projectNumber": "J1788",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-09-24T04:00:00+00:00",
        "inService": "2023-02-28T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Mary",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Caneland 230 kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2062,
      "normalized": {
        "queue_id": "J1791",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Gerald Andrus-Tinnin Road 230 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491693,
        "projectNumber": "J1791",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Gerald Andrus-Tinnin Road 230 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2063,
      "normalized": {
        "queue_id": "J1939",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "CORNELL - LAYTON 138.0kV",
        "queue_date": "2023-10-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": "2027-12-11T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 125.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491694,
        "projectNumber": "J1939",
        "queueDate": "2023-10-18T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "negInService": "2027-12-11T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "CORNELL - LAYTON 138.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 125.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2064,
      "normalized": {
        "queue_id": "J1940",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Monroe-Lallendorf 345kV Transmission Line",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491695,
        "projectNumber": "J1940",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Monroe-Lallendorf 345kV Transmission Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2065,
      "normalized": {
        "queue_id": "J1920",
        "county": "Leelanau",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Tuscola-Arrowhead 120kV Transmission Line",
        "queue_date": "2021-08-22T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491696,
        "projectNumber": "J1920",
        "queueDate": "2021-08-22T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Leelanau",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Tuscola-Arrowhead 120kV Transmission Line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2066,
      "normalized": {
        "queue_id": "J1782",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "WABASH RIVER GEN. STA. TO WHITESVILLE SOUTH SUB 230kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2026-08-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491697,
        "projectNumber": "J1782",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2026-08-10T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "WABASH RIVER GEN. STA. TO WHITESVILLE SOUTH SUB 230kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2067,
      "normalized": {
        "queue_id": "J1921",
        "county": "Montcalm",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Deja- Derby Jct 138kV Transmission line",
        "queue_date": "2021-08-22T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491698,
        "projectNumber": "J1921",
        "queueDate": "2021-08-22T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Montcalm",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Deja- Derby Jct 138kV Transmission line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2068,
      "normalized": {
        "queue_id": "J1927",
        "county": "Muscatine",
        "state": "IA",
        "transmission_owner": "MUSCATINE POWER AND WATER",
        "poi": "Grandview Substation 69 kV",
        "queue_date": "2021-12-03T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 23.4,
        "summer_net_mw": 23.4,
        "winter_net_mw": 23.4,
        "proposed_completion_date": "2027-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 24.0,
        "dp1_nris_mw": 24.0,
        "dp2_eris_mw": 24.0,
        "dp2_nris_mw": 24.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491699,
        "projectNumber": "J1927",
        "queueDate": "2021-12-03T05:00:00+00:00",
        "inService": "2027-08-01T04:00:00+00:00",
        "negInService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "MUSCATINE POWER AND WATER",
        "county": "Muscatine",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Grandview Substation 69 kV",
        "summerNetMW": 23.4,
        "winterNetMW": 23.4,
        "dp1ErisMw": 24.0,
        "dp1NrisMw": 24.0,
        "dp2ErisMw": 24.0,
        "dp2NrisMw": 24.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2069,
      "normalized": {
        "queue_id": "J1794",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "RICHARD - SCOTT 138.0kV",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2025-05-26T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-11-18T05:00:00+00:00",
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": "2022-11-18T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491700,
        "projectNumber": "J1794",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "doneDate": "2022-11-18T05:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "giaToExec": "2022-11-18T05:00:00+00:00",
        "negInService": "2025-05-26T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "RICHARD - SCOTT 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2070,
      "normalized": {
        "queue_id": "J1798",
        "county": "Wayne",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Waterman 120kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 25.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": "2023-03-01T05:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-06-01T04:00:00+00:00",
        "gia_to_execute": "2023-03-08T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "East (ITC)",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 25.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 25.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491701,
        "projectNumber": "J1798",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2021-06-01T04:00:00+00:00",
        "giaToExec": "2023-03-08T05:00:00+00:00",
        "negInService": "2023-03-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Wayne",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ITC)",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Waterman 120kV",
        "summerNetMW": 0.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 25.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 25.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2071,
      "normalized": {
        "queue_id": "J1783",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "WABASH RIVER GEN. STA. TO WHITESVILLE SOUTH SUB 230 kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2026-08-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491702,
        "projectNumber": "J1783",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2026-08-10T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "WABASH RIVER GEN. STA. TO WHITESVILLE SOUTH SUB 230 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2072,
      "normalized": {
        "queue_id": "J1932",
        "county": "Gladwin",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Other_",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491703,
        "projectNumber": "J1932",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gladwin",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2073,
      "normalized": {
        "queue_id": "J1803",
        "county": "Houghton",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Winona-Atlantic 69 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2023-02-28T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1.6,
        "summer_net_mw": 1.6,
        "winter_net_mw": 1.6,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 1.6,
        "dp1_nris_mw": 1.6,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491704,
        "projectNumber": "J1803",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2023-02-28T05:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Houghton",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Winona-Atlantic 69 kV",
        "summerNetMW": 1.6,
        "winterNetMW": 1.6,
        "dp1ErisMw": 1.6,
        "dp1NrisMw": 1.6,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2074,
      "normalized": {
        "queue_id": "J1815",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Linden Junction - Crawfordsville 138 kV",
        "queue_date": "2022-03-16T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 130.0,
        "dp1_nris_mw": 130.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491705,
        "projectNumber": "J1815",
        "queueDate": "2022-03-16T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Linden Junction - Crawfordsville 138 kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 130.0,
        "dp1NrisMw": 130.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2075,
      "normalized": {
        "queue_id": "J1933",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Bastrop Tap 115kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491706,
        "projectNumber": "J1933",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Bastrop Tap 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2076,
      "normalized": {
        "queue_id": "J1789",
        "county": "Monroe",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Brinkley East to Clarendon 115 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 5.99,
        "summer_net_mw": 5.99,
        "winter_net_mw": 5.99,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491707,
        "projectNumber": "J1789",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2021-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Monroe",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Brinkley East to Clarendon 115 kV",
        "summerNetMW": 5.99,
        "winterNetMW": 5.99,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2077,
      "normalized": {
        "queue_id": "J1930",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "N Madison - Columbia",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2023-06-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491708,
        "projectNumber": "J1930",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2023-06-05T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "N Madison - Columbia",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2078,
      "normalized": {
        "queue_id": "J1936",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Werner West - Rocky Run 345kV",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": "2023-06-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491709,
        "projectNumber": "J1936",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "withdrawnDate": "2023-06-05T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Werner West - Rocky Run 345kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2079,
      "normalized": {
        "queue_id": "J1937",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Werner West - Rocky Run 345kV",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": "2023-06-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491710,
        "projectNumber": "J1937",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "withdrawnDate": "2023-06-05T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Werner West - Rocky Run 345kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2080,
      "normalized": {
        "queue_id": "J1942",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Seville TP-Niles TP 120 kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2023-09-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491711,
        "projectNumber": "J1942",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2023-09-06T04:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Seville TP-Niles TP 120 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2081,
      "normalized": {
        "queue_id": "J1793",
        "county": "Sheboygan",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Holland 138 kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2028-06-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491712,
        "projectNumber": "J1793",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "negInService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Sheboygan",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Holland 138 kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2082,
      "normalized": {
        "queue_id": "J1805",
        "county": "LaPorte",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Maple 69 kV",
        "queue_date": "2022-01-11T05:00:00+00:00",
        "withdrawn_date": "2026-01-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491713,
        "projectNumber": "J1805",
        "queueDate": "2022-01-11T05:00:00+00:00",
        "withdrawnDate": "2026-01-09T05:00:00+00:00",
        "inService": "2024-04-12T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaPorte",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Maple 69 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2083,
      "normalized": {
        "queue_id": "J1943",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia - North Madison 345/138 kV 345.0kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491714,
        "projectNumber": "J1943",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Columbia - North Madison 345/138 kV 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2084,
      "normalized": {
        "queue_id": "J1797",
        "county": "St. John the Baptist",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Waterford 230kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491715,
        "projectNumber": "J1797",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. John the Baptist",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Waterford 230kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2085,
      "normalized": {
        "queue_id": "J1817",
        "county": "Houghton",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "ATC WInona-Atlantic Minw 69 kV tap (J1244)",
        "queue_date": "2020-07-28T04:00:00+00:00",
        "withdrawn_date": "2023-02-28T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2021-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491716,
        "projectNumber": "J1817",
        "queueDate": "2020-07-28T04:00:00+00:00",
        "withdrawnDate": "2023-02-28T05:00:00+00:00",
        "inService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Houghton",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "ATC WInona-Atlantic Minw 69 kV tap (J1244)",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2086,
      "normalized": {
        "queue_id": "J1824",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Academy 138KV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 73.8,
        "summer_net_mw": 73.8,
        "winter_net_mw": 73.8,
        "proposed_completion_date": "2025-12-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 67.0,
        "dp1_nris_mw": 67.0,
        "dp2_eris_mw": 67.0,
        "dp2_nris_mw": 67.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491717,
        "projectNumber": "J1824",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2024-12-31T05:00:00+00:00",
        "negInService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Academy 138KV",
        "summerNetMW": 73.8,
        "winterNetMW": 73.8,
        "dp1ErisMw": 67.0,
        "dp1NrisMw": 67.0,
        "dp2ErisMw": 67.0,
        "dp2NrisMw": 67.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2087,
      "normalized": {
        "queue_id": "J1804",
        "county": "St. Croix",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "PINE LAKE TO THREE LAKES 115 KV",
        "queue_date": "2022-02-28T05:00:00+00:00",
        "withdrawn_date": "2023-01-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491718,
        "projectNumber": "J1804",
        "queueDate": "2022-02-28T05:00:00+00:00",
        "withdrawnDate": "2023-01-31T05:00:00+00:00",
        "inService": "2024-06-06T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "St. Croix",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "PINE LAKE TO THREE LAKES 115 KV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2088,
      "normalized": {
        "queue_id": "J1806",
        "county": "Henry",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greensboro Substation 345kV",
        "queue_date": "2020-06-20T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491719,
        "projectNumber": "J1806",
        "queueDate": "2020-06-20T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2022-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Henry",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Greensboro Substation 345kV",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2089,
      "normalized": {
        "queue_id": "J1807",
        "county": "Washington",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Mount Tabor 138kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491720,
        "projectNumber": "J1807",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2023-05-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Washington",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Mount Tabor 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2090,
      "normalized": {
        "queue_id": "J1810",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Reynolds 345kV to Burr Oaks 345kV",
        "queue_date": "2020-06-20T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491721,
        "projectNumber": "J1810",
        "queueDate": "2020-06-20T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Reynolds 345kV to Burr Oaks 345kV",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2091,
      "normalized": {
        "queue_id": "J1811",
        "county": "Independence",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Independence 161 kV",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491722,
        "projectNumber": "J1811",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Independence",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Independence 161 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2092,
      "normalized": {
        "queue_id": "J1814",
        "county": "Dickinson",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Nordic",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 22.5,
        "summer_net_mw": 22.5,
        "winter_net_mw": 22.5,
        "proposed_completion_date": "2026-09-15T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 22.5,
        "dp1_nris_mw": 22.5,
        "dp2_eris_mw": 22.5,
        "dp2_nris_mw": 22.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491723,
        "projectNumber": "J1814",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "negInService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dickinson",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Nordic",
        "summerNetMW": 22.5,
        "winterNetMW": 22.5,
        "dp1ErisMw": 22.5,
        "dp1NrisMw": 22.5,
        "dp2ErisMw": 22.5,
        "dp2NrisMw": 22.5,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2093,
      "normalized": {
        "queue_id": "J1808",
        "county": "Barron",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Barron 161 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-02-28T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-02-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 148.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 148.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491724,
        "projectNumber": "J1808",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-02-28T05:00:00+00:00",
        "negInService": "2026-02-28T05:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Barron",
        "state": "WI",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Barron 161 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 148.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 148.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2094,
      "normalized": {
        "queue_id": "J1809",
        "county": "Houghton",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Atlantic -Silver River 138 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-02-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 62.5,
        "summer_net_mw": 62.5,
        "winter_net_mw": 62.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491725,
        "projectNumber": "J1809",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-02-19T05:00:00+00:00",
        "inService": "2023-08-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Houghton",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Atlantic -Silver River 138 kV",
        "summerNetMW": 62.5,
        "winterNetMW": 62.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2095,
      "normalized": {
        "queue_id": "J1821",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2026-09-13T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491726,
        "projectNumber": "J1821",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-09-13T04:00:00+00:00",
        "negInService": "2026-09-13T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2096,
      "normalized": {
        "queue_id": "J1827",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "bastrop tap point",
        "queue_date": "2021-10-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": "2026-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 90.0,
        "dp1_nris_mw": 90.0,
        "dp2_eris_mw": 90.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491727,
        "projectNumber": "J1827",
        "queueDate": "2021-10-20T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-10-31T04:00:00+00:00",
        "negInService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "bastrop tap point",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 90.0,
        "dp1NrisMw": 90.0,
        "dp2ErisMw": 90.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2097,
      "normalized": {
        "queue_id": "J1938",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Werner West - Rocky Run 345kV",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491728,
        "projectNumber": "J1938",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Werner West - Rocky Run 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2098,
      "normalized": {
        "queue_id": "J1792",
        "county": "Houghton",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "New Tap of the Ontonagan to Rockland Jct 69kV Line approx. 2.2 mi. north of Rockland Jct.",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-02-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 22.5,
        "summer_net_mw": 22.5,
        "winter_net_mw": 22.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491729,
        "projectNumber": "J1792",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-02-19T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Houghton",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "New Tap of the Ontonagan to Rockland Jct 69kV Line approx. 2.2 mi. north of Rockland Jct.",
        "summerNetMW": 22.5,
        "winterNetMW": 22.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2099,
      "normalized": {
        "queue_id": "J1795",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Bayou Cove to Richard 138kV (Circuit 258)",
        "queue_date": "2020-06-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-12-04T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-31T04:00:00+00:00",
        "gia_to_execute": "2022-11-21T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491730,
        "projectNumber": "J1795",
        "queueDate": "2020-06-22T04:00:00+00:00",
        "inService": "2023-08-31T04:00:00+00:00",
        "giaToExec": "2022-11-21T05:00:00+00:00",
        "negInService": "2025-12-04T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Bayou Cove to Richard 138kV (Circuit 258)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2100,
      "normalized": {
        "queue_id": "J1796",
        "county": "Evangeline",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Pine Prairie to Coughlin 138 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-02-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491731,
        "projectNumber": "J1796",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2023-02-28T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Pine Prairie to Coughlin 138 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2101,
      "normalized": {
        "queue_id": "J1812",
        "county": "Chambers",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Stowell 230 kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 294.25,
        "summer_net_mw": 294.25,
        "winter_net_mw": 294.25,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491732,
        "projectNumber": "J1812",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Chambers",
        "state": "TX",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Stowell 230 kV",
        "summerNetMW": 294.25,
        "winterNetMW": 294.25,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2102,
      "normalized": {
        "queue_id": "J1813",
        "county": "DeSoto",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Entergy Freeport 230 kV Substation",
        "queue_date": "2022-07-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 1005.0,
        "summer_net_mw": 920.0,
        "winter_net_mw": 1005.0,
        "proposed_completion_date": "2002-03-20T05:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-03-20T04:00:00+00:00",
        "gia_to_execute": "2022-11-15T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 205.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 205.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491733,
        "projectNumber": "J1813",
        "queueDate": "2022-07-07T04:00:00+00:00",
        "inService": "2020-03-20T04:00:00+00:00",
        "giaToExec": "2022-11-15T05:00:00+00:00",
        "negInService": "2002-03-20T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "DeSoto",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Entergy Freeport 230 kV Substation",
        "summerNetMW": 920.0,
        "winterNetMW": 1005.0,
        "dp1ErisMw": 205.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 205.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2103,
      "normalized": {
        "queue_id": "J1799",
        "county": "Pulaski",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Joppa 345 kV",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2021-02-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-02-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491734,
        "projectNumber": "J1799",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2021-02-13T05:00:00+00:00",
        "inService": "2022-02-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Pulaski",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "E-NRIS",
        "poiName": "Joppa 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2104,
      "normalized": {
        "queue_id": "J1800",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Adams Switch Yard 161kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491735,
        "projectNumber": "J1800",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-10-08T04:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Adams Switch Yard 161kV",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2105,
      "normalized": {
        "queue_id": "J1820",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-09-13T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491736,
        "projectNumber": "J1820",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-09-13T04:00:00+00:00",
        "negInService": "2026-09-13T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2106,
      "normalized": {
        "queue_id": "J1822",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "KILLDEER3 (631199) 345 KV TO BLACKHAWK (636199) 345 kv line Tap",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-01-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491737,
        "projectNumber": "J1822",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-01-04T05:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "KILLDEER3 (631199) 345 KV TO BLACKHAWK (636199) 345 kv line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2107,
      "normalized": {
        "queue_id": "J1801",
        "county": "Story",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Story County Substation 161kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-11-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 39.0,
        "summer_net_mw": 39.0,
        "winter_net_mw": 39.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491738,
        "projectNumber": "J1801",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-11-17T05:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Story",
        "state": "IA",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS-Only",
        "poiName": "Story County Substation 161kV",
        "summerNetMW": 39.0,
        "winterNetMW": 39.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2108,
      "normalized": {
        "queue_id": "J1802",
        "county": "Marshall",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Burr Oak 138kV",
        "queue_date": "2020-06-18T04:00:00+00:00",
        "withdrawn_date": "2026-08-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491739,
        "projectNumber": "J1802",
        "queueDate": "2020-06-18T04:00:00+00:00",
        "withdrawnDate": "2026-08-12T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Marshall",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Burr Oak 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2109,
      "normalized": {
        "queue_id": "J1825",
        "county": "Decatur",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Westport",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2020-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491740,
        "projectNumber": "J1825",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2020-12-18T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Decatur",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Westport",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2110,
      "normalized": {
        "queue_id": "J1995",
        "county": "Richland",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "DUNN - OAK RIDGE (LA) 115.0kV",
        "queue_date": "2021-08-04T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-07-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491741,
        "projectNumber": "J1995",
        "queueDate": "2021-08-04T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2025-07-23T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Richland",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "DUNN - OAK RIDGE (LA) 115.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2111,
      "normalized": {
        "queue_id": "J1996",
        "county": "Shawano",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "West Shawano 138kV - Badger 138kV",
        "queue_date": "2021-08-11T04:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491742,
        "projectNumber": "J1996",
        "queueDate": "2021-08-11T04:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Shawano",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "West Shawano 138kV - Badger 138kV",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2112,
      "normalized": {
        "queue_id": "J1997",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Nelson (EES) - Longville 138kV",
        "queue_date": "2021-08-11T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491743,
        "projectNumber": "J1997",
        "queueDate": "2021-08-11T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Nelson (EES) - Longville 138kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2113,
      "normalized": {
        "queue_id": "J1816",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "FISHER - CHERRY VALLEY 161.0kV",
        "queue_date": "2022-03-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": "2025-11-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-30T04:00:00+00:00",
        "gia_to_execute": "2022-11-17T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 135.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491744,
        "projectNumber": "J1816",
        "queueDate": "2022-03-17T04:00:00+00:00",
        "inService": "2025-10-30T04:00:00+00:00",
        "giaToExec": "2022-11-17T05:00:00+00:00",
        "negInService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "FISHER - CHERRY VALLEY 161.0kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 135.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2114,
      "normalized": {
        "queue_id": "J1818",
        "county": "Lafayette",
        "state": "LA",
        "transmission_owner": "LAFAYETTE UTILITIES SYSTEM",
        "poi": "Northeast (Moss) 69kV",
        "queue_date": "2020-06-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": "2026-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2023-01-18T05:00:00+00:00",
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": "2023-01-18T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 80.0,
        "dp2_nris_mw": 80.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491745,
        "projectNumber": "J1818",
        "queueDate": "2020-06-19T04:00:00+00:00",
        "doneDate": "2023-01-18T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "giaToExec": "2023-01-18T05:00:00+00:00",
        "negInService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "LAFAYETTE UTILITIES SYSTEM",
        "county": "Lafayette",
        "state": "LA",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Northeast (Moss) 69kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 80.0,
        "dp2NrisMw": 80.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2115,
      "normalized": {
        "queue_id": "J1819",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2026-09-13T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491746,
        "projectNumber": "J1819",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "inService": "2023-09-13T04:00:00+00:00",
        "negInService": "2026-09-13T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2116,
      "normalized": {
        "queue_id": "J1823",
        "county": "Houghton",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Portage (UPPCO) - Atlantic 69 kV",
        "queue_date": "2020-06-24T04:00:00+00:00",
        "withdrawn_date": "2021-02-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 62.5,
        "summer_net_mw": 62.5,
        "winter_net_mw": 62.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "East (ATC)",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491747,
        "projectNumber": "J1823",
        "queueDate": "2020-06-24T04:00:00+00:00",
        "withdrawnDate": "2021-02-19T05:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Houghton",
        "state": "MI",
        "studyCycle": "DPP-2020",
        "studyGroup": "East (ATC)",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Portage (UPPCO) - Atlantic 69 kV",
        "summerNetMW": 62.5,
        "winterNetMW": 62.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2117,
      "normalized": {
        "queue_id": "J1828",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Austin-1 138 kV substation",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2021-03-12T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 99.2,
        "summer_net_mw": 99.2,
        "winter_net_mw": 99.2,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491748,
        "projectNumber": "J1828",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2021-03-12T05:00:00+00:00",
        "inService": "2024-08-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "ERIS",
        "poiName": "Austin-1 138 kV substation",
        "summerNetMW": 99.2,
        "winterNetMW": 99.2,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Wind/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2118,
      "normalized": {
        "queue_id": "J1829",
        "county": "Shelby",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "DEI's Columbus to Clark Twp. 230 kV (one of the two 230 kV circuits going from Columbus to Five Poin",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2023-07-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491749,
        "projectNumber": "J1829",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2023-07-17T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Shelby",
        "state": "IN",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "DEI's Columbus to Clark Twp. 230 kV (one of the two 230 kV circuits going from Columbus to Five Poin",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2119,
      "normalized": {
        "queue_id": "J1826",
        "county": "Dakota",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Cannon Falls Transmission 69 kV",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 4.0,
        "summer_net_mw": 4.0,
        "winter_net_mw": 4.0,
        "proposed_completion_date": "2024-08-30T04:00:00+00:00",
        "generation_type": "Hydro",
        "facility_type": "Hydroelectric",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "West",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 4.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 4.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491750,
        "projectNumber": "J1826",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "inService": "2022-03-01T05:00:00+00:00",
        "negInService": "2024-08-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dakota",
        "state": "MN",
        "studyCycle": "DPP-2020",
        "studyGroup": "West",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Cannon Falls Transmission 69 kV",
        "summerNetMW": 4.0,
        "winterNetMW": 4.0,
        "dp1ErisMw": 4.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 4.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hydro",
        "facilityType": "Hydroelectric",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2120,
      "normalized": {
        "queue_id": "J1830",
        "county": "Pulaski",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Kelso - Joppa (Massac) 345 kV line",
        "queue_date": "2020-06-23T04:00:00+00:00",
        "withdrawn_date": "2024-09-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2020",
        "study_group": "Central",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491751,
        "projectNumber": "J1830",
        "queueDate": "2020-06-23T04:00:00+00:00",
        "withdrawnDate": "2024-09-03T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Pulaski",
        "state": "IL",
        "studyCycle": "DPP-2020",
        "studyGroup": "Central",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Kelso - Joppa (Massac) 345 kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2121,
      "normalized": {
        "queue_id": "J1992",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Genpower Keo 500kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491752,
        "projectNumber": "J1992",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Genpower Keo 500kV",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2122,
      "normalized": {
        "queue_id": "J1993",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia - South Fond du Lac 345.0kV",
        "queue_date": "2021-12-01T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-07-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 99.0,
        "dp1_nris_mw": 99.0,
        "dp2_eris_mw": 99.0,
        "dp2_nris_mw": 99.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491753,
        "projectNumber": "J1993",
        "queueDate": "2021-12-01T05:00:00+00:00",
        "inService": "2025-07-23T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS-Only",
        "poiName": "Columbia - South Fond du Lac 345.0kV",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 99.0,
        "dp1NrisMw": 99.0,
        "dp2ErisMw": 99.0,
        "dp2NrisMw": 99.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2123,
      "normalized": {
        "queue_id": "J2009",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Robert E Ritchie - Stuttgart Rcuskey 230kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491754,
        "projectNumber": "J2009",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Robert E Ritchie - Stuttgart Rcuskey 230kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2124,
      "normalized": {
        "queue_id": "J2010",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2028-03-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491755,
        "projectNumber": "J2010",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "negInService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2125,
      "normalized": {
        "queue_id": "J1998",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Nuthatch Switching Station",
        "queue_date": "2021-08-04T04:00:00+00:00",
        "withdrawn_date": "2026-06-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 66.0,
        "summer_net_mw": 66.0,
        "winter_net_mw": 66.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 66.0,
        "dp1_nris_mw": 66.0,
        "dp2_eris_mw": 66.0,
        "dp2_nris_mw": 66.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491756,
        "projectNumber": "J1998",
        "queueDate": "2021-08-04T04:00:00+00:00",
        "withdrawnDate": "2026-06-22T04:00:00+00:00",
        "inService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Nuthatch Switching Station",
        "summerNetMW": 66.0,
        "winterNetMW": 66.0,
        "dp1ErisMw": 66.0,
        "dp1NrisMw": 66.0,
        "dp2ErisMw": 66.0,
        "dp2NrisMw": 66.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2126,
      "normalized": {
        "queue_id": "J2006",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Robert E Ritchie - Stuttgart Rcuskey 230kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491757,
        "projectNumber": "J2006",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Robert E Ritchie - Stuttgart Rcuskey 230kV",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2127,
      "normalized": {
        "queue_id": "J1999",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Rodemacher",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491758,
        "projectNumber": "J1999",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Rodemacher",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2128,
      "normalized": {
        "queue_id": "J2000",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Frankfort to Cayuga 230kV",
        "queue_date": "2021-08-10T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491759,
        "projectNumber": "J2000",
        "queueDate": "2021-08-10T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Frankfort to Cayuga 230kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2129,
      "normalized": {
        "queue_id": "J2002",
        "county": "Washington",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SUB T HASKINS",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-05-13T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-03-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491760,
        "projectNumber": "J2002",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "inService": "2024-03-13T04:00:00+00:00",
        "negInService": "2027-05-13T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Washington",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SUB T HASKINS",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2130,
      "normalized": {
        "queue_id": "J2003",
        "county": "Deuel",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Astoria 345kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491761,
        "projectNumber": "J2003",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-10T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Deuel",
        "state": "SD",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Astoria 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2131,
      "normalized": {
        "queue_id": "J2008",
        "county": "Callaway",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "7MCCREDIE - 7MONTGMRY 345.0kV",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 65.0,
        "summer_net_mw": 65.0,
        "winter_net_mw": 65.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 65.0,
        "dp1_nris_mw": 65.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491762,
        "projectNumber": "J2008",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Callaway",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7MCCREDIE - 7MONTGMRY 345.0kV",
        "summerNetMW": 65.0,
        "winterNetMW": 65.0,
        "dp1ErisMw": 65.0,
        "dp1NrisMw": 65.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2132,
      "normalized": {
        "queue_id": "J2011",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Bastrop Tap 115kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491763,
        "projectNumber": "J2011",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Bastrop Tap 115kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2133,
      "normalized": {
        "queue_id": "J1994",
        "county": "Fond du Lac",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Metomen 138 kV",
        "queue_date": "2021-07-30T04:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 97.09,
        "summer_net_mw": 97.09,
        "winter_net_mw": 97.09,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 97.08,
        "dp1_nris_mw": 97.08,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491764,
        "projectNumber": "J1994",
        "queueDate": "2021-07-30T04:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Fond du Lac",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Metomen 138 kV",
        "summerNetMW": 97.09,
        "winterNetMW": 97.09,
        "dp1ErisMw": 97.08,
        "dp1NrisMw": 97.08,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2134,
      "normalized": {
        "queue_id": "J2001",
        "county": "Newaygo",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KENOWA - LUDINGTON 345.0kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": "2029-07-12T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 220.0,
        "dp1_nris_mw": 220.0,
        "dp2_eris_mw": 220.0,
        "dp2_nris_mw": 220.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491765,
        "projectNumber": "J2001",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "negInService": "2029-07-12T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Newaygo",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "KENOWA - LUDINGTON 345.0kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 220.0,
        "dp1NrisMw": 220.0,
        "dp2ErisMw": 220.0,
        "dp2NrisMw": 220.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2135,
      "normalized": {
        "queue_id": "J2004",
        "county": "Fountain",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 40.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491766,
        "projectNumber": "J2004",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Fountain",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 40.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2136,
      "normalized": {
        "queue_id": "J2005",
        "county": "Deuel",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Astoria 345kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491767,
        "projectNumber": "J2005",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-10T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Deuel",
        "state": "SD",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Astoria 345kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2137,
      "normalized": {
        "queue_id": "J2012",
        "county": "Tangipahoa",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Chicken Farm-Amite",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491768,
        "projectNumber": "J2012",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Tangipahoa",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Chicken Farm-Amite",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2138,
      "normalized": {
        "queue_id": "J2027",
        "county": "Dakota",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "CHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kV",
        "queue_date": "2025-07-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2029-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 150.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491769,
        "projectNumber": "J2027",
        "queueDate": "2025-07-14T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2029-10-31T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Dakota",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 150.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2139,
      "normalized": {
        "queue_id": "J2018",
        "county": "Clark",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Eau Claire - Arpin 345kV",
        "queue_date": "2021-11-23T05:00:00+00:00",
        "withdrawn_date": "2023-10-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491770,
        "projectNumber": "J2018",
        "queueDate": "2021-11-23T05:00:00+00:00",
        "withdrawnDate": "2023-10-10T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Clark",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Eau Claire - Arpin 345kV",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2140,
      "normalized": {
        "queue_id": "J2020",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "CLECO Cooper-Penton Road 230kV Line",
        "queue_date": "2021-08-10T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 260.0,
        "summer_net_mw": 260.0,
        "winter_net_mw": 260.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491771,
        "projectNumber": "J2020",
        "queueDate": "2021-08-10T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "CLECO Cooper-Penton Road 230kV Line",
        "summerNetMW": 260.0,
        "winterNetMW": 260.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2141,
      "normalized": {
        "queue_id": "J2007",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Genpower Keo 500kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491772,
        "projectNumber": "J2007",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Genpower Keo 500kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2142,
      "normalized": {
        "queue_id": "J2016",
        "county": "Daviess",
        "state": "KY",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "F.B Culley to Northeast",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491773,
        "projectNumber": "J2016",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Daviess",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "F.B Culley to Northeast",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2143,
      "normalized": {
        "queue_id": "J2030",
        "county": "Isanti",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "ISANTTI TAP to ATHNSSW 69kV",
        "queue_date": "2021-07-21T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 56.0,
        "dp1_nris_mw": 56.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491774,
        "projectNumber": "J2030",
        "queueDate": "2021-07-21T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Isanti",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ISANTTI TAP to ATHNSSW 69kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 56.0,
        "dp1NrisMw": 56.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2144,
      "normalized": {
        "queue_id": "J2031",
        "county": "Tama",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Toledo",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2029-03-13T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491775,
        "projectNumber": "J2031",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "inService": "2026-12-15T05:00:00+00:00",
        "negInService": "2029-03-13T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Tama",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Toledo",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2145,
      "normalized": {
        "queue_id": "J2021",
        "county": "Trempealeau",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Tremval 69kV",
        "queue_date": "2021-07-30T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 48.43,
        "summer_net_mw": 48.43,
        "winter_net_mw": 48.43,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 48.43,
        "dp1_nris_mw": 48.43,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491776,
        "projectNumber": "J2021",
        "queueDate": "2021-07-30T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Trempealeau",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tremval 69kV",
        "summerNetMW": 48.43,
        "winterNetMW": 48.43,
        "dp1ErisMw": 48.43,
        "dp1NrisMw": 48.43,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2146,
      "normalized": {
        "queue_id": "J2022",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Pleasant Valley 345 kV Substation",
        "queue_date": "2021-10-18T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491777,
        "projectNumber": "J2022",
        "queueDate": "2021-10-18T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pleasant Valley 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2147,
      "normalized": {
        "queue_id": "J2023",
        "county": "Amite",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Gloster to Liberty 138 kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 94.1,
        "summer_net_mw": 94.1,
        "winter_net_mw": 94.1,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491778,
        "projectNumber": "J2023",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Amite",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Gloster to Liberty 138 kV",
        "summerNetMW": 94.1,
        "winterNetMW": 94.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2148,
      "normalized": {
        "queue_id": "J2026",
        "county": "Gratiot",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "REGAL",
        "queue_date": "2021-11-15T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2027-12-02T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491779,
        "projectNumber": "J2026",
        "queueDate": "2021-11-15T05:00:00+00:00",
        "inService": "2022-12-02T05:00:00+00:00",
        "negInService": "2027-12-02T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Gratiot",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "REGAL",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2149,
      "normalized": {
        "queue_id": "J2035",
        "county": "Lafourche",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Thibodaux",
        "queue_date": "2022-04-05T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491780,
        "projectNumber": "J2035",
        "queueDate": "2022-04-05T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Lafourche",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Thibodaux",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2150,
      "normalized": {
        "queue_id": "J2036",
        "county": "Cumberland",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hutsonville - Neoga 138 kV",
        "queue_date": "2022-04-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491781,
        "projectNumber": "J2036",
        "queueDate": "2022-04-05T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Cumberland",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hutsonville - Neoga 138 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2151,
      "normalized": {
        "queue_id": "J2013",
        "county": "Tangipahoa",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Chicken Farm-Amite",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 52.92,
        "summer_net_mw": 52.92,
        "winter_net_mw": 52.92,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491782,
        "projectNumber": "J2013",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Tangipahoa",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Chicken Farm-Amite",
        "summerNetMW": 52.92,
        "winterNetMW": 52.92,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2152,
      "normalized": {
        "queue_id": "J2014",
        "county": "Clark",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Eau Claire - Arpin 345kV",
        "queue_date": "2021-11-23T05:00:00+00:00",
        "withdrawn_date": "2023-10-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491783,
        "projectNumber": "J2014",
        "queueDate": "2021-11-23T05:00:00+00:00",
        "withdrawnDate": "2023-10-10T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Clark",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Eau Claire - Arpin 345kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2153,
      "normalized": {
        "queue_id": "J2015",
        "county": "Tunica",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Lula-Tunica (same POI as J1440)",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491784,
        "projectNumber": "J2015",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tunica",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Lula-Tunica (same POI as J1440)",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2154,
      "normalized": {
        "queue_id": "J2024",
        "county": "Hardin",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Cypress 230 kV",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491785,
        "projectNumber": "J2024",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Hardin",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Cypress 230 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2155,
      "normalized": {
        "queue_id": "J2038",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Kokomo Webster St.  - Walton 230.0kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491786,
        "projectNumber": "J2038",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kokomo Webster St.  - Walton 230.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2156,
      "normalized": {
        "queue_id": "J2053",
        "county": "Redwood",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 151.47,
        "summer_net_mw": 151.47,
        "winter_net_mw": 151.47,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 151.47,
        "dp1_nris_mw": 122.0,
        "dp2_eris_mw": 151.47,
        "dp2_nris_mw": 122.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491787,
        "projectNumber": "J2053",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Redwood",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 151.47,
        "winterNetMW": 151.47,
        "dp1ErisMw": 151.47,
        "dp1NrisMw": 122.0,
        "dp2ErisMw": 151.47,
        "dp2NrisMw": 122.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2157,
      "normalized": {
        "queue_id": "J2054",
        "county": "Freeborn",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Freeborn",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 67.0,
        "summer_net_mw": 67.0,
        "winter_net_mw": 67.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 67.0,
        "dp1_nris_mw": 67.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491788,
        "projectNumber": "J2054",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Freeborn",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Freeborn",
        "summerNetMW": 67.0,
        "winterNetMW": 67.0,
        "dp1ErisMw": 67.0,
        "dp1NrisMw": 67.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2158,
      "normalized": {
        "queue_id": "J2059",
        "county": "Tippecanoe",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Springboro - Lafayette 138 kV",
        "queue_date": "2022-03-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491789,
        "projectNumber": "J2059",
        "queueDate": "2022-03-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Tippecanoe",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Springboro - Lafayette 138 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2159,
      "normalized": {
        "queue_id": "J2060",
        "county": "Tippecanoe",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Springboro - Lafayette 138 kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491790,
        "projectNumber": "J2060",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Tippecanoe",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Springboro - Lafayette 138 kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2160,
      "normalized": {
        "queue_id": "J2061",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MURPHY",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-11-24T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491791,
        "projectNumber": "J2061",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "negInService": "2028-11-24T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "MURPHY",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2161,
      "normalized": {
        "queue_id": "J2062",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia 345 kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2023-06-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491792,
        "projectNumber": "J2062",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2023-06-05T04:00:00+00:00",
        "inService": "2024-04-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Columbia 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2162,
      "normalized": {
        "queue_id": "J2063",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Wheatland 345kV Substation",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-07-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491793,
        "projectNumber": "J2063",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-07-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wheatland 345kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2163,
      "normalized": {
        "queue_id": "J2025",
        "county": "St. James",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Vacherie 230 kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 95.0,
        "summer_net_mw": 95.0,
        "winter_net_mw": 95.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491794,
        "projectNumber": "J2025",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. James",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Vacherie 230 kV",
        "summerNetMW": 95.0,
        "winterNetMW": 95.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2164,
      "normalized": {
        "queue_id": "J2033",
        "county": "Clay",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7XENIA    - 7MTVERNW 345.0kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491795,
        "projectNumber": "J2033",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clay",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7XENIA    - 7MTVERNW 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2165,
      "normalized": {
        "queue_id": "J2032",
        "county": "Marion",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Hanna",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 70.0,
        "dp1_nris_mw": 70.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491796,
        "projectNumber": "J2032",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Marion",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hanna",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 70.0,
        "dp1NrisMw": 70.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2166,
      "normalized": {
        "queue_id": "J2034",
        "county": "Lafourche",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Thibodaux",
        "queue_date": "2022-04-05T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491797,
        "projectNumber": "J2034",
        "queueDate": "2022-04-05T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Lafourche",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Thibodaux",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2167,
      "normalized": {
        "queue_id": "J2045",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Goodland 138 kV",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 50.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491798,
        "projectNumber": "J2045",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Goodland 138 kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 50.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2168,
      "normalized": {
        "queue_id": "J2046",
        "county": "Wabash",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Miami Wabash - Mier 138 kV (40.723889, -85.812019)",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491799,
        "projectNumber": "J2046",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Wabash",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Miami Wabash - Mier 138 kV (40.723889, -85.812019)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2169,
      "normalized": {
        "queue_id": "J2047",
        "county": "DeSoto",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Robinsonville 230 kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 199.0,
        "summer_net_mw": 199.0,
        "winter_net_mw": 199.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 199.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 199.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491800,
        "projectNumber": "J2047",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "DeSoto",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "Robinsonville 230 kV",
        "summerNetMW": 199.0,
        "winterNetMW": 199.0,
        "dp1ErisMw": 199.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 199.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2170,
      "normalized": {
        "queue_id": "J2056",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Morocco to Beecher 138 kV line",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-03-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 110.0,
        "dp1_nris_mw": 110.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491801,
        "projectNumber": "J2056",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-03-03T05:00:00+00:00",
        "inService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Morocco to Beecher 138 kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 110.0,
        "dp1NrisMw": 110.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2171,
      "normalized": {
        "queue_id": "J2057",
        "county": "Montcalm",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Nelson Road to Kenowa 345 kV line",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2026-03-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2029-04-15T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491802,
        "projectNumber": "J2057",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2026-03-23T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "negInService": "2029-04-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Montcalm",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Nelson Road to Kenowa 345 kV line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 2172,
      "normalized": {
        "queue_id": "J2077",
        "county": "Livingston",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Independence (6INDEPD)",
        "queue_date": "2021-12-10T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491803,
        "projectNumber": "J2077",
        "queueDate": "2021-12-10T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-04-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Livingston",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Independence (6INDEPD)",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2173,
      "normalized": {
        "queue_id": "J2078",
        "county": "Story",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Fernald",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491804,
        "projectNumber": "J2078",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Story",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fernald",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2174,
      "normalized": {
        "queue_id": "J2079",
        "county": "Hancock",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lime Creek 161 kV",
        "queue_date": "2021-08-06T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491805,
        "projectNumber": "J2079",
        "queueDate": "2021-08-06T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Hancock",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "Lime Creek 161 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2175,
      "normalized": {
        "queue_id": "J2048",
        "county": "Benton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "GOODLAND - MORRISON DITCH 138.0kV",
        "queue_date": "2022-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491806,
        "projectNumber": "J2048",
        "queueDate": "2022-03-25T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Benton",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GOODLAND - MORRISON DITCH 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2176,
      "normalized": {
        "queue_id": "J2055",
        "county": "Sheboygan",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Edgewater",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-06-26T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491807,
        "projectNumber": "J2055",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "negInService": "2026-06-26T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Sheboygan",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Edgewater",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2177,
      "normalized": {
        "queue_id": "J2064",
        "county": "Jackson",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Tompkins 138 kV",
        "queue_date": "2021-11-08T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-11-04T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491808,
        "projectNumber": "J2064",
        "queueDate": "2021-11-08T05:00:00+00:00",
        "inService": "2024-10-07T04:00:00+00:00",
        "negInService": "2026-11-04T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Jackson",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Tompkins 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2178,
      "normalized": {
        "queue_id": "J2069",
        "county": "Montcalm",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "EUREKA - VESTABURG 138.0kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2027-06-07T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491809,
        "projectNumber": "J2069",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2027-06-07T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Montcalm",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "EUREKA - VESTABURG 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2179,
      "normalized": {
        "queue_id": "J2086",
        "county": "Barnes",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Buffalo 345 kV",
        "queue_date": "2021-08-09T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491810,
        "projectNumber": "J2086",
        "queueDate": "2021-08-09T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-31T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Barnes",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Buffalo 345 kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2180,
      "normalized": {
        "queue_id": "J2087",
        "county": "Renville",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "FRANKLIN",
        "queue_date": "2025-08-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": "2029-06-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 125.0,
        "dp2_nris_mw": 125.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491811,
        "projectNumber": "J2087",
        "queueDate": "2025-08-19T04:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "negInService": "2029-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Renville",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FRANKLIN",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 125.0,
        "dp2NrisMw": 125.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2181,
      "normalized": {
        "queue_id": "J2070",
        "county": "St. Croix",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Three Lakes - Pine Lake 115 kV",
        "queue_date": "2021-10-18T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491812,
        "projectNumber": "J2070",
        "queueDate": "2021-10-18T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "St. Croix",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Three Lakes - Pine Lake 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2182,
      "normalized": {
        "queue_id": "J2075",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "China (Bus# 334204) to Sheco Batiste Creek (Bus# 334240)",
        "queue_date": "2021-08-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-05-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491813,
        "projectNumber": "J2075",
        "queueDate": "2021-08-27T04:00:00+00:00",
        "inService": "2024-10-04T04:00:00+00:00",
        "negInService": "2028-05-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "China (Bus# 334204) to Sheco Batiste Creek (Bus# 334240)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2183,
      "normalized": {
        "queue_id": "J2028",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Kuhn Rd to Parkin",
        "queue_date": "2021-08-10T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491814,
        "projectNumber": "J2028",
        "queueDate": "2021-08-10T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Kuhn Rd to Parkin",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2184,
      "normalized": {
        "queue_id": "J2029",
        "county": "Marquette",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Perch Lake",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 62.5,
        "summer_net_mw": 62.5,
        "winter_net_mw": 62.5,
        "proposed_completion_date": "2027-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 62.5,
        "dp1_nris_mw": 62.5,
        "dp2_eris_mw": 62.5,
        "dp2_nris_mw": 62.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491815,
        "projectNumber": "J2029",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marquette",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Perch Lake",
        "summerNetMW": 62.5,
        "winterNetMW": 62.5,
        "dp1ErisMw": 62.5,
        "dp1NrisMw": 62.5,
        "dp2ErisMw": 62.5,
        "dp2NrisMw": 62.5,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2185,
      "normalized": {
        "queue_id": "J2088",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500 kV (854.0)",
        "queue_date": "2022-07-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": "2027-10-31T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 400.0,
        "dp2_eris_mw": 400.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491816,
        "projectNumber": "J2088",
        "queueDate": "2022-07-13T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500 kV (854.0)",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 400.0,
        "dp2ErisMw": 400.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2186,
      "normalized": {
        "queue_id": "J2092",
        "county": "Wright",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Dickinson Sub",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2023-10-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491817,
        "projectNumber": "J2092",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2023-10-10T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Wright",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dickinson Sub",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2187,
      "normalized": {
        "queue_id": "J2039",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Meredosia to Ipava 345 kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491818,
        "projectNumber": "J2039",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Meredosia to Ipava 345 kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2188,
      "normalized": {
        "queue_id": "J2040",
        "county": "Dickinson",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Lakefield - Obrien Co 345 kV (43.497803, -95.318336)",
        "queue_date": "2021-08-03T04:00:00+00:00",
        "withdrawn_date": "2025-10-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491819,
        "projectNumber": "J2040",
        "queueDate": "2021-08-03T04:00:00+00:00",
        "withdrawnDate": "2025-10-15T04:00:00+00:00",
        "inService": "2024-11-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Dickinson",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lakefield - Obrien Co 345 kV (43.497803, -95.318336)",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2189,
      "normalized": {
        "queue_id": "J2093",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "West Memphis to Hughes 161 kV Line Tap",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 144.0,
        "summer_net_mw": 144.0,
        "winter_net_mw": 144.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 144.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491820,
        "projectNumber": "J2093",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "West Memphis to Hughes 161 kV Line Tap",
        "summerNetMW": 144.0,
        "winterNetMW": 144.0,
        "dp1ErisMw": 144.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2190,
      "normalized": {
        "queue_id": "J2094",
        "county": "Sargent",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Forman 230 kV Substation",
        "queue_date": "2021-08-03T04:00:00+00:00",
        "withdrawn_date": "2023-10-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491821,
        "projectNumber": "J2094",
        "queueDate": "2021-08-03T04:00:00+00:00",
        "withdrawnDate": "2023-10-10T04:00:00+00:00",
        "inService": "2022-11-30T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Sargent",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Forman 230 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2191,
      "normalized": {
        "queue_id": "J2041",
        "county": "Jefferson",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Amelia North substation",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491822,
        "projectNumber": "J2041",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jefferson",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Amelia North substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2192,
      "normalized": {
        "queue_id": "J2042",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "CROSSETT NORTH - BEEKMAN 115.0kV",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491823,
        "projectNumber": "J2042",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "CROSSETT NORTH - BEEKMAN 115.0kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2193,
      "normalized": {
        "queue_id": "J2097",
        "county": "Morton",
        "state": "ND",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Tri-County 230 kV Substation",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491824,
        "projectNumber": "J2097",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Morton",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tri-County 230 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2194,
      "normalized": {
        "queue_id": "J2098",
        "county": "Calhoun",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BATTLE CREEK - ONEIDA 345.0kV",
        "queue_date": "2021-08-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 309.0,
        "summer_net_mw": 309.0,
        "winter_net_mw": 309.0,
        "proposed_completion_date": "2026-01-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 309.0,
        "dp1_nris_mw": 309.0,
        "dp2_eris_mw": 309.0,
        "dp2_nris_mw": 309.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491825,
        "projectNumber": "J2098",
        "queueDate": "2021-08-22T04:00:00+00:00",
        "inService": "2025-03-31T04:00:00+00:00",
        "negInService": "2026-01-31T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "BATTLE CREEK - ONEIDA 345.0kV",
        "summerNetMW": 309.0,
        "winterNetMW": 309.0,
        "dp1ErisMw": 309.0,
        "dp1NrisMw": 309.0,
        "dp2ErisMw": 309.0,
        "dp2NrisMw": 309.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2195,
      "normalized": {
        "queue_id": "J2043",
        "county": "Callaway",
        "state": "MO",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Overton - McCredie 345kV",
        "queue_date": "2022-04-05T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491826,
        "projectNumber": "J2043",
        "queueDate": "2022-04-05T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Callaway",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Overton - McCredie 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2196,
      "normalized": {
        "queue_id": "J2044",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Goodland 138 kV Substation",
        "queue_date": "2022-03-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491827,
        "projectNumber": "J2044",
        "queueDate": "2022-03-29T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Goodland 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2197,
      "normalized": {
        "queue_id": "J2258",
        "county": "Adams",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "East Quincy-Fishhook 138kV",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Transfer",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 175.0,
        "dp2_nris_mw": 175.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491828,
        "projectNumber": "J2258",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "inService": "2024-05-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Adams",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "East Quincy-Fishhook 138kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 175.0,
        "dp2NrisMw": 175.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Transfer",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2198,
      "normalized": {
        "queue_id": "J2262",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV",
        "queue_date": "2021-10-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 625.0,
        "summer_net_mw": 625.0,
        "winter_net_mw": 625.0,
        "proposed_completion_date": "2028-09-28T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-07-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 652.0,
        "dp1_nris_mw": 652.0,
        "dp2_eris_mw": 625.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491829,
        "projectNumber": "J2262",
        "queueDate": "2021-10-11T04:00:00+00:00",
        "inService": "2029-07-20T04:00:00+00:00",
        "negInService": "2028-09-28T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV",
        "summerNetMW": 625.0,
        "winterNetMW": 625.0,
        "dp1ErisMw": 652.0,
        "dp1NrisMw": 652.0,
        "dp2ErisMw": 625.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2199,
      "normalized": {
        "queue_id": "J2049",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2022-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491830,
        "projectNumber": "J2049",
        "queueDate": "2022-03-25T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2200,
      "normalized": {
        "queue_id": "J2050",
        "county": "Macon",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Thomas Hill-Adair-1 161kV",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 208.43,
        "summer_net_mw": 208.43,
        "winter_net_mw": 208.43,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 208.43,
        "dp1_nris_mw": 208.43,
        "dp2_eris_mw": 208.43,
        "dp2_nris_mw": 208.43,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491831,
        "projectNumber": "J2050",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Macon",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Thomas Hill-Adair-1 161kV",
        "summerNetMW": 208.43,
        "winterNetMW": 208.43,
        "dp1ErisMw": 208.43,
        "dp1NrisMw": 208.43,
        "dp2ErisMw": 208.43,
        "dp2NrisMw": 208.43,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2201,
      "normalized": {
        "queue_id": "J2073",
        "county": "Ohio",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "345 kV Wilson Substation",
        "queue_date": "2021-11-29T05:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 91.53,
        "summer_net_mw": 91.53,
        "winter_net_mw": 91.53,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 91.53,
        "dp1_nris_mw": 91.53,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491832,
        "projectNumber": "J2073",
        "queueDate": "2021-11-29T05:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-10-15T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Ohio",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "345 kV Wilson Substation",
        "summerNetMW": 91.53,
        "winterNetMW": 91.53,
        "dp1ErisMw": 91.53,
        "dp1NrisMw": 91.53,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2202,
      "normalized": {
        "queue_id": "J2074",
        "county": "Outagamie",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Werner West 138 kV",
        "queue_date": "2021-10-18T04:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491833,
        "projectNumber": "J2074",
        "queueDate": "2021-10-18T04:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Outagamie",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Werner West 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2203,
      "normalized": {
        "queue_id": "J2084",
        "county": "Emmons",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Linton NW (not in power flow case yet)",
        "queue_date": "2021-11-01T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 45.0,
        "dp1_nris_mw": 45.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491834,
        "projectNumber": "J2084",
        "queueDate": "2021-11-01T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-11-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Emmons",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Linton NW (not in power flow case yet)",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 45.0,
        "dp1NrisMw": 45.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2204,
      "normalized": {
        "queue_id": "J2085",
        "county": "Emmons",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Linton NW 115 kV (radial to Wishek 115 kV)",
        "queue_date": "2021-11-01T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 40.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491835,
        "projectNumber": "J2085",
        "queueDate": "2021-11-01T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-11-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Emmons",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Linton NW 115 kV (radial to Wishek 115 kV)",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 40.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2205,
      "normalized": {
        "queue_id": "J2051",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "161 kV line tap of DELL EAST to Blytheville",
        "queue_date": "2021-11-23T05:00:00+00:00",
        "withdrawn_date": "2023-11-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491836,
        "projectNumber": "J2051",
        "queueDate": "2021-11-23T05:00:00+00:00",
        "withdrawnDate": "2023-11-10T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "161 kV line tap of DELL EAST to Blytheville",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2206,
      "normalized": {
        "queue_id": "J2052",
        "county": "Callaway",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Overton - McCredie 345kV",
        "queue_date": "2022-04-05T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491837,
        "projectNumber": "J2052",
        "queueDate": "2022-04-05T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Callaway",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Overton - McCredie 345kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2207,
      "normalized": {
        "queue_id": "J2090",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "161 kV  Parkin to Kuhn RoadLine Tap",
        "queue_date": "2022-07-13T04:00:00+00:00",
        "withdrawn_date": "2023-11-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491838,
        "projectNumber": "J2090",
        "queueDate": "2022-07-13T04:00:00+00:00",
        "withdrawnDate": "2023-11-07T05:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "161 kV  Parkin to Kuhn RoadLine Tap",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2208,
      "normalized": {
        "queue_id": "J2091",
        "county": "DeSoto",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "TWINKLETOWN 230 KV",
        "queue_date": "2022-01-11T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-02-22T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 130.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491839,
        "projectNumber": "J2091",
        "queueDate": "2022-01-11T05:00:00+00:00",
        "inService": "2025-02-22T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "DeSoto",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "TWINKLETOWN 230 KV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 130.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2209,
      "normalized": {
        "queue_id": "J2095",
        "county": "Tama",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Belle Plaine Junction to Toledo Transmission",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2023-10-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 212.0,
        "summer_net_mw": 212.0,
        "winter_net_mw": 212.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491840,
        "projectNumber": "J2095",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2023-10-10T04:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Tama",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Belle Plaine Junction to Toledo Transmission",
        "summerNetMW": 212.0,
        "winterNetMW": 212.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2210,
      "normalized": {
        "queue_id": "J2260",
        "county": "Presque Isle",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "PORT CALCITE - RIGGSVILLE 138.0kV",
        "queue_date": "2021-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 251.5,
        "summer_net_mw": 251.5,
        "winter_net_mw": 251.5,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 149.24,
        "dp1_nris_mw": 149.24,
        "dp2_eris_mw": 149.24,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491841,
        "projectNumber": "J2260",
        "queueDate": "2021-10-07T04:00:00+00:00",
        "inService": "2023-07-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Presque Isle",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "PORT CALCITE - RIGGSVILLE 138.0kV",
        "summerNetMW": 251.5,
        "winterNetMW": 251.5,
        "dp1ErisMw": 149.24,
        "dp1NrisMw": 149.24,
        "dp2ErisMw": 149.24,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2211,
      "normalized": {
        "queue_id": "J2261",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV",
        "queue_date": "2021-10-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 625.0,
        "summer_net_mw": 625.0,
        "winter_net_mw": 625.0,
        "proposed_completion_date": "2028-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-07-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 652.0,
        "dp1_nris_mw": 652.0,
        "dp2_eris_mw": 625.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491842,
        "projectNumber": "J2261",
        "queueDate": "2021-10-11T04:00:00+00:00",
        "inService": "2029-07-20T04:00:00+00:00",
        "negInService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "INDEPENDENCE-ISES - POWERLINE ROAD 500.0kV",
        "summerNetMW": 625.0,
        "winterNetMW": 625.0,
        "dp1ErisMw": 652.0,
        "dp1NrisMw": 652.0,
        "dp2ErisMw": 625.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2212,
      "normalized": {
        "queue_id": "J2267",
        "county": "Williamson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "345 kV Crab Orchard Substation",
        "queue_date": "2022-03-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 225.0,
        "dp2_nris_mw": 225.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491843,
        "projectNumber": "J2267",
        "queueDate": "2022-03-24T04:00:00+00:00",
        "inService": "2025-03-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Williamson",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "345 kV Crab Orchard Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 225.0,
        "dp2NrisMw": 225.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2213,
      "normalized": {
        "queue_id": "J2065",
        "county": "Pipestone",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Buffalo Ridge to Pipestone 115kV",
        "queue_date": "2021-07-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491844,
        "projectNumber": "J2065",
        "queueDate": "2021-07-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Pipestone",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Buffalo Ridge to Pipestone 115kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2214,
      "normalized": {
        "queue_id": "J2066",
        "county": "Henry",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Denmark",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2026-09-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-12-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491845,
        "projectNumber": "J2066",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2026-09-18T04:00:00+00:00",
        "inService": "2022-12-02T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Henry",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Denmark",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2215,
      "normalized": {
        "queue_id": "J2278",
        "county": "Edgar",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491846,
        "projectNumber": "J2278",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2025-11-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Edgar",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2216,
      "normalized": {
        "queue_id": "J2282",
        "county": "Ohio",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "BR Tap -- New Hardinsburg 161kV",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-25T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491847,
        "projectNumber": "J2282",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2025-10-25T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Ohio",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BR Tap -- New Hardinsburg 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2217,
      "normalized": {
        "queue_id": "J2068",
        "county": "Pierce",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Herbert 69 kV Substation",
        "queue_date": "2021-07-19T04:00:00+00:00",
        "withdrawn_date": "2026-05-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 75.0,
        "dp2_nris_mw": 75.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491848,
        "projectNumber": "J2068",
        "queueDate": "2021-07-19T04:00:00+00:00",
        "withdrawnDate": "2026-05-20T04:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Pierce",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Herbert 69 kV Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 75.0,
        "dp2NrisMw": 75.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2218,
      "normalized": {
        "queue_id": "J2071",
        "county": "Hardin",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "RYE CO - CYPRESS 138.0kV",
        "queue_date": "2021-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": "2028-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 198.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 198.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491849,
        "projectNumber": "J2071",
        "queueDate": "2021-09-14T04:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2028-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Hardin",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "RYE CO - CYPRESS 138.0kV",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 198.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 198.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2219,
      "normalized": {
        "queue_id": "J2072",
        "county": "Grant",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Woodward 115kV -  H.S. EHV 115 kV",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491850,
        "projectNumber": "J2072",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Grant",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Woodward 115kV -  H.S. EHV 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2220,
      "normalized": {
        "queue_id": "J2080",
        "county": "Oliver",
        "state": "ND",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Square Butte 230 kV Substation East",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2026-06-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491851,
        "projectNumber": "J2080",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2026-06-04T04:00:00+00:00",
        "inService": "2024-05-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Oliver",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Square Butte 230 kV Substation East",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2221,
      "normalized": {
        "queue_id": "J2289",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Indianola 230/130 Sub",
        "queue_date": "2021-09-09T04:00:00+00:00",
        "withdrawn_date": "2026-02-17T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491852,
        "projectNumber": "J2289",
        "queueDate": "2021-09-09T04:00:00+00:00",
        "withdrawnDate": "2026-02-17T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "negInService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "Indianola 230/130 Sub",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2222,
      "normalized": {
        "queue_id": "J2290",
        "county": "Avoyelles",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "CLECO Yellow Bayou 138kV Substation",
        "queue_date": "2022-02-17T05:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-25T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491853,
        "projectNumber": "J2290",
        "queueDate": "2022-02-17T05:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-10-25T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Avoyelles",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "CLECO Yellow Bayou 138kV Substation",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2223,
      "normalized": {
        "queue_id": "J2081",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Sans Souci 500kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2025-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": "2027-10-01T04:00:00+00:00",
        "generation_type": "Coal",
        "facility_type": "Steam Turbine (including Nuclear, Geothermal and Solar Steam)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 15.0,
        "dp1_nris_mw": 15.0,
        "dp2_eris_mw": 15.0,
        "dp2_nris_mw": 15.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491854,
        "projectNumber": "J2081",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2025-12-09T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "negInService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Sans Souci 500kV",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 15.0,
        "dp1NrisMw": 15.0,
        "dp2ErisMw": 15.0,
        "dp2NrisMw": 15.0,
        "fuelType": "Coal",
        "facilityType": "Steam Turbine (including Nuclear, Geothermal and Solar Steam)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2224,
      "normalized": {
        "queue_id": "J2082",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Shady Oaks (Bus# 500780) to Coughlin (Bus# 500230)",
        "queue_date": "2021-09-02T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491855,
        "projectNumber": "J2082",
        "queueDate": "2021-09-02T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-10-04T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Shady Oaks (Bus# 500780) to Coughlin (Bus# 500230)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2225,
      "normalized": {
        "queue_id": "J2083",
        "county": "Allen",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Caney",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": "2023-11-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491856,
        "projectNumber": "J2083",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "withdrawnDate": "2023-11-10T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Allen",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Caney",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2226,
      "normalized": {
        "queue_id": "J2089",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Line tap DELL to Manilla AECC 161 kV",
        "queue_date": "2021-11-23T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-12-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491857,
        "projectNumber": "J2089",
        "queueDate": "2021-11-23T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Line tap DELL to Manilla AECC 161 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2227,
      "normalized": {
        "queue_id": "J2300",
        "county": "Greene",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "Gainesville Switching Station",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491858,
        "projectNumber": "J2300",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Greene",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Gainesville Switching Station",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2228,
      "normalized": {
        "queue_id": "J2308",
        "county": "Miami",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greentown  - Walton. 230.0kV",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 35.0,
        "dp1_nris_mw": 35.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491859,
        "projectNumber": "J2308",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Miami",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greentown  - Walton. 230.0kV",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 35.0,
        "dp1NrisMw": 35.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2229,
      "normalized": {
        "queue_id": "J2264",
        "county": "Prairie",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Desarc(A) (500kV) -Griffithville(B) (500kV)",
        "queue_date": "2021-10-11T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 88.0,
        "summer_net_mw": 88.0,
        "winter_net_mw": 88.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491860,
        "projectNumber": "J2264",
        "queueDate": "2021-10-11T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-02-02T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Prairie",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Desarc(A) (500kV) -Griffithville(B) (500kV)",
        "summerNetMW": 88.0,
        "winterNetMW": 88.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2230,
      "normalized": {
        "queue_id": "J2265",
        "county": "Bollinger",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "St. Francois (Bus #345773) - Lutesville (Bus #344974) 345 kV Line",
        "queue_date": "2025-07-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 200.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491861,
        "projectNumber": "J2265",
        "queueDate": "2025-07-16T04:00:00+00:00",
        "inService": "2024-02-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Bollinger",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "St. Francois (Bus #345773) - Lutesville (Bus #344974) 345 kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 200.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2231,
      "normalized": {
        "queue_id": "J2309",
        "county": "Murray",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Chanarambie - ELLSBOROUGH (GRE) 115.0kV",
        "queue_date": "2021-09-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2029-10-30T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491862,
        "projectNumber": "J2309",
        "queueDate": "2021-09-07T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "negInService": "2029-10-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Murray",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Chanarambie - ELLSBOROUGH (GRE) 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2232,
      "normalized": {
        "queue_id": "J2311",
        "county": "Putnam",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Putnam",
        "queue_date": "2024-10-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-09T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 145.0,
        "dp1_nris_mw": 145.0,
        "dp2_eris_mw": 145.0,
        "dp2_nris_mw": 145.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491863,
        "projectNumber": "J2311",
        "queueDate": "2024-10-18T04:00:00+00:00",
        "inService": "2024-02-09T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Putnam",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Putnam",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 145.0,
        "dp1NrisMw": 145.0,
        "dp2ErisMw": 145.0,
        "dp2NrisMw": 145.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2233,
      "normalized": {
        "queue_id": "J2266",
        "county": "Edgar",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7KANSAS   - 08SUGCRK 345.0kV",
        "queue_date": "2025-06-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 175.0,
        "dp2_nris_mw": 175.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491864,
        "projectNumber": "J2266",
        "queueDate": "2025-06-09T04:00:00+00:00",
        "inService": "2025-03-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Edgar",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7KANSAS   - 08SUGCRK 345.0kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 175.0,
        "dp2NrisMw": 175.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2234,
      "normalized": {
        "queue_id": "J2268",
        "county": "Linn",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold",
        "queue_date": "2021-08-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 370.0,
        "dp1_nris_mw": 370.0,
        "dp2_eris_mw": 370.0,
        "dp2_nris_mw": 370.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491865,
        "projectNumber": "J2268",
        "queueDate": "2021-08-11T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Duane Arnold",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 370.0,
        "dp1NrisMw": 370.0,
        "dp2ErisMw": 370.0,
        "dp2NrisMw": 370.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2235,
      "normalized": {
        "queue_id": "J2257",
        "county": "Evangeline",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Ville Platte - Westfork 230kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491866,
        "projectNumber": "J2257",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2024-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Ville Platte - Westfork 230kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2236,
      "normalized": {
        "queue_id": "J2259",
        "county": "Hendricks",
        "state": "IN",
        "transmission_owner": "WABASH VALLEY POWER ASSOCIATION, INC.",
        "poi": "Amo 345kV",
        "queue_date": "2021-08-12T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 199.99,
        "summer_net_mw": 199.99,
        "winter_net_mw": 199.99,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491867,
        "projectNumber": "J2259",
        "queueDate": "2021-08-12T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-11-01T04:00:00+00:00",
        "transmissionOwner": "WABASH VALLEY POWER ASSOCIATION, INC.",
        "county": "Hendricks",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Amo 345kV",
        "summerNetMW": 199.99,
        "winterNetMW": 199.99,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2237,
      "normalized": {
        "queue_id": "J2313",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Other_",
        "queue_date": "2021-09-10T04:00:00+00:00",
        "withdrawn_date": "2025-03-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491868,
        "projectNumber": "J2313",
        "queueDate": "2021-09-10T04:00:00+00:00",
        "withdrawnDate": "2025-03-07T05:00:00+00:00",
        "inService": "2023-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2238,
      "normalized": {
        "queue_id": "J2316",
        "county": "Dickinson",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Nordic 138kV Substation",
        "queue_date": "2021-09-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 77.5,
        "summer_net_mw": 77.5,
        "winter_net_mw": 77.5,
        "proposed_completion_date": "2027-08-02T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 77.5,
        "dp1_nris_mw": 77.5,
        "dp2_eris_mw": 77.5,
        "dp2_nris_mw": 71.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491869,
        "projectNumber": "J2316",
        "queueDate": "2021-09-16T04:00:00+00:00",
        "inService": "2023-09-15T04:00:00+00:00",
        "negInService": "2027-08-02T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dickinson",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Nordic 138kV Substation",
        "summerNetMW": 77.5,
        "winterNetMW": 77.5,
        "dp1ErisMw": 77.5,
        "dp1NrisMw": 77.5,
        "dp2ErisMw": 77.5,
        "dp2NrisMw": 71.5,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2239,
      "normalized": {
        "queue_id": "J2270",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Merom 345 kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 300.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491870,
        "projectNumber": "J2270",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Merom 345 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 300.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2240,
      "normalized": {
        "queue_id": "J2283",
        "county": "Hillsdale",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "18Knowles (MISO node #256632)",
        "queue_date": "2021-11-19T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 16.1,
        "summer_net_mw": 16.1,
        "winter_net_mw": 16.1,
        "proposed_completion_date": "2020-10-01T04:00:00+00:00",
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2020-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 16.1,
        "dp1_nris_mw": 16.1,
        "dp2_eris_mw": 16.1,
        "dp2_nris_mw": 16.1,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491871,
        "projectNumber": "J2283",
        "queueDate": "2021-11-19T05:00:00+00:00",
        "inService": "2020-10-01T04:00:00+00:00",
        "negInService": "2020-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Hillsdale",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "18Knowles (MISO node #256632)",
        "summerNetMW": 16.1,
        "winterNetMW": 16.1,
        "dp1ErisMw": 16.1,
        "dp1NrisMw": 16.1,
        "dp2ErisMw": 16.1,
        "dp2NrisMw": 16.1,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2241,
      "normalized": {
        "queue_id": "J2269",
        "county": "Fountain",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Veedersburg West - Lafayette 230kV",
        "queue_date": "2022-06-14T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491872,
        "projectNumber": "J2269",
        "queueDate": "2022-06-14T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Fountain",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Veedersburg West - Lafayette 230kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2242,
      "normalized": {
        "queue_id": "J2273",
        "county": "Clinton",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Tabor",
        "queue_date": "2025-07-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 175.0,
        "dp2_nris_mw": 175.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491873,
        "projectNumber": "J2273",
        "queueDate": "2025-07-03T04:00:00+00:00",
        "inService": "2024-03-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clinton",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tabor",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 175.0,
        "dp2NrisMw": 175.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2243,
      "normalized": {
        "queue_id": "J2284",
        "county": "Coahoma",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Clarksdale-Delta 115kV line",
        "queue_date": "2021-09-08T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 65.97,
        "summer_net_mw": 65.97,
        "winter_net_mw": 65.97,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491874,
        "projectNumber": "J2284",
        "queueDate": "2021-09-08T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2025-12-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Coahoma",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Clarksdale-Delta 115kV line",
        "summerNetMW": 65.97,
        "winterNetMW": 65.97,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2244,
      "normalized": {
        "queue_id": "J2287",
        "county": "Bolivar",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "DELTA SES SWITCHYARD 115kV",
        "queue_date": "2021-09-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 122.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491875,
        "projectNumber": "J2287",
        "queueDate": "2021-09-07T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Bolivar",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "DELTA SES SWITCHYARD 115kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 122.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2245,
      "normalized": {
        "queue_id": "J2294",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "Dell to Nucor 161 kV",
        "queue_date": "2021-08-10T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2028-06-28T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491876,
        "projectNumber": "J2294",
        "queueDate": "2021-08-10T04:00:00+00:00",
        "inService": "2024-05-01T04:00:00+00:00",
        "negInService": "2028-06-28T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Dell to Nucor 161 kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2246,
      "normalized": {
        "queue_id": "J2302",
        "county": "St. Helena",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "MCKNIGHT - PLANT DANIEL 500.0kV",
        "queue_date": "2021-11-10T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": "2027-10-11T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 400.0,
        "dp2_eris_mw": 400.0,
        "dp2_nris_mw": 400.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491877,
        "projectNumber": "J2302",
        "queueDate": "2021-11-10T05:00:00+00:00",
        "inService": "2024-08-01T04:00:00+00:00",
        "negInService": "2027-10-11T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Helena",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "MCKNIGHT - PLANT DANIEL 500.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 400.0,
        "dp2ErisMw": 400.0,
        "dp2NrisMw": 400.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2247,
      "normalized": {
        "queue_id": "J2317",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BASTROP (CAHOON) - STERLINGTON 115 SWYD 115.0kV",
        "queue_date": "2021-12-21T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": "2027-12-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 225.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 202.5,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491878,
        "projectNumber": "J2317",
        "queueDate": "2021-12-21T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "negInService": "2027-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "BASTROP (CAHOON) - STERLINGTON 115 SWYD 115.0kV",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 225.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 202.5,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2248,
      "normalized": {
        "queue_id": "J2319",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Stein 345 kV substation",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2021-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491879,
        "projectNumber": "J2319",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2021-12-22T05:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Stein 345 kV substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2249,
      "normalized": {
        "queue_id": "J2274",
        "county": "Lincoln",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Pike - Troy 161kV",
        "queue_date": "2021-07-21T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 104.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491880,
        "projectNumber": "J2274",
        "queueDate": "2021-07-21T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Lincoln",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pike - Troy 161kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 104.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2250,
      "normalized": {
        "queue_id": "J2276",
        "county": "Douglas",
        "state": "MN",
        "transmission_owner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "poi": "ALEXANDRIA",
        "queue_date": "2022-04-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 39.5,
        "summer_net_mw": 39.5,
        "winter_net_mw": 39.5,
        "proposed_completion_date": "2027-01-01T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 39.5,
        "dp1_nris_mw": 39.5,
        "dp2_eris_mw": 39.5,
        "dp2_nris_mw": 39.5,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491881,
        "projectNumber": "J2276",
        "queueDate": "2022-04-11T04:00:00+00:00",
        "inService": "2022-01-01T05:00:00+00:00",
        "negInService": "2027-01-01T05:00:00+00:00",
        "transmissionOwner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "county": "Douglas",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ALEXANDRIA",
        "summerNetMW": 39.5,
        "winterNetMW": 39.5,
        "dp1ErisMw": 39.5,
        "dp1NrisMw": 39.5,
        "dp2ErisMw": 39.5,
        "dp2NrisMw": 39.5,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2251,
      "normalized": {
        "queue_id": "J2292",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "GOOS FERRY",
        "queue_date": "2021-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2027-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 50.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491882,
        "projectNumber": "J2292",
        "queueDate": "2021-09-15T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "GOOS FERRY",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 50.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2252,
      "normalized": {
        "queue_id": "J2296",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Merom Gibson 345kV line Tap",
        "queue_date": "2022-03-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491883,
        "projectNumber": "J2296",
        "queueDate": "2022-03-24T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Merom Gibson 345kV line Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2253,
      "normalized": {
        "queue_id": "J2304",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia - Rockdale 345.0kV",
        "queue_date": "2021-12-02T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": "2028-12-31T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 400.0,
        "dp2_eris_mw": 400.0,
        "dp2_nris_mw": 400.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491884,
        "projectNumber": "J2304",
        "queueDate": "2021-12-02T05:00:00+00:00",
        "inService": "2024-04-15T04:00:00+00:00",
        "negInService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Columbia - Rockdale 345.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 400.0,
        "dp2ErisMw": 400.0,
        "dp2NrisMw": 400.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2254,
      "normalized": {
        "queue_id": "J2305",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Henderson - AB Brown 138 kV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 139.0,
        "summer_net_mw": 139.0,
        "winter_net_mw": 139.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491885,
        "projectNumber": "J2305",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Henderson - AB Brown 138 kV",
        "summerNetMW": 139.0,
        "winterNetMW": 139.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2255,
      "normalized": {
        "queue_id": "J2263",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport 345KV",
        "queue_date": "2021-08-31T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491886,
        "projectNumber": "J2263",
        "queueDate": "2021-08-31T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2024-08-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport 345KV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2256,
      "normalized": {
        "queue_id": "J2271",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "South Fond du Lac to Columbia 345 kV",
        "queue_date": "2021-07-21T04:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491887,
        "projectNumber": "J2271",
        "queueDate": "2021-07-21T04:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "South Fond du Lac to Columbia 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2257,
      "normalized": {
        "queue_id": "J2272",
        "county": "Clinton",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Calamus East",
        "queue_date": "2021-07-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": "2026-10-01T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491888,
        "projectNumber": "J2272",
        "queueDate": "2021-07-22T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "negInService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Clinton",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Calamus East",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2258,
      "normalized": {
        "queue_id": "J2275",
        "county": "Peoria",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Fargo to Sandburg 345kV",
        "queue_date": "2022-03-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 250.0,
        "dp2_nris_mw": 250.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491889,
        "projectNumber": "J2275",
        "queueDate": "2022-03-22T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Peoria",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fargo to Sandburg 345kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 250.0,
        "dp2NrisMw": 250.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2259,
      "normalized": {
        "queue_id": "J2277",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Arnott - Golden Sands 138.0kV",
        "queue_date": "2022-05-06T04:00:00+00:00",
        "withdrawn_date": "2025-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491890,
        "projectNumber": "J2277",
        "queueDate": "2022-05-06T04:00:00+00:00",
        "withdrawnDate": "2025-10-08T04:00:00+00:00",
        "inService": "2023-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Arnott - Golden Sands 138.0kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2260,
      "normalized": {
        "queue_id": "J2279",
        "county": "Ionia",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Burnips to Tremaine 138 kV line",
        "queue_date": "2021-07-21T04:00:00+00:00",
        "withdrawn_date": "2025-03-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491891,
        "projectNumber": "J2279",
        "queueDate": "2021-07-21T04:00:00+00:00",
        "withdrawnDate": "2025-03-03T05:00:00+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Ionia",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Burnips to Tremaine 138 kV line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2261,
      "normalized": {
        "queue_id": "J2280",
        "county": "",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "GREENWOOD CLARK TOWNSHIP",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 198.0,
        "dp1_nris_mw": 198.0,
        "dp2_eris_mw": 198.0,
        "dp2_nris_mw": 198.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491892,
        "projectNumber": "J2280",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GREENWOOD CLARK TOWNSHIP",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 198.0,
        "dp1NrisMw": 198.0,
        "dp2ErisMw": 198.0,
        "dp2NrisMw": 198.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2262,
      "normalized": {
        "queue_id": "J2288",
        "county": "Ralls",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "SPENCER CREEK",
        "queue_date": "2025-01-27T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 175.0,
        "dp2_nris_mw": 175.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491893,
        "projectNumber": "J2288",
        "queueDate": "2025-01-27T05:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Ralls",
        "state": "MO",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SPENCER CREEK",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 175.0,
        "dp2NrisMw": 175.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2263,
      "normalized": {
        "queue_id": "J2312",
        "county": "Putnam",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Putnam",
        "queue_date": "2024-10-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 47.9,
        "summer_net_mw": 47.9,
        "winter_net_mw": 47.9,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-02-09T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 47.9,
        "dp1_nris_mw": 47.9,
        "dp2_eris_mw": 47.9,
        "dp2_nris_mw": 47.9,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491894,
        "projectNumber": "J2312",
        "queueDate": "2024-10-18T04:00:00+00:00",
        "inService": "2024-02-09T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Putnam",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Putnam",
        "summerNetMW": 47.9,
        "winterNetMW": 47.9,
        "dp1ErisMw": 47.9,
        "dp1NrisMw": 47.9,
        "dp2ErisMw": 47.9,
        "dp2NrisMw": 47.9,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2264,
      "normalized": {
        "queue_id": "J2314",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "PETRY WOODS SS",
        "queue_date": "2021-09-10T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 150.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491895,
        "projectNumber": "J2314",
        "queueDate": "2021-09-10T04:00:00+00:00",
        "inService": "2023-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "PETRY WOODS SS",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 150.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2265,
      "normalized": {
        "queue_id": "J2315",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Petry Woods",
        "queue_date": "2021-09-10T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.3,
        "summer_net_mw": 75.3,
        "winter_net_mw": 75.3,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491896,
        "projectNumber": "J2315",
        "queueDate": "2021-09-10T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2023-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Petry Woods",
        "summerNetMW": 75.3,
        "winterNetMW": 75.3,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2266,
      "normalized": {
        "queue_id": "J2334",
        "county": "Montgomery",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Redhawk",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 195.0,
        "summer_net_mw": 195.0,
        "winter_net_mw": 195.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 195.0,
        "dp1_nris_mw": 195.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491897,
        "projectNumber": "J2334",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Montgomery",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Redhawk",
        "summerNetMW": 195.0,
        "winterNetMW": 195.0,
        "dp1ErisMw": 195.0,
        "dp1NrisMw": 195.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2267,
      "normalized": {
        "queue_id": "J2293",
        "county": "Adams",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Other_",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": "2024-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491898,
        "projectNumber": "J2293",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "withdrawnDate": "2024-10-01T04:00:00+00:00",
        "inService": "2025-11-30T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Adams",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2268,
      "normalized": {
        "queue_id": "J2297",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Indianola 230kV Substation",
        "queue_date": "2021-09-09T04:00:00+00:00",
        "withdrawn_date": "2026-03-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491899,
        "projectNumber": "J2297",
        "queueDate": "2021-09-09T04:00:00+00:00",
        "withdrawnDate": "2026-03-10T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "negInService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "Indianola 230kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2269,
      "normalized": {
        "queue_id": "J3838",
        "county": "Ingham",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "DELHI - TOMPKINS 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 135.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491900,
        "projectNumber": "J3838",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ingham",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "DELHI - TOMPKINS 138.0kV",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 135.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2270,
      "normalized": {
        "queue_id": "J3848",
        "county": "Wabasha",
        "state": "MN",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Wabaco",
        "queue_date": "2024-12-31T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491901,
        "projectNumber": "J3848",
        "queueDate": "2024-12-31T05:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Wabasha",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Wabaco",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2271,
      "normalized": {
        "queue_id": "J2310",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Rhodes",
        "queue_date": "2021-09-09T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491902,
        "projectNumber": "J2310",
        "queueDate": "2021-09-09T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2024-04-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Rhodes",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2272,
      "normalized": {
        "queue_id": "J2318",
        "county": "Warren",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "North East (Castle) - Culley 138 kV (J1642 POI)",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": "2024-10-08T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-25T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491903,
        "projectNumber": "J2318",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "withdrawnDate": "2024-10-08T04:00:00+00:00",
        "inService": "2025-10-25T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Warren",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "North East (Castle) - Culley 138 kV (J1642 POI)",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2273,
      "normalized": {
        "queue_id": "J2320",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Inverness",
        "queue_date": "2021-09-10T04:00:00+00:00",
        "withdrawn_date": "2023-10-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491904,
        "projectNumber": "J2320",
        "queueDate": "2021-09-10T04:00:00+00:00",
        "withdrawnDate": "2023-10-25T04:00:00+00:00",
        "inService": "2023-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Inverness",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2274,
      "normalized": {
        "queue_id": "J3847",
        "county": "Jefferson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Walton Shell Substation 138KV",
        "queue_date": "2025-01-03T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491905,
        "projectNumber": "J3847",
        "queueDate": "2025-01-03T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jefferson",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Walton Shell Substation 138KV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2275,
      "normalized": {
        "queue_id": "J1748",
        "county": "DeSoto",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Twinkletown 230 kV",
        "queue_date": "2020-07-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2025-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": "2022-11-29T05:00:00+00:00",
        "in_service": "2023-08-15T04:00:00+00:00",
        "gia_to_execute": "2022-11-29T05:00:00+00:00",
        "study_cycle": "DPP-2020",
        "study_group": "South",
        "study_phase": "GIA",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 100.0,
        "dp2_nris_mw": 100.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491906,
        "projectNumber": "J1748",
        "queueDate": "2020-07-17T04:00:00+00:00",
        "doneDate": "2022-11-29T05:00:00+00:00",
        "inService": "2023-08-15T04:00:00+00:00",
        "giaToExec": "2022-11-29T05:00:00+00:00",
        "negInService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "DeSoto",
        "state": "MS",
        "studyCycle": "DPP-2020",
        "studyGroup": "South",
        "studyPhase": "GIA",
        "svcType": "NRIS",
        "poiName": "Twinkletown 230 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 100.0,
        "dp2NrisMw": 100.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2276,
      "normalized": {
        "queue_id": "J3849",
        "county": "Winnebago",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Bison - Colby 345kV",
        "queue_date": "2024-12-31T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491907,
        "projectNumber": "J3849",
        "queueDate": "2024-12-31T05:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Winnebago",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Bison - Colby 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2277,
      "normalized": {
        "queue_id": "J3846",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Other_",
        "queue_date": "2025-01-10T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491908,
        "projectNumber": "J3846",
        "queueDate": "2025-01-10T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2278,
      "normalized": {
        "queue_id": "J3853",
        "county": "Iroquois",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-12-26T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491909,
        "projectNumber": "J3853",
        "queueDate": "2024-12-26T05:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Iroquois",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2279,
      "normalized": {
        "queue_id": "J2298",
        "county": "Greene",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "Gainesville Switching Station",
        "queue_date": "2021-11-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-04-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 200.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491910,
        "projectNumber": "J2298",
        "queueDate": "2021-11-30T05:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "negInService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Greene",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Gainesville Switching Station",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 200.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2280,
      "normalized": {
        "queue_id": "J2301",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2022-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 70.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 70.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491911,
        "projectNumber": "J2301",
        "queueDate": "2022-03-28T04:00:00+00:00",
        "inService": "2025-11-30T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 70.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 70.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2281,
      "normalized": {
        "queue_id": "J3535",
        "county": "Dunklin",
        "state": "MO",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "JIM HILL - HAYTI SOUTH 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491912,
        "projectNumber": "J3535",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Dunklin",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "JIM HILL - HAYTI SOUTH 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2282,
      "normalized": {
        "queue_id": "J3547",
        "county": "Martin",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "LAKEFIELD",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 630.0,
        "summer_net_mw": 549.6,
        "winter_net_mw": 630.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491913,
        "projectNumber": "J3547",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Martin",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LAKEFIELD",
        "summerNetMW": 549.6,
        "winterNetMW": 630.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2283,
      "normalized": {
        "queue_id": "J2307",
        "county": "Miami",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greentown  - Walton. 230.0kV",
        "queue_date": "2022-03-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 130.0,
        "dp1_nris_mw": 130.0,
        "dp2_eris_mw": 130.0,
        "dp2_nris_mw": 130.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491914,
        "projectNumber": "J2307",
        "queueDate": "2022-03-23T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Miami",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greentown  - Walton. 230.0kV",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 130.0,
        "dp1NrisMw": 130.0,
        "dp2ErisMw": 130.0,
        "dp2NrisMw": 130.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2284,
      "normalized": {
        "queue_id": "J2324",
        "county": "Winnebago",
        "state": "IL",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Shirland Ave Tap (Y-54) to Shaw 69kV",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-02-24T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491915,
        "projectNumber": "J2324",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-02-24T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Winnebago",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Shirland Ave Tap (Y-54) to Shaw 69kV",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2285,
      "normalized": {
        "queue_id": "J3525",
        "county": "Rock Island",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SUB 47",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491916,
        "projectNumber": "J3525",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-06T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Rock Island",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SUB 47",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2286,
      "normalized": {
        "queue_id": "J3536",
        "county": "Poinsett",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC TRUMANN WEST - TRUMANN 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491917,
        "projectNumber": "J3536",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Poinsett",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC TRUMANN WEST - TRUMANN 161.0kV",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2287,
      "normalized": {
        "queue_id": "J3533",
        "county": "Randolph",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5MOBERLY  - SALSBRY5 (KCPL) 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491918,
        "projectNumber": "J3533",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Randolph",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5MOBERLY  - SALSBRY5 (KCPL) 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2288,
      "normalized": {
        "queue_id": "J3530",
        "county": "Saline",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHERIDAN EHV - MAGNET COVE 500.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491919,
        "projectNumber": "J3530",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Saline",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SHERIDAN EHV - MAGNET COVE 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2289,
      "normalized": {
        "queue_id": "J3559",
        "county": "Hancock",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Coleman EHV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491920,
        "projectNumber": "J3559",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-09-10T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Hancock",
        "state": "KY",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Coleman EHV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2290,
      "normalized": {
        "queue_id": "J3561",
        "county": "Jo Daviess",
        "state": "IL",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Galena (DPC) - Savanna 161kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491921,
        "projectNumber": "J3561",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Jo Daviess",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Galena (DPC) - Savanna 161kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2291,
      "normalized": {
        "queue_id": "J3620",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MONETTE JUNCTION - PARAGOULD 161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491922,
        "projectNumber": "J3620",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MONETTE JUNCTION - PARAGOULD 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2292,
      "normalized": {
        "queue_id": "J3621",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "HERGETT - POWERLINE ROAD 161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491923,
        "projectNumber": "J3621",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HERGETT - POWERLINE ROAD 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2293,
      "normalized": {
        "queue_id": "J3546",
        "county": "Lincoln",
        "state": "SD",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Yankee - Brookings CO. 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491924,
        "projectNumber": "J3546",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lincoln",
        "state": "SD",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Yankee - Brookings CO. 115.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2294,
      "normalized": {
        "queue_id": "J3617",
        "county": "Clay",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "DATTO",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491925,
        "projectNumber": "J3617",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clay",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DATTO",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2295,
      "normalized": {
        "queue_id": "J3619",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MONETTE JUNCTION - PARAGOULD 161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491926,
        "projectNumber": "J3619",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MONETTE JUNCTION - PARAGOULD 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2296,
      "normalized": {
        "queue_id": "J4307",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "",
        "queue_date": "2026-09-09T18:08:53+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 720.0,
        "summer_net_mw": 720.0,
        "winter_net_mw": 720.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491927,
        "projectNumber": "J4307",
        "queueDate": "2026-09-09T18:08:53+00:00",
        "inService": "2031-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 720.0,
        "winterNetMW": 720.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2297,
      "normalized": {
        "queue_id": "J3560",
        "county": "Putnam",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Putnam 138kV",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491928,
        "projectNumber": "J3560",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-04-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Putnam",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Putnam 138kV",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2298,
      "normalized": {
        "queue_id": "J3623",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 350.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491929,
        "projectNumber": "J3623",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 350.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2299,
      "normalized": {
        "queue_id": "J3616",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "STUTTGART NORTH SS - STUTTGART RICUSKEY 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491930,
        "projectNumber": "J3616",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STUTTGART NORTH SS - STUTTGART RICUSKEY 115.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2300,
      "normalized": {
        "queue_id": "J3618",
        "county": "Clay",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "DATTO",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491931,
        "projectNumber": "J3618",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clay",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DATTO",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2301,
      "normalized": {
        "queue_id": "J3526",
        "county": "Goodhue",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "NORTH ROCHESTER",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491932,
        "projectNumber": "J3526",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2030-12-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Goodhue",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NORTH ROCHESTER",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2302,
      "normalized": {
        "queue_id": "J3532",
        "county": "Roseau",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Riel (MH) - Roseau County North 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491933,
        "projectNumber": "J3532",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Roseau",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Riel (MH) - Roseau County North 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2303,
      "normalized": {
        "queue_id": "J3534",
        "county": "Madison",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "DELHI - TALLULAH 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491934,
        "projectNumber": "J3534",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Madison",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DELHI - TALLULAH 115.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2304,
      "normalized": {
        "queue_id": "J3531",
        "county": "White",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491935,
        "projectNumber": "J3531",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "White",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2305,
      "normalized": {
        "queue_id": "J3537",
        "county": "Kalamazoo",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Weeds Lake 138kV substation (Bus Number 256510)",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 265.0,
        "summer_net_mw": 265.0,
        "winter_net_mw": 265.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491936,
        "projectNumber": "J3537",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Kalamazoo",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Weeds Lake 138kV substation (Bus Number 256510)",
        "summerNetMW": 265.0,
        "winterNetMW": 265.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2306,
      "normalized": {
        "queue_id": "J3545",
        "county": "Ionia",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BINGHAM - MARQUETTE 138.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491937,
        "projectNumber": "J3545",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ionia",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BINGHAM - MARQUETTE 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2307,
      "normalized": {
        "queue_id": "J3578",
        "county": "Greene",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "Gainesville Switching Station",
        "queue_date": "2024-04-09T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491938,
        "projectNumber": "J3578",
        "queueDate": "2024-04-09T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Greene",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gainesville Switching Station",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2308,
      "normalized": {
        "queue_id": "J3622",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "HERGETT - POWERLINE ROAD 161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491939,
        "projectNumber": "J3622",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HERGETT - POWERLINE ROAD 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2309,
      "normalized": {
        "queue_id": "J4301",
        "county": "Peoria",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7FARGO - 7SANDBURG 345.0kV",
        "queue_date": "2026-09-08T19:05:24+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 240.0,
        "summer_net_mw": 240.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491940,
        "projectNumber": "J4301",
        "queueDate": "2026-09-08T19:05:24+00:00",
        "inService": "2031-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Peoria",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "7FARGO - 7SANDBURG 345.0kV",
        "summerNetMW": 240.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2310,
      "normalized": {
        "queue_id": "J4267",
        "county": "Tazewell",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Tazewell",
        "queue_date": "2026-08-20T18:14:15+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491941,
        "projectNumber": "J4267",
        "queueDate": "2026-08-20T18:14:15+00:00",
        "inService": "2030-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Tazewell",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2311,
      "normalized": {
        "queue_id": "J4333",
        "county": "",
        "state": "",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "",
        "queue_date": "2026-09-03T20:44:34+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 490.0,
        "summer_net_mw": 490.0,
        "winter_net_mw": 490.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491942,
        "projectNumber": "J4333",
        "queueDate": "2026-09-03T20:44:34+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 490.0,
        "winterNetMW": 490.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2312,
      "normalized": {
        "queue_id": "J4334",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "",
        "queue_date": "2026-09-03T21:47:32+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 294.0,
        "summer_net_mw": 294.0,
        "winter_net_mw": 294.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491943,
        "projectNumber": "J4334",
        "queueDate": "2026-09-03T21:47:32+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 294.0,
        "winterNetMW": 294.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2313,
      "normalized": {
        "queue_id": "J4355",
        "county": "Redwood",
        "state": "",
        "transmission_owner": "MINNESOTA MUNICIPAL POWER AGENCY M2PA",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2026-09-09T22:41:18+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491944,
        "projectNumber": "J4355",
        "queueDate": "2026-09-09T22:41:18+00:00",
        "inService": "2031-09-30T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA MUNICIPAL POWER AGENCY M2PA",
        "county": "Redwood",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2314,
      "normalized": {
        "queue_id": "J4305",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-02T19:36:36+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491945,
        "projectNumber": "J4305",
        "queueDate": "2026-09-02T19:36:36+00:00",
        "inService": "2031-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2315,
      "normalized": {
        "queue_id": "J4356",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-03T20:10:49+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 294.0,
        "summer_net_mw": 294.0,
        "winter_net_mw": 294.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491946,
        "projectNumber": "J4356",
        "queueDate": "2026-09-03T20:10:49+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 294.0,
        "winterNetMW": 294.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2316,
      "normalized": {
        "queue_id": "J4269",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2026-08-13T00:08:19+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-03-26T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491947,
        "projectNumber": "J4269",
        "queueDate": "2026-08-13T00:08:19+00:00",
        "inService": "2031-03-26T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2317,
      "normalized": {
        "queue_id": "J4391",
        "county": "",
        "state": "",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "",
        "queue_date": "2026-09-09T19:32:48+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 392.0,
        "summer_net_mw": 392.0,
        "winter_net_mw": 392.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491948,
        "projectNumber": "J4391",
        "queueDate": "2026-09-09T19:32:48+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 392.0,
        "winterNetMW": 392.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2318,
      "normalized": {
        "queue_id": "J4364",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-10T03:13:36+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491949,
        "projectNumber": "J4364",
        "queueDate": "2026-09-10T03:13:36+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2319,
      "normalized": {
        "queue_id": "J4353",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-11T23:39:42+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491950,
        "projectNumber": "J4353",
        "queueDate": "2026-09-11T23:39:42+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2320,
      "normalized": {
        "queue_id": "J4399",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-09T21:56:34+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 318.5,
        "summer_net_mw": 318.5,
        "winter_net_mw": 318.5,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491951,
        "projectNumber": "J4399",
        "queueDate": "2026-09-09T21:56:34+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 318.5,
        "winterNetMW": 318.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2321,
      "normalized": {
        "queue_id": "J4262",
        "county": "Tazewell",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Tazewell",
        "queue_date": "2026-08-20T18:29:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491952,
        "projectNumber": "J4262",
        "queueDate": "2026-08-20T18:29:06+00:00",
        "inService": "2030-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Tazewell",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2322,
      "normalized": {
        "queue_id": "J4362",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-03T21:00:15+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 490.0,
        "summer_net_mw": 490.0,
        "winter_net_mw": 490.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491953,
        "projectNumber": "J4362",
        "queueDate": "2026-09-03T21:00:15+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 490.0,
        "winterNetMW": 490.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2323,
      "normalized": {
        "queue_id": "J4354",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-03T23:33:56+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 392.0,
        "summer_net_mw": 392.0,
        "winter_net_mw": 392.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491954,
        "projectNumber": "J4354",
        "queueDate": "2026-09-03T23:33:56+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 392.0,
        "winterNetMW": 392.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2324,
      "normalized": {
        "queue_id": "J4363",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "",
        "queue_date": "2026-09-10T02:32:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491955,
        "projectNumber": "J4363",
        "queueDate": "2026-09-10T02:32:06+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2325,
      "normalized": {
        "queue_id": "J4276",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-08-28T16:44:15+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491956,
        "projectNumber": "J4276",
        "queueDate": "2026-08-28T16:44:15+00:00",
        "inService": "2031-10-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2326,
      "normalized": {
        "queue_id": "J4335",
        "county": "Clay",
        "state": "",
        "transmission_owner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "poi": "ALEXANDRIA - BISON 345.0kV",
        "queue_date": "2026-09-03T23:21:29+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 343.0,
        "summer_net_mw": 343.0,
        "winter_net_mw": 343.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491957,
        "projectNumber": "J4335",
        "queueDate": "2026-09-03T23:21:29+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "county": "Clay",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "ALEXANDRIA - BISON 345.0kV",
        "summerNetMW": 343.0,
        "winterNetMW": 343.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2327,
      "normalized": {
        "queue_id": "J4331",
        "county": "",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "",
        "queue_date": "2026-09-01T07:22:33+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1435.0,
        "summer_net_mw": 1435.0,
        "winter_net_mw": 1435.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491958,
        "projectNumber": "J4331",
        "queueDate": "2026-09-01T07:22:33+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 1435.0,
        "winterNetMW": 1435.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2328,
      "normalized": {
        "queue_id": "J4365",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-08T20:08:55+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 269.5,
        "summer_net_mw": 269.5,
        "winter_net_mw": 269.5,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491959,
        "projectNumber": "J4365",
        "queueDate": "2026-09-08T20:08:55+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 269.5,
        "winterNetMW": 269.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2329,
      "normalized": {
        "queue_id": "J4279",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-08-28T00:54:15+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 9.0,
        "summer_net_mw": 9.0,
        "winter_net_mw": 9.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-10-05T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491960,
        "projectNumber": "J4279",
        "queueDate": "2026-08-28T00:54:15+00:00",
        "inService": "2029-10-05T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 9.0,
        "winterNetMW": 9.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2330,
      "normalized": {
        "queue_id": "J4019",
        "county": "Calhoun",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BATTLE CREEK - ONEIDA 345.0kV",
        "queue_date": "2025-05-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491961,
        "projectNumber": "J4019",
        "queueDate": "2025-05-07T04:00:00+00:00",
        "inService": "2030-07-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "BATTLE CREEK - ONEIDA 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2331,
      "normalized": {
        "queue_id": "J3950",
        "county": "Clark",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CASEY - 7SNYDER  345.0kV",
        "queue_date": "2025-02-20T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 340.0,
        "summer_net_mw": 340.0,
        "winter_net_mw": 340.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491962,
        "projectNumber": "J3950",
        "queueDate": "2025-02-20T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clark",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7CASEY - 7SNYDER  345.0kV",
        "summerNetMW": 340.0,
        "winterNetMW": 340.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2332,
      "normalized": {
        "queue_id": "J3947",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7FARADAY - 7PANA 345.0kV",
        "queue_date": "2025-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491963,
        "projectNumber": "J3947",
        "queueDate": "2025-03-25T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7FARADAY - 7PANA 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2333,
      "normalized": {
        "queue_id": "J4366",
        "county": "Clay",
        "state": "",
        "transmission_owner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "poi": "ALEXANDRIA - BISON 345.0kV",
        "queue_date": "2026-09-12T01:52:16+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 343.0,
        "summer_net_mw": 343.0,
        "winter_net_mw": 343.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491964,
        "projectNumber": "J4366",
        "queueDate": "2026-09-12T01:52:16+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "county": "Clay",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "ALEXANDRIA - BISON 345.0kV",
        "summerNetMW": 343.0,
        "winterNetMW": 343.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2334,
      "normalized": {
        "queue_id": "J4021",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Petersburg - Sullivan (AEP/PJM) 345.0kV",
        "queue_date": "2025-05-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 470.0,
        "summer_net_mw": 470.0,
        "winter_net_mw": 470.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491965,
        "projectNumber": "J4021",
        "queueDate": "2025-05-27T04:00:00+00:00",
        "inService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Petersburg - Sullivan (AEP/PJM) 345.0kV",
        "summerNetMW": 470.0,
        "winterNetMW": 470.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2335,
      "normalized": {
        "queue_id": "J3975",
        "county": "Rusk",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Stone Lake - Gardner Park 345.0kV",
        "queue_date": "2025-03-10T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 416.5,
        "summer_net_mw": 416.5,
        "winter_net_mw": 416.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-02-20T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 416.5,
        "dp1_nris_mw": 416.5,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491966,
        "projectNumber": "J3975",
        "queueDate": "2025-03-10T04:00:00+00:00",
        "inService": "2030-02-20T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Rusk",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Stone Lake - Gardner Park 345.0kV",
        "summerNetMW": 416.5,
        "winterNetMW": 416.5,
        "dp1ErisMw": 416.5,
        "dp1NrisMw": 416.5,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2336,
      "normalized": {
        "queue_id": "J3973",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "COLDWATER - MOORE ROAD 138.0kV",
        "queue_date": "2025-03-05T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491967,
        "projectNumber": "J3973",
        "queueDate": "2025-03-05T05:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "COLDWATER - MOORE ROAD 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2337,
      "normalized": {
        "queue_id": "J3976",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7COFFEN N - 7RAMSEY   345.0kV",
        "queue_date": "2025-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 66.8,
        "summer_net_mw": 66.8,
        "winter_net_mw": 66.8,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 66.8,
        "dp1_nris_mw": 66.8,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491968,
        "projectNumber": "J3976",
        "queueDate": "2025-03-25T04:00:00+00:00",
        "inService": "2028-12-15T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7COFFEN N - 7RAMSEY   345.0kV",
        "summerNetMW": 66.8,
        "winterNetMW": 66.8,
        "dp1ErisMw": 66.8,
        "dp1NrisMw": 66.8,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2338,
      "normalized": {
        "queue_id": "J3896",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Bedford 345 345.0kV",
        "queue_date": "2025-02-07T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 70.0,
        "dp1_nris_mw": 70.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491969,
        "projectNumber": "J3896",
        "queueDate": "2025-02-07T05:00:00+00:00",
        "inService": "2030-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Bedford 345 345.0kV",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 70.0,
        "dp1NrisMw": 70.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2339,
      "normalized": {
        "queue_id": "J3921",
        "county": "Jasper",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "BONDURANT - MONTEZUMA 345.0kV",
        "queue_date": "2025-03-07T05:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491970,
        "projectNumber": "J3921",
        "queueDate": "2025-03-07T05:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Jasper",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BONDURANT - MONTEZUMA 345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2340,
      "normalized": {
        "queue_id": "J3922",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "HIPLE",
        "queue_date": "2025-03-04T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 1445.0,
        "summer_net_mw": 1445.0,
        "winter_net_mw": 1445.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 1445.0,
        "dp1_nris_mw": 1445.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491971,
        "projectNumber": "J3922",
        "queueDate": "2025-03-04T05:00:00+00:00",
        "inService": "2030-03-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "HIPLE",
        "summerNetMW": 1445.0,
        "winterNetMW": 1445.0,
        "dp1ErisMw": 1445.0,
        "dp1NrisMw": 1445.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2341,
      "normalized": {
        "queue_id": "J4020",
        "county": "Kenosha",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Pleasant Prairie - Arcadian 345.0kV",
        "queue_date": "2025-05-12T04:00:00+00:00",
        "withdrawn_date": "2025-09-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 481.0,
        "summer_net_mw": 481.0,
        "winter_net_mw": 481.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491972,
        "projectNumber": "J4020",
        "queueDate": "2025-05-12T04:00:00+00:00",
        "withdrawnDate": "2025-09-11T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Kenosha",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Pleasant Prairie - Arcadian 345.0kV",
        "summerNetMW": 481.0,
        "winterNetMW": 481.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2342,
      "normalized": {
        "queue_id": "J4030",
        "county": "Faulkner",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MAYFLOWER115KV",
        "queue_date": "2025-05-29T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491973,
        "projectNumber": "J4030",
        "queueDate": "2025-05-29T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2029-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Faulkner",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "MAYFLOWER115KV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2343,
      "normalized": {
        "queue_id": "J3924",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "COLDWATER - MOORE ROAD 138.0kV",
        "queue_date": "2025-03-05T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491974,
        "projectNumber": "J3924",
        "queueDate": "2025-03-05T05:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "COLDWATER - MOORE ROAD 138.0kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2344,
      "normalized": {
        "queue_id": "J3933",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Killdeer - Quinn 345kV",
        "queue_date": "2025-02-24T05:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491975,
        "projectNumber": "J3933",
        "queueDate": "2025-02-24T05:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Killdeer - Quinn 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2345,
      "normalized": {
        "queue_id": "J4099",
        "county": "Jackson",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Fox Lake - Jackson North 161kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491976,
        "projectNumber": "J4099",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Jackson",
        "state": "MN",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Fox Lake - Jackson North 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2346,
      "normalized": {
        "queue_id": "J4120",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Other_",
        "queue_date": "2025-09-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491977,
        "projectNumber": "J4120",
        "queueDate": "2025-09-16T04:00:00+00:00",
        "inService": "2030-10-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2347,
      "normalized": {
        "queue_id": "J4329",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "",
        "queue_date": "2026-09-01T21:18:45+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491978,
        "projectNumber": "J4329",
        "queueDate": "2026-09-01T21:18:45+00:00",
        "inService": "2030-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2348,
      "normalized": {
        "queue_id": "J4336",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "",
        "queue_date": "2026-09-04T03:40:40+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491979,
        "projectNumber": "J4336",
        "queueDate": "2026-09-04T03:40:40+00:00",
        "inService": "2030-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2349,
      "normalized": {
        "queue_id": "J3983",
        "county": "Gibson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "MACKEY",
        "queue_date": "2024-10-30T04:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491980,
        "projectNumber": "J3983",
        "queueDate": "2024-10-30T04:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Gibson",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "MACKEY",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2350,
      "normalized": {
        "queue_id": "S1083",
        "county": "Hancock",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Skillman",
        "queue_date": "2025-01-14T05:00:00+00:00",
        "withdrawn_date": "2026-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491981,
        "projectNumber": "S1083",
        "queueDate": "2025-01-14T05:00:00+00:00",
        "withdrawnDate": "2026-03-24T04:00:00+00:00",
        "inService": "2029-09-12T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Hancock",
        "state": "KY",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Skillman",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2351,
      "normalized": {
        "queue_id": "J4122",
        "county": "Shiawassee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Goss",
        "queue_date": "2025-09-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491982,
        "projectNumber": "J4122",
        "queueDate": "2025-09-19T04:00:00+00:00",
        "inService": "2031-04-20T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Goss",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2352,
      "normalized": {
        "queue_id": "J4133",
        "county": "De Soto",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Dolet Hills Substation",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 756.0,
        "summer_net_mw": 756.0,
        "winter_net_mw": 756.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491983,
        "projectNumber": "J4133",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "De Soto",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Dolet Hills Substation",
        "summerNetMW": 756.0,
        "winterNetMW": 756.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2353,
      "normalized": {
        "queue_id": "J3949",
        "county": "Scott",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7MEREDOSIA - 7TURNER 345.0kV",
        "queue_date": "2025-04-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 245.0,
        "dp1_nris_mw": 245.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491984,
        "projectNumber": "J3949",
        "queueDate": "2025-04-07T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Scott",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7MEREDOSIA - 7TURNER 345.0kV",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 245.0,
        "dp1NrisMw": 245.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2354,
      "normalized": {
        "queue_id": "J3946",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Tazewell",
        "queue_date": "2025-03-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491985,
        "projectNumber": "J3946",
        "queueDate": "2025-03-31T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Tazewell",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2355,
      "normalized": {
        "queue_id": "J4281",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-09-01T16:17:55+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 481.2,
        "summer_net_mw": 481.2,
        "winter_net_mw": 481.2,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491986,
        "projectNumber": "J4281",
        "queueDate": "2026-09-01T16:17:55+00:00",
        "inService": "2030-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 481.2,
        "winterNetMW": 481.2,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2356,
      "normalized": {
        "queue_id": "J4392",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-10T01:31:48+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 16.0,
        "summer_net_mw": 16.0,
        "winter_net_mw": 16.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2008-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491987,
        "projectNumber": "J4392",
        "queueDate": "2026-09-10T01:31:48+00:00",
        "inService": "2008-03-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "",
        "summerNetMW": 16.0,
        "winterNetMW": 16.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2357,
      "normalized": {
        "queue_id": "J4017",
        "county": "Blue Earth",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Wilmarth - Fieldon 345.0kV",
        "queue_date": "2025-05-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 299.0,
        "summer_net_mw": 299.0,
        "winter_net_mw": 299.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491988,
        "projectNumber": "J4017",
        "queueDate": "2025-05-15T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Blue Earth",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Wilmarth - Fieldon 345.0kV",
        "summerNetMW": 299.0,
        "winterNetMW": 299.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2358,
      "normalized": {
        "queue_id": "J4018",
        "county": "Ford",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2025-05-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491989,
        "projectNumber": "J4018",
        "queueDate": "2025-05-02T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Ford",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2359,
      "normalized": {
        "queue_id": "J3952",
        "county": "Polk",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Other_",
        "queue_date": "2025-02-26T05:00:00+00:00",
        "withdrawn_date": "2026-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 395.0,
        "summer_net_mw": 395.0,
        "winter_net_mw": 395.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491990,
        "projectNumber": "J3952",
        "queueDate": "2025-02-26T05:00:00+00:00",
        "withdrawnDate": "2026-01-02T05:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Polk",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 395.0,
        "winterNetMW": 395.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2360,
      "normalized": {
        "queue_id": "J3974",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "queue_date": "2025-02-11T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491991,
        "projectNumber": "J3974",
        "queueDate": "2025-02-11T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2361,
      "normalized": {
        "queue_id": "S1085",
        "county": "Nobles",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "NOBLES COUNTY",
        "queue_date": "2025-01-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-07-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491992,
        "projectNumber": "S1085",
        "queueDate": "2025-01-14T05:00:00+00:00",
        "inService": "2028-07-01T04:00:00+00:00",
        "negInService": "2028-07-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Nobles",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "NOBLES COUNTY",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2362,
      "normalized": {
        "queue_id": "J3897",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Bedford 345 345.0kV",
        "queue_date": "2025-02-07T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491993,
        "projectNumber": "J3897",
        "queueDate": "2025-02-07T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Bedford 345 345.0kV",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2363,
      "normalized": {
        "queue_id": "J3898",
        "county": "Howard",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "MITCHELL COUNTY (ITCM) - HAZLETON (ITCM) 345.0kV",
        "queue_date": "2025-02-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 155.0,
        "summer_net_mw": 155.0,
        "winter_net_mw": 155.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 155.0,
        "dp1_nris_mw": 155.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491994,
        "projectNumber": "J3898",
        "queueDate": "2025-02-14T05:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Howard",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "MITCHELL COUNTY (ITCM) - HAZLETON (ITCM) 345.0kV",
        "summerNetMW": 155.0,
        "winterNetMW": 155.0,
        "dp1ErisMw": 155.0,
        "dp1NrisMw": 155.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2364,
      "normalized": {
        "queue_id": "J3934",
        "county": "McLeod",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Blue Lake - MCLEOD (GRE) 230.0kV",
        "queue_date": "2025-02-19T05:00:00+00:00",
        "withdrawn_date": "2026-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-03-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491995,
        "projectNumber": "J3934",
        "queueDate": "2025-02-19T05:00:00+00:00",
        "withdrawnDate": "2026-01-02T05:00:00+00:00",
        "inService": "2029-03-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "McLeod",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Blue Lake - MCLEOD (GRE) 230.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2365,
      "normalized": {
        "queue_id": "J4097",
        "county": "Rock",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "New J1377 ATC Switching Station",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 71.5,
        "summer_net_mw": 71.5,
        "winter_net_mw": 71.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 71.5,
        "dp1_nris_mw": 71.5,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491996,
        "projectNumber": "J4097",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-01-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Rock",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "New J1377 ATC Switching Station",
        "summerNetMW": 71.5,
        "winterNetMW": 71.5,
        "dp1ErisMw": 71.5,
        "dp1NrisMw": 71.5,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2366,
      "normalized": {
        "queue_id": "J4134",
        "county": "Ouachita",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC CAMDEN SOUTH - STEPHENS 115.0kV",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491997,
        "projectNumber": "J4134",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ouachita",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "AECC CAMDEN SOUTH - STEPHENS 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2367,
      "normalized": {
        "queue_id": "J4152",
        "county": "Redwood",
        "state": "MN",
        "transmission_owner": "MINNESOTA MUNICIPAL POWER AGENCY M2PA",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491998,
        "projectNumber": "J4152",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA MUNICIPAL POWER AGENCY M2PA",
        "county": "Redwood",
        "state": "MN",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2368,
      "normalized": {
        "queue_id": "J4153",
        "county": "Grant",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Big Stone South 345 kV substation",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3491999,
        "projectNumber": "J4153",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2031-06-28T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Grant",
        "state": "SD",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Big Stone South 345 kV substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2369,
      "normalized": {
        "queue_id": "J4159",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ROOSEVELT",
        "queue_date": "2025-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 664.0,
        "summer_net_mw": 616.0,
        "winter_net_mw": 664.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492000,
        "projectNumber": "J4159",
        "queueDate": "2025-08-13T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "ROOSEVELT",
        "summerNetMW": 616.0,
        "winterNetMW": 664.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2370,
      "normalized": {
        "queue_id": "J4160",
        "county": "Ottawa",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ROOSEVELT",
        "queue_date": "2025-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 55.0,
        "summer_net_mw": 55.0,
        "winter_net_mw": 55.0,
        "proposed_completion_date": "2026-08-15T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 55.0,
        "dp1_nris_mw": 55.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492001,
        "projectNumber": "J4160",
        "queueDate": "2025-08-13T04:00:00+00:00",
        "inService": "2026-05-31T04:00:00+00:00",
        "negInService": "2026-08-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ROOSEVELT",
        "summerNetMW": 55.0,
        "winterNetMW": 55.0,
        "dp1ErisMw": 55.0,
        "dp1NrisMw": 55.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2371,
      "normalized": {
        "queue_id": "J4135",
        "county": "Grant",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Big Stone South 345 kV substation",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": "2025-12-26T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 450.0,
        "summer_net_mw": 450.0,
        "winter_net_mw": 450.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492002,
        "projectNumber": "J4135",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "withdrawnDate": "2025-12-26T05:00:00+00:00",
        "inService": "2030-04-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Grant",
        "state": "SD",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Big Stone South 345 kV substation",
        "summerNetMW": 450.0,
        "winterNetMW": 450.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2372,
      "normalized": {
        "queue_id": "J4151",
        "county": "Redwood",
        "state": "MN",
        "transmission_owner": "MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 225.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492003,
        "projectNumber": "J4151",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Redwood",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 225.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2373,
      "normalized": {
        "queue_id": "J4031",
        "county": "Scott",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7MEREDOSIA - 7TURNER 345.0kV",
        "queue_date": "2025-05-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 245.0,
        "dp1_nris_mw": 245.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492004,
        "projectNumber": "J4031",
        "queueDate": "2025-05-12T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Scott",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7MEREDOSIA - 7TURNER 345.0kV",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 245.0,
        "dp1NrisMw": 245.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2374,
      "normalized": {
        "queue_id": "J3984",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "queue_date": "2024-10-25T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492005,
        "projectNumber": "J3984",
        "queueDate": "2024-10-25T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2375,
      "normalized": {
        "queue_id": "J4156",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "RILLA - RIVERTON 115.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 93.0,
        "summer_net_mw": 93.0,
        "winter_net_mw": 93.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492006,
        "projectNumber": "J4156",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "RILLA - RIVERTON 115.0kV",
        "summerNetMW": 93.0,
        "winterNetMW": 93.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2376,
      "normalized": {
        "queue_id": "J4158",
        "county": "De Witt",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4TABOR - 4SCLINTON TP 138.0kV",
        "queue_date": "2025-10-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492007,
        "projectNumber": "J4158",
        "queueDate": "2025-10-02T04:00:00+00:00",
        "inService": "2030-01-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "De Witt",
        "state": "IL",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "4TABOR - 4SCLINTON TP 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2377,
      "normalized": {
        "queue_id": "S1190",
        "county": "Lee",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Dell - Manila 161 kV",
        "queue_date": "2026-07-31T05:52:03+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492008,
        "projectNumber": "S1190",
        "queueDate": "2026-07-31T05:52:03+00:00",
        "inService": "2028-08-03T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Dell - Manila 161 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2378,
      "normalized": {
        "queue_id": "J4361",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-11T12:18:35+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492009,
        "projectNumber": "J4361",
        "queueDate": "2026-09-11T12:18:35+00:00",
        "inService": "2029-12-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2379,
      "normalized": {
        "queue_id": "J4400",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-09T18:24:42+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492010,
        "projectNumber": "J4400",
        "queueDate": "2026-09-09T18:24:42+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2380,
      "normalized": {
        "queue_id": "J4408",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-09-04T03:45:59+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492011,
        "projectNumber": "J4408",
        "queueDate": "2026-09-04T03:45:59+00:00",
        "inService": "2031-07-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2381,
      "normalized": {
        "queue_id": "J4311",
        "county": "",
        "state": "",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "",
        "queue_date": "2026-09-10T01:32:02+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-07-19T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492012,
        "projectNumber": "J4311",
        "queueDate": "2026-09-10T01:32:02+00:00",
        "inService": "2030-07-19T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2382,
      "normalized": {
        "queue_id": "J3948",
        "county": "Posey",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "queue_date": "2025-03-25T04:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492013,
        "projectNumber": "J3948",
        "queueDate": "2025-03-25T04:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Posey",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2383,
      "normalized": {
        "queue_id": "J3951",
        "county": "Polk",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Other_",
        "queue_date": "2025-02-26T05:00:00+00:00",
        "withdrawn_date": "2026-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 218.0,
        "summer_net_mw": 218.0,
        "winter_net_mw": 218.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492014,
        "projectNumber": "J3951",
        "queueDate": "2025-02-26T05:00:00+00:00",
        "withdrawnDate": "2026-01-02T05:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Polk",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 218.0,
        "winterNetMW": 218.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2384,
      "normalized": {
        "queue_id": "J4022",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "STERLINGTON 500 SWYD",
        "queue_date": "2025-05-22T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1509.0,
        "summer_net_mw": 1509.0,
        "winter_net_mw": 1509.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492015,
        "projectNumber": "J4022",
        "queueDate": "2025-05-22T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2030-01-02T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "STERLINGTON 500 SWYD",
        "summerNetMW": 1509.0,
        "winterNetMW": 1509.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2385,
      "normalized": {
        "queue_id": "S1081",
        "county": "Muskegon",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "DU PONT - WHITE LAKE 138.0kV",
        "queue_date": "2025-01-13T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2029-05-12T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492016,
        "projectNumber": "S1081",
        "queueDate": "2025-01-13T05:00:00+00:00",
        "inService": "2028-04-30T04:00:00+00:00",
        "negInService": "2029-05-12T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "DU PONT - WHITE LAKE 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2386,
      "normalized": {
        "queue_id": "J3980",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Merom (HED) 345.0kV",
        "queue_date": "2025-04-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492017,
        "projectNumber": "J3980",
        "queueDate": "2025-04-08T04:00:00+00:00",
        "inService": "2029-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Merom (HED) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2387,
      "normalized": {
        "queue_id": "S1111",
        "county": "Adair",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "ORIENT",
        "queue_date": "2025-07-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 263.0,
        "summer_net_mw": 263.0,
        "winter_net_mw": 263.0,
        "proposed_completion_date": "2028-05-05T04:00:00+00:00",
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492018,
        "projectNumber": "S1111",
        "queueDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "negInService": "2028-05-05T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Adair",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "ORIENT",
        "summerNetMW": 263.0,
        "winterNetMW": 263.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2388,
      "normalized": {
        "queue_id": "S1080",
        "county": "Martin",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Rutland",
        "queue_date": "2025-01-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2027-10-29T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492019,
        "projectNumber": "S1080",
        "queueDate": "2025-01-14T05:00:00+00:00",
        "inService": "2028-07-30T04:00:00+00:00",
        "negInService": "2027-10-29T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Martin",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Rutland",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2389,
      "normalized": {
        "queue_id": "R5064",
        "county": "Allamakee",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lansing",
        "queue_date": "2025-04-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492020,
        "projectNumber": "R5064",
        "queueDate": "2025-04-08T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Allamakee",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Lansing",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2390,
      "normalized": {
        "queue_id": "J3923",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Majestic-Milan 345 kV Line",
        "queue_date": "2025-02-28T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1414.0,
        "summer_net_mw": 1414.0,
        "winter_net_mw": 1414.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 1414.0,
        "dp1_nris_mw": 1414.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492021,
        "projectNumber": "J3923",
        "queueDate": "2025-02-28T05:00:00+00:00",
        "inService": "2030-03-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Majestic-Milan 345 kV Line",
        "summerNetMW": 1414.0,
        "winterNetMW": 1414.0,
        "dp1ErisMw": 1414.0,
        "dp1NrisMw": 1414.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2391,
      "normalized": {
        "queue_id": "J4123",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "WAGNER",
        "queue_date": "2025-09-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492022,
        "projectNumber": "J4123",
        "queueDate": "2025-09-19T04:00:00+00:00",
        "inService": "2031-04-20T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "WAGNER",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2392,
      "normalized": {
        "queue_id": "J3981",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Merom (HED) 345.0kV",
        "queue_date": "2025-04-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492023,
        "projectNumber": "J3981",
        "queueDate": "2025-04-08T04:00:00+00:00",
        "inService": "2029-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Merom (HED) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2393,
      "normalized": {
        "queue_id": "S1113",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Quinn",
        "queue_date": "2025-08-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-10-31T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492024,
        "projectNumber": "S1113",
        "queueDate": "2025-08-26T04:00:00+00:00",
        "inService": "2026-08-30T04:00:00+00:00",
        "negInService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Quinn",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2394,
      "normalized": {
        "queue_id": "S1117",
        "county": "New Madrid",
        "state": "MO",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Marston 161 kV",
        "queue_date": "2025-08-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-09-15T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492025,
        "projectNumber": "S1117",
        "queueDate": "2025-08-31T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "negInService": "2027-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "New Madrid",
        "state": "MO",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Marston 161 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2395,
      "normalized": {
        "queue_id": "J3925",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Bedford 345 345.0kV",
        "queue_date": "2025-02-07T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 70.0,
        "dp1_nris_mw": 70.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492026,
        "projectNumber": "J3925",
        "queueDate": "2025-02-07T05:00:00+00:00",
        "inService": "2030-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Bedford 345 345.0kV",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 70.0,
        "dp1NrisMw": 70.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2396,
      "normalized": {
        "queue_id": "J4098",
        "county": "Lafayette",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Rork - Sellers Road 230.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492027,
        "projectNumber": "J4098",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "Lafayette",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Rork - Sellers Road 230.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2397,
      "normalized": {
        "queue_id": "J4119",
        "county": "Rankin",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "RANKIN",
        "queue_date": "2025-09-23T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492028,
        "projectNumber": "J4119",
        "queueDate": "2025-09-23T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2029-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "Rankin",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "RANKIN",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2398,
      "normalized": {
        "queue_id": "J4121",
        "county": "Washington",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "GERALD ANDRUS SES SWYD - INDIANOLA 230/115 SUB 230.0kV",
        "queue_date": "2025-09-19T04:00:00+00:00",
        "withdrawn_date": "2026-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492029,
        "projectNumber": "J4121",
        "queueDate": "2025-09-19T04:00:00+00:00",
        "withdrawnDate": "2026-04-17T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "Washington",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "GERALD ANDRUS SES SWYD - INDIANOLA 230/115 SUB 230.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2399,
      "normalized": {
        "queue_id": "J4136",
        "county": "Grant",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Big Stone South 345kV",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492030,
        "projectNumber": "J4136",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2030-04-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Grant",
        "state": "SD",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Big Stone South 345kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2400,
      "normalized": {
        "queue_id": "J4194",
        "county": "Meeker",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "SHERBURNE CO",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2026-06-11T04:00:00+00:00",
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492031,
        "projectNumber": "J4194",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2026-06-11T04:00:00+00:00",
        "inService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Meeker",
        "state": "MN",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "SHERBURNE CO",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2401,
      "normalized": {
        "queue_id": "S1169",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BOGALUSA - TALISHEEK (LAGEN) 230.0kV",
        "queue_date": "2026-02-11T01:56:02+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492032,
        "projectNumber": "S1169",
        "queueDate": "2026-02-11T01:56:02+00:00",
        "inService": "2027-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "BOGALUSA - TALISHEEK (LAGEN) 230.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2402,
      "normalized": {
        "queue_id": "S1134",
        "county": "DeSoto",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "TWINKLETOWN",
        "queue_date": "2025-12-24T21:51:10+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-03T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492033,
        "projectNumber": "S1134",
        "queueDate": "2025-12-24T21:51:10+00:00",
        "inService": "2028-01-03T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "DeSoto",
        "state": "MS",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "TWINKLETOWN",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2403,
      "normalized": {
        "queue_id": "R5076",
        "county": "Lake",
        "state": "IN",
        "transmission_owner": "",
        "poi": "SCHAHFER GEN STA - ST. JOHN 345.0kV",
        "queue_date": "2025-10-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492034,
        "projectNumber": "R5076",
        "queueDate": "2025-10-15T04:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Lake",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "SCHAHFER GEN STA - ST. JOHN 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2404,
      "normalized": {
        "queue_id": "J4157",
        "county": "Morrison",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Iron Ridge - Benton 345kV",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 97.5,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492035,
        "projectNumber": "J4157",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Morrison",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Iron Ridge - Benton 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 97.5,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2405,
      "normalized": {
        "queue_id": "J4205",
        "county": "Orleans",
        "state": "LA",
        "transmission_owner": "ENTERGY NEW ORLEANS, LLC",
        "poi": "Suillivan Station (Entergy0",
        "queue_date": "2025-11-17T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-06-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "0MW GIA",
        "study_group": "NA",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492036,
        "projectNumber": "J4205",
        "queueDate": "2025-11-17T05:00:00+00:00",
        "inService": "2025-06-16T04:00:00+00:00",
        "transmissionOwner": "ENTERGY NEW ORLEANS, LLC",
        "county": "Orleans",
        "state": "LA",
        "studyCycle": "0MW GIA",
        "studyGroup": "NA",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "Suillivan Station (Entergy0",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2406,
      "normalized": {
        "queue_id": "R5081",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "",
        "poi": "Adams",
        "queue_date": "2025-12-22T21:54:30+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2028-04-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492037,
        "projectNumber": "R5081",
        "queueDate": "2025-12-22T21:54:30+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "negInService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Adams",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2407,
      "normalized": {
        "queue_id": "J3881",
        "county": "Clay",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7NEWTON   - 7TANNER    345.0kV",
        "queue_date": "2025-02-10T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492038,
        "projectNumber": "J3881",
        "queueDate": "2025-02-10T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clay",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7NEWTON   - 7TANNER    345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2408,
      "normalized": {
        "queue_id": "J3877",
        "county": "Pike",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2025-01-03T05:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492039,
        "projectNumber": "J3877",
        "queueDate": "2025-01-03T05:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Pike",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2409,
      "normalized": {
        "queue_id": "S1155",
        "county": "",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "",
        "queue_date": "2026-03-13T23:38:42+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492040,
        "projectNumber": "S1155",
        "queueDate": "2026-03-13T23:38:42+00:00",
        "inService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "",
        "state": "MO",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2410,
      "normalized": {
        "queue_id": "J3880",
        "county": "Clay",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7NEWTON   - 7TANNER    345.0kV",
        "queue_date": "2025-02-10T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492041,
        "projectNumber": "J3880",
        "queueDate": "2025-02-10T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clay",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7NEWTON   - 7TANNER    345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2411,
      "normalized": {
        "queue_id": "S1143",
        "county": "",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-01-20T22:17:08+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492042,
        "projectNumber": "S1143",
        "queueDate": "2026-01-20T22:17:08+00:00",
        "inService": "2027-12-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "IL",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2412,
      "normalized": {
        "queue_id": "J4154",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "GridUnity",
        "poi": "Andes Substation",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492043,
        "projectNumber": "J4154",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "GridUnity",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Andes Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2413,
      "normalized": {
        "queue_id": "J4166",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "",
        "poi": "Commodore 500 kV Substation,",
        "queue_date": "2025-09-24T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 710.0,
        "summer_net_mw": 710.0,
        "winter_net_mw": 710.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-11-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492044,
        "projectNumber": "J4166",
        "queueDate": "2025-09-24T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2029-11-15T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Commodore 500 kV Substation,",
        "summerNetMW": 710.0,
        "winterNetMW": 710.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2414,
      "normalized": {
        "queue_id": "J4200",
        "county": "Ramsey",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Merriam Park",
        "queue_date": "2025-09-30T04:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 16.0,
        "summer_net_mw": 16.0,
        "winter_net_mw": 16.0,
        "proposed_completion_date": null,
        "generation_type": "Hydro",
        "facility_type": "Hydroelectric",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2008-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492045,
        "projectNumber": "J4200",
        "queueDate": "2025-09-30T04:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2008-03-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Ramsey",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "E-NRIS",
        "poiName": "Merriam Park",
        "summerNetMW": 16.0,
        "winterNetMW": 16.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hydro",
        "facilityType": "Hydroelectric",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2415,
      "normalized": {
        "queue_id": "J4198",
        "county": "Christian",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Pana 138 kV",
        "queue_date": "2025-09-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492046,
        "projectNumber": "J4198",
        "queueDate": "2025-09-03T04:00:00+00:00",
        "inService": "2030-01-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Christian",
        "state": "IL",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Pana 138 kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2416,
      "normalized": {
        "queue_id": "S1140",
        "county": "Clinton",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Calamus East",
        "queue_date": "2026-03-07T03:12:54+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492047,
        "projectNumber": "S1140",
        "queueDate": "2026-03-07T03:12:54+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Clinton",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Calamus East",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2417,
      "normalized": {
        "queue_id": "R5079",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "",
        "queue_date": "2025-11-25T05:41:17+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492048,
        "projectNumber": "R5079",
        "queueDate": "2025-11-25T05:41:17+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2418,
      "normalized": {
        "queue_id": "S1160",
        "county": "",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "",
        "queue_date": "2026-03-28T02:47:28+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492049,
        "projectNumber": "S1160",
        "queueDate": "2026-03-28T02:47:28+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "",
        "state": "SD",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2419,
      "normalized": {
        "queue_id": "J4196",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "GILLETT - ELAINE 115.0kV",
        "queue_date": "2025-09-29T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492050,
        "projectNumber": "J4196",
        "queueDate": "2025-09-29T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2029-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "GILLETT - ELAINE 115.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2420,
      "normalized": {
        "queue_id": "S1105",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "KEO EHV",
        "queue_date": "2025-06-24T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492051,
        "projectNumber": "S1105",
        "queueDate": "2025-06-24T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "KEO EHV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2421,
      "normalized": {
        "queue_id": "J3878",
        "county": "Jefferson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7PR STATE - 7MTVERNW 345.0kV",
        "queue_date": "2024-12-19T05:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492052,
        "projectNumber": "J3878",
        "queueDate": "2024-12-19T05:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jefferson",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7PR STATE - 7MTVERNW 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2422,
      "normalized": {
        "queue_id": "J3882",
        "county": "Crawford",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4HUTSONVL - 4HEATH 138.0kV",
        "queue_date": "2025-02-10T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492053,
        "projectNumber": "J3882",
        "queueDate": "2025-02-10T05:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Crawford",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "4HUTSONVL - 4HEATH 138.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2423,
      "normalized": {
        "queue_id": "S1137",
        "county": "",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "",
        "queue_date": "2025-12-05T20:43:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492054,
        "projectNumber": "S1137",
        "queueDate": "2025-12-05T20:43:06+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "",
        "state": "LA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2424,
      "normalized": {
        "queue_id": "J4208",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2025-12-20T03:36:56+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492055,
        "projectNumber": "J4208",
        "queueDate": "2025-12-20T03:36:56+00:00",
        "inService": "2029-05-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2425,
      "normalized": {
        "queue_id": "J3649",
        "county": "Houghton",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Winona",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-03-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492056,
        "projectNumber": "J3649",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-03-28T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Houghton",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Winona",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2426,
      "normalized": {
        "queue_id": "J3883",
        "county": "Crawford",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4HUTSONVL - 4HEATH 138.0kV",
        "queue_date": "2025-02-10T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492057,
        "projectNumber": "J3883",
        "queueDate": "2025-02-10T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Crawford",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "4HUTSONVL - 4HEATH 138.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2427,
      "normalized": {
        "queue_id": "J3879",
        "county": "Jackson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Cayuga  - Hillsdale North 230.0kV",
        "queue_date": "2024-05-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492058,
        "projectNumber": "J3879",
        "queueDate": "2024-05-28T04:00:00+00:00",
        "inService": "2030-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Jackson",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Cayuga  - Hillsdale North 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2428,
      "normalized": {
        "queue_id": "J3876",
        "county": "Lapeer",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2025-02-06T05:00:00+00:00",
        "withdrawn_date": "2025-12-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492059,
        "projectNumber": "J3876",
        "queueDate": "2025-02-06T05:00:00+00:00",
        "withdrawnDate": "2025-12-31T05:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Lapeer",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2429,
      "normalized": {
        "queue_id": "J3875",
        "county": "Lapeer",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Other_",
        "queue_date": "2025-02-06T05:00:00+00:00",
        "withdrawn_date": "2025-12-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492060,
        "projectNumber": "J3875",
        "queueDate": "2025-02-06T05:00:00+00:00",
        "withdrawnDate": "2025-12-31T05:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lapeer",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2430,
      "normalized": {
        "queue_id": "R5078",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2025-12-19T02:33:54+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492061,
        "projectNumber": "R5078",
        "queueDate": "2025-12-19T02:33:54+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2431,
      "normalized": {
        "queue_id": "J4210",
        "county": "",
        "state": "",
        "transmission_owner": "ITC",
        "poi": "",
        "queue_date": "2026-02-06T05:56:29+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492062,
        "projectNumber": "J4210",
        "queueDate": "2026-02-06T05:56:29+00:00",
        "inService": "2030-01-06T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2432,
      "normalized": {
        "queue_id": "J3520",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4WEEDMAN  - 4MAHOMET 1 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 215.0,
        "summer_net_mw": 215.0,
        "winter_net_mw": 215.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492063,
        "projectNumber": "J3520",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4WEEDMAN  - 4MAHOMET 1 138.0kV",
        "summerNetMW": 215.0,
        "winterNetMW": 215.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2433,
      "normalized": {
        "queue_id": "J4164",
        "county": "Dane",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "North Madison 345/138 kV",
        "queue_date": "2025-09-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1203.0,
        "summer_net_mw": 1203.0,
        "winter_net_mw": 1203.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 1203.0,
        "dp1_nris_mw": 1203.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492064,
        "projectNumber": "J4164",
        "queueDate": "2025-09-29T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dane",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "North Madison 345/138 kV",
        "summerNetMW": 1203.0,
        "winterNetMW": 1203.0,
        "dp1ErisMw": 1203.0,
        "dp1NrisMw": 1203.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2434,
      "normalized": {
        "queue_id": "R5077",
        "county": "",
        "state": "",
        "transmission_owner": "ITC",
        "poi": "",
        "queue_date": "2025-12-02T06:30:09+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492065,
        "projectNumber": "R5077",
        "queueDate": "2025-12-02T06:30:09+00:00",
        "inService": "2026-08-03T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2435,
      "normalized": {
        "queue_id": "J3519",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Quiver",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 199.9,
        "summer_net_mw": 199.9,
        "winter_net_mw": 199.9,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492066,
        "projectNumber": "J3519",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-10-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Quiver",
        "summerNetMW": 199.9,
        "winterNetMW": 199.9,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2436,
      "normalized": {
        "queue_id": "J3646",
        "county": "St. Clair",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "ST. CLAIR",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 220.0,
        "dp1_nris_mw": 220.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492067,
        "projectNumber": "J3646",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "St. Clair",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ST. CLAIR",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 220.0,
        "dp1NrisMw": 220.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2437,
      "normalized": {
        "queue_id": "S1161",
        "county": "",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-03-24T00:28:33+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 625.0,
        "summer_net_mw": 625.0,
        "winter_net_mw": 625.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492068,
        "projectNumber": "S1161",
        "queueDate": "2026-03-24T00:28:33+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "AR",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 625.0,
        "winterNetMW": 625.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2438,
      "normalized": {
        "queue_id": "J3497",
        "county": "Pulaski",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492069,
        "projectNumber": "J3497",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Pulaski",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2439,
      "normalized": {
        "queue_id": "J3518",
        "county": "Gasconade",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "BLAND",
        "queue_date": "2024-04-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492070,
        "projectNumber": "J3518",
        "queueDate": "2024-04-19T04:00:00+00:00",
        "inService": "2028-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Gasconade",
        "state": "MO",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BLAND",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2440,
      "normalized": {
        "queue_id": "J3310",
        "county": "Lincoln",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BROOKHAVEN",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-05-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492071,
        "projectNumber": "J3310",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-05-23T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Lincoln",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BROOKHAVEN",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2441,
      "normalized": {
        "queue_id": "J3648",
        "county": "Baraga",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Silver River - Perch Lake 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-02-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492072,
        "projectNumber": "J3648",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-02-13T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Baraga",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Silver River - Perch Lake 138.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2442,
      "normalized": {
        "queue_id": "J3341",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "J2192 POI",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492073,
        "projectNumber": "J3341",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J2192 POI",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2443,
      "normalized": {
        "queue_id": "J3349",
        "county": "Fulton",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Ipava",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492074,
        "projectNumber": "J3349",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Fulton",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ipava",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2444,
      "normalized": {
        "queue_id": "J3373",
        "county": "Poinsett",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "HARRISBURG SS - HARRISBURG 161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492075,
        "projectNumber": "J3373",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Poinsett",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "HARRISBURG SS - HARRISBURG 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2445,
      "normalized": {
        "queue_id": "J3350",
        "county": "Randolph",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5MOBERLY  - 5OVERTON  161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492076,
        "projectNumber": "J3350",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Randolph",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5MOBERLY  - 5OVERTON  161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2446,
      "normalized": {
        "queue_id": "J3396",
        "county": "Scott",
        "state": "IL",
        "transmission_owner": "PRAIRIE POWER, INC. PPI",
        "poi": "Winchester - Hillview Tap 69.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492077,
        "projectNumber": "J3396",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "PRAIRIE POWER, INC. PPI",
        "county": "Scott",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Winchester - Hillview Tap 69.0kV",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2447,
      "normalized": {
        "queue_id": "J3374",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "RITCHIE SWYD - TARLETON 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 65.0,
        "summer_net_mw": 65.0,
        "winter_net_mw": 65.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492078,
        "projectNumber": "J3374",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "RITCHIE SWYD - TARLETON 230.0kV",
        "summerNetMW": 65.0,
        "winterNetMW": 65.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2448,
      "normalized": {
        "queue_id": "J3380",
        "county": "Cleveland",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC PINEBERGEN - AECC GLENDALE 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 155.0,
        "summer_net_mw": 155.0,
        "winter_net_mw": 155.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492079,
        "projectNumber": "J3380",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cleveland",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC PINEBERGEN - AECC GLENDALE 115.0kV",
        "summerNetMW": 155.0,
        "winterNetMW": 155.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2449,
      "normalized": {
        "queue_id": "R5075",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "",
        "queue_date": "2025-12-15T08:35:54+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492080,
        "projectNumber": "R5075",
        "queueDate": "2025-12-15T08:35:54+00:00",
        "inService": "2024-07-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2450,
      "normalized": {
        "queue_id": "R5080",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Crooked Lake",
        "queue_date": "2025-12-19T02:34:46+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-03-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492081,
        "projectNumber": "R5080",
        "queueDate": "2025-12-19T02:34:46+00:00",
        "inService": "2025-03-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Crooked Lake",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2451,
      "normalized": {
        "queue_id": "R5095",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-01-03T08:24:32+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492082,
        "projectNumber": "R5095",
        "queueDate": "2026-01-03T08:24:32+00:00",
        "inService": "2024-05-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2452,
      "normalized": {
        "queue_id": "J3650",
        "county": "Genesee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BEVERIDGE",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492083,
        "projectNumber": "J3650",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-11-15T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BEVERIDGE",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2453,
      "normalized": {
        "queue_id": "J3375",
        "county": "Washington",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Gerald Andrus 230 kV Substation",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492084,
        "projectNumber": "J3375",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Washington",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Gerald Andrus 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2454,
      "normalized": {
        "queue_id": "J3395",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "PRAIRIE POWER, INC. PPI",
        "poi": "Andrew Bkr - Fancy Creek 69.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492085,
        "projectNumber": "J3395",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "PRAIRIE POWER, INC. PPI",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Andrew Bkr - Fancy Creek 69.0kV",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2455,
      "normalized": {
        "queue_id": "J3455",
        "county": "Trinity",
        "state": "TX",
        "transmission_owner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "poi": "ONALASKA",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492086,
        "projectNumber": "J3455",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "county": "Trinity",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ONALASKA",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2456,
      "normalized": {
        "queue_id": "J3624",
        "county": "Columbia",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MAGNOLIA SOUTH - SHULER 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 155.0,
        "summer_net_mw": 155.0,
        "winter_net_mw": 155.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492087,
        "projectNumber": "J3624",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Columbia",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MAGNOLIA SOUTH - SHULER 115.0kV",
        "summerNetMW": 155.0,
        "winterNetMW": 155.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2457,
      "normalized": {
        "queue_id": "J3644",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492088,
        "projectNumber": "J3644",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2458,
      "normalized": {
        "queue_id": "J3647",
        "county": "Gratiot",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "NELSON ROAD",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492089,
        "projectNumber": "J3647",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-11-15T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NELSON ROAD",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2459,
      "normalized": {
        "queue_id": "J3643",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "REDSTONE - TITTABAWASSEE 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2024-11-04T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492090,
        "projectNumber": "J3643",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2024-11-04T05:00:00+00:00",
        "inService": "2028-10-16T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REDSTONE - TITTABAWASSEE 138.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2460,
      "normalized": {
        "queue_id": "J3454",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492091,
        "projectNumber": "J3454",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2461,
      "normalized": {
        "queue_id": "J2934",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Thetford to Murphy 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492092,
        "projectNumber": "J2934",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Thetford to Murphy 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2462,
      "normalized": {
        "queue_id": "J3394",
        "county": "St. Landry",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Ville Platte - West Fork 230.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 155.6,
        "summer_net_mw": 155.6,
        "winter_net_mw": 155.6,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 155.6,
        "dp1_nris_mw": 155.6,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492093,
        "projectNumber": "J3394",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Landry",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ville Platte - West Fork 230.0kV",
        "summerNetMW": 155.6,
        "winterNetMW": 155.6,
        "dp1ErisMw": 155.6,
        "dp1NrisMw": 155.6,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2463,
      "normalized": {
        "queue_id": "J3398",
        "county": "Greene",
        "state": "IL",
        "transmission_owner": "PRAIRIE POWER, INC. PPI",
        "poi": "Walkerville - Eldred 69.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492094,
        "projectNumber": "J3398",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "PRAIRIE POWER, INC. PPI",
        "county": "Greene",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Walkerville - Eldred 69.0kV",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2464,
      "normalized": {
        "queue_id": "J3002",
        "county": "Pine",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Arrowhead - Bear Creek (GRE) 230kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 288.0,
        "summer_net_mw": 288.0,
        "winter_net_mw": 288.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 288.0,
        "dp1_nris_mw": 243.75,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492095,
        "projectNumber": "J3002",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-08-30T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Pine",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Arrowhead - Bear Creek (GRE) 230kV",
        "summerNetMW": 288.0,
        "winterNetMW": 288.0,
        "dp1ErisMw": 288.0,
        "dp1NrisMw": 243.75,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2465,
      "normalized": {
        "queue_id": "J2930",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "",
        "poi": "AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492096,
        "projectNumber": "J2930",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2466,
      "normalized": {
        "queue_id": "J3645",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "RAPSON",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492097,
        "projectNumber": "J3645",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RAPSON",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2467,
      "normalized": {
        "queue_id": "J3651",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BEECHER - KNOWLES 138.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492098,
        "projectNumber": "J3651",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BEECHER - KNOWLES 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2468,
      "normalized": {
        "queue_id": "J2946",
        "county": "Dubuque",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Salem - Hickory Creek 345 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492099,
        "projectNumber": "J2946",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Dubuque",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Salem - Hickory Creek 345 kV line",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2469,
      "normalized": {
        "queue_id": "J3010",
        "county": "Clay",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "TAP ON THE CARBON TO BRAZIL 69KV LINE",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-27T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492100,
        "projectNumber": "J3010",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-09-27T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clay",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "TAP ON THE CARBON TO BRAZIL 69KV LINE",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2470,
      "normalized": {
        "queue_id": "J2920",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "1673  Interconnection Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 92.0,
        "summer_net_mw": 92.0,
        "winter_net_mw": 92.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 92.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492101,
        "projectNumber": "J2920",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "1673  Interconnection Substation",
        "summerNetMW": 92.0,
        "winterNetMW": 92.0,
        "dp1ErisMw": 92.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2471,
      "normalized": {
        "queue_id": "J2927",
        "county": "Randolph",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Tibbs",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492102,
        "projectNumber": "J2927",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-07-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Randolph",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tibbs",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2472,
      "normalized": {
        "queue_id": "J3827",
        "county": "Mackinac",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Indian Lake - Hiawatha 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492103,
        "projectNumber": "J3827",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Mackinac",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Indian Lake - Hiawatha 138.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2473,
      "normalized": {
        "queue_id": "J3311",
        "county": "St. Landry",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "WELLS",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492104,
        "projectNumber": "J3311",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-09-10T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Landry",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WELLS",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2474,
      "normalized": {
        "queue_id": "J3360",
        "county": "Morgan",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Meredosia",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492105,
        "projectNumber": "J3360",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Morgan",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Meredosia",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2475,
      "normalized": {
        "queue_id": "J3397",
        "county": "Rock",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Magnolia",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492106,
        "projectNumber": "J3397",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2026-08-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Rock",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "Magnolia",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2476,
      "normalized": {
        "queue_id": "J3009",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "VOYAGER",
        "queue_date": "2022-08-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492107,
        "projectNumber": "J3009",
        "queueDate": "2022-08-25T04:00:00+00:00",
        "inService": "2025-05-15T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "VOYAGER",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2477,
      "normalized": {
        "queue_id": "J2944",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Rocky Run - Gardner Park 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 350.0,
        "dp1_nris_mw": 350.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492108,
        "projectNumber": "J2944",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rocky Run - Gardner Park 345.0kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 350.0,
        "dp1NrisMw": 350.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2478,
      "normalized": {
        "queue_id": "J3401",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "DELL EHV - SAN SOUCI 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 490.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492109,
        "projectNumber": "J3401",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DELL EHV - SAN SOUCI 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 490.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2479,
      "normalized": {
        "queue_id": "J2947",
        "county": "Rock",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Rock River 138 kV Substations 1 (6 RICE) and 2 (5 RICE)",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 205.0,
        "summer_net_mw": 205.0,
        "winter_net_mw": 205.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 205.0,
        "dp1_nris_mw": 205.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492110,
        "projectNumber": "J2947",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Rock",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rock River 138 kV Substations 1 (6 RICE) and 2 (5 RICE)",
        "summerNetMW": 205.0,
        "winterNetMW": 205.0,
        "dp1ErisMw": 205.0,
        "dp1NrisMw": 205.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2480,
      "normalized": {
        "queue_id": "J2921",
        "county": "Calhoun",
        "state": "MI",
        "transmission_owner": "",
        "poi": "Other_",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492111,
        "projectNumber": "J2921",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-31T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Calhoun",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2481,
      "normalized": {
        "queue_id": "J3017",
        "county": "Grant",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South 345 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492112,
        "projectNumber": "J3017",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Grant",
        "state": "SD",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Big Stone South 345 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2482,
      "normalized": {
        "queue_id": "J2938",
        "county": "Knox",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4MONM BLVD W - 4CASTRO_JCT 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492113,
        "projectNumber": "J2938",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Knox",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4MONM BLVD W - 4CASTRO_JCT 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2483,
      "normalized": {
        "queue_id": "J2951",
        "county": "Union",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Creston Roadhouse",
        "queue_date": "2022-09-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492114,
        "projectNumber": "J2951",
        "queueDate": "2022-09-05T04:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Union",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "Creston Roadhouse",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2484,
      "normalized": {
        "queue_id": "J2941",
        "county": "Chicot",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Macon Lake SS - Lake Chicot Pump STA 115kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492115,
        "projectNumber": "J2941",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-11-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Chicot",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Macon Lake SS - Lake Chicot Pump STA 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2485,
      "normalized": {
        "queue_id": "J3019",
        "county": "East Feliciana",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Fancy Point to Port Hudson 230 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492116,
        "projectNumber": "J3019",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "East Feliciana",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fancy Point to Port Hudson 230 kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2486,
      "normalized": {
        "queue_id": "J3036",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "REMINGTON SS - LONOKE EAST 115.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 105.0,
        "summer_net_mw": 105.0,
        "winter_net_mw": 105.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492117,
        "projectNumber": "J3036",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REMINGTON SS - LONOKE EAST 115.0kV",
        "summerNetMW": 105.0,
        "winterNetMW": 105.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2487,
      "normalized": {
        "queue_id": "J2987",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Merom Primary - Worthington Primary 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492118,
        "projectNumber": "J2987",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Merom Primary - Worthington Primary 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2488,
      "normalized": {
        "queue_id": "J2998",
        "county": "St. Clair",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Fayetteville Bee Hollow Road 138kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492119,
        "projectNumber": "J2998",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "St. Clair",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fayetteville Bee Hollow Road 138kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2489,
      "normalized": {
        "queue_id": "J2975",
        "county": "Jefferson",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Bevil Substation 230 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 44.1,
        "summer_net_mw": 44.1,
        "winter_net_mw": 44.1,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492120,
        "projectNumber": "J2975",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jefferson",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bevil Substation 230 kV",
        "summerNetMW": 44.1,
        "winterNetMW": 44.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2490,
      "normalized": {
        "queue_id": "J2997",
        "county": "Livingston",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "COLFAX - MADRID 120.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492121,
        "projectNumber": "J2997",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Livingston",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "COLFAX - MADRID 120.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2491,
      "normalized": {
        "queue_id": "J3006",
        "county": "Milwaukee",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Granville345kV Substation",
        "queue_date": "2025-07-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492122,
        "projectNumber": "J3006",
        "queueDate": "2025-07-29T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Milwaukee",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Granville345kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2492,
      "normalized": {
        "queue_id": "J2977",
        "county": "Bradley",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC Hermitage south- Hilo 115Kv",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492123,
        "projectNumber": "J2977",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Bradley",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC Hermitage south- Hilo 115Kv",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2493,
      "normalized": {
        "queue_id": "J2958",
        "county": "Claiborne",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Haynesville South 115kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492124,
        "projectNumber": "J2958",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Claiborne",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Haynesville South 115kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2494,
      "normalized": {
        "queue_id": "J3038",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado Upland SS 115kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492125,
        "projectNumber": "J3038",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "El Dorado Upland SS 115kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2495,
      "normalized": {
        "queue_id": "J2974",
        "county": "Adams",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4HULL     - 4HERLEMAN 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492126,
        "projectNumber": "J2974",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Adams",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4HULL     - 4HERLEMAN 138.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2496,
      "normalized": {
        "queue_id": "J3034",
        "county": "Monroe",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BRINKLEY WEST - BRINKLEY EAST 115kV Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492127,
        "projectNumber": "J3034",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-08-04T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Monroe",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BRINKLEY WEST - BRINKLEY EAST 115kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2497,
      "normalized": {
        "queue_id": "J2968",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "LC Bulk to Henning 138kV Line (Circuit 28)",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492128,
        "projectNumber": "J2968",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "LC Bulk to Henning 138kV Line (Circuit 28)",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2498,
      "normalized": {
        "queue_id": "J3057",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Richard (Bus #335366) to Colonial Academy (Bus #335375) 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492129,
        "projectNumber": "J3057",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Richard (Bus #335366) to Colonial Academy (Bus #335375) 138kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2499,
      "normalized": {
        "queue_id": "J3053",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "LAKEOVER EHV - MCADAMS EHV 500.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 169.0,
        "summer_net_mw": 169.0,
        "winter_net_mw": 169.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 169.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492130,
        "projectNumber": "J3053",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "LAKEOVER EHV - MCADAMS EHV 500.0kV",
        "summerNetMW": 169.0,
        "winterNetMW": 169.0,
        "dp1ErisMw": 169.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2500,
      "normalized": {
        "queue_id": "J3062",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Edwards to Bolton 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492131,
        "projectNumber": "J3062",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwards to Bolton 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2501,
      "normalized": {
        "queue_id": "J3073",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "INDEPENDENCE-ISES - POWERLINE ROAD 500 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492132,
        "projectNumber": "J3073",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDEPENDENCE-ISES - POWERLINE ROAD 500 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2502,
      "normalized": {
        "queue_id": "J3068",
        "county": "St. Helena",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Amite (A) - Gillsburg (B) 115kV TL",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-17T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492133,
        "projectNumber": "J3068",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-04-17T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Helena",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Amite (A) - Gillsburg (B) 115kV TL",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2503,
      "normalized": {
        "queue_id": "J3048",
        "county": "Crawford",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MOSES SES to AECC HUNTER NORTH",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492134,
        "projectNumber": "J3048",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crawford",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MOSES SES to AECC HUNTER NORTH",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2504,
      "normalized": {
        "queue_id": "J2985",
        "county": "Chicot",
        "state": "AR",
        "transmission_owner": "",
        "poi": "AECC CHICOT - EUDORA 115.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492135,
        "projectNumber": "J2985",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Chicot",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "AECC CHICOT - EUDORA 115.0kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2505,
      "normalized": {
        "queue_id": "J3012",
        "county": "Coles",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Mattoon East",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 287.0,
        "summer_net_mw": 287.0,
        "winter_net_mw": 287.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 287.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492136,
        "projectNumber": "J3012",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Coles",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Mattoon East",
        "summerNetMW": 287.0,
        "winterNetMW": 287.0,
        "dp1ErisMw": 287.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2506,
      "normalized": {
        "queue_id": "J3047",
        "county": "Adair",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "ORIENT - NORTHBORO 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 263.0,
        "summer_net_mw": 263.0,
        "winter_net_mw": 263.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 263.0,
        "dp1_nris_mw": 263.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492137,
        "projectNumber": "J3047",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Adair",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ORIENT - NORTHBORO 345.0kV",
        "summerNetMW": 263.0,
        "winterNetMW": 263.0,
        "dp1ErisMw": 263.0,
        "dp1NrisMw": 263.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2507,
      "normalized": {
        "queue_id": "J3071",
        "county": "St. Francis",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Entergy Hughes - Forest City South 161 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492138,
        "projectNumber": "J3071",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "St. Francis",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Entergy Hughes - Forest City South 161 kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2508,
      "normalized": {
        "queue_id": "J3032",
        "county": "Webster",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Sarepta",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492139,
        "projectNumber": "J3032",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Webster",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sarepta",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2509,
      "normalized": {
        "queue_id": "J3021",
        "county": "Lyon",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lake Yankton to Lyon County 115kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 235.0,
        "summer_net_mw": 235.0,
        "winter_net_mw": 235.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 235.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492140,
        "projectNumber": "J3021",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lyon",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Lake Yankton to Lyon County 115kV",
        "summerNetMW": 235.0,
        "winterNetMW": 235.0,
        "dp1ErisMw": 235.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2510,
      "normalized": {
        "queue_id": "J3163",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "BISON",
        "queue_date": "2022-07-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 481.0,
        "summer_net_mw": 481.0,
        "winter_net_mw": 481.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-03-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 481.0,
        "dp1_nris_mw": 481.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492141,
        "projectNumber": "J3163",
        "queueDate": "2022-07-26T04:00:00+00:00",
        "inService": "2028-03-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BISON",
        "summerNetMW": 481.0,
        "winterNetMW": 481.0,
        "dp1ErisMw": 481.0,
        "dp1NrisMw": 481.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2511,
      "normalized": {
        "queue_id": "J3151",
        "county": "Sheboygan",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sheboygan Falls",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492142,
        "projectNumber": "J3151",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Sheboygan",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sheboygan Falls",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2512,
      "normalized": {
        "queue_id": "J2961",
        "county": "Daviess",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport Station (08EDWRDS  249722) - Whitefield (08WHTFLD  249876) 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492143,
        "projectNumber": "J2961",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Daviess",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport Station (08EDWRDS  249722) - Whitefield (08WHTFLD  249876) 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2513,
      "normalized": {
        "queue_id": "J3058",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "TARLETON",
        "queue_date": "2025-07-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492144,
        "projectNumber": "J3058",
        "queueDate": "2025-07-28T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TARLETON",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2514,
      "normalized": {
        "queue_id": "J3152",
        "county": "Green",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "North Monroe",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492145,
        "projectNumber": "J3152",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Green",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "North Monroe",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2515,
      "normalized": {
        "queue_id": "J3153",
        "county": "Clinton",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Beaver Channel 161 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492146,
        "projectNumber": "J3153",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Clinton",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Beaver Channel 161 kV Substation",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2516,
      "normalized": {
        "queue_id": "J3063",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7JORD - 7CMDR 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 143.0,
        "summer_net_mw": 143.0,
        "winter_net_mw": 143.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 143.0,
        "dp1_nris_mw": 143.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492147,
        "projectNumber": "J3063",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-10-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7JORD - 7CMDR 345.0kV",
        "summerNetMW": 143.0,
        "winterNetMW": 143.0,
        "dp1ErisMw": 143.0,
        "dp1NrisMw": 143.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2517,
      "normalized": {
        "queue_id": "J3066",
        "county": "Osceola",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Hersey Interconnection",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492148,
        "projectNumber": "J3066",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Osceola",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hersey Interconnection",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2518,
      "normalized": {
        "queue_id": "J3069",
        "county": "St. Clair",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Tap on line Fayetteville 138kV (endpoint A) to HERZOG 138kV (endpoint B)",
        "queue_date": "2022-09-02T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-12-27T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492149,
        "projectNumber": "J3069",
        "queueDate": "2022-09-02T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-12-27T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "St. Clair",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tap on line Fayetteville 138kV (endpoint A) to HERZOG 138kV (endpoint B)",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2519,
      "normalized": {
        "queue_id": "J3050",
        "county": "Calhoun",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MAJESTIC - ONEIDA 345.0kV",
        "queue_date": "2025-07-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 255.0,
        "summer_net_mw": 255.0,
        "winter_net_mw": 255.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 255.0,
        "dp1_nris_mw": 255.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492150,
        "projectNumber": "J3050",
        "queueDate": "2025-07-29T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MAJESTIC - ONEIDA 345.0kV",
        "summerNetMW": 255.0,
        "winterNetMW": 255.0,
        "dp1ErisMw": 255.0,
        "dp1NrisMw": 255.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2520,
      "normalized": {
        "queue_id": "J3055",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BOGALUSA 500 SS - FRANKLIN EHV 500.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492151,
        "projectNumber": "J3055",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BOGALUSA 500 SS - FRANKLIN EHV 500.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2521,
      "normalized": {
        "queue_id": "J3056",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BOGALUSA 500 SS - FRANKLIN EHV 500.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492152,
        "projectNumber": "J3056",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BOGALUSA 500 SS - FRANKLIN EHV 500.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2522,
      "normalized": {
        "queue_id": "J2960",
        "county": "Spencer",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "10CULY13 253500 (F.B. Culley ) - 10AEP_T  353586 (tap between Culley (10CULY13 253500) - Grandview (",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492153,
        "projectNumber": "J2960",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-01-01T05:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Spencer",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "10CULY13 253500 (F.B. Culley ) - 10AEP_T  353586 (tap between Culley (10CULY13 253500) - Grandview (",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2523,
      "normalized": {
        "queue_id": "J3052",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MCV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Steam Turbine (including Nuclear, Geothermal and Solar Steam)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "1990-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492154,
        "projectNumber": "J3052",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "1990-03-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MCV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Steam Turbine (including Nuclear, Geothermal and Solar Steam)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2524,
      "normalized": {
        "queue_id": "J3054",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Bogslusa 500 kV - Franklin EHV 500 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2017-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492155,
        "projectNumber": "J3054",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2017-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bogslusa 500 kV - Franklin EHV 500 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2525,
      "normalized": {
        "queue_id": "J3074",
        "county": "Randolph",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4TIBBS - 4STEELEVLE N 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492156,
        "projectNumber": "J3074",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Randolph",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "4TIBBS - 4STEELEVLE N 138.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2526,
      "normalized": {
        "queue_id": "J3075",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Merom Primary - Worthington Primary 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 560.0,
        "summer_net_mw": 560.0,
        "winter_net_mw": 560.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 560.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492157,
        "projectNumber": "J3075",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-11-30T05:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Merom Primary - Worthington Primary 345.0kV",
        "summerNetMW": 560.0,
        "winterNetMW": 560.0,
        "dp1ErisMw": 560.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2527,
      "normalized": {
        "queue_id": "J3076",
        "county": "Wabash",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "08GIBSON (PSI) - 7ALBION   345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492158,
        "projectNumber": "J3076",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-11-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Wabash",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "08GIBSON (PSI) - 7ALBION   345.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2528,
      "normalized": {
        "queue_id": "J3045",
        "county": "Orange",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Chisholm RD- Hartburg 230kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492159,
        "projectNumber": "J3045",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Orange",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Chisholm RD- Hartburg 230kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2529,
      "normalized": {
        "queue_id": "J3215",
        "county": "LaPorte",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Stillwell to Babcock 345kV Transmission Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 594.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 594.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492160,
        "projectNumber": "J3215",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-07-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaPorte",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stillwell to Babcock 345kV Transmission Line",
        "summerNetMW": 500.0,
        "winterNetMW": 594.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2530,
      "normalized": {
        "queue_id": "J3077",
        "county": "Gibson",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Francisco 345/138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492161,
        "projectNumber": "J3077",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-11-30T05:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Gibson",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Francisco 345/138kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2531,
      "normalized": {
        "queue_id": "J3122",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Marked Tree â€“ Marion 161kV Tap at 35.3902, -90.3372",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492162,
        "projectNumber": "J3122",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2029-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Marked Tree â€“ Marion 161kV Tap at 35.3902, -90.3372",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2532,
      "normalized": {
        "queue_id": "J3154",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Blackhawk (MEC) - Quinn 345 (shared POI with J2892)",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Piston (Engine), Internal Combustion (Diesel)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492163,
        "projectNumber": "J3154",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Blackhawk (MEC) - Quinn 345 (shared POI with J2892)",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Piston (Engine), Internal Combustion (Diesel)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2533,
      "normalized": {
        "queue_id": "J3207",
        "county": "Starke",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "J3578",
        "queue_date": "2022-03-10T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-05-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492164,
        "projectNumber": "J3207",
        "queueDate": "2022-03-10T05:00:00+00:00",
        "inService": "2024-05-06T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Starke",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J3578",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2534,
      "normalized": {
        "queue_id": "J3099",
        "county": "Faulkner",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Hamlet to Gravel Ridge 161kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492165,
        "projectNumber": "J3099",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-27T04:00:00+00:00",
        "inService": "2027-06-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Faulkner",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Hamlet to Gravel Ridge 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2535,
      "normalized": {
        "queue_id": "J3155",
        "county": "Winnebago",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Neevin",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492166,
        "projectNumber": "J3155",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Winnebago",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Neevin",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2536,
      "normalized": {
        "queue_id": "J3033",
        "county": "Webster",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Reid EHV 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492167,
        "projectNumber": "J3033",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Webster",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reid EHV 345 kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2537,
      "normalized": {
        "queue_id": "J2942",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cooper to Penton Road 230 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492168,
        "projectNumber": "J2942",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "Cooper to Penton Road 230 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2538,
      "normalized": {
        "queue_id": "J3035",
        "county": "Desha",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "REED SS - ROHWER 115.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492169,
        "projectNumber": "J3035",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-04T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Desha",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REED SS - ROHWER 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2539,
      "normalized": {
        "queue_id": "J2966",
        "county": "Quitman",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Batesville to Moon Lake ss 230kV Line",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 450.0,
        "summer_net_mw": 450.0,
        "winter_net_mw": 450.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 450.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492170,
        "projectNumber": "J2966",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "inService": "2025-10-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Quitman",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Batesville to Moon Lake ss 230kV Line",
        "summerNetMW": 450.0,
        "winterNetMW": 450.0,
        "dp1ErisMw": 450.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2540,
      "normalized": {
        "queue_id": "J3061",
        "county": "Lawrence",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Walnut Ridge (Bus #338208) to Sedgewick (Bus #338206) 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492171,
        "projectNumber": "J3061",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lawrence",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Walnut Ridge (Bus #338208) to Sedgewick (Bus #338206) 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2541,
      "normalized": {
        "queue_id": "J3049",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "LAKEOVER EHV - MCADAMS EHV 500.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 188.0,
        "summer_net_mw": 188.0,
        "winter_net_mw": 188.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 188.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492172,
        "projectNumber": "J3049",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "LAKEOVER EHV - MCADAMS EHV 500.0kV",
        "summerNetMW": 188.0,
        "winterNetMW": 188.0,
        "dp1ErisMw": 188.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2542,
      "normalized": {
        "queue_id": "J3200",
        "county": "St. Clair",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Turkey Hill 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492173,
        "projectNumber": "J3200",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "St. Clair",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Turkey Hill 345kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2543,
      "normalized": {
        "queue_id": "J3098",
        "county": "Franklin",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "RED GUM - WINNSBORO 115 kV (122.5,122.6,122.7)",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492174,
        "projectNumber": "J3098",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Franklin",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RED GUM - WINNSBORO 115 kV (122.5,122.6,122.7)",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2544,
      "normalized": {
        "queue_id": "J3196",
        "county": "Starke",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Burr Oak to East Winamac 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-02-27T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492175,
        "projectNumber": "J3196",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-02-27T05:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Starke",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Burr Oak to East Winamac 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2545,
      "normalized": {
        "queue_id": "J3089",
        "county": "Webster",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Reid EHV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 696.0,
        "summer_net_mw": 696.0,
        "winter_net_mw": 696.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492176,
        "projectNumber": "J3089",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2029-04-30T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Webster",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reid EHV",
        "summerNetMW": 696.0,
        "winterNetMW": 696.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2546,
      "normalized": {
        "queue_id": "J3064",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "",
        "poi": "7JORD - 7CMDR 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 157.0,
        "summer_net_mw": 157.0,
        "winter_net_mw": 157.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 157.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492177,
        "projectNumber": "J3064",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-10-20T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "7JORD - 7CMDR 345.0kV",
        "summerNetMW": 157.0,
        "winterNetMW": 157.0,
        "dp1ErisMw": 157.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2547,
      "normalized": {
        "queue_id": "J3072",
        "county": "Wilkinson",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Woodviille - Centreville 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492178,
        "projectNumber": "J3072",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-27T04:00:00+00:00",
        "inService": "2024-12-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Wilkinson",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Woodviille - Centreville 115 kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2548,
      "normalized": {
        "queue_id": "J3164",
        "county": "Ouachita",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "McClellan 138 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492179,
        "projectNumber": "J3164",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Ouachita",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "McClellan 138 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2549,
      "normalized": {
        "queue_id": "J3165",
        "county": "Breckinridge",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "New Hardinsburg",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492180,
        "projectNumber": "J3165",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-08-31T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Breckinridge",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "New Hardinsburg",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2550,
      "normalized": {
        "queue_id": "J3065",
        "county": "Oceana",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "DONALDSON CREEK",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 20.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492181,
        "projectNumber": "J3065",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-03-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Oceana",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DONALDSON CREEK",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 20.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2551,
      "normalized": {
        "queue_id": "J3156",
        "county": "Rock",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Townline Road",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492182,
        "projectNumber": "J3156",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Rock",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Townline Road",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2552,
      "normalized": {
        "queue_id": "J3166",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport Station IGCC",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492183,
        "projectNumber": "J3166",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport Station IGCC",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2553,
      "normalized": {
        "queue_id": "J3168",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "REYNOLDS",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492184,
        "projectNumber": "J3168",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REYNOLDS",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2554,
      "normalized": {
        "queue_id": "J3159",
        "county": "Dubuque",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Gardner 69 kV substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492185,
        "projectNumber": "J3159",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Dubuque",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gardner 69 kV substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2555,
      "normalized": {
        "queue_id": "J3208",
        "county": "Dubois",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Patoka Valley",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 10.0,
        "summer_net_mw": 10.0,
        "winter_net_mw": 10.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-22T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 10.0,
        "dp1_nris_mw": 10.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492186,
        "projectNumber": "J3208",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "inService": "2023-09-22T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Dubois",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Patoka Valley",
        "summerNetMW": 10.0,
        "winterNetMW": 10.0,
        "dp1ErisMw": 10.0,
        "dp1NrisMw": 10.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2556,
      "normalized": {
        "queue_id": "J3097",
        "county": "Amite",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Entergy Mississippi Gillsburg Tap - Gillsburg on the Amite - Gillsburg115 kV Line",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492187,
        "projectNumber": "J3097",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-08-29T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Amite",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Entergy Mississippi Gillsburg Tap - Gillsburg on the Amite - Gillsburg115 kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2557,
      "normalized": {
        "queue_id": "J3222",
        "county": "Moultrie",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Arland to Faraday 345 kV Line Tap",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 109.0,
        "summer_net_mw": 109.0,
        "winter_net_mw": 109.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492188,
        "projectNumber": "J3222",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Moultrie",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Arland to Faraday 345 kV Line Tap",
        "summerNetMW": 109.0,
        "winterNetMW": 109.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2558,
      "normalized": {
        "queue_id": "J3093",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "LAKEOVER EHV - MCADAMS EHV 500.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492189,
        "projectNumber": "J3093",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "LAKEOVER EHV - MCADAMS EHV 500.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2559,
      "normalized": {
        "queue_id": "J3158",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Colby 345 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492190,
        "projectNumber": "J3158",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Colby 345 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2560,
      "normalized": {
        "queue_id": "J3087",
        "county": "Logan",
        "state": "TX",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Shockey",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 204.6,
        "summer_net_mw": 204.6,
        "winter_net_mw": 204.6,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492191,
        "projectNumber": "J3087",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Logan",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Shockey",
        "summerNetMW": 204.6,
        "winterNetMW": 204.6,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2561,
      "normalized": {
        "queue_id": "J3111",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC TRUMANN WEST - POWERLINE ROAD 161kv",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492192,
        "projectNumber": "J3111",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC TRUMANN WEST - POWERLINE ROAD 161kv",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2562,
      "normalized": {
        "queue_id": "J3096",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Reid 161 kV to Henderson 161 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492193,
        "projectNumber": "J3096",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reid 161 kV to Henderson 161 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2563,
      "normalized": {
        "queue_id": "J3086",
        "county": "Peoria",
        "state": "TX",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "New 345kV switchyard, looping in the Fargo-Sandburg 345kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 252.96,
        "summer_net_mw": 252.96,
        "winter_net_mw": 252.96,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492194,
        "projectNumber": "J3086",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Peoria",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "New 345kV switchyard, looping in the Fargo-Sandburg 345kV",
        "summerNetMW": 252.96,
        "winterNetMW": 252.96,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2564,
      "normalized": {
        "queue_id": "J3112",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Barton - West Helena 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492195,
        "projectNumber": "J3112",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Barton - West Helena 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2565,
      "normalized": {
        "queue_id": "J3113",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport IGCC - Amo 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2022-12-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492196,
        "projectNumber": "J3113",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2022-12-06T05:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport IGCC - Amo 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2566,
      "normalized": {
        "queue_id": "J3117",
        "county": "Clay",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Taping the 'Texas Eastern Station 8 / ST.E.P/ S-8 (338229)' to 'McDougal / 5MCDOUGAL# (338695)' 161k",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492197,
        "projectNumber": "J3117",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clay",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Taping the 'Texas Eastern Station 8 / ST.E.P/ S-8 (338229)' to 'McDougal / 5MCDOUGAL# (338695)' 161k",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2567,
      "normalized": {
        "queue_id": "J3119",
        "county": "Pulaski",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Taping 'Reynolds / 17REYNOLDS (255205)' to 'Burr Oak / 17BURR_OAK (255101)' 22.4mi from Reynolds 345",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2022-12-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492198,
        "projectNumber": "J3119",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2022-12-06T05:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Pulaski",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Taping 'Reynolds / 17REYNOLDS (255205)' to 'Burr Oak / 17BURR_OAK (255101)' 22.4mi from Reynolds 345",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2568,
      "normalized": {
        "queue_id": "J3085",
        "county": "Madison",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Fredericktown 138 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492199,
        "projectNumber": "J3085",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Madison",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fredericktown 138 kV Substation",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2569,
      "normalized": {
        "queue_id": "J3082",
        "county": "Franklin",
        "state": "LA",
        "transmission_owner": "",
        "poi": "Taping the 'Gilbert / 3GILBERT_LA (303322)' to 'Winnsboro / 3WINNSBORO! (337330)' 115kV line.",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 135.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492200,
        "projectNumber": "J3082",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Franklin",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Taping the 'Gilbert / 3GILBERT_LA (303322)' to 'Winnsboro / 3WINNSBORO! (337330)' 115kV line.",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 135.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2570,
      "normalized": {
        "queue_id": "J3211",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "J1564 Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492201,
        "projectNumber": "J3211",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J1564 Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2571,
      "normalized": {
        "queue_id": "J3230",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "PARKIN - GILMORE 161.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492202,
        "projectNumber": "J3230",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2029-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PARKIN - GILMORE 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2572,
      "normalized": {
        "queue_id": "J3157",
        "county": "Winnebago",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Bison",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492203,
        "projectNumber": "J3157",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2024-12-31T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Winnebago",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "Bison",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2573,
      "normalized": {
        "queue_id": "J3204",
        "county": "Clark",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Stone Lake - Gardner Park 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 190.0,
        "dp1_nris_mw": 190.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492204,
        "projectNumber": "J3204",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Clark",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stone Lake - Gardner Park 345.0kV",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 190.0,
        "dp1NrisMw": 190.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2574,
      "normalized": {
        "queue_id": "J3083",
        "county": "Pointe Coupee",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "WATERLOO - FANCY POINT 230.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492205,
        "projectNumber": "J3083",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Pointe Coupee",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "WATERLOO - FANCY POINT 230.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2575,
      "normalized": {
        "queue_id": "J3115",
        "county": "Sharkey",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Taping the 'Onward / 3ONWARD+ (336967)' to 'Rolling Fork / 3ROLING FRK! (336968)' 115kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 216.0,
        "summer_net_mw": 216.0,
        "winter_net_mw": 216.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492206,
        "projectNumber": "J3115",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Sharkey",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Taping the 'Onward / 3ONWARD+ (336967)' to 'Rolling Fork / 3ROLING FRK! (336968)' 115kV line",
        "summerNetMW": 216.0,
        "winterNetMW": 216.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2576,
      "normalized": {
        "queue_id": "J3088",
        "county": "Woodbury",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Raun to Sioux City",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492207,
        "projectNumber": "J3088",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-02-01T05:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Woodbury",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Raun to Sioux City",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2577,
      "normalized": {
        "queue_id": "J3167",
        "county": "Fulton",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Ipava 138 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492208,
        "projectNumber": "J3167",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Fulton",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ipava 138 kV Substation",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2578,
      "normalized": {
        "queue_id": "J3116",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Taping 'AECC Aubrey / 6AUBREY# (338885)' to 'Ritchie SES Switchyard / 6RITCHIE-2! (337991)' 230kV Li",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492209,
        "projectNumber": "J3116",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Taping 'AECC Aubrey / 6AUBREY# (338885)' to 'Ritchie SES Switchyard / 6RITCHIE-2! (337991)' 230kV Li",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2579,
      "normalized": {
        "queue_id": "J3118",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "",
        "poi": "Taping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492210,
        "projectNumber": "J3118",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Taping the 'Galion / 3GALION (337444)' to 'Oak Grove / 3OAK_GROVE! (337445)' 115kV line",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2580,
      "normalized": {
        "queue_id": "J3108",
        "county": "Jasper",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Missionary 161kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492211,
        "projectNumber": "J3108",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Jasper",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Missionary 161kV Substation",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2581,
      "normalized": {
        "queue_id": "J3114",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Sandborn Primary - Worthington Primary 161.0kV",
        "queue_date": "2025-11-13T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492212,
        "projectNumber": "J3114",
        "queueDate": "2025-11-13T05:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sandborn Primary - Worthington Primary 161.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2582,
      "normalized": {
        "queue_id": "J3080",
        "county": "Pulaski",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ameren owned Kelso - Joppa (Massac) 345 kV Tie-Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492213,
        "projectNumber": "J3080",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-08-29T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Pulaski",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ameren owned Kelso - Joppa (Massac) 345 kV Tie-Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2583,
      "normalized": {
        "queue_id": "J3101",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Shaw-Indianola 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-06-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Wind",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492214,
        "projectNumber": "J3101",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-06-13T04:00:00+00:00",
        "inService": "2025-08-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Shaw-Indianola 115kV",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Wind",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2584,
      "normalized": {
        "queue_id": "J3197",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "EAST LEESVILLE -RODEMACHER 230",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-12-22T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492215,
        "projectNumber": "J3197",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-12-22T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "EAST LEESVILLE -RODEMACHER 230",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2585,
      "normalized": {
        "queue_id": "J2563",
        "county": "Cottonwood",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "crandal",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492216,
        "projectNumber": "J2563",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cottonwood",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "crandal",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2586,
      "normalized": {
        "queue_id": "J3110",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Powerline Road / 8POWERLN_RD% (338156) 500kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492217,
        "projectNumber": "J3110",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Powerline Road / 8POWERLN_RD% (338156) 500kV Substation",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2587,
      "normalized": {
        "queue_id": "J3120",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Taping 'Newport AB / NEWPORTSOLAR (338177)' to 'Cash / 5CASH (338171)' 161kV Line.",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492218,
        "projectNumber": "J3120",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Taping 'Newport AB / NEWPORTSOLAR (338177)' to 'Cash / 5CASH (338171)' 161kV Line.",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2588,
      "normalized": {
        "queue_id": "J3210",
        "county": "St. Tammany",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "J2245 Substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492219,
        "projectNumber": "J3210",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Tammany",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J2245 Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2589,
      "normalized": {
        "queue_id": "J3198",
        "county": "Barron",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Barron",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492220,
        "projectNumber": "J3198",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-07-29T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Barron",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Barron",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2590,
      "normalized": {
        "queue_id": "J3105",
        "county": "Amite",
        "state": "MS",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Franklin EHV -  McKnight 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492221,
        "projectNumber": "J3105",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-08-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Amite",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Franklin EHV -  McKnight 500 kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2591,
      "normalized": {
        "queue_id": "J2580",
        "county": "Winn",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Montgomery to Winnfield 230 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492222,
        "projectNumber": "J2580",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Winn",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Montgomery to Winnfield 230 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2592,
      "normalized": {
        "queue_id": "J2620",
        "county": "Ouachita",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Bearden to Camden North 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 164.0,
        "summer_net_mw": 164.0,
        "winter_net_mw": 164.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492223,
        "projectNumber": "J2620",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ouachita",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bearden to Camden North 115 kV",
        "summerNetMW": 164.0,
        "winterNetMW": 164.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2593,
      "normalized": {
        "queue_id": "J2623",
        "county": "Hot Spring",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "H.S. EHV to Friendship 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492224,
        "projectNumber": "J2623",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Hot Spring",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "H.S. EHV to Friendship 115 kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2594,
      "normalized": {
        "queue_id": "J3107",
        "county": "Johnson",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Enron Substation",
        "queue_date": "2025-10-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492225,
        "projectNumber": "J3107",
        "queueDate": "2025-10-23T04:00:00+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Johnson",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Enron Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2595,
      "normalized": {
        "queue_id": "J2616",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Scanlan (Cajun) to Bosco SS 138 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492226,
        "projectNumber": "J2616",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Scanlan (Cajun) to Bosco SS 138 kV line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2596,
      "normalized": {
        "queue_id": "J2621",
        "county": "St. Croix",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Pine Lake 161 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492227,
        "projectNumber": "J2621",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "St. Croix",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pine Lake 161 kV Substation",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2597,
      "normalized": {
        "queue_id": "J2659",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Turner",
        "queue_date": "2025-10-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492228,
        "projectNumber": "J2659",
        "queueDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-07-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Turner",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2598,
      "normalized": {
        "queue_id": "J2656",
        "county": "Macon",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4LATHAM-4N DEC E 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492229,
        "projectNumber": "J2656",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Macon",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "4LATHAM-4N DEC E 138 kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2599,
      "normalized": {
        "queue_id": "J2657",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "REYNOLDS - BURR OAK 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 138.0,
        "summer_net_mw": 138.0,
        "winter_net_mw": 138.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 138.0,
        "dp1_nris_mw": 138.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492230,
        "projectNumber": "J2657",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REYNOLDS - BURR OAK 345.0kV",
        "summerNetMW": 138.0,
        "winterNetMW": 138.0,
        "dp1ErisMw": 138.0,
        "dp1NrisMw": 138.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2600,
      "normalized": {
        "queue_id": "J2664",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Cayuga Sta - Nucor 345 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492231,
        "projectNumber": "J2664",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cayuga Sta - Nucor 345 kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2601,
      "normalized": {
        "queue_id": "J2614",
        "county": "Henry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mercer 161kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492232,
        "projectNumber": "J2614",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Henry",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mercer 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2602,
      "normalized": {
        "queue_id": "J2626",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "345kV Commodore to Jordan",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492233,
        "projectNumber": "J2626",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-07-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "345kV Commodore to Jordan",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2603,
      "normalized": {
        "queue_id": "J2622",
        "county": "Drew",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Wilmar to Monticello South 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 107.0,
        "summer_net_mw": 107.0,
        "winter_net_mw": 107.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492234,
        "projectNumber": "J2622",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Drew",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wilmar to Monticello South 115 kV",
        "summerNetMW": 107.0,
        "winterNetMW": 107.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2604,
      "normalized": {
        "queue_id": "J2612",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Flora 115kV Substation",
        "queue_date": "2023-09-07T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492235,
        "projectNumber": "J2612",
        "queueDate": "2023-09-07T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Flora 115kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2605,
      "normalized": {
        "queue_id": "J2658",
        "county": "Cumberland",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CASEY-7NEWTON 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492236,
        "projectNumber": "J2658",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-23T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Cumberland",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7CASEY-7NEWTON 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2606,
      "normalized": {
        "queue_id": "J2660",
        "county": "Cumberland",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CASEY-7NEWTON 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492237,
        "projectNumber": "J2660",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-23T04:00:00+00:00",
        "inService": "2027-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Cumberland",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7CASEY-7NEWTON 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2607,
      "normalized": {
        "queue_id": "J2661",
        "county": "Marion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7Xenia- 7MT Vrnon 345 KV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492238,
        "projectNumber": "J2661",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Marion",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7Xenia- 7MT Vrnon 345 KV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2608,
      "normalized": {
        "queue_id": "J2619",
        "county": "Montcalm",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Kenowa to Nelson Rd. 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492239,
        "projectNumber": "J2619",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Montcalm",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kenowa to Nelson Rd. 345kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2609,
      "normalized": {
        "queue_id": "J2562",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Dewitt - Deluce",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-20T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492240,
        "projectNumber": "J2562",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-11-20T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dewitt - Deluce",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2610,
      "normalized": {
        "queue_id": "J2662",
        "county": "Cumberland",
        "state": "IL",
        "transmission_owner": "",
        "poi": "7CASEY    - 7NEWTON   345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492241,
        "projectNumber": "J2662",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Cumberland",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7CASEY    - 7NEWTON   345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2611,
      "normalized": {
        "queue_id": "J2581",
        "county": "Ripley",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Batesville 138kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492242,
        "projectNumber": "J2581",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Ripley",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Batesville 138kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2612,
      "normalized": {
        "queue_id": "J2629",
        "county": "Newton",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Leach to Newton Bulk 138 kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492243,
        "projectNumber": "J2629",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Newton",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Leach to Newton Bulk 138 kV Line",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2613,
      "normalized": {
        "queue_id": "J2578",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KARN - THETFORD (ATLANTA) 138.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492244,
        "projectNumber": "J2578",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "KARN - THETFORD (ATLANTA) 138.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2614,
      "normalized": {
        "queue_id": "J2567",
        "county": "Oceana",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KENOWA - LUDINGTON 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 240.0,
        "summer_net_mw": 240.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 240.0,
        "dp1_nris_mw": 240.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492245,
        "projectNumber": "J2567",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Oceana",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "KENOWA - LUDINGTON 345.0kV",
        "summerNetMW": 240.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 240.0,
        "dp1NrisMw": 240.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2615,
      "normalized": {
        "queue_id": "J2568",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Habetz - Sellers Road 138 kV Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492246,
        "projectNumber": "J2568",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Habetz - Sellers Road 138 kV Line",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2616,
      "normalized": {
        "queue_id": "J2582",
        "county": "Clark",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Speed 138 kV substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492247,
        "projectNumber": "J2582",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clark",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Speed 138 kV substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2617,
      "normalized": {
        "queue_id": "J2592",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Thetford (Atlanta) - Karn 138 kV line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492248,
        "projectNumber": "J2592",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Thetford (Atlanta) - Karn 138 kV line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2618,
      "normalized": {
        "queue_id": "J2663",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Reynolds - Burr Oak 345 kV Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492249,
        "projectNumber": "J2663",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reynolds - Burr Oak 345 kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2619,
      "normalized": {
        "queue_id": "J2615",
        "county": "Warren",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "FB Culley to Dubois Transmission Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492250,
        "projectNumber": "J2615",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Warren",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FB Culley to Dubois Transmission Line",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2620,
      "normalized": {
        "queue_id": "J2618",
        "county": "Macomb",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Lenox 120kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492251,
        "projectNumber": "J2618",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Macomb",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lenox 120kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2621,
      "normalized": {
        "queue_id": "J2666",
        "county": "Walworth",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Brick Church 138 kV",
        "queue_date": "2024-01-09T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492252,
        "projectNumber": "J2666",
        "queueDate": "2024-01-09T05:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Walworth",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Brick Church 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2622,
      "normalized": {
        "queue_id": "J2586",
        "county": "Clark",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "SPEED 345",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492253,
        "projectNumber": "J2586",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clark",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SPEED 345",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2623,
      "normalized": {
        "queue_id": "J2685",
        "county": "Sharkey",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "ROLLING FORK",
        "queue_date": "2025-08-21T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492254,
        "projectNumber": "J2685",
        "queueDate": "2025-08-21T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sharkey",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "ROLLING FORK",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2624,
      "normalized": {
        "queue_id": "J2690",
        "county": "Washington",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Other_",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492255,
        "projectNumber": "J2690",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Washington",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Wind/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2625,
      "normalized": {
        "queue_id": "J2701",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "COLONIAL WELSH 138",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492256,
        "projectNumber": "J2701",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "COLONIAL WELSH 138",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2626,
      "normalized": {
        "queue_id": "J2703",
        "county": "Scott",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Meredosia 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 398.0,
        "summer_net_mw": 398.0,
        "winter_net_mw": 398.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492257,
        "projectNumber": "J2703",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Scott",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Meredosia 345 kV",
        "summerNetMW": 398.0,
        "winterNetMW": 398.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2627,
      "normalized": {
        "queue_id": "J2723",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "EAST WINAMAC-MONTICELLO 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 249.0,
        "summer_net_mw": 249.0,
        "winter_net_mw": 249.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492258,
        "projectNumber": "J2723",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "EAST WINAMAC-MONTICELLO 138kV",
        "summerNetMW": 249.0,
        "winterNetMW": 249.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2628,
      "normalized": {
        "queue_id": "J2585",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Worthington Primary - Merom Primary 345 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 240.0,
        "summer_net_mw": 240.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492259,
        "projectNumber": "J2585",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Worthington Primary - Merom Primary 345 kV line",
        "summerNetMW": 240.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2629,
      "normalized": {
        "queue_id": "J2588",
        "county": "Jackson",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "TOMPKINS - VROOMAN 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492260,
        "projectNumber": "J2588",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Jackson",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TOMPKINS - VROOMAN 138.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2630,
      "normalized": {
        "queue_id": "J2572",
        "county": "Hamilton",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Noblesville (Duke) - Hortonville (Duke) 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492261,
        "projectNumber": "J2572",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Hamilton",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Noblesville (Duke) - Hortonville (Duke) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2631,
      "normalized": {
        "queue_id": "J2587",
        "county": "Edgar",
        "state": "IL",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Sugar Creek - Cayuga CT  345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492262,
        "projectNumber": "J2587",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Edgar",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sugar Creek - Cayuga CT  345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2632,
      "normalized": {
        "queue_id": "J2617",
        "county": "Van Buren",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Palisades to Argenta 345 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 240.0,
        "summer_net_mw": 240.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492263,
        "projectNumber": "J2617",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Van Buren",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Palisades to Argenta 345 kV",
        "summerNetMW": 240.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2633,
      "normalized": {
        "queue_id": "J2625",
        "county": "Marion",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Maywood 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492264,
        "projectNumber": "J2625",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Marion",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Maywood 345kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2634,
      "normalized": {
        "queue_id": "J2589",
        "county": "Jackson",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "TOMPKINS - VROOMAN 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492265,
        "projectNumber": "J2589",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Jackson",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TOMPKINS - VROOMAN 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2635,
      "normalized": {
        "queue_id": "J2590",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Stein - Rapson 345 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492266,
        "projectNumber": "J2590",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stein - Rapson 345 kV line",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2636,
      "normalized": {
        "queue_id": "J2693",
        "county": "Franklin",
        "state": "LA",
        "transmission_owner": "",
        "poi": "WISNER",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 105.0,
        "summer_net_mw": 105.0,
        "winter_net_mw": 105.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 105.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492267,
        "projectNumber": "J2693",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Franklin",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WISNER",
        "summerNetMW": 105.0,
        "winterNetMW": 105.0,
        "dp1ErisMw": 105.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2637,
      "normalized": {
        "queue_id": "J2700",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "138 kV LAKE CHARLES BULK",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492268,
        "projectNumber": "J2700",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "138 kV LAKE CHARLES BULK",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2638,
      "normalized": {
        "queue_id": "J2647",
        "county": "Franklin",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "West Frankfort East 345 kV (7E W FKFT)",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492269,
        "projectNumber": "J2647",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2028-02-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Franklin",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "West Frankfort East 345 kV (7E W FKFT)",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2639,
      "normalized": {
        "queue_id": "J2564",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "138kV Crawfordsville",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 18.9,
        "summer_net_mw": 18.9,
        "winter_net_mw": 18.9,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492270,
        "projectNumber": "J2564",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "138kV Crawfordsville",
        "summerNetMW": 18.9,
        "winterNetMW": 18.9,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2640,
      "normalized": {
        "queue_id": "J2683",
        "county": "Hardin",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "New Substation on Rye  Co - Cypress 138 kV (Same POI as J2071)",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492271,
        "projectNumber": "J2683",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Hardin",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "New Substation on Rye  Co - Cypress 138 kV (Same POI as J2071)",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2641,
      "normalized": {
        "queue_id": "J2731",
        "county": "Olmsted",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Maple Leaf",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-07-24T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492272,
        "projectNumber": "J2731",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-07-24T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Olmsted",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Maple Leaf",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2642,
      "normalized": {
        "queue_id": "J2720",
        "county": "Yazoo",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "MIDWAY SS (CE) - YAZOO CITY SS 115.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-25T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492273,
        "projectNumber": "J2720",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-04-25T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Yazoo",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MIDWAY SS (CE) - YAZOO CITY SS 115.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2643,
      "normalized": {
        "queue_id": "J2696",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS INC. EAI",
        "poi": "Sandy Bayou",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492274,
        "projectNumber": "J2696",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS INC. EAI",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sandy Bayou",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2644,
      "normalized": {
        "queue_id": "J2702",
        "county": "Fulton",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Ipava-Macomb, West-1429 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.8,
        "summer_net_mw": 100.8,
        "winter_net_mw": 100.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492275,
        "projectNumber": "J2702",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Fulton",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ipava-Macomb, West-1429 138 kV",
        "summerNetMW": 100.8,
        "winterNetMW": 100.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2645,
      "normalized": {
        "queue_id": "J2706",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BAXTER WILSON SES SWYD - PERRYVILLE 500 500 kV (181.1,503.0)",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492276,
        "projectNumber": "J2706",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BAXTER WILSON SES SWYD - PERRYVILLE 500 500 kV (181.1,503.0)",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2646,
      "normalized": {
        "queue_id": "J2699",
        "county": "East Carroll",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "115 kV DARNELL",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 58.1,
        "summer_net_mw": 58.1,
        "winter_net_mw": 58.1,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492277,
        "projectNumber": "J2699",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "East Carroll",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "115 kV DARNELL",
        "summerNetMW": 58.1,
        "winterNetMW": 58.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2647,
      "normalized": {
        "queue_id": "J2704",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "",
        "poi": "Cargas",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 219.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492278,
        "projectNumber": "J2704",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cargas",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 219.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2648,
      "normalized": {
        "queue_id": "J2705",
        "county": "Assumption",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "NAPOLEONVILLE 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492279,
        "projectNumber": "J2705",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Assumption",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NAPOLEONVILLE 115 kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2649,
      "normalized": {
        "queue_id": "J2707",
        "county": "Assumption",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "PAINCOURTVILLE 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492280,
        "projectNumber": "J2707",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Assumption",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PAINCOURTVILLE 115 kV",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2650,
      "normalized": {
        "queue_id": "J2708",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "",
        "poi": "Cargas",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 219.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492281,
        "projectNumber": "J2708",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cargas",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 219.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2651,
      "normalized": {
        "queue_id": "J2710",
        "county": "Clinton",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Mulliken Jct.- Chester 69 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492282,
        "projectNumber": "J2710",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Clinton",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mulliken Jct.- Chester 69 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2652,
      "normalized": {
        "queue_id": "J2733",
        "county": "Lawrence",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SWIFTON - AECC HOXIE SOUTH 161.0kV",
        "queue_date": "2025-09-05T04:00:00+00:00",
        "withdrawn_date": "2025-11-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 126.0,
        "summer_net_mw": 126.0,
        "winter_net_mw": 126.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 126.0,
        "dp1_nris_mw": 126.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492283,
        "projectNumber": "J2733",
        "queueDate": "2025-09-05T04:00:00+00:00",
        "withdrawnDate": "2025-11-03T05:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lawrence",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SWIFTON - AECC HOXIE SOUTH 161.0kV",
        "summerNetMW": 126.0,
        "winterNetMW": 126.0,
        "dp1ErisMw": 126.0,
        "dp1NrisMw": 126.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2653,
      "normalized": {
        "queue_id": "J2724",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7NEOGA-7HOLLAND 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492284,
        "projectNumber": "J2724",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7NEOGA-7HOLLAND 345 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2654,
      "normalized": {
        "queue_id": "J2709",
        "county": "Miami",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "DEEDSVILLE 345",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 228.0,
        "summer_net_mw": 228.0,
        "winter_net_mw": 228.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492285,
        "projectNumber": "J2709",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Miami",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DEEDSVILLE 345",
        "summerNetMW": 228.0,
        "winterNetMW": 228.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2655,
      "normalized": {
        "queue_id": "J2711",
        "county": "Porter",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "FLINT LAKE - SOUTH VALPARAISO 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 122.0,
        "summer_net_mw": 122.0,
        "winter_net_mw": 122.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492286,
        "projectNumber": "J2711",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Porter",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FLINT LAKE - SOUTH VALPARAISO 138 kV",
        "summerNetMW": 122.0,
        "winterNetMW": 122.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2656,
      "normalized": {
        "queue_id": "J2712",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Clinton 230",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492287,
        "projectNumber": "J2712",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Clinton 230",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2657,
      "normalized": {
        "queue_id": "J2715",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "ACADIA - COLONIAL ACADEMY CO 138.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492288,
        "projectNumber": "J2715",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ACADIA - COLONIAL ACADEMY CO 138.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2658,
      "normalized": {
        "queue_id": "J2730",
        "county": "Jackson",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Jackson North 161kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-07-24T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492289,
        "projectNumber": "J2730",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-07-24T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Jackson",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jackson North 161kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2659,
      "normalized": {
        "queue_id": "J2734",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "GILMORE - WILSON 161.0kV",
        "queue_date": "2025-07-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492290,
        "projectNumber": "J2734",
        "queueDate": "2025-07-28T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GILMORE - WILSON 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2660,
      "normalized": {
        "queue_id": "J2736",
        "county": "Bolivar",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Rosedale to Stringtown 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492291,
        "projectNumber": "J2736",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Bolivar",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rosedale to Stringtown 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2661,
      "normalized": {
        "queue_id": "J2889",
        "county": "Allegan",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Argenta 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492292,
        "projectNumber": "J2889",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Allegan",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Argenta 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2662,
      "normalized": {
        "queue_id": "J2751",
        "county": "Bolivar",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "STRINGTOWN",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492293,
        "projectNumber": "J2751",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Bolivar",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "STRINGTOWN",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2663,
      "normalized": {
        "queue_id": "J2753",
        "county": "East Carroll",
        "state": "LA",
        "transmission_owner": "",
        "poi": "DARNELL - TALLULAH 115.0kV",
        "queue_date": "2025-08-21T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492294,
        "projectNumber": "J2753",
        "queueDate": "2025-08-21T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "East Carroll",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "DARNELL - TALLULAH 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2664,
      "normalized": {
        "queue_id": "J2726",
        "county": "Montgomery",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "7Enon- 7Montgmry 345 KV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 248.0,
        "summer_net_mw": 248.0,
        "winter_net_mw": 248.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492295,
        "projectNumber": "J2726",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Montgomery",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7Enon- 7Montgmry 345 KV",
        "summerNetMW": 248.0,
        "winterNetMW": 248.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2665,
      "normalized": {
        "queue_id": "J2831",
        "county": "Natchitoches",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Colfax-Rodemacher 230 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 36.0,
        "summer_net_mw": 36.0,
        "winter_net_mw": 36.0,
        "proposed_completion_date": null,
        "generation_type": "Hydro",
        "facility_type": "Hydroelectric",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492296,
        "projectNumber": "J2831",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Natchitoches",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Colfax-Rodemacher 230 kV",
        "summerNetMW": 36.0,
        "winterNetMW": 36.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hydro",
        "facilityType": "Hydroelectric",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2666,
      "normalized": {
        "queue_id": "J2769",
        "county": "St. Helena",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Amite - Gillsburg Tap 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492297,
        "projectNumber": "J2769",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Helena",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Amite - Gillsburg Tap 115 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2667,
      "normalized": {
        "queue_id": "J2752",
        "county": "Montgomery",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "ELLIOTT SS - SAWYER SS (CE) 115.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 110.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492298,
        "projectNumber": "J2752",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Montgomery",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "ELLIOTT SS - SAWYER SS (CE) 115.0kV",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 110.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2668,
      "normalized": {
        "queue_id": "J2725",
        "county": "Ionia",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Marquette - North Belding 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492299,
        "projectNumber": "J2725",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ionia",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Marquette - North Belding 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2669,
      "normalized": {
        "queue_id": "J2727",
        "county": "Holmes",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Pickens - Midway SS (CE) 115kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492300,
        "projectNumber": "J2727",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Holmes",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pickens - Midway SS (CE) 115kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2670,
      "normalized": {
        "queue_id": "J2800",
        "county": "Columbia",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "EL DORADO EHV - SAREPTA 345/115KV SW STA 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-09-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492301,
        "projectNumber": "J2800",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2028-09-29T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Columbia",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "EL DORADO EHV - SAREPTA 345/115KV SW STA 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2671,
      "normalized": {
        "queue_id": "J2820",
        "county": "Daviess",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Bon Harbor Tap-Stanley Tap 69kv",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492302,
        "projectNumber": "J2820",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Daviess",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bon Harbor Tap-Stanley Tap 69kv",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2672,
      "normalized": {
        "queue_id": "J2867",
        "county": "Wabasha",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Lake City (A) to Zumbro Falls (B)",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492303,
        "projectNumber": "J2867",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "inService": "2029-08-31T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Wabasha",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lake City (A) to Zumbro Falls (B)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2673,
      "normalized": {
        "queue_id": "J2827",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Norrell 230kV Substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492304,
        "projectNumber": "J2827",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Norrell 230kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2674,
      "normalized": {
        "queue_id": "J2728",
        "county": "Freeborn",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Glenworth",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-07-24T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492305,
        "projectNumber": "J2728",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-07-24T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Freeborn",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Glenworth",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2675,
      "normalized": {
        "queue_id": "J2881",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "",
        "poi": "AECC PINEBERGEN - AECC GLENDALE 115.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492306,
        "projectNumber": "J2881",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-07-31T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC PINEBERGEN - AECC GLENDALE 115.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2676,
      "normalized": {
        "queue_id": "J2750",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "",
        "poi": "RITCHIE SWYD - TARLETON 230.0kV",
        "queue_date": "2025-08-21T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 197.5,
        "summer_net_mw": 197.5,
        "winter_net_mw": 197.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 197.5,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492307,
        "projectNumber": "J2750",
        "queueDate": "2025-08-21T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "RITCHIE SWYD - TARLETON 230.0kV",
        "summerNetMW": 197.5,
        "winterNetMW": 197.5,
        "dp1ErisMw": 197.5,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2677,
      "normalized": {
        "queue_id": "J2768",
        "county": "Bolivar",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Shelby SS - Roundaway SS (CE) 115 kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492308,
        "projectNumber": "J2768",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Bolivar",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Shelby SS - Roundaway SS (CE) 115 kV Line",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2678,
      "normalized": {
        "queue_id": "J2875",
        "county": "Presque Isle",
        "state": "MI",
        "transmission_owner": "",
        "poi": "Hagensville 138 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492309,
        "projectNumber": "J2875",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Presque Isle",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hagensville 138 kV Substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2679,
      "normalized": {
        "queue_id": "J2877",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MURPHY - TITTABAWASSEE 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 129.0,
        "summer_net_mw": 129.0,
        "winter_net_mw": 129.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 129.0,
        "dp1_nris_mw": 129.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492310,
        "projectNumber": "J2877",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MURPHY - TITTABAWASSEE 345.0kV",
        "summerNetMW": 129.0,
        "winterNetMW": 129.0,
        "dp1ErisMw": 129.0,
        "dp1NrisMw": 129.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2680,
      "normalized": {
        "queue_id": "J2713",
        "county": "Mercer",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "OAK GROVE - MERCER CO (AMRN)",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 47.6,
        "summer_net_mw": 47.6,
        "winter_net_mw": 47.6,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492311,
        "projectNumber": "J2713",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Mercer",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "OAK GROVE - MERCER CO (AMRN)",
        "summerNetMW": 47.6,
        "winterNetMW": 47.6,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2681,
      "normalized": {
        "queue_id": "J2714",
        "county": "St. Landry",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Eunice",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 162.0,
        "summer_net_mw": 162.0,
        "winter_net_mw": 162.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 162.0,
        "dp1_nris_mw": 130.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492312,
        "projectNumber": "J2714",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Landry",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Eunice",
        "summerNetMW": 162.0,
        "winterNetMW": 162.0,
        "dp1ErisMw": 162.0,
        "dp1NrisMw": 130.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2682,
      "normalized": {
        "queue_id": "J2754",
        "county": "Polk",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "138kV Bragg - SHECO Menard Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492313,
        "projectNumber": "J2754",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Polk",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "138kV Bragg - SHECO Menard Line",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2683,
      "normalized": {
        "queue_id": "J2876",
        "county": "Arenac",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Whittemore to Twining 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2026-03-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492314,
        "projectNumber": "J2876",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2026-03-12T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Arenac",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Whittemore to Twining 138 kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2684,
      "normalized": {
        "queue_id": "J2721",
        "county": "Panola",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Senatobia-Sardis 115 kV Line",
        "queue_date": "2023-10-19T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492315,
        "projectNumber": "J2721",
        "queueDate": "2023-10-19T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Panola",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Senatobia-Sardis 115 kV Line",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2685,
      "normalized": {
        "queue_id": "J2732",
        "county": "Ogemaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gallagher to Twinning 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492316,
        "projectNumber": "J2732",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ogemaw",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gallagher to Twinning 138kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2686,
      "normalized": {
        "queue_id": "J2862",
        "county": "Bradley",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC Hermitage South-Hilo 115kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492317,
        "projectNumber": "J2862",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Bradley",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC Hermitage South-Hilo 115kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2687,
      "normalized": {
        "queue_id": "J2878",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GREENWOOD - RAPSON 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2026-03-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492318,
        "projectNumber": "J2878",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2026-03-12T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GREENWOOD - RAPSON 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2688,
      "normalized": {
        "queue_id": "J2863",
        "county": "Fillmore",
        "state": "MN",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Other_",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492319,
        "projectNumber": "J2863",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-20T04:00:00+00:00",
        "inService": "2027-08-31T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Fillmore",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2689,
      "normalized": {
        "queue_id": "J2844",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "",
        "poi": "AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492320,
        "projectNumber": "J2844",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2690,
      "normalized": {
        "queue_id": "J2818",
        "county": "Ouachita",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC CAMDEN SOUTH - STEPHENS 115.0kV",
        "queue_date": "2025-10-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 130.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492321,
        "projectNumber": "J2818",
        "queueDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ouachita",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC CAMDEN SOUTH - STEPHENS 115.0kV",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 130.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2691,
      "normalized": {
        "queue_id": "J2864",
        "county": "Nevada",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "McNeil EHV to Etta EHV 500kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 375.0,
        "summer_net_mw": 375.0,
        "winter_net_mw": 375.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 375.0,
        "dp1_nris_mw": 375.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492322,
        "projectNumber": "J2864",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2027-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Nevada",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "McNeil EHV to Etta EHV 500kV",
        "summerNetMW": 375.0,
        "winterNetMW": 375.0,
        "dp1ErisMw": 375.0,
        "dp1NrisMw": 375.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2692,
      "normalized": {
        "queue_id": "J2819",
        "county": "Red River",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "RINGGOLD - CARROLL (CLECO) 115.0kV",
        "queue_date": "2025-10-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492323,
        "projectNumber": "J2819",
        "queueDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-02-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Red River",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RINGGOLD - CARROLL (CLECO) 115.0kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2693,
      "normalized": {
        "queue_id": "J2865",
        "county": "Ouachita",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado EHV - McNeil EHV 500kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 375.0,
        "summer_net_mw": 375.0,
        "winter_net_mw": 375.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 375.0,
        "dp1_nris_mw": 375.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492324,
        "projectNumber": "J2865",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2027-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ouachita",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "El Dorado EHV - McNeil EHV 500kV",
        "summerNetMW": 375.0,
        "winterNetMW": 375.0,
        "dp1ErisMw": 375.0,
        "dp1NrisMw": 375.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2694,
      "normalized": {
        "queue_id": "J2893",
        "county": "Holmes",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "DURANT - BOWLING GREEN SS 115.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492325,
        "projectNumber": "J2893",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-08-18T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Holmes",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DURANT - BOWLING GREEN SS 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2695,
      "normalized": {
        "queue_id": "J2762",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4TAZEWELL-4FLINT 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-05T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492326,
        "projectNumber": "J2762",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-13T04:00:00+00:00",
        "inService": "2025-11-05T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4TAZEWELL-4FLINT 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2696,
      "normalized": {
        "queue_id": "J2791",
        "county": "Lafayette",
        "state": "LA",
        "transmission_owner": "LAFAYETTE UTILITIES SYSTEM",
        "poi": "Doc Bonin 69kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 243.1,
        "summer_net_mw": 243.1,
        "winter_net_mw": 243.1,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 243.1,
        "dp1_nris_mw": 243.1,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492327,
        "projectNumber": "J2791",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2027-05-01T04:00:00+00:00",
        "transmissionOwner": "LAFAYETTE UTILITIES SYSTEM",
        "county": "Lafayette",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Doc Bonin 69kV",
        "summerNetMW": 243.1,
        "winterNetMW": 243.1,
        "dp1ErisMw": 243.1,
        "dp1NrisMw": 243.1,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2697,
      "normalized": {
        "queue_id": "J2861",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Rochester 161kV (A) to Adams 161kV (B)",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 147.0,
        "summer_net_mw": 147.0,
        "winter_net_mw": 147.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 147.0,
        "dp1_nris_mw": 147.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492328,
        "projectNumber": "J2861",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2029-08-31T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rochester 161kV (A) to Adams 161kV (B)",
        "summerNetMW": 147.0,
        "winterNetMW": 147.0,
        "dp1ErisMw": 147.0,
        "dp1NrisMw": 147.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2698,
      "normalized": {
        "queue_id": "J2816",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "",
        "poi": "RILLA - RIVERTON 115.0kV",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492329,
        "projectNumber": "J2816",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "inService": "2028-10-31T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "RILLA - RIVERTON 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2699,
      "normalized": {
        "queue_id": "J2866",
        "county": "Nevada",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "McNeil 500kV (A) to Etta 500kV (B)",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 375.0,
        "summer_net_mw": 375.0,
        "winter_net_mw": 375.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 375.0,
        "dp1_nris_mw": 375.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492330,
        "projectNumber": "J2866",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2027-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Nevada",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "McNeil 500kV (A) to Etta 500kV (B)",
        "summerNetMW": 375.0,
        "winterNetMW": 375.0,
        "dp1ErisMw": 375.0,
        "dp1NrisMw": 375.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2700,
      "normalized": {
        "queue_id": "J2821",
        "county": "Crittenden",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Sullivan - Marion Jct 69 kV",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492331,
        "projectNumber": "J2821",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Crittenden",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sullivan - Marion Jct 69 kV",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2701,
      "normalized": {
        "queue_id": "J2822",
        "county": "Van Buren",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "PALISADES - VERGENNES 345.0kV",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492332,
        "projectNumber": "J2822",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Van Buren",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PALISADES - VERGENNES 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2702,
      "normalized": {
        "queue_id": "J2824",
        "county": "Yazoo",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Picken - Midway SS (CE) 115 kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492333,
        "projectNumber": "J2824",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Yazoo",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Picken - Midway SS (CE) 115 kV",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2703,
      "normalized": {
        "queue_id": "J2903",
        "county": "Lincoln",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "BROOKHAVEN - BROOKHAVEN/SOUTH 115.0kV",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492334,
        "projectNumber": "J2903",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-02-01T05:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Lincoln",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BROOKHAVEN - BROOKHAVEN/SOUTH 115.0kV",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2704,
      "normalized": {
        "queue_id": "J2828",
        "county": "Pulaski",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "L.R. 145th St - Wrightsville 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492335,
        "projectNumber": "J2828",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pulaski",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "L.R. 145th St - Wrightsville 115kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2705,
      "normalized": {
        "queue_id": "J2789",
        "county": "Jasper",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4NEWTON-4ROBNSNAM 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-05T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492336,
        "projectNumber": "J2789",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-08T05:00:00+00:00",
        "inService": "2025-11-05T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jasper",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4NEWTON-4ROBNSNAM 138kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2706,
      "normalized": {
        "queue_id": "J2823",
        "county": "Jefferson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Madison West 138kV Substation",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492337,
        "projectNumber": "J2823",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Jefferson",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Madison West 138kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2707,
      "normalized": {
        "queue_id": "J2825",
        "county": "Panola",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "COMO - CRENSHAW 115kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492338,
        "projectNumber": "J2825",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Panola",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "COMO - CRENSHAW 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2708,
      "normalized": {
        "queue_id": "J2833",
        "county": "Wood",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sigel - Auburndale Tap (Y-107) 69kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492339,
        "projectNumber": "J2833",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Wood",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sigel - Auburndale Tap (Y-107) 69kV",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2709,
      "normalized": {
        "queue_id": "J2882",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cooper-Penton Road 230kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 410.0,
        "summer_net_mw": 410.0,
        "winter_net_mw": 410.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492340,
        "projectNumber": "J2882",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cooper-Penton Road 230kV",
        "summerNetMW": 410.0,
        "winterNetMW": 410.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2710,
      "normalized": {
        "queue_id": "J2834",
        "county": "Fond du Lac",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "South Fond du Lac - North Fond du Lac 69kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492341,
        "projectNumber": "J2834",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Fond du Lac",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "South Fond du Lac - North Fond du Lac 69kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2711,
      "normalized": {
        "queue_id": "J2884",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cooper to Penton Road 230kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 276.0,
        "summer_net_mw": 276.0,
        "winter_net_mw": 276.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492342,
        "projectNumber": "J2884",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cooper to Penton Road 230kV",
        "summerNetMW": 276.0,
        "winterNetMW": 276.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2712,
      "normalized": {
        "queue_id": "J2790",
        "county": "Christian",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7Pana-7Austin 345kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-02-05T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492343,
        "projectNumber": "J2790",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-13T04:00:00+00:00",
        "inService": "2026-02-05T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Christian",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7Pana-7Austin 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2713,
      "normalized": {
        "queue_id": "J2890",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Lake Charles Bulk 138kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 440.0,
        "summer_net_mw": 440.0,
        "winter_net_mw": 440.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492344,
        "projectNumber": "J2890",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lake Charles Bulk 138kV Substation",
        "summerNetMW": 440.0,
        "winterNetMW": 440.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2714,
      "normalized": {
        "queue_id": "J2838",
        "county": "Richland",
        "state": "LA",
        "transmission_owner": "",
        "poi": "DUNN - OAK RIDGE (LA) 115.0kV",
        "queue_date": "2025-10-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492345,
        "projectNumber": "J2838",
        "queueDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Richland",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DUNN - OAK RIDGE (LA) 115.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2715,
      "normalized": {
        "queue_id": "J2912",
        "county": "Mercer",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Coyote Switchyard 345kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 347.0,
        "summer_net_mw": 347.0,
        "winter_net_mw": 347.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492346,
        "projectNumber": "J2912",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Mercer",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Coyote Switchyard 345kV Substation",
        "summerNetMW": 347.0,
        "winterNetMW": 347.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2716,
      "normalized": {
        "queue_id": "J2837",
        "county": "Jennings",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "North Vernon - Madison 138 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492347,
        "projectNumber": "J2837",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Jennings",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "North Vernon - Madison 138 kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2717,
      "normalized": {
        "queue_id": "J2911",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Penton 230KV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 810.0,
        "summer_net_mw": 810.0,
        "winter_net_mw": 810.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492348,
        "projectNumber": "J2911",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Penton 230KV Substation",
        "summerNetMW": 810.0,
        "winterNetMW": 810.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2718,
      "normalized": {
        "queue_id": "J2787",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BRINKLEY EAST-AECC AUBREY 230kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492349,
        "projectNumber": "J2787",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-27T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BRINKLEY EAST-AECC AUBREY 230kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2719,
      "normalized": {
        "queue_id": "J2792",
        "county": "Concordia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Persimmon Mill--Red Gum  115kV Line",
        "queue_date": "2022-08-31T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492350,
        "projectNumber": "J2792",
        "queueDate": "2022-08-31T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Concordia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Persimmon Mill--Red Gum  115kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2720,
      "normalized": {
        "queue_id": "J2868",
        "county": "Jackson",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Alma Center- Merrillan (DCP) 69 KV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-08-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 46.2,
        "summer_net_mw": 46.2,
        "winter_net_mw": 46.2,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492351,
        "projectNumber": "J2868",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-08-04T04:00:00+00:00",
        "inService": "2026-12-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Jackson",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Alma Center- Merrillan (DCP) 69 KV",
        "summerNetMW": 46.2,
        "winterNetMW": 46.2,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2721,
      "normalized": {
        "queue_id": "J2763",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "CLEVELAND/SOUTH - STEINER (CE) 115.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492352,
        "projectNumber": "J2763",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "CLEVELAND/SOUTH - STEINER (CE) 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2722,
      "normalized": {
        "queue_id": "J2919",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Kokomo Webster St. to Walton 230 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 142.59,
        "summer_net_mw": 142.59,
        "winter_net_mw": 142.59,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492353,
        "projectNumber": "J2919",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kokomo Webster St. to Walton 230 kV",
        "summerNetMW": 142.59,
        "winterNetMW": 142.59,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2723,
      "normalized": {
        "queue_id": "J2774",
        "county": "Ionia",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Other_",
        "queue_date": "2024-08-20T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492354,
        "projectNumber": "J2774",
        "queueDate": "2024-08-20T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2026-07-20T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Ionia",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2724,
      "normalized": {
        "queue_id": "J2907",
        "county": "Grant",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Sheridan 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-26T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 400.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492355,
        "projectNumber": "J2907",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-05-26T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Grant",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sheridan 500 kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 400.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2725,
      "normalized": {
        "queue_id": "J2839",
        "county": "Ascension",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Donaldsonville to Evergreen 230 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492356,
        "projectNumber": "J2839",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-10-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Ascension",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Donaldsonville to Evergreen 230 kV line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2726,
      "normalized": {
        "queue_id": "J2908",
        "county": "Morgan",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Jacksonville North",
        "queue_date": "2022-07-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-07-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 30.0,
        "dp1_nris_mw": 30.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492357,
        "projectNumber": "J2908",
        "queueDate": "2022-07-27T04:00:00+00:00",
        "inService": "2023-07-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Morgan",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "E-NRIS",
        "poiName": "Jacksonville North",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 30.0,
        "dp1NrisMw": 30.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2727,
      "normalized": {
        "queue_id": "J2860",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Roy S Nelson - DeRidder Mill 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492358,
        "projectNumber": "J2860",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Roy S Nelson - DeRidder Mill 138 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2728,
      "normalized": {
        "queue_id": "J2916",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "East Leesville-Rodemacher 230 KV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492359,
        "projectNumber": "J2916",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "East Leesville-Rodemacher 230 KV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2729,
      "normalized": {
        "queue_id": "J2910",
        "county": "Chambers",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Stowell 230kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 303.0,
        "summer_net_mw": 303.0,
        "winter_net_mw": 303.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-14T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492360,
        "projectNumber": "J2910",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-22T04:00:00+00:00",
        "inService": "2026-06-14T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Chambers",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Stowell 230kV",
        "summerNetMW": 303.0,
        "winterNetMW": 303.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2730,
      "normalized": {
        "queue_id": "J2830",
        "county": "Jennings",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Brewersville - Dabney 69kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492361,
        "projectNumber": "J2830",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Jennings",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Brewersville - Dabney 69kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2731,
      "normalized": {
        "queue_id": "J2832",
        "county": "East Carroll",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Darnell - Tallulah 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492362,
        "projectNumber": "J2832",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "East Carroll",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Darnell - Tallulah 115 kV",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2732,
      "normalized": {
        "queue_id": "J2806",
        "county": "Warren",
        "state": "MO",
        "transmission_owner": "",
        "poi": "Warrenton 161kV Substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492363,
        "projectNumber": "J2806",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Warren",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Warrenton 161kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2733,
      "normalized": {
        "queue_id": "J2835",
        "county": "Jefferson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Madison - Scottsburg 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492364,
        "projectNumber": "J2835",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Jefferson",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Madison - Scottsburg 138kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2734,
      "normalized": {
        "queue_id": "J2888",
        "county": "Lafayette",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Baxter Wilson SES SWYD 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492365,
        "projectNumber": "J2888",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Lafayette",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Baxter Wilson SES SWYD 500 kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2735,
      "normalized": {
        "queue_id": "J2870",
        "county": "Sawyer",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "STONE LAKE",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 243.6,
        "summer_net_mw": 243.6,
        "winter_net_mw": 243.6,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 243.6,
        "dp1_nris_mw": 243.6,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492366,
        "projectNumber": "J2870",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-12-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Sawyer",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STONE LAKE",
        "summerNetMW": 243.6,
        "winterNetMW": 243.6,
        "dp1ErisMw": 243.6,
        "dp1NrisMw": 243.6,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2736,
      "normalized": {
        "queue_id": "J2857",
        "county": "Tunica",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Banks SS (CE) - Hambrick SS (CE) 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492367,
        "projectNumber": "J2857",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tunica",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Banks SS (CE) - Hambrick SS (CE) 115 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2737,
      "normalized": {
        "queue_id": "J2780",
        "county": "Pulaski",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "STARKE (Actual POI is on ASPHALTUM to MEDARYVILLE 69kV Circuit 6919 an appendix  G facility)",
        "queue_date": "2023-10-05T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 33.0,
        "summer_net_mw": 33.0,
        "winter_net_mw": 33.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492368,
        "projectNumber": "J2780",
        "queueDate": "2023-10-05T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Pulaski",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STARKE (Actual POI is on ASPHALTUM to MEDARYVILLE 69kV Circuit 6919 an appendix  G facility)",
        "summerNetMW": 33.0,
        "winterNetMW": 33.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2738,
      "normalized": {
        "queue_id": "J2764",
        "county": "Craighead",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "JONESBORO (APL) - CASH 161.0kV",
        "queue_date": "2025-07-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492369,
        "projectNumber": "J2764",
        "queueDate": "2025-07-24T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Craighead",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "JONESBORO (APL) - CASH 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2739,
      "normalized": {
        "queue_id": "J2759",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "",
        "poi": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "queue_date": "2023-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-02-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492370,
        "projectNumber": "J2759",
        "queueDate": "2023-09-12T04:00:00+00:00",
        "inService": "2029-02-15T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2740,
      "normalized": {
        "queue_id": "J2814",
        "county": "Kalamazoo",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ARGENTA - MORROW 138.0kV",
        "queue_date": "2022-09-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": "2027-03-27T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-02-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 220.0,
        "dp1_nris_mw": 220.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492371,
        "projectNumber": "J2814",
        "queueDate": "2022-09-07T04:00:00+00:00",
        "inService": "2026-02-15T05:00:00+00:00",
        "negInService": "2027-03-27T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Kalamazoo",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ARGENTA - MORROW 138.0kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 220.0,
        "dp1NrisMw": 220.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2741,
      "normalized": {
        "queue_id": "J2891",
        "county": "Kenosha",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Other_",
        "queue_date": "2024-01-09T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492372,
        "projectNumber": "J2891",
        "queueDate": "2024-01-09T05:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Kenosha",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2742,
      "normalized": {
        "queue_id": "J2880",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492373,
        "projectNumber": "J2880",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-07-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2743,
      "normalized": {
        "queue_id": "J2874",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "HAMPTON",
        "queue_date": "2022-08-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 85.0,
        "summer_net_mw": 85.0,
        "winter_net_mw": 85.0,
        "proposed_completion_date": "2026-09-01T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 85.0,
        "dp1_nris_mw": 85.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492374,
        "projectNumber": "J2874",
        "queueDate": "2022-08-31T04:00:00+00:00",
        "inService": "2025-11-15T05:00:00+00:00",
        "negInService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HAMPTON",
        "summerNetMW": 85.0,
        "winterNetMW": 85.0,
        "dp1ErisMw": 85.0,
        "dp1NrisMw": 85.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2744,
      "normalized": {
        "queue_id": "J2904",
        "county": "Concordia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "PLANTATION",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492375,
        "projectNumber": "J2904",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Concordia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PLANTATION",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2745,
      "normalized": {
        "queue_id": "J2788",
        "county": "Wayne",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Dayton 120kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492376,
        "projectNumber": "J2788",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-08-07T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Wayne",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dayton 120kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2746,
      "normalized": {
        "queue_id": "J2905",
        "county": "Washington",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "HOLLANDALE - NITTA YUMA SS (CE) 115.0kV",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492377,
        "projectNumber": "J2905",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Washington",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HOLLANDALE - NITTA YUMA SS (CE) 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2747,
      "normalized": {
        "queue_id": "J2871",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "",
        "poi": "AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV",
        "queue_date": "2025-10-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 70.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492378,
        "projectNumber": "J2871",
        "queueDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 70.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2748,
      "normalized": {
        "queue_id": "J2793",
        "county": "Saline",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Muddy",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492379,
        "projectNumber": "J2793",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Saline",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Muddy",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2749,
      "normalized": {
        "queue_id": "J2757",
        "county": "Cherokee",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "LITTLE SIOUX - CLIPPER 161.0kV",
        "queue_date": "2025-10-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.3,
        "summer_net_mw": 160.3,
        "winter_net_mw": 160.3,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 160.3,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492380,
        "projectNumber": "J2757",
        "queueDate": "2025-10-17T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Cherokee",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "LITTLE SIOUX - CLIPPER 161.0kV",
        "summerNetMW": 160.3,
        "winterNetMW": 160.3,
        "dp1ErisMw": 160.3,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2750,
      "normalized": {
        "queue_id": "J2765",
        "county": "West Carroll",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Darnell 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492381,
        "projectNumber": "J2765",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-12-06T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "West Carroll",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Darnell 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2751,
      "normalized": {
        "queue_id": "J2784",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Turner 345kv Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-11-03T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492382,
        "projectNumber": "J2784",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-11-03T05:00:00+00:00",
        "inService": "2026-07-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Turner 345kv Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2752,
      "normalized": {
        "queue_id": "J2799",
        "county": "Van Buren",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ARGENTA - PALISADES 345.0kV",
        "queue_date": "2025-10-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492383,
        "projectNumber": "J2799",
        "queueDate": "2025-10-25T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Van Buren",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ARGENTA - PALISADES 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2753,
      "normalized": {
        "queue_id": "J2906",
        "county": "Kalamazoo",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Jaguar 138kV substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492384,
        "projectNumber": "J2906",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Kalamazoo",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jaguar 138kV substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2754,
      "normalized": {
        "queue_id": "J2849",
        "county": "Pulaski",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Reynolds--Burr Oak 345kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 245.0,
        "dp1_nris_mw": 245.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492385,
        "projectNumber": "J2849",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-12-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Pulaski",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reynolds--Burr Oak 345kV line",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 245.0,
        "dp1NrisMw": 245.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2755,
      "normalized": {
        "queue_id": "J2856",
        "county": "Jefferson",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Franklin EHV - Grand Gulf Transmission 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492386,
        "projectNumber": "J2856",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Jefferson",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Franklin EHV - Grand Gulf Transmission 500 kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2756,
      "normalized": {
        "queue_id": "J2785",
        "county": "Calhoun",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado - Sheridan 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492387,
        "projectNumber": "J2785",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Calhoun",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "El Dorado - Sheridan 500 kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2757,
      "normalized": {
        "queue_id": "J2885",
        "county": "Red Lake",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Plummer Pipe",
        "queue_date": "2022-09-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-10T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 130.0,
        "dp1_nris_mw": 130.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492388,
        "projectNumber": "J2885",
        "queueDate": "2022-09-06T04:00:00+00:00",
        "inService": "2025-01-10T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Red Lake",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Plummer Pipe",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 130.0,
        "dp1NrisMw": 130.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2758,
      "normalized": {
        "queue_id": "J2786",
        "county": "Allegan",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ARGENTA - TALLMADGE 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492389,
        "projectNumber": "J2786",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2029-07-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Allegan",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ARGENTA - TALLMADGE 345.0kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2759,
      "normalized": {
        "queue_id": "J2813",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Slate Goss 345 KV Line",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 195.0,
        "summer_net_mw": 195.0,
        "winter_net_mw": 195.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-02-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492390,
        "projectNumber": "J2813",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-02-15T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Slate Goss 345 KV Line",
        "summerNetMW": 195.0,
        "winterNetMW": 195.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2760,
      "normalized": {
        "queue_id": "J2846",
        "county": "Pulaski",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Reynolds--Burr Oak 345kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 700.0,
        "summer_net_mw": 700.0,
        "winter_net_mw": 700.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 700.0,
        "dp1_nris_mw": 700.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492391,
        "projectNumber": "J2846",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-12-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Pulaski",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reynolds--Burr Oak 345kV line",
        "summerNetMW": 700.0,
        "winterNetMW": 700.0,
        "dp1ErisMw": 700.0,
        "dp1NrisMw": 700.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2761,
      "normalized": {
        "queue_id": "J2848",
        "county": "Hamilton",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Noblesville  - Fall Creek (AEP) 345.0kV",
        "queue_date": "2025-11-19T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492392,
        "projectNumber": "J2848",
        "queueDate": "2025-11-19T05:00:00+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Hamilton",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Noblesville  - Fall Creek (AEP) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2762,
      "normalized": {
        "queue_id": "J2817",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "poi": "Batiste Creek 230kV Substation",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492393,
        "projectNumber": "J2817",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Batiste Creek 230kV Substation",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2763,
      "normalized": {
        "queue_id": "J2782",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "KENTLAND-MOROCCO 69kV",
        "queue_date": "2022-09-07T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 38.0,
        "summer_net_mw": 38.0,
        "winter_net_mw": 38.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492394,
        "projectNumber": "J2782",
        "queueDate": "2022-09-07T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "KENTLAND-MOROCCO 69kV",
        "summerNetMW": 38.0,
        "winterNetMW": 38.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2764,
      "normalized": {
        "queue_id": "J2795",
        "county": "Lincoln",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "DOWNSVILLE",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492395,
        "projectNumber": "J2795",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Lincoln",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DOWNSVILLE",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2765,
      "normalized": {
        "queue_id": "J2815",
        "county": "Calhoun",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ARGENTA - VERONA 138.0kV",
        "queue_date": "2022-08-30T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": "2026-02-14T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-02-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492396,
        "projectNumber": "J2815",
        "queueDate": "2022-08-30T04:00:00+00:00",
        "inService": "2025-02-15T05:00:00+00:00",
        "negInService": "2026-02-14T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ARGENTA - VERONA 138.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2766,
      "normalized": {
        "queue_id": "J2854",
        "county": "White",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Griffithville - SERCY Price 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492397,
        "projectNumber": "J2854",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2024-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "White",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Griffithville - SERCY Price 115 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2767,
      "normalized": {
        "queue_id": "J2851",
        "county": "Walker",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Rocky Creek",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2022-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492398,
        "projectNumber": "J2851",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2022-12-09T05:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Walker",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rocky Creek",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2768,
      "normalized": {
        "queue_id": "J2853",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "CITY WATER LIGHT & POWER",
        "poi": "Westchester 138 kV station - PSSE bus 343513",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492399,
        "projectNumber": "J2853",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-08-30T04:00:00+00:00",
        "transmissionOwner": "CITY WATER LIGHT & POWER",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Westchester 138 kV station - PSSE bus 343513",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2769,
      "normalized": {
        "queue_id": "J2917",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "",
        "poi": "PRAIRIE ROAD",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492400,
        "projectNumber": "J2917",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-03-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PRAIRIE ROAD",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2770,
      "normalized": {
        "queue_id": "J2767",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Hightower - Rye 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492401,
        "projectNumber": "J2767",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-08-04T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hightower - Rye 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2771,
      "normalized": {
        "queue_id": "J2918",
        "county": "Jasper",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4EFFINGHM N - 4NEWTON 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 97.0,
        "summer_net_mw": 97.0,
        "winter_net_mw": 97.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 97.0,
        "dp1_nris_mw": 25.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492402,
        "projectNumber": "J2918",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Jasper",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4EFFINGHM N - 4NEWTON 138kV",
        "summerNetMW": 97.0,
        "winterNetMW": 97.0,
        "dp1ErisMw": 97.0,
        "dp1NrisMw": 25.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2772,
      "normalized": {
        "queue_id": "S1168",
        "county": "Marion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Finks 138 kV",
        "queue_date": "2026-07-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492403,
        "projectNumber": "S1168",
        "queueDate": "2026-07-02T04:00:00+00:00",
        "inService": "2028-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Marion",
        "state": "IL",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Finks 138 kV",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2773,
      "normalized": {
        "queue_id": "R5101",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-09-03T17:30:30+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-05-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492404,
        "projectNumber": "R5101",
        "queueDate": "2026-09-03T17:30:30+00:00",
        "inService": "2025-05-10T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 2774,
      "normalized": {
        "queue_id": "J2805",
        "county": "Fountain",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "VEEDERSBURG WEST 230 Substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492405,
        "projectNumber": "J2805",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Fountain",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "VEEDERSBURG WEST 230 Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2775,
      "normalized": {
        "queue_id": "J2797",
        "county": "White",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Norris City North",
        "queue_date": "2025-10-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492406,
        "projectNumber": "J2797",
        "queueDate": "2025-10-25T04:00:00+00:00",
        "inService": "2026-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "White",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Norris City North",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2776,
      "normalized": {
        "queue_id": "J2840",
        "county": "Olmsted",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Byron 161 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492407,
        "projectNumber": "J2840",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-09-30T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Olmsted",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Byron 161 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2777,
      "normalized": {
        "queue_id": "J2794",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "A Tap on Kinmundy-Otego 138kv line",
        "queue_date": "2022-08-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-12-27T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 90.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492408,
        "projectNumber": "J2794",
        "queueDate": "2022-08-23T04:00:00+00:00",
        "inService": "2029-12-27T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "A Tap on Kinmundy-Otego 138kv line",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 90.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2778,
      "normalized": {
        "queue_id": "J2859",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC KEO-BAUCUM 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-20T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492409,
        "projectNumber": "J2859",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-11-20T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC KEO-BAUCUM 115 kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2779,
      "normalized": {
        "queue_id": "J2886",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4Auburn N-4Jacksnvl 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-09-17T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 115.0,
        "dp1_nris_mw": 115.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492410,
        "projectNumber": "J2886",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2029-09-17T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4Auburn N-4Jacksnvl 138kV",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 115.0,
        "dp1NrisMw": 115.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2780,
      "normalized": {
        "queue_id": "J2812",
        "county": "Hillsdale",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MOORE ROAD",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492411,
        "projectNumber": "J2812",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Hillsdale",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MOORE ROAD",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2781,
      "normalized": {
        "queue_id": "J2855",
        "county": "Lawrence",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Bedford - Edwardsport 138 kV line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492412,
        "projectNumber": "J2855",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Lawrence",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bedford - Edwardsport 138 kV line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2782,
      "normalized": {
        "queue_id": "J2746",
        "county": "Rush",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Boyd - Sexton",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492413,
        "projectNumber": "J2746",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-07-04T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Rush",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Boyd - Sexton",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2783,
      "normalized": {
        "queue_id": "J2747",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport IGCC - Amo 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492414,
        "projectNumber": "J2747",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-04T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport IGCC - Amo 345.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2784,
      "normalized": {
        "queue_id": "J2781",
        "county": "Jasper",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Other_",
        "queue_date": "2022-09-07T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492415,
        "projectNumber": "J2781",
        "queueDate": "2022-09-07T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Jasper",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2785,
      "normalized": {
        "queue_id": "J2783",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Monticello 69kV (Acutal POI is a tap on GUERNSEY - Monon Circuit 6907 an appendix G  facility)",
        "queue_date": "2022-09-07T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 33.0,
        "summer_net_mw": 33.0,
        "winter_net_mw": 33.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492416,
        "projectNumber": "J2783",
        "queueDate": "2022-09-07T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Monticello 69kV (Acutal POI is a tap on GUERNSEY - Monon Circuit 6907 an appendix G  facility)",
        "summerNetMW": 33.0,
        "winterNetMW": 33.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2786,
      "normalized": {
        "queue_id": "J2761",
        "county": "Marion",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SME",
        "poi": "Columbia",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-09-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492417,
        "projectNumber": "J2761",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2029-09-28T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SME",
        "county": "Marion",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Columbia",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2787,
      "normalized": {
        "queue_id": "J2850",
        "county": "Chicot",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Bagby to Gerald Andrus 230 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492418,
        "projectNumber": "J2850",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-09T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Chicot",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bagby to Gerald Andrus 230 kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2788,
      "normalized": {
        "queue_id": "J2949",
        "county": "Marshall",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Marshalltown 161 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492419,
        "projectNumber": "J2949",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Marshall",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Marshalltown 161 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2789,
      "normalized": {
        "queue_id": "J2992",
        "county": "Perry",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Hintonville 161kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492420,
        "projectNumber": "J2992",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Perry",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hintonville 161kV Substation",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2790,
      "normalized": {
        "queue_id": "J2756",
        "county": "Livingston",
        "state": "KY",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Burna Tap - Joy 69.0kV",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 42.0,
        "summer_net_mw": 42.0,
        "winter_net_mw": 42.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 42.0,
        "dp1_nris_mw": 42.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492421,
        "projectNumber": "J2756",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Livingston",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Burna Tap - Joy 69.0kV",
        "summerNetMW": 42.0,
        "winterNetMW": 42.0,
        "dp1ErisMw": 42.0,
        "dp1NrisMw": 42.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2791,
      "normalized": {
        "queue_id": "J2755",
        "county": "Pike",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AMITY SS-AECC MURFREESBORO EAST 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492422,
        "projectNumber": "J2755",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-24T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pike",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AMITY SS-AECC MURFREESBORO EAST 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2792,
      "normalized": {
        "queue_id": "J2999",
        "county": "Perry",
        "state": "MS",
        "transmission_owner": "",
        "poi": "Hintonville",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492423,
        "projectNumber": "J2999",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Perry",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hintonville",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2793,
      "normalized": {
        "queue_id": "J2953",
        "county": "Orange",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "CHISHOLM RD - SABINE 230 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492424,
        "projectNumber": "J2953",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Orange",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CHISHOLM RD - SABINE 230 kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2794,
      "normalized": {
        "queue_id": "J2758",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Stuttgart Ricuskey to Woodward 230kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-02-27T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492425,
        "projectNumber": "J2758",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-02-27T05:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stuttgart Ricuskey to Woodward 230kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2795,
      "normalized": {
        "queue_id": "J2802",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Singer J1424 to Penton 230 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-04-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492426,
        "projectNumber": "J2802",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-04-06T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Singer J1424 to Penton 230 kV line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2796,
      "normalized": {
        "queue_id": "J2847",
        "county": "Starke",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Reynolds--Burr Oak 345kV Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492427,
        "projectNumber": "J2847",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Starke",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Reynolds--Burr Oak 345kV Line",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2797,
      "normalized": {
        "queue_id": "J2858",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Bayou Cove - Richard 138 kV circuit 2",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-20T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492428,
        "projectNumber": "J2858",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-11-20T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bayou Cove - Richard 138 kV circuit 2",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2798,
      "normalized": {
        "queue_id": "J2894",
        "county": "Hendricks",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Westland Jct - Westline 69kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 22.77,
        "summer_net_mw": 22.77,
        "winter_net_mw": 22.77,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492429,
        "projectNumber": "J2894",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-05-07T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Hendricks",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Westland Jct - Westline 69kV Line",
        "summerNetMW": 22.77,
        "winterNetMW": 22.77,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2799,
      "normalized": {
        "queue_id": "J2748",
        "county": "Clearwater",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Wilton - Winger 230.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492430,
        "projectNumber": "J2748",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-07T04:00:00+00:00",
        "inService": "2026-08-04T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Clearwater",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wilton - Winger 230.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2800,
      "normalized": {
        "queue_id": "J2922",
        "county": "Jasper",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CASEY    - 7NEWTON   345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492431,
        "projectNumber": "J2922",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jasper",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "7CASEY    - 7NEWTON   345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2801,
      "normalized": {
        "queue_id": "J2943",
        "county": "Webster",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Minden to Sarepta 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492432,
        "projectNumber": "J2943",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Webster",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Minden to Sarepta 115 kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2802,
      "normalized": {
        "queue_id": "J3042",
        "county": "St. John the Baptist",
        "state": "LA",
        "transmission_owner": "",
        "poi": "WATERFORD 230 SWYD - VACHERIE 230.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492433,
        "projectNumber": "J3042",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "St. John the Baptist",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "WATERFORD 230 SWYD - VACHERIE 230.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2803,
      "normalized": {
        "queue_id": "J3004",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Cane",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 142.0,
        "summer_net_mw": 142.0,
        "winter_net_mw": 142.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 142.0,
        "dp1_nris_mw": 127.5,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492434,
        "projectNumber": "J3004",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-08-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cane",
        "summerNetMW": 142.0,
        "winterNetMW": 142.0,
        "dp1ErisMw": 142.0,
        "dp1NrisMw": 127.5,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2804,
      "normalized": {
        "queue_id": "J2988",
        "county": "Humboldt",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "J2256 POI - Irvington 345kV line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492435,
        "projectNumber": "J2988",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-03-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Humboldt",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J2256 POI - Irvington 345kV line",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2805,
      "normalized": {
        "queue_id": "J3041",
        "county": "Olmsted",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Byron 161kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492436,
        "projectNumber": "J3041",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2029-08-31T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Olmsted",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Byron 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2806,
      "normalized": {
        "queue_id": "J2996",
        "county": "Clay",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Corning North to Datto 161kV Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492437,
        "projectNumber": "J2996",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clay",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Corning North to Datto 161kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2807,
      "normalized": {
        "queue_id": "J3011",
        "county": "St. Clair",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Prairie State Plant Switchyard 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492438,
        "projectNumber": "J3011",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "St. Clair",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Prairie State Plant Switchyard 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2808,
      "normalized": {
        "queue_id": "J3008",
        "county": "Cook",
        "state": "IL",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Sheffield - Burnham 345 (Tie line between CE and NIPS, NIPS owns 1.87 miles)",
        "queue_date": "2022-08-24T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 270.0,
        "summer_net_mw": 270.0,
        "winter_net_mw": 270.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492439,
        "projectNumber": "J3008",
        "queueDate": "2022-08-24T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-05-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Cook",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sheffield - Burnham 345 (Tie line between CE and NIPS, NIPS owns 1.87 miles)",
        "summerNetMW": 270.0,
        "winterNetMW": 270.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2809,
      "normalized": {
        "queue_id": "J2931",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "",
        "poi": "AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492440,
        "projectNumber": "J2931",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AB Brown 345 - Reid EHV (BREC Terminal) 345.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2810,
      "normalized": {
        "queue_id": "J2749",
        "county": "Polk",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Winger 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492441,
        "projectNumber": "J2749",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-04T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Polk",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Winger 115kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2811,
      "normalized": {
        "queue_id": "J2952",
        "county": "Chambers",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Crooked Bayou to Stowell 138 kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492442,
        "projectNumber": "J2952",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Chambers",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Crooked Bayou to Stowell 138 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2812,
      "normalized": {
        "queue_id": "J2978",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "West Memphis EHV to Keo 500 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492443,
        "projectNumber": "J2978",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "West Memphis EHV to Keo 500 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2813,
      "normalized": {
        "queue_id": "J2971",
        "county": "Covington",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Southwest Lone Star 161 kV - Mississippi Hub 161 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 280.0,
        "summer_net_mw": 280.0,
        "winter_net_mw": 280.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492444,
        "projectNumber": "J2971",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-08-15T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Covington",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Southwest Lone Star 161 kV - Mississippi Hub 161 kV",
        "summerNetMW": 280.0,
        "winterNetMW": 280.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2814,
      "normalized": {
        "queue_id": "J2970",
        "county": "Posey",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492445,
        "projectNumber": "J2970",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-15T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Posey",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2815,
      "normalized": {
        "queue_id": "J2965",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "OAK GROVE 115 SUB",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492446,
        "projectNumber": "J2965",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "OAK GROVE 115 SUB",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2816,
      "normalized": {
        "queue_id": "J2967",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "",
        "poi": "Lowe Grout Rd to Jennings 138kV Line",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492447,
        "projectNumber": "J2967",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "inService": "2025-10-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lowe Grout Rd to Jennings 138kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2817,
      "normalized": {
        "queue_id": "J3001",
        "county": "Pulaski",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "J2134 POI to White Bluff 115kV Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492448,
        "projectNumber": "J3001",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pulaski",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J2134 POI to White Bluff 115kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2818,
      "normalized": {
        "queue_id": "J2993",
        "county": "Grant",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Woodward-Grapevine 115kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492449,
        "projectNumber": "J2993",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Grant",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Woodward-Grapevine 115kV line",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2819,
      "normalized": {
        "queue_id": "J3000",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Worthington - Merom 345kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492450,
        "projectNumber": "J3000",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Worthington - Merom 345kV Line",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2820,
      "normalized": {
        "queue_id": "J3016",
        "county": "Cass",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Walton",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492451,
        "projectNumber": "J3016",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Cass",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Walton",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2821,
      "normalized": {
        "queue_id": "J3030",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "White Bluff to Sheridan 500kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 450.0,
        "summer_net_mw": 450.0,
        "winter_net_mw": 450.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 450.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492452,
        "projectNumber": "J3030",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "White Bluff to Sheridan 500kV",
        "summerNetMW": 450.0,
        "winterNetMW": 450.0,
        "dp1ErisMw": 450.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2822,
      "normalized": {
        "queue_id": "J2945",
        "county": "Washington",
        "state": "IA",
        "transmission_owner": "",
        "poi": "SUB T  3 - HILLS  3 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Steam Turbine (including Nuclear, Geothermal and Solar Steam)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 350.0,
        "dp1_nris_mw": 350.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492453,
        "projectNumber": "J2945",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Washington",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SUB T  3 - HILLS  3 345.0kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 350.0,
        "dp1NrisMw": 350.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Steam Turbine (including Nuclear, Geothermal and Solar Steam)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2823,
      "normalized": {
        "queue_id": "J2948",
        "county": "Marshall",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Marshalltown",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 75.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492454,
        "projectNumber": "J2948",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Marshall",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Marshalltown",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 75.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2824,
      "normalized": {
        "queue_id": "J3029",
        "county": "Freeborn",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Freeborn",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-12-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 153.0,
        "summer_net_mw": 153.0,
        "winter_net_mw": 153.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 153.0,
        "dp1_nris_mw": 153.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492455,
        "projectNumber": "J3029",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-12-05T05:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Freeborn",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Freeborn",
        "summerNetMW": 153.0,
        "winterNetMW": 153.0,
        "dp1ErisMw": 153.0,
        "dp1NrisMw": 153.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2825,
      "normalized": {
        "queue_id": "J3022",
        "county": "Taylor",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Orient to Atchison County 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492456,
        "projectNumber": "J3022",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Taylor",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Orient to Atchison County 345 kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2826,
      "normalized": {
        "queue_id": "J3040",
        "county": "Ouachita",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "EL DORADO EHV - MCNEIL EHV 500.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 290.0,
        "summer_net_mw": 290.0,
        "winter_net_mw": 290.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 290.0,
        "dp1_nris_mw": 290.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492457,
        "projectNumber": "J3040",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2027-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ouachita",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "EL DORADO EHV - MCNEIL EHV 500.0kV",
        "summerNetMW": 290.0,
        "winterNetMW": 290.0,
        "dp1ErisMw": 290.0,
        "dp1NrisMw": 290.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2827,
      "normalized": {
        "queue_id": "J3015",
        "county": "Iroquois",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Gilman - Watseka 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 400.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492458,
        "projectNumber": "J3015",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Iroquois",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Gilman - Watseka 138kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 400.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2828,
      "normalized": {
        "queue_id": "J2939",
        "county": "Tunica",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Hambrick Switching Station 115kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492459,
        "projectNumber": "J2939",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-11-30T05:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Tunica",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hambrick Switching Station 115kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2829,
      "normalized": {
        "queue_id": "J2940",
        "county": "Sharkey",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Nitta Yuma SS (CE) - Rolling Fork 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492460,
        "projectNumber": "J2940",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-11-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sharkey",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Nitta Yuma SS (CE) - Rolling Fork 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2830,
      "normalized": {
        "queue_id": "J2959",
        "county": "Starke",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Rollin Schahfer (17SCHAHFER  255110) 345 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492461,
        "projectNumber": "J2959",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Starke",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rollin Schahfer (17SCHAHFER  255110) 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2831,
      "normalized": {
        "queue_id": "J2980",
        "county": "Perry",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Hintonville 161/69 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-10-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492462,
        "projectNumber": "J2980",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2023-10-02T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Perry",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hintonville 161/69 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2832,
      "normalized": {
        "queue_id": "J2982",
        "county": "Warren",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Line 6629 Monmouth 69 kV Switching Station",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 35.0,
        "dp1_nris_mw": 35.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492463,
        "projectNumber": "J2982",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2023-09-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Warren",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Line 6629 Monmouth 69 kV Switching Station",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 35.0,
        "dp1NrisMw": 35.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2833,
      "normalized": {
        "queue_id": "J2976",
        "county": "Jasper",
        "state": "TX",
        "transmission_owner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "poi": "Mill Creek SW Station 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492464,
        "projectNumber": "J2976",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "EAST TEXAS ELECTRIC COOPERATIVE, INC.ETCT",
        "county": "Jasper",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mill Creek SW Station 138 kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2834,
      "normalized": {
        "queue_id": "J3031",
        "county": "Jefferson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4WLTNVL TP 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492465,
        "projectNumber": "J3031",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jefferson",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4WLTNVL TP 138 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2835,
      "normalized": {
        "queue_id": "J2955",
        "county": "Saline",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WRIGHTSVILLE Ã¢?? WHITE BLUFF EHV 115 KV",
        "queue_date": "2023-11-07T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492466,
        "projectNumber": "J2955",
        "queueDate": "2023-11-07T05:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Saline",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "WRIGHTSVILLE Ã¢?? WHITE BLUFF EHV 115 KV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2836,
      "normalized": {
        "queue_id": "J3231",
        "county": "Amite",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "GLOSTER - LIBERTY 115.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-29T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492467,
        "projectNumber": "J3231",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2024-11-29T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Amite",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GLOSTER - LIBERTY 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2837,
      "normalized": {
        "queue_id": "J2950",
        "county": "Clay",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Clay County",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 299.3,
        "summer_net_mw": 299.3,
        "winter_net_mw": 299.3,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2018-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492468,
        "projectNumber": "J2950",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2018-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Clay",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "Clay County",
        "summerNetMW": 299.3,
        "winterNetMW": 299.3,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2838,
      "normalized": {
        "queue_id": "J2990",
        "county": "Pottawattamie",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Overland - J1859 POI 345kV Line Tap",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492469,
        "projectNumber": "J2990",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-06-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Pottawattamie",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Overland - J1859 POI 345kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2839,
      "normalized": {
        "queue_id": "J2937",
        "county": "Montgomery",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4PANA - 4OAKLEY 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 186.0,
        "summer_net_mw": 186.0,
        "winter_net_mw": 186.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 186.0,
        "dp1_nris_mw": 93.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492470,
        "projectNumber": "J2937",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Montgomery",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4PANA - 4OAKLEY 138.0kV",
        "summerNetMW": 186.0,
        "winterNetMW": 186.0,
        "dp1ErisMw": 186.0,
        "dp1NrisMw": 93.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2840,
      "normalized": {
        "queue_id": "J3023",
        "county": "Hot Spring",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "H.S. EHV 500 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492471,
        "projectNumber": "J3023",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Hot Spring",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "H.S. EHV 500 kV Substation",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2841,
      "normalized": {
        "queue_id": "J3014",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cooper - Leesville 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 280.0,
        "summer_net_mw": 280.0,
        "winter_net_mw": 280.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 280.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492472,
        "projectNumber": "J3014",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Cooper - Leesville 138.0kV",
        "summerNetMW": 280.0,
        "winterNetMW": 280.0,
        "dp1ErisMw": 280.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2842,
      "normalized": {
        "queue_id": "J3018",
        "county": "Pottawattamie",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Overland Trail - Fallow Avenue 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492473,
        "projectNumber": "J3018",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-04-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Pottawattamie",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Overland Trail - Fallow Avenue 345 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2843,
      "normalized": {
        "queue_id": "J2935",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Thetford to Murphy 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492474,
        "projectNumber": "J2935",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Thetford to Murphy 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2844,
      "normalized": {
        "queue_id": "J3003",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4HAVANA2 - 4CINCINATTI 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 135.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492475,
        "projectNumber": "J3003",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-08-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4HAVANA2 - 4CINCINATTI 138.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 135.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2845,
      "normalized": {
        "queue_id": "J2983",
        "county": "Grant",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WOODWARD 115 SUB - AECC GRAPEVINE 115.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492476,
        "projectNumber": "J2983",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Grant",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "WOODWARD 115 SUB - AECC GRAPEVINE 115.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2846,
      "normalized": {
        "queue_id": "J2957",
        "county": "Panola",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Como - Crenshaw 115 kV Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492477,
        "projectNumber": "J2957",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Panola",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Como - Crenshaw 115 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2847,
      "normalized": {
        "queue_id": "J2989",
        "county": "Hardin",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Blackhawk (MEC)- Quinn 345 KV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492478,
        "projectNumber": "J2989",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-06-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Hardin",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Blackhawk (MEC)- Quinn 345 KV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2848,
      "normalized": {
        "queue_id": "J2991",
        "county": "Wayne",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Dayton 120kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492479,
        "projectNumber": "J2991",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Wayne",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dayton 120kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2849,
      "normalized": {
        "queue_id": "J2954",
        "county": "Clay",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC CORNING NORTH Ã¢?? DATTO 161 KV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492480,
        "projectNumber": "J2954",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clay",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "AECC CORNING NORTH Ã¢?? DATTO 161 KV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2850,
      "normalized": {
        "queue_id": "J2933",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gallagher-Tittabawassee 345kV Transmission Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492481,
        "projectNumber": "J2933",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gallagher-Tittabawassee 345kV Transmission Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2851,
      "normalized": {
        "queue_id": "J2973",
        "county": "Christian",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7FARADAY - 7PANA 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492482,
        "projectNumber": "J2973",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Christian",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7FARADAY - 7PANA 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2852,
      "normalized": {
        "queue_id": "J3025",
        "county": "Douglas",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Alexandria to Hudson 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 188.0,
        "summer_net_mw": 188.0,
        "winter_net_mw": 188.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492483,
        "projectNumber": "J3025",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Douglas",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Alexandria to Hudson 115 kV",
        "summerNetMW": 188.0,
        "winterNetMW": 188.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2853,
      "normalized": {
        "queue_id": "J2932",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Henderson 161kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492484,
        "projectNumber": "J2932",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Henderson 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2854,
      "normalized": {
        "queue_id": "J2984",
        "county": "Clay",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Corning North to Datto 161kV Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492485,
        "projectNumber": "J2984",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clay",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Corning North to Datto 161kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2855,
      "normalized": {
        "queue_id": "J2995",
        "county": "Chicot",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "CHICOT115kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492486,
        "projectNumber": "J2995",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Chicot",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CHICOT115kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2856,
      "normalized": {
        "queue_id": "J3037",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Eldorado Upland SS 115kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492487,
        "projectNumber": "J3037",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Eldorado Upland SS 115kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2857,
      "normalized": {
        "queue_id": "J3020",
        "county": "Lyon",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lake Yankton to Buffalo Ridge 115kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492488,
        "projectNumber": "J3020",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lyon",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lake Yankton to Buffalo Ridge 115kV",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2858,
      "normalized": {
        "queue_id": "J3005",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Havana-Shockey (138kV)",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492489,
        "projectNumber": "J3005",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-08-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Havana-Shockey (138kV)",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2859,
      "normalized": {
        "queue_id": "J2926",
        "county": "Franklin",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ashley to West Frankfort-1536",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492490,
        "projectNumber": "J2926",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-07-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Franklin",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ashley to West Frankfort-1536",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2860,
      "normalized": {
        "queue_id": "J2929",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Henderson 161kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492491,
        "projectNumber": "J2929",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Henderson 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2861,
      "normalized": {
        "queue_id": "J2964",
        "county": "Tallahatchie",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Webb 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492492,
        "projectNumber": "J2964",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tallahatchie",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Webb 115 kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2862,
      "normalized": {
        "queue_id": "J2981",
        "county": "Audrain",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Ameren Centralia 69 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492493,
        "projectNumber": "J2981",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2023-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Audrain",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ameren Centralia 69 kV Substation",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2863,
      "normalized": {
        "queue_id": "J3007",
        "county": "Mason",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "PERE MARQUETTE - LINDEMAN 138.0kV",
        "queue_date": "2022-08-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-05-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492494,
        "projectNumber": "J3007",
        "queueDate": "2022-08-25T04:00:00+00:00",
        "inService": "2025-05-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Mason",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PERE MARQUETTE - LINDEMAN 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2864,
      "normalized": {
        "queue_id": "J2994",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "Deluce 115kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492495,
        "projectNumber": "J2994",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Deluce 115kV",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2865,
      "normalized": {
        "queue_id": "J3039",
        "county": "Olmsted",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Byron 161kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492496,
        "projectNumber": "J3039",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2029-08-31T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Olmsted",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Byron 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2866,
      "normalized": {
        "queue_id": "J3024",
        "county": "Louisa",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Newport 161 kV Bus High Side of T91 XFRMR 161/69 kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2023-03-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-07T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492497,
        "projectNumber": "J3024",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2023-03-27T04:00:00+00:00",
        "inService": "2026-03-07T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Louisa",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Newport 161 kV Bus High Side of T91 XFRMR 161/69 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2867,
      "normalized": {
        "queue_id": "J2969",
        "county": "Kalkaska",
        "state": "MI",
        "transmission_owner": "MICHIGAN PUBLIC POWER AGENCY MPPA",
        "poi": "Kalkaska Gen",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 13.4,
        "summer_net_mw": 13.4,
        "winter_net_mw": 13.4,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2002-11-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 13.4,
        "dp1_nris_mw": 13.4,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492498,
        "projectNumber": "J2969",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "inService": "2002-11-01T05:00:00+00:00",
        "transmissionOwner": "MICHIGAN PUBLIC POWER AGENCY MPPA",
        "county": "Kalkaska",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kalkaska Gen",
        "summerNetMW": 13.4,
        "winterNetMW": 13.4,
        "dp1ErisMw": 13.4,
        "dp1NrisMw": 13.4,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2868,
      "normalized": {
        "queue_id": "J2972",
        "county": "Adams",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4HULL     - 4HERLEMAN 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492499,
        "projectNumber": "J2972",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Adams",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4HULL     - 4HERLEMAN 138.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2869,
      "normalized": {
        "queue_id": "J2956",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "",
        "poi": "Galion 115 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492500,
        "projectNumber": "J2956",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Galion 115 kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2870,
      "normalized": {
        "queue_id": "J2962",
        "county": "Hamilton",
        "state": "IL",
        "transmission_owner": "Southern Illinois Power Cooperative",
        "poi": "Akin - Hamilton 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492501,
        "projectNumber": "J2962",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-12-01T05:00:00+00:00",
        "transmissionOwner": "Southern Illinois Power Cooperative",
        "county": "Hamilton",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Akin - Hamilton 138 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2871,
      "normalized": {
        "queue_id": "J2986",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "",
        "poi": "AECC DELUCE - GILLETT 115.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492502,
        "projectNumber": "J2986",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "AECC DELUCE - GILLETT 115.0kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2872,
      "normalized": {
        "queue_id": "J3060",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CMDR-7ASTER 345 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492503,
        "projectNumber": "J3060",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-07-20T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7CMDR-7ASTER 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2873,
      "normalized": {
        "queue_id": "J3067",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BEEKMAN - NORTH BASTROP 115.0kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492504,
        "projectNumber": "J3067",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BEEKMAN - NORTH BASTROP 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2874,
      "normalized": {
        "queue_id": "J3104",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Tinnin Road 230kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 85.0,
        "summer_net_mw": 85.0,
        "winter_net_mw": 85.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492505,
        "projectNumber": "J3104",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tinnin Road 230kV Substation",
        "summerNetMW": 85.0,
        "winterNetMW": 85.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2875,
      "normalized": {
        "queue_id": "J3125",
        "county": "Cottonwood",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Crandall 345 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 289.0,
        "summer_net_mw": 289.0,
        "winter_net_mw": 289.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492506,
        "projectNumber": "J3125",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cottonwood",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Crandall 345 kV Substation",
        "summerNetMW": 289.0,
        "winterNetMW": 289.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2876,
      "normalized": {
        "queue_id": "J3139",
        "county": "Holmes",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Pickens 230 kV Substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 225.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492507,
        "projectNumber": "J3139",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Holmes",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Pickens 230 kV Substation",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 225.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2877,
      "normalized": {
        "queue_id": "J3202",
        "county": "Iron",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5CLARK    - 5PILTMA   161.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492508,
        "projectNumber": "J3202",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Iron",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5CLARK    - 5PILTMA   161.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2878,
      "normalized": {
        "queue_id": "J3027",
        "county": "Stark",
        "state": "IL",
        "transmission_owner": "",
        "poi": "7FARGO - 7SANDBURG 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492509,
        "projectNumber": "J3027",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Stark",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7FARGO - 7SANDBURG 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2879,
      "normalized": {
        "queue_id": "J2924",
        "county": "Columbia",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "EL DORADO EHV - SAREPTA 345/115 SS 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 222.0,
        "summer_net_mw": 222.0,
        "winter_net_mw": 222.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 222.0,
        "dp1_nris_mw": 222.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492510,
        "projectNumber": "J2924",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Columbia",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "EL DORADO EHV - SAREPTA 345/115 SS 345.0kV",
        "summerNetMW": 222.0,
        "winterNetMW": 222.0,
        "dp1ErisMw": 222.0,
        "dp1NrisMw": 222.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2880,
      "normalized": {
        "queue_id": "J2936",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Independence (A)(500kV) to Powerline (B) (500 kV)",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492511,
        "projectNumber": "J2936",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-02T05:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Independence (A)(500kV) to Powerline (B) (500 kV)",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2881,
      "normalized": {
        "queue_id": "J2963",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Puro",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492512,
        "projectNumber": "J2963",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Puro",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2882,
      "normalized": {
        "queue_id": "J2923",
        "county": "Columbia",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "EL DORADO EHV - SARPETA 345/115 KV SW STA 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 240.0,
        "summer_net_mw": 240.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-05-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492513,
        "projectNumber": "J2923",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2028-05-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Columbia",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "EL DORADO EHV - SARPETA 345/115 KV SW STA 345kV",
        "summerNetMW": 240.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2883,
      "normalized": {
        "queue_id": "J3051",
        "county": "Chisago",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Rush City 230 kV",
        "queue_date": "2024-01-09T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492514,
        "projectNumber": "J3051",
        "queueDate": "2024-01-09T05:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Chisago",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Rush City 230 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2884,
      "normalized": {
        "queue_id": "J3046",
        "county": "Concordia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Red Gum to Metropolis 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492515,
        "projectNumber": "J3046",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-25T04:00:00+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Concordia",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Red Gum to Metropolis 115 kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2885,
      "normalized": {
        "queue_id": "J3203",
        "county": "Clinton",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Bingham - Lookng GL J 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492516,
        "projectNumber": "J3203",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-07-20T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Clinton",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bingham - Lookng GL J 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2886,
      "normalized": {
        "queue_id": "J3130",
        "county": "Marion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Kinmundy to Salem 138 kV",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492517,
        "projectNumber": "J3130",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Marion",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kinmundy to Salem 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2887,
      "normalized": {
        "queue_id": "J3131",
        "county": "Columbia",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado EHV - Sarepta 345/115KV SW STA 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492518,
        "projectNumber": "J3131",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Columbia",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "El Dorado EHV - Sarepta 345/115KV SW STA 345 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2888,
      "normalized": {
        "queue_id": "J3133",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "",
        "poi": "Murphy to Nelson Road 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492519,
        "projectNumber": "J3133",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-08-31T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Murphy to Nelson Road 345 kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2889,
      "normalized": {
        "queue_id": "J3201",
        "county": "Walthall",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Tylertown-Bogalusa 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 148.0,
        "summer_net_mw": 148.0,
        "winter_net_mw": 148.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492520,
        "projectNumber": "J3201",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Walthall",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tylertown-Bogalusa 115 kV",
        "summerNetMW": 148.0,
        "winterNetMW": 148.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2890,
      "normalized": {
        "queue_id": "J3172",
        "county": "Dakota",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "GRE-NININGR7 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492521,
        "projectNumber": "J3172",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Dakota",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GRE-NININGR7 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2891,
      "normalized": {
        "queue_id": "J3174",
        "county": "Scott",
        "state": "IL",
        "transmission_owner": "PRAIRIE POWER, INC. PPI",
        "poi": "Jacksonville Industrial Pk-Winchester Switching Station 138 kV",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492522,
        "projectNumber": "J3174",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "PRAIRIE POWER, INC. PPI",
        "county": "Scott",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jacksonville Industrial Pk-Winchester Switching Station 138 kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2892,
      "normalized": {
        "queue_id": "J2925",
        "county": "Logan",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Gillett",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492523,
        "projectNumber": "J2925",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-07-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Logan",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gillett",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2893,
      "normalized": {
        "queue_id": "J2979",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mason City West 69 kV Substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492524,
        "projectNumber": "J2979",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2023-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mason City West 69 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2894,
      "normalized": {
        "queue_id": "J3026",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Deridder Mill - Roy S Nelson 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492525,
        "projectNumber": "J3026",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Deridder Mill - Roy S Nelson 138 kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2895,
      "normalized": {
        "queue_id": "J3059",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492526,
        "projectNumber": "J3059",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-07-20T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2896,
      "normalized": {
        "queue_id": "J3070",
        "county": "Morton",
        "state": "ND",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Square Butte 230 kV Substation East",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-02-27T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492527,
        "projectNumber": "J3070",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-02-27T05:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Morton",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Square Butte 230 kV Substation East",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2897,
      "normalized": {
        "queue_id": "J3043",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Edwards",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492528,
        "projectNumber": "J3043",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwards",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2898,
      "normalized": {
        "queue_id": "J3044",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Edwards",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492529,
        "projectNumber": "J3044",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwards",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2899,
      "normalized": {
        "queue_id": "J3216",
        "county": "Peoria",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Bloomington Brokaw",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492530,
        "projectNumber": "J3216",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Peoria",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bloomington Brokaw",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2900,
      "normalized": {
        "queue_id": "J3090",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS INC. EAI",
        "poi": "West Memphis EHV",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492531,
        "projectNumber": "J3090",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "inService": "2025-10-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS INC. EAI",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "West Memphis EHV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2901,
      "normalized": {
        "queue_id": "J3146",
        "county": "Putnam",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Amo - Wheatland Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492532,
        "projectNumber": "J3146",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Putnam",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Amo - Wheatland Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2902,
      "normalized": {
        "queue_id": "J3147",
        "county": "Johnson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Trafalgar Switchyard (08TRFLGJ)",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492533,
        "projectNumber": "J3147",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Johnson",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Trafalgar Switchyard (08TRFLGJ)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2903,
      "normalized": {
        "queue_id": "J3091",
        "county": "Logan",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "East Bismarck Junction to Wishek Junction",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492534,
        "projectNumber": "J3091",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Logan",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "East Bismarck Junction to Wishek Junction",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2904,
      "normalized": {
        "queue_id": "J3205",
        "county": "Franklin",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Arlington to Smithdale 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492535,
        "projectNumber": "J3205",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Franklin",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Arlington to Smithdale 115 kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2905,
      "normalized": {
        "queue_id": "J3132",
        "county": "Columbia",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "El Dorado EHV - Sarepta 345/115KV SW STA 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492536,
        "projectNumber": "J3132",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Columbia",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "El Dorado EHV - Sarepta 345/115KV SW STA 345 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2906,
      "normalized": {
        "queue_id": "J3028",
        "county": "Perry",
        "state": "MS",
        "transmission_owner": "",
        "poi": "Waynesboro 161 - Hintonville 161 161.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492537,
        "projectNumber": "J3028",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Perry",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Waynesboro 161 - Hintonville 161 161.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2907,
      "normalized": {
        "queue_id": "J2928",
        "county": "Poinsett",
        "state": "AR",
        "transmission_owner": "METC",
        "poi": "Harrisburg 161 kV Substation",
        "queue_date": "2022-09-02T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492538,
        "projectNumber": "J2928",
        "queueDate": "2022-09-02T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Poinsett",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Harrisburg 161 kV Substation",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2908,
      "normalized": {
        "queue_id": "J3184",
        "county": "St. Clair",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Turkey Hill 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 145.0,
        "dp1_nris_mw": 145.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492539,
        "projectNumber": "J3184",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "St. Clair",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Turkey Hill 138 kV",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 145.0,
        "dp1NrisMw": 145.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2909,
      "normalized": {
        "queue_id": "J3191",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC BALCH-FISHER 161kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492540,
        "projectNumber": "J3191",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC BALCH-FISHER 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2910,
      "normalized": {
        "queue_id": "J3185",
        "county": "Effingham",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Effingham - Newton 138KV (4EFFINGHM 347025 -4NEWTON 347831)",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492541,
        "projectNumber": "J3185",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-02-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Effingham",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Effingham - Newton 138KV (4EFFINGHM 347025 -4NEWTON 347831)",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2911,
      "normalized": {
        "queue_id": "J3186",
        "county": "Bolivar",
        "state": "MS",
        "transmission_owner": "",
        "poi": "Rosedale - Delta 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492542,
        "projectNumber": "J3186",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-01-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Bolivar",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rosedale - Delta 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2912,
      "normalized": {
        "queue_id": "J3013",
        "county": "Washington",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ashley",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492543,
        "projectNumber": "J3013",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Washington",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ashley",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2913,
      "normalized": {
        "queue_id": "J3206",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Killdeer 345 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 194.0,
        "summer_net_mw": 194.0,
        "winter_net_mw": 194.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492544,
        "projectNumber": "J3206",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Killdeer 345 kV Substation",
        "summerNetMW": 194.0,
        "winterNetMW": 194.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2914,
      "normalized": {
        "queue_id": "J3217",
        "county": "Cottonwood",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Crandall 345kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492545,
        "projectNumber": "J3217",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cottonwood",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Crandall 345kV Substation",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2915,
      "normalized": {
        "queue_id": "J3103",
        "county": "Fountain",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Lafayette - Veedersburg West 230 kV",
        "queue_date": "2022-06-22T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492546,
        "projectNumber": "J3103",
        "queueDate": "2022-06-22T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Fountain",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lafayette - Veedersburg West 230 kV",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2916,
      "normalized": {
        "queue_id": "J3124",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "",
        "poi": "Murphy 345 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492547,
        "projectNumber": "J3124",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-08-31T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Murphy 345 kV Substation",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2917,
      "normalized": {
        "queue_id": "J3218",
        "county": "Nevada",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Prescott (#337507) to Emmett (#337505)",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492548,
        "projectNumber": "J3218",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Nevada",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Prescott (#337507) to Emmett (#337505)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2918,
      "normalized": {
        "queue_id": "J3142",
        "county": "Johnson",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Circuit ID# 6950 - Columbus North (08COLNRT) - Franklin Forsythe St (08FRSYTH)",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492549,
        "projectNumber": "J3142",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Johnson",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Circuit ID# 6950 - Columbus North (08COLNRT) - Franklin Forsythe St (08FRSYTH)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2919,
      "normalized": {
        "queue_id": "J3143",
        "county": "Putnam",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Jackson Township (08JCKSN_TWNS) - Heritage Lake (08HERITL)",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492550,
        "projectNumber": "J3143",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Putnam",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jackson Township (08JCKSN_TWNS) - Heritage Lake (08HERITL)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2920,
      "normalized": {
        "queue_id": "J3188",
        "county": "Marshall",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Hallock 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 35.0,
        "dp1_nris_mw": 35.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492551,
        "projectNumber": "J3188",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2023-09-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Marshall",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hallock 138 kV",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 35.0,
        "dp1NrisMw": 35.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2921,
      "normalized": {
        "queue_id": "J3137",
        "county": "Pocahontas",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Sac - Pocahontas 161 kV",
        "queue_date": "2025-10-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 156.3,
        "summer_net_mw": 156.3,
        "winter_net_mw": 156.3,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 156.3,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492552,
        "projectNumber": "J3137",
        "queueDate": "2025-10-17T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Pocahontas",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Sac - Pocahontas 161 kV",
        "summerNetMW": 156.3,
        "winterNetMW": 156.3,
        "dp1ErisMw": 156.3,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2922,
      "normalized": {
        "queue_id": "J3144",
        "county": "Putnam",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport IGCC - Amo 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2026-10-06T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492553,
        "projectNumber": "J3144",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2026-10-06T04:00:00+00:00",
        "inService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Putnam",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport IGCC - Amo 345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2923,
      "normalized": {
        "queue_id": "J3145",
        "county": "Putnam",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport IGCC - Amo 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2026-10-20T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492554,
        "projectNumber": "J3145",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2026-10-20T04:00:00+00:00",
        "inService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Putnam",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport IGCC - Amo 345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2924,
      "normalized": {
        "queue_id": "J3182",
        "county": "Oliver",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Coyote",
        "queue_date": "2022-09-11T04:00:00+00:00",
        "withdrawn_date": "2023-02-16T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492555,
        "projectNumber": "J3182",
        "queueDate": "2022-09-11T04:00:00+00:00",
        "withdrawnDate": "2023-02-16T05:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Oliver",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Coyote",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2925,
      "normalized": {
        "queue_id": "J3194",
        "county": "Hardin",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "RYE CO-CYPRESS 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-02-27T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492556,
        "projectNumber": "J3194",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-02-27T05:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Hardin",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RYE CO-CYPRESS 138 kV",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2926,
      "normalized": {
        "queue_id": "J3189",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "St. Johns 138 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492557,
        "projectNumber": "J3189",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2023-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "St. Johns 138 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2927,
      "normalized": {
        "queue_id": "J3081",
        "county": "Hot Spring",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "DEGRAY DAM - H.S. EHV 115.0kV",
        "queue_date": "2025-07-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 105.0,
        "summer_net_mw": 105.0,
        "winter_net_mw": 105.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 105.0,
        "dp1_nris_mw": 105.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492558,
        "projectNumber": "J3081",
        "queueDate": "2025-07-28T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Hot Spring",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DEGRAY DAM - H.S. EHV 115.0kV",
        "summerNetMW": 105.0,
        "winterNetMW": 105.0,
        "dp1ErisMw": 105.0,
        "dp1NrisMw": 105.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2928,
      "normalized": {
        "queue_id": "J3078",
        "county": "Peoria",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Fargo to Sandburg 345kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492559,
        "projectNumber": "J3078",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "inService": "2029-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Peoria",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fargo to Sandburg 345kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2929,
      "normalized": {
        "queue_id": "J3161",
        "county": "Sheboygan",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Huebner 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492560,
        "projectNumber": "J3161",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Sheboygan",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Huebner 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2930,
      "normalized": {
        "queue_id": "J3138",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Rapides 230kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 49.3,
        "summer_net_mw": 49.3,
        "winter_net_mw": 49.3,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492561,
        "projectNumber": "J3138",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rapides 230kV Substation",
        "summerNetMW": 49.3,
        "winterNetMW": 49.3,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2931,
      "normalized": {
        "queue_id": "J3221",
        "county": "Webster",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "LA_ORD_115",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 49.0,
        "summer_net_mw": 49.0,
        "winter_net_mw": 49.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492562,
        "projectNumber": "J3221",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Webster",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "LA_ORD_115",
        "summerNetMW": 49.0,
        "winterNetMW": 49.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2932,
      "normalized": {
        "queue_id": "J3102",
        "county": "Pemiscot",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Dell to New Madrid 500kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492563,
        "projectNumber": "J3102",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-08-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Pemiscot",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dell to New Madrid 500kV line",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2933,
      "normalized": {
        "queue_id": "J3079",
        "county": "Jasper",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Jasper-Holly Springs 138 kV line tap",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492564,
        "projectNumber": "J3079",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jasper",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jasper-Holly Springs 138 kV line tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2934,
      "normalized": {
        "queue_id": "J3149",
        "county": "Mills",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Hastings to Bunge",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492565,
        "projectNumber": "J3149",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Mills",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hastings to Bunge",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2935,
      "normalized": {
        "queue_id": "J3126",
        "county": "Washington",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Stringtown-Greenville/North 115kV Transmission Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492566,
        "projectNumber": "J3126",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Washington",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stringtown-Greenville/North 115kV Transmission Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2936,
      "normalized": {
        "queue_id": "J3092",
        "county": "Bolivar",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "SHELBY SS",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492567,
        "projectNumber": "J3092",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Bolivar",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SHELBY SS",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2937,
      "normalized": {
        "queue_id": "J3134",
        "county": "Otsego",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Gaylord Interconnection",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492568,
        "projectNumber": "J3134",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Otsego",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Gaylord Interconnection",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2938,
      "normalized": {
        "queue_id": "J3213",
        "county": "Hennepin",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Riverside 115kV Substation",
        "queue_date": "2022-09-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 55.0,
        "summer_net_mw": 55.0,
        "winter_net_mw": 55.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 55.0,
        "dp1_nris_mw": 55.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492569,
        "projectNumber": "J3213",
        "queueDate": "2022-09-01T04:00:00+00:00",
        "inService": "2026-12-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Hennepin",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Riverside 115kV Substation",
        "summerNetMW": 55.0,
        "winterNetMW": 55.0,
        "dp1ErisMw": 55.0,
        "dp1NrisMw": 55.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2939,
      "normalized": {
        "queue_id": "J3181",
        "county": "Logan",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4FOGARTY - 4LIMIT 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492570,
        "projectNumber": "J3181",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-01-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Logan",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4FOGARTY - 4LIMIT 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2940,
      "normalized": {
        "queue_id": "J3219",
        "county": "Dakota",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "CANNON FALLS TRANSM.",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 3.0,
        "summer_net_mw": 3.0,
        "winter_net_mw": 3.0,
        "proposed_completion_date": null,
        "generation_type": "Hydro",
        "facility_type": "Hydroelectric",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 3.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492571,
        "projectNumber": "J3219",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dakota",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "CANNON FALLS TRANSM.",
        "summerNetMW": 3.0,
        "winterNetMW": 3.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 3.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hydro",
        "facilityType": "Hydroelectric",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2941,
      "normalized": {
        "queue_id": "J3183",
        "county": "Grant",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South 230KV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492572,
        "projectNumber": "J3183",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Grant",
        "state": "SD",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Big Stone South 230KV Substation",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2942,
      "normalized": {
        "queue_id": "J3195",
        "county": "Pulaski",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "White Bluff EHV - Wrightsville 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-02-27T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492573,
        "projectNumber": "J3195",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-02-27T05:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pulaski",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "White Bluff EHV - Wrightsville 115 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2943,
      "normalized": {
        "queue_id": "J3109",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Taping the 'Carlisle / 3CARISLE! (338003)' to 'Screeton / 3SCREETON (338005)' 115kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492574,
        "projectNumber": "J3109",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Taping the 'Carlisle / 3CARISLE! (338003)' to 'Screeton / 3SCREETON (338005)' 115kV line",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2944,
      "normalized": {
        "queue_id": "J3084",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Merom (HED) -  Dresser 345.0kV",
        "queue_date": "2025-08-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 641.8,
        "summer_net_mw": 641.8,
        "winter_net_mw": 641.8,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 641.8,
        "dp1_nris_mw": 641.8,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492575,
        "projectNumber": "J3084",
        "queueDate": "2025-08-12T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Merom (HED) -  Dresser 345.0kV",
        "summerNetMW": 641.8,
        "winterNetMW": 641.8,
        "dp1ErisMw": 641.8,
        "dp1NrisMw": 641.8,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2945,
      "normalized": {
        "queue_id": "J3220",
        "county": "Ionia",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Peddler",
        "queue_date": "2024-08-05T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492576,
        "projectNumber": "J3220",
        "queueDate": "2024-08-05T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ionia",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Peddler",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2946,
      "normalized": {
        "queue_id": "J3199",
        "county": "Adair",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Zachary 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-12-22T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492577,
        "projectNumber": "J3199",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-12-22T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Adair",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Zachary 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2947,
      "normalized": {
        "queue_id": "J3209",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Hineston",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 350.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492578,
        "projectNumber": "J3209",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-03-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Hineston",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 350.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2948,
      "normalized": {
        "queue_id": "J3187",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Havana 138 kV Sub",
        "queue_date": "2022-08-31T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 37.0,
        "summer_net_mw": 37.0,
        "winter_net_mw": 37.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492579,
        "projectNumber": "J3187",
        "queueDate": "2022-08-31T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-12-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Havana 138 kV Sub",
        "summerNetMW": 37.0,
        "winterNetMW": 37.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2949,
      "normalized": {
        "queue_id": "J3160",
        "county": "Fond du Lac",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "South Fond du Lac 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492580,
        "projectNumber": "J3160",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Fond du Lac",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "South Fond du Lac 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2950,
      "normalized": {
        "queue_id": "J3135",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Commodore-Aster-4513",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492581,
        "projectNumber": "J3135",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-07-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Commodore-Aster-4513",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2951,
      "normalized": {
        "queue_id": "J3100",
        "county": "Roscommon",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Higgins - Mio Dam 138 kV line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492582,
        "projectNumber": "J3100",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Roscommon",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Higgins - Mio Dam 138 kV line",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2952,
      "normalized": {
        "queue_id": "J3162",
        "county": "Rock",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Beloit Gateway",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492583,
        "projectNumber": "J3162",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Rock",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Beloit Gateway",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2953,
      "normalized": {
        "queue_id": "J3212",
        "county": "Mills",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "GLENWOOD",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492584,
        "projectNumber": "J3212",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Mills",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GLENWOOD",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2954,
      "normalized": {
        "queue_id": "J3106",
        "county": "Pemiscot",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Dell to New Madrid 500 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492585,
        "projectNumber": "J3106",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-08-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Pemiscot",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dell to New Madrid 500 kV line",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2955,
      "normalized": {
        "queue_id": "J3123",
        "county": "Orange",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Chisholm RD- Hartburg 230kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492586,
        "projectNumber": "J3123",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Orange",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Chisholm RD- Hartburg 230kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2956,
      "normalized": {
        "queue_id": "J3148",
        "county": "Greene",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Drager to Grand Junction",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 131.0,
        "summer_net_mw": 131.0,
        "winter_net_mw": 131.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492587,
        "projectNumber": "J3148",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Greene",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Drager to Grand Junction",
        "summerNetMW": 131.0,
        "winterNetMW": 131.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2957,
      "normalized": {
        "queue_id": "J3223",
        "county": "Edwards",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Olney (4JASPER 347868) - Albion (4ALBION N 346510) 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 88.0,
        "summer_net_mw": 88.0,
        "winter_net_mw": 88.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 88.0,
        "dp1_nris_mw": 88.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492588,
        "projectNumber": "J3223",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Edwards",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Olney (4JASPER 347868) - Albion (4ALBION N 346510) 138 kV",
        "summerNetMW": 88.0,
        "winterNetMW": 88.0,
        "dp1ErisMw": 88.0,
        "dp1NrisMw": 88.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2958,
      "normalized": {
        "queue_id": "J3150",
        "county": "Panola",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Crenshaw to Como",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492589,
        "projectNumber": "J3150",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2027-07-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Panola",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Crenshaw to Como",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2959,
      "normalized": {
        "queue_id": "J3175",
        "county": "Tunica",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Robinsonville 230kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492590,
        "projectNumber": "J3175",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tunica",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Robinsonville 230kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2960,
      "normalized": {
        "queue_id": "J3176",
        "county": "Plaquemines",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Derrick",
        "queue_date": "2022-11-05T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492591,
        "projectNumber": "J3176",
        "queueDate": "2022-11-05T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Plaquemines",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Derrick",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2961,
      "normalized": {
        "queue_id": "J3177",
        "county": "Tunica",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Robinsonville 230kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492592,
        "projectNumber": "J3177",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tunica",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Robinsonville 230kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2962,
      "normalized": {
        "queue_id": "J3224",
        "county": "Marion",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4KINMUNDY-4TANNER 138kv",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492593,
        "projectNumber": "J3224",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Marion",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4KINMUNDY-4TANNER 138kv",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2963,
      "normalized": {
        "queue_id": "J2653",
        "county": "Polk",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Army Post 161kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492594,
        "projectNumber": "J2653",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-05-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Polk",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Army Post 161kV Substation",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2964,
      "normalized": {
        "queue_id": "J3226",
        "county": "Marshall",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "BURR OAK - PLYMOUTH 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492595,
        "projectNumber": "J3226",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Marshall",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BURR OAK - PLYMOUTH 138.0kV",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2965,
      "normalized": {
        "queue_id": "J3228",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Redstone-Tittabawassee 138 kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 26.0,
        "summer_net_mw": 26.0,
        "winter_net_mw": 26.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492596,
        "projectNumber": "J3228",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Redstone-Tittabawassee 138 kV Line",
        "summerNetMW": 26.0,
        "winterNetMW": 26.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2966,
      "normalized": {
        "queue_id": "J2650",
        "county": "Hancock",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Sunnyside to Hanna 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2024-02-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 236.0,
        "summer_net_mw": 236.0,
        "winter_net_mw": 236.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492597,
        "projectNumber": "J2650",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2024-02-05T05:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Hancock",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sunnyside to Hanna 345 kV",
        "summerNetMW": 236.0,
        "winterNetMW": 236.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2967,
      "normalized": {
        "queue_id": "J2648",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Sidney 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 135.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492598,
        "projectNumber": "J2648",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-09-02T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sidney 138 kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 135.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2968,
      "normalized": {
        "queue_id": "J2591",
        "county": "Choctaw",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "WOLF CREEK 500 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "High Voltage DC",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-10-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492599,
        "projectNumber": "J2591",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2028-10-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Choctaw",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "E-NRIS",
        "poiName": "WOLF CREEK 500 kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "High Voltage DC",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2969,
      "normalized": {
        "queue_id": "J2679",
        "county": "Livingston",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "COLFAX to Madrid 120 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492600,
        "projectNumber": "J2679",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Livingston",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "COLFAX to Madrid 120 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2970,
      "normalized": {
        "queue_id": "J2557",
        "county": "Wood",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Arpin",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492601,
        "projectNumber": "J2557",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2029-07-18T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Wood",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Arpin",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2971,
      "normalized": {
        "queue_id": "J2559",
        "county": "Wood",
        "state": "WI",
        "transmission_owner": "",
        "poi": "Arpin",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492602,
        "projectNumber": "J2559",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2029-07-18T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Wood",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Arpin",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2972,
      "normalized": {
        "queue_id": "J3140",
        "county": "Porter",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "South Valparaiso 138 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 50.0,
        "dp1_nris_mw": 50.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492603,
        "projectNumber": "J3140",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Porter",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "South Valparaiso 138 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 50.0,
        "dp1NrisMw": 50.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2973,
      "normalized": {
        "queue_id": "J3169",
        "county": "Hardin",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Cypress 138 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492604,
        "projectNumber": "J3169",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Hardin",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cypress 138 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2974,
      "normalized": {
        "queue_id": "J3193",
        "county": "Hot Spring",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "POYEN-GIFFORD 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492605,
        "projectNumber": "J3193",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Hot Spring",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "POYEN-GIFFORD 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2975,
      "normalized": {
        "queue_id": "J3170",
        "county": "Avoyelles",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Eola-Marksville 138 kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492606,
        "projectNumber": "J3170",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Avoyelles",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Eola-Marksville 138 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2976,
      "normalized": {
        "queue_id": "J2645",
        "county": "St. Clair",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4PREST - 4BALDWIN 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-08-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 199.0,
        "summer_net_mw": 199.0,
        "winter_net_mw": 199.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492607,
        "projectNumber": "J2645",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-08-18T04:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "St. Clair",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4PREST - 4BALDWIN 138.0kV",
        "summerNetMW": 199.0,
        "winterNetMW": 199.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2977,
      "normalized": {
        "queue_id": "J2669",
        "county": "Mason",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Lake County - Pere Marquette (METC) 138.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492608,
        "projectNumber": "J2669",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Mason",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lake County - Pere Marquette (METC) 138.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2978,
      "normalized": {
        "queue_id": "J2556",
        "county": "Whiteside",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SUB 39 - CORDOVA 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492609,
        "projectNumber": "J2556",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-18T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Whiteside",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SUB 39 - CORDOVA 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2979,
      "normalized": {
        "queue_id": "J2558",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Delta Ms - Ruleville 115kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492610,
        "projectNumber": "J2558",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-07-18T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Delta Ms - Ruleville 115kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2980,
      "normalized": {
        "queue_id": "J2560",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "CLEVELAND/SOUTH - STEINER (CE) 115.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492611,
        "projectNumber": "J2560",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-06-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CLEVELAND/SOUTH - STEINER (CE) 115.0kV",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2981,
      "normalized": {
        "queue_id": "J2561",
        "county": "Yellow Medicine",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "HAZEL CREEK",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 153.0,
        "summer_net_mw": 153.0,
        "winter_net_mw": 153.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2030-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 153.0,
        "dp1_nris_mw": 153.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492612,
        "projectNumber": "J2561",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2030-07-18T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Yellow Medicine",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HAZEL CREEK",
        "summerNetMW": 153.0,
        "winterNetMW": 153.0,
        "dp1ErisMw": 153.0,
        "dp1NrisMw": 153.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2982,
      "normalized": {
        "queue_id": "J3171",
        "county": "Drew",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Monticello East-Reed SS 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492613,
        "projectNumber": "J3171",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Drew",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Monticello East-Reed SS 115 kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2983,
      "normalized": {
        "queue_id": "J3173",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Swifton to Hoxie 161 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492614,
        "projectNumber": "J3173",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Swifton to Hoxie 161 kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2984,
      "normalized": {
        "queue_id": "J2651",
        "county": "East Baton Rouge",
        "state": "LA",
        "transmission_owner": "",
        "poi": "MOLER - COLFEL 230.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492615,
        "projectNumber": "J2651",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "East Baton Rouge",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MOLER - COLFEL 230.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2985,
      "normalized": {
        "queue_id": "J2655",
        "county": "Polk",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Army Post 161 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492616,
        "projectNumber": "J2655",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Polk",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Army Post 161 kV Substation",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2986,
      "normalized": {
        "queue_id": "J2570",
        "county": "Lafourche",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Thibodaux 230 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492617,
        "projectNumber": "J2570",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Lafourche",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Thibodaux 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2987,
      "normalized": {
        "queue_id": "J2652",
        "county": "Dakota",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Rosemount - Nininger (GRE) 115 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 197.0,
        "summer_net_mw": 197.0,
        "winter_net_mw": 197.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492618,
        "projectNumber": "J2652",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dakota",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rosemount - Nininger (GRE) 115 kV line",
        "summerNetMW": 197.0,
        "winterNetMW": 197.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2988,
      "normalized": {
        "queue_id": "J2670",
        "county": "Mason",
        "state": "MI",
        "transmission_owner": "",
        "poi": "Ludington to Keystone 345 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 223.0,
        "summer_net_mw": 223.0,
        "winter_net_mw": 223.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 223.0,
        "dp1_nris_mw": 223.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492619,
        "projectNumber": "J2670",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Mason",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ludington to Keystone 345 kV",
        "summerNetMW": 223.0,
        "winterNetMW": 223.0,
        "dp1ErisMw": 223.0,
        "dp1NrisMw": 223.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2989,
      "normalized": {
        "queue_id": "J2672",
        "county": "Shiawassee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BINGHAM - CORNELL 138.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 120.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492620,
        "projectNumber": "J2672",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BINGHAM - CORNELL 138.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 120.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2990,
      "normalized": {
        "queue_id": "J2673",
        "county": "Clare",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BARD ROAD - WARREN 138.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": "2026-12-31T05:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 145.0,
        "dp1_nris_mw": 145.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492621,
        "projectNumber": "J2673",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "negInService": "2026-12-31T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Clare",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BARD ROAD - WARREN 138.0kV",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 145.0,
        "dp1NrisMw": 145.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2991,
      "normalized": {
        "queue_id": "J2677",
        "county": "St. Clair",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Greenwood 120 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 195.0,
        "summer_net_mw": 195.0,
        "winter_net_mw": 195.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 195.0,
        "dp1_nris_mw": 195.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492622,
        "projectNumber": "J2677",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "St. Clair",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greenwood 120 kV",
        "summerNetMW": 195.0,
        "winterNetMW": 195.0,
        "dp1ErisMw": 195.0,
        "dp1NrisMw": 195.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2992,
      "normalized": {
        "queue_id": "J2641",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "NEWPORT",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492623,
        "projectNumber": "J2641",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "NEWPORT",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2993,
      "normalized": {
        "queue_id": "J2566",
        "county": "Daviess",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Bedford 345 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492624,
        "projectNumber": "J2566",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Daviess",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Bedford 345 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2994,
      "normalized": {
        "queue_id": "J3095",
        "county": "Ford",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4PAXTON - 4J845POI 138.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492625,
        "projectNumber": "J3095",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Ford",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4PAXTON - 4J845POI 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2995,
      "normalized": {
        "queue_id": "J3121",
        "county": "Wayne",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Centerville 69 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492626,
        "projectNumber": "J3121",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Wayne",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Centerville 69 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2996,
      "normalized": {
        "queue_id": "J2671",
        "county": "Arenac",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Whittemore to Twining 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492627,
        "projectNumber": "J2671",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Arenac",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Whittemore to Twining 138 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2997,
      "normalized": {
        "queue_id": "J2674",
        "county": "Clinton",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Bingham to Marquette 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492628,
        "projectNumber": "J2674",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Clinton",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bingham to Marquette 138 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2998,
      "normalized": {
        "queue_id": "J2678",
        "county": "Delta",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Chandler 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492629,
        "projectNumber": "J2678",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Delta",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Chandler 138 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 2999,
      "normalized": {
        "queue_id": "J2583",
        "county": "Eaton",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Battle Creek - Island Road 138 kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492630,
        "projectNumber": "J2583",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Eaton",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Battle Creek - Island Road 138 kV Line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3000,
      "normalized": {
        "queue_id": "J2577",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Parkin",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492631,
        "projectNumber": "J2577",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Parkin",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3001,
      "normalized": {
        "queue_id": "J2613",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "HOLLAND BOTTOM - INDEPENDENCE-ISES 500.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492632,
        "projectNumber": "J2613",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HOLLAND BOTTOM - INDEPENDENCE-ISES 500.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3002,
      "normalized": {
        "queue_id": "J2573",
        "county": "Washington",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gallagher to Bedford 138kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492633,
        "projectNumber": "J2573",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Washington",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gallagher to Bedford 138kV Line",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3003,
      "normalized": {
        "queue_id": "J2608",
        "county": "Stevens",
        "state": "MN",
        "transmission_owner": "",
        "poi": "Hancock 115kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 160.0,
        "dp1_nris_mw": 160.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492634,
        "projectNumber": "J2608",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Stevens",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hancock 115kV Substation",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 160.0,
        "dp1NrisMw": 160.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3004,
      "normalized": {
        "queue_id": "J3192",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Mallory 161 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492635,
        "projectNumber": "J3192",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mallory 161 kV Substation",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3005,
      "normalized": {
        "queue_id": "J3190",
        "county": "Audrain",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Pike 161 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2023-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492636,
        "projectNumber": "J3190",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2023-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Audrain",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pike 161 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3006,
      "normalized": {
        "queue_id": "J2610",
        "county": "Bond",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4GREENVIL to 4HOOKDALE 138kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492637,
        "projectNumber": "J2610",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Bond",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4GREENVIL to 4HOOKDALE 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3007,
      "normalized": {
        "queue_id": "J2665",
        "county": "Mercer",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Coyote Switchyard 345kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 347.0,
        "summer_net_mw": 347.0,
        "winter_net_mw": 347.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492638,
        "projectNumber": "J2665",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-29T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Mercer",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Coyote Switchyard 345kV Substation",
        "summerNetMW": 347.0,
        "winterNetMW": 347.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3008,
      "normalized": {
        "queue_id": "J2654",
        "county": "Clinton",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Frankfort  -  New London 230.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492639,
        "projectNumber": "J2654",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clinton",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Frankfort  -  New London 230.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3009,
      "normalized": {
        "queue_id": "J2579",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Cincinnati 138 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 362.0,
        "summer_net_mw": 362.0,
        "winter_net_mw": 362.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492640,
        "projectNumber": "J2579",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-10T05:00:00+00:00",
        "inService": "2027-06-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cincinnati 138 kV Substation",
        "summerNetMW": 362.0,
        "winterNetMW": 362.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3010,
      "normalized": {
        "queue_id": "J3136",
        "county": "Daviess",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Hoosier's Sandborn - Grain Processing Center 161kV (GPC Primary - Sandborn Primary)",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492641,
        "projectNumber": "J3136",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Daviess",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hoosier's Sandborn - Grain Processing Center 161kV (GPC Primary - Sandborn Primary)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3011,
      "normalized": {
        "queue_id": "J3214",
        "county": "Lee",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Wever",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492642,
        "projectNumber": "J3214",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2024-12-31T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Lee",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wever",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3012,
      "normalized": {
        "queue_id": "J2628",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "RAPSON",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492643,
        "projectNumber": "J2628",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2028-07-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RAPSON",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3013,
      "normalized": {
        "queue_id": "J2624",
        "county": "Stevens",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South 345kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 450.0,
        "summer_net_mw": 450.0,
        "winter_net_mw": 450.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492644,
        "projectNumber": "J2624",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-01-01T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Stevens",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Big Stone South 345kV Substation",
        "summerNetMW": 450.0,
        "winterNetMW": 450.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3014,
      "normalized": {
        "queue_id": "J2646",
        "county": "Lincoln",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "REESE 115 - TRUSSELS CROSSING (LAGEN)",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492645,
        "projectNumber": "J2646",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Lincoln",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "REESE 115 - TRUSSELS CROSSING (LAGEN)",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3015,
      "normalized": {
        "queue_id": "J2595",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "LAKEOVER EHV-RAY BRASWELL EHV 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 650.0,
        "summer_net_mw": 650.0,
        "winter_net_mw": 650.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492646,
        "projectNumber": "J2595",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LAKEOVER EHV-RAY BRASWELL EHV 500 kV",
        "summerNetMW": 650.0,
        "winterNetMW": 650.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3016,
      "normalized": {
        "queue_id": "J3094",
        "county": "Washington",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Pumpkin Center 230kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492647,
        "projectNumber": "J3094",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Washington",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pumpkin Center 230kV",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3017,
      "normalized": {
        "queue_id": "J3129",
        "county": "East Feliciana",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Starhill 138 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492648,
        "projectNumber": "J3129",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "East Feliciana",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Starhill 138 kV Substation",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3018,
      "normalized": {
        "queue_id": "J2597",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "West Memphis 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492649,
        "projectNumber": "J2597",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "West Memphis 500 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3019,
      "normalized": {
        "queue_id": "J2599",
        "county": "Redwood",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lyon County 345kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 216.0,
        "summer_net_mw": 216.0,
        "winter_net_mw": 216.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 216.0,
        "dp1_nris_mw": 216.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492650,
        "projectNumber": "J2599",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Redwood",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lyon County 345kV Substation",
        "summerNetMW": 216.0,
        "winterNetMW": 216.0,
        "dp1ErisMw": 216.0,
        "dp1NrisMw": 216.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3020,
      "normalized": {
        "queue_id": "J3141",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Ritchie Plant Substation 230kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492651,
        "projectNumber": "J3141",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ritchie Plant Substation 230kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3021,
      "normalized": {
        "queue_id": "J3229",
        "county": "Maries",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "4DILLON - 4LKSIDE TP2 138.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-24T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492652,
        "projectNumber": "J3229",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-04-24T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Maries",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4DILLON - 4LKSIDE TP2 138.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3022,
      "normalized": {
        "queue_id": "J2681",
        "county": "Columbia",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Springhill 115kV (A) to Taylor 115kV (B)",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492653,
        "projectNumber": "J2681",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Columbia",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Springhill 115kV (A) to Taylor 115kV (B)",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3023,
      "normalized": {
        "queue_id": "J2575",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Cincinnati 138 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 198.0,
        "dp1_nris_mw": 198.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492654,
        "projectNumber": "J2575",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-06-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cincinnati 138 kV Substation",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 198.0,
        "dp1NrisMw": 198.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3024,
      "normalized": {
        "queue_id": "J2605",
        "county": "Steele",
        "state": "ND",
        "transmission_owner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "poi": "ALEXANDRIA 345 KV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 339.0,
        "summer_net_mw": 339.0,
        "winter_net_mw": 339.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492655,
        "projectNumber": "J2605",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "county": "Steele",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ALEXANDRIA 345 KV",
        "summerNetMW": 339.0,
        "winterNetMW": 339.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3025,
      "normalized": {
        "queue_id": "J2607",
        "county": "Montgomery",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Redhawk 138 kV - MTEP Project (17976)",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492656,
        "projectNumber": "J2607",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Montgomery",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Redhawk 138 kV - MTEP Project (17976)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3026,
      "normalized": {
        "queue_id": "J2637",
        "county": "Monroe",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Cotton Plant- Brinkley West 115KV",
        "queue_date": "2022-09-10T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 64.5,
        "summer_net_mw": 64.5,
        "winter_net_mw": 64.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492657,
        "projectNumber": "J2637",
        "queueDate": "2022-09-10T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Monroe",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cotton Plant- Brinkley West 115KV",
        "summerNetMW": 64.5,
        "winterNetMW": 64.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3027,
      "normalized": {
        "queue_id": "J2639",
        "county": "Bradley",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC HERMITAGE SOUTH - HILO 115.0kV",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 105.8,
        "summer_net_mw": 105.8,
        "winter_net_mw": 105.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 105.8,
        "dp1_nris_mw": 70.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492658,
        "projectNumber": "J2639",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Bradley",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC HERMITAGE SOUTH - HILO 115.0kV",
        "summerNetMW": 105.8,
        "winterNetMW": 105.8,
        "dp1ErisMw": 105.8,
        "dp1NrisMw": 70.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3028,
      "normalized": {
        "queue_id": "J3227",
        "county": "Ogemaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gallagher to Livingston 345 kV Segment on the Livingston â€“ Tittabawassee 345 kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492659,
        "projectNumber": "J3227",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ogemaw",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gallagher to Livingston 345 kV Segment on the Livingston â€“ Tittabawassee 345 kV Line",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3029,
      "normalized": {
        "queue_id": "J2680",
        "county": "Dunklin",
        "state": "MO",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Jim Hill-Hayti South 161 kV Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492660,
        "projectNumber": "J2680",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-20T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Dunklin",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jim Hill-Hayti South 161 kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3030,
      "normalized": {
        "queue_id": "J2574",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 172.0,
        "summer_net_mw": 172.0,
        "winter_net_mw": 172.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492661,
        "projectNumber": "J2574",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "summerNetMW": 172.0,
        "winterNetMW": 172.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3031,
      "normalized": {
        "queue_id": "J2667",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GREENWOOD - RAPSON 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 135.0,
        "dp1_nris_mw": 135.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492662,
        "projectNumber": "J2667",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GREENWOOD - RAPSON 345.0kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 135.0,
        "dp1NrisMw": 135.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3032,
      "normalized": {
        "queue_id": "J2569",
        "county": "St. Louis",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Arrowhead 115 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492663,
        "projectNumber": "J2569",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "St. Louis",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Arrowhead 115 kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3033,
      "normalized": {
        "queue_id": "J2593",
        "county": "Gasconade",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Bland 138 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-24T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492664,
        "projectNumber": "J2593",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-04-24T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Gasconade",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bland 138 kV Substation",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3034,
      "normalized": {
        "queue_id": "J2601",
        "county": "Wabasha",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "North Rochester - Briggs Road 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492665,
        "projectNumber": "J2601",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Wabasha",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "North Rochester - Briggs Road 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3035,
      "normalized": {
        "queue_id": "J2603",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4PURO - 4HAVANA3 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 320.0,
        "summer_net_mw": 320.0,
        "winter_net_mw": 320.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 320.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492666,
        "projectNumber": "J2603",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "4PURO - 4HAVANA3 138.0kV",
        "summerNetMW": 320.0,
        "winterNetMW": 320.0,
        "dp1ErisMw": 320.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3036,
      "normalized": {
        "queue_id": "J2604",
        "county": "Clinton",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "South Centralia 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492667,
        "projectNumber": "J2604",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clinton",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "South Centralia 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3037,
      "normalized": {
        "queue_id": "J2606",
        "county": "Steele",
        "state": "ND",
        "transmission_owner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "poi": "Alexandria 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 361.0,
        "summer_net_mw": 361.0,
        "winter_net_mw": 361.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492668,
        "projectNumber": "J2606",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "county": "Steele",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Alexandria 345kV",
        "summerNetMW": 361.0,
        "winterNetMW": 361.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3038,
      "normalized": {
        "queue_id": "J2634",
        "county": "Ouachita",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "CAMDEN MAGUIRE - SMACKOVER 115.0kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 105.8,
        "summer_net_mw": 105.8,
        "winter_net_mw": 105.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 105.8,
        "dp1_nris_mw": 67.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492669,
        "projectNumber": "J2634",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Ouachita",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CAMDEN MAGUIRE - SMACKOVER 115.0kV",
        "summerNetMW": 105.8,
        "winterNetMW": 105.8,
        "dp1ErisMw": 105.8,
        "dp1NrisMw": 67.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3039,
      "normalized": {
        "queue_id": "J2636",
        "county": "Clark",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BISMARCK-AECC ALPINE 115 KV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 78.5,
        "summer_net_mw": 78.5,
        "winter_net_mw": 78.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492670,
        "projectNumber": "J2636",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clark",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BISMARCK-AECC ALPINE 115 KV",
        "summerNetMW": 78.5,
        "winterNetMW": 78.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3040,
      "normalized": {
        "queue_id": "J2675",
        "county": "Gladwin",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BARD ROAD - GALLAGHER 138.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 90.0,
        "dp1_nris_mw": 90.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492671,
        "projectNumber": "J2675",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gladwin",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BARD ROAD - GALLAGHER 138.0kV",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 90.0,
        "dp1NrisMw": 90.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3041,
      "normalized": {
        "queue_id": "J2676",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "RAPSON - STEIN 345.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2027-10-04T04:00:00+00:00",
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492672,
        "projectNumber": "J2676",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "negInService": "2027-10-04T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RAPSON - STEIN 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3042,
      "normalized": {
        "queue_id": "J2565",
        "county": "Iroquois",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4GILMAN-4PAXTON E 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 265.0,
        "summer_net_mw": 265.0,
        "winter_net_mw": 265.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 265.0,
        "dp1_nris_mw": 265.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492673,
        "projectNumber": "J2565",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Iroquois",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4GILMAN-4PAXTON E 138kV",
        "summerNetMW": 265.0,
        "winterNetMW": 265.0,
        "dp1ErisMw": 265.0,
        "dp1NrisMw": 265.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3043,
      "normalized": {
        "queue_id": "J2584",
        "county": "Warren",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Warrenton 161kV Substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492674,
        "projectNumber": "J2584",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Warren",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Warrenton 161kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3044,
      "normalized": {
        "queue_id": "J3127",
        "county": "Monroe",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Brinkley East - Clarendon 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492675,
        "projectNumber": "J3127",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Monroe",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Brinkley East - Clarendon 115 kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3045,
      "normalized": {
        "queue_id": "J3128",
        "county": "East Feliciana",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Starhill Substation 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492676,
        "projectNumber": "J3128",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "East Feliciana",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Starhill Substation 138 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3046,
      "normalized": {
        "queue_id": "J3178",
        "county": "De Soto",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Dolet Hills",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492677,
        "projectNumber": "J3178",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "De Soto",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dolet Hills",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3047,
      "normalized": {
        "queue_id": "J3179",
        "county": "Plaquemines",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Derrick",
        "queue_date": "2022-11-05T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492678,
        "projectNumber": "J3179",
        "queueDate": "2022-11-05T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Plaquemines",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Derrick",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3048,
      "normalized": {
        "queue_id": "J3180",
        "county": "De Soto",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Dolet Hills",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492679,
        "projectNumber": "J3180",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "De Soto",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Dolet Hills",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3049,
      "normalized": {
        "queue_id": "J3225",
        "county": "LaPorte",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "BABCOCK-STILLWELL 345 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2022-12-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492680,
        "projectNumber": "J3225",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2022-12-05T05:00:00+00:00",
        "inService": "2026-08-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaPorte",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BABCOCK-STILLWELL 345 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3050,
      "normalized": {
        "queue_id": "J2642",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BOGALUSA - DEXTER SS (CE) 115.0kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492681,
        "projectNumber": "J2642",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BOGALUSA - DEXTER SS (CE) 115.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3051,
      "normalized": {
        "queue_id": "J2643",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BOGALUSA - DEXTER SS (CE) 115.0kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492682,
        "projectNumber": "J2643",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "BOGALUSA - DEXTER SS (CE) 115.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3052,
      "normalized": {
        "queue_id": "J2649",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500kv",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492683,
        "projectNumber": "J2649",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-09-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500kv",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3053,
      "normalized": {
        "queue_id": "J2668",
        "county": "Mason",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Lake County - Pere Marquette (METC) 138.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 215.0,
        "summer_net_mw": 215.0,
        "winter_net_mw": 215.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 215.0,
        "dp1_nris_mw": 215.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492684,
        "projectNumber": "J2668",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Mason",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lake County - Pere Marquette (METC) 138.0kV",
        "summerNetMW": 215.0,
        "winterNetMW": 215.0,
        "dp1ErisMw": 215.0,
        "dp1NrisMw": 215.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3054,
      "normalized": {
        "queue_id": "J2554",
        "county": "Putnam",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Putnam",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 220.0,
        "dp1_nris_mw": 220.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492685,
        "projectNumber": "J2554",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-18T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Putnam",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Putnam",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 220.0,
        "dp1NrisMw": 220.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3055,
      "normalized": {
        "queue_id": "J2609",
        "county": "Waushara",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sand Lake",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492686,
        "projectNumber": "J2609",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Waushara",
        "state": "WI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sand Lake",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3056,
      "normalized": {
        "queue_id": "J2635",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Cane 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 52.0,
        "summer_net_mw": 52.0,
        "winter_net_mw": 52.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492687,
        "projectNumber": "J2635",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cane 138 kV",
        "summerNetMW": 52.0,
        "winterNetMW": 52.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3057,
      "normalized": {
        "queue_id": "J2598",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Adams to Hayward 161 kV Tap",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492688,
        "projectNumber": "J2598",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Adams to Hayward 161 kV Tap",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3058,
      "normalized": {
        "queue_id": "J2627",
        "county": "Adams",
        "state": "IL",
        "transmission_owner": "",
        "poi": "East Quincy",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492689,
        "projectNumber": "J2627",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-09-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Adams",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "East Quincy",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3059,
      "normalized": {
        "queue_id": "J2632",
        "county": "Webster",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Sarpeta to Minden 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492690,
        "projectNumber": "J2632",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-24T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Webster",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sarpeta to Minden 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3060,
      "normalized": {
        "queue_id": "J2719",
        "county": "Gladwin",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BARD ROAD 138kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492691,
        "projectNumber": "J2719",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-01T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gladwin",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BARD ROAD 138kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3061,
      "normalized": {
        "queue_id": "J2740",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "",
        "poi": "DELTA SWYD - SHELBY SS 115.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-02-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492692,
        "projectNumber": "J2740",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2029-02-15T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "DELTA SWYD - SHELBY SS 115.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3062,
      "normalized": {
        "queue_id": "J2741",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "DELTA SWYD - DREW [MS] 115.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492693,
        "projectNumber": "J2741",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DELTA SWYD - DREW [MS] 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3063,
      "normalized": {
        "queue_id": "J2738",
        "county": "Rock Island",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SUB 17",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 128.0,
        "summer_net_mw": 128.0,
        "winter_net_mw": 128.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 128.0,
        "dp1_nris_mw": 128.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492694,
        "projectNumber": "J2738",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-02-01T05:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Rock Island",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SUB 17",
        "summerNetMW": 128.0,
        "winterNetMW": 128.0,
        "dp1ErisMw": 128.0,
        "dp1NrisMw": 128.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3064,
      "normalized": {
        "queue_id": "J2611",
        "county": "Alcona",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "IOSCO - SPRUCE ROAD 138.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 215.0,
        "summer_net_mw": 215.0,
        "winter_net_mw": 215.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 215.0,
        "dp1_nris_mw": 215.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492695,
        "projectNumber": "J2611",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Alcona",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "IOSCO - SPRUCE ROAD 138.0kV",
        "summerNetMW": 215.0,
        "winterNetMW": 215.0,
        "dp1ErisMw": 215.0,
        "dp1NrisMw": 215.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3065,
      "normalized": {
        "queue_id": "J2571",
        "county": "Tunica",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "J866 Six Mile Lake Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 176.6,
        "summer_net_mw": 176.6,
        "winter_net_mw": 176.6,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2024-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 176.6,
        "dp1_nris_mw": 176.6,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492696,
        "projectNumber": "J2571",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2024-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Tunica",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "J866 Six Mile Lake Substation",
        "summerNetMW": 176.6,
        "winterNetMW": 176.6,
        "dp1ErisMw": 176.6,
        "dp1NrisMw": 176.6,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3066,
      "normalized": {
        "queue_id": "J2576",
        "county": "Louisa",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Denmark - Newport 161kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 164.1,
        "summer_net_mw": 164.1,
        "winter_net_mw": 164.1,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 164.1,
        "dp1_nris_mw": 164.1,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492697,
        "projectNumber": "J2576",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-01-31T05:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Louisa",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Denmark - Newport 161kV",
        "summerNetMW": 164.1,
        "winterNetMW": 164.1,
        "dp1ErisMw": 164.1,
        "dp1NrisMw": 164.1,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3067,
      "normalized": {
        "queue_id": "J2682",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Independence-ISES- Newport 161 KV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492698,
        "projectNumber": "J2682",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-02T05:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Independence-ISES- Newport 161 KV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3068,
      "normalized": {
        "queue_id": "J2594",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Ray Braswell 230 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 650.0,
        "summer_net_mw": 650.0,
        "winter_net_mw": 650.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492699,
        "projectNumber": "J2594",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ray Braswell 230 kV",
        "summerNetMW": 650.0,
        "winterNetMW": 650.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3069,
      "normalized": {
        "queue_id": "J2596",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "West Memphis 500 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492700,
        "projectNumber": "J2596",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "West Memphis 500 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3070,
      "normalized": {
        "queue_id": "J2717",
        "county": "Hot Spring",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "ETTA 500kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-10-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 600.0,
        "summer_net_mw": 600.0,
        "winter_net_mw": 600.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2029-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492701,
        "projectNumber": "J2717",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-10-23T04:00:00+00:00",
        "inService": "2029-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Hot Spring",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ETTA 500kV Substation",
        "summerNetMW": 600.0,
        "winterNetMW": 600.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3071,
      "normalized": {
        "queue_id": "J2718",
        "county": "New Madrid",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Other_",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492702,
        "projectNumber": "J2718",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "New Madrid",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3072,
      "normalized": {
        "queue_id": "J2735",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Selman Field 69 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2022-12-06T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492703,
        "projectNumber": "J2735",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2022-12-06T05:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Selman Field 69 kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3073,
      "normalized": {
        "queue_id": "J2698",
        "county": "Choctaw",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "WOLF CREEK 500 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "High Voltage DC",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-10-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492704,
        "projectNumber": "J2698",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2028-10-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Choctaw",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "E-NRIS",
        "poiName": "WOLF CREEK 500 kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "High Voltage DC",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3074,
      "normalized": {
        "queue_id": "J2716",
        "county": "Dakota",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "HAMPTON 345 KV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492705,
        "projectNumber": "J2716",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dakota",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HAMPTON 345 KV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3075,
      "normalized": {
        "queue_id": "J2686",
        "county": "Muscatine",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Walcott 345 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492706,
        "projectNumber": "J2686",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Muscatine",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Walcott 345 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3076,
      "normalized": {
        "queue_id": "J2600",
        "county": "Wabasha",
        "state": "MN",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Wabaco to Alma 161 kV Tap",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492707,
        "projectNumber": "J2600",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Wabasha",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wabaco to Alma 161 kV Tap",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3077,
      "normalized": {
        "queue_id": "J2602",
        "county": "DeSoto",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Twinkletown 230 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492708,
        "projectNumber": "J2602",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "DeSoto",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Twinkletown 230 kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3078,
      "normalized": {
        "queue_id": "J2633",
        "county": "Van Buren",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC Clinton Industrial - AECC Clinton West 161 KV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 61.0,
        "summer_net_mw": 61.0,
        "winter_net_mw": 61.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492709,
        "projectNumber": "J2633",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Van Buren",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC Clinton Industrial - AECC Clinton West 161 KV",
        "summerNetMW": 61.0,
        "winterNetMW": 61.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3079,
      "normalized": {
        "queue_id": "J2638",
        "county": "Nevada",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Emmet SS - Hope East SS 115KV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 58.0,
        "summer_net_mw": 58.0,
        "winter_net_mw": 58.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492710,
        "projectNumber": "J2638",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Nevada",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Emmet SS - Hope East SS 115KV",
        "summerNetMW": 58.0,
        "winterNetMW": 58.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3080,
      "normalized": {
        "queue_id": "J2770",
        "county": "Grant",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Colfax-Montgomery (EES) 230 kV Line",
        "queue_date": "2023-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492711,
        "projectNumber": "J2770",
        "queueDate": "2023-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Grant",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Colfax-Montgomery (EES) 230 kV Line",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3081,
      "normalized": {
        "queue_id": "J2801",
        "county": "Woodruff",
        "state": "AR",
        "transmission_owner": "",
        "poi": "AECC HUNTER NORTH - MCCRORY 161.0kV",
        "queue_date": "2023-09-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 130.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492712,
        "projectNumber": "J2801",
        "queueDate": "2023-09-11T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Woodruff",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "AECC HUNTER NORTH - MCCRORY 161.0kV",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 130.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3082,
      "normalized": {
        "queue_id": "J2760",
        "county": "Hubbard",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "BADOURA4 (608610) 230 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 68.0,
        "summer_net_mw": 68.0,
        "winter_net_mw": 68.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492713,
        "projectNumber": "J2760",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Hubbard",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BADOURA4 (608610) 230 kV Substation",
        "summerNetMW": 68.0,
        "winterNetMW": 68.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3083,
      "normalized": {
        "queue_id": "J2803",
        "county": "Carroll",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Winona (3WINONA!  337060) - Carrollton (3CARROLLTON+  337056) 115 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492714,
        "projectNumber": "J2803",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Carroll",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Winona (3WINONA!  337060) - Carrollton (3CARROLLTON+  337056) 115 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3084,
      "normalized": {
        "queue_id": "J2644",
        "county": "Chicot",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "EUDORA - CHICKASAW (LAGEN) 115.0kV",
        "queue_date": "2022-09-10T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492715,
        "projectNumber": "J2644",
        "queueDate": "2022-09-10T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Chicot",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "EUDORA - CHICKASAW (LAGEN) 115.0kV",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3085,
      "normalized": {
        "queue_id": "J2631",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Stuttgart Ricuskey- Tarleton 230 KV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492716,
        "projectNumber": "J2631",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-24T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stuttgart Ricuskey- Tarleton 230 KV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3086,
      "normalized": {
        "queue_id": "J2729",
        "county": "West Baton Rouge",
        "state": "LA",
        "transmission_owner": "",
        "poi": "ADDIS - BIG CAJUN #1 230.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492717,
        "projectNumber": "J2729",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-02-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "West Baton Rouge",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ADDIS - BIG CAJUN #1 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3087,
      "normalized": {
        "queue_id": "J2742",
        "county": "White",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BEEBE - GARNER SS 115.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492718,
        "projectNumber": "J2742",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "White",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BEEBE - GARNER SS 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3088,
      "normalized": {
        "queue_id": "J2640",
        "county": "Calhoun",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 394.5,
        "summer_net_mw": 394.5,
        "winter_net_mw": 394.5,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492719,
        "projectNumber": "J2640",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Calhoun",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "summerNetMW": 394.5,
        "winterNetMW": 394.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3089,
      "normalized": {
        "queue_id": "J2630",
        "county": "Woodruff",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Des Arc to Cotton Plant 115 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492720,
        "projectNumber": "J2630",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-24T04:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Woodruff",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Des Arc to Cotton Plant 115 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3090,
      "normalized": {
        "queue_id": "J2744",
        "county": "Wilkinson",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "CENTREVILLE",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492721,
        "projectNumber": "J2744",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Wilkinson",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CENTREVILLE",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3091,
      "normalized": {
        "queue_id": "J2745",
        "county": "Humphreys",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BELZONI - BELZONI TAP SS 115.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492722,
        "projectNumber": "J2745",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Humphreys",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BELZONI - BELZONI TAP SS 115.0kV",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3092,
      "normalized": {
        "queue_id": "J2722",
        "county": "Clinton",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Tap on Frankfort - New London 230 kV Line",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-08-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492723,
        "projectNumber": "J2722",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-08-14T04:00:00+00:00",
        "inService": "2026-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clinton",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tap on Frankfort - New London 230 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3093,
      "normalized": {
        "queue_id": "J2691",
        "county": "Bollinger",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "7RUSH     - 7BALDWIN 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492724,
        "projectNumber": "J2691",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Bollinger",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "7RUSH     - 7BALDWIN 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Wind/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3094,
      "normalized": {
        "queue_id": "J2772",
        "county": "Mercer",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Coyote Switchyard 345 kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492725,
        "projectNumber": "J2772",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Mercer",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Coyote Switchyard 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3095,
      "normalized": {
        "queue_id": "J2775",
        "county": "White",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": "2025-08-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492726,
        "projectNumber": "J2775",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "withdrawnDate": "2025-08-07T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3096,
      "normalized": {
        "queue_id": "J2692",
        "county": "Choctaw",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "WOLF CREEK 500 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "High Voltage DC",
        "facility_type": "Solar/Wind",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-10-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492727,
        "projectNumber": "J2692",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2028-10-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Choctaw",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "E-NRIS",
        "poiName": "WOLF CREEK 500 kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "High Voltage DC",
        "facilityType": "Solar/Wind",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3097,
      "normalized": {
        "queue_id": "J2694",
        "county": "Christian",
        "state": "IL",
        "transmission_owner": "",
        "poi": "7COFFEEN  - 7PANA     345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Wind/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492728,
        "projectNumber": "J2694",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Christian",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7COFFEEN  - 7PANA     345.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Wind/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3098,
      "normalized": {
        "queue_id": "J2778",
        "county": "Miami",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Deedsville\tNorth Manchester Switching Sta 69kV (Circuit Number 6974).",
        "queue_date": "2022-09-07T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 15.0,
        "summer_net_mw": 15.0,
        "winter_net_mw": 15.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492729,
        "projectNumber": "J2778",
        "queueDate": "2022-09-07T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Miami",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Deedsville\tNorth Manchester Switching Sta 69kV (Circuit Number 6974).",
        "summerNetMW": 15.0,
        "winterNetMW": 15.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3099,
      "normalized": {
        "queue_id": "J2779",
        "county": "Clinton",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Lafayette\tto Middlefork 69kV Line (Circuit 6909)",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492730,
        "projectNumber": "J2779",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clinton",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Lafayette\tto Middlefork 69kV Line (Circuit 6909)",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3100,
      "normalized": {
        "queue_id": "J2695",
        "county": "Carroll",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 234.0,
        "summer_net_mw": 234.0,
        "winter_net_mw": 234.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492731,
        "projectNumber": "J2695",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Carroll",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 234.0,
        "winterNetMW": 234.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3101,
      "normalized": {
        "queue_id": "J2688",
        "county": "Newton",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "NEWTON 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-26T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492732,
        "projectNumber": "J2688",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-05-26T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Newton",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NEWTON 138 kV",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3102,
      "normalized": {
        "queue_id": "J2689",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "JACINTO 230kV",
        "queue_date": "2025-07-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-26T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492733,
        "projectNumber": "J2689",
        "queueDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-05-26T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "JACINTO 230kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3103,
      "normalized": {
        "queue_id": "J2687",
        "county": "Hancock",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Sunnyside to Gwynneville 345kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492734,
        "projectNumber": "J2687",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Hancock",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sunnyside to Gwynneville 345kV line",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3104,
      "normalized": {
        "queue_id": "J2773",
        "county": "Poinsett",
        "state": "AR",
        "transmission_owner": "",
        "poi": "Newport - Fisher 161 kV Line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492735,
        "projectNumber": "J2773",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Poinsett",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Newport - Fisher 161 kV Line",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3105,
      "normalized": {
        "queue_id": "J2826",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Sandborn Primary - Worthington Primary 161.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 125.0,
        "dp1_nris_mw": 125.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492736,
        "projectNumber": "J2826",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sandborn Primary - Worthington Primary 161.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 125.0,
        "dp1NrisMw": 125.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3106,
      "normalized": {
        "queue_id": "J2901",
        "county": "Columbia",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MACEDONIA - TAYLOR 115.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492737,
        "projectNumber": "J2901",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Columbia",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "MACEDONIA - TAYLOR 115.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3107,
      "normalized": {
        "queue_id": "J2892",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Blackhawk (MEC) - Quinn 345 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2026-09-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492738,
        "projectNumber": "J2892",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2026-09-16T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Blackhawk (MEC) - Quinn 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3108,
      "normalized": {
        "queue_id": "J2879",
        "county": "Washington",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "CHEMOLITE",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492739,
        "projectNumber": "J2879",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Washington",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CHEMOLITE",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3109,
      "normalized": {
        "queue_id": "J2913",
        "county": "Sargent",
        "state": "ND",
        "transmission_owner": "",
        "poi": "Forman 115kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 90.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492740,
        "projectNumber": "J2913",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-04-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Sargent",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Forman 115kV Substation",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 90.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3110,
      "normalized": {
        "queue_id": "J2902",
        "county": "Warren",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Beech Grove SS 115 kV Substation",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492741,
        "projectNumber": "J2902",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Warren",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Beech Grove SS 115 kV Substation",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3111,
      "normalized": {
        "queue_id": "J2895",
        "county": "Clark",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Bethlehem 138kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-08-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 120.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492742,
        "projectNumber": "J2895",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-08-19T04:00:00+00:00",
        "inService": "2025-04-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clark",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bethlehem 138kV Substation",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 120.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3112,
      "normalized": {
        "queue_id": "J2796",
        "county": "Jackson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Newport Ab-Cash 161kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492743,
        "projectNumber": "J2796",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Jackson",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Newport Ab-Cash 161kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3113,
      "normalized": {
        "queue_id": "J2776",
        "county": "Fulton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "WINAMAC to BRUCE LAKE 69kV (Circuit ID 6913) NIPSCO AREA",
        "queue_date": "2022-09-07T04:00:00+00:00",
        "withdrawn_date": "2023-03-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 10.0,
        "summer_net_mw": 10.0,
        "winter_net_mw": 10.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492744,
        "projectNumber": "J2776",
        "queueDate": "2022-09-07T04:00:00+00:00",
        "withdrawnDate": "2023-03-22T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Fulton",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WINAMAC to BRUCE LAKE 69kV (Circuit ID 6913) NIPSCO AREA",
        "summerNetMW": 10.0,
        "winterNetMW": 10.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3114,
      "normalized": {
        "queue_id": "J2777",
        "county": "Madison",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Cadiz\tLapel Brockway Glass 69kV",
        "queue_date": "2022-09-07T04:00:00+00:00",
        "withdrawn_date": "2023-03-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492745,
        "projectNumber": "J2777",
        "queueDate": "2022-09-07T04:00:00+00:00",
        "withdrawnDate": "2023-03-22T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Madison",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cadiz\tLapel Brockway Glass 69kV",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3115,
      "normalized": {
        "queue_id": "J2836",
        "county": "Livingston",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Tap - Cumberland 69.0kV",
        "queue_date": "2022-09-12T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492746,
        "projectNumber": "J2836",
        "queueDate": "2022-09-12T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Livingston",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tap - Cumberland 69.0kV",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3116,
      "normalized": {
        "queue_id": "J2897",
        "county": "San Jacinto",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "RIVTRIN - SHECO CALVIN 138.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492747,
        "projectNumber": "J2897",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-04-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "San Jacinto",
        "state": "TX",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "RIVTRIN - SHECO CALVIN 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3117,
      "normalized": {
        "queue_id": "J2898",
        "county": "Amite",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "FRANKLIN EHV - MCKNIGHT 500.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492748,
        "projectNumber": "J2898",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-04-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Amite",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FRANKLIN EHV - MCKNIGHT 500.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3118,
      "normalized": {
        "queue_id": "J2914",
        "county": "St. Tammany",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "MCKNIGHT - PLANT DANIEL 500.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 450.0,
        "summer_net_mw": 450.0,
        "winter_net_mw": 450.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 450.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492749,
        "projectNumber": "J2914",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-04-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Tammany",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "MCKNIGHT - PLANT DANIEL 500.0kV",
        "summerNetMW": 450.0,
        "winterNetMW": 450.0,
        "dp1ErisMw": 450.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3119,
      "normalized": {
        "queue_id": "J2887",
        "county": "Simpson",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Magee 161 - White Oak 161.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492750,
        "projectNumber": "J2887",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Simpson",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Magee 161 - White Oak 161.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3120,
      "normalized": {
        "queue_id": "J2810",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Killdeer 345/161 sub (Emery station 161 outlet)",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492751,
        "projectNumber": "J2810",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Killdeer 345/161 sub (Emery station 161 outlet)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3121,
      "normalized": {
        "queue_id": "J3828",
        "county": "Lapeer",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492752,
        "projectNumber": "J3828",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Lapeer",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3122,
      "normalized": {
        "queue_id": "J2896",
        "county": "Sargent",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Gwinner 115kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492753,
        "projectNumber": "J2896",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-04-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Sargent",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gwinner 115kV Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3123,
      "normalized": {
        "queue_id": "J2900",
        "county": "Amite",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "FRANKLIN EHV - MCKNIGHT 500.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492754,
        "projectNumber": "J2900",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-04-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Amite",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FRANKLIN EHV - MCKNIGHT 500.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3124,
      "normalized": {
        "queue_id": "J2845",
        "county": "Freeborn",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Adams - Hayward 161kV",
        "queue_date": "2025-10-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492755,
        "projectNumber": "J2845",
        "queueDate": "2025-10-23T04:00:00+00:00",
        "inService": "2025-10-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Freeborn",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Adams - Hayward 161kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3125,
      "normalized": {
        "queue_id": "J2915",
        "county": "Clark",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Other_",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 223.0,
        "summer_net_mw": 223.0,
        "winter_net_mw": 223.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2028-07-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492756,
        "projectNumber": "J2915",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2028-07-18T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Clark",
        "state": "MO",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 223.0,
        "winterNetMW": 223.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3126,
      "normalized": {
        "queue_id": "J2909",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Remington AECC to Lonoke E 115kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492757,
        "projectNumber": "J2909",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-27T04:00:00+00:00",
        "inService": "2027-06-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Remington AECC to Lonoke E 115kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3127,
      "normalized": {
        "queue_id": "J2841",
        "county": "Independence",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Independent - Holland Bottom 500kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492758,
        "projectNumber": "J2841",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Independence",
        "state": "AR",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Independent - Holland Bottom 500kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3128,
      "normalized": {
        "queue_id": "J2873",
        "county": "Simpson",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SME",
        "poi": "Magee 161 - White Oak 161.0kV",
        "queue_date": "2022-09-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 165.0,
        "dp1_nris_mw": 165.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492759,
        "projectNumber": "J2873",
        "queueDate": "2022-09-13T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SME",
        "county": "Simpson",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Magee 161 - White Oak 161.0kV",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 165.0,
        "dp1NrisMw": 165.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3129,
      "normalized": {
        "queue_id": "J2807",
        "county": "Ingham",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "DELHI to TOMPKINS 138kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492760,
        "projectNumber": "J2807",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ingham",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DELHI to TOMPKINS 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3130,
      "normalized": {
        "queue_id": "J2808",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ramsey East 138 sub (co-located with Dressor and Switchgrass)",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492761,
        "projectNumber": "J2808",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ramsey East 138 sub (co-located with Dressor and Switchgrass)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3131,
      "normalized": {
        "queue_id": "J2809",
        "county": "Iroquois",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4GILMAN - 4PAXTON E 138 kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 133.0,
        "summer_net_mw": 133.0,
        "winter_net_mw": 133.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 133.0,
        "dp1_nris_mw": 133.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492762,
        "projectNumber": "J2809",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Iroquois",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4GILMAN - 4PAXTON E 138 kV",
        "summerNetMW": 133.0,
        "winterNetMW": 133.0,
        "dp1ErisMw": 133.0,
        "dp1NrisMw": 133.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3132,
      "normalized": {
        "queue_id": "J4251",
        "county": "",
        "state": "",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "",
        "queue_date": "2026-07-15T19:50:41+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492763,
        "projectNumber": "J4251",
        "queueDate": "2026-07-15T19:50:41+00:00",
        "inService": "2029-12-31T05:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3133,
      "normalized": {
        "queue_id": "S1001",
        "county": "",
        "state": "IN",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2020-06-25T04:00:00+00:00",
        "withdrawn_date": "2024-06-07T04:00:00+00:00",
        "status": "Done",
        "capacity_mw": 7.5,
        "summer_net_mw": 7.5,
        "winter_net_mw": 7.5,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492764,
        "projectNumber": "S1001",
        "queueDate": "2020-06-25T04:00:00+00:00",
        "withdrawnDate": "2024-06-07T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 7.5,
        "winterNetMW": 7.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3134,
      "normalized": {
        "queue_id": "S1007",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Atlanta – Tuscola 120 kV line(265183)",
        "queue_date": "2021-07-08T04:00:00+00:00",
        "withdrawn_date": "2024-08-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2022-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492765,
        "projectNumber": "S1007",
        "queueDate": "2021-07-08T04:00:00+00:00",
        "withdrawnDate": "2024-08-15T04:00:00+00:00",
        "inService": "2022-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Atlanta – Tuscola 120 kV line(265183)",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3135,
      "normalized": {
        "queue_id": "J2811",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Killdeer",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 210.0,
        "summer_net_mw": 210.0,
        "winter_net_mw": 210.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 210.0,
        "dp1_nris_mw": 210.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492766,
        "projectNumber": "J2811",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Killdeer",
        "summerNetMW": 210.0,
        "winterNetMW": 210.0,
        "dp1ErisMw": 210.0,
        "dp1NrisMw": 210.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3136,
      "normalized": {
        "queue_id": "J3829",
        "county": "Hot Spring",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "ETTA",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 770.0,
        "summer_net_mw": 770.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 770.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492767,
        "projectNumber": "J3829",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Hot Spring",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ETTA",
        "summerNetMW": 770.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 770.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3137,
      "normalized": {
        "queue_id": "S1000",
        "county": "",
        "state": "AR",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2020-06-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "LEGACY: Done",
        "capacity_mw": 10.0,
        "summer_net_mw": 10.0,
        "winter_net_mw": 10.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492768,
        "projectNumber": "S1000",
        "queueDate": "2020-06-20T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "AR",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 10.0,
        "winterNetMW": 10.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "LEGACY: Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3138,
      "normalized": {
        "queue_id": "S1006",
        "county": "",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "REC Bradford - W. Darien 138kV Line",
        "queue_date": "2021-04-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492769,
        "projectNumber": "S1006",
        "queueDate": "2021-04-02T04:00:00+00:00",
        "inService": "2023-10-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "REC Bradford - W. Darien 138kV Line",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3139,
      "normalized": {
        "queue_id": "S1010",
        "county": "Gratiot",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Redstone138 kV Sub(256542)",
        "queue_date": "2021-10-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2021-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492770,
        "projectNumber": "S1010",
        "queueDate": "2021-10-15T04:00:00+00:00",
        "inService": "2021-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Redstone138 kV Sub(256542)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3140,
      "normalized": {
        "queue_id": "S1013",
        "county": "",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lakefield Junction 345kV",
        "queue_date": "2022-01-26T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2026-06-30T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492771,
        "projectNumber": "S1013",
        "queueDate": "2022-01-26T05:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "negInService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Lakefield Junction 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3141,
      "normalized": {
        "queue_id": "S1017",
        "county": "",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Tennyson 138kV",
        "queue_date": "2022-04-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492772,
        "projectNumber": "S1017",
        "queueDate": "2022-04-11T04:00:00+00:00",
        "inService": "2023-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Tennyson 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3142,
      "normalized": {
        "queue_id": "S1021",
        "county": "Gratiot",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Luce Substation",
        "queue_date": "2022-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": "2022-05-17T04:00:00+00:00",
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492773,
        "projectNumber": "S1021",
        "queueDate": "2022-04-25T04:00:00+00:00",
        "doneDate": "2022-05-17T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Luce Substation",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3143,
      "normalized": {
        "queue_id": "S1011",
        "county": "Gratiot",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Slate 345 kV Sub (256573)",
        "queue_date": "2021-10-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492774,
        "projectNumber": "S1011",
        "queueDate": "2021-10-15T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Slate 345 kV Sub (256573)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3144,
      "normalized": {
        "queue_id": "S1014",
        "county": "",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "Merricourt Wind 230kV",
        "queue_date": "2022-03-09T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 9.0,
        "summer_net_mw": 9.0,
        "winter_net_mw": 9.0,
        "proposed_completion_date": "2028-09-01T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492775,
        "projectNumber": "S1014",
        "queueDate": "2022-03-09T05:00:00+00:00",
        "inService": "2025-10-31T04:00:00+00:00",
        "negInService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "",
        "state": "ND",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Merricourt Wind 230kV",
        "summerNetMW": 9.0,
        "winterNetMW": 9.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3145,
      "normalized": {
        "queue_id": "S1018",
        "county": "",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "7 Mile Creek 138kV",
        "queue_date": "2022-04-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2022-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492776,
        "projectNumber": "S1018",
        "queueDate": "2022-04-20T04:00:00+00:00",
        "inService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "7 Mile Creek 138kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3146,
      "normalized": {
        "queue_id": "S1023",
        "county": "Grant",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Nelson Dewey - Lancaster 138kV",
        "queue_date": "2022-05-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-03-27T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492777,
        "projectNumber": "S1023",
        "queueDate": "2022-05-16T04:00:00+00:00",
        "inService": "2023-03-27T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Grant",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Nelson Dewey - Lancaster 138kV",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3147,
      "normalized": {
        "queue_id": "S1026",
        "county": "Dubois",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Dubois - Culley 138kV line",
        "queue_date": "2022-05-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": "2022-10-31T04:00:00+00:00",
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492778,
        "projectNumber": "S1026",
        "queueDate": "2022-05-26T04:00:00+00:00",
        "doneDate": "2022-10-31T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Dubois",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Dubois - Culley 138kV line",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3148,
      "normalized": {
        "queue_id": "J2684",
        "county": "St. Clair",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "BUNCE",
        "queue_date": "2022-09-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492779,
        "projectNumber": "J2684",
        "queueDate": "2022-09-08T04:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "St. Clair",
        "state": "MI",
        "studyCycle": "DPP-2022",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BUNCE",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3149,
      "normalized": {
        "queue_id": "J2739",
        "county": "Ohio",
        "state": "KY",
        "transmission_owner": "",
        "poi": "WILSON",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492780,
        "projectNumber": "J2739",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Ohio",
        "state": "KY",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WILSON",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3150,
      "normalized": {
        "queue_id": "S1022",
        "county": "Pike",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "PETEUA31 4.14kV",
        "queue_date": "2022-05-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 3.0,
        "summer_net_mw": 3.0,
        "winter_net_mw": 3.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-10-11T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492781,
        "projectNumber": "S1022",
        "queueDate": "2022-05-02T04:00:00+00:00",
        "inService": "2023-10-11T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Pike",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "PETEUA31 4.14kV",
        "summerNetMW": 3.0,
        "winterNetMW": 3.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3151,
      "normalized": {
        "queue_id": "S1025",
        "county": "Rock",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sheepskin 69kV",
        "queue_date": "2022-05-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2022-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492782,
        "projectNumber": "S1025",
        "queueDate": "2022-05-16T04:00:00+00:00",
        "inService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Rock",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Sheepskin 69kV",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3152,
      "normalized": {
        "queue_id": "S1034",
        "county": "Dodge",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "North Beaver Dam 69kV - Bus 698222",
        "queue_date": "2022-08-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-06-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492783,
        "projectNumber": "S1034",
        "queueDate": "2022-08-15T04:00:00+00:00",
        "inService": "2023-06-06T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dodge",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "North Beaver Dam 69kV - Bus 698222",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3153,
      "normalized": {
        "queue_id": "J2743",
        "county": "Washington",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BOGALUSA",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492784,
        "projectNumber": "J2743",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2026-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Washington",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BOGALUSA",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3154,
      "normalized": {
        "queue_id": "J2737",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904",
        "queue_date": "2025-09-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492785,
        "projectNumber": "J2737",
        "queueDate": "2025-09-05T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3155,
      "normalized": {
        "queue_id": "J2697",
        "county": "St. Clair",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7ASTER - 7CMDR 345.0kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492786,
        "projectNumber": "J2697",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "St. Clair",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7ASTER - 7CMDR 345.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3156,
      "normalized": {
        "queue_id": "J2798",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "E. Winamac - Monticello 138 kV line",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492787,
        "projectNumber": "J2798",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2026-08-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "E. Winamac - Monticello 138 kV line",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3157,
      "normalized": {
        "queue_id": "J2771",
        "county": "Coahoma",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "6CROSSROADS! (337100) - 6MOONLAKE%  (337107) 230 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492788,
        "projectNumber": "J2771",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Coahoma",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "6CROSSROADS! (337100) - 6MOONLAKE%  (337107) 230 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3158,
      "normalized": {
        "queue_id": "J2804",
        "county": "West Carroll",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Oak Grove - Galion 115kV Tap",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2017-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492789,
        "projectNumber": "J2804",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2017-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "West Carroll",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Oak Grove - Galion 115kV Tap",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3159,
      "normalized": {
        "queue_id": "S1039",
        "county": "Polk",
        "state": "WI",
        "transmission_owner": "",
        "poi": "Apple River 161kV",
        "queue_date": "2022-09-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492790,
        "projectNumber": "S1039",
        "queueDate": "2022-09-01T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Polk",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Apple River 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3160,
      "normalized": {
        "queue_id": "S1043",
        "county": "Dubois",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Culley to Dubois 138kV tap",
        "queue_date": "2023-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-04-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492791,
        "projectNumber": "S1043",
        "queueDate": "2023-04-17T04:00:00+00:00",
        "inService": "2024-04-07T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Dubois",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Culley to Dubois 138kV tap",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3161,
      "normalized": {
        "queue_id": "J2869",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "",
        "poi": "GERALDANDRUS SES SWITCHYARD-INDIANOLA 230 KV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492792,
        "projectNumber": "J2869",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GERALDANDRUS SES SWITCHYARD-INDIANOLA 230 KV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3162,
      "normalized": {
        "queue_id": "J2766",
        "county": "Howard",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2023-08-21T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 190.0,
        "dp1_nris_mw": 190.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492793,
        "projectNumber": "J2766",
        "queueDate": "2023-08-21T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2025-01-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Howard",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 190.0,
        "dp1NrisMw": 190.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3163,
      "normalized": {
        "queue_id": "J4253",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "",
        "queue_date": "2026-07-30T00:01:31+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 86.0,
        "summer_net_mw": 86.0,
        "winter_net_mw": 86.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492794,
        "projectNumber": "J4253",
        "queueDate": "2026-07-30T00:01:31+00:00",
        "inService": "2029-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 86.0,
        "winterNetMW": 86.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3164,
      "normalized": {
        "queue_id": "S1002",
        "county": "",
        "state": "MI",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2020-10-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492795,
        "projectNumber": "S1002",
        "queueDate": "2020-10-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3165,
      "normalized": {
        "queue_id": "S1008",
        "county": "",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Line Tap between Edwardsport and Amo 345kV",
        "queue_date": "2021-08-04T04:00:00+00:00",
        "withdrawn_date": "2025-04-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2022-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492796,
        "projectNumber": "S1008",
        "queueDate": "2021-08-04T04:00:00+00:00",
        "withdrawnDate": "2025-04-25T04:00:00+00:00",
        "inService": "2022-12-31T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Line Tap between Edwardsport and Amo 345kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3166,
      "normalized": {
        "queue_id": "S1012",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "Luce 138 kV Sub(256594)",
        "queue_date": "2021-10-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492797,
        "projectNumber": "S1012",
        "queueDate": "2021-10-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Luce 138 kV Sub(256594)",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3167,
      "normalized": {
        "queue_id": "S1015",
        "county": "Delta",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Garden Corners 138kV",
        "queue_date": "2022-04-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 55.0,
        "summer_net_mw": 55.0,
        "winter_net_mw": 55.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492798,
        "projectNumber": "S1015",
        "queueDate": "2022-04-11T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Delta",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Garden Corners 138kV",
        "summerNetMW": 55.0,
        "winterNetMW": 55.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3168,
      "normalized": {
        "queue_id": "S1019",
        "county": "",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Redstone 138kV",
        "queue_date": "2022-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492799,
        "projectNumber": "S1019",
        "queueDate": "2022-04-25T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Redstone 138kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3169,
      "normalized": {
        "queue_id": "S1024",
        "county": "Waushara",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Wautoma 138kV",
        "queue_date": "2022-05-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-01-26T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492800,
        "projectNumber": "S1024",
        "queueDate": "2022-05-16T04:00:00+00:00",
        "inService": "2023-01-26T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Waushara",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Wautoma 138kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3170,
      "normalized": {
        "queue_id": "S1027",
        "county": "Lake County",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "",
        "queue_date": "2022-05-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2028-05-31T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492801,
        "projectNumber": "S1027",
        "queueDate": "2022-05-26T04:00:00+00:00",
        "negInService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Lake County",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3171,
      "normalized": {
        "queue_id": "S1030",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2022-06-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492802,
        "projectNumber": "S1030",
        "queueDate": "2022-06-13T04:00:00+00:00",
        "inService": "2024-02-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3172,
      "normalized": {
        "queue_id": "J2829",
        "county": "Scott",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Scottsburg - Speed 69kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492803,
        "projectNumber": "J2829",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Scott",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Scottsburg - Speed 69kV",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3173,
      "normalized": {
        "queue_id": "J2872",
        "county": "Dakota",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Hampton 345kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492804,
        "projectNumber": "J2872",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-12-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Dakota",
        "state": "MN",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hampton 345kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3174,
      "normalized": {
        "queue_id": "S1032",
        "county": "Isabella County",
        "state": "",
        "transmission_owner": "METC",
        "poi": "Salt River Substation 138kV",
        "queue_date": "2022-08-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-07-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492805,
        "projectNumber": "S1032",
        "queueDate": "2022-08-19T04:00:00+00:00",
        "inService": "2025-07-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Isabella County",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Salt River Substation 138kV",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3175,
      "normalized": {
        "queue_id": "S1036",
        "county": "McLean",
        "state": "ND",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Dickinson 345 kV, Buffalo, MN",
        "queue_date": "2022-09-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492806,
        "projectNumber": "S1036",
        "queueDate": "2022-09-09T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "McLean",
        "state": "ND",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Dickinson 345 kV, Buffalo, MN",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3176,
      "normalized": {
        "queue_id": "S1037",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2022-10-26T04:00:00+00:00",
        "withdrawn_date": "2023-03-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.4,
        "summer_net_mw": 50.4,
        "winter_net_mw": 50.4,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492807,
        "projectNumber": "S1037",
        "queueDate": "2022-10-26T04:00:00+00:00",
        "withdrawnDate": "2023-03-22T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 50.4,
        "winterNetMW": 50.4,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3177,
      "normalized": {
        "queue_id": "R1002",
        "county": "Manitowoc",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Lake Front 69KV",
        "queue_date": "2020-07-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 11.4,
        "summer_net_mw": 11.4,
        "winter_net_mw": 11.4,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2022-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492808,
        "projectNumber": "R1002",
        "queueDate": "2020-07-01T04:00:00+00:00",
        "inService": "2022-07-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Manitowoc",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Lake Front 69KV",
        "summerNetMW": 11.4,
        "winterNetMW": 11.4,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3178,
      "normalized": {
        "queue_id": "R1005",
        "county": "Sherburne",
        "state": "",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Elk River Station: S6 69 kV",
        "queue_date": "2021-01-19T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 49.0,
        "summer_net_mw": 49.0,
        "winter_net_mw": 49.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2022-03-14T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492809,
        "projectNumber": "R1005",
        "queueDate": "2021-01-19T05:00:00+00:00",
        "inService": "2022-03-14T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Sherburne",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Elk River Station: S6 69 kV",
        "summerNetMW": 49.0,
        "winterNetMW": 49.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3179,
      "normalized": {
        "queue_id": "R1006",
        "county": "Lima",
        "state": "",
        "transmission_owner": "Alliant Energy West",
        "poi": "Hoot Lake 115KV",
        "queue_date": "2021-02-15T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492810,
        "projectNumber": "R1006",
        "queueDate": "2021-02-15T05:00:00+00:00",
        "inService": "2023-07-01T04:00:00+00:00",
        "transmissionOwner": "Alliant Energy West",
        "county": "Lima",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Hoot Lake 115KV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3180,
      "normalized": {
        "queue_id": "R1009",
        "county": "Montmorency",
        "state": "",
        "transmission_owner": "METC",
        "poi": "Consumers Energy 138kV Progress St. Substation",
        "queue_date": "2021-05-28T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492811,
        "projectNumber": "R1009",
        "queueDate": "2021-05-28T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2023-12-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Montmorency",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Consumers Energy 138kV Progress St. Substation",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3181,
      "normalized": {
        "queue_id": "R1013",
        "county": "Posey",
        "state": "",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "AB Brown 138kV Substation",
        "queue_date": "2021-11-16T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492812,
        "projectNumber": "R1013",
        "queueDate": "2021-11-16T05:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Posey",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "AB Brown 138kV Substation",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3182,
      "normalized": {
        "queue_id": "R1017",
        "county": "Des Moines",
        "state": "",
        "transmission_owner": "Alliant Energy West",
        "poi": "Burlington 161kV",
        "queue_date": "2022-02-15T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492813,
        "projectNumber": "R1017",
        "queueDate": "2022-02-15T05:00:00+00:00",
        "transmissionOwner": "Alliant Energy West",
        "county": "Des Moines",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Burlington 161kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3183,
      "normalized": {
        "queue_id": "R1020",
        "county": "Linn",
        "state": "",
        "transmission_owner": "Alliant Energy West",
        "poi": "ITC DAEC Substation 161kV",
        "queue_date": "2022-03-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492814,
        "projectNumber": "R1020",
        "queueDate": "2022-03-31T04:00:00+00:00",
        "inService": "2024-10-30T04:00:00+00:00",
        "transmissionOwner": "Alliant Energy West",
        "county": "Linn",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "ITC DAEC Substation 161kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3184,
      "normalized": {
        "queue_id": "R1024",
        "county": "Posey",
        "state": "",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "A.B. Brown 138kV Substation",
        "queue_date": "2022-10-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492815,
        "projectNumber": "R1024",
        "queueDate": "2022-10-12T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Posey",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "A.B. Brown 138kV Substation",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3185,
      "normalized": {
        "queue_id": "J2852",
        "county": "Roberts",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Browns Valley 230 kV Substation",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492816,
        "projectNumber": "J2852",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2025-04-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Roberts",
        "state": "SD",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Browns Valley 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3186,
      "normalized": {
        "queue_id": "J2899",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "",
        "poi": "GOOS FERRY - CHALKLEY CO 230.0kV",
        "queue_date": "2022-09-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492817,
        "projectNumber": "J2899",
        "queueDate": "2022-09-14T04:00:00+00:00",
        "inService": "2026-04-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2022",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "GOOS FERRY - CHALKLEY CO 230.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3187,
      "normalized": {
        "queue_id": "J2842",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mason 138kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2023-03-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492818,
        "projectNumber": "J2842",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2023-03-24T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Mason 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3188,
      "normalized": {
        "queue_id": "J2843",
        "county": "Hendricks",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Qualitech 345kV - Amo 345kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492819,
        "projectNumber": "J2843",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Hendricks",
        "state": "IN",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Qualitech 345kV - Amo 345kV",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3189,
      "normalized": {
        "queue_id": "J2883",
        "county": "Mercer",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Coyote Switchyard 345kV Substation",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": "2025-10-27T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 347.0,
        "summer_net_mw": 347.0,
        "winter_net_mw": 347.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492820,
        "projectNumber": "J2883",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "withdrawnDate": "2025-10-27T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Mercer",
        "state": "ND",
        "studyCycle": "DPP-2022",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Coyote Switchyard 345kV Substation",
        "summerNetMW": 347.0,
        "winterNetMW": 347.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3190,
      "normalized": {
        "queue_id": "S1004",
        "county": "",
        "state": "IN",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2020-10-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492821,
        "projectNumber": "S1004",
        "queueDate": "2020-10-28T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3191,
      "normalized": {
        "queue_id": "R1000",
        "county": "Morton",
        "state": "",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "R.M. Heskett Station",
        "queue_date": "2019-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 103.1,
        "summer_net_mw": 103.1,
        "winter_net_mw": 103.1,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2022-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492822,
        "projectNumber": "R1000",
        "queueDate": "2019-06-24T04:00:00+00:00",
        "inService": "2022-10-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "Morton",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "R.M. Heskett Station",
        "summerNetMW": 103.1,
        "winterNetMW": 103.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3192,
      "normalized": {
        "queue_id": "R1011",
        "county": "Pike",
        "state": "",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Petersburg 345kV Substation",
        "queue_date": "2021-10-04T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492823,
        "projectNumber": "R1011",
        "queueDate": "2021-10-04T04:00:00+00:00",
        "inService": "2024-01-15T05:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Pike",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Petersburg 345kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3193,
      "normalized": {
        "queue_id": "S1005",
        "county": "",
        "state": "WI",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2021-04-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492824,
        "projectNumber": "S1005",
        "queueDate": "2021-04-02T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3194,
      "normalized": {
        "queue_id": "S1009",
        "county": "",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Pleasant Valley 161kV Substation",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 258.92,
        "summer_net_mw": 258.92,
        "winter_net_mw": 258.92,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492825,
        "projectNumber": "S1009",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Pleasant Valley 161kV Substation",
        "summerNetMW": 258.92,
        "winterNetMW": 258.92,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3195,
      "normalized": {
        "queue_id": "S1016",
        "county": "",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Lone Rock 69kV",
        "queue_date": "2022-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2022-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492826,
        "projectNumber": "S1016",
        "queueDate": "2022-04-15T04:00:00+00:00",
        "inService": "2022-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Lone Rock 69kV",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3196,
      "normalized": {
        "queue_id": "S1020",
        "county": "Gratiot",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Slate Substation 345kV",
        "queue_date": "2022-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": "2022-06-20T04:00:00+00:00",
        "in_service": "2023-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492827,
        "projectNumber": "S1020",
        "queueDate": "2022-04-25T04:00:00+00:00",
        "doneDate": "2022-06-20T04:00:00+00:00",
        "inService": "2023-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Slate Substation 345kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3197,
      "normalized": {
        "queue_id": "S1028",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Reynolds - Burr Oak 345kV Line",
        "queue_date": "2022-05-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492828,
        "projectNumber": "S1028",
        "queueDate": "2022-05-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "White",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Reynolds - Burr Oak 345kV Line",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3198,
      "normalized": {
        "queue_id": "S1033",
        "county": "Green",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Bass Creek – Albany – North Monroe 138 kV",
        "queue_date": "2022-08-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-07-05T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492829,
        "projectNumber": "S1033",
        "queueDate": "2022-08-15T04:00:00+00:00",
        "inService": "2023-07-05T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Green",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Bass Creek – Albany – North Monroe 138 kV",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3199,
      "normalized": {
        "queue_id": "S1038",
        "county": "Shiawassee",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Gross 138kV",
        "queue_date": "2022-12-07T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492830,
        "projectNumber": "S1038",
        "queueDate": "2022-12-07T05:00:00+00:00",
        "inService": "2025-02-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Shiawassee",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Gross 138kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3200,
      "normalized": {
        "queue_id": "S1041",
        "county": "Ford",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Gibson City South (347114)",
        "queue_date": "2023-05-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-04-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492831,
        "projectNumber": "S1041",
        "queueDate": "2023-05-19T04:00:00+00:00",
        "inService": "2026-04-23T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Ford",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Gibson City South (347114)",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3201,
      "normalized": {
        "queue_id": "S1042",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2022-12-20T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492832,
        "projectNumber": "S1042",
        "queueDate": "2022-12-20T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3202,
      "normalized": {
        "queue_id": "R1015",
        "county": "",
        "state": "",
        "transmission_owner": "Alliant Energy East",
        "poi": "Edgewater 345kV",
        "queue_date": "2022-02-13T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 423.1,
        "summer_net_mw": 423.1,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492833,
        "projectNumber": "R1015",
        "queueDate": "2022-02-13T05:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "Alliant Energy East",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Edgewater 345kV",
        "summerNetMW": 423.1,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3203,
      "normalized": {
        "queue_id": "R1019",
        "county": "Des Moines",
        "state": "",
        "transmission_owner": "Alliant Energy West",
        "poi": "Burlington 161kV",
        "queue_date": "2022-02-15T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 212.0,
        "summer_net_mw": 212.0,
        "winter_net_mw": 103.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492834,
        "projectNumber": "R1019",
        "queueDate": "2022-02-15T05:00:00+00:00",
        "inService": "2024-12-31T05:00:00+00:00",
        "transmissionOwner": "Alliant Energy West",
        "county": "Des Moines",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Burlington 161kV",
        "summerNetMW": 212.0,
        "winterNetMW": 103.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3204,
      "normalized": {
        "queue_id": "R1022",
        "county": "Pike",
        "state": "",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Petersburg 345kV Substation",
        "queue_date": "2022-05-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492835,
        "projectNumber": "R1022",
        "queueDate": "2022-05-31T04:00:00+00:00",
        "inService": "2025-01-15T05:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Pike",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "Petersburg 345kV Substation",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3205,
      "normalized": {
        "queue_id": "R1026",
        "county": "Linn County",
        "state": "",
        "transmission_owner": "Alliant Energy West",
        "poi": "ITC DAEC Substation 161kV",
        "queue_date": "2022-11-22T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492836,
        "projectNumber": "R1026",
        "queueDate": "2022-11-22T05:00:00+00:00",
        "transmissionOwner": "Alliant Energy West",
        "county": "Linn County",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "ITC DAEC Substation 161kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3206,
      "normalized": {
        "queue_id": "R1030",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "Slocum (PSSE Bus #264511)",
        "queue_date": "2023-01-05T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492837,
        "projectNumber": "R1030",
        "queueDate": "2023-01-05T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Slocum (PSSE Bus #264511)",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3207,
      "normalized": {
        "queue_id": "R1033",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "Waterford 230kV",
        "queue_date": "2023-02-13T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492838,
        "projectNumber": "R1033",
        "queueDate": "2023-02-13T05:00:00+00:00",
        "inService": "2024-02-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Waterford 230kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3208,
      "normalized": {
        "queue_id": "R1003",
        "county": "Orange",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC.",
        "poi": "Sabine 138 & 230 kV (bus #334440, #334431, #334433",
        "queue_date": "2020-08-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 1166.0,
        "summer_net_mw": 1166.0,
        "winter_net_mw": 1163.3,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492839,
        "projectNumber": "R1003",
        "queueDate": "2020-08-05T04:00:00+00:00",
        "inService": "2026-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC.",
        "county": "Orange",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Sabine 138 & 230 kV (bus #334440, #334431, #334433",
        "summerNetMW": 1166.0,
        "winterNetMW": 1163.3,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3209,
      "normalized": {
        "queue_id": "R1007",
        "county": "Linn",
        "state": "",
        "transmission_owner": "Alliant Energy West",
        "poi": "ITC DAEC Substation 161kV",
        "queue_date": "2021-03-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492840,
        "projectNumber": "R1007",
        "queueDate": "2021-03-29T04:00:00+00:00",
        "inService": "2023-07-01T04:00:00+00:00",
        "transmissionOwner": "Alliant Energy West",
        "county": "Linn",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "ITC DAEC Substation 161kV",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3210,
      "normalized": {
        "queue_id": "R1010",
        "county": "Marathon",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2021-07-21T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492841,
        "projectNumber": "R1010",
        "queueDate": "2021-07-21T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marathon",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3211,
      "normalized": {
        "queue_id": "R1014",
        "county": "",
        "state": "",
        "transmission_owner": "Alliant Energy East",
        "poi": "Edgewater 345kV",
        "queue_date": "2022-02-04T05:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492842,
        "projectNumber": "R1014",
        "queueDate": "2022-02-04T05:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "Alliant Energy East",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Edgewater 345kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3212,
      "normalized": {
        "queue_id": "R1018",
        "county": "Allamakee",
        "state": "",
        "transmission_owner": "Alliant Energy West",
        "poi": "Lansing 161 kV substation",
        "queue_date": "2022-02-23T05:00:00+00:00",
        "withdrawn_date": "2024-03-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 280.0,
        "summer_net_mw": 280.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492843,
        "projectNumber": "R1018",
        "queueDate": "2022-02-23T05:00:00+00:00",
        "withdrawnDate": "2024-03-11T04:00:00+00:00",
        "transmissionOwner": "Alliant Energy West",
        "county": "Allamakee",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Lansing 161 kV substation",
        "summerNetMW": 280.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3213,
      "normalized": {
        "queue_id": "R1021",
        "county": "Pike",
        "state": "",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Petersburg 345kV Substation",
        "queue_date": "2022-05-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492844,
        "projectNumber": "R1021",
        "queueDate": "2022-05-31T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Pike",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "Petersburg 345kV Substation",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3214,
      "normalized": {
        "queue_id": "R1025",
        "county": "Williamson",
        "state": "",
        "transmission_owner": "Southern Illinois Power Cooperative",
        "poi": "Marion Unit 4 -Main Bus",
        "queue_date": "2022-10-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "LEGACY: Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492845,
        "projectNumber": "R1025",
        "queueDate": "2022-10-14T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "Southern Illinois Power Cooperative",
        "county": "Williamson",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Marion Unit 4 -Main Bus",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "LEGACY: Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3215,
      "normalized": {
        "queue_id": "R1029",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "Joppa 161kV Switchyard",
        "queue_date": "2022-12-12T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 37.0,
        "summer_net_mw": 37.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2024-12-01T05:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492846,
        "projectNumber": "R1029",
        "queueDate": "2022-12-12T05:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "negInService": "2024-12-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Joppa 161kV Switchyard",
        "summerNetMW": 37.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3216,
      "normalized": {
        "queue_id": "R1032",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "Wheaton Substation",
        "queue_date": "2023-01-20T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-03-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492847,
        "projectNumber": "R1032",
        "queueDate": "2023-01-20T05:00:00+00:00",
        "inService": "2025-03-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Wheaton Substation",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3217,
      "normalized": {
        "queue_id": "R1036",
        "county": "Sherburne",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Sherburne County 345kV Substation",
        "queue_date": "2022-12-28T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 710.0,
        "summer_net_mw": 710.0,
        "winter_net_mw": 710.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-05-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492848,
        "projectNumber": "R1036",
        "queueDate": "2022-12-28T05:00:00+00:00",
        "inService": "2024-05-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Sherburne",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "Sherburne County 345kV Substation",
        "summerNetMW": 710.0,
        "winterNetMW": 710.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3218,
      "normalized": {
        "queue_id": "R1034",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "ITCM Lansing",
        "queue_date": "2023-07-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492849,
        "projectNumber": "R1034",
        "queueDate": "2023-07-20T04:00:00+00:00",
        "inService": "2025-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "ITCM Lansing",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3219,
      "normalized": {
        "queue_id": "J3469",
        "county": "Marathon",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Stratford - McMillan 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492850,
        "projectNumber": "J3469",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marathon",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Stratford - McMillan 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3220,
      "normalized": {
        "queue_id": "R1028",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2022-11-22T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492851,
        "projectNumber": "R1028",
        "queueDate": "2022-11-22T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3221,
      "normalized": {
        "queue_id": "J3468",
        "county": "Day",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Ellendale - Twin Brooks 345.0kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492852,
        "projectNumber": "J3468",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Day",
        "state": "SD",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale - Twin Brooks 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3222,
      "normalized": {
        "queue_id": "J3472",
        "county": "Lapeer",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492853,
        "projectNumber": "J3472",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Lapeer",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3223,
      "normalized": {
        "queue_id": "J3478",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 35.0,
        "summer_net_mw": 35.0,
        "winter_net_mw": 35.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492854,
        "projectNumber": "J3478",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Other_",
        "summerNetMW": 35.0,
        "winterNetMW": 35.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3224,
      "normalized": {
        "queue_id": "J3479",
        "county": "Rapides",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Hineston",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-02-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492855,
        "projectNumber": "J3479",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "inService": "2027-02-28T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Rapides",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Hineston",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3225,
      "normalized": {
        "queue_id": "J3572",
        "county": "Catahoula",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "METROPOLIS - RED GUM 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-02T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492856,
        "projectNumber": "J3572",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-02T04:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Catahoula",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "METROPOLIS - RED GUM 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3226,
      "normalized": {
        "queue_id": "J3634",
        "county": "Gratiot",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "NELSON ROAD",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492857,
        "projectNumber": "J3634",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-12-31T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NELSON ROAD",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3227,
      "normalized": {
        "queue_id": "J3633",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GREENWOOD - RAPSON (BANNER) 345.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492858,
        "projectNumber": "J3633",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GREENWOOD - RAPSON (BANNER) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3228,
      "normalized": {
        "queue_id": "J3470",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492859,
        "projectNumber": "J3470",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3229,
      "normalized": {
        "queue_id": "J3481",
        "county": "Grant",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "J1577 Sub (337689)",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-02-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492860,
        "projectNumber": "J3481",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "inService": "2027-02-28T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Grant",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "J1577 Sub (337689)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3230,
      "normalized": {
        "queue_id": "J3496",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GREENWOOD - RAPSON 345.0kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-03T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 220.0,
        "dp1_nris_mw": 220.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492861,
        "projectNumber": "J3496",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "inService": "2027-12-03T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GREENWOOD - RAPSON 345.0kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 220.0,
        "dp1NrisMw": 220.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3231,
      "normalized": {
        "queue_id": "J3511",
        "county": "Arkansas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492862,
        "projectNumber": "J3511",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Arkansas",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3232,
      "normalized": {
        "queue_id": "J3278",
        "county": "Swift",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "SWENODA TAP - DUBLIN TAP - SS360 - 360WSM1 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492863,
        "projectNumber": "J3278",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Swift",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SWENODA TAP - DUBLIN TAP - SS360 - 360WSM1 115.0kV",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3233,
      "normalized": {
        "queue_id": "J3277",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-17T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492864,
        "projectNumber": "J3277",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-08-17T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3234,
      "normalized": {
        "queue_id": "J3306",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "",
        "poi": "J3064",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Transfer",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492865,
        "projectNumber": "J3306",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "J3064",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Transfer",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3235,
      "normalized": {
        "queue_id": "J3318",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Merom 345 kV Substation",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492866,
        "projectNumber": "J3318",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-25T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Merom 345 kV Substation",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3236,
      "normalized": {
        "queue_id": "J3471",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "WAGNER - BATAVIA 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492867,
        "projectNumber": "J3471",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WAGNER - BATAVIA 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3237,
      "normalized": {
        "queue_id": "J3477",
        "county": "Carroll",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492868,
        "projectNumber": "J3477",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-28T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Carroll",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3238,
      "normalized": {
        "queue_id": "J3480",
        "county": "Allegan",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "SCOTT LAKE",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 199.9,
        "summer_net_mw": 199.9,
        "winter_net_mw": 199.9,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-05-25T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 199.9,
        "dp1_nris_mw": 199.9,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492869,
        "projectNumber": "J3480",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2026-05-25T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Allegan",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SCOTT LAKE",
        "summerNetMW": 199.9,
        "winterNetMW": 199.9,
        "dp1ErisMw": 199.9,
        "dp1NrisMw": 199.9,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3239,
      "normalized": {
        "queue_id": "J3507",
        "county": "Montgomery",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Coffeen North 138kV",
        "queue_date": "2024-04-01T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 17.0,
        "summer_net_mw": 17.0,
        "winter_net_mw": 17.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492870,
        "projectNumber": "J3507",
        "queueDate": "2024-04-01T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-04-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Montgomery",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Coffeen North 138kV",
        "summerNetMW": 17.0,
        "winterNetMW": 17.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3240,
      "normalized": {
        "queue_id": "J3325",
        "county": "Cherokee",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "LITTLE SIOUX - LEMARS TAP 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492871,
        "projectNumber": "J3325",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Cherokee",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LITTLE SIOUX - LEMARS TAP 161.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3241,
      "normalized": {
        "queue_id": "J3326",
        "county": "Lyon",
        "state": "MN",
        "transmission_owner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492872,
        "projectNumber": "J3326",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "county": "Lyon",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3242,
      "normalized": {
        "queue_id": "J3367",
        "county": "Avoyelles",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Marksville - Yellow Bayou 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-01-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 88.0,
        "summer_net_mw": 88.0,
        "winter_net_mw": 88.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492873,
        "projectNumber": "J3367",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-01-10T05:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Avoyelles",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Marksville - Yellow Bayou 138.0kV",
        "summerNetMW": 88.0,
        "winterNetMW": 88.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3243,
      "normalized": {
        "queue_id": "J3385",
        "county": "Pike",
        "state": "IL",
        "transmission_owner": "PRAIRIE POWER, INC. PPI",
        "poi": "Pittsfield Trans. - Liberty 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492874,
        "projectNumber": "J3385",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "PRAIRIE POWER, INC. PPI",
        "county": "Pike",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pittsfield Trans. - Liberty 138.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3244,
      "normalized": {
        "queue_id": "J3509",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "CITY WATER LIGHT & POWER",
        "poi": "343505 Interstate",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 380.0,
        "summer_net_mw": 380.0,
        "winter_net_mw": 380.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-17T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492875,
        "projectNumber": "J3509",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-12-17T05:00:00+00:00",
        "transmissionOwner": "CITY WATER LIGHT & POWER",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "343505 Interstate",
        "summerNetMW": 380.0,
        "winterNetMW": 380.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3245,
      "normalized": {
        "queue_id": "J3573",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "GALION - OAK GROVE 115 SUB 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492876,
        "projectNumber": "J3573",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GALION - OAK GROVE 115 SUB 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3246,
      "normalized": {
        "queue_id": "S1029",
        "county": "Mclean",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Aster Substation",
        "queue_date": "2022-06-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492877,
        "projectNumber": "S1029",
        "queueDate": "2022-06-03T04:00:00+00:00",
        "inService": "2024-02-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Mclean",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Aster Substation",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3247,
      "normalized": {
        "queue_id": "S1031",
        "county": "Isabella",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Salt River Substation 138kV",
        "queue_date": "2022-08-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-07-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492878,
        "projectNumber": "S1031",
        "queueDate": "2022-08-19T04:00:00+00:00",
        "inService": "2025-07-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Isabella",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Salt River Substation 138kV",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3248,
      "normalized": {
        "queue_id": "S1035",
        "county": "Rock",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Townline Rd. - Paddock 138kV",
        "queue_date": "2022-08-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 33.0,
        "summer_net_mw": 33.0,
        "winter_net_mw": 33.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492879,
        "projectNumber": "S1035",
        "queueDate": "2022-08-15T04:00:00+00:00",
        "inService": "2023-07-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Rock",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Townline Rd. - Paddock 138kV",
        "summerNetMW": 33.0,
        "winterNetMW": 33.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3249,
      "normalized": {
        "queue_id": "J3308",
        "county": "Woodruff",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MOSES SWYD - AECC HUNTER NORTH 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492880,
        "projectNumber": "J3308",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Woodruff",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MOSES SWYD - AECC HUNTER NORTH 161.0kV",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3250,
      "normalized": {
        "queue_id": "J3328",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hoopeston West",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492881,
        "projectNumber": "J3328",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hoopeston West",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3251,
      "normalized": {
        "queue_id": "S1040",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Gibson City South (347114)",
        "queue_date": "2022-12-16T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-04-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492882,
        "projectNumber": "S1040",
        "queueDate": "2022-12-16T05:00:00+00:00",
        "inService": "2026-04-23T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Gibson City South (347114)",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3252,
      "normalized": {
        "queue_id": "S1044",
        "county": "Lake",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Green Acres 138 kV Substation (43684)",
        "queue_date": "2023-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-04-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492883,
        "projectNumber": "S1044",
        "queueDate": "2023-04-17T04:00:00+00:00",
        "inService": "2024-04-07T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Lake",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Green Acres 138 kV Substation (43684)",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3253,
      "normalized": {
        "queue_id": "J3632",
        "county": "Cleveland",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "TEXAS EASTERN P.S. G SS - FORDYCE ORIENT SS 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 85.0,
        "summer_net_mw": 85.0,
        "winter_net_mw": 85.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492884,
        "projectNumber": "J3632",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-07-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cleveland",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TEXAS EASTERN P.S. G SS - FORDYCE ORIENT SS 115.0kV",
        "summerNetMW": 85.0,
        "winterNetMW": 85.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3254,
      "normalized": {
        "queue_id": "J3309",
        "county": "Copiah",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "FRANKLIN EHV - RAY BRASWELL EHV 500.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-05-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492885,
        "projectNumber": "J3309",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-05-23T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Copiah",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FRANKLIN EHV - RAY BRASWELL EHV 500.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3255,
      "normalized": {
        "queue_id": "R1001",
        "county": "Otter Tail",
        "state": "",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Hoot Lake 115KV",
        "queue_date": "2020-05-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 49.9,
        "summer_net_mw": 49.9,
        "winter_net_mw": 49.9,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2022-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492886,
        "projectNumber": "R1001",
        "queueDate": "2020-05-15T04:00:00+00:00",
        "inService": "2022-04-15T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Otter Tail",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Hoot Lake 115KV",
        "summerNetMW": 49.9,
        "winterNetMW": 49.9,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3256,
      "normalized": {
        "queue_id": "R1004",
        "county": "De Soto Parish",
        "state": "",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Dolet Hills 345 kV (Bus #500260)",
        "queue_date": "2020-12-30T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 330.0,
        "summer_net_mw": 330.0,
        "winter_net_mw": 330.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492887,
        "projectNumber": "R1004",
        "queueDate": "2020-12-30T05:00:00+00:00",
        "inService": "2024-12-31T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "De Soto Parish",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "Dolet Hills 345 kV (Bus #500260)",
        "summerNetMW": 330.0,
        "winterNetMW": 330.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3257,
      "normalized": {
        "queue_id": "R1008",
        "county": "Adair",
        "state": "",
        "transmission_owner": "",
        "poi": "J499 Arbor Hills",
        "queue_date": "2021-04-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492888,
        "projectNumber": "R1008",
        "queueDate": "2021-04-12T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Adair",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "J499 Arbor Hills",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3258,
      "normalized": {
        "queue_id": "R1012",
        "county": "Linn County",
        "state": "",
        "transmission_owner": "Alliant Energy West",
        "poi": "Duane Arnold 161 kV",
        "queue_date": "2021-09-30T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 640.0,
        "summer_net_mw": 640.0,
        "winter_net_mw": 640.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492889,
        "projectNumber": "R1012",
        "queueDate": "2021-09-30T04:00:00+00:00",
        "inService": "2023-07-01T04:00:00+00:00",
        "transmissionOwner": "Alliant Energy West",
        "county": "Linn County",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Duane Arnold 161 kV",
        "summerNetMW": 640.0,
        "winterNetMW": 640.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3259,
      "normalized": {
        "queue_id": "R1016",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS INC.",
        "poi": "Bailey 161kV substation(338879)",
        "queue_date": "2022-02-18T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 124.4,
        "summer_net_mw": 122.0,
        "winter_net_mw": 124.4,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-05-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492890,
        "projectNumber": "R1016",
        "queueDate": "2022-02-18T05:00:00+00:00",
        "inService": "2023-05-10T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS INC.",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "Bailey 161kV substation(338879)",
        "summerNetMW": 122.0,
        "winterNetMW": 124.4,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3260,
      "normalized": {
        "queue_id": "J3312",
        "county": "Washington",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "RAPTOR",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492891,
        "projectNumber": "J3312",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-04T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Washington",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RAPTOR",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3261,
      "normalized": {
        "queue_id": "J3317",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492892,
        "projectNumber": "J3317",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3262,
      "normalized": {
        "queue_id": "J3316",
        "county": "Washington",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Okawville 138 kV",
        "queue_date": "2024-05-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492893,
        "projectNumber": "J3316",
        "queueDate": "2024-05-06T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Washington",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Okawville 138 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3263,
      "normalized": {
        "queue_id": "J3340",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Rossville 138kV on the Hoopeston to Vermilion 138kV Line",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492894,
        "projectNumber": "J3340",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rossville 138kV on the Hoopeston to Vermilion 138kV Line",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3264,
      "normalized": {
        "queue_id": "R1023",
        "county": "Jackson",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2022-09-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492895,
        "projectNumber": "R1023",
        "queueDate": "2022-09-29T04:00:00+00:00",
        "inService": "2023-11-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jackson",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3265,
      "normalized": {
        "queue_id": "R1027",
        "county": "Linn County",
        "state": "",
        "transmission_owner": "Alliant Energy West",
        "poi": "ITC DAEC Substation 161kV",
        "queue_date": "2022-11-22T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492896,
        "projectNumber": "R1027",
        "queueDate": "2022-11-22T05:00:00+00:00",
        "transmissionOwner": "Alliant Energy West",
        "county": "Linn County",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "ITC DAEC Substation 161kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3266,
      "normalized": {
        "queue_id": "R1031",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "Edwards 138 kV",
        "queue_date": "2023-03-07T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "LEGACY: Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2025-11-01T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492897,
        "projectNumber": "R1031",
        "queueDate": "2023-03-07T05:00:00+00:00",
        "inService": "2024-12-01T05:00:00+00:00",
        "negInService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Edwards 138 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "LEGACY: Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3267,
      "normalized": {
        "queue_id": "R1035",
        "county": "Massac",
        "state": "",
        "transmission_owner": "",
        "poi": "JOPPA 161 kV",
        "queue_date": "2023-04-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492898,
        "projectNumber": "R1035",
        "queueDate": "2023-04-19T04:00:00+00:00",
        "inService": "2023-03-31T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Massac",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "JOPPA 161 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3268,
      "normalized": {
        "queue_id": "J3508",
        "county": "Fulton",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Duck Creek 345kV",
        "queue_date": "2024-04-01T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 16.3,
        "summer_net_mw": 16.3,
        "winter_net_mw": 16.3,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492899,
        "projectNumber": "J3508",
        "queueDate": "2024-04-01T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-04-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fulton",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Duck Creek 345kV",
        "summerNetMW": 16.3,
        "winterNetMW": 16.3,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3269,
      "normalized": {
        "queue_id": "J3352",
        "county": "Cape Girardeau",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "LUTESVILLE",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-17T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492900,
        "projectNumber": "J3352",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2027-12-17T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Cape Girardeau",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LUTESVILLE",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3270,
      "normalized": {
        "queue_id": "J3393",
        "county": "Henderson",
        "state": "KY",
        "transmission_owner": "HENDERSON UTILITY COMM DBA HENDERSON MUNICIPAL POWER AND LIGHT",
        "poi": "HMPL Sub No.4",
        "queue_date": "2024-04-11T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492901,
        "projectNumber": "J3393",
        "queueDate": "2024-04-11T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "HENDERSON UTILITY COMM DBA HENDERSON MUNICIPAL POWER AND LIGHT",
        "county": "Henderson",
        "state": "KY",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HMPL Sub No.4",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3271,
      "normalized": {
        "queue_id": "J3392",
        "county": "Scott",
        "state": "IL",
        "transmission_owner": "PRAIRIE POWER, INC. PPI",
        "poi": "Murrayville Jct. W - Roodhouse 69.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 25.0,
        "summer_net_mw": 25.0,
        "winter_net_mw": 25.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492902,
        "projectNumber": "J3392",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "PRAIRIE POWER, INC. PPI",
        "county": "Scott",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Murrayville Jct. W - Roodhouse 69.0kV",
        "summerNetMW": 25.0,
        "winterNetMW": 25.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3272,
      "normalized": {
        "queue_id": "J3387",
        "county": "Henry",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Connersville  - New Castle 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492903,
        "projectNumber": "J3387",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Henry",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Connersville  - New Castle 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3273,
      "normalized": {
        "queue_id": "J3510",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "FISHER - CHERRY VALLEY 161.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492904,
        "projectNumber": "J3510",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FISHER - CHERRY VALLEY 161.0kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3274,
      "normalized": {
        "queue_id": "J3562",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4VERMILION - 4NCHAMPGN W 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492905,
        "projectNumber": "J3562",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4VERMILION - 4NCHAMPGN W 138.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3275,
      "normalized": {
        "queue_id": "J3635",
        "county": "Kent",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "GAINES",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492906,
        "projectNumber": "J3635",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2027-12-31T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Kent",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GAINES",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3276,
      "normalized": {
        "queue_id": "J3307",
        "county": "Callaway",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Callaway",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-08-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-11-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492907,
        "projectNumber": "J3307",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-08-05T04:00:00+00:00",
        "inService": "2027-11-02T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Callaway",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Callaway",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3277,
      "normalized": {
        "queue_id": "J3327",
        "county": "Pike",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Cato 138/69kV (facilities above 100kV)",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492908,
        "projectNumber": "J3327",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2027-05-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Pike",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cato 138/69kV (facilities above 100kV)",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3278,
      "normalized": {
        "queue_id": "J3329",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Merom (HED) -  Dresser 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492909,
        "projectNumber": "J3329",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Merom (HED) -  Dresser 345.0kV",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3279,
      "normalized": {
        "queue_id": "J3338",
        "county": "Hamilton",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7W_FRFT_E - 7NORRIS   345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 199.99,
        "summer_net_mw": 199.99,
        "winter_net_mw": 199.99,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492910,
        "projectNumber": "J3338",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-10-28T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Hamilton",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7W_FRFT_E - 7NORRIS   345.0kV",
        "summerNetMW": 199.99,
        "winterNetMW": 199.99,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3280,
      "normalized": {
        "queue_id": "J3353",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Rising",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 191.3,
        "summer_net_mw": 191.3,
        "winter_net_mw": 191.3,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 191.3,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492911,
        "projectNumber": "J3353",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Rising",
        "summerNetMW": 191.3,
        "winterNetMW": 191.3,
        "dp1ErisMw": 191.3,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3281,
      "normalized": {
        "queue_id": "J3366",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-08-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492912,
        "projectNumber": "J3366",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-08-18T04:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3282,
      "normalized": {
        "queue_id": "J3369",
        "county": "Scott",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "BLUE LAKE",
        "queue_date": "2024-03-28T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492913,
        "projectNumber": "J3369",
        "queueDate": "2024-03-28T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-15T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Scott",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BLUE LAKE",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3283,
      "normalized": {
        "queue_id": "J3390",
        "county": "Miami",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Kokomo East - Converse 69.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 37.0,
        "summer_net_mw": 37.0,
        "winter_net_mw": 37.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492914,
        "projectNumber": "J3390",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Miami",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kokomo East - Converse 69.0kV",
        "summerNetMW": 37.0,
        "winterNetMW": 37.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3284,
      "normalized": {
        "queue_id": "J3391",
        "county": "Coles",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CASEY    - 7KANSAS   345.0kV",
        "queue_date": "2024-04-10T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.3,
        "summer_net_mw": 200.3,
        "winter_net_mw": 200.3,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 200.3,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492915,
        "projectNumber": "J3391",
        "queueDate": "2024-04-10T04:00:00+00:00",
        "inService": "2027-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Coles",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "7CASEY    - 7KANSAS   345.0kV",
        "summerNetMW": 200.3,
        "winterNetMW": 200.3,
        "dp1ErisMw": 200.3,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3285,
      "normalized": {
        "queue_id": "J3826",
        "county": "Holmes",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "3Pickens",
        "queue_date": "2025-10-27T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492916,
        "projectNumber": "J3826",
        "queueDate": "2025-10-27T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Holmes",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "3Pickens",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3286,
      "normalized": {
        "queue_id": "R5066",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia",
        "queue_date": "2025-04-10T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 20.2,
        "summer_net_mw": 20.2,
        "winter_net_mw": 20.2,
        "proposed_completion_date": null,
        "generation_type": "Compressed Air Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492917,
        "projectNumber": "R5066",
        "queueDate": "2025-04-10T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Columbia",
        "summerNetMW": 20.2,
        "winterNetMW": 20.2,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Compressed Air Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3287,
      "normalized": {
        "queue_id": "J3943",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Sandford",
        "queue_date": "2025-02-21T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 337.0,
        "summer_net_mw": 337.0,
        "winter_net_mw": 337.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492918,
        "projectNumber": "J3943",
        "queueDate": "2025-02-21T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Sandford",
        "summerNetMW": 337.0,
        "winterNetMW": 337.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3288,
      "normalized": {
        "queue_id": "S1108",
        "county": "LaGrange",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "LAGRANGE",
        "queue_date": "2025-07-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492919,
        "projectNumber": "S1108",
        "queueDate": "2025-07-18T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaGrange",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "LAGRANGE",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3289,
      "normalized": {
        "queue_id": "J3913",
        "county": "Amite",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "GLOSTER - LIBERTY 115.0kV",
        "queue_date": "2024-10-25T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492920,
        "projectNumber": "J3913",
        "queueDate": "2024-10-25T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Amite",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "GLOSTER - LIBERTY 115.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3290,
      "normalized": {
        "queue_id": "J3915",
        "county": "Perry",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Purvis Bulk 161 - Hintonville 161 161.0kV",
        "queue_date": "2024-10-25T04:00:00+00:00",
        "withdrawn_date": "2025-10-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "E-NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492921,
        "projectNumber": "J3915",
        "queueDate": "2024-10-25T04:00:00+00:00",
        "withdrawnDate": "2025-10-28T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Perry",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "E-NRIS",
        "poiName": "Purvis Bulk 161 - Hintonville 161 161.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3291,
      "normalized": {
        "queue_id": "J4000",
        "county": "Scott",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7MEREDOSIA - 7TURNER 345.0kV",
        "queue_date": "2025-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 343.0,
        "summer_net_mw": 343.0,
        "winter_net_mw": 343.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 343.0,
        "dp1_nris_mw": 343.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492922,
        "projectNumber": "J4000",
        "queueDate": "2025-04-29T04:00:00+00:00",
        "inService": "2030-01-28T05:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Scott",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7MEREDOSIA - 7TURNER 345.0kV",
        "summerNetMW": 343.0,
        "winterNetMW": 343.0,
        "dp1ErisMw": 343.0,
        "dp1NrisMw": 343.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3292,
      "normalized": {
        "queue_id": "J4006",
        "county": "Ringgold",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Orient - Denny 345kV",
        "queue_date": "2025-05-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 289.8,
        "summer_net_mw": 289.8,
        "winter_net_mw": 289.8,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "ERIS",
        "dp1_eris_mw": 289.8,
        "dp1_nris_mw": 289.8,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492923,
        "projectNumber": "J4006",
        "queueDate": "2025-05-07T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Ringgold",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "ERIS",
        "poiName": "Orient - Denny 345kV",
        "summerNetMW": 289.8,
        "winterNetMW": 289.8,
        "dp1ErisMw": 289.8,
        "dp1NrisMw": 289.8,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3293,
      "normalized": {
        "queue_id": "J3967",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "MINDEN",
        "queue_date": "2025-04-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492924,
        "projectNumber": "J3967",
        "queueDate": "2025-04-01T04:00:00+00:00",
        "inService": "2029-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "MINDEN",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3294,
      "normalized": {
        "queue_id": "J3966",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GRASSMERE",
        "queue_date": "2025-04-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 318.0,
        "summer_net_mw": 318.0,
        "winter_net_mw": 318.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492925,
        "projectNumber": "J3966",
        "queueDate": "2025-04-01T04:00:00+00:00",
        "inService": "2029-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "GRASSMERE",
        "summerNetMW": 318.0,
        "winterNetMW": 318.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3295,
      "normalized": {
        "queue_id": "J3916",
        "county": "Saline",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4HARCO    - 4MUDDY    138.0kV",
        "queue_date": "2024-10-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492926,
        "projectNumber": "J3916",
        "queueDate": "2024-10-25T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Saline",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "4HARCO    - 4MUDDY    138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3296,
      "normalized": {
        "queue_id": "J4075",
        "county": "St. Landry",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Ville Platte - West Fork 230.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492927,
        "projectNumber": "J4075",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "St. Landry",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Ville Platte - West Fork 230.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3297,
      "normalized": {
        "queue_id": "J3330",
        "county": "Kenosha",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Pleasant Prairie - Arcadian 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 705.0,
        "summer_net_mw": 705.0,
        "winter_net_mw": 705.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492928,
        "projectNumber": "J3330",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-11T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Kenosha",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pleasant Prairie - Arcadian 345.0kV",
        "summerNetMW": 705.0,
        "winterNetMW": 705.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3298,
      "normalized": {
        "queue_id": "J3351",
        "county": "Putnam",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Hickok",
        "queue_date": "2024-04-04T04:00:00+00:00",
        "withdrawn_date": "2025-03-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492929,
        "projectNumber": "J3351",
        "queueDate": "2024-04-04T04:00:00+00:00",
        "withdrawnDate": "2025-03-13T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Putnam",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hickok",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3299,
      "normalized": {
        "queue_id": "J3361",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 254.0,
        "summer_net_mw": 254.0,
        "winter_net_mw": 254.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-03T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 254.0,
        "dp1_nris_mw": 254.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492930,
        "projectNumber": "J3361",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "inService": "2027-12-03T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 254.0,
        "winterNetMW": 254.0,
        "dp1ErisMw": 254.0,
        "dp1NrisMw": 254.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3300,
      "normalized": {
        "queue_id": "J3399",
        "county": "Goodhue",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Hampton - Prairie Island 345.0kV",
        "queue_date": "2024-04-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492931,
        "projectNumber": "J3399",
        "queueDate": "2024-04-09T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Goodhue",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hampton - Prairie Island 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3301,
      "normalized": {
        "queue_id": "J4004",
        "county": "Peoria",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2025-05-03T04:00:00+00:00",
        "withdrawn_date": "2026-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 392.0,
        "summer_net_mw": 392.0,
        "winter_net_mw": 392.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2032-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492932,
        "projectNumber": "J4004",
        "queueDate": "2025-05-03T04:00:00+00:00",
        "withdrawnDate": "2026-01-07T05:00:00+00:00",
        "inService": "2032-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Peoria",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 392.0,
        "winterNetMW": 392.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3302,
      "normalized": {
        "queue_id": "J4001",
        "county": "Marion",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "7MAYWOOD - 7PALMYRA  345.0kV",
        "queue_date": "2025-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 245.0,
        "dp1_nris_mw": 245.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492933,
        "projectNumber": "J4001",
        "queueDate": "2025-04-29T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Marion",
        "state": "MO",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7MAYWOOD - 7PALMYRA  345.0kV",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 245.0,
        "dp1NrisMw": 245.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3303,
      "normalized": {
        "queue_id": "J3389",
        "county": "Clay",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4KINMUNDY S - 4TANNER 138.0kV",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492934,
        "projectNumber": "J3389",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clay",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4KINMUNDY S - 4TANNER 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3304,
      "normalized": {
        "queue_id": "J3386",
        "county": "Calhoun",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492935,
        "projectNumber": "J3386",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Calhoun",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3305,
      "normalized": {
        "queue_id": "J3388",
        "county": "Calhoun",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492936,
        "projectNumber": "J3388",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Calhoun",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3306,
      "normalized": {
        "queue_id": "J3972",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "CHINA - STOWELL 230.0kV",
        "queue_date": "2025-03-26T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-03-18T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492937,
        "projectNumber": "J3972",
        "queueDate": "2025-03-26T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2029-03-18T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "CHINA - STOWELL 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3307,
      "normalized": {
        "queue_id": "J3887",
        "county": "Montcalm",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KENOWA - NELSON ROAD 345.0kV",
        "queue_date": "2025-01-10T05:00:00+00:00",
        "withdrawn_date": "2026-02-20T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492938,
        "projectNumber": "J3887",
        "queueDate": "2025-01-10T05:00:00+00:00",
        "withdrawnDate": "2026-02-20T05:00:00+00:00",
        "inService": "2030-12-31T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Montcalm",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "KENOWA - NELSON ROAD 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3308,
      "normalized": {
        "queue_id": "J4071",
        "county": "Livingston",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "COLY",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2026-01-20T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1500.0,
        "summer_net_mw": 1500.0,
        "winter_net_mw": 1500.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492939,
        "projectNumber": "J4071",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2026-01-20T05:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Livingston",
        "state": "LA",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "COLY",
        "summerNetMW": 1500.0,
        "winterNetMW": 1500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3309,
      "normalized": {
        "queue_id": "J4002",
        "county": "Edgar",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7KANSAS   - 08SUGCRK 345.0kV",
        "queue_date": "2025-04-30T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492940,
        "projectNumber": "J4002",
        "queueDate": "2025-04-30T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Edgar",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7KANSAS   - 08SUGCRK 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3310,
      "normalized": {
        "queue_id": "J4003",
        "county": "Edgar",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7KANSAS - 08SUGCRK 345.0kV",
        "queue_date": "2025-04-30T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492941,
        "projectNumber": "J4003",
        "queueDate": "2025-04-30T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Edgar",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7KANSAS - 08SUGCRK 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3311,
      "normalized": {
        "queue_id": "J4005",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Petersburg - Sullivan (AEP/PJM) 345.0kV",
        "queue_date": "2025-05-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-02-29T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492942,
        "projectNumber": "J4005",
        "queueDate": "2025-05-01T04:00:00+00:00",
        "inService": "2028-02-29T05:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Petersburg - Sullivan (AEP/PJM) 345.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3312,
      "normalized": {
        "queue_id": "R5065",
        "county": "Allamakee",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Lansing",
        "queue_date": "2025-04-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492943,
        "projectNumber": "R5065",
        "queueDate": "2025-04-09T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Allamakee",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Lansing",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3313,
      "normalized": {
        "queue_id": "J3944",
        "county": "Bureau",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4BUREAU - 4PRN_MUNI TP 138.0kV",
        "queue_date": "2025-02-20T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492944,
        "projectNumber": "J3944",
        "queueDate": "2025-02-20T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Bureau",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "4BUREAU - 4PRN_MUNI TP 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3314,
      "normalized": {
        "queue_id": "J3953",
        "county": "Faulkner",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BONO - GREENBRIER 161.0kV",
        "queue_date": "2024-11-05T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492945,
        "projectNumber": "J3953",
        "queueDate": "2024-11-05T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2028-12-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Faulkner",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BONO - GREENBRIER 161.0kV",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3315,
      "normalized": {
        "queue_id": "J3965",
        "county": "Christian",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7LATHAM - KINCAID  ; B 345.0kV",
        "queue_date": "2025-04-07T04:00:00+00:00",
        "withdrawn_date": "2025-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 401.8,
        "summer_net_mw": 401.8,
        "winter_net_mw": 401.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492946,
        "projectNumber": "J3965",
        "queueDate": "2025-04-07T04:00:00+00:00",
        "withdrawnDate": "2025-12-22T05:00:00+00:00",
        "inService": "2030-01-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Christian",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7LATHAM - KINCAID  ; B 345.0kV",
        "summerNetMW": 401.8,
        "winterNetMW": 401.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3316,
      "normalized": {
        "queue_id": "J3964",
        "county": "Brookings",
        "state": "SD",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Split Rock - White (WAPA) 345.0kV",
        "queue_date": "2025-04-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 490.0,
        "summer_net_mw": 490.0,
        "winter_net_mw": 490.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 490.0,
        "dp1_nris_mw": 490.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492947,
        "projectNumber": "J3964",
        "queueDate": "2025-04-07T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Brookings",
        "state": "SD",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Split Rock - White (WAPA) 345.0kV",
        "summerNetMW": 490.0,
        "winterNetMW": 490.0,
        "dp1ErisMw": 490.0,
        "dp1NrisMw": 490.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3317,
      "normalized": {
        "queue_id": "J3914",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "COMPTON CO",
        "queue_date": "2024-10-25T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 85.0,
        "summer_net_mw": 85.0,
        "winter_net_mw": 85.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492948,
        "projectNumber": "J3914",
        "queueDate": "2024-10-25T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "COMPTON CO",
        "summerNetMW": 85.0,
        "winterNetMW": 85.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3318,
      "normalized": {
        "queue_id": "J4070",
        "county": "Emmons",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "Linton NW",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492949,
        "projectNumber": "J4070",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-06-28T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "Emmons",
        "state": "ND",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Linton NW",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3319,
      "normalized": {
        "queue_id": "S1128",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "CITY WATER LIGHT & POWER",
        "poi": "343515 Chatham Main - 346555 North Aurburn (Ameren) 138.0kV",
        "queue_date": "2025-11-20T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492950,
        "projectNumber": "S1128",
        "queueDate": "2025-11-20T05:00:00+00:00",
        "inService": "2030-05-10T04:00:00+00:00",
        "transmissionOwner": "CITY WATER LIGHT & POWER",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "343515 Chatham Main - 346555 North Aurburn (Ameren) 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3320,
      "normalized": {
        "queue_id": "S1123",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cole - Penton Road 230.0kV",
        "queue_date": "2025-10-21T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-03-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492951,
        "projectNumber": "S1123",
        "queueDate": "2025-10-21T04:00:00+00:00",
        "inService": "2027-03-29T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Cole - Penton Road 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3321,
      "normalized": {
        "queue_id": "S1163",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "MORRISON DITCH",
        "queue_date": "2026-02-16T19:38:17+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492952,
        "projectNumber": "S1163",
        "queueDate": "2026-02-16T19:38:17+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "MORRISON DITCH",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3322,
      "normalized": {
        "queue_id": "J4171",
        "county": "Racine",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "138 kV Jupiter Substation (#50167)",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492953,
        "projectNumber": "J4171",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2029-04-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Racine",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "138 kV Jupiter Substation (#50167)",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3323,
      "normalized": {
        "queue_id": "J4195",
        "county": "Clinton",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GREENWOOD - RAPSON 345.0kV",
        "queue_date": "2025-10-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492954,
        "projectNumber": "J4195",
        "queueDate": "2025-10-09T04:00:00+00:00",
        "inService": "2030-04-02T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Clinton",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "GREENWOOD - RAPSON 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3324,
      "normalized": {
        "queue_id": "S1127",
        "county": "Washington",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "GERALD ANDRUS SES SWYD - TINNIN ROAD 230.0kV",
        "queue_date": "2025-11-10T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": "2030-06-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492955,
        "projectNumber": "S1127",
        "queueDate": "2025-11-10T05:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "negInService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Washington",
        "state": "MS",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "GERALD ANDRUS SES SWYD - TINNIN ROAD 230.0kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3325,
      "normalized": {
        "queue_id": "S1129",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Arnott - Golden Sands 138.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.31,
        "summer_net_mw": 50.31,
        "winter_net_mw": 50.31,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-03-21T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492956,
        "projectNumber": "S1129",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2026-03-21T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Arnott - Golden Sands 138.0kV",
        "summerNetMW": 50.31,
        "winterNetMW": 50.31,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3326,
      "normalized": {
        "queue_id": "J4189",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "ROUNDAWAY SS (CE) - CLARKSDALE 115.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2026-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492957,
        "projectNumber": "J4189",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2026-04-16T04:00:00+00:00",
        "inService": "2030-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ROUNDAWAY SS (CE) - CLARKSDALE 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3327,
      "normalized": {
        "queue_id": "J3993",
        "county": "Wayne",
        "state": "IL",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Geff",
        "queue_date": "2025-04-29T04:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 21.44,
        "summer_net_mw": 21.44,
        "winter_net_mw": 21.44,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492958,
        "projectNumber": "J3993",
        "queueDate": "2025-04-29T04:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2027-02-01T05:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Wayne",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Geff",
        "summerNetMW": 21.44,
        "winterNetMW": 21.44,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3328,
      "normalized": {
        "queue_id": "S1088",
        "county": "Benton",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "GRE-BENTON 7 115kV",
        "queue_date": "2025-03-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492959,
        "projectNumber": "S1088",
        "queueDate": "2025-03-17T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Benton",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "GRE-BENTON 7 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3329,
      "normalized": {
        "queue_id": "J4029",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Hybar 230kV",
        "queue_date": "2025-06-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 85.0,
        "summer_net_mw": 85.0,
        "winter_net_mw": 85.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 85.0,
        "dp1_nris_mw": 85.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492960,
        "projectNumber": "J4029",
        "queueDate": "2025-06-03T04:00:00+00:00",
        "inService": "2025-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Hybar 230kV",
        "summerNetMW": 85.0,
        "winterNetMW": 85.0,
        "dp1ErisMw": 85.0,
        "dp1NrisMw": 85.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3330,
      "normalized": {
        "queue_id": "J3999",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Sugar Creek - Cayuga CT  345.0kV",
        "queue_date": "2025-04-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1540.0,
        "summer_net_mw": 1540.0,
        "winter_net_mw": 1540.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 1540.0,
        "dp1_nris_mw": 1540.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492961,
        "projectNumber": "J3999",
        "queueDate": "2025-04-14T04:00:00+00:00",
        "inService": "2030-01-02T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Sugar Creek - Cayuga CT  345.0kV",
        "summerNetMW": 1540.0,
        "winterNetMW": 1540.0,
        "dp1ErisMw": 1540.0,
        "dp1NrisMw": 1540.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3331,
      "normalized": {
        "queue_id": "S1114",
        "county": "Scott",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Alsey Generation Station",
        "queue_date": "2025-08-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 168.8,
        "summer_net_mw": 168.8,
        "winter_net_mw": 168.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492962,
        "projectNumber": "S1114",
        "queueDate": "2025-08-19T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Scott",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Alsey Generation Station",
        "summerNetMW": 168.8,
        "winterNetMW": 168.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3332,
      "normalized": {
        "queue_id": "J4084",
        "county": "Jefferson",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC.",
        "poi": "Rhodair",
        "queue_date": "2025-06-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Waste Heat Recovery",
        "facility_type": "Co-gen",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "0MW GIA",
        "study_group": "NA",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492963,
        "projectNumber": "J4084",
        "queueDate": "2025-06-19T04:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC.",
        "county": "Jefferson",
        "state": "TX",
        "studyCycle": "0MW GIA",
        "studyGroup": "NA",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "Rhodair",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Waste Heat Recovery",
        "facilityType": "Co-gen",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3333,
      "normalized": {
        "queue_id": "J4007",
        "county": "Peoria",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7FARGO - 7SANDBURG 345.0kV",
        "queue_date": "2025-05-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492964,
        "projectNumber": "J4007",
        "queueDate": "2025-05-15T04:00:00+00:00",
        "inService": "2027-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Peoria",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7FARGO - 7SANDBURG 345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3334,
      "normalized": {
        "queue_id": "J4008",
        "county": "Henry",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greensboro  -  New Castle 138 138.0kV",
        "queue_date": "2025-05-02T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492965,
        "projectNumber": "J4008",
        "queueDate": "2025-05-02T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2027-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Henry",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Greensboro  -  New Castle 138 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3335,
      "normalized": {
        "queue_id": "S1084",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Worthington",
        "queue_date": "2025-01-13T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": "2029-09-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492966,
        "projectNumber": "S1084",
        "queueDate": "2025-01-13T05:00:00+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "negInService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Worthington",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3336,
      "normalized": {
        "queue_id": "J4058",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "WYATT",
        "queue_date": "2025-08-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492967,
        "projectNumber": "J4058",
        "queueDate": "2025-08-22T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "WYATT",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3337,
      "normalized": {
        "queue_id": "J4090",
        "county": "Schuyler",
        "state": "MO",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Other_",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2026-03-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492968,
        "projectNumber": "J4090",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2026-03-17T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Schuyler",
        "state": "MO",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3338,
      "normalized": {
        "queue_id": "J4091",
        "county": "Otter Tail",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "ALEXANDRIA - BISON 345.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 295.0,
        "summer_net_mw": 295.0,
        "winter_net_mw": 295.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492969,
        "projectNumber": "J4091",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Otter Tail",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ALEXANDRIA - BISON 345.0kV",
        "summerNetMW": 295.0,
        "winterNetMW": 295.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3339,
      "normalized": {
        "queue_id": "J4092",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Deridder - Longville 138.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492970,
        "projectNumber": "J4092",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-01-01T05:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Deridder - Longville 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3340,
      "normalized": {
        "queue_id": "J4147",
        "county": "Clay",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "ALEXANDRIA - BISON 345.0kV",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "ERIS",
        "dp1_eris_mw": 245.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492971,
        "projectNumber": "J4147",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Clay",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "ERIS",
        "poiName": "ALEXANDRIA - BISON 345.0kV",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 245.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3341,
      "normalized": {
        "queue_id": "J4197",
        "county": "Drew",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "MONTICELLO EAST - REED SS 115.0kV",
        "queue_date": "2025-09-05T04:00:00+00:00",
        "withdrawn_date": "2026-02-26T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492972,
        "projectNumber": "J4197",
        "queueDate": "2025-09-05T04:00:00+00:00",
        "withdrawnDate": "2026-02-26T05:00:00+00:00",
        "inService": "2030-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Drew",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "MONTICELLO EAST - REED SS 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3342,
      "normalized": {
        "queue_id": "J4191",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEBRE",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 805.0,
        "summer_net_mw": 755.0,
        "winter_net_mw": 805.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492973,
        "projectNumber": "J4191",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-01-02T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "WEBRE",
        "summerNetMW": 755.0,
        "winterNetMW": 805.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3343,
      "normalized": {
        "queue_id": "S1098",
        "county": "Itasca",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Boswell 230kV",
        "queue_date": "2025-05-30T04:00:00+00:00",
        "withdrawn_date": "2025-12-18T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 85.01,
        "summer_net_mw": 85.01,
        "winter_net_mw": 85.01,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492974,
        "projectNumber": "S1098",
        "queueDate": "2025-05-30T04:00:00+00:00",
        "withdrawnDate": "2025-12-18T05:00:00+00:00",
        "inService": "2027-01-01T05:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Itasca",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Boswell 230kV",
        "summerNetMW": 85.01,
        "winterNetMW": 85.01,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3344,
      "normalized": {
        "queue_id": "J3830",
        "county": "",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 225.0,
        "dp1_nris_mw": 225.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492975,
        "projectNumber": "J3830",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 225.0,
        "dp1NrisMw": 225.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3345,
      "normalized": {
        "queue_id": "J3998",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Killdeer - Quinn 345kV",
        "queue_date": "2025-02-25T05:00:00+00:00",
        "withdrawn_date": "2025-11-14T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 450.0,
        "summer_net_mw": 450.0,
        "winter_net_mw": 450.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492976,
        "projectNumber": "J3998",
        "queueDate": "2025-02-25T05:00:00+00:00",
        "withdrawnDate": "2025-11-14T05:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Killdeer - Quinn 345kV",
        "summerNetMW": 450.0,
        "winterNetMW": 450.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3346,
      "normalized": {
        "queue_id": "S1090",
        "county": "Kenosha",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "EAST PARIS",
        "queue_date": "2025-01-31T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 133.0,
        "summer_net_mw": 133.0,
        "winter_net_mw": 133.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-09-24T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492977,
        "projectNumber": "S1090",
        "queueDate": "2025-01-31T05:00:00+00:00",
        "inService": "2026-09-24T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Kenosha",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "EAST PARIS",
        "summerNetMW": 133.0,
        "winterNetMW": 133.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3347,
      "normalized": {
        "queue_id": "J4060",
        "county": "McLeod",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Blue Lake - MCLEOD (GRE) 230.0kV",
        "queue_date": "2025-08-20T04:00:00+00:00",
        "withdrawn_date": "2026-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 129.0,
        "summer_net_mw": 129.0,
        "winter_net_mw": 129.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492978,
        "projectNumber": "J4060",
        "queueDate": "2025-08-20T04:00:00+00:00",
        "withdrawnDate": "2026-01-02T05:00:00+00:00",
        "inService": "2030-12-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "McLeod",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Blue Lake - MCLEOD (GRE) 230.0kV",
        "summerNetMW": 129.0,
        "winterNetMW": 129.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3348,
      "normalized": {
        "queue_id": "J4059",
        "county": "McLeod",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Blue Lake - MCLEOD (GRE) 230.0kV",
        "queue_date": "2025-08-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 129.0,
        "summer_net_mw": 129.0,
        "winter_net_mw": 129.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 129.0,
        "dp1_nris_mw": 129.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492979,
        "projectNumber": "J4059",
        "queueDate": "2025-08-20T04:00:00+00:00",
        "inService": "2030-12-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "McLeod",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Blue Lake - MCLEOD (GRE) 230.0kV",
        "summerNetMW": 129.0,
        "winterNetMW": 129.0,
        "dp1ErisMw": 129.0,
        "dp1NrisMw": 129.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3349,
      "normalized": {
        "queue_id": "S1078",
        "county": "Rock",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Magnolia",
        "queue_date": "2025-02-18T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 72.0,
        "summer_net_mw": 72.0,
        "winter_net_mw": 72.0,
        "proposed_completion_date": "2028-02-28T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492980,
        "projectNumber": "S1078",
        "queueDate": "2025-02-18T05:00:00+00:00",
        "inService": "2027-06-15T04:00:00+00:00",
        "negInService": "2028-02-28T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Rock",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Magnolia",
        "summerNetMW": 72.0,
        "winterNetMW": 72.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3350,
      "normalized": {
        "queue_id": "S1110",
        "county": "Chisago",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "CHISAGO COUNTY",
        "queue_date": "2025-08-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2027-01-31T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492981,
        "projectNumber": "S1110",
        "queueDate": "2025-08-22T04:00:00+00:00",
        "inService": "2027-02-01T05:00:00+00:00",
        "negInService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chisago",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "CHISAGO COUNTY",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3351,
      "normalized": {
        "queue_id": "J4088",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Wheatley 500 kV Switching Station (being built by J1710 & J1820)",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 340.0,
        "summer_net_mw": 340.0,
        "winter_net_mw": 340.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 340.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492982,
        "projectNumber": "J4088",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Wheatley 500 kV Switching Station (being built by J1710 & J1820)",
        "summerNetMW": 340.0,
        "winterNetMW": 340.0,
        "dp1ErisMw": 340.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3352,
      "normalized": {
        "queue_id": "J4115",
        "county": "Fond du Lac",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "South Fond du Lac - Fitzgerald 345.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 525.0,
        "summer_net_mw": 525.0,
        "winter_net_mw": 525.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 525.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492983,
        "projectNumber": "J4115",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Fond du Lac",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "South Fond du Lac - Fitzgerald 345.0kV",
        "summerNetMW": 525.0,
        "winterNetMW": 525.0,
        "dp1ErisMw": 525.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3353,
      "normalized": {
        "queue_id": "J4199",
        "county": "Fulton",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Canton South",
        "queue_date": "2025-09-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492984,
        "projectNumber": "J4199",
        "queueDate": "2025-09-29T04:00:00+00:00",
        "inService": "2029-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fulton",
        "state": "IL",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Canton South",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3354,
      "normalized": {
        "queue_id": "J4089",
        "county": "Freeborn",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Hayward",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2026-06-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492985,
        "projectNumber": "J4089",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2026-06-11T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Freeborn",
        "state": "MN",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Hayward",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3355,
      "normalized": {
        "queue_id": "J4161",
        "county": "Watonwan",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lakefield Generation SW - LAKEFIELD JCT 345.0kV",
        "queue_date": "2025-09-26T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1000.0,
        "summer_net_mw": 1000.0,
        "winter_net_mw": 1000.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492986,
        "projectNumber": "J4161",
        "queueDate": "2025-09-26T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Watonwan",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Lakefield Generation SW - LAKEFIELD JCT 345.0kV",
        "summerNetMW": 1000.0,
        "winterNetMW": 1000.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3356,
      "normalized": {
        "queue_id": "J4204",
        "county": "Marion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "South Belleville",
        "queue_date": "2025-12-03T19:39:47+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492987,
        "projectNumber": "J4204",
        "queueDate": "2025-12-03T19:39:47+00:00",
        "inService": "2031-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Marion",
        "state": "IL",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "South Belleville",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3357,
      "normalized": {
        "queue_id": "J4162",
        "county": "Stearns",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Quarry - Alexandria 345.0kV",
        "queue_date": "2025-09-29T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492988,
        "projectNumber": "J4162",
        "queueDate": "2025-09-29T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2028-04-03T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Stearns",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Quarry - Alexandria 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3358,
      "normalized": {
        "queue_id": "S1126",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport Station IGCC",
        "queue_date": "2025-10-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492989,
        "projectNumber": "S1126",
        "queueDate": "2025-10-23T04:00:00+00:00",
        "inService": "2029-05-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Edwardsport Station IGCC",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3359,
      "normalized": {
        "queue_id": "J4190",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "WILLOW GLEN 230 SWYD",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 707.0,
        "summer_net_mw": 707.0,
        "winter_net_mw": 707.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-14T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492990,
        "projectNumber": "J4190",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-06-14T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "WILLOW GLEN 230 SWYD",
        "summerNetMW": 707.0,
        "winterNetMW": 707.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3360,
      "normalized": {
        "queue_id": "J4173",
        "county": "Wapello",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ottumwa Generating St. 161 kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 199.0,
        "summer_net_mw": 199.0,
        "winter_net_mw": 199.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492991,
        "projectNumber": "J4173",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Wapello",
        "state": "IA",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Ottumwa Generating St. 161 kV",
        "summerNetMW": 199.0,
        "winterNetMW": 199.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3361,
      "normalized": {
        "queue_id": "J4201",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Cole",
        "queue_date": "2025-09-30T04:00:00+00:00",
        "withdrawn_date": "2026-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-08-24T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492992,
        "projectNumber": "J4201",
        "queueDate": "2025-09-30T04:00:00+00:00",
        "withdrawnDate": "2026-04-16T04:00:00+00:00",
        "inService": "2029-08-24T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Cole",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3362,
      "normalized": {
        "queue_id": "S1112",
        "county": "Pike",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Cato 138/69kV (facilities above 100kV)",
        "queue_date": "2025-08-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": "2027-04-01T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492993,
        "projectNumber": "S1112",
        "queueDate": "2025-08-11T04:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "negInService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Pike",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Cato 138/69kV (facilities above 100kV)",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3363,
      "normalized": {
        "queue_id": "J4116",
        "county": "Walworth",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sugar Creek 345 kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 950.0,
        "summer_net_mw": 950.0,
        "winter_net_mw": 950.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 950.0,
        "dp1_nris_mw": 950.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492994,
        "projectNumber": "J4116",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-12-31T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Walworth",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Sugar Creek 345 kV",
        "summerNetMW": 950.0,
        "winterNetMW": 950.0,
        "dp1ErisMw": 950.0,
        "dp1NrisMw": 950.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3364,
      "normalized": {
        "queue_id": "J4174",
        "county": "Poinsett",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "MARKED TREE",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492995,
        "projectNumber": "J4174",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Poinsett",
        "state": "AR",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "MARKED TREE",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3365,
      "normalized": {
        "queue_id": "J3903",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "North Austin - Adams (ITC) 161.0kV",
        "queue_date": "2025-02-19T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-03-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "ERIS",
        "dp1_eris_mw": 185.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492996,
        "projectNumber": "J3903",
        "queueDate": "2025-02-19T05:00:00+00:00",
        "inService": "2029-03-30T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "ERIS",
        "poiName": "North Austin - Adams (ITC) 161.0kV",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 185.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3366,
      "normalized": {
        "queue_id": "J3874",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "White Bluff EHV",
        "queue_date": "2024-12-19T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 770.0,
        "summer_net_mw": 770.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "ERIS",
        "dp1_eris_mw": 770.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492997,
        "projectNumber": "J3874",
        "queueDate": "2024-12-19T05:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "ERIS",
        "poiName": "White Bluff EHV",
        "summerNetMW": 770.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 770.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3367,
      "normalized": {
        "queue_id": "S1131",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7JORD - 7CMDR 345.0kV",
        "queue_date": "2025-11-11T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492998,
        "projectNumber": "S1131",
        "queueDate": "2025-11-11T05:00:00+00:00",
        "inService": "2027-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "7JORD - 7CMDR 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3368,
      "normalized": {
        "queue_id": "J3872",
        "county": "Wayne",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "RIVER ROUGE",
        "queue_date": "2025-01-27T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-01-05T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 350.0,
        "dp1_nris_mw": 350.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3492999,
        "projectNumber": "J3872",
        "queueDate": "2025-01-27T05:00:00+00:00",
        "inService": "2029-01-05T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Wayne",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "RIVER ROUGE",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 350.0,
        "dp1NrisMw": 350.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3369,
      "normalized": {
        "queue_id": "J3936",
        "county": "Kenosha",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "PARIS 345kV Substation",
        "queue_date": "2025-02-12T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 133.0,
        "summer_net_mw": 133.0,
        "winter_net_mw": 133.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 133.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493000,
        "projectNumber": "J3936",
        "queueDate": "2025-02-12T05:00:00+00:00",
        "inService": "2027-01-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Kenosha",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "PARIS 345kV Substation",
        "summerNetMW": 133.0,
        "winterNetMW": 133.0,
        "dp1ErisMw": 133.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3370,
      "normalized": {
        "queue_id": "R5085",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2025-12-29T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493001,
        "projectNumber": "R5085",
        "queueDate": "2025-12-29T05:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3371,
      "normalized": {
        "queue_id": "J4211",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2025-11-15T02:56:26+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "0MW GIA",
        "study_group": "NA",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493002,
        "projectNumber": "J4211",
        "queueDate": "2025-11-15T02:56:26+00:00",
        "inService": "2027-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "0MW GIA",
        "studyGroup": "NA",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3372,
      "normalized": {
        "queue_id": "R5073",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "",
        "queue_date": "2025-12-17T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493003,
        "projectNumber": "R5073",
        "queueDate": "2025-12-17T05:00:00+00:00",
        "inService": "2027-04-28T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3373,
      "normalized": {
        "queue_id": "R5074",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "",
        "queue_date": "2025-12-18T02:41:58+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2028-04-30T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493004,
        "projectNumber": "R5074",
        "queueDate": "2025-12-18T02:41:58+00:00",
        "inService": "2025-08-01T04:00:00+00:00",
        "negInService": "2028-04-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3374,
      "normalized": {
        "queue_id": "J4170",
        "county": "Richland",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Hankinson - Wahpeton 230.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 172.0,
        "summer_net_mw": 172.0,
        "winter_net_mw": 172.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493005,
        "projectNumber": "J4170",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2029-08-31T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Richland",
        "state": "ND",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Hankinson - Wahpeton 230.0kV",
        "summerNetMW": 172.0,
        "winterNetMW": 172.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3375,
      "normalized": {
        "queue_id": "J2204",
        "county": "St. Clair",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "DUPO FERRY",
        "queue_date": "2021-10-29T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493006,
        "projectNumber": "J2204",
        "queueDate": "2021-10-29T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "St. Clair",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DUPO FERRY",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3376,
      "normalized": {
        "queue_id": "J1950",
        "county": "Gibson",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Francisco - Toyota 138kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 83.16,
        "summer_net_mw": 83.16,
        "winter_net_mw": 83.16,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493007,
        "projectNumber": "J1950",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Gibson",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Francisco - Toyota 138kV",
        "summerNetMW": 83.16,
        "winterNetMW": 83.16,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3377,
      "normalized": {
        "queue_id": "J3736",
        "county": "Osage",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "LOOSE CREEK",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-03T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493008,
        "projectNumber": "J3736",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2027-12-03T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Osage",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LOOSE CREEK",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3378,
      "normalized": {
        "queue_id": "J1977",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Trenton 120kV",
        "queue_date": "2021-08-17T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493009,
        "projectNumber": "J1977",
        "queueDate": "2021-08-17T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Trenton 120kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3379,
      "normalized": {
        "queue_id": "J3716",
        "county": "Holmes",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 199.0,
        "summer_net_mw": 199.0,
        "winter_net_mw": 199.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493010,
        "projectNumber": "J3716",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-07-03T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Holmes",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV",
        "summerNetMW": 199.0,
        "winterNetMW": 199.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3380,
      "normalized": {
        "queue_id": "S1149",
        "county": "",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-02-09T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493011,
        "projectNumber": "S1149",
        "queueDate": "2026-02-09T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "IL",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3381,
      "normalized": {
        "queue_id": "J2037",
        "county": "Olmsted",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Byron 345 kV Substation",
        "queue_date": "2021-07-20T04:00:00+00:00",
        "withdrawn_date": "2021-11-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493012,
        "projectNumber": "J2037",
        "queueDate": "2021-07-20T04:00:00+00:00",
        "withdrawnDate": "2021-11-23T05:00:00+00:00",
        "inService": "2024-10-31T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Olmsted",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Byron 345 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3382,
      "normalized": {
        "queue_id": "J3597",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 348.0,
        "summer_net_mw": 348.0,
        "winter_net_mw": 348.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 348.0,
        "dp1_nris_mw": 226.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493013,
        "projectNumber": "J3597",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "summerNetMW": 348.0,
        "winterNetMW": 348.0,
        "dp1ErisMw": 348.0,
        "dp1NrisMw": 226.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3383,
      "normalized": {
        "queue_id": "J3594",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "ELTON - COMPTON TAP 69.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2024-09-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493014,
        "projectNumber": "J3594",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2024-09-10T04:00:00+00:00",
        "inService": "2026-12-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ELTON - COMPTON TAP 69.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3384,
      "normalized": {
        "queue_id": "J1981",
        "county": "Gibson",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "Francisco - Toyota 138kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 15.0,
        "summer_net_mw": 15.0,
        "winter_net_mw": 15.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493015,
        "projectNumber": "J1981",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Gibson",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Francisco - Toyota 138kV",
        "summerNetMW": 15.0,
        "winterNetMW": 15.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3385,
      "normalized": {
        "queue_id": "J2285",
        "county": "Polk",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Praire - Winger",
        "queue_date": "2021-07-14T04:00:00+00:00",
        "withdrawn_date": "2021-09-10T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493016,
        "projectNumber": "J2285",
        "queueDate": "2021-07-14T04:00:00+00:00",
        "withdrawnDate": "2021-09-10T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Polk",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Praire - Winger",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3386,
      "normalized": {
        "queue_id": "J3596",
        "county": "Harris",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "BEVIL - CYPRESS 230.0kV",
        "queue_date": "2024-04-19T04:00:00+00:00",
        "withdrawn_date": "2025-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 460.0,
        "summer_net_mw": 460.0,
        "winter_net_mw": 460.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-07-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493017,
        "projectNumber": "J3596",
        "queueDate": "2024-04-19T04:00:00+00:00",
        "withdrawnDate": "2025-04-17T04:00:00+00:00",
        "inService": "2029-07-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Harris",
        "state": "TX",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BEVIL - CYPRESS 230.0kV",
        "summerNetMW": 460.0,
        "winterNetMW": 460.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3387,
      "normalized": {
        "queue_id": "J3641",
        "county": "Dickinson",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Amberg - Plains 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493018,
        "projectNumber": "J3641",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-10-16T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dickinson",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Amberg - Plains 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3388,
      "normalized": {
        "queue_id": "J3737",
        "county": "Mills",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "HASTINGS",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-10-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493019,
        "projectNumber": "J3737",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-10-24T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Mills",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HASTINGS",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3389,
      "normalized": {
        "queue_id": "J3637",
        "county": "Otsego",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "LIVINGSTON - TITTABAWASSEE 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493020,
        "projectNumber": "J3637",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Otsego",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LIVINGSTON - TITTABAWASSEE 345.0kV",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3390,
      "normalized": {
        "queue_id": "J3640",
        "county": "Shiawassee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "NELSON ROAD - STYX 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493021,
        "projectNumber": "J3640",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NELSON ROAD - STYX 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3391,
      "normalized": {
        "queue_id": "J3642",
        "county": "Dickinson",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Nordic",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493022,
        "projectNumber": "J3642",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-10-16T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dickinson",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Nordic",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3392,
      "normalized": {
        "queue_id": "J3666",
        "county": "Morgan",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Petersburg - Thompson 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 263.7,
        "summer_net_mw": 263.7,
        "winter_net_mw": 263.7,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 263.7,
        "dp1_nris_mw": 263.7,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493023,
        "projectNumber": "J3666",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Morgan",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Petersburg - Thompson 345.0kV",
        "summerNetMW": 263.7,
        "winterNetMW": 263.7,
        "dp1ErisMw": 263.7,
        "dp1NrisMw": 263.7,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3393,
      "normalized": {
        "queue_id": "J3667",
        "county": "Dickey",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493024,
        "projectNumber": "J3667",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-04-17T04:00:00+00:00",
        "inService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Dickey",
        "state": "ND",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3394,
      "normalized": {
        "queue_id": "J3717",
        "county": "Yalobusha",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "ENID - TILLATOBA 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 199.0,
        "summer_net_mw": 199.0,
        "winter_net_mw": 199.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493025,
        "projectNumber": "J3717",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-07-03T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Yalobusha",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ENID - TILLATOBA 230.0kV",
        "summerNetMW": 199.0,
        "winterNetMW": 199.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3395,
      "normalized": {
        "queue_id": "J3738",
        "county": "Vermilion",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Gueydan Entergy Power Station 69kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-04-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 65.0,
        "summer_net_mw": 65.0,
        "winter_net_mw": 65.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-12-09T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493026,
        "projectNumber": "J3738",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-04-22T04:00:00+00:00",
        "inService": "2026-12-09T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Vermilion",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gueydan Entergy Power Station 69kV",
        "summerNetMW": 65.0,
        "winterNetMW": 65.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3396,
      "normalized": {
        "queue_id": "J3664",
        "county": "LaGrange",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Other_",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493027,
        "projectNumber": "J3664",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-12-30T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaGrange",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3397,
      "normalized": {
        "queue_id": "J3665",
        "county": "Redwood",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Redwood Falls Tap - Redwood Falls West 115.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493028,
        "projectNumber": "J3665",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-12-30T05:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Redwood",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Redwood Falls Tap - Redwood Falls West 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3398,
      "normalized": {
        "queue_id": "J2110",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Gilmore 161kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-09-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493029,
        "projectNumber": "J2110",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2025-09-16T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "Gilmore 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3399,
      "normalized": {
        "queue_id": "J3730",
        "county": "Macoupin",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "MORO 345 kV Substation",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 305.0,
        "summer_net_mw": 305.0,
        "winter_net_mw": 305.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 305.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493030,
        "projectNumber": "J3730",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macoupin",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "MORO 345 kV Substation",
        "summerNetMW": 305.0,
        "winterNetMW": 305.0,
        "dp1ErisMw": 305.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3400,
      "normalized": {
        "queue_id": "J3688",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Luse Road Substation",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493031,
        "projectNumber": "J3688",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Luse Road Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3401,
      "normalized": {
        "queue_id": "J3687",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4OTEGO - 4KINMUNDY 138.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 113.0,
        "summer_net_mw": 113.0,
        "winter_net_mw": 113.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-07-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 113.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493032,
        "projectNumber": "J3687",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2027-07-23T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4OTEGO - 4KINMUNDY 138.0kV",
        "summerNetMW": 113.0,
        "winterNetMW": 113.0,
        "dp1ErisMw": 113.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3402,
      "normalized": {
        "queue_id": "J3595",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 230.0,
        "summer_net_mw": 230.0,
        "winter_net_mw": 230.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493033,
        "projectNumber": "J3595",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "summerNetMW": 230.0,
        "winterNetMW": 230.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3403,
      "normalized": {
        "queue_id": "J3639",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia - Rockdale 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493034,
        "projectNumber": "J3639",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Columbia - Rockdale 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3404,
      "normalized": {
        "queue_id": "J3638",
        "county": "Dickinson",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Amberg - Plains 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493035,
        "projectNumber": "J3638",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-10-16T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dickinson",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Amberg - Plains 138.0kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3405,
      "normalized": {
        "queue_id": "J3636",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "BAUER",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493036,
        "projectNumber": "J3636",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BAUER",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3406,
      "normalized": {
        "queue_id": "J3685",
        "county": "Pike",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4HULL     - 4MEPPEN T 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493037,
        "projectNumber": "J3685",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Pike",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4HULL     - 4MEPPEN T 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3407,
      "normalized": {
        "queue_id": "J3686",
        "county": "Christian",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4AUSTIN - 4TAYLORVL 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 190.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493038,
        "projectNumber": "J3686",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Christian",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4AUSTIN - 4TAYLORVL 138.0kV",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 190.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3408,
      "normalized": {
        "queue_id": "J1928",
        "county": "Grant",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Hill Valley 345kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493039,
        "projectNumber": "J1928",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Grant",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Hill Valley 345kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3409,
      "normalized": {
        "queue_id": "J2111",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Marion to Marked Tree 161kV",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-09-16T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493040,
        "projectNumber": "J2111",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2025-09-16T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "ERIS",
        "poiName": "Marion to Marked Tree 161kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3410,
      "normalized": {
        "queue_id": "J1941",
        "county": "Polk",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Crookston",
        "queue_date": "2021-08-25T04:00:00+00:00",
        "withdrawn_date": "2021-10-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493041,
        "projectNumber": "J1941",
        "queueDate": "2021-08-25T04:00:00+00:00",
        "withdrawnDate": "2021-10-22T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Polk",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Crookston",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3411,
      "normalized": {
        "queue_id": "J3788",
        "county": "Grant",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC GRAPEVINE - CARTHAGE (AR) 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493042,
        "projectNumber": "J3788",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Grant",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC GRAPEVINE - CARTHAGE (AR) 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3412,
      "normalized": {
        "queue_id": "S1104",
        "county": "Fayette",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ramsey",
        "queue_date": "2025-07-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493043,
        "projectNumber": "S1104",
        "queueDate": "2025-07-28T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Fayette",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Ramsey",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3413,
      "normalized": {
        "queue_id": "J3791",
        "county": "Houston",
        "state": "MN",
        "transmission_owner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "poi": "Caledonia",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493044,
        "projectNumber": "J3791",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-16T04:00:00+00:00",
        "inService": "2028-05-07T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN MINNESOTA MUNICIPAL POWER AGENCY",
        "county": "Houston",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Caledonia",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3414,
      "normalized": {
        "queue_id": "S1182",
        "county": "Isabella",
        "state": "",
        "transmission_owner": "METC",
        "poi": "Salt River 138 kV",
        "queue_date": "2026-03-17T00:11:30+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-02-19T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493045,
        "projectNumber": "S1182",
        "queueDate": "2026-03-17T00:11:30+00:00",
        "inService": "2027-02-19T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Isabella",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Salt River 138 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3415,
      "normalized": {
        "queue_id": "J3739",
        "county": "Warren",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "138kV Line Tap Between Galesburg Monmouth Boulevard (BUS 348956) and Castro JCT (BUS 348917). Distan",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493046,
        "projectNumber": "J3739",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Warren",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "138kV Line Tap Between Galesburg Monmouth Boulevard (BUS 348956) and Castro JCT (BUS 348917). Distan",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3416,
      "normalized": {
        "queue_id": "J3668",
        "county": "Cheboygan",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "PORT CALCITE - RIGGSVILLE 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493047,
        "projectNumber": "J3668",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Cheboygan",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PORT CALCITE - RIGGSVILLE 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3417,
      "normalized": {
        "queue_id": "J3689",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493048,
        "projectNumber": "J3689",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3418,
      "normalized": {
        "queue_id": "J3789",
        "county": "Hancock",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "FOUNTAINTOWN",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-02-13T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 77.0,
        "summer_net_mw": 77.0,
        "winter_net_mw": 77.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493049,
        "projectNumber": "J3789",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-02-13T05:00:00+00:00",
        "inService": "2028-07-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Hancock",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FOUNTAINTOWN",
        "summerNetMW": 77.0,
        "winterNetMW": 77.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3419,
      "normalized": {
        "queue_id": "S1180",
        "county": "Story",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Story County",
        "queue_date": "2026-03-16T23:24:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493050,
        "projectNumber": "S1180",
        "queueDate": "2026-03-16T23:24:06+00:00",
        "inService": "2028-09-12T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Story",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Story County",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3420,
      "normalized": {
        "queue_id": "J1919",
        "county": "Ingham",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Oneida-Majestic 345 kV",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 132.0,
        "summer_net_mw": 132.0,
        "winter_net_mw": 132.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493051,
        "projectNumber": "J1919",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2023-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ingham",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Oneida-Majestic 345 kV",
        "summerNetMW": 132.0,
        "winterNetMW": 132.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3421,
      "normalized": {
        "queue_id": "J2019",
        "county": "Rolette",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Rugby-Glenborough 230 kV Line",
        "queue_date": "2021-08-27T04:00:00+00:00",
        "withdrawn_date": "2021-11-30T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-02-17T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493052,
        "projectNumber": "J2019",
        "queueDate": "2021-08-27T04:00:00+00:00",
        "withdrawnDate": "2021-11-30T05:00:00+00:00",
        "inService": "2025-02-17T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Rolette",
        "state": "ND",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rugby-Glenborough 230 kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3422,
      "normalized": {
        "queue_id": "J3868",
        "county": "Sharp",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "CAVE CITY",
        "queue_date": "2024-12-02T05:00:00+00:00",
        "withdrawn_date": "2025-09-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493053,
        "projectNumber": "J3868",
        "queueDate": "2024-12-02T05:00:00+00:00",
        "withdrawnDate": "2025-09-11T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Sharp",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "CAVE CITY",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3423,
      "normalized": {
        "queue_id": "S1185",
        "county": "Faribault",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Huntley - Blue Earth 161 kV",
        "queue_date": "2026-07-11T01:46:18+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493054,
        "projectNumber": "S1185",
        "queueDate": "2026-07-11T01:46:18+00:00",
        "inService": "2028-10-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Faribault",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Huntley - Blue Earth 161 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3424,
      "normalized": {
        "queue_id": "S1183",
        "county": "Isabella",
        "state": "",
        "transmission_owner": "METC",
        "poi": "Salt River 138 kV",
        "queue_date": "2026-03-17T00:30:05+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-02-19T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493055,
        "projectNumber": "S1183",
        "queueDate": "2026-03-17T00:30:05+00:00",
        "inService": "2027-02-19T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Isabella",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Salt River 138 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3425,
      "normalized": {
        "queue_id": "S1150",
        "county": "",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-03-24T04:19:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493056,
        "projectNumber": "S1150",
        "queueDate": "2026-03-24T04:19:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "IL",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3426,
      "normalized": {
        "queue_id": "S1188",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Rockdale 345kV",
        "queue_date": "2026-06-11T23:14:18+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-19T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493057,
        "projectNumber": "S1188",
        "queueDate": "2026-06-11T23:14:18+00:00",
        "inService": "2026-08-19T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Rockdale 345kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3427,
      "normalized": {
        "queue_id": "J3762",
        "county": "Clay",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "ALEXANDRIA - BISON 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 430.0,
        "summer_net_mw": 430.0,
        "winter_net_mw": 430.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 430.0,
        "dp1_nris_mw": 430.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493058,
        "projectNumber": "J3762",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Clay",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ALEXANDRIA - BISON 345.0kV",
        "summerNetMW": 430.0,
        "winterNetMW": 430.0,
        "dp1ErisMw": 430.0,
        "dp1NrisMw": 430.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3428,
      "normalized": {
        "queue_id": "J3768",
        "county": "Walker",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "ROCKY CREEK",
        "queue_date": "2024-04-10T04:00:00+00:00",
        "withdrawn_date": "2025-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493059,
        "projectNumber": "J3768",
        "queueDate": "2024-04-10T04:00:00+00:00",
        "withdrawnDate": "2025-10-01T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Walker",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ROCKY CREEK",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3429,
      "normalized": {
        "queue_id": "J3284",
        "county": "Woodford",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Spring Bay",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-05-05T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493060,
        "projectNumber": "J3284",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-05-05T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Woodford",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Spring Bay",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3430,
      "normalized": {
        "queue_id": "J3290",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "MAGNETATION",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493061,
        "projectNumber": "J3290",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "White",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MAGNETATION",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3431,
      "normalized": {
        "queue_id": "J3744",
        "county": "Mason",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MICHIGAN POWER - PEREMARQUETTE 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 15.0,
        "summer_net_mw": 15.0,
        "winter_net_mw": 15.0,
        "proposed_completion_date": "1995-10-23T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "1995-10-23T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493062,
        "projectNumber": "J3744",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "1995-10-23T04:00:00+00:00",
        "negInService": "1995-10-23T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Mason",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MICHIGAN POWER - PEREMARQUETTE 138.0kV",
        "summerNetMW": 15.0,
        "winterNetMW": 15.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 3432,
      "normalized": {
        "queue_id": "J3759",
        "county": "Jasper",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Newton Switchyard",
        "queue_date": "2024-04-01T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 15.0,
        "summer_net_mw": 15.0,
        "winter_net_mw": 15.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493063,
        "projectNumber": "J3759",
        "queueDate": "2024-04-01T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-04-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jasper",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Newton Switchyard",
        "summerNetMW": 15.0,
        "winterNetMW": 15.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3433,
      "normalized": {
        "queue_id": "J4238",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-04-10T01:25:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493064,
        "projectNumber": "J4238",
        "queueDate": "2026-04-10T01:25:06+00:00",
        "inService": "2029-12-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3434,
      "normalized": {
        "queue_id": "J3752",
        "county": "Aitkin",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Cromwell (GRE) - Riverton 115kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493065,
        "projectNumber": "J3752",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-10-01T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Aitkin",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cromwell (GRE) - Riverton 115kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3435,
      "normalized": {
        "queue_id": "J3869",
        "county": "Pike",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5PIKE 1 - 5CALUMET 161.0kV",
        "queue_date": "2024-12-02T05:00:00+00:00",
        "withdrawn_date": "2025-09-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493066,
        "projectNumber": "J3869",
        "queueDate": "2024-12-02T05:00:00+00:00",
        "withdrawnDate": "2025-09-11T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Pike",
        "state": "MO",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "5PIKE 1 - 5CALUMET 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3436,
      "normalized": {
        "queue_id": "J3790",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MARIANNA - WEST HELENA 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493067,
        "projectNumber": "J3790",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MARIANNA - WEST HELENA 115.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3437,
      "normalized": {
        "queue_id": "J3285",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "TH Pfizer Jct. - Worthington (HED)",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2024-08-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493068,
        "projectNumber": "J3285",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2024-08-30T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TH Pfizer Jct. - Worthington (HED)",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3438,
      "normalized": {
        "queue_id": "J3291",
        "county": "LaGrange",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "HIPLE",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493069,
        "projectNumber": "J3291",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaGrange",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HIPLE",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3439,
      "normalized": {
        "queue_id": "J3681",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CLINTON  - 7BROKAW 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493070,
        "projectNumber": "J3681",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "7CLINTON  - 7BROKAW 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3440,
      "normalized": {
        "queue_id": "J3677",
        "county": "Daviess",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 148.0,
        "summer_net_mw": 148.0,
        "winter_net_mw": 148.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493071,
        "projectNumber": "J3677",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-16T04:00:00+00:00",
        "inService": "2027-01-31T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Daviess",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 148.0,
        "winterNetMW": 148.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3441,
      "normalized": {
        "queue_id": "J3675",
        "county": "Greene",
        "state": "AR",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "SEDGEWICK SS - AECC LIGHT 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493072,
        "projectNumber": "J3675",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2029-09-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Greene",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SEDGEWICK SS - AECC LIGHT 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3442,
      "normalized": {
        "queue_id": "J3676",
        "county": "Otsego",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Gaylord - Atlanta 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 93.0,
        "summer_net_mw": 93.0,
        "winter_net_mw": 93.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493073,
        "projectNumber": "J3676",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-12-15T05:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Otsego",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Gaylord - Atlanta 138.0kV",
        "summerNetMW": 93.0,
        "winterNetMW": 93.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3443,
      "normalized": {
        "queue_id": "J2306",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Commodore-Jordan",
        "queue_date": "2021-07-21T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493074,
        "projectNumber": "J2306",
        "queueDate": "2021-07-21T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Commodore-Jordan",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3444,
      "normalized": {
        "queue_id": "J1968",
        "county": "Polk",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Crookston",
        "queue_date": "2021-08-18T04:00:00+00:00",
        "withdrawn_date": "2021-10-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 30.0,
        "summer_net_mw": 30.0,
        "winter_net_mw": 30.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493075,
        "projectNumber": "J1968",
        "queueDate": "2021-08-18T04:00:00+00:00",
        "withdrawnDate": "2021-10-22T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Polk",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Crookston",
        "summerNetMW": 30.0,
        "winterNetMW": 30.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3445,
      "normalized": {
        "queue_id": "J3760",
        "county": "Richland",
        "state": "LA",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 405.0,
        "summer_net_mw": 405.0,
        "winter_net_mw": 405.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493076,
        "projectNumber": "J3760",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Richland",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "summerNetMW": 405.0,
        "winterNetMW": 405.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3446,
      "normalized": {
        "queue_id": "J3288",
        "county": "Carroll",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Kokomo Webster St.  - Walton 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493077,
        "projectNumber": "J3288",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-15T04:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Carroll",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Kokomo Webster St.  - Walton 230.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3447,
      "normalized": {
        "queue_id": "J3289",
        "county": "Sherburne",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "ELK RIVER 14",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 60.0,
        "summer_net_mw": 60.0,
        "winter_net_mw": 60.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 35.0,
        "dp1_nris_mw": 60.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493078,
        "projectNumber": "J3289",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Sherburne",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ELK RIVER 14",
        "summerNetMW": 60.0,
        "winterNetMW": 60.0,
        "dp1ErisMw": 35.0,
        "dp1NrisMw": 60.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3448,
      "normalized": {
        "queue_id": "J3678",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "CAYUGA 345",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493079,
        "projectNumber": "J3678",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-09-10T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CAYUGA 345",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3449,
      "normalized": {
        "queue_id": "J3674",
        "county": "Jasper",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4NEWTON   - 4WISEMAN 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493080,
        "projectNumber": "J3674",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jasper",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4NEWTON   - 4WISEMAN 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3450,
      "normalized": {
        "queue_id": "J2256",
        "county": "Humboldt",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Irvington - Webster 345kV Line",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2021-09-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493081,
        "projectNumber": "J2256",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2021-09-17T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Humboldt",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Irvington - Webster 345kV Line",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3451,
      "normalized": {
        "queue_id": "J1878",
        "county": "Decatur",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "HE Westport 138kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 145.0,
        "summer_net_mw": 145.0,
        "winter_net_mw": 145.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493082,
        "projectNumber": "J1878",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Decatur",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HE Westport 138kV",
        "summerNetMW": 145.0,
        "winterNetMW": 145.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3452,
      "normalized": {
        "queue_id": "J1879",
        "county": "Decatur",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "HE Westport 138kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 43.5,
        "summer_net_mw": 43.5,
        "winter_net_mw": 43.5,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493083,
        "projectNumber": "J1879",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Decatur",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HE Westport 138kV",
        "summerNetMW": 43.5,
        "winterNetMW": 43.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3453,
      "normalized": {
        "queue_id": "R5094",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-01-03T07:08:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-01-03T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493084,
        "projectNumber": "R5094",
        "queueDate": "2026-01-03T07:08:00+00:00",
        "inService": "2023-01-03T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3454,
      "normalized": {
        "queue_id": "S1154",
        "county": "",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "",
        "queue_date": "2026-03-10T21:41:58+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493085,
        "projectNumber": "S1154",
        "queueDate": "2026-03-10T21:41:58+00:00",
        "inService": "2029-12-01T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "",
        "state": "MN",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3455,
      "normalized": {
        "queue_id": "J4207",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2025-12-20T03:36:16+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493086,
        "projectNumber": "J4207",
        "queueDate": "2025-12-20T03:36:16+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3456,
      "normalized": {
        "queue_id": "S1138",
        "county": "",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2025-12-13T01:31:09+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2026-12-22T05:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-03-27T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493087,
        "projectNumber": "S1138",
        "queueDate": "2025-12-13T01:31:09+00:00",
        "inService": "2027-03-27T04:00:00+00:00",
        "negInService": "2026-12-22T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3457,
      "normalized": {
        "queue_id": "J4206",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2025-12-20T03:35:57+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493088,
        "projectNumber": "J4206",
        "queueDate": "2025-12-20T03:35:57+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3458,
      "normalized": {
        "queue_id": "J3292",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "RITCHIE SWYD - TARLETON 230.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 193.0,
        "summer_net_mw": 193.0,
        "winter_net_mw": 193.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 193.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493089,
        "projectNumber": "J3292",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "RITCHIE SWYD - TARLETON 230.0kV",
        "summerNetMW": 193.0,
        "winterNetMW": 193.0,
        "dp1ErisMw": 193.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3459,
      "normalized": {
        "queue_id": "J3673",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "GOODLAND - MORRISON DITCH 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493090,
        "projectNumber": "J3673",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "GOODLAND - MORRISON DITCH 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3460,
      "normalized": {
        "queue_id": "J3680",
        "county": "Scott",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "PELAHATCHIE",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 189.0,
        "summer_net_mw": 189.0,
        "winter_net_mw": 189.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493091,
        "projectNumber": "J3680",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-11-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Scott",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PELAHATCHIE",
        "summerNetMW": 189.0,
        "winterNetMW": 189.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3461,
      "normalized": {
        "queue_id": "J3679",
        "county": "LaPorte",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "BABCOCK - STILLWELL 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 149.0,
        "summer_net_mw": 149.0,
        "winter_net_mw": 149.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 149.0,
        "dp1_nris_mw": 115.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493092,
        "projectNumber": "J3679",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-01-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "LaPorte",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BABCOCK - STILLWELL 345.0kV",
        "summerNetMW": 149.0,
        "winterNetMW": 149.0,
        "dp1ErisMw": 149.0,
        "dp1NrisMw": 115.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3462,
      "normalized": {
        "queue_id": "S1130",
        "county": "",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2026-01-29T22:56:59+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": "2027-03-15T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-03-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493093,
        "projectNumber": "S1130",
        "queueDate": "2026-01-29T22:56:59+00:00",
        "inService": "2027-03-15T04:00:00+00:00",
        "negInService": "2027-03-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3463,
      "normalized": {
        "queue_id": "R5091",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "",
        "queue_date": "2026-01-09T02:25:07+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-11-14T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493094,
        "projectNumber": "R5091",
        "queueDate": "2026-01-09T02:25:07+00:00",
        "inService": "2027-11-14T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3464,
      "normalized": {
        "queue_id": "J4231",
        "county": "Pike",
        "state": "",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "",
        "queue_date": "2026-03-20T19:05:07+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493095,
        "projectNumber": "J4231",
        "queueDate": "2026-03-20T19:05:07+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Pike",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3465,
      "normalized": {
        "queue_id": "J4223",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-03-11T20:22:10+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493096,
        "projectNumber": "J4223",
        "queueDate": "2026-03-11T20:22:10+00:00",
        "inService": "2029-04-03T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3466,
      "normalized": {
        "queue_id": "S1136",
        "county": "",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2025-12-19T22:52:01+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2027-01-08T05:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-12-04T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493097,
        "projectNumber": "S1136",
        "queueDate": "2025-12-19T22:52:01+00:00",
        "inService": "2026-12-04T05:00:00+00:00",
        "negInService": "2027-01-08T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3467,
      "normalized": {
        "queue_id": "R5089",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-01-01T00:47:48+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493098,
        "projectNumber": "R5089",
        "queueDate": "2026-01-01T00:47:48+00:00",
        "inService": "2027-08-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3468,
      "normalized": {
        "queue_id": "J3840",
        "county": "St. Landry",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Wells",
        "queue_date": "2024-12-31T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493099,
        "projectNumber": "J3840",
        "queueDate": "2024-12-31T05:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "St. Landry",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Wells",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3469,
      "normalized": {
        "queue_id": "J4209",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2025-12-20T03:34:56+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493100,
        "projectNumber": "J4209",
        "queueDate": "2025-12-20T03:34:56+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3470,
      "normalized": {
        "queue_id": "S1147",
        "county": "",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2026-01-17T01:27:24+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 132.0,
        "summer_net_mw": 132.0,
        "winter_net_mw": 132.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-07T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493101,
        "projectNumber": "S1147",
        "queueDate": "2026-01-17T01:27:24+00:00",
        "inService": "2027-01-07T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "MI",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 132.0,
        "winterNetMW": 132.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3471,
      "normalized": {
        "queue_id": "S1158",
        "county": "Story",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Story County",
        "queue_date": "2026-02-06T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493102,
        "projectNumber": "S1158",
        "queueDate": "2026-02-06T05:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Story",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Story County",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3472,
      "normalized": {
        "queue_id": "S1133",
        "county": "Sangamon",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "343515 Chatham Main - 346555 North Aurburn (Ameren) 138.0kV",
        "queue_date": "2026-02-11T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-01-09T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493103,
        "projectNumber": "S1133",
        "queueDate": "2026-02-11T05:00:00+00:00",
        "inService": "2029-01-09T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Sangamon",
        "state": "LA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "343515 Chatham Main - 346555 North Aurburn (Ameren) 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3473,
      "normalized": {
        "queue_id": "S1148",
        "county": "Rock",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Magnolia",
        "queue_date": "2026-01-09T03:31:13+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 230.0,
        "summer_net_mw": 230.0,
        "winter_net_mw": 230.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493104,
        "projectNumber": "S1148",
        "queueDate": "2026-01-09T03:31:13+00:00",
        "inService": "2027-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Rock",
        "state": "MN",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Magnolia",
        "summerNetMW": 230.0,
        "winterNetMW": 230.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3474,
      "normalized": {
        "queue_id": "R5090",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2025-12-30T00:33:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493105,
        "projectNumber": "R5090",
        "queueDate": "2025-12-30T00:33:06+00:00",
        "inService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3475,
      "normalized": {
        "queue_id": "S1144",
        "county": "",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2026-02-10T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493106,
        "projectNumber": "S1144",
        "queueDate": "2026-02-10T05:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3476,
      "normalized": {
        "queue_id": "S1165",
        "county": "",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2026-03-31T02:47:33+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493107,
        "projectNumber": "S1165",
        "queueDate": "2026-03-31T02:47:33+00:00",
        "inService": "2027-08-31T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "WI",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3477,
      "normalized": {
        "queue_id": "J4215",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "",
        "queue_date": "2026-02-18T02:47:47+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493108,
        "projectNumber": "J4215",
        "queueDate": "2026-02-18T02:47:47+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3478,
      "normalized": {
        "queue_id": "S1152",
        "county": "",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "",
        "queue_date": "2026-04-15T07:38:42+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 139.0,
        "summer_net_mw": 139.0,
        "winter_net_mw": 139.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493109,
        "projectNumber": "S1152",
        "queueDate": "2026-04-15T07:38:42+00:00",
        "inService": "2028-07-03T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "",
        "state": "MO",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 139.0,
        "winterNetMW": 139.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3479,
      "normalized": {
        "queue_id": "J3870",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "SUGAR CREEK",
        "queue_date": "2024-12-23T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 87.0,
        "summer_net_mw": 87.0,
        "winter_net_mw": 87.0,
        "proposed_completion_date": "2002-05-01T04:00:00+00:00",
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-01-26T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 87.0,
        "dp1_nris_mw": 87.0,
        "dp2_eris_mw": 87.0,
        "dp2_nris_mw": 87.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493110,
        "projectNumber": "J3870",
        "queueDate": "2024-12-23T05:00:00+00:00",
        "inService": "2024-01-26T05:00:00+00:00",
        "negInService": "2002-05-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SUGAR CREEK",
        "summerNetMW": 87.0,
        "winterNetMW": 87.0,
        "dp1ErisMw": 87.0,
        "dp1NrisMw": 87.0,
        "dp2ErisMw": 87.0,
        "dp2NrisMw": 87.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3480,
      "normalized": {
        "queue_id": "J4222",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-03-11T20:22:09+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493111,
        "projectNumber": "J4222",
        "queueDate": "2026-03-11T20:22:09+00:00",
        "inService": "2029-04-03T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3481,
      "normalized": {
        "queue_id": "S1187",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-01-30T20:01:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493112,
        "projectNumber": "S1187",
        "queueDate": "2026-01-30T20:01:06+00:00",
        "inService": "2028-10-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3482,
      "normalized": {
        "queue_id": "J4214",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "",
        "queue_date": "2026-02-18T02:43:26+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493113,
        "projectNumber": "J4214",
        "queueDate": "2026-02-18T02:43:26+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3483,
      "normalized": {
        "queue_id": "J4212",
        "county": "",
        "state": "",
        "transmission_owner": "ITC",
        "poi": "",
        "queue_date": "2026-02-18T07:21:38+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493114,
        "projectNumber": "J4212",
        "queueDate": "2026-02-18T07:21:38+00:00",
        "inService": "2030-01-06T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3484,
      "normalized": {
        "queue_id": "J4213",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "",
        "queue_date": "2026-02-18T03:20:21+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493115,
        "projectNumber": "J4213",
        "queueDate": "2026-02-18T03:20:21+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3485,
      "normalized": {
        "queue_id": "R5097",
        "county": "Morehouse Parish",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Sterlington - Bastrop 115 kV",
        "queue_date": "2026-02-04T06:30:30+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493116,
        "projectNumber": "R5097",
        "queueDate": "2026-02-04T06:30:30+00:00",
        "inService": "2027-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse Parish",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "Sterlington - Bastrop 115 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3486,
      "normalized": {
        "queue_id": "R5082",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2026-02-03T20:14:47+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493117,
        "projectNumber": "R5082",
        "queueDate": "2026-02-03T20:14:47+00:00",
        "inService": "2028-01-02T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3487,
      "normalized": {
        "queue_id": "J4328",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-08-31T23:58:09+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 3.8,
        "summer_net_mw": 3.8,
        "winter_net_mw": 3.8,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493118,
        "projectNumber": "J4328",
        "queueDate": "2026-08-31T23:58:09+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "",
        "summerNetMW": 3.8,
        "winterNetMW": 3.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3488,
      "normalized": {
        "queue_id": "J4247",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-06-24T22:51:21+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493119,
        "projectNumber": "J4247",
        "queueDate": "2026-06-24T22:51:21+00:00",
        "inService": "2031-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3489,
      "normalized": {
        "queue_id": "J4254",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-08-08T05:14:01+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493120,
        "projectNumber": "J4254",
        "queueDate": "2026-08-08T05:14:01+00:00",
        "inService": "2031-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3490,
      "normalized": {
        "queue_id": "J4243",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "",
        "queue_date": "2026-06-08T02:28:38+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493121,
        "projectNumber": "J4243",
        "queueDate": "2026-06-08T02:28:38+00:00",
        "inService": "2031-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3491,
      "normalized": {
        "queue_id": "J3233",
        "county": "Yellow Medicine",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Canby 115 kV Substation",
        "queue_date": "2024-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493122,
        "projectNumber": "J3233",
        "queueDate": "2024-03-28T04:00:00+00:00",
        "inService": "2028-01-15T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Yellow Medicine",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Canby 115 kV Substation",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3492,
      "normalized": {
        "queue_id": "J3283",
        "county": "Grand Traverse",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KEYSTONE - WEXFORD 138.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493123,
        "projectNumber": "J3283",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Grand Traverse",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "KEYSTONE - WEXFORD 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3493,
      "normalized": {
        "queue_id": "J3281",
        "county": "Marquette",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Presque Isle - North Lake 138.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493124,
        "projectNumber": "J3281",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Marquette",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Presque Isle - North Lake 138.0kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3494,
      "normalized": {
        "queue_id": "J4249",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2026-06-03T17:30:43+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493125,
        "projectNumber": "J4249",
        "queueDate": "2026-06-03T17:30:43+00:00",
        "inService": "2031-05-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3495,
      "normalized": {
        "queue_id": "J4245",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "",
        "queue_date": "2026-06-25T20:02:21+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 770.0,
        "summer_net_mw": 770.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493126,
        "projectNumber": "J4245",
        "queueDate": "2026-06-25T20:02:21+00:00",
        "inService": "2031-07-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 770.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3496,
      "normalized": {
        "queue_id": "J4248",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-06-25T19:26:56+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493127,
        "projectNumber": "J4248",
        "queueDate": "2026-06-25T19:26:56+00:00",
        "inService": "2031-11-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3497,
      "normalized": {
        "queue_id": "J3255",
        "county": "Holmes",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV",
        "queue_date": "2024-04-13T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493128,
        "projectNumber": "J3255",
        "queueDate": "2024-04-13T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Holmes",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3498,
      "normalized": {
        "queue_id": "J3467",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Bloomington Brokaw",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493129,
        "projectNumber": "J3467",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2027-04-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bloomington Brokaw",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3499,
      "normalized": {
        "queue_id": "J3494",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "TH Pfizer Jct. - Worthington (HED)",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493130,
        "projectNumber": "J3494",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TH Pfizer Jct. - Worthington (HED)",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3500,
      "normalized": {
        "queue_id": "J3273",
        "county": "Madison",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 473.8,
        "summer_net_mw": 473.8,
        "winter_net_mw": 473.8,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493131,
        "projectNumber": "J3273",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Madison",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "summerNetMW": 473.8,
        "winterNetMW": 473.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3501,
      "normalized": {
        "queue_id": "J3279",
        "county": "Day",
        "state": "SD",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Ellendale 345 - Twin Brooks 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493132,
        "projectNumber": "J3279",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-09-04T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Day",
        "state": "SD",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale 345 - Twin Brooks 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3502,
      "normalized": {
        "queue_id": "J3253",
        "county": "Woodruff",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "Bailey",
        "queue_date": "2024-03-26T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493133,
        "projectNumber": "J3253",
        "queueDate": "2024-03-26T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Woodruff",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Bailey",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3503,
      "normalized": {
        "queue_id": "J3514",
        "county": "Chippewa",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Pine River 69 kV",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": "2025-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493134,
        "projectNumber": "J3514",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "withdrawnDate": "2025-04-17T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Chippewa",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pine River 69 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3504,
      "normalized": {
        "queue_id": "J4244",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "",
        "queue_date": "2026-06-06T02:06:17+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493135,
        "projectNumber": "J4244",
        "queueDate": "2026-06-06T02:06:17+00:00",
        "inService": "2031-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3505,
      "normalized": {
        "queue_id": "S1167",
        "county": "Coles",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Greenway 138 kV",
        "queue_date": "2026-07-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493136,
        "projectNumber": "S1167",
        "queueDate": "2026-07-02T04:00:00+00:00",
        "inService": "2028-12-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Coles",
        "state": "IL",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Greenway 138 kV",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3506,
      "normalized": {
        "queue_id": "J3556",
        "county": "Montgomery",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7COFFEEN  - 7PANA     345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493137,
        "projectNumber": "J3556",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Montgomery",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7COFFEEN  - 7PANA     345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3507,
      "normalized": {
        "queue_id": "J3563",
        "county": "Franklin",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7W_FRFT_E - 7MTVERNW 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493138,
        "projectNumber": "J3563",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Franklin",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7W_FRFT_E - 7MTVERNW 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3508,
      "normalized": {
        "queue_id": "J3234",
        "county": "Carver",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "ST BONIFACIUS",
        "queue_date": "2024-03-28T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 130.0,
        "summer_net_mw": 130.0,
        "winter_net_mw": 130.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493139,
        "projectNumber": "J3234",
        "queueDate": "2024-03-28T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-01-15T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Carver",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ST BONIFACIUS",
        "summerNetMW": 130.0,
        "winterNetMW": 130.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3509,
      "normalized": {
        "queue_id": "J3235",
        "county": "Benton",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Cherry Park Substation",
        "queue_date": "2024-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493140,
        "projectNumber": "J3235",
        "queueDate": "2024-03-28T04:00:00+00:00",
        "inService": "2028-01-15T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Benton",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cherry Park Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3510,
      "normalized": {
        "queue_id": "J3236",
        "county": "Chisago",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Chisago County 115kV Substation",
        "queue_date": "2024-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493141,
        "projectNumber": "J3236",
        "queueDate": "2024-03-28T04:00:00+00:00",
        "inService": "2028-01-15T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chisago",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Chisago County 115kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3511,
      "normalized": {
        "queue_id": "J3241",
        "county": "Lincoln",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "ARLINGTON GOAB",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493142,
        "projectNumber": "J3241",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-25T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Lincoln",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ARLINGTON GOAB",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3512,
      "normalized": {
        "queue_id": "J3495",
        "county": "Greene",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Merom Primary - Worthington Primary 345.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 220.0,
        "dp1_nris_mw": 220.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493143,
        "projectNumber": "J3495",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Greene",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Merom Primary - Worthington Primary 345.0kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 220.0,
        "dp1NrisMw": 220.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3513,
      "normalized": {
        "queue_id": "J3539",
        "county": "Alcona",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ALPENA - SPRUCE ROAD 138.0kV",
        "queue_date": "2024-03-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 116.9,
        "summer_net_mw": 116.9,
        "winter_net_mw": 116.9,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 116.9,
        "dp1_nris_mw": 116.9,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493144,
        "projectNumber": "J3539",
        "queueDate": "2024-03-28T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Alcona",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ALPENA - SPRUCE ROAD 138.0kV",
        "summerNetMW": 116.9,
        "winterNetMW": 116.9,
        "dp1ErisMw": 116.9,
        "dp1NrisMw": 116.9,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3514,
      "normalized": {
        "queue_id": "J3282",
        "county": "Mason",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KEYSTONE - LUDINGTON 345.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493145,
        "projectNumber": "J3282",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Mason",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "KEYSTONE - LUDINGTON 345.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3515,
      "normalized": {
        "queue_id": "J3280",
        "county": "Dickey",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "poi": "Ellendale",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493146,
        "projectNumber": "J3280",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.MDU",
        "county": "Dickey",
        "state": "ND",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Ellendale",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3516,
      "normalized": {
        "queue_id": "J3569",
        "county": "Poinsett",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "TRUMANN - HARRISBURG SS 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493147,
        "projectNumber": "J3569",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Poinsett",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "TRUMANN - HARRISBURG SS 161.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3517,
      "normalized": {
        "queue_id": "J3581",
        "county": "Avoyelles",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Eola - Marksville 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-05-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493148,
        "projectNumber": "J3581",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-05-23T04:00:00+00:00",
        "inService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Avoyelles",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Eola - Marksville 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3518,
      "normalized": {
        "queue_id": "J3582",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Longville - Nelson (EES) 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2024-10-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "Withdrawn",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493149,
        "projectNumber": "J3582",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2024-10-17T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Longville - Nelson (EES) 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": "Withdrawn"
      }
    },
    {
      "source_row_number": 3519,
      "normalized": {
        "queue_id": "J3314",
        "county": "Clayton",
        "state": "IA",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "Postville",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-05-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493150,
        "projectNumber": "J3314",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-05-23T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Clayton",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Postville",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3520,
      "normalized": {
        "queue_id": "J3538",
        "county": "Warren",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "Baxter 115/34kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 770.0,
        "summer_net_mw": 730.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-03-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493151,
        "projectNumber": "J3538",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2027-03-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Warren",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Baxter 115/34kV",
        "summerNetMW": 730.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3521,
      "normalized": {
        "queue_id": "J3542",
        "county": "Lincoln",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BROOKHAVEN - BROOKHAVEN/SOUTH 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493152,
        "projectNumber": "J3542",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Lincoln",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BROOKHAVEN - BROOKHAVEN/SOUTH 115.0kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3522,
      "normalized": {
        "queue_id": "J3557",
        "county": "Morgan",
        "state": "IN",
        "transmission_owner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "poi": "Heartland Crossing Tap - Eagle Valley 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493153,
        "projectNumber": "J3557",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "INDIANAPOLIS POWER & LIGHT COMPANY",
        "county": "Morgan",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Heartland Crossing Tap - Eagle Valley 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3523,
      "normalized": {
        "queue_id": "J3558",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Rising",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-10T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493154,
        "projectNumber": "J3558",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2027-09-10T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rising",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3524,
      "normalized": {
        "queue_id": "J3564",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 275.0,
        "summer_net_mw": 275.0,
        "winter_net_mw": 275.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 275.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493155,
        "projectNumber": "J3564",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 275.0,
        "winterNetMW": 275.0,
        "dp1ErisMw": 275.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3525,
      "normalized": {
        "queue_id": "J3566",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 198.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493156,
        "projectNumber": "J3566",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Other_",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 198.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3526,
      "normalized": {
        "queue_id": "J3321",
        "county": "Wayne",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493157,
        "projectNumber": "J3321",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Wayne",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3527,
      "normalized": {
        "queue_id": "J3346",
        "county": "Lyon",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Other_",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493158,
        "projectNumber": "J3346",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Lyon",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3528,
      "normalized": {
        "queue_id": "J3370",
        "county": "Kittson",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493159,
        "projectNumber": "J3370",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-08-28T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Kittson",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3529,
      "normalized": {
        "queue_id": "J3384",
        "county": "Big Stone",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South - Alexandria 345kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493160,
        "projectNumber": "J3384",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-10-31T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Big Stone",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Big Stone South - Alexandria 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3530,
      "normalized": {
        "queue_id": "J3403",
        "county": "Macon",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493161,
        "projectNumber": "J3403",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-08-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Macon",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3531,
      "normalized": {
        "queue_id": "J3426",
        "county": "Chicot",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MACON LAKE SS",
        "queue_date": "2024-03-19T04:00:00+00:00",
        "withdrawn_date": "2025-07-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493162,
        "projectNumber": "J3426",
        "queueDate": "2024-03-19T04:00:00+00:00",
        "withdrawnDate": "2025-07-01T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Chicot",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MACON LAKE SS",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3532,
      "normalized": {
        "queue_id": "J3568",
        "county": "Leflore",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "SCHLATER",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493163,
        "projectNumber": "J3568",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2028-05-13T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Leflore",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "SCHLATER",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3533,
      "normalized": {
        "queue_id": "J3575",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "GILMORE - WILSON 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493164,
        "projectNumber": "J3575",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GILMORE - WILSON 161.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3534,
      "normalized": {
        "queue_id": "J3466",
        "county": "Winnebago",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "FTZGERLD",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 75.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493165,
        "projectNumber": "J3466",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Winnebago",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FTZGERLD",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 75.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3535,
      "normalized": {
        "queue_id": "J3465",
        "county": "Isanti",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "CAMBRIDGE",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 20.0,
        "dp1_nris_mw": 40.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493166,
        "projectNumber": "J3465",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Isanti",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CAMBRIDGE",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 20.0,
        "dp1NrisMw": 40.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3536,
      "normalized": {
        "queue_id": "J3512",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "MONITOR",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493167,
        "projectNumber": "J3512",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MONITOR",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3537,
      "normalized": {
        "queue_id": "J3513",
        "county": "Acadia",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "RICHARD - WELLS 500.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 550.0,
        "summer_net_mw": 550.0,
        "winter_net_mw": 550.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493168,
        "projectNumber": "J3513",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Acadia",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RICHARD - WELLS 500.0kV",
        "summerNetMW": 550.0,
        "winterNetMW": 550.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3538,
      "normalized": {
        "queue_id": "J3579",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MARIANNA WEST SS - MARIANNA 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493169,
        "projectNumber": "J3579",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MARIANNA WEST SS - MARIANNA 115.0kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3539,
      "normalized": {
        "queue_id": "J3585",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "HARTBURG - AEP LAYFIELD 500.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493170,
        "projectNumber": "J3585",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "HARTBURG - AEP LAYFIELD 500.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3540,
      "normalized": {
        "queue_id": "J3577",
        "county": "Simpson",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "MAGEE - NEW HEBRON 115.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493171,
        "projectNumber": "J3577",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-11-15T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Simpson",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MAGEE - NEW HEBRON 115.0kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3541,
      "normalized": {
        "queue_id": "J3593",
        "county": "Clay",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Wabash River  -  Staunton 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493172,
        "projectNumber": "J3593",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-10-01T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Clay",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Wabash River  -  Staunton 230.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3542,
      "normalized": {
        "queue_id": "J3540",
        "county": "Monroe",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "RITCHIE SWYD - TARLETON 230.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493173,
        "projectNumber": "J3540",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2028-05-13T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Monroe",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "RITCHIE SWYD - TARLETON 230.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3543,
      "normalized": {
        "queue_id": "J3541",
        "county": "Bolivar",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "CLEVELAND/SOUTH",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-07-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493174,
        "projectNumber": "J3541",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-07-31T04:00:00+00:00",
        "inService": "2028-05-13T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Bolivar",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "CLEVELAND/SOUTH",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3544,
      "normalized": {
        "queue_id": "J3565",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Rising",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493175,
        "projectNumber": "J3565",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Rising",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3545,
      "normalized": {
        "queue_id": "J3570",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC WYNNE EAST - PARKIN 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493176,
        "projectNumber": "J3570",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC WYNNE EAST - PARKIN 161.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3546,
      "normalized": {
        "queue_id": "J3347",
        "county": "Hancock",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Greenfield Hastings Park - Greensboro 138.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493177,
        "projectNumber": "J3347",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Hancock",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Greenfield Hastings Park - Greensboro 138.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3547,
      "normalized": {
        "queue_id": "J3357",
        "county": "Kosciusko",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "LEESBURG",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493178,
        "projectNumber": "J3357",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-12-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Kosciusko",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LEESBURG",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3548,
      "normalized": {
        "queue_id": "J3571",
        "county": "Poinsett",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MARKED TREE - TWIST 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-08-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493179,
        "projectNumber": "J3571",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-08-28T04:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Poinsett",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MARKED TREE - TWIST 161.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3549,
      "normalized": {
        "queue_id": "J3567",
        "county": "Calhoun",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-05-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493180,
        "projectNumber": "J3567",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-05-09T04:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Calhoun",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3550,
      "normalized": {
        "queue_id": "J3363",
        "county": "Tensas",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "RED GUM",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493181,
        "projectNumber": "J3363",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Tensas",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RED GUM",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3551,
      "normalized": {
        "queue_id": "J3362",
        "county": "Oakland",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "BLACKFOOT - MADRID 345.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493182,
        "projectNumber": "J3362",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Oakland",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BLACKFOOT - MADRID 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3552,
      "normalized": {
        "queue_id": "J3576",
        "county": "Walthall",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BOGALUSA 500 SS - FRANKLIN EHV 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493183,
        "projectNumber": "J3576",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Walthall",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "BOGALUSA 500 SS - FRANKLIN EHV 500.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3553,
      "normalized": {
        "queue_id": "J3580",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "poi": "AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-05-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493184,
        "projectNumber": "J3580",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-05-23T04:00:00+00:00",
        "inService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "ARKANSAS ELECTRIC COOPERATIVE CORPORATION AECT",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC Dell 161kV - Nucor-Yamato 161kV Switching Station 161.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3554,
      "normalized": {
        "queue_id": "J3371",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493185,
        "projectNumber": "J3371",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3555,
      "normalized": {
        "queue_id": "J3381",
        "county": "St. Francis",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "FORREST CITY SOUTH - HUGHES 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2026-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.92,
        "summer_net_mw": 150.92,
        "winter_net_mw": 150.92,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.92,
        "dp1_nris_mw": 150.92,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493186,
        "projectNumber": "J3381",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2026-01-07T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "St. Francis",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "FORREST CITY SOUTH - HUGHES 161.0kV",
        "summerNetMW": 150.92,
        "winterNetMW": 150.92,
        "dp1ErisMw": 150.92,
        "dp1NrisMw": 150.92,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3556,
      "normalized": {
        "queue_id": "J3382",
        "county": "Piatt",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4WEEDMAN  - 4MAHOMET 1 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 171.0,
        "summer_net_mw": 171.0,
        "winter_net_mw": 171.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 171.0,
        "dp1_nris_mw": 171.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493187,
        "projectNumber": "J3382",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Piatt",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4WEEDMAN  - 4MAHOMET 1 138.0kV",
        "summerNetMW": 171.0,
        "winterNetMW": 171.0,
        "dp1ErisMw": 171.0,
        "dp1NrisMw": 171.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3557,
      "normalized": {
        "queue_id": "J3383",
        "county": "Boone",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Nucor  -  Whitestown 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493188,
        "projectNumber": "J3383",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-19T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Boone",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Nucor  -  Whitestown 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3558,
      "normalized": {
        "queue_id": "J3440",
        "county": "Daviess",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493189,
        "projectNumber": "J3440",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Daviess",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3559,
      "normalized": {
        "queue_id": "J3442",
        "county": "Scott",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5STODDARD - 5MORLEY (AECI) 161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 156.0,
        "summer_net_mw": 156.0,
        "winter_net_mw": 156.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 156.0,
        "dp1_nris_mw": 156.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493190,
        "projectNumber": "J3442",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Scott",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "5STODDARD - 5MORLEY (AECI) 161.0kV",
        "summerNetMW": 156.0,
        "winterNetMW": 156.0,
        "dp1ErisMw": 156.0,
        "dp1NrisMw": 156.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3560,
      "normalized": {
        "queue_id": "J3313",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MOROCCO  - ALLEN JUNCTION 345.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 263.0,
        "summer_net_mw": 263.0,
        "winter_net_mw": 263.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 263.0,
        "dp1_nris_mw": 263.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493191,
        "projectNumber": "J3313",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MOROCCO  - ALLEN JUNCTION 345.0kV",
        "summerNetMW": 263.0,
        "winterNetMW": 263.0,
        "dp1ErisMw": 263.0,
        "dp1NrisMw": 263.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3561,
      "normalized": {
        "queue_id": "J3323",
        "county": "Knox",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Other_",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-08-18T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493192,
        "projectNumber": "J3323",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-08-18T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Knox",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3562,
      "normalized": {
        "queue_id": "J3583",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "HOLLAND BOTTOM - KEO EHV 500.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493193,
        "projectNumber": "J3583",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HOLLAND BOTTOM - KEO EHV 500.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3563,
      "normalized": {
        "queue_id": "J3584",
        "county": "Lee",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BRINKLEY EAST - AECC AUBREY 230.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-03-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 215.0,
        "summer_net_mw": 215.0,
        "winter_net_mw": 215.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493194,
        "projectNumber": "J3584",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-03-28T04:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lee",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BRINKLEY EAST - AECC AUBREY 230.0kV",
        "summerNetMW": 215.0,
        "winterNetMW": 215.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3564,
      "normalized": {
        "queue_id": "J3431",
        "county": "Holmes",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV",
        "queue_date": "2024-03-19T04:00:00+00:00",
        "withdrawn_date": "2025-08-25T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493195,
        "projectNumber": "J3431",
        "queueDate": "2024-03-19T04:00:00+00:00",
        "withdrawnDate": "2025-08-25T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Holmes",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDIANOLA 230/115 SUB - MCADAMS EHV 230.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3565,
      "normalized": {
        "queue_id": "J3811",
        "county": "Clay",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4KINMUNDY S - 4TANNER 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493196,
        "projectNumber": "J3811",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clay",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4KINMUNDY S - 4TANNER 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3566,
      "normalized": {
        "queue_id": "J3812",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BALD KNOB T.E.T.C. P.S. #6 SS - AECC COFFEEVILLE 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 158.59,
        "summer_net_mw": 158.59,
        "winter_net_mw": 158.59,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493197,
        "projectNumber": "J3812",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BALD KNOB T.E.T.C. P.S. #6 SS - AECC COFFEEVILLE 161.0kV",
        "summerNetMW": 158.59,
        "winterNetMW": 158.59,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3567,
      "normalized": {
        "queue_id": "J3820",
        "county": "Hancock",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "LRTP Line",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 127.0,
        "summer_net_mw": 127.0,
        "winter_net_mw": 127.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 127.0,
        "dp1_nris_mw": 127.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493198,
        "projectNumber": "J3820",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Hancock",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LRTP Line",
        "summerNetMW": 127.0,
        "winterNetMW": 127.0,
        "dp1ErisMw": 127.0,
        "dp1NrisMw": 127.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3568,
      "normalized": {
        "queue_id": "J3348",
        "county": "Marshall",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "PLYMOUTH - KOSCIUSKO & LEESBURG & KOSCIUSKO CO REMC - NORTHWEST 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493199,
        "projectNumber": "J3348",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Marshall",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "PLYMOUTH - KOSCIUSKO & LEESBURG & KOSCIUSKO CO REMC - NORTHWEST 138.0kV",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3569,
      "normalized": {
        "queue_id": "J3424",
        "county": "Posey",
        "state": "IN",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493200,
        "projectNumber": "J3424",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Posey",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AB Brown 345 - Gibson (Duke Terminal) 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3570,
      "normalized": {
        "queue_id": "J3436",
        "county": "Daviess",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493201,
        "projectNumber": "J3436",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Daviess",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3571,
      "normalized": {
        "queue_id": "J3432",
        "county": "Lawrence",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4LAWRNCVL - 4JASPER 138.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493202,
        "projectNumber": "J3432",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Lawrence",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4LAWRNCVL - 4JASPER 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3572,
      "normalized": {
        "queue_id": "J3822",
        "county": "Pointe Coupee",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "DEVIN - LIVONIA 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 139.58,
        "summer_net_mw": 139.58,
        "winter_net_mw": 139.58,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493203,
        "projectNumber": "J3822",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Pointe Coupee",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DEVIN - LIVONIA 138.0kV",
        "summerNetMW": 139.58,
        "winterNetMW": 139.58,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3573,
      "normalized": {
        "queue_id": "J3781",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "HEBERT (SLEMCO) - HENNING 138.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-07-27T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493204,
        "projectNumber": "J3781",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2027-07-27T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "HEBERT (SLEMCO) - HENNING 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3574,
      "normalized": {
        "queue_id": "J3433",
        "county": "Barron",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE DPC",
        "poi": "BARRON  - WASHCO  161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493205,
        "projectNumber": "J3433",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE DPC",
        "county": "Barron",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BARRON  - WASHCO  161.0kV",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3575,
      "normalized": {
        "queue_id": "J3434",
        "county": "Kandiyohi",
        "state": "MN",
        "transmission_owner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "poi": "Willmar",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493206,
        "projectNumber": "J3434",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "MISSOURI RIVER ENERGY SERVICES - TRANSMISSION",
        "county": "Kandiyohi",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Willmar",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3576,
      "normalized": {
        "queue_id": "J3806",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "STEINER (CE) - SHAW SS (CE) 115.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493207,
        "projectNumber": "J3806",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STEINER (CE) - SHAW SS (CE) 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3577,
      "normalized": {
        "queue_id": "J3810",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport IGCC - Amo 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493208,
        "projectNumber": "J3810",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport IGCC - Amo 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3578,
      "normalized": {
        "queue_id": "J3814",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "FORREST CITY N SS - WYNNE SOUTH 161.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493209,
        "projectNumber": "J3814",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS-Only",
        "poiName": "FORREST CITY N SS - WYNNE SOUTH 161.0kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3579,
      "normalized": {
        "queue_id": "J3813",
        "county": "Putnam",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport IGCC - Amo 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493210,
        "projectNumber": "J3813",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Putnam",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport IGCC - Amo 345.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3580,
      "normalized": {
        "queue_id": "J3780",
        "county": "Buchanan",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Hazleton",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 205.0,
        "summer_net_mw": 205.0,
        "winter_net_mw": 205.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493211,
        "projectNumber": "J3780",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Buchanan",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hazleton",
        "summerNetMW": 205.0,
        "winterNetMW": 205.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3581,
      "normalized": {
        "queue_id": "J3935",
        "county": "Genesee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "THETFORD",
        "queue_date": "2025-02-28T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 975.4,
        "summer_net_mw": 975.4,
        "winter_net_mw": 975.4,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 975.4,
        "dp1_nris_mw": 975.4,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493212,
        "projectNumber": "J3935",
        "queueDate": "2025-02-28T05:00:00+00:00",
        "inService": "2030-03-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Genesee",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "THETFORD",
        "summerNetMW": 975.4,
        "winterNetMW": 975.4,
        "dp1ErisMw": 975.4,
        "dp1NrisMw": 975.4,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3582,
      "normalized": {
        "queue_id": "J3803",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "LEMOYNE - MAJESTIC 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493213,
        "projectNumber": "J3803",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LEMOYNE - MAJESTIC 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3583,
      "normalized": {
        "queue_id": "J3807",
        "county": "Goodhue",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Hampton - Prairie Island 345.0kV",
        "queue_date": "2024-04-09T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493214,
        "projectNumber": "J3807",
        "queueDate": "2024-04-09T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Goodhue",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Hampton - Prairie Island 345.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3584,
      "normalized": {
        "queue_id": "J3322",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "NELSON 500 SWYD - RICHARD 500.0kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-06-03T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 325.0,
        "summer_net_mw": 325.0,
        "winter_net_mw": 325.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493215,
        "projectNumber": "J3322",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-06-03T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NELSON 500 SWYD - RICHARD 500.0kV",
        "summerNetMW": 325.0,
        "winterNetMW": 325.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3585,
      "normalized": {
        "queue_id": "J3430",
        "county": "Lawrence",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4LAWRNCVL - 4JASPER 138.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493216,
        "projectNumber": "J3430",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Lawrence",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4LAWRNCVL - 4JASPER 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3586,
      "normalized": {
        "queue_id": "J3995",
        "county": "Jasper",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CASEY    - 7NEWTON   345.0kV",
        "queue_date": "2025-04-23T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493217,
        "projectNumber": "J3995",
        "queueDate": "2025-04-23T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2030-07-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jasper",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "7CASEY    - 7NEWTON   345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3587,
      "normalized": {
        "queue_id": "J3961",
        "county": "Lincoln",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "YANKEE",
        "queue_date": "2025-04-07T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493218,
        "projectNumber": "J3961",
        "queueDate": "2025-04-07T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lincoln",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "YANKEE",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3588,
      "normalized": {
        "queue_id": "J3782",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "18MURPHY",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-07-26T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493219,
        "projectNumber": "J3782",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2027-07-26T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "18MURPHY",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3589,
      "normalized": {
        "queue_id": "J3987",
        "county": "Amite",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "SMITHDALE SS (CE) - LIBERTY 115.0kV",
        "queue_date": "2024-10-25T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493220,
        "projectNumber": "J3987",
        "queueDate": "2024-10-25T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Amite",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SMITHDALE SS (CE) - LIBERTY 115.0kV",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3590,
      "normalized": {
        "queue_id": "J3821",
        "county": "Walker",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "RIVTRIN",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493221,
        "projectNumber": "J3821",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Walker",
        "state": "TX",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "RIVTRIN",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3591,
      "normalized": {
        "queue_id": "J3785",
        "county": "Kenosha",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Pleasant Prairie",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493222,
        "projectNumber": "J3785",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Kenosha",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pleasant Prairie",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3592,
      "normalized": {
        "queue_id": "J3997",
        "county": "Pike",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta  - Petersburg - (IP&L) 345.0kV",
        "queue_date": "2025-05-01T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-02-10T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493223,
        "projectNumber": "J3997",
        "queueDate": "2025-05-01T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2028-02-10T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Pike",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Gibson Sta  - Petersburg - (IP&L) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3593,
      "normalized": {
        "queue_id": "J3994",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "18MOROCCO 256583",
        "queue_date": "2025-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 360.0,
        "summer_net_mw": 360.0,
        "winter_net_mw": 360.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493224,
        "projectNumber": "J3994",
        "queueDate": "2025-04-17T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "18MOROCCO 256583",
        "summerNetMW": 360.0,
        "winterNetMW": 360.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3594,
      "normalized": {
        "queue_id": "J3796",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "NELSON 230 SWYD",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 770.0,
        "summer_net_mw": 735.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined-Cycle – Steam Plant",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493225,
        "projectNumber": "J3796",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-11-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "NELSON 230 SWYD",
        "summerNetMW": 735.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined-Cycle – Steam Plant",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3595,
      "normalized": {
        "queue_id": "R5063",
        "county": "Shiawassee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BELL ROAD - CORNELL 138.0kV",
        "queue_date": "2025-05-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493226,
        "projectNumber": "R5063",
        "queueDate": "2025-05-09T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawassee",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "BELL ROAD - CORNELL 138.0kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3596,
      "normalized": {
        "queue_id": "J3986",
        "county": "Liberty",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "JACINTO - PEACH CREEK 230.0kV",
        "queue_date": "2024-10-25T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 270.0,
        "summer_net_mw": 270.0,
        "winter_net_mw": 270.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493227,
        "projectNumber": "J3986",
        "queueDate": "2024-10-25T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "TX",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "JACINTO - PEACH CREEK 230.0kV",
        "summerNetMW": 270.0,
        "winterNetMW": 270.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3597,
      "normalized": {
        "queue_id": "J3985",
        "county": "Polk",
        "state": "TX",
        "transmission_owner": "SAM HOUSTON ELECTRIC COOPERATIVE, INC.SHTO",
        "poi": "SHECO/ETEC, BUS#334130",
        "queue_date": "2024-11-18T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 240.0,
        "summer_net_mw": 240.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493228,
        "projectNumber": "J3985",
        "queueDate": "2024-11-18T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "SAM HOUSTON ELECTRIC COOPERATIVE, INC.SHTO",
        "county": "Polk",
        "state": "TX",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SHECO/ETEC, BUS#334130",
        "summerNetMW": 240.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3598,
      "normalized": {
        "queue_id": "J3989",
        "county": "Williamson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Marion North",
        "queue_date": "2025-04-01T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493229,
        "projectNumber": "J3989",
        "queueDate": "2025-04-01T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Williamson",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Marion North",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3599,
      "normalized": {
        "queue_id": "J3937",
        "county": "Dallas",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "queue_date": "2025-04-01T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493230,
        "projectNumber": "J3937",
        "queueDate": "2025-04-01T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Dallas",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SHERIDAN EHV - EL DORADO EHV 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3600,
      "normalized": {
        "queue_id": "J3940",
        "county": "Isabella",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "SALT RIVER - WARREN 138.0kV",
        "queue_date": "2025-02-14T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 214.0,
        "summer_net_mw": 214.0,
        "winter_net_mw": 214.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493231,
        "projectNumber": "J3940",
        "queueDate": "2025-02-14T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Isabella",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SALT RIVER - WARREN 138.0kV",
        "summerNetMW": 214.0,
        "winterNetMW": 214.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3601,
      "normalized": {
        "queue_id": "J3942",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Sandford",
        "queue_date": "2025-02-20T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 365.0,
        "summer_net_mw": 365.0,
        "winter_net_mw": 365.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 365.0,
        "dp1_nris_mw": 365.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493232,
        "projectNumber": "J3942",
        "queueDate": "2025-02-20T05:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Sandford",
        "summerNetMW": 365.0,
        "winterNetMW": 365.0,
        "dp1ErisMw": 365.0,
        "dp1NrisMw": 365.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3602,
      "normalized": {
        "queue_id": "R5071",
        "county": "Linn",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold (ARNOLD 5)",
        "queue_date": "2025-08-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 251.0,
        "summer_net_mw": 251.0,
        "winter_net_mw": 251.0,
        "proposed_completion_date": "2028-09-01T04:00:00+00:00",
        "generation_type": "Nuclear",
        "facility_type": "Nuclear",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493233,
        "projectNumber": "R5071",
        "queueDate": "2025-08-26T04:00:00+00:00",
        "negInService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Duane Arnold (ARNOLD 5)",
        "summerNetMW": 251.0,
        "winterNetMW": 251.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Nuclear",
        "facilityType": "Nuclear",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3603,
      "normalized": {
        "queue_id": "J4061",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "KNOWLES - MOORE ROAD 138.0kV",
        "queue_date": "2025-08-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493234,
        "projectNumber": "J4061",
        "queueDate": "2025-08-07T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "KNOWLES - MOORE ROAD 138.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3604,
      "normalized": {
        "queue_id": "J3957",
        "county": "Sullivan",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2025-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493235,
        "projectNumber": "J3957",
        "queueDate": "2025-04-17T04:00:00+00:00",
        "inService": "2029-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Sullivan",
        "state": "MO",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3605,
      "normalized": {
        "queue_id": "J3963",
        "county": "Brookings",
        "state": "SD",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "BROOKINGS COUNTY",
        "queue_date": "2025-04-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 490.0,
        "summer_net_mw": 490.0,
        "winter_net_mw": 490.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 490.0,
        "dp1_nris_mw": 490.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493236,
        "projectNumber": "J3963",
        "queueDate": "2025-04-07T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Brookings",
        "state": "SD",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BROOKINGS COUNTY",
        "summerNetMW": 490.0,
        "winterNetMW": 490.0,
        "dp1ErisMw": 490.0,
        "dp1NrisMw": 490.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3606,
      "normalized": {
        "queue_id": "J3958",
        "county": "Sullivan",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Other_",
        "queue_date": "2025-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-10-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493237,
        "projectNumber": "J3958",
        "queueDate": "2025-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-10-22T04:00:00+00:00",
        "inService": "2029-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Sullivan",
        "state": "MO",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3607,
      "normalized": {
        "queue_id": "R5069",
        "county": "Linn",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold (ARNOLD 5)",
        "queue_date": "2025-08-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-09-01T04:00:00+00:00",
        "generation_type": "Nuclear",
        "facility_type": "Nuclear",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493238,
        "projectNumber": "R5069",
        "queueDate": "2025-08-26T04:00:00+00:00",
        "negInService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Duane Arnold (ARNOLD 5)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Nuclear",
        "facilityType": "Nuclear",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3608,
      "normalized": {
        "queue_id": "J3808",
        "county": "Webster",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "IRVINGTON - WEBSTER 345.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493239,
        "projectNumber": "J3808",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Webster",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "IRVINGTON - WEBSTER 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3609,
      "normalized": {
        "queue_id": "J3815",
        "county": "St. Charles",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Waterford 3 SWYD",
        "queue_date": "2024-06-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 153.1,
        "summer_net_mw": 153.1,
        "winter_net_mw": 59.5,
        "proposed_completion_date": "2026-10-22T04:00:00+00:00",
        "generation_type": "Nuclear",
        "facility_type": "Nuclear",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-22T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 59.5,
        "dp1_nris_mw": 153.1,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493240,
        "projectNumber": "J3815",
        "queueDate": "2024-06-29T04:00:00+00:00",
        "inService": "2026-10-22T04:00:00+00:00",
        "negInService": "2026-10-22T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Charles",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Waterford 3 SWYD",
        "summerNetMW": 153.1,
        "winterNetMW": 59.5,
        "dp1ErisMw": 59.5,
        "dp1NrisMw": 153.1,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Nuclear",
        "facilityType": "Nuclear",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3610,
      "normalized": {
        "queue_id": "J3823",
        "county": "Watonwan",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Crandall - Fieldon 345.0kV",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": "2025-09-26T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493241,
        "projectNumber": "J3823",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "withdrawnDate": "2025-09-26T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Watonwan",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Crandall - Fieldon 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3611,
      "normalized": {
        "queue_id": "J3787",
        "county": "Stutsman",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Jamestown 345 kV Substation",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 247.0,
        "summer_net_mw": 247.0,
        "winter_net_mw": 247.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 247.0,
        "dp1_nris_mw": 247.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493242,
        "projectNumber": "J3787",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Stutsman",
        "state": "ND",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jamestown 345 kV Substation",
        "summerNetMW": 247.0,
        "winterNetMW": 247.0,
        "dp1ErisMw": 247.0,
        "dp1NrisMw": 247.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3612,
      "normalized": {
        "queue_id": "J3786",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Coventry 230kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-03-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493243,
        "projectNumber": "J3786",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-03-13T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Coventry 230kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3613,
      "normalized": {
        "queue_id": "J3784",
        "county": "Ozaukee",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Saukville (Cedarsauk)",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ATC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493244,
        "projectNumber": "J3784",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Ozaukee",
        "state": "WI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Saukville (Cedarsauk)",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3614,
      "normalized": {
        "queue_id": "J4057",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "YANKEE",
        "queue_date": "2025-08-22T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 127.4,
        "summer_net_mw": 127.4,
        "winter_net_mw": 127.4,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493245,
        "projectNumber": "J4057",
        "queueDate": "2025-08-22T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-05-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "YANKEE",
        "summerNetMW": 127.4,
        "winterNetMW": 127.4,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3615,
      "normalized": {
        "queue_id": "J4054",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "CLAREMONT - LAYTON 138.0kV",
        "queue_date": "2025-09-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 146.0,
        "summer_net_mw": 146.0,
        "winter_net_mw": 146.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493246,
        "projectNumber": "J4054",
        "queueDate": "2025-09-18T04:00:00+00:00",
        "inService": "2030-10-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "CLAREMONT - LAYTON 138.0kV",
        "summerNetMW": 146.0,
        "winterNetMW": 146.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3616,
      "normalized": {
        "queue_id": "J3996",
        "county": "St. Charles",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "SIOUX",
        "queue_date": "2025-04-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 2220.0,
        "summer_net_mw": 2220.0,
        "winter_net_mw": 2220.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 2200.0,
        "dp1_nris_mw": 2200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493247,
        "projectNumber": "J3996",
        "queueDate": "2025-04-29T04:00:00+00:00",
        "inService": "2030-01-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "St. Charles",
        "state": "MO",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SIOUX",
        "summerNetMW": 2220.0,
        "winterNetMW": 2220.0,
        "dp1ErisMw": 2200.0,
        "dp1NrisMw": 2200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3617,
      "normalized": {
        "queue_id": "J3938",
        "county": "Marshall",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "BURR OAK - EAST WINAMAC 138.0 kV",
        "queue_date": "2025-04-01T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 123.0,
        "summer_net_mw": 123.0,
        "winter_net_mw": 123.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493248,
        "projectNumber": "J3938",
        "queueDate": "2025-04-01T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Marshall",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BURR OAK - EAST WINAMAC 138.0 kV",
        "summerNetMW": 123.0,
        "winterNetMW": 123.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3618,
      "normalized": {
        "queue_id": "J3930",
        "county": "Iberia",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Morbihan",
        "queue_date": "2025-02-13T05:00:00+00:00",
        "withdrawn_date": "2026-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493249,
        "projectNumber": "J3930",
        "queueDate": "2025-02-13T05:00:00+00:00",
        "withdrawnDate": "2026-04-17T04:00:00+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Iberia",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Morbihan",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3619,
      "normalized": {
        "queue_id": "J4102",
        "county": "Cass",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "WEEDS LAKE - HIPLE 345.0kV",
        "queue_date": "2025-10-10T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 539.0,
        "summer_net_mw": 539.0,
        "winter_net_mw": 539.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493250,
        "projectNumber": "J4102",
        "queueDate": "2025-10-10T04:00:00+00:00",
        "inService": "2029-08-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Cass",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "WEEDS LAKE - HIPLE 345.0kV",
        "summerNetMW": 539.0,
        "winterNetMW": 539.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3620,
      "normalized": {
        "queue_id": "J4103",
        "county": "Trinity",
        "state": "TX",
        "transmission_owner": "SAM HOUSTON ELECTRIC COOPERATIVE, INC.",
        "poi": "ONALASKA",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493251,
        "projectNumber": "J4103",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2029-06-30T04:00:00+00:00",
        "transmissionOwner": "SAM HOUSTON ELECTRIC COOPERATIVE, INC.",
        "county": "Trinity",
        "state": "TX",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ONALASKA",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3621,
      "normalized": {
        "queue_id": "J4106",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Buffalo 345 kV Substation",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2026-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-02-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493252,
        "projectNumber": "J4106",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2026-04-16T04:00:00+00:00",
        "inService": "2027-02-15T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Buffalo 345 kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3622,
      "normalized": {
        "queue_id": "J3982",
        "county": "Lonoke",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "queue_date": "2024-12-24T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 319.5,
        "summer_net_mw": 319.5,
        "winter_net_mw": 319.5,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 319.5,
        "dp1_nris_mw": 128.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493253,
        "projectNumber": "J3982",
        "queueDate": "2024-12-24T05:00:00+00:00",
        "inService": "2030-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Lonoke",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "summerNetMW": 319.5,
        "winterNetMW": 319.5,
        "dp1ErisMw": 319.5,
        "dp1NrisMw": 128.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3623,
      "normalized": {
        "queue_id": "R5072",
        "county": "Linn",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold (ARNOLD 5)",
        "queue_date": "2025-08-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2028-09-01T04:00:00+00:00",
        "generation_type": "Nuclear",
        "facility_type": "Nuclear",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493254,
        "projectNumber": "R5072",
        "queueDate": "2025-08-26T04:00:00+00:00",
        "negInService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Duane Arnold (ARNOLD 5)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Nuclear",
        "facilityType": "Nuclear",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3624,
      "normalized": {
        "queue_id": "J3783",
        "county": "Cross",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC WYNNE EAST - PARKIN 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493255,
        "projectNumber": "J3783",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Cross",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "AECC WYNNE EAST - PARKIN 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3625,
      "normalized": {
        "queue_id": "S1101",
        "county": "St. Francis",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BRINKLEY EAST - AECC AUBREY 230.0kV",
        "queue_date": "2025-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-01-20T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493256,
        "projectNumber": "S1101",
        "queueDate": "2025-06-16T04:00:00+00:00",
        "inService": "2027-10-31T04:00:00+00:00",
        "negInService": "2028-01-20T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "St. Francis",
        "state": "AR",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "BRINKLEY EAST - AECC AUBREY 230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3626,
      "normalized": {
        "queue_id": "S1095",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7ASTER - 7CMDR 345.0kV",
        "queue_date": "2025-04-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-05-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493257,
        "projectNumber": "S1095",
        "queueDate": "2025-04-22T04:00:00+00:00",
        "inService": "2027-05-28T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "7ASTER - 7CMDR 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3627,
      "normalized": {
        "queue_id": "J3988",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "NORTH BASTROP TAP - LOG CABIN (LAGEN) 115.0kV",
        "queue_date": "2024-10-25T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 85.0,
        "summer_net_mw": 85.0,
        "winter_net_mw": 85.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493258,
        "projectNumber": "J3988",
        "queueDate": "2024-10-25T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "NORTH BASTROP TAP - LOG CABIN (LAGEN) 115.0kV",
        "summerNetMW": 85.0,
        "winterNetMW": 85.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3628,
      "normalized": {
        "queue_id": "J3941",
        "county": "Deuel",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Astoria 345kV substation",
        "queue_date": "2025-03-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1144.0,
        "summer_net_mw": 1144.0,
        "winter_net_mw": 1144.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 1144.0,
        "dp1_nris_mw": 744.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493259,
        "projectNumber": "J3941",
        "queueDate": "2025-03-26T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Deuel",
        "state": "SD",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Astoria 345kV substation",
        "summerNetMW": 1144.0,
        "winterNetMW": 1144.0,
        "dp1ErisMw": 1144.0,
        "dp1NrisMw": 744.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3629,
      "normalized": {
        "queue_id": "J3959",
        "county": "Grundy",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2025-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493260,
        "projectNumber": "J3959",
        "queueDate": "2025-04-17T04:00:00+00:00",
        "inService": "2029-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Grundy",
        "state": "MO",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3630,
      "normalized": {
        "queue_id": "J3960",
        "county": "Lac qui Parle",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South - Deuel County 345.0kV",
        "queue_date": "2025-04-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493261,
        "projectNumber": "J3960",
        "queueDate": "2025-04-08T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Lac qui Parle",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Big Stone South - Deuel County 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3631,
      "normalized": {
        "queue_id": "J3962",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BAUER - HAMPTON 1 345.0kV",
        "queue_date": "2025-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Wind/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493262,
        "projectNumber": "J3962",
        "queueDate": "2025-03-12T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "BAUER - HAMPTON 1 345.0kV",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind/Battery",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3632,
      "normalized": {
        "queue_id": "R5070",
        "county": "Linn",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold (ARNOLD 5)",
        "queue_date": "2025-08-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 64.0,
        "summer_net_mw": 64.0,
        "winter_net_mw": 64.0,
        "proposed_completion_date": "2028-09-01T04:00:00+00:00",
        "generation_type": "Nuclear",
        "facility_type": "Nuclear",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493263,
        "projectNumber": "R5070",
        "queueDate": "2025-08-26T04:00:00+00:00",
        "negInService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Duane Arnold (ARNOLD 5)",
        "summerNetMW": 64.0,
        "winterNetMW": 64.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Nuclear",
        "facilityType": "Nuclear",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3633,
      "normalized": {
        "queue_id": "S1107",
        "county": "Clinton",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Calamus East",
        "queue_date": "2025-07-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-03-01T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493264,
        "projectNumber": "S1107",
        "queueDate": "2025-07-08T04:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "negInService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Clinton",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Calamus East",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3634,
      "normalized": {
        "queue_id": "J4056",
        "county": "Marshall",
        "state": "IA",
        "transmission_owner": "THE MUNICIPAL ELECTRIC UTILITY OF THE CITY OF CEDAR FALLS, IOWA",
        "poi": "Lehigh - Marshalltown (Twinkle) 345kV",
        "queue_date": "2025-08-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 310.0,
        "summer_net_mw": 310.0,
        "winter_net_mw": 310.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 310.0,
        "dp1_nris_mw": 310.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493265,
        "projectNumber": "J4056",
        "queueDate": "2025-08-27T04:00:00+00:00",
        "inService": "2030-08-01T04:00:00+00:00",
        "transmissionOwner": "THE MUNICIPAL ELECTRIC UTILITY OF THE CITY OF CEDAR FALLS, IOWA",
        "county": "Marshall",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Lehigh - Marshalltown (Twinkle) 345kV",
        "summerNetMW": 310.0,
        "winterNetMW": 310.0,
        "dp1ErisMw": 310.0,
        "dp1NrisMw": 310.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3635,
      "normalized": {
        "queue_id": "J4055",
        "county": "Ionia",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Peddler",
        "queue_date": "2025-08-29T04:00:00+00:00",
        "withdrawn_date": "2026-09-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 198.0,
        "summer_net_mw": 198.0,
        "winter_net_mw": 198.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493266,
        "projectNumber": "J4055",
        "queueDate": "2025-08-29T04:00:00+00:00",
        "withdrawnDate": "2026-09-01T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Ionia",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "Peddler",
        "summerNetMW": 198.0,
        "winterNetMW": 198.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3636,
      "normalized": {
        "queue_id": "J3904",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2025-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493267,
        "projectNumber": "J3904",
        "queueDate": "2025-03-12T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3637,
      "normalized": {
        "queue_id": "J3920",
        "county": "Clay",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Other_",
        "queue_date": "2025-03-10T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493268,
        "projectNumber": "J3920",
        "queueDate": "2025-03-10T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Clay",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "ERIS",
        "poiName": "Other_",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3638,
      "normalized": {
        "queue_id": "J3919",
        "county": "Lincoln",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Other_",
        "queue_date": "2025-03-07T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493269,
        "projectNumber": "J3919",
        "queueDate": "2025-03-07T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-11-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Lincoln",
        "state": "MO",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3639,
      "normalized": {
        "queue_id": "J4104",
        "county": "Houston",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC.",
        "poi": "ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2025-12-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493270,
        "projectNumber": "J4104",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2025-12-19T05:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC.",
        "county": "Houston",
        "state": "TX",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ROCKY CREEK - CROCKETT (SWEPCO) 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3640,
      "normalized": {
        "queue_id": "R5067",
        "county": "Lake",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "NIPSCO Green Acres 138kV Sub",
        "queue_date": "2025-07-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2028-05-31T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493271,
        "projectNumber": "R5067",
        "queueDate": "2025-07-03T04:00:00+00:00",
        "negInService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Lake",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "NIPSCO Green Acres 138kV Sub",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3641,
      "normalized": {
        "queue_id": "J3892",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "CITY WATER LIGHT & POWER",
        "poi": "343506 Eastdale",
        "queue_date": "2025-01-29T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493272,
        "projectNumber": "J3892",
        "queueDate": "2025-01-29T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "CITY WATER LIGHT & POWER",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "343506 Eastdale",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3642,
      "normalized": {
        "queue_id": "J3902",
        "county": "Jefferson",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "STOWELL",
        "queue_date": "2025-02-06T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 288.5,
        "summer_net_mw": 288.5,
        "winter_net_mw": 288.5,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 218.94,
        "dp1_nris_mw": 218.94,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493273,
        "projectNumber": "J3902",
        "queueDate": "2025-02-06T05:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Jefferson",
        "state": "TX",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "STOWELL",
        "summerNetMW": 288.5,
        "winterNetMW": 288.5,
        "dp1ErisMw": 218.94,
        "dp1NrisMw": 218.94,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3643,
      "normalized": {
        "queue_id": "S1096",
        "county": "Wood",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Saratoga - Badger West 138.0kV",
        "queue_date": "2025-05-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.3,
        "summer_net_mw": 50.3,
        "winter_net_mw": 50.3,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493274,
        "projectNumber": "S1096",
        "queueDate": "2025-05-20T04:00:00+00:00",
        "inService": "2028-02-01T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Wood",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Saratoga - Badger West 138.0kV",
        "summerNetMW": 50.3,
        "winterNetMW": 50.3,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3644,
      "normalized": {
        "queue_id": "J4101",
        "county": "Jefferson",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "University (UWW)",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 71.0,
        "summer_net_mw": 71.0,
        "winter_net_mw": 71.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 71.0,
        "dp1_nris_mw": 35.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493275,
        "projectNumber": "J4101",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Jefferson",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "University (UWW)",
        "summerNetMW": 71.0,
        "winterNetMW": 71.0,
        "dp1ErisMw": 71.0,
        "dp1NrisMw": 35.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3645,
      "normalized": {
        "queue_id": "J4105",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Buffalo 345 kV Substation",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2026-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493276,
        "projectNumber": "J4105",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2026-04-16T04:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Buffalo 345 kV Substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3646,
      "normalized": {
        "queue_id": "J4127",
        "county": "Barron",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Ridgeland",
        "queue_date": "2025-09-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-01-19T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 90.0,
        "dp1_nris_mw": 90.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493277,
        "projectNumber": "J4127",
        "queueDate": "2025-09-18T04:00:00+00:00",
        "inService": "2029-01-19T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Barron",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Ridgeland",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 90.0,
        "dp1NrisMw": 90.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3647,
      "normalized": {
        "queue_id": "R5093",
        "county": "St. James",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "VACHERIE",
        "queue_date": "2025-10-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493278,
        "projectNumber": "R5093",
        "queueDate": "2025-10-14T04:00:00+00:00",
        "inService": "2023-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. James",
        "state": "LA",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "VACHERIE",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3648,
      "normalized": {
        "queue_id": "J4125",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Other_",
        "queue_date": "2025-09-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493279,
        "projectNumber": "J4125",
        "queueDate": "2025-09-16T04:00:00+00:00",
        "inService": "2030-10-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3649,
      "normalized": {
        "queue_id": "R5086",
        "county": "Pointe Coupee",
        "state": "LA",
        "transmission_owner": "",
        "poi": "Big Cajun II 500kV Substation",
        "queue_date": "2025-10-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 593.0,
        "summer_net_mw": 593.0,
        "winter_net_mw": 593.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-02-29T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493280,
        "projectNumber": "R5086",
        "queueDate": "2025-10-17T04:00:00+00:00",
        "inService": "2028-02-29T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Pointe Coupee",
        "state": "LA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Big Cajun II 500kV Substation",
        "summerNetMW": 593.0,
        "winterNetMW": 593.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3650,
      "normalized": {
        "queue_id": "J4126",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MOROCCO  - ALLEN JUNCTION 345.0kV",
        "queue_date": "2025-09-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 112.0,
        "summer_net_mw": 112.0,
        "winter_net_mw": 112.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493281,
        "projectNumber": "J4126",
        "queueDate": "2025-09-16T04:00:00+00:00",
        "inService": "2030-10-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "MOROCCO  - ALLEN JUNCTION 345.0kV",
        "summerNetMW": 112.0,
        "winterNetMW": 112.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3651,
      "normalized": {
        "queue_id": "J4193",
        "county": "Meeker",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "SHERBURNE CO",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493282,
        "projectNumber": "J4193",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-12-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Meeker",
        "state": "MN",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "SHERBURNE CO",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3652,
      "normalized": {
        "queue_id": "J3891",
        "county": "Pope",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "ATKINS",
        "queue_date": "2025-01-31T05:00:00+00:00",
        "withdrawn_date": "2026-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493283,
        "projectNumber": "J3891",
        "queueDate": "2025-01-31T05:00:00+00:00",
        "withdrawnDate": "2026-04-16T04:00:00+00:00",
        "inService": "2030-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Pope",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ATKINS",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3653,
      "normalized": {
        "queue_id": "J4192",
        "county": "Racine",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Bain - State Line 138.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493284,
        "projectNumber": "J4192",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2029-04-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Racine",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Bain - State Line 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3654,
      "normalized": {
        "queue_id": "S1151",
        "county": "Jefferson",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "University (UWW)",
        "queue_date": "2025-11-19T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 109.0,
        "summer_net_mw": 109.0,
        "winter_net_mw": 109.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493285,
        "projectNumber": "S1151",
        "queueDate": "2025-11-19T05:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Jefferson",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "University (UWW)",
        "summerNetMW": 109.0,
        "winterNetMW": 109.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3655,
      "normalized": {
        "queue_id": "J4032",
        "county": "Deuel",
        "state": "SD",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Astoria - Brookings County 345.0kV",
        "queue_date": "2025-05-30T04:00:00+00:00",
        "withdrawn_date": "2025-12-26T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 442.0,
        "summer_net_mw": 442.0,
        "winter_net_mw": 442.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493286,
        "projectNumber": "J4032",
        "queueDate": "2025-05-30T04:00:00+00:00",
        "withdrawnDate": "2025-12-26T05:00:00+00:00",
        "inService": "2030-12-01T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Deuel",
        "state": "SD",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Astoria - Brookings County 345.0kV",
        "summerNetMW": 442.0,
        "winterNetMW": 442.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3656,
      "normalized": {
        "queue_id": "J3990",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2025-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493287,
        "projectNumber": "J3990",
        "queueDate": "2025-04-17T04:00:00+00:00",
        "inService": "2029-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3657,
      "normalized": {
        "queue_id": "J3991",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2025-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 340.0,
        "summer_net_mw": 340.0,
        "winter_net_mw": 340.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 340.0,
        "dp1_nris_mw": 340.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493288,
        "projectNumber": "J3991",
        "queueDate": "2025-04-17T04:00:00+00:00",
        "inService": "2029-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 340.0,
        "winterNetMW": 340.0,
        "dp1ErisMw": 340.0,
        "dp1NrisMw": 340.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3658,
      "normalized": {
        "queue_id": "J3978",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Petersburg - Sullivan (AEP/PJM) 345.0kV",
        "queue_date": "2025-04-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493289,
        "projectNumber": "J3978",
        "queueDate": "2025-04-08T04:00:00+00:00",
        "inService": "2029-10-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Petersburg - Sullivan (AEP/PJM) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3659,
      "normalized": {
        "queue_id": "J3979",
        "county": "Sullivan",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Petersburg - Sullivan (AEP/PJM) 345.0kV",
        "queue_date": "2025-04-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493290,
        "projectNumber": "J3979",
        "queueDate": "2025-04-08T04:00:00+00:00",
        "inService": "2029-10-01T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Sullivan",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Petersburg - Sullivan (AEP/PJM) 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3660,
      "normalized": {
        "queue_id": "J4051",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "NELSON 500 SWYD - RICHARD 500.0kV",
        "queue_date": "2025-09-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 220.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493291,
        "projectNumber": "J4051",
        "queueDate": "2025-09-02T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "NELSON 500 SWYD - RICHARD 500.0kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 220.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3661,
      "normalized": {
        "queue_id": "J3888",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "EL DORADO EHV - SAREPTA 345/115 SS 345.0kV",
        "queue_date": "2025-02-06T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493292,
        "projectNumber": "J3888",
        "queueDate": "2025-02-06T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-12T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "EL DORADO EHV - SAREPTA 345/115 SS 345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3662,
      "normalized": {
        "queue_id": "S1153",
        "county": "Waushara",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sand Lake 138kV",
        "queue_date": "2025-11-04T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493293,
        "projectNumber": "S1153",
        "queueDate": "2025-11-04T05:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Waushara",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Sand Lake 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3663,
      "normalized": {
        "queue_id": "R5087",
        "county": "Washington",
        "state": "IL",
        "transmission_owner": "",
        "poi": "4JORD - 4ASHLEY 138.0kV",
        "queue_date": "2025-11-06T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 185.0,
        "summer_net_mw": 185.0,
        "winter_net_mw": 185.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493294,
        "projectNumber": "R5087",
        "queueDate": "2025-11-06T05:00:00+00:00",
        "inService": "2027-06-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Washington",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "4JORD - 4ASHLEY 138.0kV",
        "summerNetMW": 185.0,
        "winterNetMW": 185.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3664,
      "normalized": {
        "queue_id": "J4014",
        "county": "Calumet",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Forest Junction",
        "queue_date": "2025-05-21T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 650.0,
        "summer_net_mw": 650.0,
        "winter_net_mw": 650.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 650.0,
        "dp1_nris_mw": 650.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493295,
        "projectNumber": "J4014",
        "queueDate": "2025-05-21T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Calumet",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Forest Junction",
        "summerNetMW": 650.0,
        "winterNetMW": 650.0,
        "dp1ErisMw": 650.0,
        "dp1NrisMw": 650.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3665,
      "normalized": {
        "queue_id": "J4028",
        "county": "Walworth",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "North Creek 138kV",
        "queue_date": "2025-05-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 324.0,
        "summer_net_mw": 324.0,
        "winter_net_mw": 324.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 324.0,
        "dp1_nris_mw": 163.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493296,
        "projectNumber": "J4028",
        "queueDate": "2025-05-01T04:00:00+00:00",
        "inService": "2027-05-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Walworth",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "North Creek 138kV",
        "summerNetMW": 324.0,
        "winterNetMW": 324.0,
        "dp1ErisMw": 324.0,
        "dp1NrisMw": 163.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3666,
      "normalized": {
        "queue_id": "J3992",
        "county": "Eaton",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MAJESTIC - ONEIDA 345.0kV",
        "queue_date": "2025-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493297,
        "projectNumber": "J3992",
        "queueDate": "2025-04-17T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Eaton",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "MAJESTIC - ONEIDA 345.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3667,
      "normalized": {
        "queue_id": "J4052",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "NELSON 500 SWYD - RICHARD 500.0kV",
        "queue_date": "2025-09-02T04:00:00+00:00",
        "withdrawn_date": "2026-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493298,
        "projectNumber": "J4052",
        "queueDate": "2025-09-02T04:00:00+00:00",
        "withdrawnDate": "2026-04-17T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "NELSON 500 SWYD - RICHARD 500.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3668,
      "normalized": {
        "queue_id": "S1097",
        "county": "Vermilion",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Tilton Switchyard",
        "queue_date": "2025-05-23T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 188.0,
        "summer_net_mw": 188.0,
        "winter_net_mw": 188.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493299,
        "projectNumber": "S1097",
        "queueDate": "2025-05-23T04:00:00+00:00",
        "inService": "2027-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Vermilion",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Tilton Switchyard",
        "summerNetMW": 188.0,
        "winterNetMW": 188.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3669,
      "normalized": {
        "queue_id": "S1077",
        "county": "St. Clair",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Fayetteville Bee Hollow Road",
        "queue_date": "2025-01-13T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493300,
        "projectNumber": "S1077",
        "queueDate": "2025-01-13T05:00:00+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "St. Clair",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Fayetteville Bee Hollow Road",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3670,
      "normalized": {
        "queue_id": "J3945",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "MAJESTIC - MILAN 345.0kV",
        "queue_date": "2025-04-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493301,
        "projectNumber": "J3945",
        "queueDate": "2025-04-07T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "MAJESTIC - MILAN 345.0kV",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3671,
      "normalized": {
        "queue_id": "J3895",
        "county": "Muskegon",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KENOWA - LUDINGTON 345.0kV",
        "queue_date": "2025-02-07T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 199.72,
        "summer_net_mw": 199.72,
        "winter_net_mw": 199.72,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493302,
        "projectNumber": "J3895",
        "queueDate": "2025-02-07T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Muskegon",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "KENOWA - LUDINGTON 345.0kV",
        "summerNetMW": 199.72,
        "winterNetMW": 199.72,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3672,
      "normalized": {
        "queue_id": "J3905",
        "county": "Tazewell",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2025-03-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.0,
        "dp1_nris_mw": 175.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493303,
        "projectNumber": "J3905",
        "queueDate": "2025-03-12T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 175.0,
        "dp1NrisMw": 175.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3673,
      "normalized": {
        "queue_id": "J3932",
        "county": "Linn",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold 161 kV",
        "queue_date": "2025-03-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 646.0,
        "summer_net_mw": 646.0,
        "winter_net_mw": 646.0,
        "proposed_completion_date": null,
        "generation_type": "Nuclear",
        "facility_type": "Nuclear",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 646.0,
        "dp1_nris_mw": 646.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493304,
        "projectNumber": "J3932",
        "queueDate": "2025-03-14T04:00:00+00:00",
        "inService": "2029-06-29T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Duane Arnold 161 kV",
        "summerNetMW": 646.0,
        "winterNetMW": 646.0,
        "dp1ErisMw": 646.0,
        "dp1NrisMw": 646.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Nuclear",
        "facilityType": "Nuclear",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3674,
      "normalized": {
        "queue_id": "J3927",
        "county": "Sheboygan",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "SHEBOYGAN FALLS STATION 138 KV",
        "queue_date": "2025-02-24T05:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493305,
        "projectNumber": "J3927",
        "queueDate": "2025-02-24T05:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Sheboygan",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SHEBOYGAN FALLS STATION 138 KV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3675,
      "normalized": {
        "queue_id": "J4083",
        "county": "Perry",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY",
        "poi": "Purvis Bulk 161 - Hintonville 161 161.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493306,
        "projectNumber": "J4083",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY",
        "county": "Perry",
        "state": "MS",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Purvis Bulk 161 - Hintonville 161 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3676,
      "normalized": {
        "queue_id": "J4117",
        "county": "Goodhue",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "North Rochester - Prairie Island 345.0kV",
        "queue_date": "2025-09-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 240.0,
        "summer_net_mw": 240.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 240.0,
        "dp1_nris_mw": 240.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493307,
        "projectNumber": "J4117",
        "queueDate": "2025-09-26T04:00:00+00:00",
        "inService": "2030-09-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Goodhue",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "North Rochester - Prairie Island 345.0kV",
        "summerNetMW": 240.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 240.0,
        "dp1NrisMw": 240.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3677,
      "normalized": {
        "queue_id": "J4128",
        "county": "Eaton",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "Clinton Interconnection",
        "queue_date": "2025-09-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-02-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493308,
        "projectNumber": "J4128",
        "queueDate": "2025-09-19T04:00:00+00:00",
        "inService": "2030-02-28T05:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Eaton",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Clinton Interconnection",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3678,
      "normalized": {
        "queue_id": "J4129",
        "county": "Otter Tail",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "ALEXANDRIA - BISON 345.0kV",
        "queue_date": "2025-10-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493309,
        "projectNumber": "J4129",
        "queueDate": "2025-10-01T04:00:00+00:00",
        "inService": "2029-04-12T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Otter Tail",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ALEXANDRIA - BISON 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3679,
      "normalized": {
        "queue_id": "J4130",
        "county": "Pepin",
        "state": "WI",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE",
        "poi": "ALMA  - ROCK ELM 161.0kV",
        "queue_date": "2025-10-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 110.0,
        "dp1_nris_mw": 110.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493310,
        "projectNumber": "J4130",
        "queueDate": "2025-10-01T04:00:00+00:00",
        "inService": "2030-12-01T05:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE",
        "county": "Pepin",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ALMA  - ROCK ELM 161.0kV",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 110.0,
        "dp1NrisMw": 110.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3680,
      "normalized": {
        "queue_id": "J3894",
        "county": "Lyon",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Lyon County - Brookings County 345.0kV",
        "queue_date": "2025-02-14T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493311,
        "projectNumber": "J3894",
        "queueDate": "2025-02-14T05:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Lyon",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Lyon County - Brookings County 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3681,
      "normalized": {
        "queue_id": "J3909",
        "county": "Gratiot",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ALMA - VESTABURG 138.0kV",
        "queue_date": "2025-02-28T05:00:00+00:00",
        "withdrawn_date": "2026-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493312,
        "projectNumber": "J3909",
        "queueDate": "2025-02-28T05:00:00+00:00",
        "withdrawnDate": "2026-04-17T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Gratiot",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ALMA - VESTABURG 138.0kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3682,
      "normalized": {
        "queue_id": "J3926",
        "county": "Webster",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Grimes - Lehigh 345kV",
        "queue_date": "2025-03-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 170.0,
        "dp1_nris_mw": 170.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493313,
        "projectNumber": "J3926",
        "queueDate": "2025-03-13T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Webster",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Grimes - Lehigh 345kV",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 170.0,
        "dp1NrisMw": 170.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3683,
      "normalized": {
        "queue_id": "J3928",
        "county": "Bay",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "TITTABAWASSEE 345kV- GALLEGHER 345kV",
        "queue_date": "2025-01-31T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ITC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493314,
        "projectNumber": "J3928",
        "queueDate": "2025-01-31T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-10-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Bay",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "TITTABAWASSEE 345kV- GALLEGHER 345kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3684,
      "normalized": {
        "queue_id": "J4144",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 525.0,
        "summer_net_mw": 525.0,
        "winter_net_mw": 525.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493315,
        "projectNumber": "J4144",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Columbia",
        "summerNetMW": 525.0,
        "winterNetMW": 525.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3685,
      "normalized": {
        "queue_id": "J4148",
        "county": "Clay",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "ALEXANDRIA - BISON 345.0kV",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 245.0,
        "summer_net_mw": 245.0,
        "winter_net_mw": 245.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "ERIS",
        "dp1_eris_mw": 245.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493316,
        "projectNumber": "J4148",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Clay",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "ERIS",
        "poiName": "ALEXANDRIA - BISON 345.0kV",
        "summerNetMW": 245.0,
        "winterNetMW": 245.0,
        "dp1ErisMw": 245.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3686,
      "normalized": {
        "queue_id": "S1142",
        "county": "East Feliciana",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "MOLER - COLFEL 230.0kV",
        "queue_date": "2026-01-30T00:15:13+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-08-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493317,
        "projectNumber": "S1142",
        "queueDate": "2026-01-30T00:15:13+00:00",
        "inService": "2027-08-20T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "East Feliciana",
        "state": "LA",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "MOLER - COLFEL 230.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3687,
      "normalized": {
        "queue_id": "J4016",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "ATLANTA - THETFORD [KARN] 138.0kV",
        "queue_date": "2025-05-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493318,
        "projectNumber": "J4016",
        "queueDate": "2025-05-20T04:00:00+00:00",
        "inService": "2029-12-30T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "ATLANTA - THETFORD [KARN] 138.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3688,
      "normalized": {
        "queue_id": "J4015",
        "county": "Mason",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Quiver",
        "queue_date": "2025-05-09T04:00:00+00:00",
        "withdrawn_date": "2026-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 136.0,
        "summer_net_mw": 136.0,
        "winter_net_mw": 136.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493319,
        "projectNumber": "J4015",
        "queueDate": "2025-05-09T04:00:00+00:00",
        "withdrawnDate": "2026-01-02T05:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Mason",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Quiver",
        "summerNetMW": 136.0,
        "winterNetMW": 136.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3689,
      "normalized": {
        "queue_id": "J3977",
        "county": "Sanilac",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GREENWOOD - RAPSON 345.0kV",
        "queue_date": "2025-03-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493320,
        "projectNumber": "J3977",
        "queueDate": "2025-03-31T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Sanilac",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "GREENWOOD - RAPSON 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3690,
      "normalized": {
        "queue_id": "S1094",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BOB WHITE",
        "queue_date": "2025-04-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": "2028-03-03T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493321,
        "projectNumber": "S1094",
        "queueDate": "2025-04-08T04:00:00+00:00",
        "inService": "2026-10-31T04:00:00+00:00",
        "negInService": "2028-03-03T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "BOB WHITE",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3691,
      "normalized": {
        "queue_id": "J4053",
        "county": "Grand Traverse",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KEYSTONE - WEXFORD 138.0kV",
        "queue_date": "2025-07-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493322,
        "projectNumber": "J4053",
        "queueDate": "2025-07-28T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Grand Traverse",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "KEYSTONE - WEXFORD 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3692,
      "normalized": {
        "queue_id": "J3889",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "EL DORADO EHV - SAREPTA 345/115 SS 345.0kV",
        "queue_date": "2025-02-06T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493323,
        "projectNumber": "J3889",
        "queueDate": "2025-02-06T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-12T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "EL DORADO EHV - SAREPTA 345/115 SS 345.0kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3693,
      "normalized": {
        "queue_id": "J3907",
        "county": "Stark",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4BUREAU - 4EKEWANEE N 138.0kV",
        "queue_date": "2025-03-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493324,
        "projectNumber": "J3907",
        "queueDate": "2025-03-11T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Stark",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "4BUREAU - 4EKEWANEE N 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3694,
      "normalized": {
        "queue_id": "J3893",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC AUBREY - RITCHIE SWYD 230.0kV",
        "queue_date": "2025-02-20T05:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 214.0,
        "summer_net_mw": 214.0,
        "winter_net_mw": 214.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493325,
        "projectNumber": "J3893",
        "queueDate": "2025-02-20T05:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "AECC AUBREY - RITCHIE SWYD 230.0kV",
        "summerNetMW": 214.0,
        "winterNetMW": 214.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3695,
      "normalized": {
        "queue_id": "J3906",
        "county": "Stoddard",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "5STODDARD - 5MORLEY (AECI) 161.0kV",
        "queue_date": "2025-03-12T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493326,
        "projectNumber": "J3906",
        "queueDate": "2025-03-12T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Stoddard",
        "state": "MO",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "5STODDARD - 5MORLEY (AECI) 161.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3696,
      "normalized": {
        "queue_id": "J3929",
        "county": "Audrain",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "SPENCER CREEK",
        "queue_date": "2025-01-31T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493327,
        "projectNumber": "J3929",
        "queueDate": "2025-01-31T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-10-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Audrain",
        "state": "MO",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SPENCER CREEK",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3697,
      "normalized": {
        "queue_id": "J4076",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "NELSON 500 SWYD - RICHARD 500.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493328,
        "projectNumber": "J4076",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "NELSON 500 SWYD - RICHARD 500.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3698,
      "normalized": {
        "queue_id": "J3908",
        "county": "St. Joseph",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BATAVIA - MORROW  138.0kV",
        "queue_date": "2025-03-10T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 196.0,
        "summer_net_mw": 196.0,
        "winter_net_mw": 196.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493329,
        "projectNumber": "J3908",
        "queueDate": "2025-03-10T04:00:00+00:00",
        "inService": "2025-04-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "St. Joseph",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "BATAVIA - MORROW  138.0kV",
        "summerNetMW": 196.0,
        "winterNetMW": 196.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3699,
      "normalized": {
        "queue_id": "J3931",
        "county": "Jasper",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Other_",
        "queue_date": "2025-02-07T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 500.0,
        "dp1_nris_mw": 500.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493330,
        "projectNumber": "J3931",
        "queueDate": "2025-02-07T05:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Jasper",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 500.0,
        "dp1NrisMw": 500.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3700,
      "normalized": {
        "queue_id": "J4082",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "Other_",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493331,
        "projectNumber": "J4082",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3701,
      "normalized": {
        "queue_id": "J4085",
        "county": "Dickinson",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Nordic",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 42.0,
        "summer_net_mw": 42.0,
        "winter_net_mw": 42.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 42.0,
        "dp1_nris_mw": 42.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493332,
        "projectNumber": "J4085",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2027-10-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dickinson",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Nordic",
        "summerNetMW": 42.0,
        "winterNetMW": 42.0,
        "dp1ErisMw": 42.0,
        "dp1NrisMw": 42.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3702,
      "normalized": {
        "queue_id": "J4100",
        "county": "Livingston",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "COLY - WILLOW GLEN 500 SWYD 500.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493333,
        "projectNumber": "J4100",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Livingston",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "COLY - WILLOW GLEN 500 SWYD 500.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3703,
      "normalized": {
        "queue_id": "J4118",
        "county": "McLean",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Radbourn 345kV (LRTP-41)",
        "queue_date": "2025-09-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493334,
        "projectNumber": "J4118",
        "queueDate": "2025-09-24T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "McLean",
        "state": "IL",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Radbourn 345kV (LRTP-41)",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3704,
      "normalized": {
        "queue_id": "J4086",
        "county": "Wapello",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ottumwa Generation - Tri-County 161kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493335,
        "projectNumber": "J4086",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2029-04-02T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Wapello",
        "state": "IA",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Ottumwa Generation - Tri-County 161kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3705,
      "normalized": {
        "queue_id": "J4124",
        "county": "Trinity",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC.",
        "poi": "MAGNOLIA GROVETON - KICKAPOO (L-111) TAP 138.0kV",
        "queue_date": "2025-08-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493336,
        "projectNumber": "J4124",
        "queueDate": "2025-08-25T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC.",
        "county": "Trinity",
        "state": "TX",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "MAGNOLIA GROVETON - KICKAPOO (L-111) TAP 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3706,
      "normalized": {
        "queue_id": "J4143",
        "county": "West Carroll",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "DARNELL",
        "queue_date": "2025-10-04T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493337,
        "projectNumber": "J4143",
        "queueDate": "2025-10-04T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "West Carroll",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "DARNELL",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3707,
      "normalized": {
        "queue_id": "J4150",
        "county": "Cass",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO.",
        "poi": "ATLANTIC - ADAIR 161.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 42.24,
        "summer_net_mw": 42.24,
        "winter_net_mw": 42.24,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 39.0,
        "dp1_nris_mw": 39.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493338,
        "projectNumber": "J4150",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO.",
        "county": "Cass",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "ATLANTIC - ADAIR 161.0kV",
        "summerNetMW": 42.24,
        "winterNetMW": 42.24,
        "dp1ErisMw": 39.0,
        "dp1NrisMw": 39.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3708,
      "normalized": {
        "queue_id": "J4132",
        "county": "Benton",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Mud Lake - Benton County (GRE) 230kV",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 303.8,
        "summer_net_mw": 303.8,
        "winter_net_mw": 303.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493339,
        "projectNumber": "J4132",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-01-31T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Benton",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Mud Lake - Benton County (GRE) 230kV",
        "summerNetMW": 303.8,
        "winterNetMW": 303.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3709,
      "normalized": {
        "queue_id": "J4145",
        "county": "Cerro Gordo",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Emery",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 98.0,
        "summer_net_mw": 98.0,
        "winter_net_mw": 98.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493340,
        "projectNumber": "J4145",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Cerro Gordo",
        "state": "IA",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Emery",
        "summerNetMW": 98.0,
        "winterNetMW": 98.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3710,
      "normalized": {
        "queue_id": "J4149",
        "county": "Grant",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Big Stone South 345 kV substation",
        "queue_date": "2025-10-05T04:00:00+00:00",
        "withdrawn_date": "2025-12-24T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493341,
        "projectNumber": "J4149",
        "queueDate": "2025-10-05T04:00:00+00:00",
        "withdrawnDate": "2025-12-24T05:00:00+00:00",
        "inService": "2030-04-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Grant",
        "state": "SD",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Big Stone South 345 kV substation",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3711,
      "normalized": {
        "queue_id": "J4155",
        "county": "Linn",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Prairie Creek - Stony Point 115kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 195.0,
        "summer_net_mw": 195.0,
        "winter_net_mw": 195.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493342,
        "projectNumber": "J4155",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2029-09-03T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "IA",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Prairie Creek - Stony Point 115kV",
        "summerNetMW": 195.0,
        "winterNetMW": 195.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3712,
      "normalized": {
        "queue_id": "J4168",
        "county": "Goodhue",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "NROC 3 (601039) to PR ISLD3 (601003) 345 kV line",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 330.0,
        "summer_net_mw": 330.0,
        "winter_net_mw": 330.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 330.0,
        "dp1_nris_mw": 330.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493343,
        "projectNumber": "J4168",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "inService": "2028-04-03T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Goodhue",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "NROC 3 (601039) to PR ISLD3 (601003) 345 kV line",
        "summerNetMW": 330.0,
        "winterNetMW": 330.0,
        "dp1ErisMw": 330.0,
        "dp1NrisMw": 330.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3713,
      "normalized": {
        "queue_id": "R5088",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "GOOS FERRY",
        "queue_date": "2025-11-18T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 325.0,
        "summer_net_mw": 325.0,
        "winter_net_mw": 325.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493344,
        "projectNumber": "R5088",
        "queueDate": "2025-11-18T05:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "GOOS FERRY",
        "summerNetMW": 325.0,
        "winterNetMW": 325.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3714,
      "normalized": {
        "queue_id": "J4131",
        "county": "Scott",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "J1347 TO Switchyard (115kV Entergy MS Switchyard)",
        "queue_date": "2025-10-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493345,
        "projectNumber": "J4131",
        "queueDate": "2025-10-01T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "Scott",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "J1347 TO Switchyard (115kV Entergy MS Switchyard)",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3715,
      "normalized": {
        "queue_id": "J4167",
        "county": "Allegan",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "ARGENTA",
        "queue_date": "2025-09-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493346,
        "projectNumber": "J4167",
        "queueDate": "2025-09-17T04:00:00+00:00",
        "inService": "2030-10-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Allegan",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "ARGENTA",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3716,
      "normalized": {
        "queue_id": "S1125",
        "county": "St. Francis",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "queue_date": "2025-10-20T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493347,
        "projectNumber": "S1125",
        "queueDate": "2025-10-20T04:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "St. Francis",
        "state": "AR",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "WEST MEMPHIS EHV - KEO EHV 500.0kV",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3717,
      "normalized": {
        "queue_id": "S1132",
        "county": "Walworth",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "North Creek 138kV Station",
        "queue_date": "2025-09-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493348,
        "projectNumber": "S1132",
        "queueDate": "2025-09-12T04:00:00+00:00",
        "inService": "2027-05-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Walworth",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "North Creek 138kV Station",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3718,
      "normalized": {
        "queue_id": "J4188",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "Cole - Cooper 230.0kV",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 140.0,
        "summer_net_mw": 140.0,
        "winter_net_mw": 140.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-06T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 140.0,
        "dp1_nris_mw": 140.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493349,
        "projectNumber": "J4188",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "inService": "2029-09-06T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Cole - Cooper 230.0kV",
        "summerNetMW": 140.0,
        "winterNetMW": 140.0,
        "dp1ErisMw": 140.0,
        "dp1NrisMw": 140.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3719,
      "normalized": {
        "queue_id": "R5083",
        "county": "St. James",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "CHACKBAY - VACHERIE 230.0kV",
        "queue_date": "2025-09-30T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 135.0,
        "summer_net_mw": 135.0,
        "winter_net_mw": 135.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493350,
        "projectNumber": "R5083",
        "queueDate": "2025-09-30T04:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. James",
        "state": "LA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "CHACKBAY - VACHERIE 230.0kV",
        "summerNetMW": 135.0,
        "winterNetMW": 135.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3720,
      "normalized": {
        "queue_id": "R5084",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "DONALDSONVILLE - EVERGREEN 230.0kV",
        "queue_date": "2025-11-04T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493351,
        "projectNumber": "R5084",
        "queueDate": "2025-11-04T05:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "DONALDSONVILLE - EVERGREEN 230.0kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3721,
      "normalized": {
        "queue_id": "J3516",
        "county": "Jackson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Makanda North",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-08-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 83.4,
        "summer_net_mw": 83.4,
        "winter_net_mw": 83.4,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-05-25T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493352,
        "projectNumber": "J3516",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-08-14T04:00:00+00:00",
        "inService": "2026-05-25T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jackson",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "Makanda North",
        "summerNetMW": 83.4,
        "winterNetMW": 83.4,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3722,
      "normalized": {
        "queue_id": "S1135",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Adams",
        "queue_date": "2025-12-23T02:01:14+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493353,
        "projectNumber": "S1135",
        "queueDate": "2025-12-23T02:01:14+00:00",
        "inService": "2028-04-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Adams",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3723,
      "normalized": {
        "queue_id": "J4172",
        "county": "Wapello",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Ottumwa Generating St. 161 kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 99.0,
        "summer_net_mw": 99.0,
        "winter_net_mw": 99.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493354,
        "projectNumber": "J4172",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2028-08-31T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Wapello",
        "state": "IA",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Ottumwa Generating St. 161 kV",
        "summerNetMW": 99.0,
        "winterNetMW": 99.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3724,
      "normalized": {
        "queue_id": "S1170",
        "county": "Union",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "HUTTIG SS - STRONG SS 115.0kV",
        "queue_date": "2025-06-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493355,
        "projectNumber": "S1170",
        "queueDate": "2025-06-27T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Union",
        "state": "AR",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "HUTTIG SS - STRONG SS 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3725,
      "normalized": {
        "queue_id": "J3517",
        "county": "Williamson",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Ordill",
        "queue_date": "2024-04-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 145.0,
        "dp1_nris_mw": 145.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493356,
        "projectNumber": "J3517",
        "queueDate": "2024-04-19T04:00:00+00:00",
        "inService": "2028-10-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Williamson",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Ordill",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 145.0,
        "dp1NrisMw": 145.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3726,
      "normalized": {
        "queue_id": "S1179",
        "county": "Portage",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Plover",
        "queue_date": "2026-07-09T01:49:42+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493357,
        "projectNumber": "S1179",
        "queueDate": "2026-07-09T01:49:42+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Portage",
        "state": "WI",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Plover",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3727,
      "normalized": {
        "queue_id": "J3770",
        "county": "Randolph",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "The Baldwin 345kV substation found in the drop down. But please note the POI is same as J1202. The p",
        "queue_date": "2024-04-01T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 45.8,
        "summer_net_mw": 45.8,
        "winter_net_mw": 45.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493358,
        "projectNumber": "J3770",
        "queueDate": "2024-04-01T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-04-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Randolph",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "The Baldwin 345kV substation found in the drop down. But please note the POI is same as J1202. The p",
        "summerNetMW": 45.8,
        "winterNetMW": 45.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3728,
      "normalized": {
        "queue_id": "J3772",
        "county": "Panola",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BATESVILLE [MS] - MARKS 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493359,
        "projectNumber": "J3772",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-07-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Panola",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BATESVILLE [MS] - MARKS 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3729,
      "normalized": {
        "queue_id": "J3775",
        "county": "Desha",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "DUMAS - REED SS 115.0kV",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493360,
        "projectNumber": "J3775",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-12-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Desha",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "DUMAS - REED SS 115.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3730,
      "normalized": {
        "queue_id": "J3515",
        "county": "Sangamon",
        "state": "IL",
        "transmission_owner": "CITY WATER LIGHT & POWER",
        "poi": "343505 Interstate",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 199.9,
        "summer_net_mw": 199.9,
        "winter_net_mw": 199.9,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-05-25T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 199.9,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493361,
        "projectNumber": "J3515",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "inService": "2026-05-25T04:00:00+00:00",
        "transmissionOwner": "CITY WATER LIGHT & POWER",
        "county": "Sangamon",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "343505 Interstate",
        "summerNetMW": 199.9,
        "winterNetMW": 199.9,
        "dp1ErisMw": 199.9,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3731,
      "normalized": {
        "queue_id": "J3726",
        "county": "Hancock",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Skillman",
        "queue_date": "2024-03-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-15T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493362,
        "projectNumber": "J3726",
        "queueDate": "2024-03-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2027-01-15T05:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Hancock",
        "state": "KY",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Skillman",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3732,
      "normalized": {
        "queue_id": "J3771",
        "county": "Sabine",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Fisher - Many 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493363,
        "projectNumber": "J3771",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Sabine",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Fisher - Many 138.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3733,
      "normalized": {
        "queue_id": "J3774",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 303.0,
        "summer_net_mw": 303.0,
        "winter_net_mw": 303.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493364,
        "projectNumber": "J3774",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-07-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "summerNetMW": 303.0,
        "winterNetMW": 303.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3734,
      "normalized": {
        "queue_id": "J2206",
        "county": "Fountain",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Attica Substation 230kV",
        "queue_date": "2021-08-19T04:00:00+00:00",
        "withdrawn_date": "2023-04-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493365,
        "projectNumber": "J2206",
        "queueDate": "2021-08-19T04:00:00+00:00",
        "withdrawnDate": "2023-04-04T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Fountain",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Attica Substation 230kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3735,
      "normalized": {
        "queue_id": "J3700",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7BUNSONVILLE - 7SIDNEY   345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493366,
        "projectNumber": "J3700",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7BUNSONVILLE - 7SIDNEY   345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3736,
      "normalized": {
        "queue_id": "J3773",
        "county": "Drew",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "MONTICELLO EAST - REED SS 115.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 265.0,
        "summer_net_mw": 265.0,
        "winter_net_mw": 265.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493367,
        "projectNumber": "J3773",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-07-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Drew",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MONTICELLO EAST - REED SS 115.0kV",
        "summerNetMW": 265.0,
        "winterNetMW": 265.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3737,
      "normalized": {
        "queue_id": "J3239",
        "county": "Christian",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Pana 138kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493368,
        "projectNumber": "J3239",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Christian",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Pana 138kV",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3738,
      "normalized": {
        "queue_id": "J3694",
        "county": "Vermillion",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Sugar Creek - Cayuga CT  345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493369,
        "projectNumber": "J3694",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vermillion",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sugar Creek - Cayuga CT  345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3739,
      "normalized": {
        "queue_id": "J3705",
        "county": "Redwood",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493370,
        "projectNumber": "J3705",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Redwood",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3740,
      "normalized": {
        "queue_id": "J1987",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Coventry",
        "queue_date": "2021-08-23T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493371,
        "projectNumber": "J1987",
        "queueDate": "2021-08-23T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Coventry",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3741,
      "normalized": {
        "queue_id": "J3818",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4PANA 1 - 4SHELBYVL E 138.0kV",
        "queue_date": "2024-06-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "ERIS",
        "dp1_eris_mw": 40.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493372,
        "projectNumber": "J3818",
        "queueDate": "2024-06-07T04:00:00+00:00",
        "inService": "2028-03-01T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "ERIS",
        "poiName": "4PANA 1 - 4SHELBYVL E 138.0kV",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 40.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3742,
      "normalized": {
        "queue_id": "J3706",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "GILMORE - WILSON 161.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493373,
        "projectNumber": "J3706",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2030-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "GILMORE - WILSON 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3743,
      "normalized": {
        "queue_id": "J2017",
        "county": "Daviess",
        "state": "KY",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "F B Culley- Northeast 138kV",
        "queue_date": "2021-08-26T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493374,
        "projectNumber": "J2017",
        "queueDate": "2021-08-26T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2025-10-01T04:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "Daviess",
        "state": "KY",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "F B Culley- Northeast 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3744,
      "normalized": {
        "queue_id": "J3710",
        "county": "Jersey",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Jerseyville Northwest",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493375,
        "projectNumber": "J3710",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-07-31T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Jersey",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Jerseyville Northwest",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3745,
      "normalized": {
        "queue_id": "J3714",
        "county": "Scott",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SMEP",
        "poi": "Homewood 69 - Lake 69.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-07-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 95.0,
        "summer_net_mw": 95.0,
        "winter_net_mw": 95.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493376,
        "projectNumber": "J3714",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-07-15T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SMEP",
        "county": "Scott",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Homewood 69 - Lake 69.0kV",
        "summerNetMW": 95.0,
        "winterNetMW": 95.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3746,
      "normalized": {
        "queue_id": "J1865",
        "county": "Hardin",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Quinn-Blackhawk 345kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2021-09-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493377,
        "projectNumber": "J1865",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2021-09-17T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Hardin",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Quinn-Blackhawk 345kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3747,
      "normalized": {
        "queue_id": "J2067",
        "county": "Clay",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Tamarac",
        "queue_date": "2021-09-14T04:00:00+00:00",
        "withdrawn_date": "2021-10-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 39.4,
        "summer_net_mw": 39.4,
        "winter_net_mw": 39.4,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493378,
        "projectNumber": "J2067",
        "queueDate": "2021-09-14T04:00:00+00:00",
        "withdrawnDate": "2021-10-12T04:00:00+00:00",
        "inService": "2024-09-01T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Clay",
        "state": "MN",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Tamarac",
        "summerNetMW": 39.4,
        "winterNetMW": 39.4,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3748,
      "normalized": {
        "queue_id": "J3734",
        "county": "Oakland",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "STRATFORD",
        "queue_date": "2024-04-05T04:00:00+00:00",
        "withdrawn_date": "2025-09-24T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493379,
        "projectNumber": "J3734",
        "queueDate": "2024-04-05T04:00:00+00:00",
        "withdrawnDate": "2025-09-24T04:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Oakland",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "STRATFORD",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3749,
      "normalized": {
        "queue_id": "J3757",
        "county": "Dubuque",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Salem 161kv",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-03-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493380,
        "projectNumber": "J3757",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-03-13T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Dubuque",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Salem 161kv",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3750,
      "normalized": {
        "queue_id": "J3769",
        "county": "Saginaw",
        "state": "MI",
        "transmission_owner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "poi": "MURPHY - NELSON ROAD 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493381,
        "projectNumber": "J3769",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "WOLVERINE POWER SUPPLY COOPERATIVE",
        "county": "Saginaw",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "MURPHY - NELSON ROAD 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3751,
      "normalized": {
        "queue_id": "J2299",
        "county": "Greene",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Marmaduke",
        "queue_date": "2021-09-09T04:00:00+00:00",
        "withdrawn_date": "2023-04-04T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493382,
        "projectNumber": "J2299",
        "queueDate": "2021-09-09T04:00:00+00:00",
        "withdrawnDate": "2023-04-04T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Greene",
        "state": "AR",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Marmaduke",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3752,
      "normalized": {
        "queue_id": "J3237",
        "county": "Itasca",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "National Tac Plant 115kV (Customer-owned)",
        "queue_date": "2024-04-09T04:00:00+00:00",
        "withdrawn_date": "2025-07-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 86.0,
        "summer_net_mw": 86.0,
        "winter_net_mw": 86.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-09T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493383,
        "projectNumber": "J3237",
        "queueDate": "2024-04-09T04:00:00+00:00",
        "withdrawnDate": "2025-07-30T04:00:00+00:00",
        "inService": "2028-06-09T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Itasca",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "National Tac Plant 115kV (Customer-owned)",
        "summerNetMW": 86.0,
        "winterNetMW": 86.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3753,
      "normalized": {
        "queue_id": "J3238",
        "county": "Evangeline",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "Cocodrie - Ville Platte 230.0kV",
        "queue_date": "2024-04-10T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 155.0,
        "summer_net_mw": 155.0,
        "winter_net_mw": 155.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493384,
        "projectNumber": "J3238",
        "queueDate": "2024-04-10T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Evangeline",
        "state": "LA",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cocodrie - Ville Platte 230.0kV",
        "summerNetMW": 155.0,
        "winterNetMW": 155.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3754,
      "normalized": {
        "queue_id": "J1859",
        "county": "Pottawattamie",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "Council Bluffs - Fallow Avenue 345kV Line Tap",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2021-10-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493385,
        "projectNumber": "J1859",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2021-10-12T04:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Pottawattamie",
        "state": "IA",
        "studyCycle": "DPP-2021",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Council Bluffs - Fallow Avenue 345kV Line Tap",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3755,
      "normalized": {
        "queue_id": "J2303",
        "county": "Waushara",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Sand Lake 138kV Substation",
        "queue_date": "2021-07-19T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ATC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493386,
        "projectNumber": "J2303",
        "queueDate": "2021-07-19T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Waushara",
        "state": "WI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Sand Lake 138kV Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3756,
      "normalized": {
        "queue_id": "J3693",
        "county": "Marshall",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "BURR OAK - LEESBURG 345.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493387,
        "projectNumber": "J3693",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Marshall",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "BURR OAK - LEESBURG 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3757,
      "normalized": {
        "queue_id": "J3695",
        "county": "Clark",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7CASEY - 7SNYDER  345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493388,
        "projectNumber": "J3695",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Clark",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "7CASEY - 7SNYDER  345.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3758,
      "normalized": {
        "queue_id": "J3804",
        "county": "Putnam",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Edwardsport IGCC - Amo 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-29T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493389,
        "projectNumber": "J3804",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-29T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Putnam",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Edwardsport IGCC - Amo 345.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3759,
      "normalized": {
        "queue_id": "J3749",
        "county": "Lyon",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "LYON COUNTY",
        "queue_date": "2024-04-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493390,
        "projectNumber": "J3749",
        "queueDate": "2024-04-11T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Lyon",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "LYON COUNTY",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3760,
      "normalized": {
        "queue_id": "J3699",
        "county": "Henry",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SUB 39 - OAK GROVE 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493391,
        "projectNumber": "J3699",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Henry",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "SUB 39 - OAK GROVE 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3761,
      "normalized": {
        "queue_id": "J3704",
        "county": "Redwood",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493392,
        "projectNumber": "J3704",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Redwood",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3762,
      "normalized": {
        "queue_id": "J3758",
        "county": "Macon",
        "state": "MO",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493393,
        "projectNumber": "J3758",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Macon",
        "state": "MO",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3763,
      "normalized": {
        "queue_id": "J3801",
        "county": "Mercer",
        "state": "IL",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "OAK GROVE - SANDBURG (AMRN) 345.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 195.64,
        "summer_net_mw": 195.64,
        "winter_net_mw": 195.64,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 195.64,
        "dp1_nris_mw": 195.64,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493394,
        "projectNumber": "J3801",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Mercer",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "OAK GROVE - SANDBURG (AMRN) 345.0kV",
        "summerNetMW": 195.64,
        "winterNetMW": 195.64,
        "dp1ErisMw": 195.64,
        "dp1NrisMw": 195.64,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3764,
      "normalized": {
        "queue_id": "J3683",
        "county": "Scott",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4BALLARD - 4MEREDOSA 138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-12-23T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493395,
        "projectNumber": "J3683",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-12-23T05:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Scott",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4BALLARD - 4MEREDOSA 138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3765,
      "normalized": {
        "queue_id": "J3703",
        "county": "Itasca",
        "state": "MN",
        "transmission_owner": "MINNESOTA POWER INC.",
        "poi": "Blackberry 230/115kV",
        "queue_date": "2024-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493396,
        "projectNumber": "J3703",
        "queueDate": "2024-03-25T04:00:00+00:00",
        "inService": "2028-06-15T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA POWER INC.",
        "county": "Itasca",
        "state": "MN",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Blackberry 230/115kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3766,
      "normalized": {
        "queue_id": "J1881",
        "county": "Decatur",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "Decatur Switching Station 161kV",
        "queue_date": "2021-08-16T04:00:00+00:00",
        "withdrawn_date": "2021-12-08T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 48.0,
        "summer_net_mw": 48.0,
        "winter_net_mw": 48.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493397,
        "projectNumber": "J1881",
        "queueDate": "2021-08-16T04:00:00+00:00",
        "withdrawnDate": "2021-12-08T05:00:00+00:00",
        "inService": "2024-09-15T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Decatur",
        "state": "IN",
        "studyCycle": "DPP-2021",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Decatur Switching Station 161kV",
        "summerNetMW": 48.0,
        "winterNetMW": 48.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3767,
      "normalized": {
        "queue_id": "J2058",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Monroe to Wayne",
        "queue_date": "2021-08-24T04:00:00+00:00",
        "withdrawn_date": "2021-09-07T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "East (ITC)",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493398,
        "projectNumber": "J2058",
        "queueDate": "2021-08-24T04:00:00+00:00",
        "withdrawnDate": "2021-09-07T04:00:00+00:00",
        "inService": "2024-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2021",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "Monroe to Wayne",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3768,
      "normalized": {
        "queue_id": "J1887",
        "county": "St. Martin",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "St John 69kV",
        "queue_date": "2021-08-13T04:00:00+00:00",
        "withdrawn_date": "2021-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 90.0,
        "summer_net_mw": 90.0,
        "winter_net_mw": 90.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2021",
        "study_group": "South",
        "study_phase": "Phase 3",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493399,
        "projectNumber": "J1887",
        "queueDate": "2021-08-13T04:00:00+00:00",
        "withdrawnDate": "2021-12-09T05:00:00+00:00",
        "inService": "2024-11-30T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "St. Martin",
        "state": "LA",
        "studyCycle": "DPP-2021",
        "studyGroup": "South",
        "studyPhase": "Phase 3",
        "svcType": "NRIS",
        "poiName": "St John 69kV",
        "summerNetMW": 90.0,
        "winterNetMW": 90.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3769,
      "normalized": {
        "queue_id": "J3819",
        "county": "Madison",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "CATLETT - TINNIN ROAD 230.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-08-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 36.1,
        "summer_net_mw": 36.1,
        "winter_net_mw": 36.1,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "South",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493400,
        "projectNumber": "J3819",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-08-15T04:00:00+00:00",
        "inService": "2027-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Madison",
        "state": "MS",
        "studyCycle": "DPP-2023",
        "studyGroup": "South",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "CATLETT - TINNIN ROAD 230.0kV",
        "summerNetMW": 36.1,
        "winterNetMW": 36.1,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3770,
      "normalized": {
        "queue_id": "J3817",
        "county": "Allegan",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Other_",
        "queue_date": "2024-04-11T04:00:00+00:00",
        "withdrawn_date": "2025-09-30T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 175.0,
        "summer_net_mw": 175.0,
        "winter_net_mw": 175.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-17T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493401,
        "projectNumber": "J3817",
        "queueDate": "2024-04-11T04:00:00+00:00",
        "withdrawnDate": "2025-09-30T04:00:00+00:00",
        "inService": "2028-08-17T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Allegan",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 175.0,
        "winterNetMW": 175.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3771,
      "normalized": {
        "queue_id": "J3754",
        "county": "Iroquois",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 146.66,
        "summer_net_mw": 146.66,
        "winter_net_mw": 146.66,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 146.66,
        "dp1_nris_mw": 146.66,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493402,
        "projectNumber": "J3754",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Iroquois",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 146.66,
        "winterNetMW": 146.66,
        "dp1ErisMw": 146.66,
        "dp1NrisMw": 146.66,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3772,
      "normalized": {
        "queue_id": "J3910",
        "county": "Newton",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Other_",
        "queue_date": "2025-02-28T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 300.0,
        "dp1_nris_mw": 300.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493403,
        "projectNumber": "J3910",
        "queueDate": "2025-02-28T05:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Newton",
        "state": "IN",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 300.0,
        "dp1NrisMw": 300.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3773,
      "normalized": {
        "queue_id": "J3885",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "STERLINGTON 115 SWYD - AECC MERIDIAN 115.0kV",
        "queue_date": "2025-02-25T05:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493404,
        "projectNumber": "J3885",
        "queueDate": "2025-02-25T05:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "STERLINGTON 115 SWYD - AECC MERIDIAN 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3774,
      "normalized": {
        "queue_id": "J3745",
        "county": "Dearborn",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Sunman Weisburg",
        "queue_date": "2024-04-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 150.0,
        "dp1_nris_mw": 150.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493405,
        "projectNumber": "J3745",
        "queueDate": "2024-04-15T04:00:00+00:00",
        "inService": "2028-07-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Dearborn",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Sunman Weisburg",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 150.0,
        "dp1NrisMw": 150.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3775,
      "normalized": {
        "queue_id": "J3684",
        "county": "Morgan",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4JACK_IND N - 4YATES  138.0kV",
        "queue_date": "2024-04-17T04:00:00+00:00",
        "withdrawn_date": "2025-04-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493406,
        "projectNumber": "J3684",
        "queueDate": "2024-04-17T04:00:00+00:00",
        "withdrawnDate": "2025-04-22T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Morgan",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4JACK_IND N - 4YATES  138.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3776,
      "normalized": {
        "queue_id": "J3886",
        "county": "Swift",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South - Alexandria 345kV",
        "queue_date": "2025-02-11T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493407,
        "projectNumber": "J3886",
        "queueDate": "2025-02-11T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-04-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Swift",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Big Stone South - Alexandria 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3777,
      "normalized": {
        "queue_id": "J4220",
        "county": "",
        "state": "",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "",
        "queue_date": "2026-02-26T01:51:55+00:00",
        "withdrawn_date": "2026-05-28T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 1500.0,
        "summer_net_mw": 1500.0,
        "winter_net_mw": 1500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493408,
        "projectNumber": "J4220",
        "queueDate": "2026-02-26T01:51:55+00:00",
        "withdrawnDate": "2026-05-28T04:00:00+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 1500.0,
        "winterNetMW": 1500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3778,
      "normalized": {
        "queue_id": "J3740",
        "county": "Putnam",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Other_",
        "queue_date": "2024-04-16T04:00:00+00:00",
        "withdrawn_date": "2025-07-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493409,
        "projectNumber": "J3740",
        "queueDate": "2024-04-16T04:00:00+00:00",
        "withdrawnDate": "2025-07-01T04:00:00+00:00",
        "inService": "2027-09-15T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Putnam",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3779,
      "normalized": {
        "queue_id": "J4217",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY SERVICES, LLC.",
        "poi": "",
        "queue_date": "2026-02-23T23:10:31+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 800.0,
        "summer_net_mw": 800.0,
        "winter_net_mw": 800.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493410,
        "projectNumber": "J4217",
        "queueDate": "2026-02-23T23:10:31+00:00",
        "inService": "2031-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY SERVICES, LLC.",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 800.0,
        "winterNetMW": 800.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3780,
      "normalized": {
        "queue_id": "J3753",
        "county": "Iroquois",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 195.55,
        "summer_net_mw": 195.55,
        "winter_net_mw": 195.55,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 195.55,
        "dp1_nris_mw": 195.55,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493411,
        "projectNumber": "J3753",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Iroquois",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 195.55,
        "winterNetMW": 195.55,
        "dp1ErisMw": 195.55,
        "dp1NrisMw": 195.55,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3781,
      "normalized": {
        "queue_id": "J3755",
        "county": "Iroquois",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 146.66,
        "summer_net_mw": 146.66,
        "winter_net_mw": 146.66,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 146.66,
        "dp1_nris_mw": 146.66,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493412,
        "projectNumber": "J3755",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Iroquois",
        "state": "IL",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 146.66,
        "winterNetMW": 146.66,
        "dp1ErisMw": 146.66,
        "dp1NrisMw": 146.66,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3782,
      "normalized": {
        "queue_id": "J3702",
        "county": "Mitchell",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "ADAMS",
        "queue_date": "2024-03-27T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "West",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493413,
        "projectNumber": "J3702",
        "queueDate": "2024-03-27T04:00:00+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Mitchell",
        "state": "IA",
        "studyCycle": "DPP-2023",
        "studyGroup": "West",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ADAMS",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3783,
      "normalized": {
        "queue_id": "S1109",
        "county": "Kossuth",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Bison",
        "queue_date": "2025-07-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2019-10-18T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493414,
        "projectNumber": "S1109",
        "queueDate": "2025-07-11T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "negInService": "2019-10-18T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Kossuth",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Bison",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3784,
      "normalized": {
        "queue_id": "J3912",
        "county": "Chippewa",
        "state": "WI",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Red Cedar - Wheaton 56 161.0kV",
        "queue_date": "2025-02-21T05:00:00+00:00",
        "withdrawn_date": "2026-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493415,
        "projectNumber": "J3912",
        "queueDate": "2025-02-21T05:00:00+00:00",
        "withdrawnDate": "2026-01-02T05:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chippewa",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Red Cedar - Wheaton 56 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3785,
      "normalized": {
        "queue_id": "S1174",
        "county": "",
        "state": "",
        "transmission_owner": "ITC",
        "poi": "",
        "queue_date": "2026-03-23T16:41:35+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493416,
        "projectNumber": "S1174",
        "queueDate": "2026-03-23T16:41:35+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3786,
      "normalized": {
        "queue_id": "S1159",
        "county": "",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2026-02-27T02:29:24+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493417,
        "projectNumber": "S1159",
        "queueDate": "2026-02-27T02:29:24+00:00",
        "inService": "2028-08-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "WI",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3787,
      "normalized": {
        "queue_id": "J4228",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2026-03-19T21:36:16+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2032-04-20T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493418,
        "projectNumber": "J4228",
        "queueDate": "2026-03-19T21:36:16+00:00",
        "inService": "2032-04-20T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3788,
      "normalized": {
        "queue_id": "R5100",
        "county": "Hot Spring",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Arklahoma 115 kV",
        "queue_date": "2026-07-22T22:09:39+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493419,
        "projectNumber": "R5100",
        "queueDate": "2026-07-22T22:09:39+00:00",
        "inService": "2028-04-15T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Hot Spring",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Arklahoma 115 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3789,
      "normalized": {
        "queue_id": "J4221",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "",
        "queue_date": "2026-02-26T01:53:49+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1500.0,
        "summer_net_mw": 1500.0,
        "winter_net_mw": 1500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493420,
        "projectNumber": "J4221",
        "queueDate": "2026-02-26T01:53:49+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 1500.0,
        "winterNetMW": 1500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3790,
      "normalized": {
        "queue_id": "S1139",
        "county": "",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY SME",
        "poi": "",
        "queue_date": "2026-03-04T09:27:50+00:00",
        "withdrawn_date": "2026-10-01T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 96.0,
        "summer_net_mw": 96.0,
        "winter_net_mw": 96.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493421,
        "projectNumber": "S1139",
        "queueDate": "2026-03-04T09:27:50+00:00",
        "withdrawnDate": "2026-10-01T04:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY SME",
        "county": "",
        "state": "MS",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 96.0,
        "winterNetMW": 96.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3791,
      "normalized": {
        "queue_id": "J4232",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-03-20T19:15:57+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493422,
        "projectNumber": "J4232",
        "queueDate": "2026-03-20T19:15:57+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3792,
      "normalized": {
        "queue_id": "J4236",
        "county": "",
        "state": "",
        "transmission_owner": "CLECO POWER LLC",
        "poi": "",
        "queue_date": "2026-03-20T20:03:44+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493423,
        "projectNumber": "J4236",
        "queueDate": "2026-03-20T20:03:44+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3793,
      "normalized": {
        "queue_id": "S1162",
        "county": "",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-03-20T20:58:20+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 390.0,
        "summer_net_mw": 390.0,
        "winter_net_mw": 390.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-03-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493424,
        "projectNumber": "S1162",
        "queueDate": "2026-03-20T20:58:20+00:00",
        "inService": "2029-03-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "AR",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 390.0,
        "winterNetMW": 390.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3794,
      "normalized": {
        "queue_id": "J4239",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-04-23T23:01:14+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 770.0,
        "summer_net_mw": 770.0,
        "winter_net_mw": 770.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493425,
        "projectNumber": "J4239",
        "queueDate": "2026-04-23T23:01:14+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 770.0,
        "winterNetMW": 770.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3795,
      "normalized": {
        "queue_id": "J4233",
        "county": "",
        "state": "",
        "transmission_owner": "ITC",
        "poi": "",
        "queue_date": "2026-03-21T01:18:26+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493426,
        "projectNumber": "J4233",
        "queueDate": "2026-03-21T01:18:26+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3796,
      "normalized": {
        "queue_id": "J4225",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-03-20T19:02:22+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493427,
        "projectNumber": "J4225",
        "queueDate": "2026-03-20T19:02:22+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3797,
      "normalized": {
        "queue_id": "J4235",
        "county": "Linn",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold",
        "queue_date": "2026-03-21T01:44:17+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493428,
        "projectNumber": "J4235",
        "queueDate": "2026-03-21T01:44:17+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Duane Arnold",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3798,
      "normalized": {
        "queue_id": "J3767",
        "county": "Crawford",
        "state": "IN",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "ECKERTY - BUECHLER 69.0kV",
        "queue_date": "2024-04-18T04:00:00+00:00",
        "withdrawn_date": "2025-09-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 38.0,
        "summer_net_mw": 38.0,
        "winter_net_mw": 38.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493429,
        "projectNumber": "J3767",
        "queueDate": "2024-04-18T04:00:00+00:00",
        "withdrawnDate": "2025-09-23T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "Crawford",
        "state": "IN",
        "studyCycle": "DPP-2023",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ECKERTY - BUECHLER 69.0kV",
        "summerNetMW": 38.0,
        "winterNetMW": 38.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3799,
      "normalized": {
        "queue_id": "J3911",
        "county": "Louisa",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "SUB 93 LOUISA - SUB T HASKINS 345.0kV",
        "queue_date": "2025-02-25T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 250.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493430,
        "projectNumber": "J3911",
        "queueDate": "2025-02-25T05:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "Louisa",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SUB 93 LOUISA - SUB T HASKINS 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 250.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3800,
      "normalized": {
        "queue_id": "R5096",
        "county": "Mississippi",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC Dell East - Blytheville Elm St 161 kV",
        "queue_date": "2026-03-17T06:40:55+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-07-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493431,
        "projectNumber": "R5096",
        "queueDate": "2026-03-17T06:40:55+00:00",
        "inService": "2027-07-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "AECC Dell East - Blytheville Elm St 161 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3801,
      "normalized": {
        "queue_id": "J4026",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "BEECHER - KNOWLES 138.0kV",
        "queue_date": "2025-05-21T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493432,
        "projectNumber": "J4026",
        "queueDate": "2025-05-21T04:00:00+00:00",
        "inService": "2029-01-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "BEECHER - KNOWLES 138.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3802,
      "normalized": {
        "queue_id": "J4027",
        "county": "Clay",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC MCDOUGAL - TEXAS EASTERN STA 8 161.0kV",
        "queue_date": "2025-05-28T04:00:00+00:00",
        "withdrawn_date": "2026-01-07T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493433,
        "projectNumber": "J4027",
        "queueDate": "2025-05-28T04:00:00+00:00",
        "withdrawnDate": "2026-01-07T05:00:00+00:00",
        "inService": "2030-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Clay",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "AECC MCDOUGAL - TEXAS EASTERN STA 8 161.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3803,
      "normalized": {
        "queue_id": "J3939",
        "county": "Beauregard",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "COLE to PENTON 230.0 kV",
        "queue_date": "2025-04-01T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 386.0,
        "summer_net_mw": 386.0,
        "winter_net_mw": 386.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493434,
        "projectNumber": "J3939",
        "queueDate": "2025-04-01T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Beauregard",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "COLE to PENTON 230.0 kV",
        "summerNetMW": 386.0,
        "winterNetMW": 386.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3804,
      "normalized": {
        "queue_id": "J3743",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "ARROWHEAD",
        "queue_date": "2024-04-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 175.5,
        "summer_net_mw": 175.5,
        "winter_net_mw": 175.5,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2023",
        "study_group": "East (ITC)",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 175.5,
        "dp1_nris_mw": 175.5,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493435,
        "projectNumber": "J3743",
        "queueDate": "2024-04-12T04:00:00+00:00",
        "inService": "2027-05-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "DPP-2023",
        "studyGroup": "East (ITC)",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "ARROWHEAD",
        "summerNetMW": 175.5,
        "winterNetMW": 175.5,
        "dp1ErisMw": 175.5,
        "dp1NrisMw": 175.5,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3805,
      "normalized": {
        "queue_id": "J4216",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY SERVICES, LLC.",
        "poi": "",
        "queue_date": "2026-02-23T21:49:02+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1500.0,
        "summer_net_mw": 1500.0,
        "winter_net_mw": 1500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493436,
        "projectNumber": "J4216",
        "queueDate": "2026-02-23T21:49:02+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY SERVICES, LLC.",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 1500.0,
        "winterNetMW": 1500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3806,
      "normalized": {
        "queue_id": "J4218",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY SERVICES, LLC.",
        "poi": "",
        "queue_date": "2026-02-24T02:16:35+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 800.0,
        "summer_net_mw": 800.0,
        "winter_net_mw": 800.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493437,
        "projectNumber": "J4218",
        "queueDate": "2026-02-24T02:16:35+00:00",
        "inService": "2031-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY SERVICES, LLC.",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 800.0,
        "winterNetMW": 800.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3807,
      "normalized": {
        "queue_id": "J4219",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "",
        "queue_date": "2026-02-24T03:15:09+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1500.0,
        "summer_net_mw": 1500.0,
        "winter_net_mw": 1500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493438,
        "projectNumber": "J4219",
        "queueDate": "2026-02-24T03:15:09+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 1500.0,
        "winterNetMW": 1500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3808,
      "normalized": {
        "queue_id": "S1146",
        "county": "Muskegon",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "DU PONT - WHITE LAKE 138.0kV",
        "queue_date": "2026-03-16T20:02:28+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 125.0,
        "summer_net_mw": 125.0,
        "winter_net_mw": 125.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493439,
        "projectNumber": "S1146",
        "queueDate": "2026-03-16T20:02:28+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Muskegon",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "DU PONT - WHITE LAKE 138.0kV",
        "summerNetMW": 125.0,
        "winterNetMW": 125.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3809,
      "normalized": {
        "queue_id": "S1172",
        "county": "Clinton",
        "state": "",
        "transmission_owner": "METC",
        "poi": "Calamus East",
        "queue_date": "2026-03-07T03:13:45+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493440,
        "projectNumber": "S1172",
        "queueDate": "2026-03-07T03:13:45+00:00",
        "inService": "2027-12-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Clinton",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Calamus East",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3810,
      "normalized": {
        "queue_id": "J4237",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2026-03-24T01:07:46+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493441,
        "projectNumber": "J4237",
        "queueDate": "2026-03-24T01:07:46+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3811,
      "normalized": {
        "queue_id": "J4230",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-03-20T18:56:10+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493442,
        "projectNumber": "J4230",
        "queueDate": "2026-03-20T18:56:10+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3812,
      "normalized": {
        "queue_id": "J4226",
        "county": "Story",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Story County",
        "queue_date": "2026-03-21T01:47:08+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493443,
        "projectNumber": "J4226",
        "queueDate": "2026-03-21T01:47:08+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Story",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Story County",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3813,
      "normalized": {
        "queue_id": "J4227",
        "county": "Story",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Story County",
        "queue_date": "2026-03-21T01:49:23+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493444,
        "projectNumber": "J4227",
        "queueDate": "2026-03-21T01:49:23+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Story",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Story County",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3814,
      "normalized": {
        "queue_id": "S1176",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-04-13T22:25:17+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493445,
        "projectNumber": "S1176",
        "queueDate": "2026-04-13T22:25:17+00:00",
        "inService": "2028-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3815,
      "normalized": {
        "queue_id": "J3955",
        "county": "Lac qui Parle",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South - Deuel County 345.0kV",
        "queue_date": "2025-04-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493446,
        "projectNumber": "J3955",
        "queueDate": "2025-04-08T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Lac qui Parle",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Big Stone South - Deuel County 345.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3816,
      "normalized": {
        "queue_id": "S1175",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2026-03-23T16:39:10+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493447,
        "projectNumber": "S1175",
        "queueDate": "2026-03-23T16:39:10+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3817,
      "normalized": {
        "queue_id": "J4234",
        "county": "",
        "state": "",
        "transmission_owner": "ITC",
        "poi": "",
        "queue_date": "2026-03-21T01:20:07+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493448,
        "projectNumber": "J4234",
        "queueDate": "2026-03-21T01:20:07+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3818,
      "normalized": {
        "queue_id": "J4224",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "",
        "queue_date": "2026-03-20T18:57:57+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493449,
        "projectNumber": "J4224",
        "queueDate": "2026-03-20T18:57:57+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3819,
      "normalized": {
        "queue_id": "J4229",
        "county": "",
        "state": "",
        "transmission_owner": "DAIRYLAND POWER COOPERATIVE",
        "poi": "",
        "queue_date": "2026-03-20T18:50:34+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493450,
        "projectNumber": "J4229",
        "queueDate": "2026-03-20T18:50:34+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "DAIRYLAND POWER COOPERATIVE",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3820,
      "normalized": {
        "queue_id": "S1173",
        "county": "Union",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "HUTTIG SS - STRONG SS 115.0kV",
        "queue_date": "2026-03-16T19:13:11+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493451,
        "projectNumber": "S1173",
        "queueDate": "2026-03-16T19:13:11+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Union",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "HUTTIG SS - STRONG SS 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3821,
      "normalized": {
        "queue_id": "J4024",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2025-05-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1499.0,
        "summer_net_mw": 1499.0,
        "winter_net_mw": 1499.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493452,
        "projectNumber": "J4024",
        "queueDate": "2025-05-05T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 1499.0,
        "winterNetMW": 1499.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3822,
      "normalized": {
        "queue_id": "J4025",
        "county": "Monroe",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Other_",
        "queue_date": "2025-05-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1499.0,
        "summer_net_mw": 1499.0,
        "winter_net_mw": 1499.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493453,
        "projectNumber": "J4025",
        "queueDate": "2025-05-05T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Monroe",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 1499.0,
        "winterNetMW": 1499.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3823,
      "normalized": {
        "queue_id": "J4041",
        "county": "Menard",
        "state": "IL",
        "transmission_owner": "",
        "poi": "Shockey",
        "queue_date": "2025-06-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493454,
        "projectNumber": "J4041",
        "queueDate": "2025-06-12T04:00:00+00:00",
        "inService": "2030-11-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Menard",
        "state": "IL",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Shockey",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3824,
      "normalized": {
        "queue_id": "J4043",
        "county": "Eaton",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Oneida",
        "queue_date": "2025-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 178.0,
        "summer_net_mw": 178.0,
        "winter_net_mw": 178.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493455,
        "projectNumber": "J4043",
        "queueDate": "2025-08-13T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Eaton",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Oneida",
        "summerNetMW": 178.0,
        "winterNetMW": 178.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3825,
      "normalized": {
        "queue_id": "J3969",
        "county": "Poinsett",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "HARRISBURG",
        "queue_date": "2025-03-10T04:00:00+00:00",
        "withdrawn_date": "2026-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 196.0,
        "summer_net_mw": 196.0,
        "winter_net_mw": 196.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493456,
        "projectNumber": "J3969",
        "queueDate": "2025-03-10T04:00:00+00:00",
        "withdrawnDate": "2026-01-02T05:00:00+00:00",
        "inService": "2030-10-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Poinsett",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "HARRISBURG",
        "summerNetMW": 196.0,
        "winterNetMW": 196.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3826,
      "normalized": {
        "queue_id": "J4040",
        "county": "Van Buren",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Palisades Switchyard",
        "queue_date": "2025-07-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 735.0,
        "summer_net_mw": 735.0,
        "winter_net_mw": 735.0,
        "proposed_completion_date": null,
        "generation_type": "Nuclear",
        "facility_type": "Nuclear",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493457,
        "projectNumber": "J4040",
        "queueDate": "2025-07-25T04:00:00+00:00",
        "inService": "2029-10-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Van Buren",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Palisades Switchyard",
        "summerNetMW": 735.0,
        "winterNetMW": 735.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Nuclear",
        "facilityType": "Nuclear",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3827,
      "normalized": {
        "queue_id": "J3954",
        "county": "Christian",
        "state": "IL",
        "transmission_owner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "poi": "7AUSTIN - 7PANA 345.0kV",
        "queue_date": "2025-04-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "ERIS",
        "dp1_eris_mw": 250.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493458,
        "projectNumber": "J3954",
        "queueDate": "2025-04-09T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN TRANSMISSION COMPANY OF ILLINOIS",
        "county": "Christian",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "ERIS",
        "poiName": "7AUSTIN - 7PANA 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 250.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3828,
      "normalized": {
        "queue_id": "J3970",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "MINDEN",
        "queue_date": "2025-04-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493459,
        "projectNumber": "J3970",
        "queueDate": "2025-04-01T04:00:00+00:00",
        "inService": "2029-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "MINDEN",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3829,
      "normalized": {
        "queue_id": "J3956",
        "county": "Wilkin",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Hankinson 230 kV Substation",
        "queue_date": "2025-04-21T04:00:00+00:00",
        "withdrawn_date": "2025-12-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 240.0,
        "summer_net_mw": 240.0,
        "winter_net_mw": 240.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493460,
        "projectNumber": "J3956",
        "queueDate": "2025-04-21T04:00:00+00:00",
        "withdrawnDate": "2025-12-19T05:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Wilkin",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Hankinson 230 kV Substation",
        "summerNetMW": 240.0,
        "winterNetMW": 240.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3830,
      "normalized": {
        "queue_id": "J4062",
        "county": "Jefferson",
        "state": "TX",
        "transmission_owner": "ENTERGY TEXAS, INC.",
        "poi": "Rhodair",
        "queue_date": "2025-06-17T04:00:00+00:00",
        "withdrawn_date": "2026-07-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Waste Heat Recovery",
        "facility_type": "Co-gen",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-05-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "0MW GIA",
        "study_group": "NA",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493461,
        "projectNumber": "J4062",
        "queueDate": "2025-06-17T04:00:00+00:00",
        "withdrawnDate": "2026-07-13T04:00:00+00:00",
        "inService": "2025-05-12T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC.",
        "county": "Jefferson",
        "state": "TX",
        "studyCycle": "0MW GIA",
        "studyGroup": "NA",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "Rhodair",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Waste Heat Recovery",
        "facilityType": "Co-gen",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3831,
      "normalized": {
        "queue_id": "J3918",
        "county": "Champaign",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4RANTOUL  - 4RISING   138.0kV",
        "queue_date": "2025-02-06T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 138.38,
        "summer_net_mw": 138.38,
        "winter_net_mw": 138.38,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 138.38,
        "dp1_nris_mw": 138.38,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493462,
        "projectNumber": "J3918",
        "queueDate": "2025-02-06T05:00:00+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Champaign",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "4RANTOUL  - 4RISING   138.0kV",
        "summerNetMW": 138.38,
        "winterNetMW": 138.38,
        "dp1ErisMw": 138.38,
        "dp1NrisMw": 138.38,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3832,
      "normalized": {
        "queue_id": "J4074",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "TWIST",
        "queue_date": "2025-09-29T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493463,
        "projectNumber": "J4074",
        "queueDate": "2025-09-29T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2029-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "TWIST",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3833,
      "normalized": {
        "queue_id": "J4044",
        "county": "Lenawee",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "BEECHER - SEEMLESS EAST 138.0kV",
        "queue_date": "2025-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 190.0,
        "summer_net_mw": 190.0,
        "winter_net_mw": 190.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493464,
        "projectNumber": "J4044",
        "queueDate": "2025-08-13T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "BEECHER - SEEMLESS EAST 138.0kV",
        "summerNetMW": 190.0,
        "winterNetMW": 190.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3834,
      "normalized": {
        "queue_id": "J4047",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "KARN - THETFORD (ATLANTA) 138.0kV",
        "queue_date": "2025-08-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 160.0,
        "summer_net_mw": 160.0,
        "winter_net_mw": 160.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493465,
        "projectNumber": "J4047",
        "queueDate": "2025-08-13T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "KARN - THETFORD (ATLANTA) 138.0kV",
        "summerNetMW": 160.0,
        "winterNetMW": 160.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3835,
      "normalized": {
        "queue_id": "J4081",
        "county": "Grant",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Big Stone South 345 kV substation",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493466,
        "projectNumber": "J4081",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2031-06-28T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Grant",
        "state": "SD",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Big Stone South 345 kV substation",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3836,
      "normalized": {
        "queue_id": "J4087",
        "county": "Blue Earth",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "SOUTH BEND",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2026-06-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 183.0,
        "summer_net_mw": 183.0,
        "winter_net_mw": 183.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493467,
        "projectNumber": "J4087",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2026-06-11T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Blue Earth",
        "state": "MN",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "SOUTH BEND",
        "summerNetMW": 183.0,
        "winterNetMW": 183.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3837,
      "normalized": {
        "queue_id": "J4050",
        "county": "Jefferson Davis",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "NELSON 500 SWYD - RICHARD 500.0kV",
        "queue_date": "2025-09-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 220.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 220.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493468,
        "projectNumber": "J4050",
        "queueDate": "2025-09-02T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Jefferson Davis",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "NELSON 500 SWYD - RICHARD 500.0kV",
        "summerNetMW": 220.0,
        "winterNetMW": 220.0,
        "dp1ErisMw": 220.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3838,
      "normalized": {
        "queue_id": "J3899",
        "county": "Putnam",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2024-12-03T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-11-07T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493469,
        "projectNumber": "J3899",
        "queueDate": "2024-12-03T05:00:00+00:00",
        "inService": "2027-11-07T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Putnam",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3839,
      "normalized": {
        "queue_id": "J3917",
        "county": "Columbia",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SPRINGHILL - TAYLOR 115.0kV",
        "queue_date": "2024-11-20T05:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493470,
        "projectNumber": "J3917",
        "queueDate": "2024-11-20T05:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Columbia",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SPRINGHILL - TAYLOR 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3840,
      "normalized": {
        "queue_id": "J4068",
        "county": "Marshall",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO.",
        "poi": "Lehigh - Marshalltown (Twinkle) 345kV",
        "queue_date": "2025-10-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 232.0,
        "summer_net_mw": 232.0,
        "winter_net_mw": 232.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 232.0,
        "dp1_nris_mw": 232.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493471,
        "projectNumber": "J4068",
        "queueDate": "2025-10-03T04:00:00+00:00",
        "inService": "2030-08-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO.",
        "county": "Marshall",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Lehigh - Marshalltown (Twinkle) 345kV",
        "summerNetMW": 232.0,
        "winterNetMW": 232.0,
        "dp1ErisMw": 232.0,
        "dp1NrisMw": 232.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3841,
      "normalized": {
        "queue_id": "J4067",
        "county": "Panola",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "Batesville",
        "queue_date": "2025-09-25T04:00:00+00:00",
        "withdrawn_date": "2026-01-02T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 180.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493472,
        "projectNumber": "J4067",
        "queueDate": "2025-09-25T04:00:00+00:00",
        "withdrawnDate": "2026-01-02T05:00:00+00:00",
        "inService": "2029-02-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "Panola",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Batesville",
        "summerNetMW": 180.0,
        "winterNetMW": 180.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3842,
      "normalized": {
        "queue_id": "J4066",
        "county": "Isabella",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Weidman - Deerfield 69.0kV",
        "queue_date": "2025-09-24T04:00:00+00:00",
        "withdrawn_date": "2026-02-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-06T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493473,
        "projectNumber": "J4066",
        "queueDate": "2025-09-24T04:00:00+00:00",
        "withdrawnDate": "2026-02-19T05:00:00+00:00",
        "inService": "2030-01-06T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Isabella",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "Weidman - Deerfield 69.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3843,
      "normalized": {
        "queue_id": "J4078",
        "county": "Mower",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "ADAMS",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493474,
        "projectNumber": "J4078",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-06-28T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Mower",
        "state": "MN",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "ADAMS",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3844,
      "normalized": {
        "queue_id": "J4095",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GRASSMERE",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493475,
        "projectNumber": "J4095",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "GRASSMERE",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3845,
      "normalized": {
        "queue_id": "J3968",
        "county": "Coles",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Mattoon West",
        "queue_date": "2025-03-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 100.0,
        "dp1_nris_mw": 100.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493476,
        "projectNumber": "J3968",
        "queueDate": "2025-03-14T04:00:00+00:00",
        "inService": "2028-09-15T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Coles",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Mattoon West",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 100.0,
        "dp1NrisMw": 100.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3846,
      "normalized": {
        "queue_id": "J3971",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "STEIN",
        "queue_date": "2025-04-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 255.0,
        "summer_net_mw": 255.0,
        "winter_net_mw": 255.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493477,
        "projectNumber": "J3971",
        "queueDate": "2025-04-01T04:00:00+00:00",
        "inService": "2029-12-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "STEIN",
        "summerNetMW": 255.0,
        "winterNetMW": 255.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3847,
      "normalized": {
        "queue_id": "J4064",
        "county": "Tallahatchie",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "WEBB",
        "queue_date": "2025-09-04T04:00:00+00:00",
        "withdrawn_date": "2025-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493478,
        "projectNumber": "J4064",
        "queueDate": "2025-09-04T04:00:00+00:00",
        "withdrawnDate": "2025-12-22T05:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "Tallahatchie",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "WEBB",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3848,
      "normalized": {
        "queue_id": "J4010",
        "county": "De Witt",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Clinton 345kV Substation",
        "queue_date": "2025-04-30T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 21.0,
        "summer_net_mw": 21.0,
        "winter_net_mw": 21.0,
        "proposed_completion_date": null,
        "generation_type": "Nuclear",
        "facility_type": "Nuclear",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 21.0,
        "dp1_nris_mw": 21.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493479,
        "projectNumber": "J4010",
        "queueDate": "2025-04-30T04:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "De Witt",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Clinton 345kV Substation",
        "summerNetMW": 21.0,
        "winterNetMW": 21.0,
        "dp1ErisMw": 21.0,
        "dp1NrisMw": 21.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Nuclear",
        "facilityType": "Nuclear",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3849,
      "normalized": {
        "queue_id": "J4141",
        "county": "Morehouse",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2025-12-19T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 650.0,
        "summer_net_mw": 650.0,
        "winter_net_mw": 650.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493480,
        "projectNumber": "J4141",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2025-12-19T05:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Morehouse",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "summerNetMW": 650.0,
        "winterNetMW": 650.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3850,
      "normalized": {
        "queue_id": "J4137",
        "county": "Pulaski",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Other_",
        "queue_date": "2025-09-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493481,
        "projectNumber": "J4137",
        "queueDate": "2025-09-29T04:00:00+00:00",
        "inService": "2030-08-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Pulaski",
        "state": "IL",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3851,
      "normalized": {
        "queue_id": "J4065",
        "county": "Dakota",
        "state": "MN",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "Nininger 115 kV",
        "queue_date": "2025-09-22T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 200.0,
        "dp1_nris_mw": 200.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493482,
        "projectNumber": "J4065",
        "queueDate": "2025-09-22T04:00:00+00:00",
        "inService": "2030-06-28T04:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "Dakota",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Nininger 115 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 200.0,
        "dp1NrisMw": 200.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3852,
      "normalized": {
        "queue_id": "J4063",
        "county": "Knox",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Gibson Sta - Bedford 345 345.0kV",
        "queue_date": "2025-09-04T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493483,
        "projectNumber": "J4063",
        "queueDate": "2025-09-04T04:00:00+00:00",
        "inService": "2030-08-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Knox",
        "state": "IN",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Gibson Sta - Bedford 345 345.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3853,
      "normalized": {
        "queue_id": "J4009",
        "county": "Marshall",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Viking - Karlstad 115.0kV",
        "queue_date": "2025-04-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493484,
        "projectNumber": "J4009",
        "queueDate": "2025-04-25T04:00:00+00:00",
        "inService": "2030-08-30T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Marshall",
        "state": "MN",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Viking - Karlstad 115.0kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3854,
      "normalized": {
        "queue_id": "J4011",
        "county": "Miller",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "AECC LEWISVILLE WEST",
        "queue_date": "2025-05-15T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493485,
        "projectNumber": "J4011",
        "queueDate": "2025-05-15T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2029-08-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Miller",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "AECC LEWISVILLE WEST",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3855,
      "normalized": {
        "queue_id": "J4096",
        "county": "Goodhue",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Other_",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493486,
        "projectNumber": "J4096",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-01-30T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Goodhue",
        "state": "MN",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3856,
      "normalized": {
        "queue_id": "J4094",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "GRASSMERE",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493487,
        "projectNumber": "J4094",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "GRASSMERE",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3857,
      "normalized": {
        "queue_id": "J4012",
        "county": "Crittenden",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "TWIST - PARKIN 161.0kV",
        "queue_date": "2025-05-15T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-04T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493488,
        "projectNumber": "J4012",
        "queueDate": "2025-05-15T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2029-09-04T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Crittenden",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "TWIST - PARKIN 161.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3858,
      "normalized": {
        "queue_id": "J4046",
        "county": "Attala",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "CONEHOMA CREEK - CARTHAGE (MS) 115.0kV",
        "queue_date": "2025-07-17T04:00:00+00:00",
        "withdrawn_date": "2026-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493489,
        "projectNumber": "J4046",
        "queueDate": "2025-07-17T04:00:00+00:00",
        "withdrawnDate": "2026-04-16T04:00:00+00:00",
        "inService": "2030-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Attala",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "CONEHOMA CREEK - CARTHAGE (MS) 115.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3859,
      "normalized": {
        "queue_id": "S1100",
        "county": "Mississippi",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV",
        "queue_date": "2025-06-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-04-21T04:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493490,
        "projectNumber": "S1100",
        "queueDate": "2025-06-18T04:00:00+00:00",
        "inService": "2027-10-31T04:00:00+00:00",
        "negInService": "2028-04-21T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Mississippi",
        "state": "AR",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3860,
      "normalized": {
        "queue_id": "J4049",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "RILLA",
        "queue_date": "2025-08-28T04:00:00+00:00",
        "withdrawn_date": "2026-04-17T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493491,
        "projectNumber": "J4049",
        "queueDate": "2025-08-28T04:00:00+00:00",
        "withdrawnDate": "2026-04-17T04:00:00+00:00",
        "inService": "2029-06-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "RILLA",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3861,
      "normalized": {
        "queue_id": "J3901",
        "county": "Shelby",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4MATOONW S - 4NEOGA 3 138.0kV",
        "queue_date": "2025-01-17T05:00:00+00:00",
        "withdrawn_date": "2026-04-14T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "Central",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493492,
        "projectNumber": "J3901",
        "queueDate": "2025-01-17T05:00:00+00:00",
        "withdrawnDate": "2026-04-14T04:00:00+00:00",
        "inService": "2030-04-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Shelby",
        "state": "IL",
        "studyCycle": "DPP-2025",
        "studyGroup": "Central",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "4MATOONW S - 4NEOGA 3 138.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3862,
      "normalized": {
        "queue_id": "J4073",
        "county": "Coahoma",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "LULA - JONESTOWN SS 115.0kV",
        "queue_date": "2025-09-29T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493493,
        "projectNumber": "J4073",
        "queueDate": "2025-09-29T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2029-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "Coahoma",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "LULA - JONESTOWN SS 115.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3863,
      "normalized": {
        "queue_id": "J4093",
        "county": "Mason",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "PERE MARQUETTE",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 400.0,
        "summer_net_mw": 400.0,
        "winter_net_mw": 400.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493494,
        "projectNumber": "J4093",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Mason",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "PERE MARQUETTE",
        "summerNetMW": 400.0,
        "winterNetMW": 400.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3864,
      "normalized": {
        "queue_id": "J4107",
        "county": "Covington",
        "state": "MS",
        "transmission_owner": "COOPERATIVE ENERGY",
        "poi": "Southwest Lone Star 161 - Mississippi Hub 161.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2025-12-26T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493495,
        "projectNumber": "J4107",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2025-12-26T05:00:00+00:00",
        "inService": "2030-10-15T04:00:00+00:00",
        "transmissionOwner": "COOPERATIVE ENERGY",
        "county": "Covington",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Southwest Lone Star 161 - Mississippi Hub 161.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3865,
      "normalized": {
        "queue_id": "J4140",
        "county": "Ouachita",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Cotton",
        "queue_date": "2025-09-25T04:00:00+00:00",
        "withdrawn_date": "2026-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493496,
        "projectNumber": "J4140",
        "queueDate": "2025-09-25T04:00:00+00:00",
        "withdrawnDate": "2026-04-16T04:00:00+00:00",
        "inService": "2030-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Ouachita",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Cotton",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3866,
      "normalized": {
        "queue_id": "J4139",
        "county": "Nevada",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "EMMET SS - HOPE EAST SS 115.0kV",
        "queue_date": "2025-09-25T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493497,
        "projectNumber": "J4139",
        "queueDate": "2025-09-25T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Nevada",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "EMMET SS - HOPE EAST SS 115.0kV",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3867,
      "normalized": {
        "queue_id": "J4072",
        "county": "Redwood",
        "state": "MN",
        "transmission_owner": "MINNESOTA MUNICIPAL POWER AGENCY M2PA",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493498,
        "projectNumber": "J4072",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-09-30T04:00:00+00:00",
        "transmissionOwner": "MINNESOTA MUNICIPAL POWER AGENCY M2PA",
        "county": "Redwood",
        "state": "MN",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3868,
      "normalized": {
        "queue_id": "J4077",
        "county": "Emmons",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "Linton NW",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 45.0,
        "summer_net_mw": 45.0,
        "winter_net_mw": 45.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-28T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493499,
        "projectNumber": "J4077",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2030-06-28T04:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "Emmons",
        "state": "ND",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Linton NW",
        "summerNetMW": 45.0,
        "winterNetMW": 45.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3869,
      "normalized": {
        "queue_id": "J4048",
        "county": "Oceana",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "MEYER - LUDINGTON 345.0kV",
        "queue_date": "2025-08-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 110.0,
        "summer_net_mw": 110.0,
        "winter_net_mw": 110.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493500,
        "projectNumber": "J4048",
        "queueDate": "2025-08-19T04:00:00+00:00",
        "inService": "2028-04-01T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Oceana",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "MEYER - LUDINGTON 345.0kV",
        "summerNetMW": 110.0,
        "winterNetMW": 110.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3870,
      "normalized": {
        "queue_id": "J3900",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "queue_date": "2024-12-26T05:00:00+00:00",
        "withdrawn_date": "2026-04-16T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 163.0,
        "summer_net_mw": 163.0,
        "winter_net_mw": 163.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493501,
        "projectNumber": "J3900",
        "queueDate": "2024-12-26T05:00:00+00:00",
        "withdrawnDate": "2026-04-16T04:00:00+00:00",
        "inService": "2030-04-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "INDIANOLA 230/115 SUB - TILLATOBA 230.0kV",
        "summerNetMW": 163.0,
        "winterNetMW": 163.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3871,
      "normalized": {
        "queue_id": "S1079",
        "county": "Cass",
        "state": "ND",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "BISON",
        "queue_date": "2025-03-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": "2028-02-28T05:00:00+00:00",
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-07-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493502,
        "projectNumber": "S1079",
        "queueDate": "2025-03-25T04:00:00+00:00",
        "inService": "2028-07-30T04:00:00+00:00",
        "negInService": "2028-02-28T05:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cass",
        "state": "ND",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "BISON",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3872,
      "normalized": {
        "queue_id": "S1092",
        "county": "Lafayette",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Falcon",
        "queue_date": "2025-03-04T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Revision Approval",
        "capacity_mw": 98.0,
        "summer_net_mw": 98.0,
        "winter_net_mw": 98.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493503,
        "projectNumber": "S1092",
        "queueDate": "2025-03-04T05:00:00+00:00",
        "inService": "2027-09-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Lafayette",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Falcon",
        "summerNetMW": 98.0,
        "winterNetMW": 98.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Revision Approval",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3873,
      "normalized": {
        "queue_id": "J4079",
        "county": "Calcasieu",
        "state": "LA",
        "transmission_owner": "CLECO POWER LLC CLEC",
        "poi": "NELSON 230 SWYD - PENTON ROAD (CLECO) 230.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493504,
        "projectNumber": "J4079",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "CLECO POWER LLC CLEC",
        "county": "Calcasieu",
        "state": "LA",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "NELSON 230 SWYD - PENTON ROAD (CLECO) 230.0kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3874,
      "normalized": {
        "queue_id": "J4080",
        "county": "Jefferson",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": "2026-05-19T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493505,
        "projectNumber": "J4080",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "withdrawnDate": "2026-05-19T04:00:00+00:00",
        "inService": "2030-06-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Jefferson",
        "state": "AR",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "STUTTGART RICUSKEY - WOODWARD 230 SUB 230.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3875,
      "normalized": {
        "queue_id": "S1141",
        "county": "Hinds",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "TINNIN ROAD",
        "queue_date": "2025-08-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493506,
        "projectNumber": "S1141",
        "queueDate": "2025-08-26T04:00:00+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "Hinds",
        "state": "MS",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "TINNIN ROAD",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3876,
      "normalized": {
        "queue_id": "J4203",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "RAPSON - STEIN 345.0kV",
        "queue_date": "2025-06-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 350.0,
        "summer_net_mw": 350.0,
        "winter_net_mw": 350.0,
        "proposed_completion_date": null,
        "generation_type": "Wind",
        "facility_type": "Wind Turbine",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ITC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493507,
        "projectNumber": "J4203",
        "queueDate": "2025-06-06T04:00:00+00:00",
        "inService": "2028-11-01T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ITC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "RAPSON - STEIN 345.0kV",
        "summerNetMW": 350.0,
        "winterNetMW": 350.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Wind",
        "facilityType": "Wind Turbine",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3877,
      "normalized": {
        "queue_id": "J4138",
        "county": "Iberville",
        "state": "LA",
        "transmission_owner": "ENTERGY ARKANSAS, LLC",
        "poi": "WEBRE",
        "queue_date": "2025-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 805.0,
        "summer_net_mw": 755.0,
        "winter_net_mw": 805.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combined Cycle",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493508,
        "projectNumber": "J4138",
        "queueDate": "2025-10-07T04:00:00+00:00",
        "inService": "2030-01-02T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC",
        "county": "Iberville",
        "state": "LA",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "WEBRE",
        "summerNetMW": 755.0,
        "winterNetMW": 805.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combined Cycle",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3878,
      "normalized": {
        "queue_id": "S1145",
        "county": "Huron",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Harvest Wind Point Tap 120 kV",
        "queue_date": "2025-10-30T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-07-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493509,
        "projectNumber": "S1145",
        "queueDate": "2025-10-30T04:00:00+00:00",
        "inService": "2029-07-31T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Huron",
        "state": "MI",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Harvest Wind Point Tap 120 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3879,
      "normalized": {
        "queue_id": "S1103",
        "county": "Perry",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Aster 138kV Station",
        "queue_date": "2025-06-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493510,
        "projectNumber": "S1103",
        "queueDate": "2025-06-17T04:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Perry",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Aster 138kV Station",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3880,
      "normalized": {
        "queue_id": "J4169",
        "county": "Dickinson",
        "state": "MI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Nordic",
        "queue_date": "2025-10-06T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 5.99,
        "summer_net_mw": 5.99,
        "winter_net_mw": 5.99,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 5.99,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493511,
        "projectNumber": "J4169",
        "queueDate": "2025-10-06T04:00:00+00:00",
        "inService": "2025-09-15T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Dickinson",
        "state": "MI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Nordic",
        "summerNetMW": 5.99,
        "winterNetMW": 5.99,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 5.99,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3881,
      "normalized": {
        "queue_id": "S1102",
        "county": "Cass",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Walton 230",
        "queue_date": "2025-06-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Pending Transfer",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493512,
        "projectNumber": "S1102",
        "queueDate": "2025-06-16T04:00:00+00:00",
        "inService": "2026-06-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Cass",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Walton 230",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Pending Transfer",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3882,
      "normalized": {
        "queue_id": "J4037",
        "county": "Franklin",
        "state": "IA",
        "transmission_owner": "MIDAMERICAN ENERGY CO.",
        "poi": "FRANKLIN - WALL LAKE 161.0kV",
        "queue_date": "2025-06-30T04:00:00+00:00",
        "withdrawn_date": "2026-04-15T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "West",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493513,
        "projectNumber": "J4037",
        "queueDate": "2025-06-30T04:00:00+00:00",
        "withdrawnDate": "2026-04-15T04:00:00+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO.",
        "county": "Franklin",
        "state": "IA",
        "studyCycle": "DPP-2025",
        "studyGroup": "West",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "FRANKLIN - WALL LAKE 161.0kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3883,
      "normalized": {
        "queue_id": "J4165",
        "county": "Kenosha",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Other_",
        "queue_date": "2025-09-29T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1203.0,
        "summer_net_mw": 1203.0,
        "winter_net_mw": 1203.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "East (ATC)",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 1203.0,
        "dp1_nris_mw": 1203.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493514,
        "projectNumber": "J4165",
        "queueDate": "2025-09-29T04:00:00+00:00",
        "inService": "2030-05-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Kenosha",
        "state": "WI",
        "studyCycle": "DPP-2025",
        "studyGroup": "East (ATC)",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 1203.0,
        "winterNetMW": 1203.0,
        "dp1ErisMw": 1203.0,
        "dp1NrisMw": 1203.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3884,
      "normalized": {
        "queue_id": "J4163",
        "county": "Drew",
        "state": "AR",
        "transmission_owner": "",
        "poi": "Wilmar East",
        "queue_date": "2025-11-05T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "Biomass",
        "facility_type": "Co-gen",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "0MW GIA",
        "study_group": "NA",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493515,
        "projectNumber": "J4163",
        "queueDate": "2025-11-05T05:00:00+00:00",
        "inService": "2026-08-03T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Drew",
        "state": "AR",
        "studyCycle": "0MW GIA",
        "studyGroup": "NA",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "Wilmar East",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Biomass",
        "facilityType": "Co-gen",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3885,
      "normalized": {
        "queue_id": "J4142",
        "county": "Franklin",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Gilbert 115 kV",
        "queue_date": "2025-10-04T04:00:00+00:00",
        "withdrawn_date": "2026-03-11T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 115.0,
        "summer_net_mw": 115.0,
        "winter_net_mw": 115.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493516,
        "projectNumber": "J4142",
        "queueDate": "2025-10-04T04:00:00+00:00",
        "withdrawnDate": "2026-03-11T04:00:00+00:00",
        "inService": "2030-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Franklin",
        "state": "LA",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "Gilbert 115 kV",
        "summerNetMW": 115.0,
        "winterNetMW": 115.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3886,
      "normalized": {
        "queue_id": "J4038",
        "county": "St. Francis",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "BRINKLEY EAST - AECC PALESTINE 161.0kV",
        "queue_date": "2025-06-18T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Solar/Battery",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 80.0,
        "dp1_nris_mw": 80.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493517,
        "projectNumber": "J4038",
        "queueDate": "2025-06-18T04:00:00+00:00",
        "inService": "2030-01-01T05:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "St. Francis",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "BRINKLEY EAST - AECC PALESTINE 161.0kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 80.0,
        "dp1NrisMw": 80.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Solar/Battery",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3887,
      "normalized": {
        "queue_id": "J4033",
        "county": "Christian",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "7LATHAM - KINCAID  ; B 345.0kV",
        "queue_date": "2025-06-13T04:00:00+00:00",
        "withdrawn_date": "2025-12-22T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 156.8,
        "summer_net_mw": 156.8,
        "winter_net_mw": 156.8,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-01-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493518,
        "projectNumber": "J4033",
        "queueDate": "2025-06-13T04:00:00+00:00",
        "withdrawnDate": "2025-12-22T05:00:00+00:00",
        "inService": "2030-01-30T05:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Christian",
        "state": "IL",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "7LATHAM - KINCAID  ; B 345.0kV",
        "summerNetMW": 156.8,
        "winterNetMW": 156.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3888,
      "normalized": {
        "queue_id": "J4257",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "",
        "queue_date": "2026-08-17T19:45:28+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493519,
        "projectNumber": "J4257",
        "queueDate": "2026-08-17T19:45:28+00:00",
        "inService": "2031-10-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3889,
      "normalized": {
        "queue_id": "J4343",
        "county": "Redwood",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2026-09-09T22:39:54+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 500.0,
        "summer_net_mw": 500.0,
        "winter_net_mw": 500.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493520,
        "projectNumber": "J4343",
        "queueDate": "2026-09-09T22:39:54+00:00",
        "inService": "2031-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Redwood",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 500.0,
        "winterNetMW": 500.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3890,
      "normalized": {
        "queue_id": "J4268",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-08-12T20:37:25+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493521,
        "projectNumber": "J4268",
        "queueDate": "2026-08-12T20:37:25+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3891,
      "normalized": {
        "queue_id": "S1181",
        "county": "Story",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Story County",
        "queue_date": "2026-03-02T22:47:59+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "Battery Storage",
        "facility_type": "Battery Storage",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493522,
        "projectNumber": "S1181",
        "queueDate": "2026-03-02T22:47:59+00:00",
        "inService": "2028-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Story",
        "state": "IA",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Story County",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Battery Storage",
        "facilityType": "Battery Storage",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3892,
      "normalized": {
        "queue_id": "J4034",
        "county": "Vigo",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "Sandford 345 kV",
        "queue_date": "2025-06-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493523,
        "projectNumber": "J4034",
        "queueDate": "2025-06-13T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "Vigo",
        "state": "IN",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Sandford 345 kV",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3893,
      "normalized": {
        "queue_id": "J4259",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-08-21T17:46:46+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493524,
        "projectNumber": "J4259",
        "queueDate": "2026-08-21T17:46:46+00:00",
        "inService": "2030-12-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3894,
      "normalized": {
        "queue_id": "J4252",
        "county": "",
        "state": "",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "",
        "queue_date": "2026-07-15T19:34:08+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493525,
        "projectNumber": "J4252",
        "queueDate": "2026-07-15T19:34:08+00:00",
        "inService": "2029-12-31T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3895,
      "normalized": {
        "queue_id": "J4250",
        "county": "",
        "state": "",
        "transmission_owner": "GREAT RIVER ENERGY",
        "poi": "",
        "queue_date": "2026-07-15T19:16:39+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493526,
        "projectNumber": "J4250",
        "queueDate": "2026-07-15T19:16:39+00:00",
        "inService": "2029-12-31T05:00:00+00:00",
        "transmissionOwner": "GREAT RIVER ENERGY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3896,
      "normalized": {
        "queue_id": "J4035",
        "county": "Greene",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "SEDGEWICK SS - AECC LIGHT 115.0kV",
        "queue_date": "2025-06-09T04:00:00+00:00",
        "withdrawn_date": "2026-01-05T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 113.0,
        "summer_net_mw": 113.0,
        "winter_net_mw": 113.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2025",
        "study_group": "South",
        "study_phase": "Phase 1",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493527,
        "projectNumber": "J4035",
        "queueDate": "2025-06-09T04:00:00+00:00",
        "withdrawnDate": "2026-01-05T05:00:00+00:00",
        "inService": "2029-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Greene",
        "state": "AR",
        "studyCycle": "DPP-2025",
        "studyGroup": "South",
        "studyPhase": "Phase 1",
        "svcType": "NRIS",
        "poiName": "SEDGEWICK SS - AECC LIGHT 115.0kV",
        "summerNetMW": 113.0,
        "winterNetMW": 113.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3897,
      "normalized": {
        "queue_id": "J4039",
        "county": "Montgomery",
        "state": "IN",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Cayuga  -  Frankfort  230.0kV",
        "queue_date": "2025-06-13T04:00:00+00:00",
        "withdrawn_date": "2026-07-22T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "Solar",
        "facility_type": "Photovoltaic",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493528,
        "projectNumber": "J4039",
        "queueDate": "2025-06-13T04:00:00+00:00",
        "withdrawnDate": "2026-07-22T04:00:00+00:00",
        "inService": "2030-06-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Montgomery",
        "state": "IN",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Cayuga  -  Frankfort  230.0kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Solar",
        "facilityType": "Photovoltaic",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3898,
      "normalized": {
        "queue_id": "J4309",
        "county": "Ford",
        "state": "",
        "transmission_owner": "",
        "poi": "Other_",
        "queue_date": "2026-09-10T00:17:17+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-04-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493529,
        "projectNumber": "J4309",
        "queueDate": "2026-09-10T00:17:17+00:00",
        "inService": "2031-04-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Ford",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Other_",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3899,
      "normalized": {
        "queue_id": "J4284",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-08-15T01:40:04+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 118.0,
        "summer_net_mw": 118.0,
        "winter_net_mw": 118.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493530,
        "projectNumber": "J4284",
        "queueDate": "2026-08-15T01:40:04+00:00",
        "inService": "2029-04-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 118.0,
        "winterNetMW": 118.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3900,
      "normalized": {
        "queue_id": "J4285",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "",
        "queue_date": "2026-08-15T01:40:17+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 189.0,
        "summer_net_mw": 189.0,
        "winter_net_mw": 189.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-04-02T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493531,
        "projectNumber": "J4285",
        "queueDate": "2026-08-15T01:40:17+00:00",
        "inService": "2029-04-02T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 189.0,
        "winterNetMW": 189.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3901,
      "normalized": {
        "queue_id": "J4313",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "",
        "queue_date": "2026-08-14T18:03:07+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493532,
        "projectNumber": "J4313",
        "queueDate": "2026-08-14T18:03:07+00:00",
        "inService": "2031-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3902,
      "normalized": {
        "queue_id": "J4266",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "",
        "queue_date": "2026-08-14T02:51:26+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493533,
        "projectNumber": "J4266",
        "queueDate": "2026-08-14T02:51:26+00:00",
        "inService": "2031-05-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3903,
      "normalized": {
        "queue_id": "J4411",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-09-11T06:48:16+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 226.0,
        "summer_net_mw": 226.0,
        "winter_net_mw": 226.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493534,
        "projectNumber": "J4411",
        "queueDate": "2026-09-11T06:48:16+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 226.0,
        "winterNetMW": 226.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3904,
      "normalized": {
        "queue_id": "J4297",
        "county": "",
        "state": "",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "",
        "queue_date": "2026-09-04T21:16:39+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-07-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493535,
        "projectNumber": "J4297",
        "queueDate": "2026-09-04T21:16:39+00:00",
        "inService": "2030-07-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3905,
      "normalized": {
        "queue_id": "S1178",
        "county": "",
        "state": "",
        "transmission_owner": "MIDAMERICAN ENERGY CO. MEC",
        "poi": "",
        "queue_date": "2026-07-29T01:54:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-29T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493536,
        "projectNumber": "S1178",
        "queueDate": "2026-07-29T01:54:06+00:00",
        "inService": "2027-09-29T04:00:00+00:00",
        "transmissionOwner": "MIDAMERICAN ENERGY CO. MEC",
        "county": "",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3906,
      "normalized": {
        "queue_id": "J4310",
        "county": "",
        "state": "",
        "transmission_owner": "HOOSIER ENERGY",
        "poi": "",
        "queue_date": "2026-09-22T03:33:24+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493537,
        "projectNumber": "J4310",
        "queueDate": "2026-09-22T03:33:24+00:00",
        "inService": "2029-09-15T04:00:00+00:00",
        "transmissionOwner": "HOOSIER ENERGY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3907,
      "normalized": {
        "queue_id": "J4275",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-08-18T21:41:50+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493538,
        "projectNumber": "J4275",
        "queueDate": "2026-08-18T21:41:50+00:00",
        "inService": "2031-05-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3908,
      "normalized": {
        "queue_id": "J4261",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2026-08-24T17:35:42+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493539,
        "projectNumber": "J4261",
        "queueDate": "2026-08-24T17:35:42+00:00",
        "inService": "2029-12-31T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3909,
      "normalized": {
        "queue_id": "J4278",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-08-28T02:36:10+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493540,
        "projectNumber": "J4278",
        "queueDate": "2026-08-28T02:36:10+00:00",
        "inService": "2031-05-12T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3910,
      "normalized": {
        "queue_id": "J4277",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-08-28T02:26:06+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493541,
        "projectNumber": "J4277",
        "queueDate": "2026-08-28T02:26:06+00:00",
        "inService": "2031-05-12T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3911,
      "normalized": {
        "queue_id": "J4271",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-08-24T21:38:02+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-12T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493542,
        "projectNumber": "J4271",
        "queueDate": "2026-08-24T21:38:02+00:00",
        "inService": "2031-05-12T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3912,
      "normalized": {
        "queue_id": "J4321",
        "county": "Redwood",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Cedar Mountain - Lyon County 345.0kV",
        "queue_date": "2026-09-09T22:38:23+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493543,
        "projectNumber": "J4321",
        "queueDate": "2026-09-09T22:38:23+00:00",
        "inService": "2031-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Redwood",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Cedar Mountain - Lyon County 345.0kV",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3913,
      "normalized": {
        "queue_id": "J4410",
        "county": "",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "",
        "queue_date": "2026-09-11T07:05:25+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493544,
        "projectNumber": "J4410",
        "queueDate": "2026-09-11T07:05:25+00:00",
        "inService": "2030-10-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3914,
      "normalized": {
        "queue_id": "J4291",
        "county": "",
        "state": "",
        "transmission_owner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "poi": "",
        "queue_date": "2026-08-24T23:21:22+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-11-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493545,
        "projectNumber": "J4291",
        "queueDate": "2026-08-24T23:21:22+00:00",
        "inService": "2026-11-30T05:00:00+00:00",
        "transmissionOwner": "SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3915,
      "normalized": {
        "queue_id": "J4264",
        "county": "",
        "state": "",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "",
        "queue_date": "2026-08-20T19:51:19+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1000.0,
        "summer_net_mw": 1000.0,
        "winter_net_mw": 1000.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493546,
        "projectNumber": "J4264",
        "queueDate": "2026-08-20T19:51:19+00:00",
        "inService": "2031-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 1000.0,
        "winterNetMW": 1000.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3916,
      "normalized": {
        "queue_id": "J4287",
        "county": "Morehouse",
        "state": "",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "poi": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "queue_date": "2026-08-14T18:44:16+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "South",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493547,
        "projectNumber": "J4287",
        "queueDate": "2026-08-14T18:44:16+00:00",
        "inService": "2028-09-01T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC. EMTO",
        "county": "Morehouse",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "South",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "BAXTER WILSON SES SWYD - PERRYVILLE 500 SWYD 500.0kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3917,
      "normalized": {
        "queue_id": "J4273",
        "county": "",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "",
        "queue_date": "2026-08-24T17:36:27+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493548,
        "projectNumber": "J4273",
        "queueDate": "2026-08-24T17:36:27+00:00",
        "inService": "2029-12-31T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3918,
      "normalized": {
        "queue_id": "J4256",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-08-10T22:42:47+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 2015.0,
        "summer_net_mw": 2015.0,
        "winter_net_mw": 2015.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493549,
        "projectNumber": "J4256",
        "queueDate": "2026-08-10T22:42:47+00:00",
        "inService": "2031-06-30T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 2015.0,
        "winterNetMW": 2015.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3919,
      "normalized": {
        "queue_id": "J4270",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-08-14T18:50:55+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493550,
        "projectNumber": "J4270",
        "queueDate": "2026-08-14T18:50:55+00:00",
        "inService": "2031-05-01T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3920,
      "normalized": {
        "queue_id": "J4272",
        "county": "",
        "state": "",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "",
        "queue_date": "2026-08-24T17:37:24+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493551,
        "projectNumber": "J4272",
        "queueDate": "2026-08-24T17:37:24+00:00",
        "inService": "2029-12-31T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3921,
      "normalized": {
        "queue_id": "J4358",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-08T21:53:37+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-01-14T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493552,
        "projectNumber": "J4358",
        "queueDate": "2026-09-08T21:53:37+00:00",
        "inService": "2031-01-14T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3922,
      "normalized": {
        "queue_id": "J4255",
        "county": "",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC CIN",
        "poi": "",
        "queue_date": "2026-07-24T21:04:01+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-01-14T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493553,
        "projectNumber": "J4255",
        "queueDate": "2026-07-24T21:04:01+00:00",
        "inService": "2031-01-14T05:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC CIN",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3923,
      "normalized": {
        "queue_id": "R5099",
        "county": "Liberty",
        "state": "",
        "transmission_owner": "ENTERGY TEXAS, INC. ETTO",
        "poi": "Colony - Plum Grove 230 kV",
        "queue_date": "2026-07-22T16:54:37+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-03-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493554,
        "projectNumber": "R5099",
        "queueDate": "2026-07-22T16:54:37+00:00",
        "inService": "2029-03-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY TEXAS, INC. ETTO",
        "county": "Liberty",
        "state": "",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "Colony - Plum Grove 230 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3924,
      "normalized": {
        "queue_id": "J4300",
        "county": "",
        "state": "",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "",
        "queue_date": "2026-08-28T21:30:16+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 238.7,
        "summer_net_mw": 238.7,
        "winter_net_mw": 238.7,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493555,
        "projectNumber": "J4300",
        "queueDate": "2026-08-28T21:30:16+00:00",
        "inService": "2030-04-15T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 238.7,
        "winterNetMW": 238.7,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3925,
      "normalized": {
        "queue_id": "R1049",
        "county": "Sheboygan",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Edgewater 345kV",
        "queue_date": "2024-12-24T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 303.5,
        "summer_net_mw": 303.5,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493556,
        "projectNumber": "R1049",
        "queueDate": "2024-12-24T05:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Sheboygan",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Edgewater 345kV",
        "summerNetMW": 303.5,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3926,
      "normalized": {
        "queue_id": "R1045",
        "county": "Chippewa",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Wheaton 161kV",
        "queue_date": "2024-03-01T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 237.0,
        "summer_net_mw": 237.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-06-03T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493557,
        "projectNumber": "R1045",
        "queueDate": "2024-03-01T05:00:00+00:00",
        "inService": "2025-06-03T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chippewa",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Wheaton 161kV",
        "summerNetMW": 237.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3927,
      "normalized": {
        "queue_id": "S1069",
        "county": "Montcalm",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Eureka to Vestaburg 138kV",
        "queue_date": "2024-11-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493558,
        "projectNumber": "S1069",
        "queueDate": "2024-11-01T04:00:00+00:00",
        "inService": "2027-01-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Montcalm",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Eureka to Vestaburg 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3928,
      "normalized": {
        "queue_id": "R1051",
        "county": "Scott County",
        "state": "MN",
        "transmission_owner": "",
        "poi": "Blue Lake 115kV",
        "queue_date": "2024-05-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 55.0,
        "summer_net_mw": 55.0,
        "winter_net_mw": 42.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493559,
        "projectNumber": "R1051",
        "queueDate": "2024-05-16T04:00:00+00:00",
        "inService": "2025-04-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Scott County",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Blue Lake 115kV",
        "summerNetMW": 55.0,
        "winterNetMW": 42.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3929,
      "normalized": {
        "queue_id": "R1057",
        "county": "Jefferson",
        "state": "",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Rush Island Plant – 345KV Switchyard (Existing)",
        "queue_date": "2024-08-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-09-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493560,
        "projectNumber": "R1057",
        "queueDate": "2024-08-16T04:00:00+00:00",
        "inService": "2025-09-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Jefferson",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "Rush Island Plant – 345KV Switchyard (Existing)",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3930,
      "normalized": {
        "queue_id": "J4360",
        "county": "Menard",
        "state": "",
        "transmission_owner": "",
        "poi": "Shockey 138kV",
        "queue_date": "2026-09-09T21:01:05+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493561,
        "projectNumber": "J4360",
        "queueDate": "2026-09-09T21:01:05+00:00",
        "inService": "2031-11-01T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "Menard",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Shockey 138kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3931,
      "normalized": {
        "queue_id": "S1072",
        "county": "Sherburne",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Sherburne 345kV",
        "queue_date": "2024-12-05T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 10.0,
        "summer_net_mw": 10.0,
        "winter_net_mw": 10.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-08-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493562,
        "projectNumber": "S1072",
        "queueDate": "2024-12-05T05:00:00+00:00",
        "inService": "2025-08-15T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Sherburne",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Sherburne 345kV",
        "summerNetMW": 10.0,
        "winterNetMW": 10.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3932,
      "normalized": {
        "queue_id": "S1074",
        "county": "Phillips",
        "state": "AR",
        "transmission_owner": "ENTERGY ARKANSAS, LLC EATO",
        "poi": "Ritchie Plant 230 kV Substation",
        "queue_date": "2025-02-28T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493563,
        "projectNumber": "S1074",
        "queueDate": "2025-02-28T05:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY ARKANSAS, LLC EATO",
        "county": "Phillips",
        "state": "AR",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Ritchie Plant 230 kV Substation",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3933,
      "normalized": {
        "queue_id": "S1063",
        "county": "Calhoun",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Verona - Foundry 138kV",
        "queue_date": "2024-08-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 70.0,
        "summer_net_mw": 70.0,
        "winter_net_mw": 70.0,
        "proposed_completion_date": "2027-09-30T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Under Construction",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493564,
        "projectNumber": "S1063",
        "queueDate": "2024-08-28T04:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "negInService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Verona - Foundry 138kV",
        "summerNetMW": 70.0,
        "winterNetMW": 70.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": "Under Construction"
      }
    },
    {
      "source_row_number": 3934,
      "normalized": {
        "queue_id": "J4274",
        "county": "",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "",
        "queue_date": "2026-08-24T17:38:08+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "East (ATC)",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493565,
        "projectNumber": "J4274",
        "queueDate": "2026-08-24T17:38:08+00:00",
        "inService": "2029-12-31T05:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "East (ATC)",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3935,
      "normalized": {
        "queue_id": "J4280",
        "county": "",
        "state": "",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "",
        "queue_date": "2026-08-28T21:27:09+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 245.8,
        "summer_net_mw": 245.8,
        "winter_net_mw": 245.8,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-04-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "West",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493566,
        "projectNumber": "J4280",
        "queueDate": "2026-08-28T21:27:09+00:00",
        "inService": "2030-04-15T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "West",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 245.8,
        "winterNetMW": 245.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3936,
      "normalized": {
        "queue_id": "S1066",
        "county": "Lenawee County",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "",
        "queue_date": "2024-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493567,
        "projectNumber": "S1066",
        "queueDate": "2024-10-07T04:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Lenawee County",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3937,
      "normalized": {
        "queue_id": "S1086",
        "county": "Stoddard",
        "state": "MO",
        "transmission_owner": "",
        "poi": "Stoddard - Morley 161kV",
        "queue_date": "2025-02-18T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 225.0,
        "summer_net_mw": 225.0,
        "winter_net_mw": 225.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-12-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493568,
        "projectNumber": "S1086",
        "queueDate": "2025-02-18T05:00:00+00:00",
        "inService": "2026-12-01T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "Stoddard",
        "state": "MO",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Stoddard - Morley 161kV",
        "summerNetMW": 225.0,
        "winterNetMW": 225.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3938,
      "normalized": {
        "queue_id": "S1057",
        "county": "Cumberland and Coles",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Neoga South",
        "queue_date": "2024-07-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 210.0,
        "summer_net_mw": 210.0,
        "winter_net_mw": 210.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-07-11T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493569,
        "projectNumber": "S1057",
        "queueDate": "2024-07-15T04:00:00+00:00",
        "inService": "2027-07-11T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Cumberland and Coles",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Neoga South",
        "summerNetMW": 210.0,
        "winterNetMW": 210.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3939,
      "normalized": {
        "queue_id": "J4260",
        "county": "Wayne",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Kays - Reifen 138kV",
        "queue_date": "2026-08-25T21:10:25+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2031-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493570,
        "projectNumber": "J4260",
        "queueDate": "2026-08-25T21:10:25+00:00",
        "inService": "2031-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Wayne",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Kays - Reifen 138kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3940,
      "normalized": {
        "queue_id": "J4357",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": "2026-09-04T03:52:52+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 250.0,
        "summer_net_mw": 250.0,
        "winter_net_mw": 250.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2030-09-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2026",
        "study_group": "Central",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493571,
        "projectNumber": "J4357",
        "queueDate": "2026-09-04T03:52:52+00:00",
        "inService": "2030-09-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "DPP-2026",
        "studyGroup": "Central",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 250.0,
        "winterNetMW": 250.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3941,
      "normalized": {
        "queue_id": "R1038",
        "county": "Benton",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Mayhew Lake 115kV",
        "queue_date": "2023-11-28T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493572,
        "projectNumber": "R1038",
        "queueDate": "2023-11-28T05:00:00+00:00",
        "inService": "2025-11-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Benton",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Mayhew Lake 115kV",
        "summerNetMW": 100.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3942,
      "normalized": {
        "queue_id": "S1003",
        "county": "White",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "Reynolds 345KV substation",
        "queue_date": "2020-11-06T05:00:00+00:00",
        "withdrawn_date": "2021-02-10T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 55.0,
        "summer_net_mw": 55.0,
        "winter_net_mw": 55.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493573,
        "projectNumber": "S1003",
        "queueDate": "2020-11-06T05:00:00+00:00",
        "withdrawnDate": "2021-02-10T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "White",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Reynolds 345KV substation",
        "summerNetMW": 55.0,
        "winterNetMW": 55.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3943,
      "normalized": {
        "queue_id": "R1052",
        "county": "",
        "state": "",
        "transmission_owner": "METC",
        "poi": "\"18CAMPBELLW”, “18CAMPBELLB",
        "queue_date": "2024-06-24T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 615.0,
        "summer_net_mw": 615.0,
        "winter_net_mw": 615.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "ERIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493574,
        "projectNumber": "R1052",
        "queueDate": "2024-06-24T04:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "ERIS",
        "poiName": "\"18CAMPBELLW”, “18CAMPBELLB",
        "summerNetMW": 615.0,
        "winterNetMW": 615.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3944,
      "normalized": {
        "queue_id": "S1053",
        "county": "Chisago",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Chisago County Substation",
        "queue_date": "2024-07-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493575,
        "projectNumber": "S1053",
        "queueDate": "2024-07-09T04:00:00+00:00",
        "inService": "2026-10-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Chisago",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Chisago County Substation",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3945,
      "normalized": {
        "queue_id": "S1076",
        "county": "Tangipahoa Parish",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Amite 115kV",
        "queue_date": "2025-01-07T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493576,
        "projectNumber": "S1076",
        "queueDate": "2025-01-07T05:00:00+00:00",
        "inService": "2027-08-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Tangipahoa Parish",
        "state": "LA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Amite 115kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3946,
      "normalized": {
        "queue_id": "S1091",
        "county": "Cape Girardeau",
        "state": "MO",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Adna 345 kV",
        "queue_date": "2025-02-19T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 200.0,
        "summer_net_mw": 200.0,
        "winter_net_mw": 200.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493577,
        "projectNumber": "S1091",
        "queueDate": "2025-02-19T05:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Cape Girardeau",
        "state": "MO",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Adna 345 kV",
        "summerNetMW": 200.0,
        "winterNetMW": 200.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3947,
      "normalized": {
        "queue_id": "R1047",
        "county": "St. Louis",
        "state": "",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Meramec Substation 138kV",
        "queue_date": "2024-05-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 824.0,
        "summer_net_mw": 824.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493578,
        "projectNumber": "R1047",
        "queueDate": "2024-05-28T04:00:00+00:00",
        "inService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "St. Louis",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Meramec Substation 138kV",
        "summerNetMW": 824.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3948,
      "normalized": {
        "queue_id": "R1043",
        "county": "Des Moines",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "ITCM Burlington 161kV",
        "queue_date": "2023-12-01T05:00:00+00:00",
        "withdrawn_date": "2024-12-09T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 31.0,
        "summer_net_mw": 31.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493579,
        "projectNumber": "R1043",
        "queueDate": "2023-12-01T05:00:00+00:00",
        "withdrawnDate": "2024-12-09T05:00:00+00:00",
        "inService": "2024-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Des Moines",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "ITCM Burlington 161kV",
        "summerNetMW": 31.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3949,
      "normalized": {
        "queue_id": "S1071",
        "county": "Lee",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Wever - Burlington 161 kV",
        "queue_date": "2024-11-15T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-11-07T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493580,
        "projectNumber": "S1071",
        "queueDate": "2024-11-15T05:00:00+00:00",
        "inService": "2025-11-07T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Lee",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Wever - Burlington 161 kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3950,
      "normalized": {
        "queue_id": "S1073",
        "county": "Webster",
        "state": "KY",
        "transmission_owner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "poi": "Hopkins to Reid EVH 161kV",
        "queue_date": "2025-02-19T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": "2027-03-01T05:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493581,
        "projectNumber": "S1073",
        "queueDate": "2025-02-19T05:00:00+00:00",
        "inService": "2026-08-31T04:00:00+00:00",
        "negInService": "2027-03-01T05:00:00+00:00",
        "transmissionOwner": "BIG RIVERS ELECTRIC CORPORATION BREC",
        "county": "Webster",
        "state": "KY",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Hopkins to Reid EVH 161kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3951,
      "normalized": {
        "queue_id": "S1060",
        "county": "Shiawasse",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Gross 138kV - Bus #256155",
        "queue_date": "2024-07-25T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 149.0,
        "summer_net_mw": 149.0,
        "winter_net_mw": 149.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-02-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493582,
        "projectNumber": "S1060",
        "queueDate": "2024-07-25T04:00:00+00:00",
        "inService": "2026-02-01T05:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Shiawasse",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Gross 138kV - Bus #256155",
        "summerNetMW": 149.0,
        "winterNetMW": 149.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3952,
      "normalized": {
        "queue_id": "R1059",
        "county": "St. Louis",
        "state": "",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Meramec Plant – 138KV Switchyard",
        "queue_date": "2024-12-16T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 98.8,
        "summer_net_mw": 98.8,
        "winter_net_mw": 98.8,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-12-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493583,
        "projectNumber": "R1059",
        "queueDate": "2024-12-16T05:00:00+00:00",
        "inService": "2025-12-31T05:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "St. Louis",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "Meramec Plant – 138KV Switchyard",
        "summerNetMW": 98.8,
        "winterNetMW": 98.8,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3953,
      "normalized": {
        "queue_id": "R1040",
        "county": "Ottawa",
        "state": "",
        "transmission_owner": "METC",
        "poi": "Campbell Substation 345kV",
        "queue_date": "2023-11-09T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 749.0,
        "summer_net_mw": 749.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493584,
        "projectNumber": "R1040",
        "queueDate": "2023-11-09T05:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Ottawa",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Campbell Substation 345kV",
        "summerNetMW": 749.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3954,
      "normalized": {
        "queue_id": "R1039",
        "county": "Ouachita",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Sterlington 115kV",
        "queue_date": "2023-10-05T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 49.0,
        "summer_net_mw": 49.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-01-31T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493585,
        "projectNumber": "R1039",
        "queueDate": "2023-10-05T04:00:00+00:00",
        "inService": "2025-01-31T05:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Ouachita",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Sterlington 115kV",
        "summerNetMW": 49.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3955,
      "normalized": {
        "queue_id": "S1068",
        "county": "Hillsdale",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Cronk Road",
        "queue_date": null,
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-01T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493586,
        "projectNumber": "S1068",
        "inService": "2027-01-01T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Hillsdale",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Cronk Road",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3956,
      "normalized": {
        "queue_id": "R1044",
        "county": "Vermillion",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Cayuga Steam Station Switchyards 230kV and 345kV",
        "queue_date": "2024-02-06T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 1040.0,
        "summer_net_mw": 1040.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-03-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493587,
        "projectNumber": "R1044",
        "queueDate": "2024-02-06T05:00:00+00:00",
        "inService": "2028-03-31T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Vermillion",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Cayuga Steam Station Switchyards 230kV and 345kV",
        "summerNetMW": 1040.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3957,
      "normalized": {
        "queue_id": "R5068",
        "county": "",
        "state": "",
        "transmission_owner": "",
        "poi": "",
        "queue_date": null,
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": "2023-10-20T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-11-27T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493588,
        "projectNumber": "R5068",
        "inService": "2023-11-27T05:00:00+00:00",
        "negInService": "2023-10-20T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3958,
      "normalized": {
        "queue_id": "R1054",
        "county": "Tazewell",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "E.D. Edwards 69kV",
        "queue_date": "2024-07-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 261.0,
        "summer_net_mw": 261.0,
        "winter_net_mw": 261.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493589,
        "projectNumber": "R1054",
        "queueDate": "2024-07-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-31T05:00:00+00:00",
        "inService": "2025-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "E.D. Edwards 69kV",
        "summerNetMW": 261.0,
        "winterNetMW": 261.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3959,
      "normalized": {
        "queue_id": "R5061",
        "county": "Sheboygan",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Edgewater 5 - 345kV",
        "queue_date": "2025-02-01T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493590,
        "projectNumber": "R5061",
        "queueDate": "2025-02-01T05:00:00+00:00",
        "inService": "2025-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Sheboygan",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Edgewater 5 - 345kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3960,
      "normalized": {
        "queue_id": "R1056",
        "county": "Tazewell",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "E.D. Edwards 138kV",
        "queue_date": "2024-07-12T04:00:00+00:00",
        "withdrawn_date": "2025-12-31T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 184.71,
        "summer_net_mw": 184.71,
        "winter_net_mw": 184.71,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493591,
        "projectNumber": "R1056",
        "queueDate": "2024-07-12T04:00:00+00:00",
        "withdrawnDate": "2025-12-31T05:00:00+00:00",
        "inService": "2025-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Tazewell",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "E.D. Edwards 138kV",
        "summerNetMW": 184.71,
        "winterNetMW": 184.71,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3961,
      "normalized": {
        "queue_id": "S1075",
        "county": "Jasper and Starke",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "poi": "Hinshaw 345 kV",
        "queue_date": "2024-12-20T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-12-27T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493592,
        "projectNumber": "S1075",
        "queueDate": "2024-12-20T05:00:00+00:00",
        "inService": "2027-12-27T05:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS",
        "county": "Jasper and Starke",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Hinshaw 345 kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3962,
      "normalized": {
        "queue_id": "R1046",
        "county": "Jefferson",
        "state": "",
        "transmission_owner": "DUKE ENERGY INDIANA, LLC",
        "poi": "Madison Substation 138kV",
        "queue_date": "2024-05-08T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493593,
        "projectNumber": "R1046",
        "queueDate": "2024-05-08T04:00:00+00:00",
        "inService": "2025-09-30T04:00:00+00:00",
        "transmissionOwner": "DUKE ENERGY INDIANA, LLC",
        "county": "Jefferson",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Madison Substation 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3963,
      "normalized": {
        "queue_id": "R1055",
        "county": "Peoria",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "E.D. Edwards 138kV",
        "queue_date": "2024-07-12T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 322.0,
        "summer_net_mw": 322.0,
        "winter_net_mw": 110.15,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493594,
        "projectNumber": "R1055",
        "queueDate": "2024-07-12T04:00:00+00:00",
        "inService": "2025-09-30T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Peoria",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "E.D. Edwards 138kV",
        "summerNetMW": 322.0,
        "winterNetMW": 110.15,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3964,
      "normalized": {
        "queue_id": "J2656",
        "county": "Macon",
        "state": "",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "4LATHAM-4N DEC E 138 kV",
        "queue_date": "2022-09-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "Not Started",
        "approval_date": null,
        "in_service": "2026-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "DPP-2022",
        "study_group": "Central",
        "study_phase": "Phase 2",
        "service_type": "NRIS",
        "dp1_eris_mw": 180.0,
        "dp1_nris_mw": 180.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493595,
        "projectNumber": "J2656",
        "queueDate": "2022-09-15T04:00:00+00:00",
        "inService": "2026-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Macon",
        "state": "",
        "studyCycle": "DPP-2022",
        "studyGroup": "Central",
        "studyPhase": "Phase 2",
        "svcType": "NRIS",
        "poiName": "4LATHAM-4N DEC E 138 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 180.0,
        "dp1NrisMw": 180.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": "Not Started"
      }
    },
    {
      "source_row_number": 3965,
      "normalized": {
        "queue_id": "R1048",
        "county": "Iberville",
        "state": "",
        "transmission_owner": "ENTERGY LOUISIANA, LLC ELTO",
        "poi": "Dow Meter Point",
        "queue_date": "2024-05-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 1231.73,
        "summer_net_mw": 0.0,
        "winter_net_mw": 1231.73,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-05-13T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493596,
        "projectNumber": "R1048",
        "queueDate": "2024-05-13T04:00:00+00:00",
        "inService": "2025-05-13T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC ELTO",
        "county": "Iberville",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Dow Meter Point",
        "summerNetMW": 0.0,
        "winterNetMW": 1231.73,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3966,
      "normalized": {
        "queue_id": "S1055",
        "county": "Beltrami",
        "state": "MN",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Wilton (endpoint 1) to Bagley (endpoint 2) 115kV",
        "queue_date": "2024-07-09T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2026-12-03T05:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493597,
        "projectNumber": "S1055",
        "queueDate": "2024-07-09T04:00:00+00:00",
        "inService": "2026-08-01T04:00:00+00:00",
        "negInService": "2026-12-03T05:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Beltrami",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Wilton (endpoint 1) to Bagley (endpoint 2) 115kV",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3967,
      "normalized": {
        "queue_id": "R1050",
        "county": "Scott",
        "state": "",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Blue Lake 115kV",
        "queue_date": "2024-05-31T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 135.5,
        "summer_net_mw": 135.5,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-04-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493598,
        "projectNumber": "R1050",
        "queueDate": "2024-05-31T04:00:00+00:00",
        "inService": "2027-04-01T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Scott",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Blue Lake 115kV",
        "summerNetMW": 135.5,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3968,
      "normalized": {
        "queue_id": "R1042",
        "county": "Linn",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Duane Arnold 161kV",
        "queue_date": "2022-10-22T04:00:00+00:00",
        "withdrawn_date": "2025-05-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 64.0,
        "summer_net_mw": 64.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2023-10-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493599,
        "projectNumber": "R1042",
        "queueDate": "2022-10-22T04:00:00+00:00",
        "withdrawnDate": "2025-05-13T04:00:00+00:00",
        "inService": "2023-10-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Linn",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "Duane Arnold 161kV",
        "summerNetMW": 64.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3969,
      "normalized": {
        "queue_id": "R1053",
        "county": "Milwaukee",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Elm Road",
        "queue_date": "2024-06-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 1138.0,
        "summer_net_mw": 1138.0,
        "winter_net_mw": 1138.0,
        "proposed_completion_date": null,
        "generation_type": "Gas",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493600,
        "projectNumber": "R1053",
        "queueDate": "2024-06-17T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Milwaukee",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "Elm Road",
        "summerNetMW": 1138.0,
        "winterNetMW": 1138.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Gas",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3970,
      "normalized": {
        "queue_id": "S1052",
        "county": "Cumberland",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Neoga South 138kV",
        "queue_date": "2024-06-14T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-09-22T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493601,
        "projectNumber": "S1052",
        "queueDate": "2024-06-14T04:00:00+00:00",
        "inService": "2026-09-22T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Cumberland",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Neoga South 138kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3971,
      "normalized": {
        "queue_id": "S1047",
        "county": "Codington",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY OTP",
        "poi": "Big Stone South 230kV",
        "queue_date": "2023-10-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "NO_CYCLE",
        "study_group": "NO_GROUP",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493602,
        "projectNumber": "S1047",
        "queueDate": "2023-10-13T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY OTP",
        "county": "Codington",
        "state": "SD",
        "studyCycle": "NO_CYCLE",
        "studyGroup": "NO_GROUP",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Big Stone South 230kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3972,
      "normalized": {
        "queue_id": "R1060",
        "county": "Green",
        "state": "",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "North Monroe 138 kV",
        "queue_date": "2025-01-22T05:00:00+00:00",
        "withdrawn_date": "2025-10-31T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493603,
        "projectNumber": "R1060",
        "queueDate": "2025-01-22T05:00:00+00:00",
        "withdrawnDate": "2025-10-31T04:00:00+00:00",
        "inService": "2027-11-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Green",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "North Monroe 138 kV",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3973,
      "normalized": {
        "queue_id": "S1058",
        "county": "Calhoun",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Stonehill Substation 138kV",
        "queue_date": null,
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 100.0,
        "summer_net_mw": 100.0,
        "winter_net_mw": 100.0,
        "proposed_completion_date": "2022-03-30T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493604,
        "projectNumber": "S1058",
        "inService": "2026-08-01T04:00:00+00:00",
        "negInService": "2022-03-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Calhoun",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Stonehill Substation 138kV",
        "summerNetMW": 100.0,
        "winterNetMW": 100.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3974,
      "normalized": {
        "queue_id": "S1050",
        "county": "Jefferson Davies",
        "state": "LA",
        "transmission_owner": "ENTERGY LOUISIANA, LLC",
        "poi": "Lake Charles Bulk 38kV Tap",
        "queue_date": "2024-04-04T04:00:00+00:00",
        "withdrawn_date": "2024-07-12T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 165.0,
        "summer_net_mw": 165.0,
        "winter_net_mw": 165.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493605,
        "projectNumber": "S1050",
        "queueDate": "2024-04-04T04:00:00+00:00",
        "withdrawnDate": "2024-07-12T04:00:00+00:00",
        "inService": "2026-05-31T04:00:00+00:00",
        "transmissionOwner": "ENTERGY LOUISIANA, LLC",
        "county": "Jefferson Davies",
        "state": "LA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Lake Charles Bulk 38kV Tap",
        "summerNetMW": 165.0,
        "winterNetMW": 165.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3975,
      "normalized": {
        "queue_id": "R1058",
        "county": "Jefferson",
        "state": "",
        "transmission_owner": "AMEREN MISSOURI",
        "poi": "Rush Island Plant – 345kV Switchyard (Existing) Bus Number in Power Flow",
        "queue_date": "2024-08-16T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-09-25T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS-Only",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493606,
        "projectNumber": "R1058",
        "queueDate": "2024-08-16T04:00:00+00:00",
        "inService": "2025-09-25T04:00:00+00:00",
        "transmissionOwner": "AMEREN MISSOURI",
        "county": "Jefferson",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS-Only",
        "poiName": "Rush Island Plant – 345kV Switchyard (Existing) Bus Number in Power Flow",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3976,
      "normalized": {
        "queue_id": "J544",
        "county": "",
        "state": "LA",
        "transmission_owner": "",
        "poi": "",
        "queue_date": null,
        "withdrawn_date": null,
        "status": "LEGACY: Done",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": "2021-09-15T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "In Service",
        "approval_date": null,
        "in_service": "2018-09-01T04:00:00+00:00",
        "gia_to_execute": "2018-01-12T05:00:00+00:00",
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 98.1,
        "dp1_nris_mw": 98.1,
        "dp2_eris_mw": 98.1,
        "dp2_nris_mw": 98.1,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493607,
        "projectNumber": "J544",
        "inService": "2018-09-01T04:00:00+00:00",
        "giaToExec": "2018-01-12T05:00:00+00:00",
        "negInService": "2021-09-15T04:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "LA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 98.1,
        "dp1NrisMw": 98.1,
        "dp2ErisMw": 98.1,
        "dp2NrisMw": 98.1,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "LEGACY: Done",
        "sisPhase1": "",
        "postGIAStatus": "In Service"
      }
    },
    {
      "source_row_number": 3977,
      "normalized": {
        "queue_id": "S1065",
        "county": "Washtenaw County",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Majestic 345kV to Milan 345kV",
        "queue_date": "2024-10-07T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 76.5,
        "summer_net_mw": 76.5,
        "winter_net_mw": 76.5,
        "proposed_completion_date": "2028-09-30T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2028-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493608,
        "projectNumber": "S1065",
        "queueDate": "2024-10-07T04:00:00+00:00",
        "inService": "2028-09-30T04:00:00+00:00",
        "negInService": "2028-09-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw County",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Majestic 345kV to Milan 345kV",
        "summerNetMW": 76.5,
        "winterNetMW": 76.5,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3978,
      "normalized": {
        "queue_id": "S1046",
        "county": "Codington",
        "state": "SD",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "Big Stone South 230kV",
        "queue_date": "2023-10-13T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 120.0,
        "summer_net_mw": 120.0,
        "winter_net_mw": 120.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493609,
        "projectNumber": "S1046",
        "queueDate": "2023-10-13T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "Codington",
        "state": "SD",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Big Stone South 230kV",
        "summerNetMW": 120.0,
        "winterNetMW": 120.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3979,
      "normalized": {
        "queue_id": "S1045",
        "county": "Emmons",
        "state": "ND",
        "transmission_owner": "MONTANA-DAKOTA UTILITIES CO.",
        "poi": "Napoleon SW 230 kV (661091)",
        "queue_date": "2023-09-17T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 170.0,
        "summer_net_mw": 170.0,
        "winter_net_mw": 170.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2024-03-02T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493610,
        "projectNumber": "S1045",
        "queueDate": "2023-09-17T04:00:00+00:00",
        "inService": "2024-03-02T05:00:00+00:00",
        "transmissionOwner": "MONTANA-DAKOTA UTILITIES CO.",
        "county": "Emmons",
        "state": "ND",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Napoleon SW 230 kV (661091)",
        "summerNetMW": 170.0,
        "winterNetMW": 170.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3980,
      "normalized": {
        "queue_id": "S1054",
        "county": "Cottonwood",
        "state": "MN",
        "transmission_owner": "NORTHERN STATES POWER COMPANY",
        "poi": "Lakefield Junction 345kV",
        "queue_date": "2024-07-19T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 300.0,
        "summer_net_mw": 300.0,
        "winter_net_mw": 300.0,
        "proposed_completion_date": "2028-05-31T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-10-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493611,
        "projectNumber": "S1054",
        "queueDate": "2024-07-19T04:00:00+00:00",
        "inService": "2027-10-30T04:00:00+00:00",
        "negInService": "2028-05-31T04:00:00+00:00",
        "transmissionOwner": "NORTHERN STATES POWER COMPANY",
        "county": "Cottonwood",
        "state": "MN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Lakefield Junction 345kV",
        "summerNetMW": 300.0,
        "winterNetMW": 300.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3981,
      "normalized": {
        "queue_id": "S1059",
        "county": "Tuscola",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Dixon 120kV - Bus # 265182",
        "queue_date": "2024-07-26T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 100.3,
        "summer_net_mw": 100.3,
        "winter_net_mw": 100.3,
        "proposed_completion_date": "2013-11-18T05:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-01-30T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493612,
        "projectNumber": "S1059",
        "queueDate": "2024-07-26T04:00:00+00:00",
        "inService": "2027-01-30T05:00:00+00:00",
        "negInService": "2013-11-18T05:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Tuscola",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Dixon 120kV - Bus # 265182",
        "summerNetMW": 100.3,
        "winterNetMW": 100.3,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3982,
      "normalized": {
        "queue_id": "S1061",
        "county": "Midland",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "Redstone 138 kV - Bus #256543",
        "queue_date": "2024-08-01T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 50.0,
        "summer_net_mw": 50.0,
        "winter_net_mw": 50.0,
        "proposed_completion_date": "2026-09-30T04:00:00+00:00",
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493613,
        "projectNumber": "S1061",
        "queueDate": "2024-08-01T04:00:00+00:00",
        "inService": "2026-09-30T04:00:00+00:00",
        "negInService": "2026-09-30T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Midland",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Redstone 138 kV - Bus #256543",
        "summerNetMW": 50.0,
        "winterNetMW": 50.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3983,
      "normalized": {
        "queue_id": "S1070",
        "county": "Union",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "ROUNDHOUSEJ1",
        "queue_date": null,
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-08-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493614,
        "projectNumber": "S1070",
        "inService": "2025-08-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Union",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "ROUNDHOUSEJ1",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3984,
      "normalized": {
        "queue_id": "R5062",
        "county": "Jasper",
        "state": "IN",
        "transmission_owner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "poi": "SCHAHFER GEN STA",
        "queue_date": "2024-12-23T05:00:00+00:00",
        "withdrawn_date": "2026-04-13T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 732.73,
        "summer_net_mw": 732.73,
        "winter_net_mw": 732.73,
        "proposed_completion_date": null,
        "generation_type": "Hybrid",
        "facility_type": "Combustion Turbine (Simple Cycle)",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493615,
        "projectNumber": "R5062",
        "queueDate": "2024-12-23T05:00:00+00:00",
        "withdrawnDate": "2026-04-13T04:00:00+00:00",
        "transmissionOwner": "NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC",
        "county": "Jasper",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "SCHAHFER GEN STA",
        "summerNetMW": 732.73,
        "winterNetMW": 732.73,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "Hybrid",
        "facilityType": "Combustion Turbine (Simple Cycle)",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3985,
      "normalized": {
        "queue_id": "S1048",
        "county": "Logan",
        "state": "IL",
        "transmission_owner": "AMEREN ILLINOIS",
        "poi": "Fogarty Substation 138kV",
        "queue_date": "2023-10-30T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 40.0,
        "summer_net_mw": 40.0,
        "winter_net_mw": 40.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-05-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493616,
        "projectNumber": "S1048",
        "queueDate": "2023-10-30T04:00:00+00:00",
        "inService": "2025-05-01T04:00:00+00:00",
        "transmissionOwner": "AMEREN ILLINOIS",
        "county": "Logan",
        "state": "IL",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Fogarty Substation 138kV",
        "summerNetMW": 40.0,
        "winterNetMW": 40.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3986,
      "normalized": {
        "queue_id": "S1049",
        "county": "Sunflower",
        "state": "MS",
        "transmission_owner": "ENTERGY MISSISSIPPI, LLC.",
        "poi": "Shaw to Indianola 115kV Line Tap",
        "queue_date": "2024-04-04T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-08-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493617,
        "projectNumber": "S1049",
        "queueDate": "2024-04-04T04:00:00+00:00",
        "inService": "2026-08-30T04:00:00+00:00",
        "transmissionOwner": "ENTERGY MISSISSIPPI, LLC.",
        "county": "Sunflower",
        "state": "MS",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Shaw to Indianola 115kV Line Tap",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3987,
      "normalized": {
        "queue_id": "S1062",
        "county": "Branch",
        "state": "MI",
        "transmission_owner": "METC",
        "poi": "New Byers 138kV",
        "queue_date": "2024-08-15T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-10-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493618,
        "projectNumber": "S1062",
        "queueDate": "2024-08-15T04:00:00+00:00",
        "inService": "2026-10-15T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Branch",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "New Byers 138kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3988,
      "normalized": {
        "queue_id": "S1056",
        "county": "Columbia",
        "state": "WI",
        "transmission_owner": "AMERICAN TRANSMISSION COMPANY",
        "poi": "Columbia 345kV",
        "queue_date": "2024-07-15T04:00:00+00:00",
        "withdrawn_date": "2025-04-09T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493619,
        "projectNumber": "S1056",
        "queueDate": "2024-07-15T04:00:00+00:00",
        "withdrawnDate": "2025-04-09T04:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "AMERICAN TRANSMISSION COMPANY",
        "county": "Columbia",
        "state": "WI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Columbia 345kV",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3989,
      "normalized": {
        "queue_id": "R1037",
        "county": "Allamakee",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "ITCM Lansing 161kV",
        "queue_date": "2023-09-28T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Withdrawn",
        "capacity_mw": 180.0,
        "summer_net_mw": 180.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-02-28T05:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493620,
        "projectNumber": "R1037",
        "queueDate": "2023-09-28T04:00:00+00:00",
        "inService": "2026-02-28T05:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Allamakee",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "ITCM Lansing 161kV",
        "summerNetMW": 180.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3990,
      "normalized": {
        "queue_id": "S1087",
        "county": "Clinton",
        "state": "",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Rock Creek 345 kV",
        "queue_date": "2025-02-18T05:00:00+00:00",
        "withdrawn_date": null,
        "status": "Active",
        "capacity_mw": 150.0,
        "summer_net_mw": 150.0,
        "winter_net_mw": 150.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-06-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493621,
        "projectNumber": "S1087",
        "queueDate": "2025-02-18T05:00:00+00:00",
        "inService": "2026-06-01T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Clinton",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Rock Creek 345 kV",
        "summerNetMW": 150.0,
        "winterNetMW": 150.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Active",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3991,
      "normalized": {
        "queue_id": "S1064",
        "county": "",
        "state": "ND",
        "transmission_owner": "OTTER TAIL POWER COMPANY",
        "poi": "EDGE SS9 41.6 kV",
        "queue_date": "2024-09-06T04:00:00+00:00",
        "withdrawn_date": "2026-06-23T04:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 20.0,
        "summer_net_mw": 20.0,
        "winter_net_mw": 20.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2026-11-01T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493622,
        "projectNumber": "S1064",
        "queueDate": "2024-09-06T04:00:00+00:00",
        "withdrawnDate": "2026-06-23T04:00:00+00:00",
        "inService": "2026-11-01T04:00:00+00:00",
        "transmissionOwner": "OTTER TAIL POWER COMPANY",
        "county": "",
        "state": "ND",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "EDGE SS9 41.6 kV",
        "summerNetMW": 20.0,
        "winterNetMW": 20.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3992,
      "normalized": {
        "queue_id": "R1041",
        "county": "Wayne",
        "state": "",
        "transmission_owner": "METC",
        "poi": "TCHPP Position JC 120kV",
        "queue_date": "2023-10-11T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 220.0,
        "summer_net_mw": 220.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2025-05-31T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "NRIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493623,
        "projectNumber": "R1041",
        "queueDate": "2023-10-11T04:00:00+00:00",
        "inService": "2025-05-31T04:00:00+00:00",
        "transmissionOwner": "METC",
        "county": "Wayne",
        "state": "",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "NRIS",
        "poiName": "TCHPP Position JC 120kV",
        "summerNetMW": 220.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3993,
      "normalized": {
        "queue_id": "S1051",
        "county": "Worth",
        "state": "IA",
        "transmission_owner": "ITC MIDWEST",
        "poi": "Worth County Substation 161kV",
        "queue_date": "2024-06-03T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 80.0,
        "summer_net_mw": 80.0,
        "winter_net_mw": 80.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2029-03-15T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493624,
        "projectNumber": "S1051",
        "queueDate": "2024-06-03T04:00:00+00:00",
        "inService": "2029-03-15T04:00:00+00:00",
        "transmissionOwner": "ITC MIDWEST",
        "county": "Worth",
        "state": "IA",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Worth County Substation 161kV",
        "summerNetMW": 80.0,
        "winterNetMW": 80.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3994,
      "normalized": {
        "queue_id": "J446",
        "county": "",
        "state": "IN",
        "transmission_owner": "",
        "poi": "",
        "queue_date": null,
        "withdrawn_date": "2023-02-21T05:00:00+00:00",
        "status": "Withdrawn",
        "capacity_mw": 0.0,
        "summer_net_mw": 0.0,
        "winter_net_mw": 0.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": null,
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493625,
        "projectNumber": "J446",
        "withdrawnDate": "2023-02-21T05:00:00+00:00",
        "transmissionOwner": "",
        "county": "",
        "state": "IN",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "",
        "poiName": "",
        "summerNetMW": 0.0,
        "winterNetMW": 0.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Withdrawn",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    },
    {
      "source_row_number": 3995,
      "normalized": {
        "queue_id": "S1067",
        "county": "Washtenaw",
        "state": "MI",
        "transmission_owner": "ITC",
        "poi": "Majestic- Lemoyne 345 kV",
        "queue_date": "2024-10-02T04:00:00+00:00",
        "withdrawn_date": null,
        "status": "Done",
        "capacity_mw": 75.0,
        "summer_net_mw": 75.0,
        "winter_net_mw": 75.0,
        "proposed_completion_date": null,
        "generation_type": "",
        "facility_type": "",
        "post_gia_status": "",
        "approval_date": null,
        "in_service": "2027-09-30T04:00:00+00:00",
        "gia_to_execute": null,
        "study_cycle": "",
        "study_group": "",
        "study_phase": "",
        "service_type": "SIS",
        "dp1_eris_mw": 0.0,
        "dp1_nris_mw": 0.0,
        "dp2_eris_mw": 0.0,
        "dp2_nris_mw": 0.0,
        "sis_phase1": ""
      },
      "raw": {
        "id": 3493626,
        "projectNumber": "S1067",
        "queueDate": "2024-10-02T04:00:00+00:00",
        "inService": "2027-09-30T04:00:00+00:00",
        "transmissionOwner": "ITC",
        "county": "Washtenaw",
        "state": "MI",
        "studyCycle": "",
        "studyGroup": "",
        "studyPhase": "",
        "svcType": "SIS",
        "poiName": "Majestic- Lemoyne 345 kV",
        "summerNetMW": 75.0,
        "winterNetMW": 75.0,
        "dp1ErisMw": 0.0,
        "dp1NrisMw": 0.0,
        "dp2ErisMw": 0.0,
        "dp2NrisMw": 0.0,
        "fuelType": "",
        "facilityType": "",
        "applicationStatus": "Done",
        "sisPhase1": "",
        "postGIAStatus": ""
      }
    }
  ]
}
